RERA projects past their possession deadline
11,770 MahaRERA-registered projects are past the possession date currently on file and still report under 100% construction progress. Both figures are the promoter's own disclosure to the regulator.
Page 53 of 59
- KYRAA PARK1.1 yr overdueKYRAA INFRA PROJECTS PRIVATE LIMITED · Thane, ThaneP51700005769· filed Dec 2023 → now Jun 2025· 67.3% built· 4 complaints
- DA Mathura Residency1.1 yr overdueDA ASSOCIATES · Mhasrul, NashikP51600027338· 90.9% built
- SHREENANDAN1.1 yr overdueSHREEYOG PROPERTIES · KATHE GALLI NASHIK, NashikP51600032910· filed Dec 2024 → now Jun 2025· 90.9% built
- ACE AURUM III TOWER 031.1 yr overdueJHAMTANI REALTY PRIVATE LIMITED · RAVET, PuneP52100025143· 49% built
- PROXIMUS1.1 yr overdueGeeCee Ventures Limited · CHEMBUR, Mumbai SuburbanP51800027318· 89.1% built
- Majestique Biznow1.1 yr overdueMajestique Springfields LLP · Kondhwa Khurd, PuneP52100027583· 40.9% built
- ATHARVA VANDAN1.1 yr overdueSIDDHIVINAYAK BUILDTECH · ADGAON, NashikP51600026106· 63.6% built
- REGENT HILL A B C D AND E WING1.1 yr overdueHGP Community Pvt. Ltd. · Kurla, Mumbai SuburbanP51800018620· 90.9% built· 2 complaints
- Prapti Heritage1.1 yr overdueTridev Enterprises · Manjarli Badlapur West, ThaneP51700025683· 90.9% built
- KANCHAN IMPERIAL1.1 yr overdueNOVEL BUILDCON · Palghar, PalgharP99000027066· filed Jun 2023 → now Jun 2025· 81.8% built
- HIRASHREE LAKE CITY APARTMENT PHASE III1.1 yr overdueKrishnat Shripatrao Patil · Rankala lake, KolhapurP53000028661· 86.4% built
- CEEJAY RESIDENCY1.1 yr overduePRIME REALTY LLP · Ward GSouth, Mumbai CityP51900028679· 99.7% built
- RUDRA PALACE1.1 yr overduePATEL ENTERPRISES · KHARGHAR, RaigarhP52000027165· 90.9% built
- Green County Phase II Wing-B1.1 yr overdueAnand Developers · Fursungi, PuneP52100026716· 86.1% built
- MILLENNIA1.1 yr overdueM/S SAGA CONSTRUCTIONS ANU GROUP · NEAR SHRIRANG VIHAR, PuneP52100032494· 81.8% built
- NICON INFINITY PHASE 21.1 yr overdueNICON INFRA LLP · GOKHIWARE, PalgharP99000028077· 78.6% built· 1 complaint
- BORIVALI YASHODHAN CHSL1.1 yr overdueTGN REALTOR LLP · BORIVALI WEST, Mumbai SuburbanP51800048607· filed Jun 2024 → now Jun 2025· 90.9% built
- LEELA ONE1.1 yr overdueSHUBHAM JAIDEEP RANA · JAI NAGRA NEW USMANPURA, AurangabadP51500025850· 90.9% built
- Paramount B1.1 yr overdueKalpataru Homes Private Limited · Thane, ThaneP51700004741· 93.4% built· 1 complaint
- ANANYA1.1 yr overdueTRYKSHA PROJECTS PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800026054· 90.9% built
- ACE AURUM III TOWER 011.1 yr overdueJHAMTANI REALTY PRIVATE LIMITED · RAVET, PuneP52100026571· 43.5% built
- NISARG GREENS Phase - 2 D1.1 yr overdueNND Ambernath LLP · Amberntah East, ThaneP51700031807· 63.6% built
- ACE AURUM III TOWER 021.1 yr overdueJHAMTANI REALTY PRIVATE LIMITED · RAVET, PuneP52100026568· 48.1% built
- Paramount A1.1 yr overdueKalpataru Homes Private Limited · Thane, ThaneP51700004031· 93.9% built· 5 complaints
- VTP Beaumonde Building T31.1 yr overdueARHUM ERECTORS PRIVATE LIMITED · Manjari, PuneP52100022781· 80.9% built· 6 complaints
