RERA projects past their possession deadline
12,128 MahaRERA-registered projects are past the possession date currently on file and still report under 100% construction progress. Both figures are the promoter's own disclosure to the regulator.
Page 55 of 61
- Reliable Commercial Complex10 mo overdueShree Balaji Developers · Nashik, NashikP51600052728· filed Dec 2024 → now Dec 2025· 72.7% built
- Aveza Phase 210 mo overdueTata Housing Development Company Limited · Mulund East, Opp Navghar Police Station, MHADA Colony, Mulund East,, Mumbai SuburbanP51900007740· 0% built
- RANJANA HILLS10 mo overdueM/S. MARIA CONSTRUCTION · Wagdara (536054), NagpurP50500012794· filed Jun 2019 → now Dec 2025· 54.5% built
- EXCELLAA RESIDENCY10 mo overdueTHE EXCELLAA · AMBEGAON, PuneP52100021432· 90.9% built
- BELLAVUE10 mo overdueBHAKTI DEVELOPERS · Khopoli, RaigarhP52000000459· 79.7% built
- Sunrise Parkview Phase I10 mo overdueSukham Corporation Proprietor Sunrise Lifespaces LLP · Padle Village, ThaneP51700021145· 86.4% built
- Immensa B10 mo overdueAgile Real Estate Pvt. Ltd. · Thane, ThaneP51700000927· 99% built· 25 complaints
- ASHAR MAPLE BIRCH10 mo overdueMs ASHAR REALTORS · VAISHALI NAGAR, Mumbai SuburbanP51800023941· 66.8% built· 1 complaint
- NICE CITY10 mo overdueNICE REALTY AND DEVELOPERS · Thane, ThaneP51700010742· 89.1% built
- NILGIRI10 mo overdueCHAITANYA BUILDERS · CHAVDAR TALE MAHAD, RaigarhP52000016174· 81.8% built
- Hubtown Sunstone A wing10 mo overdueSunstone Developers Joint Venture · Andheri, Mumbai SuburbanP51800000183· 98.2% built· 2 complaints
- MARATHON NEXZONE TRITON -210 mo overdueSANVO RESORTS PVT. LTD. · PALASPE PHATA, RaigarhP52000000668· 72.3% built
- DREAMVILLE APARTMENT10 mo overdueSAWANT AND MOTWANI ASSOCIATES · SAWANT NAGAR, PuneP52100023444· 81.8% built
- ANP - ATLANTIS -Phase I10 mo overdueM/S.Five Star Shelters · BALEWADI, PuneP52100024229· 91.4% built
- JP North Imperia - Tower 110 mo overdueJP Infra Realty Private Limited · Near Vinay Nagar, ThaneP51700019613· 88% built· 1 complaint
- WORLIWALA CHSL10 mo overdueSHAMIK & SANGHVI DEVELOPERS LLP · VILE PARLE (EAST), Mumbai SuburbanP51800047017· 90.9% built
- Godrej Alive B10 mo overdueModella Textile Industries Limited · Mulund Thane Circle, ThaneP51700005281· 0% built· 9 complaints
- Megapolis Serenity A1 to A7, B1 and Conv shop A10 mo overduePegasus Properties Pvt. Ltd. · Rajiv Gandhi Infotech Park Phase 3, PuneP52100023051· 75.2% built· 2 complaints
- Tabeer Spaces10 mo overdueTabeer Properties · Royal Colony, NashikP51600023179· 90.9% built
- Rachana Enclave10 mo overdueRACHANA LIFESPACE · Sector 34C, RaigarhP52000025085· filed Dec 2024 → now Dec 2025· 90.9% built
- Heavan C Wing10 mo overdueHeet Builders Private Limited · Mumbai City, Mumbai CityP51900000175· 76% built
- TIRTHRAJ ENCLAVE10 mo overdueS K DEVELOPERS · SHAHUPURI, KolhapurP53000023532· 81.8% built
