RERA projects past their possession deadline
11,768 MahaRERA-registered projects are past the possession date currently on file and still report under 100% construction progress. Both figures are the promoter's own disclosure to the regulator.
Page 51 of 59
- Aditi Sadan CHSL1.6 yr overdueKelkar Pinnac Housing LLP · Sanewadi Aundh, PuneP52100045268· 81.8% built
- ELIXIR GIRIK1.6 yr overdueELIXIR BUILDERS · CHANDSHI, NashikP51600033898· 90.9% built
- Anjani Tirth1.6 yr overdueGeeta Space Realtors · Borivali (West), Mumbai SuburbanP51800033828· 90.9% built
- Panvelkar Estate - Stanford - Phase II - R1 - B1.6 yr overduePanvelkar Infrastructures Private Limited · Mankivali, ThaneP51700031879· 90.9% built
- Shree Rajrajeshwari Chhaya Chs Ltd.1.6 yr overdueSUNIL DINKAR SHINDE · Bhandup East, Mumbai SuburbanP51800032685· 90.9% built
- Park Infinia - L1, K3 and I41.6 yr overdueKumar Properties and Real Estate Pvt. Ltd. · Hadapsar, PuneP52100045667· 86.2% built
- ALAG ARANYA1.6 yr overdueALAG AARCHIE LLP · Panth Nagar, Mumbai SuburbanP51800032034· 90.9% built
- KARMA PALACE1.6 yr overdueSHREE SAI DEVELOPERS · TEMBHODE, PalgharP99000031586· 90.9% built
- VEDRITI1.6 yr overdueSURENDRA BAPUSAHEB PATHARE · Chandan NagarP52100030287· 78.2% built
- CITI NEST1.6 yr overdueBasons Investments Private Limited · ANDHERI - EAST, Mumbai SuburbanP51800049340· 36.8% built
- NIDHI REALTY PHASE I1.6 yr overdueLALIT NAGINDAS DOSHI · Vasai, PalgharP99000002258· filed Dec 2018 → now Dec 2024· 80.2% built
- SHIV RESIDENCY1.6 yr overdueM AND K BUILDERS · VAKHARBHAG, SangliP53100032201· filed Dec 2023 → now Dec 2024· 90.9% built
- VENKATESH VIOM1.6 yr overdueSHREE VENKATESH DEVELOPERS · BHUSARI COLONY, PuneP52100030481· 90.9% built
- PANCHARATNA HEIGHTS1.6 yr overduePANCHARATNA BUILDERS · NEAR MAULI LAWNS, NashikP51600033520· 82.5% built
- Lotus Residency1.6 yr overdueLotus Logistics and Developers pvt ltd · Mumbai, Mumbai SuburbanP51800006322· filed Jun 2021 → now Dec 2024· 80.9% built· 2 complaints
- RBI Employees Awantika Co Op Hsg Soc Ltd1.6 yr overdueGOVIND OJASS EDIFICE PVT. LTD. · Naupada, ThaneP51700048962· 72.7% built
- ALAG ARTIS1.6 yr overdueALAG LIFESPACE LLP · GHATKOPAR EAST, Mumbai SuburbanP51800032385· 84.5% built
- NEELKANTH RESIDENCY PHASE - II1.6 yr overdueSHIVSHAKTI ASSOCIATES · CHIKHALI, PuneP52100033196· 88.2% built
- B-ORBIT PALMS1.6 yr overdueB Orbit Group · KALA NAGAR LANE NO 5, NashikP51600029811· 72.7% built
- YASH HEIGHTS1.6 yr overdueDEELIPRAO DAULATRAO DEORE · KAMATHWADE, NashikP51600046131· 9.1% built
- Prakash B Zone1.6 yr overduePrakash Ventures · Moshi , Sec-4 (Pradhikaran), PuneP52100047362· 81.8% built
- SEQUOIA1.6 yr overdueAUM PRIMA LLP · Andheri, Mumbai SuburbanP51800032970· 56.8% built
- MITRAKUNJ1.6 yr overdueKishor B Sancheti · Parvati, PuneP52100049348· 72.7% built
- NAVKAR RESIDENCY1.6 yr overdueVINOD RAMANLAL DHADIWAL · SUSHILA PARK, PuneP52100048714· 64.5% built
- MADHUKUNJ1.6 yr overdueNAKSHATRA CREATIONS · JEVHERI COLONY, PuneP52100048351· 49.1% built