- ESPACIO - COMMERCIAL1.1 yr overdueKNIGHT WEST REALTY LLP · BALEWADI, PuneP52100026492· 81.8% built
- Paramount D1.1 yr overdueKalpataru Homes Private Limited · Thane, ThaneP51700021474· 81.1% built· 4 complaints
- 19 North1.1 yr overdueKANDIVALI, Mumbai SuburbanP51800026243· 71.5% built
- HEMKUNJ1.1 yr overdueMAHENDRA RAVJIBHAI MAKWANA · Ghatkopar East, Mumbai SuburbanP51800047837· 63.6% built
- Haware Intelligentia Sigma South JVLR Wing A1.1 yr overdueSuresh Kashinath Haware · Tagore Nagar, Vikhroli East, Hariyali Village, Mumbai, Mumbai CityP51900028286· 47% built
- ICON RESIDENCY1.1 yr overdueICON BUILDERS · PUNE, PuneP52100033227· 27.3% built
- VISHWA RAM-SNEH1.1 yr overduePatki-Joshi Engineers and Contractors Pvt. Ltd. · Nagala Park, KolhapurP53000046648· 89.1% built
- HERITAGE GARDEN1.1 yr overdueHERITAGE GARDEN · Ulhasnagar, ThaneP51700054143· 53.6% built
- MAHADEO SHRUSHTI1.1 yr overdueMAHADEO BUILDCON · NASHIK, NashikP51600049425· 82.3% built
- ACE AURUM III TOWER 041.1 yr overdueJHAMTANI REALTY PRIVATE LIMITED · RAVET, PuneP52100024925· 50.5% built
- YashONE Infinitee - Phase I1.1 yr overdueVilas Javdekar Infinitee Developers Pvt. Ltd. · Near Puneville Project, PuneP52100028229· 96.4% built
- Kumar Pratham - D E G1.1 yr overdueKumar Agro Products Pvt Ltd · Moshi, PuneP52100031354· 93% built
- Joyville Hadapsar Annexe Phase 101.1 yr overdueJoyville Shapoorji Housing Private Limited · Shewalewadi, PuneP52100026795· 83.4% built
- 27 East1.1 yr overdueRashi Developers · Sagaon, ThaneP51700028466· 65.3% built
- Joyville Hadapsar Annexe Phase 91.1 yr overdueJoyville Shapoorji Housing Private Limited · Shewalewadi, PuneP52100026797· 86.5% built
- SILVER STONE1.1 yr overduePanama Sunarch Developers · HANDEWADI, PuneP52100010659· filed Dec 2024 → now Jun 2025· 79.2% built· 2 complaints
- GANGA ANTRA1.1 yr overdueMEENAMANI APC CONSTRUCTION (I) LLP · KHARADIP52100021195· filed Dec 2022 → now Jun 2025· 59.7% built· 1 complaint
- RAVI UDAY1.1 yr overdueLAJWANTI CONSULTANTS AND BUILDERS PRIVATE LIMITED · -, PuneP52100032853· 77.2% built
- Chinmay Paradise1.1 yr overdueChinmay Paradise · Kondhwa BK, PuneP52100047572· 74.5% built
- KUBER HEIGHTS1.1 yr overdueBHAGYODAY DEVELOPERS (A.O.P.) · BUDHAWAR PETH, SolapurP52600045423· 90.9% built
- MEDHA APARTMENTS1.1 yr overdueKEDAR SANJEEV KHADKE · PARVATI NORTH, PuneP52100046933· 81.8% built
- ELIXA PARK1.1 yr overdueAJAYSINH V DESAI BUILDERS & DEVELOPERS · ‘E’ Ward, KolhapurP53000001735· filed Dec 2022 → now Jun 2025· 86.2% built
- SAKAR PRIDE1.1 yr overdueOM DEVELOPERS · HIRAWADI, NashikP51600026720· 90.9% built
- VASANTSHREE1.1 yr overduePIONEER CONSTRUCTIONS · Chittavihari Society, PuneP52100045708· filed Dec 2024 → now Jun 2025· 90% built
- Gagan Ela1.1 yr overdueGagan Landmarks LLP · Mohammadwadi, PuneP52100002439· filed Dec 2020 → now Jun 2025· 76.2% built· 6 complaints
- Pranam1.1 yr overduePrimary Housing Corporation LLP · Talegaon, PuneP52100000382· filed Dec 2019 → now Jun 2025· 56.9% built
