RERA projects past their possession deadline
11,770 MahaRERA-registered projects are past the possession date currently on file and still report under 100% construction progress. Both figures are the promoter's own disclosure to the regulator.
Page 52 of 59
- Krishna Square1.4 yr overdueKrishna Square · Mahalaxmi Nagar, JalnaP51400033420· 72.7% built
- VIVESTA1.4 yr overdueNIYATI LIFESPACES PRIVATE LIMITED · SECTOR NO. CDC, PuneP52100051718· 90.9% built
- Pragati Ambition1.4 yr overduePRAGATI BUILDTECH · Moshi, PuneP52100034480· 90.9% built
- GINI ARIA MHADA WING1.4 yr overdueGini Construction Pvt Ltd · YEWALEWADI, PuneP52100031664· 81.8% built
- PEARL EMINENT1.4 yr overduePEARL REALTY · BALEWADI, PuneP52100030820· 53.6% built
- OM SAI RESIDENCY1.4 yr overdueKAUSTUBH DILIP MORE · KARANDWADI, SataraP52700024157· filed Jan 2023 → now Mar 2025· 68.6% built
- VEDEK GLORY1.4 yr overdueVEDEK BUILDCON · NASHIK SHIWAR, NashikP51600030503· 81.8% built
- EVERNEST AARAMBH1.4 yr overdueEVERNEST HIGHRISELLP · PATILNAGAR, PuneP52100045785· 33.7% built
- T7 named Belvedere phase 3 of Raheja Reserve being buildings T7 T8 T9 T10 in RV Premiere1.4 yr overdueCavalcade Properties Private Limited · NIBM, PuneP52100030551· 72.7% built
- SHREE MURALIDHAR HEIGHTS1.4 yr overdueSHREE BUILDCON · ADGAON SHIWAR, NashikP51600047373· 90.9% built
- Utkarsh1.4 yr overdueAmbrosial Developers Private Limited · Santacruz East, Mumbai SuburbanP51800030434· 83% built
- SILVER OAK APARTMENT1.4 yr overdueASHOKKUMAR TOPANLAL DEWANI · SHAHAPUR, ThaneP51700051210· 62.6% built
- Saideep Apartment1.4 yr overdueDARSHAN INFRA · Andheri, Mumbai SuburbanP51800045356· 90.9% built
- INAARA1.4 yr overdueARION DEVELOPERS & REALTORS PVT. LTD. · Gotheghar, RaigarhP52000012163· filed Mar 2019 → now Mar 2025· 27.3% built· 4 complaints
- DREAM RESIDENCY APARTMENT1.4 yr overdueDREAM BUILDTECH · ADGAON SHIWAR, NashikP51600033666· 90.9% built
- ROMELL SERENE1.4 yr overdueROMELL REAL ESTATE PRIVATE LIMITED · Borivali, Mumbai SuburbanP51800034025· 81.8% built
- Om Laxmi Sadan CHS Ltd1.4 yr overdueMAVERICK REALTORS · Mulund West, Mumbai SuburbanP51800029133· 59.5% built· 1 complaint
- SHATAYU KARWA1.4 yr overdueGREEN CANOPY PROPERTIES LLP · Makhamalabad, NashikP51600033346· 90.9% built
- AISHWARYAM DEERSTONE1.4 yr overdueESSEN REALTORS · PRADHIKARAN, PuneP52100045451· 80.9% built
- AVIGHNA1.4 yr overdueDHAVAL JAYESH AJMERA · BARAMPUR, PalgharP99000048704· 59.1% built
- GIRIKUNJ1.4 yr overdueAvantika Sanjay Baviskar · NR MANRTA CITY, PuneP52100048636· 45.5% built
- GANGASADAN1.4 yr overdueNAVPADH REALTY LLP · GORAS WADI, Mumbai SuburbanP51800048440· 90.9% built
- Suhas Sudhanva1.4 yr overdueDigamber Parulekar · Rambaug Colony, PuneP52100030693· filed Dec 2024 → now Mar 2025· 88.6% built
- SHARMILA RESIDENCY1.4 yr overdueANNAPURNA ENTERPRISES · AMBERNATH, ThaneP51700032556· 61.8% built
- Revati Sunanda Apartment1.4 yr overdueRevati Infra Engineers · Beside Namco Bank, Hanuman Wadi, NashikP51600046785· 81.8% built