- SHANTI HEIGHTS1.6 yr overdueSUNNY DEVELOPERS · MULUND WEST, Mumbai SuburbanP51800032643· 97.7% built
- Grande View 7 Capital1.6 yr overdueChirag Developers · Ambegaon Budruk, PuneP52100001308· filed Dec 2018 → now Dec 2024· 90.9% built
- GAMI SOLITAIRE1.6 yr overdueANIL LAXMAN GAMI · KOPARKHAIRANE, ThaneP51700045909· 9.1% built
- Pragati Revanta1.6 yr overduePragati Enterprises · Ghatkopar, Mumbai SuburbanP51800032025· 90.9% built
- VARDHMAN PEARL1.6 yr overdueDIWALI DEVELOPERS · MALAD WEST, Mumbai SuburbanP51800032809· 36.4% built
- ROHIT CO-OP HOUSING SOCIETY LTD1.6 yr overdueVEDANT CONSTRUCTION · Panchpakhadi, ThaneP51700045536· 89.1% built
- BHASKAR VASTUPURTI1.6 yr overduePRATIK BUILDCON · AURANGABAD, AurangabadP51500005068· filed Dec 2018 → now Dec 2024· 51.8% built
- Teerth Avila1.6 yr overdueVIJAY TUKARAM RAUNDAL · Parkhe Vasti, PuneP52100034662· 62.7% built· 1 complaint
- Eraville Phase I1.6 yr overdueNeha Constructions · Sadesataranali Hadapsar, PuneP52100016089· filed Jun 2021 → now Dec 2024· 70.7% built
- GANDHARV GALAXIA1.6 yr overdueGANDHARV REALTY · HADAPSAR, PuneP52100009123· filed Dec 2019 → now Dec 2024· 90.9% built
- ELEGANT-91.6 yr overduePRADEEP KASHINATH BHINGARE · Haveli, PuneP52100034293· 27.3% built
- ROONGTA FLORENZA APARTMENT1.6 yr overdueROONGTA HOMES LLP · NASHIK, NashikP51600033635· 89.1% built· 3 complaints
- AUDUMBAR APARTMENTS CHS LTD1.6 yr overdueMASAKIN DEVELOPERS · MALAD WEST MUMBAI, Mumbai SuburbanP51800034993· 90.9% built
- Bileshwar Darshan CHSL1.6 yr overdueM/s. Desai Residency Private Limited · Vile Parle East, Mumbai SuburbanP51800047797· 90.9% built
- NANDANVAN1.6 yr overduePRIDE REALTY · KIRKATWADI, PuneP52100032704· 90.9% built
- NYATI ELAN CENTRAL II1.6 yr overduePSQUARE BUILDERS LLP · WAGHOLI, PuneP52100031800· 78.2% built
- RUNWAL PEARL1.6 yr overdueRunwal Construction Private Limited · Thane, ThaneP51700001383· filed May 2019 → now Dec 2024· 95.5% built· 6 complaints
- KUMAR PRISM1.6 yr overdueKUMAR PROPERTIES AND PROMOTERS PRIVATE LIMITED · MUNDHAWA, PuneP52100034109· 36.4% built
- ABHANG HEIGHTS B BUILDING1.6 yr overdueR K Lunkad Housing Company · Chovisawadi Pimpri Chinchwad (M.corp), PuneP52100031783· 90.9% built
- SHRESHTHA SWAPNA CO-OP HOUSING SOCIETY LTD1.6 yr overdueOM SHREE SAI BUILDERS AND DEVELOPERS · Taluka Ambarnath, ThaneP51700031812· 46.8% built
- SAIKRUPA1.6 yr overdueSaidutta Developers · MOUJE-SATURNA, AmravatiP50300032125· 69.1% built
- SMITA APARTMENT1.6 yr overdueFORTUNE DEVELOPERS · CTS NO 40/2 ERANDWANE, FINAL PLOT NO 56 SUB PLOT NO 2, ERANDWANE, PUNE-411004, PuneP52100033240· 70% built
- INDRAYANI PURAM1.6 yr overdueSHIVKRUPA DEVELOPERS · CHOVISAWADI, PuneP52100034310· 64.1% built
- VATSALYA PURAM BUILDING A1.6 yr overdueNANDAN DEVELOPERS · KUMBARE TOWNSHIP, PuneP52100033502· 99.8% built
- A R IMPERIA1.6 yr overdueA R REALTY · WAKAD, PuneP52100032942· 78.6% built· 3 complaints
- RAVEERA1.6 yr overdueINFINITY LANDMARKS · PIMPLE NILAKH, PuneP52100032611· 62.3% built
