RERA projects past their possession deadline
12,128 MahaRERA-registered projects are past the possession date currently on file and still report under 100% construction progress. Both figures are the promoter's own disclosure to the regulator.
Page 54 of 61
- BALWANT RESIDENCY PHASE 21.2 yr overdueSUSHIL LAXMAN SHINGADE · VADUJ, SataraP52700026247· 45.5% built
- UJWAL VIAAN A WING1.2 yr overdueUJWAL CONSTRUCTION · DHAYARI, PuneP52100028620· 9.7% built
- SPDL Greens Row House Phase I1.2 yr overdueSANDEEP DWELLERS PVT. LTD. · Wanjara, NagpurP50500022603· 81.8% built
- Nexus Kinaara B C1.2 yr overdueNexus Enterprises · Chikhali, PuneP52100031120· filed Aug 2024 → now Aug 2025· 88.2% built
- RAGHAV MARVEL1.2 yr overdueRAGHAV RAJ BUILDERS & DEVELOPERS LLP · Nehrunagar, Mumbai SuburbanP51800045396· filed Aug 2024 → now Aug 2025· 88.6% built· 4 complaints
- RACHANA1.2 yr overdueVISION REALTORS · PANVEL, RaigarhP52000030741· filed Aug 2024 → now Aug 2025· 0.7% built
- 153 SKYE1.2 yr overdueNITIN SHANTILAL GADA · MATUNGA WESTP51900047692· filed Aug 2024 → now Aug 2025· 90.9% built
- Bitcon Paradise Complex -Ecstasy1.2 yr overdueKiran Development Corporation · Achole, PalgharP99000031200· 81.8% built
- Harikunj Enclave1.2 yr overdueSamir Shrinivas Kale · Brahman Society, Naupada, ThaneP51700047799· 80.9% built
- GAJANAN HEIGHTS1.2 yr overdueSHREE GAJANAN BUILDERS AND DEVELOPERS · BORGAON, NagpurP50500052627· 90.9% built
- Fortune Pride1.2 yr overdueFOrtune Properties · Haveli, PuneP52100047707· 81.8% built
- Sur at Nanded City1.2 yr overdueNanded City Development & Construction Co. Ltd. · Nanded Phata, PuneP52100032686· 99.6% built
- Ganraj Heights1.2 yr overdueM/S Viraj Infra Heights · Shree Ran Nagar Layout, NagpurP50500047070· 49.5% built
- ARIHANT VIEW1.2 yr overdueARIHANT LABDHI BUILDERS PRIVATE LIMITED · SANTACRUZ EAST MUMBAI, Mumbai SuburbanP51800055681· 43.2% built
- Siddhesh Shreeram1.2 yr overdueSiddhesh Developers · karvenagar, PuneP52100047903· 89.5% built
- SAFALYA1.2 yr overdueHRISHIKESH SHRIPAD DESHPANDE · VISHRAMBAG, SangliP53100048427· 90.9% built
- PARGAONKAR NAGAR - II1.2 yr overdueRUDRA BUILDERS AND DEVELOPERS · AURANGABAD, AurangabadP51500047669· 4.8% built
- Unique Legacy Royale1.2 yr overdueUnique Realty · Keshavnagar, PuneP52100030486· 90.9% built
- SHYAM ICON1.2 yr overdueRAMDEV CONSTRUCTION · NEAR RTO CORNER MERI, NashikP51600031542· 72.7% built
- Avyukta Breeze1.2 yr overdueShivoham Associates · I C Colony, Mumbai SuburbanP51800034240· 72.7% built
- SULOCHANA PARK1.2 yr overdueANIL HIRAMAN RIKAME · NASHIK SHIWAR, NashikP51600028850· 6.4% built
- AADINATH PROSPERA1.2 yr overdueAADINATH PROPERTIES · NANDANVAN COLONY, AurangabadP51500028644· 81.8% built
- KUSH ELEGANTE1.2 yr overdueKUSH REALCON LLP · KANDIVALI WEST, Mumbai SuburbanP51800027575· filed Jun 2024 → now Sept 2025· 81.8% built· 1 complaint
- TruSpace Premiera1.2 yr overdueAtharva Enterprises · Near Park Central Hotel, PuneP52100048391· filed May 2024 → now Sept 2025· 81.8% built