- AMAZON PARK BUILDING NO 2 - WING C1.4 yr overdueR.J. CONSTRUCTIONS · BORIVALI WEST, Mumbai SuburbanP51800002956· filed Jun 2021 → now Mar 2025· 53.6% built· 14 complaints
- BRAHMA HEIGHTS1.4 yr overdueR S & CO · NASHIK, NashikP51600049647· 67.7% built
- NIRJA HEIGHTS1.4 yr overdueNIRJA BUILDERS AND DEVELOPERS · CHAKKI NAKA TISGAON KALYAN EAST, ThaneP51700051866· 90% built
- SPRINGNEST1.4 yr overdueSAIKRUPA ASSOCIATES · Pune City, PuneP52100029911· 90.9% built
- CHAITANYA SHREE1.4 yr overdueSHREE CHAITANYA BUILDERS · RAMACHA GOT, SataraP52700033511· 4.5% built
- KDR PRIME1.4 yr overdueKDR BUILDERS · SHEET NO 218/42 JARIPATKA, NagpurP50500034978· 82.7% built
- Hi Life1.4 yr overdueRising welworth Enterprises LLP · Dange Chowk, PuneP52100016413· filed Jun 2023 → now Mar 2025· 97.7% built· 43 complaints
- Bappa Residency1.4 yr overdueketan shrikrishna navle · Navle Nagar, AhmednagarP52200045823· 89.5% built
- TORNA1.4 yr overdueVASTUSHILP REALTY · ADGAON, NashikP51600050447· 81.8% built
- MANOHAR APARTMENT1.4 yr overdueAMEYA SHRIKANT BHAVE · MANGAON, RaigarhP52000050872· filed Mar 2024 → now Mar 2025· 63.6% built
- SAI TIRTH PHASE II1.4 yr overduePINNACLE CORPORATION · JOVELI, ThaneP51700034566· 90.9% built
- MODIREALTY KALPVRIKSH1.4 yr overdueMODIREALTY DEVELOPERS PVT LTD · ANDHERI WEST, Mumbai SuburbanP51800034375· 90.9% built
- Jindal Park1.4 yr overdueSimran Enterprises · Panvel, RaigarhP52000047020· 81.8% built· 1 complaint
- SAI KRISHNA RESIDENCY WING B1.4 yr overdueRADIANCE INFRAVENTURE · PIPLA, NagpurP50500047943· 72.7% built
- SHREE GANESH ALANKAR1.4 yr overduePRIME ASSOCIATES · VISHRAMBAG, SangliP53100034004· filed Dec 2024 → now Mar 2025· 90.9% built
- VINOD PARK1.4 yr overdueH V PAJWANI HUF · Dahanu Road East, PalgharP99000047407· 90.9% built
- HARI VIJAY CO. OP. HSG. SOC. LTD1.4 yr overdueSIDDHIVINAYAK DEVELOPERS · DWARKA, NashikP51600048515· 90.9% built
- PUSHKARAJ CHS PROPOSED1.4 yr overdueSPLENDOR SHELTERS PVT LTD · BEHIND DNC HIGHSCHOOL, ThaneP51700051480· 90.9% built
- OM MADHUSADAN CHS LTD1.4 yr overdueREGENT BUILDERS · CHITRKAR KETKAR MARG VILE PARLE EAST MUMBAI, Mumbai SuburbanP51800034194· 93.6% built
- SHIVSHANKAR APARTMENT1.4 yr overdueDATTA NIVRUTTI SHEJVAL · PIMPALGAON BAHULA SHIVAR, NASHIK, NashikP51600048646· 90.9% built
- HANSINI ELEGANCE1.4 yr overdueKARSAN BACHU SATRA · Borivali, Mumbai SuburbanP51800010085· filed Dec 2019 → now Mar 2025· 64.6% built
- PUSHP RESIDENCY1.4 yr overduePUSHPAM DEVELOPERS · LAXMINAGAR, SataraP52700033790· 90.9% built
- Aayushi Pride1.4 yr overdueAayushi Infracone LLP · Karanjade, RaigarhP52000048520· 90.9% built
- Yamuna Tower1.4 yr overdueMarvel Trinity Real Estate LLP · Near Sai Mandir, AkolaP50100051525· 81.8% built
- AMOD PRIDE1.4 yr overdueABHISHEK BUILDERS · OPP. V D SHINDE HIGH SCHOOL, KolhapurP53000030924· 90.9% built
- MAHADEV APARTMENT1.4 yr overdueUMIYAKRIPA BUILDCON · MHASRUL SHIWAR, NASHIK, NashikP51600047552· 90.9% built
- Sahas Paradise proposed Apartment on Plot 8 and 9 In Sr No 39/11.4 yr overdueSAHAS LAND AND INFRA DEVELOPERS PRIVATEl LIMITED · Giripeth, WardhaP50400047417· 72.7% built
