RERA projects past their possession deadline
11,770 MahaRERA-registered projects are past the possession date currently on file and still report under 100% construction progress. Both figures are the promoter's own disclosure to the regulator.
Page 55 of 59
- VNSVL Shubh Nirvana Phase 17 mo overdueViman Nagar Shubh Ventures LLP · Viman Nagar, PuneP52100031263· 93.6% built
- Arkade Prime7 mo overdueM/s. Arkade Developers Pvt Ltd. · Andheri East, Mumbai SuburbanP51800047081· 78.6% built
- AAMOD7 mo overdueTODAY GLOBAL REALTORS · PANVEL, RaigarhP52000030717· filed Dec 2024 → now Dec 2025· 64.8% built
- Nova Casa7 mo overdueAllied Realty · Savedi, AhmednagarP52200034574· 19.1% built
- OMEGA COMMERCIAL COMPLEX - SOHAM ICON7 mo overdueSoham Developers · Haveli, PuneP52100006261· filed Dec 2019 → now Dec 2025· 67.3% built
- NAVKAR7 mo overdueKaro Constructions · Gulmohar Colony, Behind Architecture and engineering Hall Sangli, SangliP53100033281· 13.2% built
- EURUS7 mo overdueEDENIC ENTERPRISES PVT LTD · PUNE, PuneP52100034246· 70% built
- VRAJ7 mo overdueSATULKUMAR VRAJLAL ANKOLA · MOTI CHOWK, SangliP53100048228· 52.3% built
- Archana Prestige7 mo overdueKANIFNATH REALITY · mohamadwadi, PuneP52100050992· 81.8% built
- SARTHAK HEIGHTS7 mo overdueSarthak Developers · Andheri, Mumbai SuburbanP51800007127· filed Nov 2019 → now Dec 2025· 80.6% built· 16 complaints
- BELLE VUE ISLE7 mo overdueBELLE VUE INFRA · GOVIND NAGAR, NashikP51600047823· 47.3% built
- Aurum Apartment7 mo overdueLahoti Builders And Developers · Lahoti Nagar, NashikP51600046156· 90.9% built· 1 complaint
- MONITA PARK B BUILDING7 mo overdueUNITY DEVELOPERS · NEAR SAJAI GARDEN, SataraP52700033846· 81.8% built
- THE PAVILION7 mo overdueADITYABUILDCON · GOVT COLONY, SangliP53100046044· 86.4% built
- BEEZHIVE7 mo overdueBEDEKAR LIFESPACES LLP · E WARD, SHAHUPURI, KolhapurP53000029433· 70% built
- SAI VRINDAVAN7 mo overdueGANESH BABURAO KOLI · OPP. WALCHAND COLLEGE BACK GATE, SangliP53100047913· 81.8% built
- BRENTWOOD7 mo overdueBANTHIA CONSTRUCTION · S.No. 278/4/2 Pallod Farm, PuneP52100047663· 75.5% built
- RVK JANAKI7 mo overdueRVK REALTY · SATHE COLONY, PuneP52100031533· 81.8% built
- VATSALYA PROPERTIES7 mo overdueVatsalya Properties · NANA NANI PARK KONDHAWA BUDRUK, PuneP52100031866· filed Dec 2024 → now Dec 2025· 9.3% built
- Green Nook7 mo overdueUNIVERSAL HOUSE PVT. LTD. · Plot No. H-7, Rani Laxmi Nagar,, NagpurP50500045632· 80% built
- MANMOHAN RESIDENCY7 mo overdueHOME DEVELOPERS AND REALITY · PUNE, PuneP52100050793· 86.5% built
- KRISHNA NIWAS7 mo overdueK.PATELAND CO · Goregaon East, Mumbai SuburbanP51800033756· 90.9% built
- Rolex SRA CHS7 mo overdueSQUARE CONSTRUCTIONS · Andheri, Mumbai SuburbanP51800011887· filed Mar 2019 → now Dec 2025· 90.9% built
- TULSI PARK7 mo overdueDEVENDRA BABULAL PATEL · NAGAPUR, AhmednagarP52200030500· 90.9% built