- ORIENT HILL VIEW1.1 yr overdueBOKHARA BUILDTECH · MOHAMMEDWADI, PuneP52100026764· 90.9% built· 1 complaint
- MAYFAIR GNYANADEEP1.1 yr overdueMAYFAIR HOUSING PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800034829· 89.5% built
- REDEVELOPMENT OF RUSHABH MAHAL CHSL1.1 yr overduePRANAV CONSTRUCTIONS LIMITED · MALAD EAST, Mumbai SuburbanP51800034099· 90.9% built
- Rajkamal1.1 yr overdueKhushi Associates · Borivali- West, Mumbai SuburbanP51800028704· 90.9% built
- KUSH SYMPHONY1.1 yr overdueKush Buildcon LLP · Mulund West, Mumbai SuburbanP51800030410· filed Dec 2023 → now Jun 2025· 90.9% built
- Global Luxuria1.1 yr overdueDnyaneshwar Mahadu Jadhav proprietor of Global Construction · Alephata, PuneP52100026469· 36.1% built
- Redevelopment of Sri Guruvayurappan Balmukund Co-operative Housing Society Ltd.1.1 yr overdueSMERA HOMES LLP · Chembur, Mumbai SuburbanP51800045578· filed Sept 2024 → now Jun 2025· 81.8% built
- PALMNEST PHASE III1.1 yr overdueNG RATHI PROPERTIES LLP · KESNAND ROAD, PuneP52100015668· filed Dec 2022 → now Jun 2025· 56.4% built· 1 complaint
- HELLY APARTMENT1.1 yr overdueSAFFRON DEVELOPERS · VEVOOR, PalgharP99000031499· filed Dec 2024 → now Jun 2025· 67.7% built
- VISION PRISA1.1 yr overdueP4 GROUP · Haveli, PuneP52100051225· 90.9% built
- GHATKOPAR AVENUE AARADHYA ONE EARTH H PHASE VII1.1 yr overdueMAN REALTORS AND HOLDING PRIVATE LIMITED · GHATKOPAR EAST, Mumbai SuburbanP51800046812· 63.6% built
- Royal Palm1.1 yr overdueBuildcon Enterprises · Washind, ThaneP51700028329· filed Jun 2024 → now Jun 2025· 78.5% built
- SUNSHINE GREEN PARK PHASE 21.1 yr overdueSHantee Homes Realty LLP · Vasai, PalgharP99000001294· filed Mar 2019 → now Jun 2025· 52.3% built· 3 complaints
- CHAITRANGAN1.1 yr overdueDEDGE HOUSING DEVELOPMENT LLP · KIRKATWADI, PuneP52100045554· filed Dec 2024 → now Jun 2025· 81.8% built
- SAISHREERAM1.1 yr overdueMUKESH MAHADEV VAZE · GOVT COLONY, SangliP53100027589· 90.9% built
- ADITI AARAMBH1.1 yr overdueVijay Rajaram Pawar · NA, SataraP52700046263· filed Dec 2024 → now Jul 2025· 33.3% built
- TRITON1.1 yr overdueJade Constructions Private Limited · SANTACRUZ WEST, Mumbai SuburbanP51800031222· 90.5% built
- Indraprastha Prestige1.1 yr overdueSomraj Vithalrao Deshmukh · Arun Sarnaik Nagar, KolhapurP53000000209· 90.9% built
- AAROHI COMPLEX1.1 yr overdueM/S TODAY SHYAM DEVELOPERS · NAVI MUMBAI, RaigarhP52000015331· filed Nov 2022 → now Jul 2025· 81.8% built· 1 complaint
- THE PARK RESIDENCES PHASE-I1.1 yr overdueDEVLAND INFRACON PVT. LTD. · OSHIWARA, Mumbai SuburbanP51800015211· 42.7% built
- mahalaxmi apartment 81.0 yr overdueP. S. ASSOCIATES · KEWAL COLONY, AmravatiP50300026192· 81.8% built
- EAGLERIDGE WING B1.0 yr overdueROMA BUILDERS PRIVATE LIMITED · PATLIPADA, HIRANANDANI ESTATE, OFF GHODBUNDER ROAD, ThaneP51700017267· 90.9% built
- VRUNDAVAN1.0 yr overdueSHREE VASTURACHANA REALTORS · ARIWALI, RaigarhP52000031656· filed Jul 2024 → now Jul 2025· 57.3% built
- EAGLERIDGE WING A1.0 yr overdueROMA BUILDERS PRIVATE LIMITED · PATLIPADA, HIRANANDANI ESTATE, OFF GHODBUNDER ROAD, ThaneP51700019923· 90.9% built