- SHREENEELKANTH APARTMENT1.4 yr overdueSWAMI CONSTRUCTIONS · RAJIV NAGAR, NashikP51600045701· 90.9% built
- NILANJAN CRYSTAL1.3 yr overdueSANJAY MADHAVRAO BHAVSAR · CHINCHOLE SHIVAR, NashikP51600029266· 90.9% built
- Buland-031.3 yr overdueFundamental Engineers And Electronics Private Limited · New Panvel (East), RaigarhP52000022979· 36.4% built
- ADITYA GALAXY1.3 yr overdueAditya Properties · SHIVAJI NAGAR, PuneP52100034834· 93.2% built
- AURA LUXISCA1.3 yr overdueVISHWAKARMA BHAGYODAYA AARSH VENTURES · New Panvel West, RaigarhP52000025283· filed Mar 2025 → now Apr 2025· 99.5% built
- AKSHAR ELITA1.3 yr overdueVAGAD CONSTRUCTIONS · NAVI MUMBAI, ThaneP51700005621· filed Dec 2019 → now Apr 2025· 96.8% built
- AARYAHI RESIDENCY1.3 yr overdueMVK DEVELOPERS · Vijay Nagar, Nande, RaigarhP52000020461· 18.2% built
- TAAL1.3 yr overdueAce Property Developers · Near Global City, PalgharP99000010690· filed Mar 2019 → now Apr 2025· 90.9% built
- GANGA ACROPOLIS1.3 yr overdueGANRAJ HOMES LLP · Mulashi, PuneP52100001396· filed Jun 2023 → now Apr 2025· 83% built· 14 complaints
- AKSHAD SUPER CITY PHASE- II1.3 yr overdueVANSH INFRASTRUCTURE · NEAR SHENDRA MIDC, AurangabadP51500027259· 25.5% built
- ASHTAVINAYAK1.3 yr overduePARISPARSH · SAI BABA MANDIR, ThaneP51700046185· 10% built
- VEDRAJ ELITE1.3 yr overdueSadguru Buildcon · TARWALA NAGAR, NashikP51600033270· filed Sept 2024 → now Apr 2025· 89.1% built· 1 complaint
- GARDENIA CREST1.3 yr overdueRUJUTA SHELTERS · sus, PuneP52100001527· filed Jun 2019 → now Apr 2025· 90.9% built· 3 complaints
- Swanand Wing - A1.3 yr overdueDattaraya Bhaguji Vede · Bavdhan, PuneP52100045732· 56.4% built
- BIZ SQUARE1.3 yr overdueSAM REALTIES · Gut No 58, AurangabadP51500008228· filed Dec 2019 → now Apr 2025· 73.2% built
- GIRIVAN LA QUINTA1.3 yr overdueAbhishek Mahesh Garodia · Kurla, Mumbai SuburbanP51800026169· 97.7% built
- Runwal Shopping Arcade1.3 yr overdueRunwal Residency Private Limited · Dombivli, ThaneP51700026438· filed Apr 2024 → now Apr 2025· 90.9% built· 1 complaint
- Shubhada Niketan1.3 yr overdueNiketan Construction · Near Gol Maruti Mandir, SataraP52700034486· 81.8% built
- SAI RAJ1.3 yr overdueAnil Shankar Aher · RACCA GARDEN, NashikP51600026803· filed Apr 2024 → now Apr 2025· 80.5% built
- Bluegrass Residences - Tower I1.3 yr overdueSagitarius Ecospaces LLP · Pune City, PuneP52100018091· 81.3% built
- SAI MILLENIUM1.3 yr overdueSHIV CONSTRUCTIONS · PUNAWALE, PuneP52100024710· 90.9% built
- Aangan1.3 yr overdueIndus Valley Constructions LLP · Ward GNorth, Mumbai CityP51900015218· filed Dec 2023 → now Apr 2025· 96.8% built· 3 complaints
- BAITUL HUSSAIN APARTMENT WING - B1.3 yr overdueMEHREIN BUILDERS and DEVELOPERS · MAUJE WADALA SHIWAR KHODE MALA NASHIK, NashikP51600029511· 90.9% built
- SAI-SHALWAK1.3 yr overdueNITIN VINAYAK DANGORE · RATHI NAGAR, AmravatiP50300045449· 67.3% built· 1 complaint
- REDEVELOPMENT OF RAMESH MANDIR CHSL1.3 yr overduePRANAV CONSTRUCTIONS LIMITED · MUMBAI, Mumbai SuburbanP51800032468· 76.9% built
- Supreme Imperial1.3 yr overdueSupreme Real Estate Developer · Borivali, Mumbai SuburbanP51800032164· 94.5% built