- VANTAGIO. PH21.2 yr overdueHarmony Shubham Associates · Pune, PuneP52100034311· filed Apr 2024 → now Sept 2025· 94.5% built
- TRINITY TOWER1.2 yr overdueS S DEVELOPERS · SHIRWAL, SataraP52700032771· 77.3% built
- SKYRISE RESIDENCY1.2 yr overdueNISHITH SUBANDHU LUHAR · AMBERNATH, ThaneP51700051261· filed Jul 2025 → now Sept 2025· 81.8% built
- Amanora Ascent Avenue1.2 yr overdueCity Corporation Limited · Hadapsar, PuneP52100047453· filed Jun 2025 → now Sept 2025· 81.8% built
- SNEHAM1.1 yr overdueParidhi Developers · Thane, ThaneP51700020410· filed Feb 2025 → now Sept 2025· 81.8% built
- New Abhiram CHS LTD1.1 yr overduePeerless Constructions Pvt. Ltd. · Kastur Park, Mumbai SuburbanP51800045965· filed Jun 2025 → now Sept 2025· 73.2% built
- SARVADA HEIGHTS1.1 yr overdueSARVADA ENTERPRISES · DHAWANEWADI, RatnagiriP52800015906· filed Sept 2022 → now Sept 2025· 90.8% built
- Alpha C1.1 yr overdueRaichandani Constructions Private Limited · Pune, PuneP52100045387· filed Sept 2024 → now Sept 2025· 90.9% built
- SIDDHI SKYLARK1.1 yr overdueGANGADHAR RAMESH BHALEKAR · MOSHI, PuneP52100045994· filed Sept 2024 → now Sept 2025· 81.7% built
- APURVA VAISHALI CHSL1.1 yr overdueDIRAVYA DEVELOPERS LLP · BORIVALI EAST, Mumbai SuburbanP51800050330· 90.9% built
- VIVANTA MARVEL1.1 yr overdueTECHNO VISION REALTORS LLP · MIRA ROAD - EAST, ThaneP51700031458· 90% built· 1 complaint
- SUNDER MOTI1.1 yr overdueDILIP MOTILALJI CHORDIA · CHINCHWAD, PuneP52100051080· filed Mar 2025 → now Sept 2025· 81.4% built
- ATHANG HOMES Project By Morvekar Realtors1.1 yr overdueCHANDRASHEKHAR SURYAKANT MORVEKAR · Kandalgaon, SindhudurgP52900026109· 85.5% built
- GHATKOPAR AVENUE AARADHYA ONE EARTH E PHASE II1.1 yr overdueMAN REALTORS AND HOLDINGS PRIVATE LIMITED · Kurla, Mumbai SuburbanP51800027588· 63.6% built
- OZONE1.1 yr overdueSURE DEAL MARKETING PVT LTD · VIMAL NAGAR OZAR NIPHAD NASHIK, NashikP51600031592· 81.8% built
- JOYVILLE HADAPSAR ANNEXE PHASE 61.1 yr overdueJoyville Shapoorji Housing Private Limited · Shewalewadi, PuneP52100026779· 80.3% built
- NEEL SIDHI SAPPHIRE1.1 yr overdueNEEL SIDHI REALTIES · KHANDA COLONY, RaigarhP52000046192· filed May 2023 → now Sept 2025· 81.8% built
- GHATKOPAR AVENUE AARADHYA ONE EARTH F PHASE IV1.1 yr overdueMAN REALTORS AND HOLDINGS PVT LTD · Kurla, Mumbai SuburbanP51800027826· 63.6% built
- NYATI ERA II1.1 yr overdueNYATI CONSTRUCTION PRIVATE LIMITED · DHANORIP52100035037· filed Mar 2025 → now Sept 2025· 59.4% built· 1 complaint
- Maatr Skye1.1 yr overdueMaatr Ventures · Khadakpada, ThaneP51700028786· 90.9% built
- KEYSTONE RESIDENCY APARTMENT1.1 yr overdueKEYSTONE DEVELOPERS · NASHIK SHIVAR, NashikP51600022554· 90.9% built
- SAMARTH RESIDENCY1.1 yr overdueS B ASSOCIATES · UTTARA NAGRI, AurangabadP51500032439· 85.5% built
- RAM RIVERA1.1 yr overdueKULGAON BADLAPUR, ThaneP51700049706· 39% built
- VENKATESH GRAFFITI GLOVER PHASE 21.1 yr overdueSHREE VENKATESH BUILDCON PVT LTD · KESHAVNAGAR MUNDHWA PUNE, PuneP52100025956· 90.9% built