- SHREEKRUPA complex1.0 yr overdueK.K.Enterprises · Shrivardhan, RaigarhP52000014938· filed Jul 2021 → now Jul 2025· 83.9% built
- SOL1.0 yr overdueSWATI S HAJGUDE · TQ. LATUR, LaturP52400077158· 86.4% built
- PADMAVISHWA DREAM SQUARE1.0 yr overdueJAI PADMAVATI BUILDERS · MAUJE WADALA SHIWAR SHIVAJI NAGAR, NashikP51600022190· 90.9% built
- Hubtown Seasons Czarnowo1.0 yr overdueJoynest Premises Private Limited · Kurla, Mumbai SuburbanP51800003012· 70% built
- SARA VATIKA A3 AND A4 TYPE BUILDING1.0 yr overdueSAKAMBARI BUILDCON · NEAR PROPOSED ISKCON TEMPLE, AurangabadP51500030233· 66.4% built
- BALI DIVINE1.0 yr overdueBALI ESTATES LLP · GOREGAON WEST MUMBAI, Mumbai SuburbanP51800047014· 81.8% built
- FULORA CO-OP HOUSING SOCIETY LTD1.0 yr overduePINNACLE CREATORS · BADLAPUR EAST, ThaneP51700046975· 90.9% built
- ANANDI APARTMENTS1.0 yr overdueKUSHAL CONSTRUCTIONS · RAJENDRA NAGAR,HINGNA ROAD, NagpurP50500049002· filed Apr 2025 → now Jul 2025· 90% built
- KRISHNA VIJAY1.0 yr overdueM/S RUDRA DEVELOPERS · HADAPSAR, PuneP52100028074· filed Jun 2023 → now Jul 2025· 72.7% built
- BALAJI PRIDE APARTMENT1.0 yr overdueSHREE BALAJI BUILDERS and DEVELOPERS · DHRUVA NAGAR NR MOTIWALA MEDICAL COLLEGE, NashikP51600030424· 90.9% built
- SARVODAY NAGAR SECTOR 11.0 yr overdueTHALIA INVESTMENT PRIVATE LIMITED · Ambarnath, ThaneP51700007690· 89.1% built· 1 complaint
- BASHARABI PLAZA1.0 yr overdueAMAR CHAND ATTAR · Sawkar Colony Islampur, SangliP53100030376· 70.9% built
- MIRAYA ENCLAVE1.0 yr overdueM/S Ahirkar Developers · KH NO 100 101 102/1 AND 99 WARD NO 68 MOUZA DABHA, NagpurP50500047490· 65.5% built
- KUMAR PALAASH A11.0 yr overdueKUMAR & POTNIS ASSOCIATES · SOMNATH NAGARP52100028014· 90.9% built
- Yashodhan1.0 yr overdueAMIT JUGALKISHOR RATHI · Aundh, PuneP52100046635· 63.6% built
- SAPPHIRE INDUSTRIAL PREMISES1.0 yr overdueKRISHA BUILDTECH LLP · WALIV, PalgharP99000032272· 73.1% built
- VISHWAMUKH RESIDENCY1.0 yr overdueDEEPAK RAJESH AGRAWAL · AKOLI, AkolaP50100053392· 81.8% built
- VERVE1.0 yr overdueKOLTE-PATIL DEVELOPERS LIMITED · Bangur Nagar, Village Pahadi, Goregaon (West), Mumbai SuburbanP51800028783· 57.5% built
- SHYAM AASHIRWAD1.0 yr overdueJAIDEEP VINODRAI TANK · PANCHAVATI, NashikP51600047309· 54.5% built
- SHYAM ANAND1.0 yr overdueHEENA SATISHBHAI CHAVDA · MAKHAMALABAD, NashikP51600049282· 81.8% built
- SOLITAIRE1.0 yr overdueM/S KULKARNI LOHIA DEVELOPERS · SAMBHAJI NAGAR, KolhapurP53000047372· 29.1% built
- ANANTAA CITY CENTER1.0 yr overdueSuvarna Lifespace Developers LLP · SHRIRAMPUR, AHMEDNAGAR, AhmednagarP52200047466· 90.9% built
- NIRMITI RESIDENCY WING C AND D1.0 yr overdueSWASTIVASTU DEVELOPERS LLP · CHINTAMANINAGAR, SangliP53100028586· 81.8% built
- BHARADIYA TOWER1.0 yr overdueRAJ ASSOCIATES · NANDED, NandedP51100050694· 90.9% built
- Marvel Bounty J Building1.0 yr overdueMARVEL SIGMA HOMES PRIVATE LIMITED · Hadapsar, PuneP52100006797· filed Dec 2019 → now Aug 2025· 90.9% built· 5 complaints
- HARI OM HEIGHTS12 mo overdueDEEP VIJAY CONSTRUCTION · HARSOOL, AURANGABAD, AurangabadP51500033315· 81.4% built