- BAITUL HASAN APARTMENT WING - A1.3 yr overdueONYX CONSTRUCTIONS · MAUJE WADALA SHIWAR KHODE MALA NASHIK, NashikP51600029491· 90.9% built
- ROONGTA GRANDEZZA APARTMENT1.3 yr overdueROONGTA HOMES LLP · NASHIK, NashikP51600029147· 78.2% built
- Chandraprabhakar Co-operative Housing Society Limited1.3 yr overdueMellennium Homes · Garibcha wada Dombivli west, ThaneP51700048538· 87.3% built
- Palmspring Towers - A6, A7 and B31.3 yr overdueKUMAR KERING DEVELOPERS LLP · Mohammedwadi, PuneP52100018532· 90.9% built
- SHREEYA APARTMENTS1.3 yr overdueRANADE BAGADE CONSTRUCTIONS · ERANDAVANE, PuneP52100045301· 81.8% built
- GOLD CLIFF1.3 yr overdueANANDINFRACON · BRT ROAD DIGHIP52100021116· 90.8% built
- Vaidehi Villas1.3 yr overdueVaidehi Enterprises · Prathamesh Park, PuneP52100021172· 90.9% built
- SHRI MADHUBAN HEIGHTS1.2 yr overduePRUTHVI BUILDERS AND DEVELOPERS · VASANTNAGAR, SangliP53100048829· 48.6% built
- Vrundavan City1.2 yr overdueKalyani Buildcon · Malkapur City, SataraP52700021161· 70.5% built
- SAI ICON1.2 yr overdueParadise Infra-con Pvt Ltd · Sector 35 D Kharghar, RaigarhP52000023156· filed Dec 2024 → now May 2025· 95.9% built· 1 complaint
- KANHA RESIDENCY1.2 yr overdueKULKARNII BUILDER · BELAVALI GAON, ThaneP51700030985· 90.9% built
- Mangirish Co-operative Housing Society Ltd1.2 yr overdueCHITALE HOUSING AAKAR CONSTRUCTIONS · Shivajinagar, PuneP52100046515· filed Apr 2025 → now May 2025· 64.5% built
- Priyadarshan - I1.2 yr overdueKumar Agro Products Pvt Ltd · Jai Bhavani Nagar, PuneP52100047781· 86.5% built
- MADHUBAN HEGHTS1.2 yr overdueHIRAL REAL ESTATE DEVELOPERS LLP · KANDIVALI WEST, Mumbai SuburbanP51800046035· 90.9% built
- Darpan Niketan Cooperative Society1.2 yr overdueBricks and Blocks Construction LLP · Kurla, Mumbai SuburbanP51800048133· 90.9% built
- Kamalraj Prayag1.2 yr overdueKamalraj V Square Properties LLP · DATTA NAGARP52100020219· filed Apr 2025 → now May 2025· 90.9% built
- Devdatta Apartment1.2 yr overdueAjay Madhavrao Mahajan And Makarand Sudhakar Puranik · Wadala Shivar, Nashik, NashikP51600047601· filed Jan 2024 → now May 2025· 90.9% built
- SHRIYA RESIDENCY1.2 yr overdueDHATINGAN ASSOCIATES · MAKHAMALABAD NASHIK, NashikP51600048985· 90.9% built
- SAMARTH RESIDENCY1.2 yr overdueISHAKRISHA ASSOCIATES · Guhagar, RatnagiriP52800009163· filed Dec 2021 → now May 2025· 52.7% built
- AVANEESH1.2 yr overdueKLS Constructions · NIGDI PRADHIKARAN PCMC PUNE, PuneP52100047283· 73.5% built
- Shiva Residency1.2 yr overdueDEEPALI SHIVAJI RAJGURAV · Near Yamai Mandir DighiP52100035062· filed Oct 2024 → now May 2025· 89.1% built
- Joyville Hadapsar Annexe Phase 51.2 yr overdueJoyville Shapoorji Housing Private Limited · shewalewadi, PuneP52100026452· 90.9% built
- SHIVA RECEDENCY1.2 yr overdueABASO YASHWANT JADHAV · NODE- PUSHPAK NODE, RaigarhP52000022288· filed Dec 2022 → now May 2025· 9.1% built
- SENSORIUM, PHASE III1.2 yr overdueJoyville Shapoorji Housing Private Limited · Village Maan, PuneP52100024965· 68.5% built