- PEARL HANS RESIDENCY - H WING10 mo overduePEARL HANS RESIDENCY - H WING · Kurla, Mumbai SuburbanP51800022506· 90.9% built
- UNNATHI WOODS PHASE VII A10 mo overdueUNNATHI ESTATES · Thane, ThaneP51700000002· 90.9% built· 5 complaints
- GLENRIDGE10 mo overdueROMA BUILDERS PRIVATE LIMITED · PATLIPADA, HIRANANDANI ESTATE, OFF. G B ROAD, ThaneP51700019550· 90.9% built
- Perfect 10 Phase IV10 mo overdueShagun Manav Spaces LLP · Balewadi, PuneP52100022249· 80.5% built
- South Tower10 mo overdueGlider Buildcon Realtors Private Ltd · Saatraasta, Mumbai CityP51900015854· 90.9% built· 15 complaints
- Krishna Heights10 mo overdueNarayan Dharmaji Bodke · Haveli, PuneP52100018577· 90.9% built
- RAUNAK CITY SECTOR IV - D210 mo overdueRAUNAK CORPORATION · Kalyan, ThaneP51700003210· 90.9% built
- NEHRU NAGAR GURUPRASAD CO-OPERATIVE HOUSING SOCIETY LIMITED10 mo overdueDERAIYA REALTORS PRIVATE LIMITED · Kurla, Mumbai SuburbanP51800023015· 90.9% built· 2 complaints
- Rajveer Nucleus10 mo overdueWaghere Promoters · kaspate wasti, PuneP52100009974· 90.9% built
- ROYAL HARMONY - B10 mo overdueSHAILESH HARAKHCHAND KHUTHIYA · DAMAN, DamanP49500000040· 86.4% built
- Verizon10 mo overdueBafna Realtors Pvt Ltd · Nashik, NashikP51600014206· 0% built
- JP North Alexa10 mo overdueJP Infra Realty Private Limited · near Vinay Nagar, ThaneP51700016736· 81.8% built
- Godrej Alive C10 mo overdueModella Textile Industries Limited · Mulund Thane Circle, ThaneP51700009993· 0% built· 2 complaints
- AVISHKAR HEIGHTS - C WING - PHASE III10 mo overdueAVISHKAR DEVELOPERS · Jalgaon, RatnagiriP52800001154· 90.9% built
- White House By Sai Builders10 mo overdueSai Builders · Garkheda, AurangabadP51500023865· 90.9% built
- REAL HEIGHTS10 mo overdueREALTECH DEVELOPMENT ASSOCIATES · OPP EVERSHINE CITY, PalgharP99000019569· 86.8% built
- AURIS BUSINESS CENTRE10 mo overdueDev Pooja Builders Pvt Ltd · SHIMPOLI, BORIVALI WEST, Mumbai SuburbanP51800034380· filed Dec 2024 → now Dec 2025· 63.2% built
- ATMIYA HEIGHTS10 mo overdueAKSHAR GROUP · SONIVALI, ThaneP51700015091· 83.3% built
- JP North Imperia - Tower 210 mo overdueJP Infra Realty Private Limited · Near Vinay Nagar, ThaneP51700019783· 90.9% built
- IMPERIAL HEIGHTS PHASE I - A AND B WING10 mo overdueAKSHAR SHANTI REALTORS PRIVATE LIMITED · Thane, ThaneP51700006296· filed Dec 2024 → now Dec 2025· 99.1% built· 5 complaints
- Wellwisher Town10 mo overdueWellwisher Properties · khopoli muncipal council, RaigarhP52000000721· 89.1% built
- Aditya Shagun10 mo overdueOgale Realty LLP · Chikhali, PuneP52100027220· 90.9% built
- EXCELLAA PLAZZO10 mo overdueTHE EXCELLAA · Ambegaon, PuneP52100021440· 90.9% built
- INDU HEIGHTS APARTMENT10 mo overdueMAULI BUILDERS · MANKAR NAGAR MAKHMALABAD PANCHVATI NASIK, NashikP51600025725· 90.9% built
- STERLING HEIGHTS B WING10 mo overdueSHANTEE SWARG · Yashwant Smart City, PalgharP99000018952· 90.9% built
- GANGA TRINITY PHASE I A1A2A310 mo overdueGANRAJ INFRASTRUCTURE LLP · PISOLI, PuneP52100019948· 0% built