- SHRADDHA PRIVILEGE7 mo overdueSHRADDHA LANDMARK PRIVATE LIMITED · KANNAMWAR NAGAR VIKHROLI EAST, Mumbai SuburbanP51800033921· 82.7% built
- UNITY HOMES7 mo overdueSHIVAM CONSTRUCTION · Neral, RaigarhP52000050427· 45% built
- Empire Estate 27 mo overdueJavid Yasin Kojar · Kaman, PalgharP99000045918· 79.5% built
- ANAND PRIDE PLUS7 mo overdueANAND CONTRACTORS & DEVELOPERS · BABRAS MALA, PuneP52100031161· filed Dec 2024 → now Dec 2025· 90.9% built
- Manasi7 mo overdueABHILASHA DEVELOPERS · Dahanukar Colony Kothrud, PuneP52100049332· 81.8% built· 2 complaints
- Aayush Ayaansh7 mo overdueAayush Developers · Chembur East, Mumbai SuburbanP51800051964· 86.4% built
- MANGAL KALASH7 mo overduePANKAJ CONSTRUCTIONS · Haveli, PuneP52100030962· 90.9% built
- SWOJAS NAKSHATRA7 mo overdueSWOJAS ASSOCIATES LLP · ERANDWANA, PuneP52100032107· 90.9% built
- Hetali Vishnu Bhavan7 mo overdueJayesh Pandya · Akurli, Kandivali East, Mumbai SuburbanP51800034561· 63% built
- JANKI CRYSTAL7 mo overdueACE PROPERTIES · KIWALE, PuneP52100031236· 68.2% built
- KUMAR PALMCREST A57 mo overdueKUMAR PROPERTIES AND PROMOTERS PRIVATE LIMITED · PISOLI, PuneP52100033817· 72.1% built
- Tulsidas City Center7 mo overdueRythm Properties · Near Shagun Chowk, PuneP52100078760· 40.9% built
- KABINI7 mo overdueshree shakti developers · Chavindra, ThaneP51700010423· filed Dec 2021 → now Dec 2025· 90.9% built· 1 complaint
- KAMAL ELITE7 mo overdueKAMAL BUILDTECH · PATHARDI, NashikP51600034336· 81.8% built
- Raj Residencies7 mo overdueRaj Realty & Infra LLP · Nallasopara East, PalgharP99000047508· 90.9% built
- 33 keshav kunj7 mo overdueCRYSTAL PROPERTIES · Mundhawa, PuneP52100003364· filed Sept 2019 → now Dec 2025· 95.4% built
- ACE INFINIA7 mo overdueAce properties · MULUND WEST, Mumbai SuburbanP51800051062· 44.5% built
- KOHINOOR SHANGRILA PHASE 27 mo overdueKOHINOOR PROPERTIES · PIMPRI, PuneP52100030688· 94.4% built· 2 complaints
- SUKHWANI PALMS7 mo overdueSUKHWANI PROMOTERS & BUILDERS · WAGHOLI, PuneP52100030796· 58.6% built
- SWAPNA SADAN7 mo overdueJADHAV ASSOCIATES · DEFENCE COLONY, PuneP52100031106· 90.9% built
- Basil Mondale7 mo overduevelx constructions llp · Keshavnagar, PuneP52100033136· 84.2% built· 1 complaint
- NIRAMAY PARK7 mo overdueMONARCH PROPERTIES · SAVEDI AHMEDNAGAR, AhmednagarP52200032266· 10.9% built
- Grandeview7 Phase-VII Bldg-L7 mo overdueChirag Developers · Near Poddar International School, PuneP52100033228· filed Dec 2024 → now Dec 2025· 90.9% built
- THE SKY7 mo overdueJAYPRAKASH BALIRAM SAHAJRAMANI · DIXIT NAGAR, NagpurP50500034570· 90.9% built
- Yogesh Co-Operative Housing Society7 mo overdueRavindra Developers Private Limited · Kulkarni Garden, NashikP51600048451· 90.9% built
- SHREE BHAGWATI CO-OP HSG SOCIETY7 mo overdueVINAY MAGANLAL KARNAVAT · BYTCO POINT, NashikP51600047578· 90.9% built