- Courtyard - Rozanne1.2 yr overdueCOURTYARD REAL ESTATE PRIVATE LIMITED · Thane, ThaneP51700006312· 88.6% built· 3 complaints
- GARDEN VIEW1.2 yr overdueSMLIFE SHREEJI DEVELOPERS LLP · BORIVALI WEST, Mumbai SuburbanP51800046071· 90.9% built
- Joyville Hadapsar Annexe Phase 41.2 yr overdueJoyville Shapoorji Housing Private Limited · shewalewadi, PuneP52100026478· 90.9% built
- SHIV KUNJ1.2 yr overdueUDAY NIVRUTTIRAO PATIL · VRINDAVAN COLONY, LaturP52400027020· 81.8% built
- YESHWANT VINAYAK COMPLEX1.2 yr overdueSHREE CHINTAMANI DEVELOPERS · Vasai, PalgharP99000003231· filed Jun 2021 → now May 2025· 90.9% built
- Kamdhenu23-west1.2 yr overdueAccura Developers LLP · Thane, ThaneP51700025164· 75.5% built
- Sadguru Complex1.2 yr overdueJare Buildcon Pvt Ltd · DEHU, PuneP52100012957· filed Dec 2019 → now May 2025· 67.3% built
- Supreme Elysia1.2 yr overdueSupreme Mega Constructions LLP · Andheri, Mumbai SuburbanP51800034860· 95.5% built
- The Exchange1.2 yr overdueViraj Estates Pvt. Ltd. & Others · Near Durga Garden, Besides NMC Building, Deolali, NashikP51600031795· 81.8% built
- INDRAYANI PRIDE1.2 yr overdueINDRAYANI CONSTRUCTIONS · ULKANAGARI, AurangabadP51500045770· 30.9% built
- SAI HANUMAN TOWER B WING1.2 yr overdueOM SAI BABA BUILDERS · RAI, ThaneP51700048598· 89.1% built
- Redevelopment of Parle Satam CHS Ltd1.2 yr overdueR R CONSTRUCTIONS · vile parle east, Mumbai SuburbanP51800046583· 71.4% built
- RAJKAMAL PARK1.2 yr overduePRARTHANA GRIHA NIRMAN · Ward FSouth, Mumbai CityP51900010115· filed Dec 2023 → now May 2025· 89.9% built
- VERISTA1.2 yr overdueVM REAL TECH LLP · Erandwane, PuneP52100047130· 90.9% built
- KUMAR PICCADILLY1.2 yr overdueKUMAR PROPERTIES AND PROMOTERS PVT. LTD · NEAR BHUMKAR CHOWK, PuneP52100029950· 90.9% built
- SHREE RAM KRUSHNA HEIGHTS1.2 yr overdueKISAN SHIVRAM BALLAL · NASHIK, NashikP51600050495· 56.4% built
- REDEVELOPMENT OF NAV VIKAS CHSL1.2 yr overdueSwara Constructions · VILE PARLE EAST, Mumbai SuburbanP51800046341· 57.3% built
- THE LISA1.2 yr overdueSHETHWALA INFRA · Andheri, Mumbai SuburbanP51800046662· 90.9% built
- FIORA PARK1.2 yr overdueS R DEVELOPERS · PEN, RaigarhP52000046438· 89.6% built
- Kalpataru Jade Residences A1.2 yr overdueAstrum Developments Private Limited · Baner, PuneP52100030004· 70.5% built
- VIJAY APARTMENT CHSL1.2 yr overdueCASA BUILDERS AND DEVELOPERS · VASAI, PalgharP99000048569· 72.7% built
- Om Paradise Phase -21.2 yr overduePATADE PROPERTIES · Gandhinglaj, KolhapurP53000033167· filed May 2023 → now May 2025· 71.8% built
- MANSI RESIDENCY1.2 yr overdueSHRADDHA DEVELOPERS · PATHARDI SHIWAR NASHIK, NashikP51600051139· 90.9% built
- ASHAPURI GIRIJA1.2 yr overdueEKDANT DEVELOPERS · NASHIK, NashikP51600049826· 79.1% built
- SHREE SAMARTH HEIGHTS1.2 yr overdueSHRI SWAMI SAMARTH BUILDERS AND DEVELOPERS · NASHIK, NashikP51600052209· 81.8% built
- Falcon Towers at Riverview City1.2 yr overdueRiverview City Constructions Ltd · Haveli, PuneP52100032051· filed Apr 2025 → now Jun 2025· 97.3% built· 2 complaints