- 11 West10 mo overdueBaner Hills LLP · Baner, PuneP52100020311· 90.9% built
- W-5710 mo overdueAdi Siddhashila Associates · Wakad, PuneP52100024520· 89.1% built
- Immensa A10 mo overdueAgile Real Estate Pvt. Ltd. · Thane, ThaneP51700001039· 99.8% built· 24 complaints
- Forest Edge Phase 210 mo overdueAjanta Enterprises · Sector 3P52100021807· 97.3% built
- VIVIANA - BLOCK310 mo overdueNIRMAN REALTORS AND DEVELOPERS LTD · Karjat, RaigarhP52000007537· 81.8% built· 1 complaint
- PEARL HANS RESIDENCY - G WING10 mo overdueHARI OM CONSTRUCTION · KURLA WEST, Mumbai SuburbanP51800022670· 90.9% built
- Immensa F10 mo overdueAgile Real Estate Pvt. Ltd. · Thane, ThaneP51700001278· 91.1% built· 25 complaints
- MAJESTIQUE MRUGAVARSHA PHASE I10 mo overdueMAJESTIQUE HERITAGE LIVING SPACES LLP · DHAYARI PUNE, PuneP52100022731· 66.7% built
- REVANTA10 mo overdueSIDDHESH PADMAMBA BUILDERS & DEVELOPERS · Mali Colony Takala, KolhapurP53000016078· 90.9% built
- ARIHANT CITY PHASE-I BUIDING-A,B,C,D,D1,D2,H,H1,H2,F10 mo overdueARIHANT ENTERPRISES · Bhiwandi, ThaneP51700010884· 86.5% built
- Nexus Kinaara D10 mo overdueNexus Enterprises · Chikhali, PuneP52100033605· filed Dec 2024 → now Dec 2025· 88.6% built
- GLENDALE10 mo overdueROMA BUILDERS PRIVATE LIMITED · PATLIPADA, HIRANANDNAI ESTATE, OFF. G B ROAD, ThaneP51700019542· 90.9% built
- SADGURU ASHISH PHAZE II10 mo overdueVIVEK MOHAN GADRE · Khedshi, RatnagiriP52800013242· 63.6% built
- CAPITAL10 mo overdueMarudhar Builders · rajarampuri Bus Route E Ward Kolhapur, KolhapurP53000019373· 90.9% built
- TRILOK PARK10 mo overdueRAJESH TRILOKCHAND CHOPRA · KANDIVALI WEST, Mumbai SuburbanP51800033509· filed Dec 2024 → now Dec 2025· 86.4% built
- VIVIANA - BLOCK 510 mo overdueNIRMAN REALTORS AND DEVELOPERS LTD · VIVIANA PROJECT, RaigarhP52000006209· 65.5% built· 2 complaints
- AATMAJ APARTMENT CO OPERATIVE HOUSING SOCIETY LIMITED10 mo overdueDMASS DEVELOPERS · MAHATMA NAGAR, NashikP51600048016· filed Dec 2024 → now Dec 2025· 61.4% built
- Hubtown Sunstone B Wing10 mo overdueSunstone Developers Joint Venture · Andheri, Mumbai SuburbanP51800000186· 89.1% built· 1 complaint
- RAUNAK CITY SECTOR IV - D110 mo overdueRAUNAK CORPORATION · Kalyan, ThaneP51700003377· 90.9% built
- Shanti Towers10 mo overdueBora Developers · Golegaon Road, PuneP52100050909· filed Dec 2024 → now Dec 2025· 72.7% built
- PRIYESH HEIGHTS10 mo overduePRIYESH ENTERPRISES · HDIL TOWNSHIP, PalgharP99000009305· filed Jun 2021 → now Dec 2025· 81.8% built
- Kalpataru Exquisite - Wing 410 mo overdueKalpataru Retail Ventures Private Limited · Wakad, PuneP52100023268· 52.3% built· 1 complaint
- Immensa H10 mo overdueAgile Real Estate Pvt. Ltd. · Thane, ThaneP51700001310· 66.6% built· 20 complaints
- Immensa G10 mo overdueAgile Real Estate Pvt. Ltd. · Thane, ThaneP51700001083· 70.4% built
- VIJAY APARTMENT10 mo overdueVIJAY VISHWANATH TAKALE · ABHAYNAGAR, SangliP53100033402· filed Dec 2024 → now Dec 2025· 72.7% built
