RERA projects past their possession deadline
12,128 MahaRERA-registered projects are past the possession date currently on file and still report under 100% construction progress. Both figures are the promoter's own disclosure to the regulator.
Page 56 of 61
- Arkade Prime10 mo overdueM/s. Arkade Developers Pvt Ltd. · Andheri East, Mumbai SuburbanP51800047081· 78.6% built
- SHANTIBHUSHAN APARTMENTS10 mo overdueShri Mauli Developers And Builders · Nagaland Chowk, SolapurP52600009916· filed Nov 2023 → now Dec 2025· 36.4% built
- PERRY APARTMENT10 mo overduePANKAJ SHANTILAL PARIKH · ORLEM MALAD WEST MUMBAI, Mumbai SuburbanP51800077645· 90.9% built· 1 complaint
- RA URBANIA10 mo overdueMs Croissance Buildcon · Ganesh Nagar, PuneP52100050429· filed Jun 2025 → now Dec 2025· 81.8% built
- Eco Luxuria Pride10 mo overdueEco Luxuria Developers Private Limited · Mudre (KH), RaigarhP52000029150· filed Dec 2024 → now Dec 2025· 90.9% built
- KABINI10 mo overdueShree Shakti Developers · Chavindra, ThaneP51700010423· filed Dec 2021 → now Dec 2025· 90.9% built· 1 complaint
- JVMs Spectrum10 mo overdueJVM Spectrum LLP · Dhokali- Thane, ThaneP51700050671· 72.7% built
- GVC SHAGUN CITY IV10 mo overdueSHAGUN BUILDCON · KAUTHA, NandedP51100047816· 70.6% built
- VRUNDAWAN PARK AMENITY COMMERCIAL10 mo overdueVedant Developers · KASBA BARAMATI, PuneP52100048748· 81.8% built
- YAHVI10 mo overdueVilas Shinde Developers · Parvati, PuneP52100076961· 81.8% built
- ARKADE CROWN10 mo overdueArkade Developers Private Limited · Borivali, Mumbai SuburbanP51800045342· 71.1% built
- LAXMI NARAYAN CO OP HOUSING SOCIETY LTD10 mo overdueOJASS GOVIND INFRA LLP · NAUPADA, ThaneP51700049169· 74.3% built
- Vertica Wing D10 mo overdueINFINITY CORP · Chikali, PuneP52100033670· 68.2% built
- Hill Avenue10 mo overdueILMS SHELTERS PVT LTD · Near Pashan Hills, PuneP52100051340· 81.8% built
- GOVIND RESIDENCY-I10 mo overdueBHAVYA INFRAVENTURES PRIVATE LIMITED · NARA, NagpurP50500034342· 90.9% built
- MANGAL KALASH10 mo overduePANKAJ CONSTRUCTIONS · Haveli, PuneP52100030962· 90.9% built
- GAYATRI NIWAS10 mo overdueGayatri Builders · CHIKANGHAR, ThaneP51700029816· 90.9% built
- RELIABLE SWAPNA NAGARI-1,2,5,8,13,14,1510 mo overdueRELIABLE TARANG · Vasai, PalgharP99000007894· filed Aug 2018 → now Dec 2025· 87% built
- Tulsidas City Center10 mo overdueRythm Properties · Near Shagun Chowk, PuneP52100078760· 40.9% built
- KHANOLKAR BHAVAN CHSL - PARADISE10 mo overdueC H PATIL AND SONS LLP · GOREGAON EAST, Mumbai SuburbanP51800046246· 9.1% built
- ISKCON RESIDENCY PHASE 110 mo overdueIskcon Realtors · AMBERNATH, ThaneP51700051160· 59.1% built
- Green Nook10 mo overdueUNIVERSAL HOUSE PVT. LTD. · Plot No. H-7, Rani Laxmi Nagar,, NagpurP50500045632· 80% built
- KAPSE APARTMENT10 mo overduePANDURANG RAMBHAU WARUNGASE · DESHMUKH NAGARP51600049602· 70.9% built
- TRINITY EMPIRE10 mo overdueTRINITY GROUP ENGINEERS AND DEVELOPERS · Jasingrao Park, KolhapurP53000034847· filed Dec 2023 → now Dec 2025· 51.8% built
- Jai Ganesh Vishnu Bliss10 mo overdueVaruna Ashok Mewani · Vahal, Ulwe, RaigarhP52000048309· 78.2% built
- SHIVAAY LANDMARK10 mo overdueSHIVAAY REALITY · CHAROLI, PuneP52100052494· 81.8% built