- VISION HEIGHTS WING C1.2 yr overdueFiona Realty Private Limited · Andheri, Mumbai SuburbanP51800007259· filed Dec 2023 → now Jun 2025· 78.6% built
- Supreme Villagio I1.2 yr overdueTurquoise Housing LLP · Somatne, PuneP52100046867· filed Mar 2025 → now Jun 2025· 72.7% built
- Vision Harmony1.2 yr overdueM/S Vista Vision Developers LLP · Hingane (Bk) karvenagar, PuneP52100033418· 81.8% built
- Horizon Giridarshan1.2 yr overdueHORIZON PROMOTERS INDIA LTD · Mulund West, Mumbai SuburbanP51800049813· 90.9% built
- 41COSMO1.2 yr overdueKRISALA ENTERPRISES LLP · TATHAWADE, PuneP52100029844· filed Dec 2024 → now Jun 2025· 86.4% built· 2 complaints
- Fortune Skyes1.2 yr overdueFortune Dream-con Private Limited · Devka, Nani Daman, DamanP49500000023· filed Mar 2024 → now Jun 2025· 72.7% built
- U. S. Residency1.2 yr overdueNew Modern Buildwell Private Limited · Lonavala, PuneP52100029751· 41.8% built
- SIGMA CENTURIA1.1 yr overdueSigma Realtors · Haveli, PuneP52100003501· filed Sept 2018 → now Jun 2025· 45.5% built
- 66 Palazzio1.1 yr overdueParsh Realty · Borivali, Mumbai SuburbanP51800026378· 76.5% built
- DS UNIQUE SARVODAYA1.1 yr overdueDS UNIQUE · Haveli, PuneP52100049916· 32.7% built· 2 complaints
- MADHVACHHAYA1.1 yr overdueFORTUNE DEVELOPERS · Pune City, PuneP52100053769· 72.7% built
- Welcome Co-Operative Housing Society Ltd.1.1 yr overdueWeclome Co-Operative Housing Society Ltd · Panchavati, NashikP51600048204· 90.9% built
- Ambika Harmony1.1 yr overdueAmbika Buildcon · Mayur Vihar Colony, NashikP51600045830· filed Jun 2024 → now Jun 2025· 78.2% built
- SACRED BASIL1.1 yr overdueM/S INFINITY DEVELOPERS · HAVELI WAKAD, PuneP52100028883· 81.8% built
- SAKAR PRIME1.1 yr overdueMUKTABEN PURUSHOTTAM NARODIA · Morade Nagar, Mhasrul Shivar, NashikP51600048611· filed Mar 2025 → now Jun 2025· 81.8% built
- Kalpataru Estate Building 81.1 yr overdueKalpataru Construction (Pune) · Pimple Gurav, PuneP52100017535· filed Dec 2022 → now Jun 2025· 86.9% built· 48 complaints
- VIVA CITY - A81.1 yr overdueVIVA WINNER VENTURE RELATORS LLP · VIRAR WEST, PalgharP99000004130· filed Jun 2024 → now Jun 2025· 45.5% built· 1 complaint
- OMKAR SWARUP PHASE-21.1 yr overdueSANIKET INFRACON LLP · ICHHAPURTI GANESH MANDIR, PuneP52100033738· filed Jun 2024 → now Jun 2025· 81.8% built
- Anita Pride1.1 yr overdueGirish Vasudev Joshi · Ujalaiwadi, KolhapurP53000032808· filed Jun 2024 → now Jun 2025· 84.1% built
- SHARADA MYRIA B AND C BUILDING1.1 yr overdueSHARADA ERECTORS PRIVATE LIMITED · Haveli, PuneP52100018973· filed Dec 2023 → now Jun 2025· 41.4% built
- Brajesh Sapphire1.1 yr overdueLife Good Happiness Homes · Panvel, RaigarhP52000033994· filed Jun 2024 → now Jun 2025· 63.6% built
- Darekar Heights1.1 yr overdueMangaldeep Radiant Developers · Tathawade, PuneP52100026195· filed Jun 2024 → now Jun 2025· 39.1% built
- Mahavir Galaxy1.1 yr overdueNayan Builders · Kurla, Mumbai SuburbanP51800001952· filed Jun 2021 → now Jun 2025· 99.9% built· 1 complaint
- EKAANTE PHASE 21.1 yr overdueGREEN PARK DEVELOPERS · Alibaug, RaigarhP52000009962· filed Jun 2024 → now Jun 2025· 64.5% built