- NYATI ERA I12 mo overdueNYATI CONSTRUCTION PRIVATE LIMITED · DHANORI, PuneP52100032682· filed Jun 2025 → now Aug 2025· 79.2% built· 3 complaints
- SAMARTH RECEDENCY12 mo overdueURMODI BUILDER & DEVELOPERS · Jakatwadi, SataraP52700016134· filed Sept 2022 → now Aug 2025· 88.2% built
- ADINATH DECCAN12 mo overdueDECCAN VENTURES · NEAR CIRCUIT HOUSE, SangliP53100046981· filed Jun 2025 → now Aug 2025· 67.3% built
- RASHMI VASUDEO12 mo overdueModi's Navnirman Limited · BORIVALI WEST, Mumbai SuburbanP51800051769· 95.5% built
- BORIVALI PADAM CHSL12 mo overdueAMISHA CONSTRUCTIONS PRIVATE LIMITED · BORIVALI WEST, Mumbai SuburbanP51800032736· filed Jun 2025 → now Aug 2025· 81.8% built
- Kumar Prospera - A612 mo overdueKumar Agro Products Pvt Ltd - Kumar Company (Now known as Kumar Construction and Properties Pvt Ltd) JV · Magarpatta, PuneP52100029906· filed Jun 2025 → now Aug 2025· 90.9% built
- Kailas Ashish12 mo overdueDNK Developers KA LLP · Ghatkopar East, Mumbai SuburbanP51800045948· 90.9% built
- THE PLATINUM TOWERS12 mo overdueAVISHKAR ARISTA DEVELOPERS LLP · KHARADIP52100019881· filed Mar 2025 → now Aug 2025· 81.6% built
- Krishvi Apartments12 mo overdueM/s Shagun Construction · -P51900004145· filed Dec 2018 → now Aug 2025· 90.9% built
- Kotwal Business Zone Building A11 mo overdueVISHHRAM DEVELOPERS · Village - Somatane, Tal - Mawal, PuneP52100054072· filed Mar 2025 → now Aug 2025· 72.7% built
- ROYAL RESIDENCY C PHASE I11 mo overdueDEVANG HEMANTKUMAR VYAS · Ward FSouth, Mumbai CityP51900012122· filed Jan 2018 → now Aug 2025· 90.9% built· 13 complaints
- MAYURESH PLANET11 mo overdueSHREEGOPAL JUGALKISHORE BARASIA · Thane, ThaneP51700011665· 86.4% built
- PARADISE HILLS NEW11 mo overduePARADISE ASSOCIATES · Wagdara (536084), NagpurP50500013765· 78.2% built
- UJWAL VIAAN A WING11 mo overdueUJWAL CONSTRUCTION · DHAYARI, PuneP52100028620· 9.7% built
- BALWANT RESIDENCY PHASE 211 mo overdueSUSHIL LAXMAN SHINGADE · VADUJ, SataraP52700026247· 45.5% built
- SPDL Greens Row House Phase I11 mo overdueSANDEEP DWELLERS PVT. LTD. · Wanjara, NagpurP50500022603· 81.8% built
- Nexus Kinaara B C11 mo overdueNexus Enterprises · Chikhali, PuneP52100031120· filed Aug 2024 → now Aug 2025· 88.2% built
- RACHANA11 mo overdueVISION REALTORS · PANVEL, RaigarhP52000030741· filed Aug 2024 → now Aug 2025· 0.7% built
- Fortune Pride11 mo overdueFOrtune Properties · Haveli, PuneP52100047707· 81.8% built
- Sur at Nanded City11 mo overdueNanded City Development & Construction Co. Ltd. · Nanded Phata, PuneP52100032686· 99.6% built
- GAJANAN HEIGHTS11 mo overdueSHREE GAJANAN BUILDERS AND DEVELOPERS · BORGAON, NagpurP50500052627· 90.9% built
- Siddhesh Shreeram11 mo overdueSiddhesh Developers · karvenagar, PuneP52100047903· 89.5% built
- 153 SKYE11 mo overdueNITIN SHANTILAL GADA · MATUNGA WESTP51900047692· filed Aug 2024 → now Aug 2025· 90.9% built
- Ganraj Heights11 mo overdueM/S Viraj Infra Heights · Shree Ran Nagar Layout, NagpurP50500047070· 49.5% built
- Harikunj Enclave11 mo overdueSamir Shrinivas Kale · Brahman Society, Naupada, ThaneP51700047799· 80.9% built
