RERA projects past their possession deadline
11,770 MahaRERA-registered projects are past the possession date currently on file and still report under 100% construction progress. Both figures are the promoter's own disclosure to the regulator.
Page 54 of 59
- ISHANYA HEIGHTS9 mo overdueVIVAAN INFRA · AURANGABAD, AurangabadP51500051507· 42.7% built
- Legacy Imperial Phase I9 mo overdueWhite Properties and Ventures · Near Symbiosis College, PuneP52100046570· 95.5% built
- RAVIKIRAN ANNEXE PHASE I9 mo overdueDREAMHOUSE CONSTRUCTIONS PRIVATE LIMITED · WADMUKHWADI, PuneP52100045726· 90.9% built
- KRYSTAL ONE PHASE I9 mo overdueRAMA SPACES · Chikhali, PuneP52100030567· filed Oct 2024 → now Oct 2025· 90.9% built
- LEENA PARADISE9 mo overdueLEENA DEVELOPERS & INFRASTRUCTURES · CHINCHAVLI-SHEKIN, NEAR LOWJEE RAILWAY STATION, RaigarhP52000031814· 89.1% built
- Peninsula - D9 mo overdueKumar Agro Products Pvt Ltd · Pashan, PuneP52100049664· 76.2% built
- JADE GARDENS TOWER A9 mo overdueJAIRAJHAPPYHOMES · Pant Nagar Ghatkopar East, Mumbai SuburbanP51800033601· 61.4% built
- RATNANKUR9 mo overdueRanjekar Realty LLP · Kothrud, PuneP52100035032· 81.8% built
- Crest Parkview9 mo overdueCREST VENTURES LIMITED · Bandra West, Mumbai SuburbanP51800045968· 80.9% built
- ASHIRWAD SYMPHONY APARTMENT9 mo overdueASHIRWAD BUILDWELL · OLD ADGAON NAKA PANCHVATI NASHIK, NashikP51600032197· 90.9% built
- Jade Gardens Tower B9 mo overdueJAIRAJHAPPYHOMES · Pant Nagar Ghatkopar East, Mumbai SuburbanP51800033945· 79.1% built
- JADE GARDENS TOWER C9 mo overdueJAIRAJHAPPYHOMES · Pant Nagar Ghatkopar East, Mumbai SuburbanP51800033954· 81.8% built
- HRISHIKESH 39 mo overdueRare Livspace · Nevali, RaigarhP52000052666· filed Jun 2025 → now Oct 2025· 80% built
- DIVUM9 mo overdueDYNAMIX CONTRACTORS & BUILDERS PRIVATE LIMITED · Borivali, Mumbai SuburbanP51800018784· filed Sept 2024 → now Oct 2025· 83.9% built· 2 complaints
- PRISM INDUSTRIAL ESTATE9 mo overdueSPLENDOR SHELTERS PVT LTD · NEAR PENDHARKAR COLLEGE, ThaneP51700032231· 90.9% built
- AAKAR PRIME9 mo overdueROHIT ASHOKRAO JIWARKAR · AMRAVATI CAMP, AmravatiP50300049011· 81.8% built
- Mauli Green Park Phase-29 mo overdueMauli Developers · Mauli Green Park, AhmednagarP52200032285· 72.7% built
- Seeta-Govind9 mo overdueRANADE REALTORS LLP · SADASHIV PETH, PuneP52100027756· 81.8% built
- SHRIRAM RESIDENCY9 mo overdueMS OM CONSTRUCTION · NEAR BELBAG, KolhapurP53000050820· 90.9% built
- SHREE VAIBHAV CLASSIC9 mo overdueDSJ GROUP · RANE NAGAR, NashikP51600049625· 90.9% built
- MAITRI CO-OP HSG SOCIETY LIMITED9 mo overdueMAITRI CO-OP HSG SOCIETY LIMITED · KALAMBOLI, RaigarhP52000053041· 90.9% built
- BALAJI RESIDENCY9 mo overdueSHREE BALAJI DEVELOPERS · NASHIK SHIWAR, NashikP51600045391· 81.8% built
- INDUKIRAN CO-OP HOUSING SOCIETY LIMITED9 mo overdueKotibhaskar Infrastructures &Developers Pvt.Ltd. · KOTHRUD, PuneP52100046237· 70.9% built