- Kalpataru Jade Residences D1.6 yr overdueAstrum Developments Private Limited · Baner, PuneP52100029693· 80.5% built· 1 complaint
- MONSOON MIST1.6 yr overdueNITIN DAYALAL KOTHARI · Igatpuri, NashikP51600019135· filed Mar 2020 → now Dec 2024· 81.8% built
- MANGALMURTI HERITAGE1.6 yr overdueSANJAM DEVELOPERS · DAHIVALI TARFE NEED, RaigarhP52000048848· 90.9% built
- BHOOMI CELESTIA - A WING1.6 yr overdueSASHWAT CONSTRUWELL PRIVATE LIMITED · Librity Garden, Opp. S.N.D.T. Girls Collage, Mumbai SuburbanP51800011623· filed Dec 2022 → now Dec 2024· 30.5% built
- FIA CONSTRUCTION COMPANY A/C FIA ENCLAVE1.6 yr overdueNIMISH LAXMICHAND PASAD · Palghar, PalgharP99000029790· 90.9% built
- NILKANTH DHAM1.6 yr overdueNILKANTH INFRA · MAKHAMALABAD, NashikP51600030816· 90.9% built
- NIRMAN KANCHANGANGA1.6 yr overdueNIRMAN BUILDERS · PARVATI, PuneP52100030471· 90.9% built
- SHARAWATI APARTMENTS1.6 yr overdueRANADE REALTORS LLP · KOTHRUD, PuneP52100030474· 81.8% built
- Elina1.6 yr overdueTulip Venture · Pimple Nilakh, PuneP52100048472· 72.7% built
- KANTHARIA LAKESIDE1.6 yr overduePROACTIVE HOUSING LLP · Vasai, PalgharP99000020016· filed Dec 2022 → now Dec 2024· 81.8% built
- OM DATTATRAY CHS LTD1.6 yr overdueSHIV SHAKTI DEVELOPERS · SHIV GANGA NAGAR, ThaneP51700048053· 72.7% built
- Shree Jalaram Heights1.6 yr overdueNitinkumar Chhaganlal Ganatra · Ward No. 12, BuldanaP50000032877· 81.8% built
- Tirupati Vishwa1.6 yr overdueSAI DEVELOPERS · Mahanagar 1, AurangabadP51500034327· 90.9% built
- Jindal Avenue1.6 yr overdueJindal Builders and Developers · PANVEL, RaigarhP52000031962· 81.8% built
- ANNAVISTA1.6 yr overdueTRISONS BUILDERS · BANDRA WEST, Mumbai SuburbanP51800034372· 74.1% built
- UNIQUE PRIDE1.6 yr overdueAKSHAD INFRASTRUCTURE AND DEVELOPERS · MOLACH ODHA, SataraP52700032387· 90.9% built
- Ark One1.6 yr overdueIYI Milestone Realities LLP · Haveli, PuneP52100045548· 90.9% built
- MAXX GLORY1.6 yr overdueMAXX BUILDER AND DEVELOPERS · MANISH NAGAR AREA, NagpurP50500022443· filed Sept 2024 → now Dec 2024· 86.7% built
- MAITRY HEIGHTS1.6 yr overdueRAJ MAITRY & ESKON DEVELOPERS · Vasai, PalgharP99000005628· filed Jul 2019 → now Dec 2024· 56.7% built
- Kalp Avenue1.6 yr overdueSuccess Aashirwad Infra · Moshi, PuneP52100029616· 50.9% built
- BORIVALI SHALIMAR CO-OPERATIVE HOUSING SOCIETY LIMITED1.6 yr overdueTASMAI SHREE · Borivali, Mumbai SuburbanP51800045551· 90.9% built
- SHUBHAM AVALON CO-OPERATIVE HOUSING SOCIETY LIMITED1.6 yr overdueAVVAD HOUSING LLP · GHATKOPAR EAST, Mumbai SuburbanP51800045851· 90.9% built
- Khol Khandoba Tower1.6 yr overduePride Group · Khol Khandoba, KolhapurP53000029324· 0.9% built
- PUSHP-VATIKA1.6 yr overdueANISH SHAH & MANISH SHAH · Andheri, Mumbai SuburbanP51800031796· 85% built
- CRESCENTPOINT-II1.6 yr overdueK K CONSTRUCTION · KALAWATI MANDIR AREA, PalgharP99000020521· filed Dec 2022 → now Dec 2024· 90.9% built
- TruSpace Prima Angulus1.6 yr overdueAtharva Enterprises · Balewadi, PuneP52100029972· 98.2% built
- YASHODA COMPLEX1.6 yr overdueCHAITANYA MAHADEV GHULE · AMBEGAON BK, PuneP52100048559· 81.4% built