- PARGAONKAR NAGAR - II11 mo overdueRUDRA BUILDERS AND DEVELOPERS · AURANGABAD, AurangabadP51500047669· 4.8% built
- Unique Legacy Royale11 mo overdueUnique Realty · Keshavnagar, PuneP52100030486· 90.9% built
- SAFALYA11 mo overdueHRISHIKESH SHRIPAD DESHPANDE · VISHRAMBAG, SangliP53100048427· 90.9% built
- ARIHANT VIEW11 mo overdueARIHANT LABDHI BUILDERS PRIVATE LIMITED · SANTACRUZ EAST MUMBAI, Mumbai SuburbanP51800055681· 43.2% built
- SULOCHANA PARK11 mo overdueANIL HIRAMAN RIKAME · NASHIK SHIWAR, NashikP51600028850· 6.4% built
- SHYAM ICON11 mo overdueRAMDEV CONSTRUCTION · NEAR RTO CORNER MERI, NashikP51600031542· 72.7% built
- AADINATH PROSPERA11 mo overdueAADINATH PROPERTIES · NANDANVAN COLONY, AurangabadP51500028644· 81.8% built
- KUSH ELEGANTE11 mo overdueKUSH REALCON LLP · KANDIVALI WEST, Mumbai SuburbanP51800027575· filed Jun 2024 → now Sept 2025· 81.8% built· 1 complaint
- TruSpace Premiera11 mo overdueAtharva Enterprises · Near Park Central Hotel, PuneP52100048391· filed May 2024 → now Sept 2025· 81.8% built
- VANTAGIO. PH211 mo overdueHarmony Shubham Associates · Pune, PuneP52100034311· filed Apr 2024 → now Sept 2025· 94.5% built
- TRINITY TOWER11 mo overdueS S DEVELOPERS · SHIRWAL, SataraP52700032771· 77.3% built
- Amanora Ascent Avenue11 mo overdueCity Corporation Limited · Hadapsar, PuneP52100047453· filed Jun 2025 → now Sept 2025· 81.8% built
- SNEHAM11 mo overdueParidhi Developers · Thane, ThaneP51700020410· filed Feb 2025 → now Sept 2025· 81.8% built
- New Abhiram CHS LTD10 mo overduePeerless Constructions Pvt. Ltd. · Kastur Park, Mumbai SuburbanP51800045965· filed Jun 2025 → now Sept 2025· 73.2% built
- SARVADA HEIGHTS10 mo overdueSARVADA ENTERPRISES · DHAWANEWADI, RatnagiriP52800015906· filed Sept 2022 → now Sept 2025· 90.8% built
- Alpha C10 mo overdueRaichandani Constructions Private Limited · Pune, PuneP52100045387· filed Sept 2024 → now Sept 2025· 90.9% built
- SIDDHI SKYLARK10 mo overdueGANGADHAR RAMESH BHALEKAR · MOSHI, PuneP52100045994· filed Sept 2024 → now Sept 2025· 81.7% built
- Astonia Royale Phase II - K and L Building10 mo overdueAMIT ENTERPRISES HOUSING LIMITED · Ambegaon Bk, PuneP52100001124· filed Dec 2021 → now Sept 2025· 91.1% built
- REDEVELOPMENT OF NEW SHALIMAR APARTMENTS CHSL10 mo overduePRANAV CONSTRUCTIONS LIMITED · Borivali, Mumbai SuburbanP51800034915· 90.9% built
- Hillview Residency P Commercial10 mo overdueKUMAR BEHARAY PROPERTIES LLP · Behind Mahatma Society Kothrud, PuneP52100052705· filed Sept 2024 → now Sept 2025· 81.8% built
- GHATKOPAR AVENUE AARADHYA ONE EARTH E PHASE II10 mo overdueMAN REALTORS AND HOLDINGS PRIVATE LIMITED · Kurla, Mumbai SuburbanP51800027588· 63.6% built
- Metropolis - Aquaris Phase 210 mo overdueANANT SQUARE · Kasarvadavli, ThaneP51700022959· 90.9% built
- Krushanadarshan10 mo overdueVISHAVAJIT · Bandhakarwadi, SindhudurgP52900028902· 90.9% built
- REDEVELOPMENT OF GOLD COIN CHSL10 mo overduePRANAV CONSTRUCTIONS LIMITED · MUMBAI, Mumbai SuburbanP51800034931· 90.9% built· 1 complaint