- Samraat AmOzon8 mo overdueM/S Shweta Infrastructure & Housing (I) Pvt. Ltd. · Serene Meadows, NashikP51600023135· filed Nov 2024 → now Nov 2025· 89.1% built
- Lodha Amara - Wing 40 and 418 mo overdueLODHA DEVELOPERS LIMITED · Balkum, ThaneP51700020088· filed Nov 2024 → now Nov 2025· 81.6% built· 1 complaint
- PALAVA SERENITY A8 mo overdueLodha Developers Limited · Palava, ThaneP51700020155· 73.6% built
- PROSPERIA PART 18 mo overduePristine Properties · CHIKHALI, PuneP52100020997· 81.8% built· 3 complaints
- INDRADHANU PARK8 mo overduecoldstardevelopers · village bopardi, SataraP52700002422· filed Jan 2024 → now Nov 2025· 68.8% built
- SWAMI KUNJ8 mo overdueVaibhavlaxmi Infracon · Sadashiv Peth, PuneP52100054128· 9.1% built
- DRESDEN8 mo overdueVISHRUT CONSTRUCTIONS · ULWE NAVI MUMBAI, RaigarhP52000051926· 90.9% built
- VIJAYALAXMI ARCADE8 mo overdueTrimurti Infracon · Miraj, SangliP53100045764· 99.1% built
- GOKULNAGARI8 mo overdueKRISHNA BUILDCON · PHALTAN, SataraP52700050784· 72.7% built
- SKYVIEW CHS8 mo overdueHIRANIMANTHAN BUILDERS AND DEVELOPERS · Nehru Nagar, Mumbai SuburbanP51800008227· filed Dec 2019 → now Nov 2025· 90.9% built· 1 complaint
- Morivali Richmand Park8 mo overdueSHREE KHODIYAR BUILDCON · Mauje Morivali, ThaneP51700046687· filed Nov 2024 → now Nov 2025· 52.7% built
- ARHAM RESIDENCY8 mo overdueNPS BUILDCON PRIVATE LIMITED · PATEL PADA, DAHANU ROAD (EAST), PalgharP99000045747· 26.1% built
- SHREE MURLIDHAR HEIGHTS8 mo overdueHARSHAL ANIL HANMANTE · MHASRUL, NashikP51600016397· 10% built
- KAVERI HEIGHTS8 mo overduePRADEEP RATAN PATIL · PARDESHI ALI, RaigarhP52000030933· 90.9% built
- SAI PUJA ROW HOUSES8 mo overdueVISHWAS CONSTRUCTION · MAKHMALABAD SHIWAR, NashikP51600025018· 90.9% built
- MANI MADHAVI APARTMENT8 mo overdueRACHANA DEVELOPERS · SAVRKAR COLONY, SangliP53100029705· 90.9% built
- GANESH SPHURTI8 mo overdueTRIMITI DEVELOPERS · NEAR HOTEL DALCHANI, SangliP53100048039· 90.9% built
- AVANI NIVAS8 mo overdueAVANI CORP. · CHARHOLI, PuneP52100024811· 72.7% built· 1 complaint
- KESAR8 mo overdueRAICHANDANI CONSTRUCTIONS PRIVATE LIMITED · HAVELI, PuneP52100034252· 9.1% built
- VASANTPUSHPA8 mo overdueABHISHEK VASANTRAO VINCHURKAR · PRAGANE NANDGAON PETH, AmravatiP50300048791· 30.9% built
- VRUSHTI KAMAL8 mo overdueVRUSHTI ENTERPRISES · NERAL EAST, RaigarhP52000034678· 90.9% built
- SOHAM PRAKASH8 mo overdueSOHAM PROMOTERS AND BUILDERS · ABHUDAY NAGAR, RatnagiriP52800032587· 88.6% built
- SAKAR VATIKA APARTMENT8 mo overdueMANISH PURSHOTTAM NARODIA · SWAMI SAMARTH NAGAR, NashikP51600031190· 81.8% built
- Taksh Residency8 mo overdueMadhusamruddhi Associates · Mahalaxmi Chowk, SangliP53100049718· 81.8% built
- PAREKH HOUSE7 mo overdueINNOVATIVE REALEST PRIVATE LIMITED · Ward FNorth, Mumbai CityP51900034002· 58.2% built
- SUVARNBHASKAR RESIDENCY7 mo overdueSUVARNBHASKAR DEVELOPERS · DAULATNAGAR, SataraP52700032128· filed Jan 2025 → now Dec 2025· 98% built
- ARV Newtown Phase II7 mo overdueVedant Infracon · Pisoli, PuneP52100015904· 69.1% built