- The Palm1.6 yr overdueISHWARLAL MULJI PATEL · Agartakli, NashikP51600031552· 22.7% built
- SUKRUTI NILAYA1.6 yr overdueSUKRUTI CONSTRUCTIONS · GANGAPUR ROAD, NashikP51600048811· 11.8% built
- Kumar Samruddhi A6 and A7 Building1.6 yr overdueVed Real Estate Developers Pvt Ltd · Sidheshwar NagarP52100030526· 38.6% built· 1 complaint
- SUYASH CO.OP. HOUSING SOCIETY LTD1.6 yr overdueSNA Build-Tech · Thane, ThaneP51700030476· 87.3% built
- Vitthal Shanti1.6 yr overdueVitthal Shant Enterprises · Somvar Peth, PuneP52100050241· filed Dec 2024 → now Jan 2025· 81.8% built
- SUPREME MADHUKAR1.6 yr overdueSUPREME ENTERPRISE · BORIVALI, Mumbai SuburbanP51800032692· 86.8% built
- APEX DEVELOPERS1.6 yr overdueAPEX DEVELOPERS · Vasai-Virar City (M Corp), PalgharP99000007741· filed Jun 2022 → now Jan 2025· 70.9% built
- DIYA WOODS1.6 yr overdueKRISHA ENTERPRISES · TITWALA, ThaneP51700021634· filed Dec 2022 → now Jan 2025· 89.1% built
- LAXMISHRIHARI COMPLEX1.6 yr overdueAbhishek Nandkumar Phadke · Shukrawar Peth, SataraP52700051893· 33.6% built· 1 complaint
- Shree Ganesh Northstar1.6 yr overdueSHREE GANESH BUILDERS LIMITED · Dixit Nagar, NagpurP50500024282· 86% built
- VED VIHAR PHASE II - BUILDING NO. 41.6 yr overdueROHAN PATE GROUP OF CONSTRUCTIONS LLP · Kothrud, PuneP52100012713· filed Dec 2021 → now Jan 2025· 95.6% built· 2 complaints
- Agastya sea view apartments1.6 yr overdueM/s Phatak Developers · Harne, RatnagiriP52800033048· filed Dec 2024 → now Jan 2025· 61.4% built
- SIDDHESHWAR HEIGHTS A WING FROM 2nd TO 14th FLOOR1.6 yr overdueSHREE JAI MALHAR ENTERPRISES · Kalyan, ThaneP51700031142· filed Dec 2024 → now Jan 2025· 37.5% built
- YASHADA SPLENDID PARK1.5 yr overdueYASHADA DEVELOPERS · Dudulgaon, PuneP52100021070· 95.2% built
- ROHAN HEIGHTS1.5 yr overdueSANJAY RAMCHANDRA JADHAV · KOYANAVASAHAT, SataraP52700031672· filed Dec 2023 → now Jan 2025· 90.9% built
- BORIVALI NEELKANTH NAGAR CHS LTD1.5 yr overdueMAHAVIR INFRASTRUCTURE · Borivali, Mumbai SuburbanP51800006154· filed Dec 2020 → now Jan 2025· 90.9% built
- LAXMI HEIGHTS1.5 yr overdueNASALAPURE KULKARNI BUILDERS AND DEVELOPERS · Laxmi Nagar Kupwad, SangliP53100034987· 63.6% built
- SAI HEIGHTS APARTMENT1.5 yr overdueSHRI SAI CONSTRUCTION · SHANI CHOWK SHRAMIK NAGAR, NashikP51600033867· 90.9% built
- NYSA BUSINESS CENTER1.5 yr overdueR D BUILDWELL · MAKHAMALABAD, NashikP51600029342· 90.9% built
- ROONGTA ASHOK VIHAR APARTMENT1.5 yr overdueSHREE CHAWO SATI BUILDERS PRIVATE LIMITED · NASHIK, NashikP51600046725· 81.8% built
- Rose Castle1.5 yr overdueRose Crystal Developers · Borhadewadi, PuneP52100030687· filed Jul 2024 → now Jan 2025· 20% built
- RACHANA EKAA1.5 yr overdueRachana construction Co. (Nagpur) Pvt. Ltd. · MOUZA CHINCHBHUVAN, NagpurP50500034119· filed Mar 2024 → now Jan 2025· 90.5% built
- BHOLEBABA HEIGHTS1.5 yr overdueSHARAD DINKAR DESHMUKH · MAKHMALABAD SHIWAR, NASHIK, NashikP51600035162· 84.1% built
- JOYVILLE HADAPSAR ANNEXE PHASE 11.5 yr overdueJoyville Shapoorji Housing Private Limited · Shewalewadi, PuneP52100026451· 90.9% built· 3 complaints