- Ray Nagar Housing Project10 mo overdueVasant Vihar Realty Pvt Ltd · Kumbhari to Doddi road, SolapurP52600017938· 78.2% built
- CUBOID URBAN TRADE CENTRE10 mo overdueUDAY KASHINATH GHUGE · NASHIK, NashikP51600021295· 81.8% built
- ROMELL DIVA PHASE III - 21ST TO 23RD FLOOR10 mo overdueROMELL REAL ESTATE PRIVATE LIMITED · Borivali, Mumbai SuburbanP51800014484· 82.3% built· 1 complaint
- TRISHABH GREENS - WING B10 mo overdueRISHABH ENTERPRISES · CHEMBUR NAKA, CHEMBUR EAST, Mumbai SuburbanP51800018350· 81.8% built
- MAYURESH RESIDENCY10 mo overdueSHRI BALAJI DEVELOPERS · BHADKAMKARNAGAR, SataraP52700025312· 81.8% built
- MILLANO HEIGHTS10 mo overdueCHIMNANI CONSTRUCTIONS · Ulhasnagar, ThaneP51700047948· filed Dec 2024 → now Dec 2025· 86.8% built
- KRISHNA NAGRI10 mo overdueKRISHNA DEVELOPERS · Palghar, PalgharP99000005597· 59.4% built
- RIO HEIGHTS10 mo overdueRIO INFRATECH · Taloja Pachnand, RaigarhP52000023504· filed Dec 2024 → now Dec 2025· 88.2% built
- NIVANTA10 mo overdueYASHODEEP BUILDCON · KOYNAVELE, RaigarhP52000023225· 90.9% built
- SHREE KRISHNA HEIGHTS10 mo overdueSHREE KRISHNA REALITY · Palghar, PalgharP99000005927· 27.3% built
- ORCHID SQUARE PHASE 410 mo overdueM/S SQUAREFEET ECO HOUSING LLP · Ambarnath, ThaneP51700022076· 81.8% built
- SARVODAY SQUARE PHASE 2 BLDG NO 210 mo overdueSHREE SQUAREFEET ENTERPRISES LLP · Ambarnath, ThaneP51700018388· 90.9% built
- HUDA PARK10 mo overdueHUDA CONSTRUCTION · KAUSA MUMBRA, ThaneP51700016090· filed Dec 2024 → now Dec 2025· 81.8% built
- vedant nakshatra M phase 210 mo overdueMOHAN HARDASMAL THARWANI · Rameshwadi, ThaneP51700008414· 69.5% built
- Majestique Nest Building C10 mo overdueM/S MAJESTIQUE ASSOCIATES · PUNE, PuneP52100020198· 90.9% built
- TruEarth Views10 mo overdueTRUEARTH DEVELOPERS PVT LTD · Vikhroli (East), Mumbai SuburbanP51800024328· 28.7% built· 7 complaints
- Godrej Alive E10 mo overdueModella Textile Industries Limited · Thane (M Corp.), ThaneP51700009992· 0% built· 1 complaint
- V N PLEDGE APARTMENT10 mo overdueCENTURY BUILDERS and DEVELOPERS · MANEKSHA NAGAR, NashikP51600034299· 90.9% built
- Nexus One10 mo overdueAmar Chandrakant Dhamane · Mahadik Vasahat, KolhapurP53000052508· 77.3% built
- NIVASA ELEVIA - PHASE I10 mo overdueShree Samarth Spaces · KESHAVNAGAR, PuneP52100031816· filed Dec 2024 → now Dec 2025· 60% built· 1 complaint
- Sai Pearl10 mo overdueM/S MITRA REALITY · Katrap, ThaneP51700030340· 86.4% built· 1 complaint
- ABD PRIDE10 mo overdueANUP BUILDERS & DEVELOPERS · NEAR RTO OFFICE, NashikP51600048494· 90% built
- A K CROWN10 mo overdueAbdul Hai Liyaqat Qazi · Kherdi, RatnagiriP52800050649· 57.3% built
- Vighnaharta Towers10 mo overdueVighnaharta Constrcutions · Pisadevi Aurangabad, AurangabadP51500033129· 66.4% built
- TIARA by Swastik Empire10 mo overdueM/s SWASTIK EMPIRE DEVELOPERS LLP · PANTNAGAR, Mumbai SuburbanP51800034308· 90.4% built