- MAHAVIR KUTIR7 mo overdueRajesh Construction · Palghar, PalgharP99000046061· 90.9% built
- SKY VISION TOWER7 mo overdueOM SAI CONSTRUCTION · MAHAVIR UDYAAN, SangliP53100030477· 81.8% built
- Kaveri Tower7 mo overdueGnanesh Virendra Lakhia · Andheri West, Mumbai SuburbanP51800051955· 77.7% built
- GANGA SERIO G BUILDING7 mo overdueGOEL GANGA LANDMARKS LLP · KHARADI, PuneP52100029757· 99.9% built· 2 complaints
- 51B Inclusive Housing7 mo overdueVilas Javdekar Eco Housing Private Limited · Balewadi, PuneP52100051227· 86.4% built
- JVMs Spectrum7 mo overdueJVM Spectrum LLP · Dhokali- Thane, ThaneP51700050671· 72.7% built
- RELIABLE SWAPNA NAGARI-1,2,5,8,13,14,157 mo overdueRELIABLE TARANG · Vasai, PalgharP99000007894· filed Aug 2018 → now Dec 2025· 87% built
- GANGWANI GARDENS7 mo overdueAaditya Lifespaces Infraventure Pvt Ltd · GANGWANI GARDEN, NagpurP50500015680· filed Mar 2018 → now Dec 2025· 65.6% built
- PRAGATI TOWER7 mo overdueSHALIMAR CONSTRUCTIONS · NA, OsmanabadP52500052771· filed Dec 2024 → now Dec 2025· 69.2% built
- MY HOME PUNAWALE - Phase II7 mo overdueKeystone Properties · Punawale, PuneP52100033551· 90.9% built· 1 complaint
- SWAPNASHILP7 mo overdueAKSHAY SHRIDHAR PHATAK · JALGAON, RatnagiriP52800049318· filed Mar 2024 → now Dec 2025· 90.9% built
- QUALCON HERITAGE7 mo overdueQUALCON TAKKA PROPERTIES LLP · Panvel, RaigarhP52000051192· 33.6% built
- SWAPNA SADAN A7 mo overdueJADHAV ASSOCIATES · Defence colony Daund, PuneP52100033815· 90.9% built
- ATHARVA SANCHIT7 mo overdueNITISH HEMANT KULKARNI · MALI COLONY, KolhapurP53000046739· 90.9% built
- Ved Lucky7 mo overdueShailesh Kumar Yadav · Pushpak- Vahal, RaigarhP52000050625· 81.8% built
- Sai Vinay7 mo overdueVinayak Developers · Near Pimpri Station, PuneP52100055902· 69.1% built
- PRIME LEGACY7 mo overduePRIME GROUP · Dahisar, Mumbai SuburbanP51800046428· filed Dec 2024 → now Dec 2025· 81.8% built
- Ashwamedh Pride7 mo overdueSunil Manohar Bakare · B ward, KolhapurP53000048663· 81.8% built
- JVMs Magnum7 mo overdueJVM Spectrum LLP · Dhokali- Thane, ThaneP51700052431· 78.2% built
- THE SKYLARK7 mo overdueSanjay Pandurang Gaikwad · 511 E Ward New Tarabai Park, KolhapurP53000052120· filed Dec 2024 → now Dec 2025· 72.7% built
- FORTUNE SHIV7 mo overdueFORTUNE DREAM-CON PRIVATE LIMITED · NANI DAMAN, DamanP49500000032· 80.6% built
- V N PLEDGE APARTMENT7 mo overdueCENTURY BUILDERS and DEVELOPERS · MANEKSHA NAGAR, NashikP51600034299· 90.9% built
- Gaurang Apartment7 mo overdueGanesha Developers · Opp to State Bank of India, ThaneP51700048961· filed Dec 2024 → now Dec 2025· 90.9% built
- VRUNDAVAN7 mo overdueR R ENTERPRISES · NAVAL NAGAR NAVALI, PalgharP99000032896· 85.9% built
- Rati Vighnarta7 mo overdueRATI BUILDERS AND DEVELOPERS · Vahal- Node Pushpak, RaigarhP52000077197· 90.9% built