- Shubham Tarangan Phase II10 mo overdueSHUBHAM VIPRA ASSOCIATES · 1.5 Kms from Alephata Chowk toward Nashik, A/P - Ale, Tal - Junnar, Dist - Pune, PuneP52100029066· 78.9% built· 3 complaints
- BHAGYALAXMI SWARUP10 mo overdueBHAGYALAXMI BUILDERS AND DEVELOPERS · NEAR SOMESHWAR, GANGAPUR SHIWAR, NASHIK, NashikP51600030855· 90.9% built
- BRENTWOOD10 mo overdueBANTHIA CONSTRUCTION · S.No. 278/4/2 Pallod Farm, PuneP52100047663· 75.5% built
- ROYAL ANNEX10 mo overdueSUSHANT VIJAY BHALBAR · AKHILESH PARK KAGAL, KolhapurP53000017431· filed Nov 2023 → now Dec 2025· 55.3% built
- ARSH GLORY10 mo overdueM/s. VIKAS INFRAVENTURES · MOUZA- KACHIMET, NagpurP50500046204· 83.2% built
- SHEETALKUNJ SAHAKARI GRUHARACHANA SANSATHA MARYADIT10 mo overdueICON PROPERTIES · SHIVAJI NAGAR, PuneP52100034994· 81.8% built
- JAGDAMBA VRUNDAVAN10 mo overdueJAGDAMBA ENTERPRISES · KUMBHAR ALI, RaigarhP52000033548· 81.8% built
- NUTAN NISHIGANDHA C.H.S LTD10 mo overdueCONARCH LIFESPACE LLP · Vile Parle (East), Mumbai CityP51900049182· 72.7% built
- Marina Enclave Wings Q and R with Kindergarten Phase - IV10 mo overdueGURUKRUPA DEVELOPERS D N NAGR PROJECT · Malvani Malad West, Mumbai SuburbanP51800032847· 71.4% built
- JAY PRAKASH CO. HSG. SOCIETY10 mo overdueJ B DEVELOPERS · NASHIK ROAD, NashikP51600049535· 90.9% built
- CONCLAVE10 mo overdueVEDA VENTURES · Pune City, PuneP52100048511· 81.8% built
- Jay Ganesh Residency10 mo overdueAtharv Construction and Developers · Katrang, RaigarhP52000049819· 81.8% built
- PARIJAT CHS SRA LTD10 mo overdueGloriosa Infra and Consultants Private Limited · ANDHERI WEST, Mumbai SuburbanP51800047617· 72.7% built
- IDEAL RESIDENCY10 mo overdueNEW IDEAL DEVELOPERS · Khed-bhadgaon, RatnagiriP52800005082· filed Jan 2021 → now Dec 2025· 59.8% built
- JVMs Magnum10 mo overdueJVM Spectrum LLP · Dhokali- Thane, ThaneP51700052431· 78.2% built
- UNITY HOMES10 mo overdueSHIVAM CONSTRUCTION · Neral, RaigarhP52000050427· 45% built
- SOHO RESIDENCY10 mo overdueMAHAVIR CONSTRUCTION COMPANY · NEAR 70 GALA, PalgharP99000030867· 90.9% built
- PURPLE AASHRAY APARTMENT10 mo overdueKIRAN JAYANTIBHAI PATEL · SATPUR, NashikP51600050208· 90.9% built
- PAL GARDEN PHASE II10 mo overdueAlexandra And Pal Estates Private Limited · KARJAT, RaigarhP52000015378· filed Dec 2022 → now Dec 2025· 84.3% built
- Easterlia Phase 210 mo overdueSpacemint Realty LLP · Khese Park, PuneP52100034658· 89.1% built
- VRUNDAVAN10 mo overdueR R ENTERPRISES · NAVAL NAGAR NAVALI, PalgharP99000032896· 85.9% built
- CHORDIYA GALAXY10 mo overdueN K ASSOCIATES · KONDHWA BK, PuneP52100052801· 79.1% built
- Yogesh Co-Operative Housing Society10 mo overdueRavindra Developers Private Limited · Kulkarni Garden, NashikP51600048451· 90.9% built
- Arch Kanchan10 mo overdueARCH DEVELOPERS · Shivajinagar, AurangabadP51500029712· 81.8% built
- CHINTAMANI HABITAT JASMINE TYPE A-B-J10 mo overdueJASHNANI CONSTRUCTION PRIVATE LIMITED · SHAHAPUR, ThaneP51700034891· 81.8% built
- Mehta Premiere-Residential10 mo overdueAsiatic Trading and Construction Company · Magathane, Mumbai SuburbanP51800033388· 99.5% built
- MULUND GIRIRAJ CHSL10 mo overdueANON DEVELOPERS · MULUND WEST, Mumbai SuburbanP51800050695· 65.5% built