- Bank of Maharashtra Employees Manisha Co-Operative Housing Society Limited1.5 yr overdueJ B Constructions · Tilak nagar, ThaneP51700050442· 90.9% built
- GHATKOPAR PARK VIEW CHS LIMITED1.5 yr overdueEV AND SARAF REALTY · KURLA, Mumbai SuburbanP51800014255· filed Dec 2019 → now Jan 2025· 86.4% built
- Joyville Hadapsar Annexe Phase 21.5 yr overdueJoyville Shapoorji Housing Private Limited · Shewalewadi, PuneP52100026479· 90.9% built· 1 complaint
- Joyville Hadapsar Annexe Phase 31.5 yr overdueJoyville Shapoorji Housing Private Limited · Shewalewadi, PuneP52100026480· 90.9% built· 3 complaints
- Kumar Pratham - A B C and Shops1.5 yr overdueKumar Agro Products Pvt Ltd · Moshi - Borhadewadi, PuneP52100022486· 97.7% built
- Sahavas Apartments1.5 yr overdueYojak Developers · Osmanpura, AurangabadP51500019967· filed Jul 2021 → now Feb 2025· 90.7% built
- The Greens - Radhakunj1.5 yr overdueEthics Infra Development Pvt Ltd · Kandivali East, Mumbai SuburbanP51800029355· filed May 2024 → now Feb 2025· 90% built
- RAHUL CO.OP. HOUSING SOCIETY LTD1.5 yr overdueSNA Build-Tech · PANCHPAKHADI, ThaneP51700030595· 80% built
- Primo 1121.5 yr overdueLuxora Infrastructure Private Limited · Mauza, NagpurP50500010660· filed Dec 2019 → now Feb 2025· 90.9% built
- VIGHNARAJ1.5 yr overduePATIL MAHAJAN · MOJE SATARE BHUSAWAL, JalgaonP49900051886· 16.4% built
- Mittal Park1.5 yr overdueAllwin Buildcon · Nandur Naka, NashikP51600022317· 85.1% built
- SYMPHONY APARTMENTS1.5 yr overdueAakar Constructions · VITTHAL NAGAR, HADAPSAR, PuneP52100034426· 64.5% built
- PARAS HEIGHTS1.5 yr overdueSUSHILP BUILDERS · PHALTAN, SataraP52700028909· filed Mar 2023 → now Feb 2025· 28.2% built
- SHIVSRUSHTI ANNEX1.4 yr overdueVISHAL LAXMAN GADEKAR · MAKHMALABAD, NashikP51600034167· 90.9% built
- Nabhraj Trimurti1.4 yr overdueNABHRAJ BUILDERS AND DEVELOPERS PVT LTD · Shreyanagar, Osmanpura, AurangabadP51500047311· 90.9% built
- REDEVELOPMENT OF PLOT NO. 2121.4 yr overduePRANAV CONSTRUCTIONS LIMITED · MUMBAI, Mumbai SuburbanP51800034087· 90.9% built
- GIRIRAJ RESIDENCY1.4 yr overdueGREENSTONE INFRASTRUCTURE · ZINGABAI TAKLI NAGPUR, NagpurP50500033121· 90.9% built
- Megapolis Mystic - F1.4 yr overduePegasus Properties Pvt. Ltd. · Rajiv Gandhi Infotech Park Phase 3, PuneP52100029121· filed Jan 2025 → now Feb 2025· 90.9% built
- SHUBH REGENCY1.4 yr overdueSHUBH ENTERPRISE · MULUND, Mumbai SuburbanP51800003145· filed Jun 2022 → now Feb 2025· 90.9% built· 2 complaints
- DHANRAJ1.4 yr overdueANEISHA LIVINGS LLP · BORIVALI (W), Mumbai SuburbanP51800034955· 90.9% built
- AURALIA RESIDENCY1.4 yr overdueANUSHREE AND JHAMTANI REALTY · PUNAWALE, PuneP52100027347· 81.8% built
- SAMRAT SARTHAK1.4 yr overdueBORA REALTY LLP · 411046, PuneP52100023095· 90.9% built· 1 complaint
- DEEPA CHS LTD1.4 yr overdueREGENT SPACES · VILE PARLE EAST, Mumbai SuburbanP51800026864· 96.4% built
- Tejas Heritage1.4 yr overdueTejas Enterprises · Near Ramsheth Thakur Sports Complex, RaigarhP52000025147· 95.5% built