- Mangalam Icon1.1 yr overdueRamdas Damodar Phuge proprietor of Bhagyalaxmi Construction · Haveli, PuneP52100029682· filed Jun 2024 → now Jun 2025· 63.8% built
- VIVA CITY -A91.1 yr overdueVIVA WINNER VENTURE REALTORS LLP · VIRAR WEST, PalgharP99000003243· filed Jun 2024 → now Jun 2025· 38.8% built· 1 complaint
- CROWN C1.1 yr overdueSHREE SAMARTH REALTY · Karjat, RaigarhP52000026298· filed Jun 2024 → now Jun 2025· 90.8% built
- VTP Cygnus Building T101.1 yr overdueARHUM ERECTORS PRIVATE LIMITED · manjari, PuneP52100024551· 87.9% built· 13 complaints
- Parksyde Homes Phase 5A1.1 yr overdueJaikumar Constructions LLP · Hanuman Nagar, NashikP51600004799· 89.1% built
- GHATKOPAR AVENUE AARADHYA ONE EARTH G PHASE VI1.1 yr overdueMAN REALTORS AND HOLDINGS PRIVATE LIMITED · Kurla, Mumbai SuburbanP51800029288· 63.6% built
- VTP Cygnus BuildingT12 and Commercial1.1 yr overdueARHUM ERECTORS PRIVATE LIMITED · Manjari, PuneP52100023473· 84.6% built· 3 complaints
- Guardian Cityscapes Phase 21.1 yr overdueGuardian Homes Private Limited · Dattawadi, PuneP52100003427· filed Jun 2023 → now Jun 2025· 81.8% built
- THE COURTYARD 41 TO 451.1 yr overdueM/s LIVINGDWELL ENTERPRISE · OPP APJ ABDUL KALAM COLLEGE, Dadra & Nagar HaveliP49600000097· 90.9% built
- SHREE RAM LALLA NIWAS APARTMENT1.1 yr overdueROONGTA HOMES LLP · NASHIK, NashikP51600045450· 78.2% built
- SHEETAL BUILDERS AND DEVELOPERS RAMESH RIVANTA1.1 yr overduePARESH RAMESH BARIA · Vasai-Virar City (M Corp), PalgharP99000012997· filed May 2019 → now Jun 2025· 90.9% built
- BHOSALE APPARTMENT1.1 yr overdueRavindra Shamrao Bhosale · UNCHGAON, KolhapurP53000047483· 36.8% built
- PATELS PRESTIGE1.1 yr overdueVRUDEE ASSOCIATES · AMBERNATH, ThaneP51700017035· filed Dec 2022 → now Jun 2025· 77% built
- WHITE BERRY RESIDENCY1.1 yr overdueM/S. WHITE BERRY REALSPACES L.L.P. · Borivali, Mumbai SuburbanP51800027240· 90.9% built
- SAHAYOG GARDEN1.1 yr overdueSAHAYOG DEVELOPERS · ., SataraP52700004633· filed Dec 2019 → now Jun 2025· 82.3% built· 1 complaint
- DEOGIRI PLAZA1.1 yr overdueAGRAGANYA BUILDCON · BEED BYPASS, AurangabadP51500027859· 90.9% built
- Rajshree Aashiyana1.1 yr overdueGanesh Chhaya Construction LLP · Ghatkopar East, Mumbai SuburbanP51800046829· 81.8% built
- Birla Vanya - Phase 11.1 yr overdueAditya Birla Real Estate Limited · Shahad, ThaneP51700019178· 99.2% built· 8 complaints
- Mangalmurti Residency1.1 yr overdueKRISHNAPRAKASH ASSOCIATES · Kharadi, PuneP52100050222· 81.8% built
- HARSIDDHI SADAN CHS LTD1.1 yr overdueRK CONSTRUCTION · Borivali East, Mumbai SuburbanP51800052312· 79.9% built
- RUNWAL EIRENE - PART I1.1 yr overdueRUNWAL DEVELOPERS LIMITED · Thane, ThaneP51700004574· 99.3% built· 56 complaints
- PRABHAT KUNJ1.1 yr overdueLAKSHMICONSTRUCTION · Mumbai, Mumbai SuburbanP51800047024· 89.1% built
- Palm Springs Phase 11.1 yr overdueDIVINE VENTURES AND LANKE BIRJE ASSOCIATES · Vinodewasti, PuneP52100026794· 81.8% built· 1 complaint
- GOVIND HEIGHTS APARTMENT1.1 yr overdueS S CONSTRUCTIONS · MAKHMALABAD SHIVAR SHANTI NAGAR PANCHVATI NASHIK, NashikP51600027872· 90.9% built