- SHIV RESIDENCY1.1 yr overdueMAHI DEVELOPERS · Palghar, PalgharP99000003893· filed Mar 2021 → now Sept 2025· 63.6% built
- Inner Circle Phase 21.1 yr overdueExpress Interiors & Contractors LLP · Dattapada, RaigarhP52000031498· filed Sept 2023 → now Sept 2025· 87.7% built
- AYESHA GARDEN B WING1.1 yr overdueAZKA BUILDERS AND DEVELOPERS · KALYAN, ThaneP51700033810· filed Dec 2024 → now Sept 2025· 82.3% built
- VRUNDAVAN HEIGHTS1.1 yr overdueVRUNDAVAN DEVELOPERS · PATAT, PuneP52100030876· filed Sept 2024 → now Sept 2025· 89.1% built
- ROONGTA PRECISO APARTMENT1.1 yr overdueROONGTA HOMES LLP · NASHIK, NashikP51600046804· 53.9% built· 3 complaints
- Astonia Royale Phase II - K and L Building1.1 yr overdueAMIT ENTERPRISES HOUSING LIMITED · Ambegaon Bk, PuneP52100001124· filed Dec 2021 → now Sept 2025· 91.1% built
- Metropolis - Aquaris Phase 21.1 yr overdueANANT SQUARE · Kasarvadavli, ThaneP51700022959· 90.9% built
- Bhaskar 741.1 yr overdueGondwana Builders and Developers · Shivaji Nagar, NagpurP50500050720· 70% built
- GODREJ BOULEVARD1.1 yr overdueManjari Housing Projects LLP · Manjri Khurd, PuneP52100024616· 81.8% built· 3 complaints
- ACE AASTHA BUILDING C1.1 yr overdueSAKSHI DEVELOPERS · OPP. TANISHQ ORCHID SOCIETY, PuneP52100024476· filed Oct 2024 → now Sept 2025· 87.7% built· 11 complaints
- YASH PLATINA1.1 yr overdueMD REALTORS & DEVELOPERS LLP · NEAR PENINSNULA PARK VIRAR WEST, PalgharP99000026746· 31.8% built
- GANRAJ APARTMENT1.1 yr overdueVAASTU VISHWA DEVELOPERSSS · JALOCHI, PuneP52100052009· 90.9% built
- Bhakti Shrinidhi1.1 yr overdueBHAKTI BUILDERS · Chinchwad, PuneP52100051298· 81.8% built
- Monte Verita North Annexe1.1 yr overdueM/s B G Shirke Redevelopment and Gas Pvt. Ltd. (Formerly M/s B G Shirke Oil and Gas India Pvt. Ltd.) · Gulmohar City, Magathane, Mumbai SuburbanP51800028561· 48.4% built· 2 complaints
- KRUTANJALI APARTMENTS1.1 yr overdueGULAB TULSIRAM WANJARI · Somalwada, NagpurP50500048943· 72.7% built
- REDEVELOPMENT OF NEW SHALIMAR APARTMENTS CHSL1.1 yr overduePRANAV CONSTRUCTIONS LIMITED · Borivali, Mumbai SuburbanP51800034915· 90.9% built
- BUSINESS CAPITAL1.1 yr overdueRAM CONSTRUCTIONS · Wadala, NashikP51600023619· 81.8% built
- Kalpataru Bliss Apartments1.1 yr overdueKlassik Vinyl Products LLP · Andheri, Mumbai SuburbanP51800020262· 81.5% built· 3 complaints
- DHRUVA TOWER1.1 yr overdueAPURVA BUILDERS and DEVELOPERS · MAUJE GANGAPUR SHIWAR NR MOTIWALA MEDICLE COLLAGE, NashikP51600031244· 95.5% built
- Tapadiya City Center1.1 yr overdueLandmark Tapadia LLP · Saturna, AmravatiP50300019138· 27.3% built
- Godrej Parkridge1.1 yr overdueManjari Housing Projects LLP · Manjari Kh, PuneP52100028310· 71.3% built· 37 complaints
- Jai Jinendra Apartment1.1 yr overdueH D DEVELOPERS · Mhasrul Shivar, NashikP51600048859· 61.8% built
- REDEVELOPMENT OF GOLD COIN CHSL1.1 yr overduePRANAV CONSTRUCTIONS LIMITED · MUMBAI, Mumbai SuburbanP51800034931· 90.9% built· 1 complaint
- KALASH PALACE C WING1.1 yr overdueSWASTIK ESTATES · NR. MSEB GODOWN, NashikP51600026544· 81.8% built