- ELITE RIAAN1.4 yr overdueM/s. RIAAN ANKIT REALTECH · SHRAMIK NAGAR SATPUR, NashikP51600034237· 90.9% built
- Prabhu Business Center1.4 yr overduePacific Builders · Wadala Shiwar, NashikP51600030755· 81.8% built
- Kasturi Milan1.4 yr overdueH RISHABRAJ REALTY · Borivali West, Mumbai SuburbanP51800051982· 90.9% built
- SUPREME HAPPY HOME1.4 yr overdueShelby Realty LLP · Kandivali West, Mumbai SuburbanP51800034043· 90.9% built
- SANGHVI PARSSSVA CITY1.4 yr overdueSANGHVI PREMISES PRIVATE LIMITED · Atgaon, ThaneP51700009886· filed Dec 2020 → now Mar 2025· 81.8% built
- Madhu Milind Co-Op Housing Society Ltd1.4 yr overdueAditya Associates · Naupada, ThaneP51700034830· 87.7% built
- SHIV UTSAV1.4 yr overdueMARUTI ENTERPISES · Pashane, RaigarhP52000007812· filed Mar 2024 → now Mar 2025· 86.9% built
- KRISHNA KAMAL1.4 yr overdueJSM REALTORS PRIVATE LIMITED · SECTOR 8, NEW PANVEL, RaigarhP52000047687· 86.4% built
- GURU AANGAN APARTMENT1.4 yr overdueRAMESH PATEL · PAWAR WADI, NashikP51600032061· 90.9% built
- CASA IMPERIA EWS1.4 yr overdueAum Sanskruti Housing · WAKAD, PuneP52100027706· filed Sept 2022 → now Mar 2025· 90% built
- MANGAL RESIDENCY1.4 yr overdueGAURAV VISHVANATH AWATI · KANDA MARKET ROAD, AhmednagarP52200051562· 90.9% built
- SNEHABANDH CO-OP HOUSING SOCIETY LTD1.4 yr overdueJK BUILDCON · Indiranagar, NashikP51600035092· 90.9% built
- SHREE SIDDHIVINAYAK HEIGHTS1.4 yr overdueSURYAPRATAP PROMOTERS AND BUILDERS · VITA, SangliP53100027420· filed Jun 2023 → now Mar 2025· 43.7% built
- AMITs COLORI Phase-III G Building1.4 yr overdueAMIT ENTERPRISES HOUSING LIMITED · Undri, PuneP52100000785· filed Jun 2021 → now Mar 2025· 90.9% built· 3 complaints
- Happiness Hub - Varve1.4 yr overduePARANJAPE SCHEMES (CONSTRUCTION) LTD · Varve, PuneP52100000303· filed Mar 2020 → now Mar 2025· 88.2% built· 24 complaints
- Paranjape Abhiruchi Parisar -T1,T2 ,T3, M1A, M1B and M21.4 yr overduePARANJAPE SCHEMES (CONSTRUCTION) LTD · Haveli, PuneP52100000452· filed Dec 2020 → now Mar 2025· 79.9% built· 28 complaints
- NARAYAN SHOPPING PARK1.4 yr overduePOOJA GROUP OF COMPANY · NEAR GANESH KUND, BOISAR(EAST) , Dist.-PALGHAR, PalgharP99000016863· filed Dec 2023 → now Mar 2025· 89.1% built
- hi life phase31.4 yr overdueRising welworth Enterprises LLP · Dange Chowk, PuneP52100017456· filed Jun 2024 → now Mar 2025· 98.1% built· 2 complaints
- My Home1.4 yr overdueSIMAR PRIDE VENTURES LLP · Shahnoorwadi, AurangabadP51500019553· 84.1% built
- Samarth Srushti1.4 yr overdueSamarth Buildcon · Chikhali, PuneP52100024587· 90.9% built
- OBELISK1.4 yr overdueSHREE CHINMAY GAURANG INFRASTRUCTURE · PANVEL, RaigarhP52000016196· filed Mar 2024 → now Mar 2025· 87.3% built
- SADGURU ASHISH1.4 yr overdueVIVEK MOHAN GADRE · Khedshi, RatnagiriP52800009727· 63.6% built
- AMAR APEX1.4 yr overdueAmar Ventures · OPP. RACHANA VIDYALAYA, NashikP51600031753· filed Dec 2024 → now Mar 2025· 81.8% built
- SUYOG APARTMENT1.4 yr overdueTELANGE BUILDERS & DEVELOPERS PRIVATE LIMITED · SAI SECTION, ThaneP51700045255· 49.1% built