- PARMESHWAR RESIDENCY7 mo overdueTulja Developers · Tuljapur, OsmanabadP52500080617· 40% built
- OMKAR RESIDENCY7 mo overdueM/s OMKAR ASSOCIATES · manda, ThaneP51700029285· 81.8% built
- Raj Apartments7 mo overdueSainath Construction · Aundh, Pune, PuneP52100056085· 51.8% built
- Vighnaharta Towers7 mo overdueVighnaharta Constrcutions · Pisadevi Aurangabad, AurangabadP51500033129· 66.4% built
- Joyville Hadapsar Annexe Phase 147 mo overdueJoyville Shapoorji Housing Private Limited · Shewalewadi, PuneP52100031515· 57% built
- iLife Upper NIBM7 mo overdueLegacy Fortune Associates · Undri, PuneP52100045658· 58.5% built
- OM TRYAMBAK PLAZA7 mo overdueANITA PRALHAD KESKAR · VASAN NAGAR, NashikP51600029012· 90.9% built
- KESAR CLASSIC7 mo overdueKESAR INFRASPACES LLP · Anand Nagar, Nashik Road, NashikP51600054090· 56.8% built
- JB ENTERPRISES7 mo overdueRAJU BHERULAL JAIN · NAVALI VILLAGE, PalgharP99000032671· 90.9% built
- NEELAYA7 mo overdueAVANI INFRASTRUCTURE · VIKASNAGAR, SataraP52700032202· 90.9% built
- SHIV ORION7 mo overdueZOIL INFRA · KHADGAON ROAD, DABHA, NagpurP50500048236· 81.8% built
- MANOHAR MAHAL7 mo overdueSHARDA VASTU NIRMITEE PVT. LTD. · PANCHPAKHADI, ThaneP51700048230· 81.8% built
- LAXMI NARAYAN CO OP HOUSING SOCIETY LTD7 mo overdueOJASS GOVIND INFRA LLP · NAUPADA, ThaneP51700049169· 74.3% built
- Jai Ganesh Vishnu Bliss7 mo overdueVaruna Ashok Mewani · Vahal, Ulwe, RaigarhP52000048309· 78.2% built
- AMOGH7 mo overdueVENKATESH BUILDCON · YESHWANT NAGAR, SangliP53100050110· 28.6% built
- Madhusha Legacy7 mo overdueShree Dattaguru Construction Company · Mouje Mudre Khurd, RaigarhP52000053026· 81.8% built
- Guru Ganesh CHS7 mo overdueVADNERE BUILDER & DEVELOPERS · Badlapur East, ThaneP51700049564· 81.8% built
- Sara Angan Phase-1 A1 -B1 Type Building7 mo overdueSara Infrastructures · Gangapur jahagir, AurangabadP51500049187· 89.5% built
- SAPTASHRUNGI TOWER7 mo overduePRAKASH AMBADAS DAGALE(HUF) · NASHIK, NashikP51600029748· 72.7% built
- Sharon Rose CHSL7 mo overdueM/s JDN REALTY LLP · MALAD WEST, Mumbai SuburbanP51800033903· 84.1% built
- SHIVAAY LANDMARK7 mo overdueSHIVAAY REALITY · CHAROLI, PuneP52100052494· 81.8% built
- Sai Pearl7 mo overdueM/S MITRA REALITY · Katrap, ThaneP51700030340· 86.4% built· 1 complaint
- UTOPIA7 mo overdueEDENIC ENTERPRISES PVT LTD · ROADPALI, RaigarhP52000029982· 90.9% built· 1 complaint
- VEDANT AVENUE7 mo overdueVedant Buildcon · Kasba, PuneP52100054028· 81.8% built
- Kohinoor Majestic7 mo overdueParvej Aslam Mujawar · Near KBP Chowk, SolapurP52600049027· 79.1% built
- GULMOHAR PARK7 mo overdueSUNIL MOHANDAS MAKHIJA · Taluka Panvel, Navi Mumbai, RaigarhP52000053503· 90.5% built
- BHAKTI HOME ROYALS7 mo overdueJayantilal Dharamshibhai Parmar · SHIRSAD PHATA, PalgharP99000011844· filed Dec 2019 → now Dec 2025· 61.4% built· 5 complaints