- Hillview Residency P Commercial1.1 yr overdueKUMAR BEHARAY PROPERTIES LLP · Behind Mahatma Society Kothrud, PuneP52100052705· filed Sept 2024 → now Sept 2025· 81.8% built
- Vatika1.1 yr overduekishor Laxmanrao Nimhan · warje, PuneP52100027403· 90.9% built
- Pruthvi Park View1.1 yr overduePruthvi Enterprise · Vile Parle East, Mumbai SuburbanP51800047524· 80.5% built
- Metro Park County1.1 yr overdueM/s. Dream Works Realty · Balewadi, PuneP52100028748· 95.8% built· 1 complaint
- Krushanadarshan1.1 yr overdueVISHAVAJIT · Bandhakarwadi, SindhudurgP52900028902· 90.9% built
- T9 Chronos and T10 Supremus Phase 1 Of Raheja Reserve being Buildings T7 T8 T9 T10 in RV Premiere1.1 yr overdueCavalcade Properties Private Limited · NIBM, PuneP52100021356· 72.7% built· 5 complaints
- Govind Nagar SRA CHS Ltd.1.1 yr overdueDrishti Developers II · mahakali, Mumbai SuburbanP51800010475· filed Sept 2022 → now Sept 2025· 98.7% built
- Shriniwasa Residency1.1 yr overdueMoreshwar Gopalrao Kale · Ramdaspeth, NagpurP50500048587· filed Dec 2024 → now Sept 2025· 68.3% built
- Gurumauli Residency1.1 yr overdueKirti Babu Mhatre · Ulwe, Panvel, RaigarhP52000047279· 49.3% built
- TEMPLE VIEW APARTMENT1.1 yr overdueFATTECHAND GHEVARCHAND BAGMAR · GULMOHAR NAGAR MHASRUL PANCHVATI NASHIK, NashikP51600048539· 90.9% built
- Triaa Aashray1.1 yr overdueEBPL HOMES LLP · Shindewadi, SataraP52700013128· filed Sept 2018 → now Sept 2025· 86.8% built· 1 complaint
- DATT-KEDAR SAHNIVAS1.1 yr overdueDATTAGURU ASSOCIATES · KUPWAD SANGLI, SangliP53100047577· 81.8% built
- Windsor County Phase IV Wing I1.1 yr overdueWindsor Shelters · Ambegaon Bk., PuneP52100034251· 90.9% built
- Park Infinia - B1 and B21.1 yr overdueKumar Properties and Real Estate Pvt. Ltd. · Hadapsar, PuneP52100047895· filed Jul 2025 → now Oct 2025· 78.7% built
- MAYA MAMTA1.1 yr overdueGREENBUILDING LIFESCAPES LLP · Borivali WEST, Mumbai SuburbanP51800045381· 0% built
- MALUSARE RESIDENCY1.1 yr overdueSANDEEP ENTERPRISES · VARASGAO, RaigarhP52000010748· filed Apr 2020 → now Oct 2025· 81.8% built
- GULMOHAR PARK1.1 yr overdueDEEPAK BHAUSAHEB KATE · BARAMATI, PuneP52100051482· 38.1% built
- MANJIRI PRATHAM1.1 yr overdueSHRI DEVELOPERS · SHRI SAMARTH SOCIETY,, OsmanabadP52500047191· filed Jul 2025 → now Oct 2025· 72.7% built
- S SQUARE1.1 yr overdueSANDIP MADHAV BHADALE · BAVDHAN KHURD, PuneP52100053501· filed Mar 2025 → now Oct 2025· 90.9% built
- KP TOWER1.1 yr overdueRAVINDRA SHANKAR KHILARE · VITTHAL NAGAR SANGLI, SangliP53100050541· 63.2% built
- Jubilation A Wing Phase II1.0 yr overdueAakankssha Properties · Yawalewadi, PuneP52100047953· 27.3% built
- SHRI VENKATESH PARK1.0 yr overdueAJAY BUILDERS DAUND · GOPALWADI, PuneP52100048143· 81.8% built
- ISHANYA HEIGHTS1.0 yr overdueVIVAAN INFRA · AURANGABAD, AurangabadP51500051507· 42.7% built
- LEENA PARADISE1.0 yr overdueLEENA DEVELOPERS & INFRASTRUCTURES · CHINCHAVLI-SHEKIN, NEAR LOWJEE RAILWAY STATION, RaigarhP52000031814· 89.1% built