- Rolex SRA CHS10 mo overdueSQUARE CONSTRUCTIONS · Andheri, Mumbai SuburbanP51800011887· filed Mar 2019 → now Dec 2025· 90.9% built
- LABH HEIGHTS10 mo overdueLABH ASSOCIATES · Vasai, PalgharP99000003792· filed Mar 2019 → now Dec 2025· 90.9% built
- CHOICE AMBE DARSHAN10 mo overdueCHOICE DEVELOPER · PANT NAGAR GHATKOPAR (E) MUMBAI, Mumbai SuburbanP51800045613· 90.9% built
- Manisha Prime10 mo overdueMANISHA ELITE REALTY PRIVATE LIMITED · Mulund East, Mumbai SuburbanP51800047877· 89.1% built
- Niwara Pride10 mo overdueM/s Niwara Builders & Developers · Near D. Y. Patil Hospital, Kadamwadi, KolhapurP53000045615· 59.1% built
- SHREE PURNANAND APARTMENT10 mo overdueSADHNA MILIND SHINDE · GANESH NAGAR, RaigarhP52000053051· 81.8% built
- SANSKAR10 mo overdueSANSKAR DWELLINGS LLP · Andheri, Mumbai SuburbanP51800046200· 83.2% built
- ISHAAN GHARKUL A10 mo overdueIshaan Buildcon · Bhor, PuneP52100018238· filed Dec 2022 → now Dec 2025· 54.5% built
- VASANT VIHAR10 mo overdueNAKSHATRA BUILDCON · TALEGAON DABHADE, PuneP52100048937· 38.2% built
- Lotus Heights10 mo overdueSamruddhi Developers · Malkapur, AkolaP50100045220· 90.9% built
- TRINETRA APARTMENT10 mo overdueSHREE SAI CONSTRUCTION · VASAI VIRAR, PalgharP99000011142· filed Jul 2023 → now Dec 2025· 90.9% built
- AMBER BLISS10 mo overdueM/S. AMBER COMBINES · DOMBIVLI WEST, ThaneP51700032492· 79.1% built
- MAYURESH RESIDENCY10 mo overdueM/s Pavan and GJ construction co · Zadgaon, RatnagiriP52800029697· 66.4% built
- KEDARDHAM10 mo overdueSANDEEP GUNDAJI SAWANT · Nevali, RaigarhP52000050341· 90.9% built
- GV7 CAPITAL 410 mo overdueChirag Developers · Ambegaon Budruk, PuneP52100022958· filed Mar 2022 → now Dec 2025· 7.7% built
- Naik Kharude Heights10 mo overdueMAHADEV DEVELOPERS · AJRA, KolhapurP53000051048· 81.8% built
- PHOTON APARTMENT PHASE II10 mo overdueB B Constructions · Pratibhanagar Extensions, KolhapurP53000032978· 49.5% built
- AMARILLO TOWN10 mo overdueWAKADKAR BROTHERS · RAVET, PuneP52100035039· 90% built
- CHARKOP SHWETAMBARA CO OPERATIVE HOUSING SOCIETY LIMITED10 mo overdueCHARKOP SHWETAMBARA COOPERATIVE HOUSING SOCIETY LIMITED · CHARKOP KANDIVALI WEST, Mumbai SuburbanP51800029344· 90.9% built· 1 complaint
- AMBAI RESIDENCY10 mo overdueM/S HARMONY INFRA · Rankala west, KolhapurP53000032399· 88.6% built
- VISTA10 mo overdueSARVSHUBH ENTERPRISES · MULUND EAST, Mumbai SuburbanP51800045286· 44.6% built
- SAUJANYA RACHANAA10 mo overdueTERRAFERMA DEVELOPERS LLP · ANDHERI, Mumbai SuburbanP51800046295· 91.8% built
- SUYOG SPACE - PHASE II10 mo overdueSUYOG BUILDERS · WAKAD, PuneP52100032138· 81.1% built
- YashONE Infinitee - Phase II10 mo overdueVilas Javdekar Infinitee Developers Pvt. Ltd. · Kate Wasti, PuneP52100029042· 93.3% built· 1 complaint
- BHAKTI HOME ROYALS10 mo overdueJayantilal Dharamshibhai Parmar · SHIRSAD PHATA, PalgharP99000011844· filed Dec 2019 → now Dec 2025· 61.4% built· 5 complaints