- Apollo Heights7 mo overdueJASANI REALTY PVT.LTD · Khar (West), Mumbai SuburbanP51800008154· filed Jul 2022 → now Dec 2025· 67.5% built
- Casa Bella Homes7 mo overdueJayashri Chintaman Patil · Balwant Nagar, Behind Wisdom High School, NashikP51600048790· 56.8% built
- Kalpataru Serenity - Bldg. 37 mo overdueKalpataru Gardens Pvt. Ltd. · Pune, PuneP52100034075· 65.9% built
- Sai Heights Building No.1 B Wing7 mo overdueSai Siddhi Developers · Vithalwadi,, ThaneP51700032918· 90.9% built
- Vindhyagiri7 mo overdueGio Properties · Pahadi Eksar and Pahadi Goregaon East, Mumbai SuburbanP51800034813· filed Feb 2025 → now Dec 2025· 71.9% built
- CHINTAMANI HABITAT JASMINE TYPE A-B-J7 mo overdueJASHNANI CONSTRUCTION PRIVATE LIMITED · SHAHAPUR, ThaneP51700034891· 81.8% built
- GVC SHAGUN CITY IV7 mo overdueSHAGUN BUILDCON · KAUTHA, NandedP51100047816· 70.6% built
- KAPSE APARTMENT7 mo overduePANDURANG RAMBHAU WARUNGASE · DESHMUKH NAGARP51600049602· 70.9% built
- VEDANT AARTI APARTMENT7 mo overdueVANDANA GORAKSHNATH MHASKE · MAUJE SINNAR - 1 SHIWAR, NashikP51600033600· 90.9% built
- YASH PRIME7 mo overdueSHAHSIKANT YASHWANT TARGE · SHIVAJI NAGAR, NashikP51600045511· 88.6% built
- SHREEMALHAR APARTMENT7 mo overdueSHREESWAMI CONSTRUCTIONS · GANGAPUR ROAD, NashikP51600048639· filed Dec 2024 → now Dec 2025· 90.9% built
- CONCLAVE7 mo overdueVEDA VENTURES · Pune City, PuneP52100048511· 81.8% built
- Borivli Vasundhara CHS Ltd.7 mo overdueShree Sai Shraddha Developers · Borivali East, Mumbai SuburbanP51800006294· filed Jan 2020 → now Dec 2025· 72.7% built
- SUKH SAGAR CO-OP HSG SOCIETY7 mo overdueNOBLE INFRASTRUCTURE BUILDER AND DEVELOPERS · KATRAP, ThaneP51700051135· 72.7% built
- SAVAI APARTMENT7 mo overdueS & T Corporation LTD · Dapoli, RaigarhP52000055894· filed Dec 2024 → now Dec 2025· 90.9% built
- KSHIPRA HOMES7 mo overdueNEELKANTH BUILDERS · Takala, KolhapurP53000050147· 90.9% built
- SHANKESHWAR PEARL7 mo overdueS P DEVELOPERS · RAVET, PuneP52100035074· 60% built
- SHRI GANESH APARTMENT7 mo overdueANIL HIRALAL BHANDARI · MHASRUL, NashikP51600050646· 0.9% built
- JAY PRAKASH CO. HSG. SOCIETY7 mo overdueJ B DEVELOPERS · NASHIK ROAD, NashikP51600049535· 90.9% built
- PARIJAT CHS SRA LTD7 mo overdueGloriosa Infra and Consultants Private Limited · ANDHERI WEST, Mumbai SuburbanP51800047617· 72.7% built
- MULUND GIRIRAJ CHSL7 mo overdueANON DEVELOPERS · MULUND WEST, Mumbai SuburbanP51800050695· 65.5% built
- Anand Residency7 mo overdueTapkir Associates · Haveli, PuneP52100053521· 90.9% built
- ACE AMBIENCE7 mo overdueAce properties · MULUND WEST, Mumbai SuburbanP51800034328· 70.9% built
- VASANT VIHAR7 mo overdueNAKSHATRA BUILDCON · TALEGAON DABHADE, PuneP52100048937· 38.2% built
- TRINETRA APARTMENT7 mo overdueSHREE SAI CONSTRUCTION · VASAI VIRAR, PalgharP99000011142· filed Jul 2023 → now Dec 2025· 90.9% built