- KRYSTAL ONE PHASE I1.0 yr overdueRAMA SPACES · Chikhali, PuneP52100030567· filed Oct 2024 → now Oct 2025· 90.9% built· 2 complaints
- Legacy Imperial Phase I1.0 yr overdueWhite Properties and Ventures · Near Symbiosis College, PuneP52100046570· 95.5% built
- RAVIKIRAN ANNEXE PHASE I1.0 yr overdueDREAMHOUSE CONSTRUCTIONS PRIVATE LIMITED · WADMUKHWADI, PuneP52100045726· 90.9% built
- AAKAR PRIME1.0 yr overdueROHIT ASHOKRAO JIWARKAR · AMRAVATI CAMP, AmravatiP50300049011· 81.8% built
- JADE GARDENS TOWER A1.0 yr overdueJAIRAJHAPPYHOMES · Pant Nagar Ghatkopar East, Mumbai SuburbanP51800033601· 61.4% built
- PRISM INDUSTRIAL ESTATE1.0 yr overdueSPLENDOR SHELTERS PVT LTD · NEAR PENDHARKAR COLLEGE, ThaneP51700032231· 90.9% built
- HRISHIKESH 31.0 yr overdueRare Livspace · Nevali, RaigarhP52000052666· filed Jun 2025 → now Oct 2025· 80% built
- Jade Gardens Tower B1.0 yr overdueJAIRAJHAPPYHOMES · Pant Nagar Ghatkopar East, Mumbai SuburbanP51800033945· 79.1% built
- RATNANKUR1.0 yr overdueRanjekar Realty LLP · Kothrud, PuneP52100035032· 81.8% built
- ASHIRWAD SYMPHONY APARTMENT1.0 yr overdueASHIRWAD BUILDWELL · OLD ADGAON NAKA PANCHVATI NASHIK, NashikP51600032197· 90.9% built
- DIVUM1.0 yr overdueDYNAMIX CONTRACTORS & BUILDERS PRIVATE LIMITED · Borivali, Mumbai SuburbanP51800018784· filed Sept 2024 → now Oct 2025· 83.9% built· 2 complaints
- Crest Parkview1.0 yr overdueCREST VENTURES LIMITED · Bandra West, Mumbai SuburbanP51800045968· 80.9% built
- Peninsula - D1.0 yr overdueKumar Agro Products Pvt Ltd · Pashan, PuneP52100049664· 76.2% built
- JADE GARDENS TOWER C1.0 yr overdueJAIRAJHAPPYHOMES · Pant Nagar Ghatkopar East, Mumbai SuburbanP51800033954· 81.8% built
- Mauli Green Park Phase-21.0 yr overdueMauli Developers · Mauli Green Park, AhmednagarP52200032285· 72.7% built
- Seeta-Govind1.0 yr overdueRANADE REALTORS LLP · SADASHIV PETH, PuneP52100027756· 81.8% built
- SHRIRAM RESIDENCY1.0 yr overdueMS OM CONSTRUCTION · NEAR BELBAG, KolhapurP53000050820· 90.9% built
- SHREE VAIBHAV CLASSIC12 mo overdueDSJ GROUP · RANE NAGAR, NashikP51600049625· 90.9% built
- BALAJI RESIDENCY12 mo overdueSHREE BALAJI DEVELOPERS · NASHIK SHIWAR, NashikP51600045391· 81.8% built
- MAITRI CO-OP HSG SOCIETY LIMITED12 mo overdueMAITRI CO-OP HSG SOCIETY LIMITED · KALAMBOLI, RaigarhP52000053041· 90.9% built
- INDUKIRAN CO-OP HOUSING SOCIETY LIMITED12 mo overdueKotibhaskar Infrastructures &Developers Pvt.Ltd. · KOTHRUD, PuneP52100046237· 70.9% built
- PALAVA SERENITY A11 mo overdueLodha Developers Limited · Palava, ThaneP51700020155· 73.6% built
- PROSPERIA PART 111 mo overduePristine Properties · CHIKHALI, PuneP52100020997· 81.8% built· 3 complaints
- Lodha Amara - Wing 40 and 4111 mo overdueLODHA DEVELOPERS LIMITED · Balkum, ThaneP51700020088· filed Nov 2024 → now Nov 2025· 81.6% built· 1 complaint
- Samraat AmOzon11 mo overdueM/S Shweta Infrastructure & Housing (I) Pvt. Ltd. · Serene Meadows, NashikP51600023135· filed Nov 2024 → now Nov 2025· 89.1% built
- GOKULNAGARI11 mo overdueKRISHNA BUILDCON · PHALTAN, SataraP52700050784· 72.7% built