- GHATKOPAR AVENUE AARADHYA ONE EARTH B PHASE III1.4 yr overdueMAN REALTORS AND HOLDINGS PRIVATE LIMITED · Kurla, Mumbai SuburbanP51800027659· 63.6% built
- LEVERAGE GREENWOODS - HARMONY, WING - A1.4 yr overdueLeverage Spaces LLP · PIPLA, NagpurP50500025134· 36.8% built
- Shreement mauli1.4 yr overdueManishkumar R Zanwar · Bhagur Rural, NashikP51600010816· 48.2% built
- Tejas Sapphire1.4 yr overdueTejas Enterprises · Near Kharkopar Railway Station, RaigarhP52000022328· filed Mar 2024 → now Mar 2025· 95.5% built· 1 complaint
- SKY Gardens1.4 yr overdueV & M BUILDERS & DEVELOPERS · PROFESSOR COLONY DASTUR NAGAR, AmravatiP50300023111· 63.6% built
- Nayantara Presidency Phase 21.4 yr overduePancharatna Builcon Pvt. Ltd · Rajiv nagar, NashikP51600000079· filed Sept 2021 → now Mar 2025· 79.5% built· 1 complaint
- Anand Park Mamta Heights1.4 yr overdueSachin Shantilal Joshi · Palghar, PalgharP99000004112· filed Dec 2019 → now Mar 2025· 77.3% built· 1 complaint
- Metropolis - RIVERA1.4 yr overdueANANT SQUARE · Kasarvadavali, ThaneP51700022700· 90.9% built
- TEN X HABITAT Raymond Realty | Tower A & B1.4 yr overdueRaymond Limited · Thane, ThaneP51700019265· 84.7% built· 3 complaints
- AARADHYA HIGHPARK - PROJECT 1 OF PHASE I1.4 yr overdueMAN VASTUCON LLP · NEAR SINGAPORE INTERNATIONAL SCHOOL, ThaneP51700017865· 90.9% built· 13 complaints
- ADIKAILAS A1 A21.4 yr overdueMadhumalti Costruction Pvt Ltd · BOLHEGAON, AhmednagarP52200025319· 90.9% built
- Lolage Corner1.4 yr overdueshrinivas tukaram badve · Haveli, PuneP52100024220· 81.8% built
- MOUNTAIN VIEW RESIDENCY 11.4 yr overdueImmaculate Developers · Khalapur, RaigarhP52000009816· 78.5% built· 2 complaints
- VARAD AVIGHNA1.4 yr overdueSTAR NAKSHTRA REALITY LLP · OPP COLLECTOR OFFICE, SangliP53100033345· 90.9% built
- SHRAVANDHARA ANNEX1.4 yr overdueSuyog Nirman · CHIPLUN, RatnagiriP52800021445· 58.5% built
- PARADISE PARK - Phase 11.4 yr overdueM/S VAKRATUND ENTERPRISES · Belavli, ThaneP51700016121· filed Mar 2024 → now Mar 2025· 45.5% built
- Shreemant Divine1.4 yr overdueManishkumar R Zanwar · Deolali (CB), NashikP51600012907· 90.9% built
- "The Mansion" By ABIL1.4 yr overdueArindam Developers LLP · Mumbai City, Mumbai CityP51900022063· filed Mar 2024 → now Mar 2025· 87.7% built
- LEVERAGE GREENWOODS HARMONY WING D1.4 yr overdueLeverage Spaces LLP · PIPLA, NagpurP50500026781· 18.2% built
- HARI-OM1.4 yr overduePRAJ Developers · Wanlesswadi, SangliP53100025107· 81.8% built
- GHATKOPAR AVENUE AARADHYA ONE EARTH PHASE I1.4 yr overdueMAN REALTORS AND HOLDINGS PRIVATE LIMITED · Kurla, Mumbai SuburbanP51800024676· 87.6% built
- SHUBHAMKAROTI1.4 yr overdueCLASSIC HESTIA DEVELOPERS · NEAR FUTKA TALAV, SataraP52700020601· 90.9% built
- Sam Bhoomi Sky Villas1.4 yr overdueLIFE Spaces Realty Private Limited · Mumbai City, Mumbai CityP51900000590· 90% built· 1 complaint
- ARAMBH1.4 yr overdueSHRI JANANI DEVELOPERS · GHORPADI PETH, PuneP52100048101· filed Mar 2024 → now Mar 2025· 90.9% built