- KALASH PALACE C WING10 mo overdueSWASTIK ESTATES · NR. MSEB GODOWN, NashikP51600026544· 81.8% built
- Metro Park County10 mo overdueM/s. Dream Works Realty · Balewadi, PuneP52100028748· 95.8% built· 1 complaint
- ATHANG HOMES Project By Morvekar Realtors10 mo overdueCHANDRASHEKHAR SURYAKANT MORVEKAR · Kandalgaon, SindhudurgP52900026109· 85.5% built
- Kalpataru Bliss Apartments10 mo overdueKlassik Vinyl Products LLP · Andheri, Mumbai SuburbanP51800020262· 81.5% built· 3 complaints
- SAMARTH RESIDENCY10 mo overdueS B ASSOCIATES · UTTARA NAGRI, AurangabadP51500032439· 85.5% built
- JOYVILLE HADAPSAR ANNEXE PHASE 610 mo overdueJoyville Shapoorji Housing Private Limited · Shewalewadi, PuneP52100026779· 80.3% built
- Pruthvi Park View10 mo overduePruthvi Enterprise · Vile Parle East, Mumbai SuburbanP51800047524· 80.5% built
- Maatr Skye10 mo overdueMaatr Ventures · Khadakpada, ThaneP51700028786· 90.9% built
- RAM RIVERA10 mo overdueKULGAON BADLAPUR, ThaneP51700049706· 39% built
- VRUNDAVAN HEIGHTS10 mo overdueVRUNDAVAN DEVELOPERS · PATAT, PuneP52100030876· filed Sept 2024 → now Sept 2025· 89.1% built
- Shriniwasa Residency10 mo overdueMoreshwar Gopalrao Kale · Ramdaspeth, NagpurP50500048587· filed Dec 2024 → now Sept 2025· 68.3% built
- KEYSTONE RESIDENCY APARTMENT10 mo overdueKEYSTONE DEVELOPERS · NASHIK SHIVAR, NashikP51600022554· 90.9% built
- NEEL SIDHI SAPPHIRE10 mo overdueNEEL SIDHI REALTIES · KHANDA COLONY, RaigarhP52000046192· filed May 2023 → now Sept 2025· 81.8% built
- Inner Circle Phase 210 mo overdueExpress Interiors & Contractors LLP · Dattapada, RaigarhP52000031498· filed Sept 2023 → now Sept 2025· 87.7% built
- GHATKOPAR AVENUE AARADHYA ONE EARTH F PHASE IV10 mo overdueMAN REALTORS AND HOLDINGS PVT LTD · Kurla, Mumbai SuburbanP51800027826· 63.6% built
- Govind Nagar SRA CHS Ltd.10 mo overdueDrishti Developers II · mahakali, Mumbai SuburbanP51800010475· filed Sept 2022 → now Sept 2025· 98.7% built
- BUSINESS CAPITAL10 mo overdueRAM CONSTRUCTIONS · Wadala, NashikP51600023619· 81.8% built
- AYESHA GARDEN B WING10 mo overdueAZKA BUILDERS AND DEVELOPERS · KALYAN, ThaneP51700033810· filed Dec 2024 → now Sept 2025· 82.3% built
- OZONE10 mo overdueSURE DEAL MARKETING PVT LTD · VIMAL NAGAR OZAR NIPHAD NASHIK, NashikP51600031592· 81.8% built
- GANRAJ APARTMENT10 mo overdueVAASTU VISHWA DEVELOPERSSS · JALOCHI, PuneP52100052009· 90.9% built
- Monte Verita North Annexe10 mo overdueM/s B G Shirke Redevelopment and Gas Pvt. Ltd. (Formerly M/s B G Shirke Oil and Gas India Pvt. Ltd.) · Gulmohar City, Magathane, Mumbai SuburbanP51800028561· 48.4% built· 2 complaints
- Bhaskar 7410 mo overdueGondwana Builders and Developers · Shivaji Nagar, NagpurP50500050720· 70% built
- NYATI ERA II10 mo overdueNYATI CONSTRUCTION PRIVATE LIMITED · DHANORIP52100035037· filed Mar 2025 → now Sept 2025· 59.4% built· 1 complaint
- TEMPLE VIEW APARTMENT10 mo overdueFATTECHAND GHEVARCHAND BAGMAR · GULMOHAR NAGAR MHASRUL PANCHVATI NASHIK, NashikP51600048539· 90.9% built
- GODREJ BOULEVARD10 mo overdueManjari Housing Projects LLP · Manjri Khurd, PuneP52100024616· 81.8% built· 3 complaints