- Shiv Paradise7 mo overdueShiv Corporation · Shirgaon, ThaneP51700046607· 90.9% built
- FIA CONSTRUCTION COMPANY FIA ORION - GRANDE7 mo overdueNIMISH LAXMICHAND PASAD · NAVALI PALGHAR, PalgharP99000032530· 81.8% built
- The Wellness Square7 mo overdueV Qube · Pathardi Phata, Nashik, NashikP51600045927· 50.5% built
- Hill Avenue7 mo overdueILMS SHELTERS PVT LTD · Near Pashan Hills, PuneP52100051340· 81.8% built
- ZAR EMPIRE7 mo overdueZAR BUILDERS & DEVELOPERS · Vasai-Virar City (M Corp), PalgharP99000009027· filed Jan 2021 → now Dec 2025· 52.7% built
- VIVANTA7 mo overdueSA BUILDERS AND DEVELOPERS · NORTH SHIVAJINAGAR, SangliP53100049872· filed Aug 2025 → now Dec 2025· 81.8% built
- KESHAV7 mo overdueShri Parasnath Properties · Koradi Road, Nagpur, NagpurP50500045596· 72.7% built
- RA URBANIA7 mo overdueMs Croissance Buildcon · Ganesh Nagar, PuneP52100050429· filed Jun 2025 → now Dec 2025· 81.8% built
- Jay Ganesh Residency7 mo overdueAtharv Construction and Developers · Katrang, RaigarhP52000049819· 81.8% built
- RUPASHRI APARTMENTS7 mo overdueYATIN S KULKARNI · PARVATI, PuneP52100030617· 90.9% built
- BHALCHANDRA BLESSINGS7 mo overdueN B BHONDAVE INFRA · SHINDEWASTI, PuneP52100046815· 95.5% built
- MADHAV PRIDE7 mo overdueFourth Dimension Properties · ADGAON, NashikP51600034272· 90.9% built
- Rushi Hans7 mo overdueAnkur Chaturbhai Rakholiya · Aanandwalli, Chandshi, NashikP51600033251· 9.1% built
- NEW MUKTI CO-OPERATIVE HOUSING SOCIETY LIMITED7 mo overdueSAI SIDDHI BUILDERS AND DEVELOPERS · NALLASOPARA WEST, PalgharP99000048123· 90.9% built
- AARADHYA HIGHPARK PROJECT III of PHASE 17 mo overdueMAN VASTUCON LLP · NEAR SINGAPORE INTERNATIONAL SCHOOL, ThaneP51700030611· 95% built· 2 complaints
- RELIABLE SWAPNA NAGARI-21,22,23,24,25,26,277 mo overdueRELIABLE TARANG · Vasai, PalgharP99000012328· filed Aug 2018 → now Dec 2025· 82.1% built· 1 complaint
- RAMKUNJ7 mo overdueJAYANT JAGANNATH SIRSAT · SHIVAJI PARK, Mumbai CityP51900047036· 77.1% built
- Mirage Tower7 mo overdueUNITY CONSTRUCTIONS · Nashik, NashikP51600046828· 72.7% built
- Shri Sai Mangal Co-Op Housing Society Ltd A Building7 mo overdueAMOGH ASSOCIATES · Village Chole , Thakurli, ThaneP51700050524· 84.1% built
- ONE MERAKI - Wing A & Wing B7 mo overdueMeraki Habitats LLP · CHEMBUR, Mumbai SuburbanP51800011606· filed Dec 2023 → now Dec 2025· 99.5% built
- UNNATI CREST7 mo overdueUNNATI SHELTORS · SECTOR-7, RaigarhP52000048115· 90.9% built
- VISION SPACIO7 mo overdueVISION CREATIVE ASSOCIATES · DUDULGAON, PuneP52100053856· 92.9% built
- ANUGANGA CLASSIC7 mo overdueBENKAR BUILDERS · DHAYARI, PuneP52100048218· 90.9% built
- Janaranjani - D Phase II at Nanded City7 mo overdueNanded City Development & Construction Co. Ltd. · Nanded Phata, PuneP52100047078· 90% built