- HECC-ROHAWALA HERITAGE1.1 yr overdueLIYAKAT ANWAR HAFIZ · Roha, RaigarhP52000050665· 9.1% built
- Ephelia- Phase 11.1 yr overdueMajestique Giga Homes LLP · kondhwa khurd, PuneP52100025991· 95.5% built
- NISARG GREENS Phase - 2 F1.1 yr overdueNND Ambernath LLP · Ambernath East, ThaneP51700031797· 72.7% built
- KURLA SAHAYOG CHS LTD., BLDG. NO.681.1 yr overduePARSN CONSTRUCTION AND DEVELOPERS PRIVATE LIMITED · Kurla, Mumbai SuburbanP51800009819· filed Jun 2018 → now Jun 2025· 90.9% built· 6 complaints
- ADITYA HEIGHTS1.1 yr overdueRATNAKAR DHARMA PATIL · MANDA, ThaneP51700048244· 90.9% built
- Green Woods1.1 yr overdueGoldfinger Ventures · Pune City, PuneP52100013183· filed Dec 2017 → now Jun 2025· 81.8% built
- ADVIKA PHASE III - E1.1 yr overdueADVIKA CONSTRUCTIONS PVT.LTD · PISOLI, PuneP52100022868· filed Dec 2024 → now Jun 2025· 90.5% built
- PRAGATI HEIGHTS1.1 yr overduePragati Builders and Developers · Jalochi, PuneP52100047529· 72.7% built
- MORYA RESIDENCY1.1 yr overdueSHRIRAM BUILDERS AND DEVELOPERS · NEAR ADITYA HALL, INDIRA NAGAR, NASHIK, NashikP51600033550· 90.9% built
- SWOJAS AVANI1.1 yr overdueSWOJAS REALTORS LLP · ERANDWANA, PuneP52100046896· 90.9% built
- NYATI EXUBERANCE III1.1 yr overdueNYATI BUILDERS PRIVATE LIMITED · MOHAMMADWADI, PuneP52100034932· filed Jun 2024 → now Jun 2025· 38.1% built
- RAUNAK CITY SECTOR IV - D41.1 yr overdueRAUNAK CORPORATION · KALYAN WEST, ThaneP51700019962· 90.9% built· 4 complaints
- ANMOLPRITI1.1 yr overdueMuktistar Buildcon Private Limited · Borivali, Mumbai SuburbanP51800006598· filed Dec 2018 → now Jun 2025· 89.7% built· 6 complaints
- SHREENATH DARSHAN CHS1.1 yr overdueNexus Home LLP · PANVEL, RaigarhP52000048086· 72.7% built
- Sarathi Heights1.1 yr overdueSAKET SANJAY SAYANKAR · Satpur, NashikP51600050717· 76.4% built
- SHREE LAXMI VANDAN1.1 yr overduePRAGATI LAND DEVELOPERS · KANDIVALI WEST, Mumbai SuburbanP51800027654· filed Jun 2023 → now Jun 2025· 90.9% built
- SHREE SAI RESIDENCY1.1 yr overdueDHANDAI CONSTRUCTIONS BUILDERS and DEVELOPERS · GAVTHAN AREA SAMBHAJI CHOWK NR CARBON NAKA, NashikP51600030197· 90.9% built
- SIESTA1.1 yr overduePRESTIGE MULUND REALTY PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800005285· filed Dec 2023 → now Jun 2025· 77.7% built· 12 complaints
- Jyotsna Heritage Redevelopment of The Dahisar R.K. Nayak Niwasi CHS LTD1.1 yr overdueM/S SHREE SAINAMAH HOMES LLP · DAHISAR EAST, Mumbai SuburbanP51800047220· 88.2% built
- ANTAAYA1.1 yr overdueBALASAHEB BHATTU KARANJULE · Balewadi, PuneP52100024983· 52.7% built
- PINNACLE ADARSH1.1 yr overduePINNACLE ENTERPRISES · BELAVLI BADLAPUR WEST, ThaneP51700050363· 90.9% built
- Lifescapes Prithvii1.1 yr overdueGirnar Builders & Developers · Mumbai, Mumbai SuburbanP51800001333· filed Jan 2021 → now Jun 2025· 91.1% built
- YASHWIN HINJAWADI1.1 yr overdueVilas Javdekar Eco Shelters Private Limited · HINJAWADI, PuneP52100000037· 94.5% built· 2 complaints
- GREENVILLE BUILDING A31.1 yr overdueVision Realtors · HADAPSAR, PuneP52100052806· 68.2% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.