- DATT-KEDAR SAHNIVAS10 mo overdueDATTAGURU ASSOCIATES · KUPWAD SANGLI, SangliP53100047577· 81.8% built
- ROONGTA PRECISO APARTMENT10 mo overdueROONGTA HOMES LLP · NASHIK, NashikP51600046804· 53.9% built· 3 complaints
- SUNDER MOTI10 mo overdueDILIP MOTILALJI CHORDIA · CHINCHWAD, PuneP52100051080· filed Mar 2025 → now Sept 2025· 81.4% built
- YASH PLATINA10 mo overdueMD REALTORS & DEVELOPERS LLP · NEAR PENINSNULA PARK VIRAR WEST, PalgharP99000026746· 31.8% built
- KRUTANJALI APARTMENTS10 mo overdueGULAB TULSIRAM WANJARI · Somalwada, NagpurP50500048943· 72.7% built
- VENKATESH GRAFFITI GLOVER PHASE 210 mo overdueSHREE VENKATESH BUILDCON PVT LTD · KESHAVNAGAR MUNDHWA PUNE, PuneP52100025956· 90.9% built
- APURVA VAISHALI CHSL10 mo overdueDIRAVYA DEVELOPERS LLP · BORIVALI EAST, Mumbai SuburbanP51800050330· 90.9% built
- Tapadiya City Center10 mo overdueLandmark Tapadia LLP · Saturna, AmravatiP50300019138· 27.3% built
- Windsor County Phase IV Wing I10 mo overdueWindsor Shelters · Ambegaon Bk., PuneP52100034251· 90.9% built
- Jai Jinendra Apartment10 mo overdueH D DEVELOPERS · Mhasrul Shivar, NashikP51600048859· 61.8% built
- SHIV RESIDENCY10 mo overdueMAHI DEVELOPERS · Palghar, PalgharP99000003893· filed Mar 2021 → now Sept 2025· 63.6% built
- Triaa Aashray10 mo overdueEBPL HOMES LLP · Shindewadi, SataraP52700013128· filed Sept 2018 → now Sept 2025· 86.8% built· 1 complaint
- T9 Chronos and T10 Supremus Phase 1 Of Raheja Reserve being Buildings T7 T8 T9 T10 in RV Premiere10 mo overdueCavalcade Properties Private Limited · NIBM, PuneP52100021356· 72.7% built· 5 complaints
- VIVANTA MARVEL10 mo overdueTECHNO VISION REALTORS LLP · MIRA ROAD - EAST, ThaneP51700031458· 90% built· 1 complaint
- Gurumauli Residency10 mo overdueKirti Babu Mhatre · Ulwe, Panvel, RaigarhP52000047279· 49.3% built
- Bhakti Shrinidhi10 mo overdueBHAKTI BUILDERS · Chinchwad, PuneP52100051298· 81.8% built
- DHRUVA TOWER10 mo overdueAPURVA BUILDERS and DEVELOPERS · MAUJE GANGAPUR SHIWAR NR MOTIWALA MEDICLE COLLAGE, NashikP51600031244· 95.5% built
- Park Infinia - B1 and B210 mo overdueKumar Properties and Real Estate Pvt. Ltd. · Hadapsar, PuneP52100047895· filed Jul 2025 → now Oct 2025· 78.7% built
- MALUSARE RESIDENCY10 mo overdueSANDEEP ENTERPRISES · VARASGAO, RaigarhP52000010748· filed Apr 2020 → now Oct 2025· 81.8% built
- GULMOHAR PARK10 mo overdueDEEPAK BHAUSAHEB KATE · BARAMATI, PuneP52100051482· 38.1% built
- MANJIRI PRATHAM10 mo overdueSHRI DEVELOPERS · SHRI SAMARTH SOCIETY,, OsmanabadP52500047191· filed Jul 2025 → now Oct 2025· 72.7% built
- S SQUARE10 mo overdueSANDIP MADHAV BHADALE · BAVDHAN KHURD, PuneP52100053501· filed Mar 2025 → now Oct 2025· 90.9% built
- KP TOWER10 mo overdueRAVINDRA SHANKAR KHILARE · VITTHAL NAGAR SANGLI, SangliP53100050541· 63.2% built
- Jubilation A Wing Phase II9 mo overdueAakankssha Properties · Yawalewadi, PuneP52100047953· 27.3% built
- SHRI VENKATESH PARK9 mo overdueAJAY BUILDERS DAUND · GOPALWADI, PuneP52100048143· 81.8% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.