- Grandeview7 Phase-VII Bldg-L10 mo overdueChirag Developers · Near Poddar International School, PuneP52100033228· filed Dec 2024 → now Dec 2025· 90.9% built
- Shree Apartment10 mo overdueS R Developers · Near Veer Baba Mandir, PuneP52100051723· 90.9% built
- Ashwamedh Pride10 mo overdueSunil Manohar Bakare · B ward, KolhapurP53000048663· 81.8% built
- SHREEMALHAR APARTMENT10 mo overdueSHREESWAMI CONSTRUCTIONS · GANGAPUR ROAD, NashikP51600048639· filed Dec 2024 → now Dec 2025· 90.9% built
- Sai Heritage10 mo overdueShashank Enterprises · Ambernath, ThaneP51700053065· 80.5% built
- Kohinoor City Residential Phase 2 Block 210 mo overdueKohinoor Developers · Kurla, Mumbai SuburbanP51800003258· filed Dec 2019 → now Dec 2025· 89.1% built
- SUMATI SUMAN10 mo overdueSACHIN SUMATILAL BEDMUTHA · VIJAY NAGAR TO KUPWAD ROAD, SangliP53100032400· 80.9% built
- AMOGH10 mo overdueVENKATESH BUILDCON · YESHWANT NAGAR, SangliP53100050110· 28.6% built
- ROONGTA ELEGANTE APARTMENT10 mo overdueROONGTA LANDMARKS LLP · NASHIK, NashikP51600033975· 58.7% built· 5 complaints
- Guru Ganesh CHS10 mo overdueVADNERE BUILDER & DEVELOPERS · Badlapur East, ThaneP51700049564· 81.8% built
- VATSALYA PROPERTIES10 mo overdueVatsalya Properties · NANA NANI PARK KONDHAWA BUDRUK, PuneP52100031866· filed Dec 2024 → now Dec 2025· 9.3% built
- Manasi10 mo overdueABHILASHA DEVELOPERS · Dahanukar Colony Kothrud, PuneP52100049332· 81.8% built· 2 complaints
- The Wellness Square10 mo overdueV Qube · Pathardi Phata, Nashik, NashikP51600045927· 50.5% built
- Abhishek Heights10 mo overdueAjaysinh V Desai Developers · Tarabai Park, KolhapurP53000021112· filed Nov 2023 → now Dec 2025· 81.8% built
- VALLABHNIWAS CO-OP HOUSING SOCIETY LTD10 mo overdueSWOJAS REALTORS LLP · RAMBAUG COLONY, PuneP52100046809· 73.2% built
- Tricity Natraj10 mo overdueTricity Realty LLP · Wadhavali, Chembur, Mumbai SuburbanP51800050160· 77% built
- VNSVL Shubh Nirvana Phase 110 mo overdueViman Nagar Shubh Ventures LLP · Viman Nagar, PuneP52100031263· 93.6% built
- ZAR EMPIRE10 mo overdueZAR BUILDERS & DEVELOPERS · Vasai-Virar City (M Corp), PalgharP99000009027· filed Jan 2021 → now Dec 2025· 52.7% built
- Aayush Ayaansh10 mo overdueAayush Developers · Chembur East, Mumbai SuburbanP51800051964· 86.4% built
- RAUNAK RESIDENCY10 mo overdueUNNATHI ESTATES · Thane, ThaneP51700009540· filed Jun 2024 → now Dec 2025· 69.5% built· 1 complaint
- MY HOME PUNAWALE - Phase II10 mo overdueKeystone Properties · Punawale, PuneP52100033551· 90.9% built· 1 complaint
- Construction of MIG t/s on open plot on land bearing S.No.01 pt. on CTS No. 1/3 village kopari powai10 mo overdueMHADA · Near Shipping corporation india, opposite powai lake, Mumbai SuburbanP51800077430· 98.5% built
- EURUS10 mo overdueEDENIC ENTERPRISES PVT LTD · PUNE, PuneP52100034246· 70% built
- PHATAK SOLITAIRE10 mo overdueM/s Phatak Developers · Jalgaon, RatnagiriP52800046383· filed Mar 2025 → now Dec 2025· 81.8% built