- Sai Vinay10 mo overdueVinayak Developers · Near Pimpri Station, PuneP52100055902· 69.1% built
- SHANKESHWAR PEARL10 mo overdueS P DEVELOPERS · RAVET, PuneP52100035074· 60% built
- SWARA PRIDE10 mo overdueMILIND RANGARAV SHINDE · REES KAMBA, RaigarhP52000052039· 72.7% built
- VRAJ10 mo overdueSATULKUMAR VRAJLAL ANKOLA · MOTI CHOWK, SangliP53100048228· 52.3% built
- ANTARIKSH AVALON10 mo overdueANTARIKSH REALTORS PRIVATE LIMITED · PANTNAGAR GHATKOPAR EAST, Mumbai SuburbanP51800030439· 87.7% built
- GANGWANI GARDENS10 mo overdueAaditya Lifespaces Infraventure Pvt Ltd · GANGWANI GARDEN, NagpurP50500015680· filed Mar 2018 → now Dec 2025· 65.6% built
- SANSKAR PRIDE10 mo overdueLAXMAN EKNATH GOMASE · GIRIDHAR NAGAR PATHARDI PHATA NASHIK, NashikP51600032398· 90.9% built
- PADMA MADHAV10 mo overdueVriddhi Realty Parvati LLP · KOTHRUD, PuneP52100052040· filed Jun 2025 → now Dec 2025· 66.8% built
- SARTHAK HEIGHTS10 mo overdueSarthak Developers · Andheri, Mumbai SuburbanP51800007127· filed Nov 2019 → now Dec 2025· 80.6% built· 16 complaints
- AUROVILLE A AND B WING10 mo overdueARYA CONSTRUCTION · SANDAP, ThaneP51700047056· 81.8% built
- Unique Legacy Regal10 mo overdueUnique Realty · Near Renuka Mata Mandir, PuneP52100045485· 86.8% built
- Sharon Rose CHSL10 mo overdueM/s JDN REALTY LLP · MALAD WEST, Mumbai SuburbanP51800033903· 84.1% built
- THE PARK VIEW10 mo overdueNAVNIRMAN BUILDERS & LAND DEVELOPER · LASHKARIBAG BASTI, NagpurP50500034253· 81.8% built
- YASH PRIME10 mo overdueSHAHSIKANT YASHWANT TARGE · SHIVAJI NAGAR, NashikP51600045511· 88.6% built
- Aurum Apartment10 mo overdueLahoti Builders And Developers · Lahoti Nagar, NashikP51600046156· 90.9% built· 1 complaint
- SARVESH DREAM CITY WING D10 mo overdueSAI SHRADHA DEVELOPERS · JOVELI, ThaneP51700030642· 61.8% built
- YashONE Infinitee - Phase III10 mo overdueVilas Javdekar Infinitee Developers Pvt. Ltd. · Kate wasti, PuneP52100030825· 86.8% built
- SWOJAS NAKSHATRA10 mo overdueSWOJAS ASSOCIATES LLP · ERANDWANA, PuneP52100032107· 90.9% built
- Raj Residencies10 mo overdueRaj Realty & Infra LLP · Nallasopara East, PalgharP99000047508· 90.9% built
- SKY VISION TOWER10 mo overdueOM SAI CONSTRUCTION · MAHAVIR UDYAAN, SangliP53100030477· 81.8% built
- SHIVTEJ ASHIYANA10 mo overdueYOGESH RAMDAS SARJINE · Seawoods, ThaneP51700011753· filed Apr 2018 → now Dec 2025· 90.9% built
- OM TRYAMBAK PLAZA10 mo overdueANITA PRALHAD KESKAR · VASAN NAGAR, NashikP51600029012· 90.9% built
- DEVAKINANDAN10 mo overdueKISHORKUMAR SWAROOPCHAND JAIN · NANA NANI PARK, PuneP52100045361· filed Dec 2024 → now Dec 2025· 81.8% built
- RELIABLE SWAPNA NAGARI-21,22,23,24,25,26,2710 mo overdueRELIABLE TARANG · Vasai, PalgharP99000012328· filed Aug 2018 → now Dec 2025· 82.1% built· 1 complaint
- NEELKANTH HEIGHTS10 mo overdueYATIN ANNASAHIB WANI · HIRE NAGAR, NashikP51600034435· 89.5% built
- THE SKY10 mo overdueJAYPRAKASH BALIRAM SAHAJRAMANI · DIXIT NAGAR, NagpurP50500034570· 90.9% built
- PARMESHWAR RESIDENCY10 mo overdueTulja Developers · Tuljapur, OsmanabadP52500080617· 40% built
- Rudra Regency10 mo overdueKrishna Enterprises · Kharghar, RaigarhP52000054251· 70.9% built
- Silver Crest10 mo overdueGold Coin Builders · Andheri, Mumbai SuburbanP51800030332· 83.3% built