- Halima residency7 mo overdueIQBAL IBRAHIM SHAIKH · PUNE, PuneP52100033220· 81.8% built
- Golden Plaza7 mo overdueIqbal Umar Mukadam · Mandangad, RatnagiriP52800018729· filed Dec 2024 → now Dec 2025· 62.7% built
- Sai Sankalp7 mo overdueSankalp Group · Pushpak Nagar, RaigarhP52000034544· 88.5% built
- BAY VIEW RESIDENCY PHASE 3 BLDG 47 mo overdueJM DEVELOPERS · TUPGAON KHALAPUR, RaigarhP52000005770· filed Dec 2023 → now Dec 2025· 63.6% built
- Destination Ishanya A Wing7 mo overdueGavhane Realty · Bhosari, PuneP52100053406· 40.9% built
- GOKULDHAM7 mo overdueSHREEJI DEVELOPERS · SHELU, RaigarhP52000009607· filed Jun 2021 → now Dec 2025· 78.2% built
- Supreme Estia Phase I7 mo overdueSupreme Palatial Developers LLP · Baner, PuneP52100024783· 90.9% built
- The Back Water Residency Phase II - B Building7 mo overdueLNK PROJECTS Through Proprietor Mr Narayan Baburao Khasnis · Sinhagad Fort area, PuneP52100031341· 4.5% built
- Neelyog Virat -B Wing7 mo overdueNeelyog Construction Pvt Ltd · Borivali, Mumbai SuburbanP51800003560· 99.9% built
- AISHWARYAM HAMARA ABHIMAAN7 mo overdueSAI ESSEN DEVELOPERS · CHIKHALI, PuneP52100052847· 50.2% built· 1 complaint
- SHAKTI TROMBAY 887 mo overdueVASHU RAHEJA SONS REALTY LLP · Kurla, Mumbai SuburbanP51800049964· filed Jun 2025 → now Dec 2025· 97.7% built
- Blue Sapphire Business Park7 mo overdueMangaldeep Associates · Pimple saudagar, PuneP52100019991· filed Dec 2023 → now Dec 2025· 81.8% built
- SKYLINE TOWERS-WING A7 mo overdueYUGANTH REALTY · KADAMWAKWASTI, PuneP52100047241· 81.8% built
- Nirmaan Heena7 mo overdueM/s. Ramkripa Enterprises · Vile Parle East, Mumbai SuburbanP51800056079· 90.9% built
- MAULI SADAN7 mo overdueMR. RAMCHANDRA DHONDU ARGADE AND MR. SADASHIV UDDHAV JADHAV · Haveli, PuneP52100034977· filed Dec 2023 → now Dec 2025· 72.7% built
- REAL HEIGHTS7 mo overdueREALTECH DEVELOPMENT ASSOCIATES · OPP EVERSHINE CITY, PalgharP99000019569· 86.8% built
- VIVIANA - BLOCK37 mo overdueNIRMAN REALTORS AND DEVELOPERS LTD · Karjat, RaigarhP52000007537· 81.8% built· 1 complaint
- VIVIANA - BLOCK 57 mo overdueNIRMAN REALTORS AND DEVELOPERS LTD · VIVIANA PROJECT, RaigarhP52000006209· 65.5% built· 2 complaints
- AVISHKAR HEIGHTS - C WING - PHASE III7 mo overdueAVISHKAR DEVELOPERS · Jalgaon, RatnagiriP52800001154· 90.9% built
- Godrej Alive A7 mo overdueModella Textile Industries Limited · Mulund Thane Circle, ThaneP51700010303· 0% built· 2 complaints
- RAUNAK CITY SECTOR IV - D27 mo overdueRAUNAK CORPORATION · Kalyan, ThaneP51700003210· 90.9% built
- 11 West7 mo overdueBaner Hills LLP · Baner, PuneP52100020311· 90.9% built
- ATMIYA HEIGHTS7 mo overdueAKSHAR GROUP · SONIVALI, ThaneP51700015091· 83.3% built
- ROYAL HARMONY - B7 mo overdueSHAILESH HARAKHCHAND KHUTHIYA · DAMAN, DamanP49500000040· 86.4% built
- ASHAR MAPLE BIRCH7 mo overdueMs ASHAR REALTORS · VAISHALI NAGAR, Mumbai SuburbanP51800023941· 66.8% built· 1 complaint