- QBIX10 mo overdueTopline Buildtech · Baner Taluka Haweli, PuneP52100033154· 90.9% built
- Shankeshwar Gravity10 mo overdueMunisuvrat Properties · NA, PuneP52100024786· 90.9% built
- MADHAV PRIDE10 mo overdueFourth Dimension Properties · ADGAON, NashikP51600034272· 90.9% built
- RISHABRAJ PARK VISTAS10 mo overdueH RISHABRAJ REALTY · BORIVALI WEST, Mumbai SuburbanP51800033442· 59.1% built
- YOGANAND PARK 210 mo overdueBELVALKAR HOUSING LLP · KOTHRUD, PuneP52100051502· 72.7% built
- La Charmaine CHSL10 mo overdueJDN DEVELOPERS · Malad West, Mumbai SuburbanP51800051287· 63.6% built
- OMKAR10 mo overdueRanjekar Realty LLP · Karve Nagar, PuneP52100052757· 81.8% built
- MANOHAR MAHAL10 mo overdueSHARDA VASTU NIRMITEE PVT. LTD. · PANCHPAKHADI, ThaneP51700048230· 81.8% built
- Kohinoor Majestic10 mo overdueParvej Aslam Mujawar · Near KBP Chowk, SolapurP52600049027· 79.1% built
- SAI SHRADDHA RESIDENCY10 mo overdueSHRI SAI BUILDERS AND DEVELOPERS · BRIJWADI, AurangabadP51500046576· 81.8% built
- SUKRUT APARTMENTS10 mo overdueSHODHAN YASHWANT JOSHI · OSMANPURA, DARGAH ROAD, AurangabadP51500033918· 81.8% built
- KUMAR PALMCREST A510 mo overdueKUMAR PROPERTIES AND PROMOTERS PRIVATE LIMITED · PISOLI, PuneP52100033817· 72.1% built
- Shivam Homes Wing A and B10 mo overdueShivam Homes · Badlapur East, ThaneP51700048026· 81.8% built
- KRISHNA NIWAS10 mo overdueK.PATELAND CO · Goregaon East, Mumbai SuburbanP51800033756· 90.9% built
- Hetali Vishnu Bhavan10 mo overdueJayesh Pandya · Akurli, Kandivali East, Mumbai SuburbanP51800034561· 63% built
- CHHATRAPATI CHAMBERS10 mo overdueSAI CONSTRUCTION · NR NAVAN CHAWL NASHIK ROAD CENTRAL JAIL ROAD NASHIK ROAD NASHIK, NashikP51600033617· 90.9% built
- NEELAYA10 mo overdueAVANI INFRASTRUCTURE · VIKASNAGAR, SataraP52700032202· 90.9% built
- SHRADDHA ELITE10 mo overdueSHRADDHA DEVELOPERS & REALTORS · BORIVALI WEST, Mumbai SuburbanP51800045452· 90.5% built
- TULSI PARK10 mo overdueDEVENDRA BABULAL PATEL · NAGAPUR, AhmednagarP52200030500· 90.9% built
- PARKSYDE NEST PHASE-3A10 mo overdueJAIKUMAR CONSTRUCTIONS LTD · PANCHAVATI ANNEX, NashikP51600033065· 92.3% built
- SHRI GANESH APARTMENT10 mo overdueANIL HIRALAL BHANDARI · MHASRUL, NashikP51600050646· 0.9% built
- ACE INFINIA10 mo overdueAce properties · MULUND WEST, Mumbai SuburbanP51800051062· 44.5% built
- RVK JANAKI10 mo overdueRVK REALTY · SATHE COLONY, PuneP52100031533· 81.8% built
- Sai Heights Building No.1 B Wing10 mo overdueSai Siddhi Developers · Vithalwadi,, ThaneP51700032918· 90.9% built
- EKTA CREST10 mo overdueEKTA HOUSING PRIVATE LIMITED · CHEMBUR, Mumbai SuburbanP51800046149· 93.9% built
- UNNATI CREST10 mo overdueUNNATI SHELTORS · SECTOR-7, RaigarhP52000048115· 90.9% built
- SHREE RESIDENCY10 mo overdueSharad Hindurao Patil · Survey No. 2239 Balwant Bunglow Shivaji Housing Society Sangli 416416, SangliP53100045798· 66.5% built