- PUSHP RESIDENCY1.4 yr overduePUSHPAM DEVELOPERS · LAXMINAGAR, SataraP52700033790· 90.9% built
- ALAMPAT BUSINESS CENTRE1.4 yr overdueKARTIK BUILDCON · COLLEGE ROAD, NashikP51600034684· 78.2% built
- SAI TIRTH PHASE II1.4 yr overduePINNACLE CORPORATION · JOVELI, ThaneP51700034566· 90.9% built
- 9th Avenue1.4 yr overdueAureum Homes LLP · K/W Ward Vile Parle (West) Mumbai, Mumbai CityP51900035024· 90.9% built
- Aayushi Pride1.4 yr overdueAayushi Infracone LLP · Karanjade, RaigarhP52000048520· 90.9% built
- Senwin Residency1.4 yr overdueSenwin Divine Ventures · Waldhuni, ThaneP51700046632· 79.5% built
- MSR OLIVE1.4 yr overdueMind Space Realty Pvt. Ltd. · Ambegaon, PuneP52100008615· filed Jun 2021 → now Mar 2025· 59.5% built
- NIRJA HEIGHTS1.4 yr overdueNIRJA BUILDERS AND DEVELOPERS · CHAKKI NAKA TISGAON KALYAN EAST, ThaneP51700051866· 90% built
- Joyville Virar Phase 61.4 yr overdueJoyville Shapoorji Housing Private Limited · Virar, Bolinj, PalgharP99000031256· 72.4% built· 3 complaints
- NILYOG APARTMENT1.4 yr overdueRAJNB HOUSING LLP · SURYODAYA CHS, ThaneP51700048983· filed Mar 2024 → now Mar 2025· 34.1% built
- Shriji Srusthi1.4 yr overdueShriram Developers Satara · Devi Colony, SataraP52700032457· filed Nov 2024 → now Mar 2025· 28.2% built
- AMAZON PARK BUILDING NO 2 - WING C1.4 yr overdueR.J. CONSTRUCTIONS · BORIVALI WEST, Mumbai SuburbanP51800002956· filed Jun 2021 → now Mar 2025· 53.6% built· 14 complaints
- BRAHMA HEIGHTS1.4 yr overdueR S & CO · NASHIK, NashikP51600049647· 67.7% built
- VINOD PARK1.4 yr overdueH V PAJWANI HUF · Dahanu Road East, PalgharP99000047407· 90.9% built
- OMKARA RESIDENCY1.4 yr overdueJALGAON PROJECTS PVT LTD · NEAR SMIT COLLEGE, JalgaonP49900046617· 81.8% built
- NANDARAJ1.4 yr overdueRUCHA RAJESH MAPUSKAR · RATNAGIRI, RatnagiriP52800047100· 32.7% built
- KRUSHNABHUMI RESIDENCY1.4 yr overdueVijay Balaso Shetake · Chandi Nagar, KolhapurP53000046465· 90.9% built
- MAHADEV APARTMENT1.4 yr overdueUMIYAKRIPA BUILDCON · MHASRUL SHIWAR, NASHIK, NashikP51600047552· 90.9% built
- Krishna Square1.4 yr overdueKrishna Square · Mahalaxmi Nagar, JalnaP51400033420· 72.7% built
- SHREE MURALIDHAR HEIGHTS1.4 yr overdueSHREE BUILDCON · ADGAON SHIWAR, NashikP51600047373· 90.9% built
- T7 named Belvedere phase 3 of Raheja Reserve being buildings T7 T8 T9 T10 in RV Premiere1.4 yr overdueCavalcade Properties Private Limited · NIBM, PuneP52100030551· 72.7% built
- KDR PRIME1.4 yr overdueKDR BUILDERS · SHEET NO 218/42 JARIPATKA, NagpurP50500034978· 82.7% built
- AVIGHNA1.4 yr overdueDHAVAL JAYESH AJMERA · BARAMPUR, PalgharP99000048704· 59.1% built
- SARA SANGAM - NARMADA AND SHARAYU BUILDING1.4 yr overdueJAGRUT SARA ASSOCIATES · NEAR BHONDAVE ENGLISH SCHOOL, AurangabadP51500045949· 89.3% built
- VIVESTA1.4 yr overdueNIYATI LIFESPACES PRIVATE LIMITED · SECTOR NO. CDC, PuneP52100051718· 90.9% built
- Suhas Sudhanva1.4 yr overdueDigamber Parulekar · Rambaug Colony, PuneP52100030693· filed Dec 2024 → now Mar 2025· 88.6% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.