- AVIKA11 mo overdueNJ PROPRTIES · CHIKHALI PCMC PUNE, PuneP52100047866· 81.8% built
- VIJAYALAXMI ARCADE11 mo overdueTrimurti Infracon · Miraj, SangliP53100045764· 99.1% built
- INDRADHANU PARK11 mo overdueColdstardevelopers · village bopardi, SataraP52700002422· filed Jan 2024 → now Nov 2025· 68.8% built
- SWAMI KUNJ11 mo overdueVaibhavlaxmi Infracon · Sadashiv Peth, PuneP52100054128· 9.1% built
- Morivali Richmand Park11 mo overdueSHREE KHODIYAR BUILDCON · Mauje Morivali, ThaneP51700046687· filed Nov 2024 → now Nov 2025· 52.7% built
- SKYVIEW CHS11 mo overdueHIRANIMANTHAN BUILDERS AND DEVELOPERS · Nehru Nagar, Mumbai SuburbanP51800008227· filed Dec 2019 → now Nov 2025· 90.9% built
- DRESDEN11 mo overdueVISHRUT CONSTRUCTIONS · ULWE NAVI MUMBAI, RaigarhP52000051926· 90.9% built
- GANESH SPHURTI11 mo overdueTRIMITI DEVELOPERS · NEAR HOTEL DALCHANI, SangliP53100048039· 90.9% built
- MANI MADHAVI APARTMENT11 mo overdueRACHANA DEVELOPERS · SAVRKAR COLONY, SangliP53100029705· 90.9% built
- SHREE MURLIDHAR HEIGHTS11 mo overdueHARSHAL ANIL HANMANTE · MHASRUL, NashikP51600016397· 10% built
- ARHAM RESIDENCY11 mo overdueNPS BUILDCON PRIVATE LIMITED · PATEL PADA, DAHANU ROAD (EAST), PalgharP99000045747· 26.1% built
- KAVERI HEIGHTS11 mo overduePRADEEP RATAN PATIL · PARDESHI ALI, RaigarhP52000030933· 90.9% built
- SAI PUJA ROW HOUSES11 mo overdueVISHWAS CONSTRUCTION · MAKHMALABAD SHIWAR, NashikP51600025018· 90.9% built
- AVANI NIVAS11 mo overdueAVANI CORP. · CHARHOLI, PuneP52100024811· 72.7% built· 1 complaint
- KESAR11 mo overdueRAICHANDANI CONSTRUCTIONS PRIVATE LIMITED · HAVELI, PuneP52100034252· 9.1% built
- VASANTPUSHPA11 mo overdueABHISHEK VASANTRAO VINCHURKAR · PRAGANE NANDGAON PETH, AmravatiP50300048791· 30.9% built
- VRUSHTI KAMAL11 mo overdueVRUSHTI ENTERPRISES · NERAL EAST, RaigarhP52000034678· 90.9% built
- SOHAM PRAKASH11 mo overdueSOHAM PROMOTERS AND BUILDERS · ABHUDAY NAGAR, RatnagiriP52800032587· 88.6% built
- SAKAR VATIKA APARTMENT11 mo overdueMANISH PURSHOTTAM NARODIA · SWAMI SAMARTH NAGAR, NashikP51600031190· 81.8% built
- Taksh Residency11 mo overdueMadhusamruddhi Associates · Mahalaxmi Chowk, SangliP53100049718· 81.8% built
- HARI NIWAS11 mo overdueTORAL RAJ DEVELOPERS · BORIVALI EAST, Mumbai SuburbanP51800053673· 72.7% built
- KRUSHNAKUNJ11 mo overdueBADHEKAR DEVELOPERS · KOTHRUD, PuneP52100050407· 81.8% built
- PAREKH HOUSE11 mo overdueINNOVATIVE REALEST PRIVATE LIMITED · Ward FNorth, Mumbai CityP51900034002· 58.2% built
- SUVARNBHASKAR RESIDENCY11 mo overdueSUVARNBHASKAR DEVELOPERS · DAULATNAGAR, SataraP52700032128· filed Jan 2025 → now Dec 2025· 98% built
- ARV Newtown Phase II11 mo overdueVedant Infracon · Pisoli, PuneP52100015904· 69.1% built
- Halima residency10 mo overdueIQBAL IBRAHIM SHAIKH · PUNE, PuneP52100033220· 81.8% built
- BAY VIEW RESIDENCY PHASE 3 BLDG 410 mo overdueJM DEVELOPERS · TUPGAON KHALAPUR, RaigarhP52000005770· filed Dec 2023 → now Dec 2025· 63.6% built
- GOKULDHAM10 mo overdueSHREEJI DEVELOPERS · SHELU, RaigarhP52000009607· filed Jun 2021 → now Dec 2025· 78.2% built