- Godrej Alive B7 mo overdueModella Textile Industries Limited · Mulund Thane Circle, ThaneP51700005281· 0% built· 9 complaints
- DWARKAI7 mo overdueMURLIDHAR RAJARAM MAHAJAN · BESIDE VATIKA ASHRAM, JalgaonP49900021316· 90.9% built
- RAUNAK CITY SECTOR IV - D17 mo overdueRAUNAK CORPORATION · Kalyan, ThaneP51700003377· 90.9% built
- NEHRU NAGAR GURUPRASAD CO-OPERATIVE HOUSING SOCIETY LIMITED7 mo overdueDERAIYA REALTORS PRIVATE LIMITED · Kurla, Mumbai SuburbanP51800023015· 90.9% built· 2 complaints
- BELLAVUE7 mo overdueBHAKTI DEVELOPERS · Khopoli, RaigarhP52000000459· 79.7% built
- Anmol Residency7 mo overdueAbhay Housrao Shirsat and Sandeep Housrao Shirsat · Itkheda, AurangabadP51500025196· 95.5% built
- CAPITAL7 mo overdueMarudhar Builders · rajarampuri Bus Route E Ward Kolhapur, KolhapurP53000019373· 90.9% built
- TRISHABH GREENS - WING A7 mo overdueRISHABH ENTERPRISES · CHEMBUR NAKA, CHEMBUR EAST, Mumbai SuburbanP51800018331· 90.9% built
- INDU HEIGHTS APARTMENT7 mo overdueMAULI BUILDERS · MANKAR NAGAR MAKHMALABAD PANCHVATI NASIK, NashikP51600025725· 90.9% built
- CUBOID URBAN TRADE CENTRE7 mo overdueUDAY KASHINATH GHUGE · NASHIK, NashikP51600021295· 81.8% built
- Krishna Heights7 mo overdueNarayan Dharmaji Bodke · Haveli, PuneP52100018577· 90.9% built
- JP North Imperia - Tower 17 mo overdueJP Infra Realty Private Limited · Near Vinay Nagar, ThaneP51700019613· 88% built· 1 complaint
- ARIHANT CITY PHASE-I BUIDING-A,B,C,D,D1,D2,H,H1,H2,F7 mo overdueARIHANT ENTERPRISES · Bhiwandi, ThaneP51700010884· 86.5% built
- SHRIJEE RESIDENCY7 mo overdueValjibhai Mohanbhai Makwana · opp. maruti temple, NashikP51600024651· 9.1% built
- LA-IMPERO A AND B BUILDING7 mo overdueKytek Homes and Infra Structure Pvt. Ltd. · HOTEL RIDDESH, RaigarhP52000010268· 23.6% built
- GLENRIDGE7 mo overdueROMA BUILDERS PRIVATE LIMITED · PATLIPADA, HIRANANDANI ESTATE, OFF. G B ROAD, ThaneP51700019550· 90.9% built
- Ray Nagar Housing Project7 mo overdueVasant Vihar Realty Pvt Ltd · Kumbhari to Doddi road, SolapurP52600017938· 78.2% built
- Ashiyana Village Phase 37 mo overdueAjaz Yusuf Khot · Khalapur, RaigarhP52000007737· 68.6% built
- REVANTA7 mo overdueSIDDHESH PADMAMBA BUILDERS & DEVELOPERS · Mali Colony Takala, KolhapurP53000016078· 90.9% built
- Godrej Alive C7 mo overdueModella Textile Industries Limited · Mulund Thane Circle, ThaneP51700009993· 0% built· 2 complaints
- AURIS BUSINESS CENTRE7 mo overdueDev Pooja Builders Pvt Ltd · SHIMPOLI, BORIVALI WEST, Mumbai SuburbanP51800034380· filed Dec 2024 → now Dec 2025· 63.2% built
- ESPACIO - WING C D AND E/MHADA7 mo overdueKNIGHT WEST REALTY LLP · BALEWADI, PuneP52100025099· 78.8% built
- UNNATHI WOODS PHASE VII A7 mo overdueUNNATHI ESTATES · Thane, ThaneP51700000002· 90.9% built· 5 complaints
- CHIRAG ELITE7 mo overdueP M DEVELOPERS · Near Baramati District Court, PuneP52100019319· 90.9% built