- Balaji Heritage7 mo overdueBalaji Developers · Belavali, ThaneP51700048085· filed Dec 2024 → now Dec 2025· 79.5% built
- THE PARK VIEW7 mo overdueNAVNIRMAN BUILDERS & LAND DEVELOPER · LASHKARIBAG BASTI, NagpurP50500034253· 81.8% built
- SANSKAR7 mo overdueSANSKAR DWELLINGS LLP · Andheri, Mumbai SuburbanP51800046200· 83.2% built
- OMKAR7 mo overdueRanjekar Realty LLP · Karve Nagar, PuneP52100052757· 81.8% built
- JAYDEV HEIGHTS7 mo overdueAshwini Facility Creators LLP · Near New Karad Naka, SolapurP52600050305· 39.5% built
- ISHAAN GHARKUL A7 mo overdueIshaan Buildcon · Bhor, PuneP52100018238· filed Dec 2022 → now Dec 2025· 54.5% built
- Vertica Wing D7 mo overdueINFINITY CORP · Chikali, PuneP52100033670· 68.2% built
- Shreeji Residency7 mo overdueSUGAM KISHOR CHANIYARA · Avdhoot Colony, NashikP51600033874· 90.9% built
- JAGDAMBA VRUNDAVAN7 mo overdueJAGDAMBA ENTERPRISES · KUMBHAR ALI, RaigarhP52000033548· 81.8% built
- Park View7 mo overduePinak Enterprises · Mulund West, Mumbai SuburbanP51800033996· 89.1% built· 1 complaint
- MOHAMMEDIMANZIL7 mo overdueJEM DEVELOPERS AND BUILDERS · Andheri, Mumbai SuburbanP51800034489· 55.5% built
- IDEAL COLONY PHASE- II7 mo overdueTHE IDEAL CONSTRUCTION · Sutarmala Kolhapur, KolhapurP53000034244· 72.7% built
- RESHMA HEIGHTS CO-OPERATIVE HOUSING SOCIETY LTD.7 mo overdueNestcon · Dahanukar Colony, PuneP52100051614· 68.2% built
- Eco Luxuria Pride7 mo overdueEco Luxuria Developers Private Limited · Mudre (KH), RaigarhP52000029150· filed Dec 2024 → now Dec 2025· 90.9% built
- Mehta Premiere-Residential7 mo overdueAsiatic Trading and Construction Company · Magathane, Mumbai SuburbanP51800033388· 99.5% built
- MANAV MAITRY7 mo overdueMANAV REALTORS · Gaothan Village, PalgharP99000012261· filed Dec 2021 → now Dec 2025· 72.7% built
- Unique Legacy Regal7 mo overdueUnique Realty · Near Renuka Mata Mandir, PuneP52100045485· 86.8% built
- Silver Crest7 mo overdueGold Coin Builders · Andheri, Mumbai SuburbanP51800030332· 83.3% built
- YashONE Infinitee - Phase III7 mo overdueVilas Javdekar Infinitee Developers Pvt. Ltd. · Kate wasti, PuneP52100030825· 86.8% built
- Shree Apartment7 mo overdueS R Developers · Near Veer Baba Mandir, PuneP52100051723· 90.9% built
- La Charmaine CHSL7 mo overdueJDN DEVELOPERS · Malad West, Mumbai SuburbanP51800051287· 63.6% built
- SWAPNAPURTI APPARTMENT7 mo overdueAVHAD BUILDERS AND DEVELOPERS LIMITED · SAIKHEDA, NashikP51600049930· 90.9% built
- VEDANT AMBER7 mo overdueYASHWANT AJABRAO KHODKE · KHAMLA, NagpurP50500048289· 90.9% built· 1 complaint
- AMBER BLISS7 mo overdueM/S. AMBER COMBINES · DOMBIVLI WEST, ThaneP51700032492· 79.1% built
- ROYAL RESIDENCY7 mo overdueSKYLINE SHELTERS · VASAI, PalgharP99000047035· filed Aug 2024 → now Dec 2025· 89.5% built
- Shankeshwar Gravity7 mo overdueMunisuvrat Properties · NA, PuneP52100024786· 90.9% built