- Golden Plaza10 mo overdueIqbal Umar Mukadam · Mandangad, RatnagiriP52800018729· filed Dec 2024 → now Dec 2025· 62.7% built
- Sai Sankalp10 mo overdueSankalp Group · Pushpak Nagar, RaigarhP52000034544· 88.5% built
- Destination Ishanya A Wing10 mo overdueGavhane Realty · Bhosari, PuneP52100053406· 40.9% built
- Supreme Estia Phase I10 mo overdueSupreme Palatial Developers LLP · Baner, PuneP52100024783· 90.9% built
- BLOSSOMS10 mo overdueGARNET CONSTRUCTION LIMITED · HISSA NO 2,3,4,5,6, RaigarhP52000019720· 0% built· 2 complaints
- The Back Water Residency Phase II - B Building10 mo overdueLNK PROJECTS Through Proprietor Mr Narayan Baburao Khasnis · Sinhagad Fort area, PuneP52100031341· 4.5% built
- Neelyog Virat -B Wing10 mo overdueNeelyog Construction Pvt Ltd · Borivali, Mumbai SuburbanP51800003560· 99.9% built
- SHREE KRUSHNA TOWER10 mo overdueMAGNAACASA REALTY PVT. LTD. · Tambe Nagar, Mulund West, Mumbai SuburbanP51800022998· filed Dec 2024 → now Dec 2025· 83.5% built· 1 complaint
- SHAKTI TROMBAY 8810 mo overdueVASHU RAHEJA SONS REALTY LLP · Kurla, Mumbai SuburbanP51800049964· filed Jun 2025 → now Dec 2025· 97.7% built
- AISHWARYAM HAMARA ABHIMAAN10 mo overdueSAI ESSEN DEVELOPERS · CHIKHALI, PuneP52100052847· 50.2% built· 3 complaints
- Blue Sapphire Business Park10 mo overdueMangaldeep Associates · Pimple saudagar, PuneP52100019991· filed Dec 2023 → now Dec 2025· 81.8% built
- Nirmaan Heena10 mo overdueM/s. Ramkripa Enterprises · Vile Parle East, Mumbai SuburbanP51800056079· 90.9% built
- MAULI SADAN10 mo overdueMR. RAMCHANDRA DHONDU ARGADE AND MR. SADASHIV UDDHAV JADHAV · Haveli, PuneP52100034977· filed Dec 2023 → now Dec 2025· 72.7% built
- SKYLINE TOWERS-WING A10 mo overdueYUGANTH REALTY · KADAMWAKWASTI, PuneP52100047241· 81.8% built
- JARE ROYAL HOME10 mo overdueSACHIN VASANT JARE · MOSHI, PuneP52100048303· filed Dec 2024 → now Dec 2025· 72.7% built
- AMEX RESIDENCY10 mo overdueAMEX DEVELOPERS PVT. LTD., ·P51900009319· 47.3% built· 1 complaint
- Immensa C10 mo overdueAgile Real Estate Pvt. Ltd. · Thane, ThaneP51700001040· 98.9% built· 25 complaints
- RAUNAK HEIGHTS10 mo overdueUNNATHI ASSOCIATES · Thane, ThaneP51700000766· 90.9% built· 3 complaints
- Ashiyana Village Phase 310 mo overdueAjaz Yusuf Khot · Khalapur, RaigarhP52000007737· 68.6% built
- Godrej Alive A10 mo overdueModella Textile Industries Limited · Mulund Thane Circle, ThaneP51700010303· 0% built· 2 complaints
- North Barcelona10 mo overdueJP Infra Residency Private Limited · Near Vinay Nagar, ThaneP51700020082· 67.8% built· 3 complaints
- GLENWOOD10 mo overdueROMA BUILDERS PRIVATE LIMITED · PATLIPADA, HIRANANDANI ESTATE, OFF. G B ROAD, ThaneP51700019547· 90.9% built
- OM PARADISE NX10 mo overdueACON PROPERTIES · VIKAS NAGAR, KIWALE, PuneP52100019128· filed Dec 2022 → now Dec 2025· 72.7% built
- AMBER TARA10 mo overdueAMBERCORPORATION · TUKARAM NAGAR, ThaneP51700020065· 90.9% built
- MEMORIES 90 -PHASE III10 mo overdueM/s NAMO DEVELOPERS · MOHAMMADWADI PUNE, PuneP52100023691· 75% built