- GLENWOOD7 mo overdueROMA BUILDERS PRIVATE LIMITED · PATLIPADA, HIRANANDANI ESTATE, OFF. G B ROAD, ThaneP51700019547· 90.9% built
- NILGIRI7 mo overdueCHAITANYA BUILDERS · CHAVDAR TALE MAHAD, RaigarhP52000016174· 81.8% built
- ARV UTHVILLE7 mo overdueVedant Spaces · KharadiP52100030680· filed Dec 2024 → now Dec 2025· 94.5% built
- Immensa A7 mo overdueAgile Real Estate Pvt. Ltd. · Thane, ThaneP51700001039· 99.8% built· 24 complaints
- Godrej Alive E7 mo overdueModella Textile Industries Limited · Thane (M Corp.), ThaneP51700009992· 0% built· 1 complaint
- Nexus Kinaara D7 mo overdueNexus Enterprises · Chikhali, PuneP52100033605· filed Dec 2024 → now Dec 2025· 88.6% built
- NIVANTA7 mo overdueYASHODEEP BUILDCON · KOYNAVELE, RaigarhP52000023225· 90.9% built
- TruEarth Views7 mo overdueTRUEARTH DEVELOPERS PVT LTD · Vikhroli (East), Mumbai SuburbanP51800024328· 28.7% built· 6 complaints
- SADGURU ASHISH PHAZE II7 mo overdueVIVEK MOHAN GADRE · Khedshi, RatnagiriP52800013242· 63.6% built
- Immensa F7 mo overdueAgile Real Estate Pvt. Ltd. · Thane, ThaneP51700001278· 91.1% built· 25 complaints
- AIM Platinum7 mo overdueAIM REALTORS PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800023249· 96.8% built
- RAUNAK HEIGHTS7 mo overdueUNNATHI ASSOCIATES · Thane, ThaneP51700000766· 90.9% built· 3 complaints
- Immensa D7 mo overdueAgile Real Estate Pvt. Ltd. · Thane, ThaneP51700000732· 89.8% built· 27 complaints
- Forest Edge Phase 27 mo overdueAjanta Enterprises · Sector 3P52100021807· 97.3% built
- Hubtown Sunstone A wing7 mo overdueSunstone Developers Joint Venture · Andheri, Mumbai SuburbanP51800000183· 98.2% built· 2 complaints
- AMBER TARA7 mo overdueAMBERCORPORATION · TUKARAM NAGAR, ThaneP51700020065· 90.9% built
- Kalpataru Exquisite - Wing 47 mo overdueKalpataru Retail Ventures Private Limited · Wakad, PuneP52100023268· 52.3% built
- Reliable Commercial Complex7 mo overdueShree Balaji Developers · Nashik, NashikP51600052728· filed Dec 2024 → now Dec 2025· 72.7% built
- Aditya Shagun7 mo overdueOgale Realty LLP · Chikhali, PuneP52100027220· 90.9% built
- GLENDALE7 mo overdueROMA BUILDERS PRIVATE LIMITED · PATLIPADA, HIRANANDNAI ESTATE, OFF. G B ROAD, ThaneP51700019542· 90.9% built
- Immensa G7 mo overdueAgile Real Estate Pvt. Ltd. · Thane, ThaneP51700001083· 70.4% built· 13 complaints
- MARATHON NEXZONE TRITON -27 mo overdueSANVO RESORTS PVT. LTD. · PALASPE PHATA, RaigarhP52000000668· 72.3% built
- vedant nakshatra M phase 27 mo overdueMOHAN HARDASMAL THARWANI · Rameshwadi, ThaneP51700008414· 69.5% built
- IMPERIAL HEIGHTS PHASE I - A AND B WING7 mo overdueAKSHAR SHANTI REALTORS PRIVATE LIMITED · Thane, ThaneP51700006296· filed Dec 2024 → now Dec 2025· 99.1% built· 5 complaints
- WORLIWALA CHSL7 mo overdueSHAMIK & SANGHVI DEVELOPERS LLP · VILE PARLE (EAST), Mumbai SuburbanP51800047017· 90.9% built
- TRISHABH GREENS - WING B7 mo overdueRISHABH ENTERPRISES · CHEMBUR NAKA, CHEMBUR EAST, Mumbai SuburbanP51800018350· 81.8% built