- AASTHA RESIDENCY10 mo overdueMANOJ MADHUKAR TOSHNIWAL · TILAKWADI, NashikP51600034910· 90.5% built
- EPITOME10 mo overdueTHOROUGHBRED REALTY LLP · GARODIA NAGAR, Mumbai SuburbanP51800034589· 99.5% built
- SHAH S SADGURU RESIDENCY PHASE II10 mo overdueSHAH BUILDERS · CHEHADI PUMPING, NashikP51600047168· 72.7% built
- Park View10 mo overduePinak Enterprises · Mulund West, Mumbai SuburbanP51800033996· 89.1% built· 1 complaint
- SUNVIEW CO-OPERATIVE HOUSING SOCIETY LIMITED10 mo overdueSAMRUDDHEE CONSTRUCTIONS · PIMPRI WAGHERE, PuneP52100050177· filed May 2025 → now Dec 2025· 90.9% built
- 24 JEWELS10 mo overdueDESHPANDE INFRA · Kasaba Karveer Ruikar Colony Nimbalkar Colony, KolhapurP53000050821· 85% built
- JB ENTERPRISES10 mo overdueRAJU BHERULAL JAIN · NAVALI VILLAGE, PalgharP99000032671· 90.9% built
- SANKALP HEIGHTS10 mo overdueDaiwik Developers · OLD EMPLOYMENT CHOWK, SolapurP52600032739· 54.5% built
- KESAR CLASSIC10 mo overdueKESAR INFRASPACES LLP · Anand Nagar, Nashik Road, NashikP51600054090· 56.8% built
- Vakratunda CHS10 mo overdueARYA ENTERPRISES · THANE, ThaneP51700049403· 45.5% built
- MANMOHAN RESIDENCY10 mo overdueHOME DEVELOPERS AND REALITY · PUNE, PuneP52100050793· 86.5% built
- AARADHYA HIGHPARK PROJECT III of PHASE 110 mo overdueMAN VASTUCON LLP · NEAR SINGAPORE INTERNATIONAL SCHOOL, ThaneP51700030611· 95% built· 2 complaints
- THE SKYLARK10 mo overdueSanjay Pandurang Gaikwad · 511 E Ward New Tarabai Park, KolhapurP53000052120· filed Dec 2024 → now Dec 2025· 72.7% built
- KATARIAS SHIV SHRISHTI10 mo overdueSHIV SAGAR DEVELOPERS AND BUILDERS · MORIVALI, ThaneP51700046409· 72.3% built
- 24 SUNSHINE TOWERS10 mo overdueSHIV ASSOCIATES · CHIKHALI, PuneP52100029620· 81.8% built
- UTOPIA10 mo overdueEDENIC ENTERPRISES PVT LTD · ROADPALI, RaigarhP52000029982· 90.9% built· 1 complaint
- VASANTPUSHPA10 mo overdueKTG ASSOCIATES · INDIRANAGAR, NashikP51600049199· 90.9% built
- Tapovan Orchid10 mo overdueRUDDHI BUILDCON PVT. LTD. · Dwarka, NashikP51600047487· 69.5% built
- SHIVNERI RESIDENCY10 mo overdueNice Home · PATOLE MALA, NASHIK ROAD, NashikP51600048370· 90.9% built
- MANGALAM SIGNATURE10 mo overdueMetro Realty Group · Moshi, PuneP52100031523· 18.2% built
- ANUGANGA CLASSIC10 mo overdueBENKAR BUILDERS · DHAYARI, PuneP52100048218· 90.9% built
- QUALCON HERITAGE10 mo overdueQUALCON TAKKA PROPERTIES LLP · Panvel, RaigarhP52000051192· 33.6% built
- GLORY APARTMENTS10 mo overdueAdnani Constructions · BORIVALI WEST, Mumbai SuburbanP51800048855· filed Dec 2024 → now Dec 2025· 72.7% built
- SHREE BHAGWATI CO-OP HSG SOCIETY10 mo overdueVINAY MAGANLAL KARNAVAT · BYTCO POINT, NashikP51600047578· 90.9% built
- SHIV ORION10 mo overdueZOIL INFRA · KHADGAON ROAD, DABHA, NagpurP50500048236· 81.8% built
- SWAPNALOK PHASE II WING G10 mo overdueMANAV KRUSHNAI DEVELOPERS THROUGH ITS PROPRIETOR MANAV REALTY · Fursungi Pune, PuneP52100034008· 90.9% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.