- LABH HEIGHTS7 mo overdueLABH ASSOCIATES · Vasai, PalgharP99000003792· filed Mar 2019 → now Dec 2025· 90.9% built
- Arch Kundan7 mo overdueManthan Associates · Shivajinagar, AurangabadP51500029050· 81.8% built
- PAL GARDEN PHASE II7 mo overdueAlexandra And Pal Estates Private Limited · KARJAT, RaigarhP52000015378· filed Dec 2022 → now Dec 2025· 84.3% built
- GOKULPARK II7 mo overdueHARIHAR INFRASTRUCTURE DEVELOPMENT CORPORATION LIMITED · MANISH NAGAR, NagpurP50500048220· 80% built
- GOVIND RESIDENCY-I7 mo overdueBHAVYA INFRAVENTURES PRIVATE LIMITED · NARA, NagpurP50500034342· 90.9% built
- Shraddha Panache7 mo overdueShraddha Landmark Private Limited · Village Hariyali, Mumbai SuburbanP51800046277· 81.8% built
- CHHATRAPATI CHAMBERS7 mo overdueSAI CONSTRUCTION · NR NAVAN CHAWL NASHIK ROAD CENTRAL JAIL ROAD NASHIK ROAD NASHIK, NashikP51600033617· 90.9% built
- YashONE Infinitee - Phase II7 mo overdueVilas Javdekar Infinitee Developers Pvt. Ltd. · Kate Wasti, PuneP52100029042· 93.3% built· 1 complaint
- PERRY APARTMENT7 mo overduePANKAJ SHANTILAL PARIKH · ORLEM MALAD WEST MUMBAI, Mumbai SuburbanP51800077645· 90.9% built· 1 complaint
- MANGALAM SIGNATURE7 mo overdueMetro Realty Group · Moshi, PuneP52100031523· 18.2% built
- SHRI RAJ RAJESHWAR TOWER7 mo overdueSHREE SWAMI DEVELOPERS · NEAR BUS STAND, AkolaP50100077276· 34.1% built
- SARVESH DREAM CITY WING D7 mo overdueSAI SHRADHA DEVELOPERS · JOVELI, ThaneP51700030642· 61.8% built
- Tapovan Orchid7 mo overdueRUDDHI BUILDCON PVT. LTD. · Dwarka, NashikP51600047487· 69.5% built
- VRUNDAWAN PARK AMENITY COMMERCIAL7 mo overduevedant developers · KASBA BARAMATI, PuneP52100048748· 81.8% built
- ALFA PREMIO PHASE 17 mo overdueARK PREM CONSTRUCTIONS · VIMAN NAGAR, PuneP52100000855· filed Sept 2018 → now Dec 2025· 95.9% built· 2 complaints
- Sun Stone7 mo overdueMahesh Brijmohan Agarwal · Pushpak (Dapoli), RaigarhP52000050961· 71.3% built· 1 complaint
- K-SQUARE NERIUM7 mo overdueANKIT CONSTRUCTION · SOMALWADA, NagpurP50500030653· 55% built
- VASANTPUSHPA7 mo overdueKTG ASSOCIATES · INDIRANAGAR, NashikP51600049199· 90.9% built
- Sai Ashray7 mo overdueDOORVA CONSTRUCTION · Pushpak- Vadghar, RaigarhP52000056165· filed Dec 2024 → now Dec 2025· 87.3% built
- Niwara Pride7 mo overdueM/s Niwara Builders & Developers · Near D. Y. Patil Hospital, Kadamwadi, KolhapurP53000045615· 59.1% built
- KOEL7 mo overdueshree shakti developers · Chavindra, ThaneP51700007920· filed Dec 2021 → now Dec 2025· 90.9% built
- Shubham Tarangan Phase II7 mo overdueSHUBHAM VIPRA ASSOCIATES · 1.5 Kms from Alephata Chowk toward Nashik, A/P - Ale, Tal - Junnar, Dist - Pune, PuneP52100029066· 78.9% built· 2 complaints
- PHATAK SOLITAIRE7 mo overdueM/s Phatak Developers · Jalgaon, RatnagiriP52800046383· filed Mar 2025 → now Dec 2025· 81.8% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.