- Majestique Nest Building C7 mo overdueM/S MAJESTIQUE ASSOCIATES · PUNE, PuneP52100020198· 90.9% built
- JP North Alexa7 mo overdueJP Infra Realty Private Limited · near Vinay Nagar, ThaneP51700016736· 81.8% built
- PEARL HANS RESIDENCY - G WING7 mo overdueHARI OM CONSTRUCTION · KURLA WEST, Mumbai SuburbanP51800022670· 90.9% built
- AMEX RESIDENCY7 mo overdueAMEX DEVELOPERS PVT. LTD., ·P51900009319· 47.3% built· 1 complaint
- GREEN PARK7 mo overdueSHREEJI ASSOCIATES · Mahad, RaigarhP52000013578· 50.9% built
- Immensa E7 mo overdueAgile Real Estate Pvt. Ltd. · Thane, ThaneP51700000924· 89.7% built· 19 complaints
- Megapolis Serenity A8 to A12, B2 and Conv shop B7 mo overduePegasus Properties Pvt. Ltd. · Rajiv Gandhi Infotech Park Phase 3, PuneP52100022957· 85.2% built
- Wellwisher Town7 mo overdueWellwisher Properties · khopoli muncipal council, RaigarhP52000000721· 89.1% built
- JARE ROYAL HOME7 mo overdueSACHIN VASANT JARE · MOSHI, PuneP52100048303· filed Dec 2024 → now Dec 2025· 72.7% built
- ROMELL DIVA PHASE II - 17TH TO 20TH FOOR7 mo overdueROMELL REAL ESTATE PRIVATE LIMITED · Borivali, Mumbai SuburbanP51800014389· 82.3% built
- OM PARADISE NX7 mo overdueACON PROPERTIES · VIKAS NAGAR, KIWALE, PuneP52100019128· filed Dec 2022 → now Dec 2025· 72.7% built
- MM VALLEY A-17 mo overdueALFA ENTERPRISES · KAUSA-MUMBRA-THANE, ThaneP51700024240· 79.8% built· 1 complaint
- PRIYESH HEIGHTS7 mo overduePRIYESH ENTERPRISES · HDIL TOWNSHIP, PalgharP99000009305· filed Jun 2021 → now Dec 2025· 81.8% built
- PLATINUM LIFE7 mo overdueSAMUDRA DARSHAN GRUHPRAVESH LLP · ANDHERI WEST, Mumbai SuburbanP51800014518· 90.7% built· 15 complaints
- KRISHNA NAGRI7 mo overdueKRISHNA DEVELOPERS · Palghar, PalgharP99000005597· 59.4% built
- ROMELL DIVA PHASE III - 21ST TO 23RD FLOOR7 mo overdueROMELL REAL ESTATE PRIVATE LIMITED · Borivali, Mumbai SuburbanP51800014484· 82.3% built· 1 complaint
- JP North Imperia - Tower 27 mo overdueJP Infra Realty Private Limited · Near Vinay Nagar, ThaneP51700019783· 90.9% built
- VIJAY APARTMENT7 mo overdueVIJAY VISHWANATH TAKALE · ABHAYNAGAR, SangliP53100033402· filed Dec 2024 → now Dec 2025· 72.7% built
- NICE CITY7 mo overdueNICE REALTY AND DEVELOPERS · Thane, ThaneP51700010742· 89.1% built
- Perfect 10 Phase IV7 mo overdueShagun Manav Spaces LLP · Balewadi, PuneP52100022249· 80.5% built
- MAJESTIQUE MRUGAVARSHA PHASE I7 mo overdueMAJESTIQUE HERITAGE LIVING SPACES LLP · DHAYARI PUNE, PuneP52100022731· 66.7% built
- ORCHID SQUARE PHASE 47 mo overdueM/S SQUAREFEET ECO HOUSING LLP · Ambarnath, ThaneP51700022076· 81.8% built
- Ashtavinayak Granduer7 mo overdueManisha Mahendrakumar Sharma · Serene Meadows, Anandwalli, NashikP51600051234· filed Dec 2024 → now Dec 2025· 90.9% built
- DREAMVILLE APARTMENT7 mo overdueSAWANT AND MOTWANI ASSOCIATES · SAWANT NAGAR, PuneP52100023444· 81.8% built
- MEMORIES 90 -PHASE III7 mo overdueM/s NAMO DEVELOPERS · MOHAMMADWADI PUNE, PuneP52100023691· 75% built