- ROMELL DIVA PHASE II - 17TH TO 20TH FOOR10 mo overdueROMELL REAL ESTATE PRIVATE LIMITED · Borivali, Mumbai SuburbanP51800014389· 82.3% built
- VIVIANA - BLOCK 410 mo overdueNIRMAN REALTORS AND DEVELOPERS LTD · Karjat, RaigarhP52000007121· 90.9% built
- SHRIJEE RESIDENCY10 mo overdueValjibhai Mohanbhai Makwana · opp. maruti temple, NashikP51600024651· 9.1% built
- Immensa D10 mo overdueAgile Real Estate Pvt. Ltd. · Thane, ThaneP51700000732· 89.8% built· 27 complaints
- AIM Platinum10 mo overdueAIM REALTORS PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800023249· 96.8% built
- Anmol Residency10 mo overdueAbhay Housrao Shirsat and Sandeep Housrao Shirsat · Itkheda, AurangabadP51500025196· 95.5% built
- Atharva Heights10 mo overdueViva Highways Limited · Dasak Shiwar, NashikP51600015843· 90.9% built
- FORTUNE PROSPERO10 mo overdueFORTUNE HOMES · KONDHAWA BK, PuneP52100046770· 76.4% built
- LA-IMPERO A AND B BUILDING10 mo overdueKytek Homes and Infra Structure Pvt. Ltd. · HOTEL RIDDESH, RaigarhP52000010268· 23.6% built
- SARA SANGAM PLOT 110 mo overdueJAGRUT SARA ASSOCIATES · BAJAJ NAGAR, AurangabadP51500024165· 89.1% built
- DWARKAI10 mo overdueMURLIDHAR RAJARAM MAHAJAN · BESIDE VATIKA ASHRAM, JalgaonP49900021316· 90.9% built
- SDPL Aashray Beltarodi10 mo overdueSANDEEP DWELLERS PVT. LTD. · Beltarodi, NagpurP50500023552· 90.5% built· 11 complaints
- MM VALLEY A-110 mo overdueALFA ENTERPRISES · KAUSA-MUMBRA-THANE, ThaneP51700024240· 79.8% built· 1 complaint
- Megapolis Serenity A8 to A12, B2 and Conv shop B10 mo overduePegasus Properties Pvt. Ltd. · Rajiv Gandhi Infotech Park Phase 3, PuneP52100022957· 85.2% built
- ARV UTHVILLE10 mo overdueVedant Spaces · KharadiP52100030680· filed Dec 2024 → now Dec 2025· 94.5% built
- Mahavir Spring - Daffodils - Phase 210 mo overdueVinayak developers · Pokhran Road No. 2, ThaneP51700022995· 79.5% built
- JP North Euphoria10 mo overdueJP Infra Realty Private Limited · Vinaynagar, ThaneP51700016290· 86.1% built· 2 complaints
- TRISHABH GREENS - WING A10 mo overdueRISHABH ENTERPRISES · CHEMBUR NAKA, CHEMBUR EAST, Mumbai SuburbanP51800018331· 90.9% built
- CHIRAG ELITE10 mo overdueP M DEVELOPERS · Near Baramati District Court, PuneP52100019319· 90.9% built
- PLATINUM 910 mo overdueHNK BUILDTECH LLP · PUNE, PuneP52100020126· 72.7% built· 1 complaint
- Immensa E10 mo overdueAgile Real Estate Pvt. Ltd. · Thane, ThaneP51700000924· 89.7% built· 19 complaints
- PLATINUM LIFE10 mo overdueSAMUDRA DARSHAN GRUHPRAVESH LLP · ANDHERI WEST, Mumbai SuburbanP51800014518· 90.7% built· 15 complaints
- Ashtavinayak Granduer10 mo overdueManisha Mahendrakumar Sharma · Serene Meadows, Anandwalli, NashikP51600051234· filed Dec 2024 → now Dec 2025· 90.9% built
- GREEN PARK10 mo overdueSHREEJI ASSOCIATES · Mahad, RaigarhP52000013578· 50.9% built
- ESPACIO - WING C D AND E/MHADA10 mo overdueKNIGHT WEST REALTY LLP · BALEWADI, PuneP52100025099· 78.8% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.