- Rajveer Nucleus7 mo overdueWaghere Promoters · kaspate wasti, PuneP52100009974· 90.9% built
- Atharva Heights7 mo overdueViva Highways Limited · Dasak Shiwar, NashikP51600015843· 90.9% built
- Immensa H7 mo overdueAgile Real Estate Pvt. Ltd. · Thane, ThaneP51700001310· 66.6% built· 19 complaints
- Megapolis Serenity A1 to A7, B1 and Conv shop A7 mo overduePegasus Properties Pvt. Ltd. · Rajiv Gandhi Infotech Park Phase 3, PuneP52100023051· 75.2% built· 2 complaints
- EXCELLAA PLAZZO7 mo overdueTHE EXCELLAA · Ambegaon, PuneP52100021440· 90.9% built
- MAYURESH RESIDENCY7 mo overdueSHRI BALAJI DEVELOPERS · BHADKAMKARNAGAR, SataraP52700025312· 81.8% built
- MILLANO HEIGHTS7 mo overdueCHIMNANI CONSTRUCTIONS · Ulhasnagar, ThaneP51700047948· filed Dec 2024 → now Dec 2025· 86.8% built
- Immensa B7 mo overdueAgile Real Estate Pvt. Ltd. · Thane, ThaneP51700000927· 99% built· 25 complaints
- Hubtown Sunstone B Wing7 mo overdueSunstone Developers Joint Venture · Andheri, Mumbai SuburbanP51800000186· 89.1% built· 1 complaint
- Immensa C7 mo overdueAgile Real Estate Pvt. Ltd. · Thane, ThaneP51700001040· 98.9% built· 24 complaints
- North Barcelona7 mo overdueJP Infra Residency Private Limited · Near Vinay Nagar, ThaneP51700020082· 67.8% built· 3 complaints
- VIVIANA - BLOCK 47 mo overdueNIRMAN REALTORS AND DEVELOPERS LTD · Karjat, RaigarhP52000007121· 90.9% built
- PEARL HANS RESIDENCY - H WING7 mo overduePEARL HANS RESIDENCY - H WING · Kurla, Mumbai SuburbanP51800022506· 90.9% built
- SARA SANGAM PLOT 17 mo overdueJAGRUT SARA ASSOCIATES · BAJAJ NAGAR, AurangabadP51500024165· 89.1% built
- FORTUNE PROSPERO7 mo overdueFORTUNE HOMES · KONDHAWA BK, PuneP52100046770· 76.4% built
- ANP - ATLANTIS -Phase I7 mo overdueM/S.Five Star Shelters · BALEWADI, PuneP52100024229· 91.4% built
- TIRTHRAJ ENCLAVE7 mo overdueS K DEVELOPERS · SHAHUPURI, KolhapurP53000023532· 81.8% built
- White House By Sai Builders7 mo overdueSai Builders · Garkheda, AurangabadP51500023865· 90.9% built
- AATMAJ APARTMENT CO OPERATIVE HOUSING SOCIETY LIMITED7 mo overdueDMASS DEVELOPERS · MAHATMA NAGAR, NashikP51600048016· filed Dec 2024 → now Dec 2025· 61.4% built
- SARVODAY SQUARE PHASE 2 BLDG NO 27 mo overdueSHREE SQUAREFEET ENTERPRISES LLP · Ambarnath, ThaneP51700018388· 90.9% built
- JP North Euphoria7 mo overdueJP Infra Realty Private Limited · Vinaynagar, ThaneP51700016290· 86.1% built· 2 complaints
- W-577 mo overdueAdi Siddhashila Associates · Wakad, PuneP52100024520· 89.1% built
- EXCELLAA RESIDENCY7 mo overdueTHE EXCELLAA · AMBEGAON, PuneP52100021432· 90.9% built
- Shanti Towers7 mo overdueBora Developers · Golegaon Road, PuneP52100050909· filed Dec 2024 → now Dec 2025· 72.7% built
- Heavan C Wing7 mo overdueHeet Builders Private Limited · Mumbai City, Mumbai CityP51900000175· 76% built
- Sunrise Parkview Phase I7 mo overdueSukham Corporation Proprietor Sunrise Lifespaces LLP · Padle Village, ThaneP51700021145· 86.4% built
- SDPL Aashray Beltarodi7 mo overdueSANDEEP DWELLERS PVT. LTD. · Beltarodi, NagpurP50500023552· 90.5% built· 11 complaints
- Tabeer Spaces7 mo overdueTabeer Properties · Royal Colony, NashikP51600023179· 90.9% built
- RANJANA HILLS7 mo overdueM/S. MARIA CONSTRUCTION · Wagdara (536054), NagpurP50500012794· filed Jun 2019 → now Dec 2025· 54.5% built
- ANURAG ORCHID7 mo overdueANURAG DEVELOPERS · Near Dhyandeep Convet SRPF Gate No 3 Jaitala, NagpurP50500045638· 49.5% built
- SHANTIBHUSHAN APARTMENTS7 mo overdueShri Mauli Developers And Builders · Nagaland Chowk, SolapurP52600009916· filed Nov 2023 → now Dec 2025· 36.4% built
- Aranya Phase II7 mo overduePRASHANT MOHAN BARGE · Satara, SataraP52700051909· 29.1% built
- RIVANSH AVENUE7 mo overdueAKSHAY SUBHASH KOTHAWADE · UNTWADI NASHIK, NashikP51600032092· 81.9% built
- SWAPNALOK PHASE II WING G7 mo overdueMANAV KRUSHNAI DEVELOPERS THROUGH ITS PROPRIETOR MANAV REALTY · Fursungi Pune, PuneP52100034008· 90.9% built
- YAHVI7 mo overdueVilas Shinde Developers · Parvati, PuneP52100076961· 81.8% built
- LAXMI NARAYAN ENCLAVE7 mo overduePRAVIN CHIMOTE · KH NO. 135 AND 136, MOUZA DABHA, CTS NO. 41 & 42, SANT JAGNADE CO OPERATIVE HOUSING SOCIETY LTD, NAGPUR, NagpurP50500049364· 75.5% built
- TIARA by Swastik Empire7 mo overdueM/s SWASTIK EMPIRE DEVELOPERS LLP · PANTNAGAR, Mumbai SuburbanP51800034308· 90.4% built
- SHUBHADA COOP HOUSING SOCIETYPROPOSED7 mo overdueKAUSTUBH JEEVAN KULKARNI · CHENDHARE, RaigarhP52000046434· 49.6% built
- 24 JEWELS7 mo overdueDESHPANDE INFRA · Kasaba Karveer Ruikar Colony Nimbalkar Colony, KolhapurP53000050821· 85% built
- Marina Enclave Wings Q and R with Kindergarten Phase - IV7 mo overdueGURUKRUPA DEVELOPERS D N NAGR PROJECT · Malvani Malad West, Mumbai SuburbanP51800032847· 71.4% built
- SHREE RESIDENCY7 mo overdueSharad Hindurao Patil · Survey No. 2239 Balwant Bunglow Shivaji Housing Society Sangli 416416, SangliP53100045798· 66.5% built
- Kamlaba Business Avenue7 mo overdueKashibas Infratech · Gole Colony, NashikP51600052647· 43.6% built
- Sai Bliss7 mo overdueMr Vinod Kishanchand Matani · Punawale, PuneP52100049314· 81.8% built
- IHITA C AND D BUILDING7 mo overdueNayana Anand Kaswa · Bavadhan BK, PuneP52100009220· filed Dec 2019 → now Dec 2025· 90.9% built
- Rudra Regency7 mo overdueKrishna Enterprises · Kharghar, RaigarhP52000054251· 70.9% built
- SHARDA EMPORIO7 mo overdueSHARDA INFRA · NEAR AMAN TALKIES, ThaneP51700047731· 23.6% built
- SANSKAR PRIDE7 mo overdueLAXMAN EKNATH GOMASE · GIRIDHAR NAGAR PATHARDI PHATA NASHIK, NashikP51600032398· 90.9% built
- MAYURESH RESIDENCY7 mo overdueM/s Pavan and GJ construction co · Zadgaon, RatnagiriP52800029697· 66.4% built
- ABD PRIDE7 mo overdueANUP BUILDERS & DEVELOPERS · NEAR RTO OFFICE, NashikP51600048494· 90% built
- ROONGTA ELEGANTE APARTMENT7 mo overdueROONGTA LANDMARKS LLP · NASHIK, NashikP51600033975· 58.7% built· 5 complaints
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.