- MEERA SQUARE10 mo overdueSARASWATI CORP · BEHIND SHIV MANDIR, ThaneP51700053500· filed Jun 2025 → now Dec 2025· 71.6% built
- Gaurang Apartment10 mo overdueGanesha Developers · Opp to State Bank of India, ThaneP51700048961· filed Dec 2024 → now Dec 2025· 90.9% built
- ADVAIT APARTMENT10 mo overdueGRANDMARK SPACES · GOVIND NAGAR, NashikP51600048825· 81.8% built
- JANKI CRYSTAL10 mo overdueACE PROPERTIES · KIWALE, PuneP52100031236· 68.2% built
- Shiv Paradise10 mo overdueShiv Corporation · Shirgaon, ThaneP51700046607· 90.9% built
- Apollo Heights10 mo overdueJASANI REALTY PVT.LTD · Khar (West), Mumbai SuburbanP51800008154· filed Jul 2022 → now Dec 2025· 67.5% built
- SHUBHADA COOP HOUSING SOCIETYPROPOSED10 mo overdueKAUSTUBH JEEVAN KULKARNI · CHENDHARE, RaigarhP52000046434· 49.6% built
- BELLE VUE ISLE10 mo overdueBELLE VUE INFRA · GOVIND NAGAR, NashikP51600047823· 47.3% built
- Redevelopment of Gurudeo Geetanjali CHS Ltd.10 mo overdueHeritage Lifestyles LLP · Chembur, Mumbai SuburbanP51800034564· 90.9% built
- Rushi Hans10 mo overdueAnkur Chaturbhai Rakholiya · Aanandwalli, Chandshi, NashikP51600033251· 9.1% built
- SUKH SAGAR CO-OP HSG SOCIETY10 mo overdueNOBLE INFRASTRUCTURE BUILDER AND DEVELOPERS · KATRAP, ThaneP51700051135· 72.7% built
- MAHAVIR KUTIR10 mo overdueRajesh Construction · Palghar, PalgharP99000046061· 90.9% built
- SAI VRINDAVAN10 mo overdueGANESH BABURAO KOLI · OPP. WALCHAND COLLEGE BACK GATE, SangliP53100047913· 81.8% built
- SWAPNAPURTI APPARTMENT10 mo overdueAVHAD BUILDERS AND DEVELOPERS LIMITED · SAIKHEDA, NashikP51600049930· 90.9% built
- Jaydev Imperia10 mo overdueJAYDEV LIFESPACE LLP · Pushpak, Vahal, RaigarhP52000051712· 37.7% built
- Arch Kundan10 mo overdueManthan Associates · Shivajinagar, AurangabadP51500029050· 81.8% built
- VISION SPACIO10 mo overdueVISION CREATIVE ASSOCIATES · DUDULGAON, PuneP52100053856· 92.9% built
- USHAKIRAN10 mo overdueKapil Ulhas Trimal · SADASHIV PETH, PuneP52100046401· 45.5% built
- Ved Lucky10 mo overdueShailesh Kumar Yadav · Pushpak- Vahal, RaigarhP52000050625· 81.8% built
- SAPTASHRUNGI TOWER10 mo overduePRAKASH AMBADAS DAGALE(HUF) · NASHIK, NashikP51600029748· 72.7% built
- GANGA SERIO G BUILDING10 mo overdueGOEL GANGA LANDMARKS LLP · KHARADI, PuneP52100029757· 99.9% built· 2 complaints
- KESHAV10 mo overdueShri Parasnath Properties · Koradi Road, Nagpur, NagpurP50500045596· 72.7% built
- Basil Mondale10 mo overdueVelx Constructions Llp · Keshavnagar, PuneP52100033136· 84.2% built· 1 complaint
- BHALCHANDRA BLESSINGS10 mo overdueN B BHONDAVE INFRA · SHINDEWASTI, PuneP52100046815· 95.5% built
- THE PAVILION10 mo overdueADITYABUILDCON · GOVT COLONY, SangliP53100046044· 86.4% built
- Komal10 mo overduePrasad Construction · Pushapk New, RaigarhP52000056454· filed Nov 2024 → now Dec 2025· 43.5% built
- iLife Upper NIBM10 mo overdueLegacy Fortune Associates · Undri, PuneP52100045658· 58.5% built
- FORTUNE SHIV10 mo overdueFORTUNE DREAM-CON PRIVATE LIMITED · NANI DAMAN, DamanP49500000032· 80.6% built
- Nova Casa10 mo overdueAllied Realty · Savedi, AhmednagarP52200034574· 19.1% built
- Shraddha Panache10 mo overdueShraddha Landmark Private Limited · Village Hariyali, Mumbai SuburbanP51800046277· 81.8% built
- IHITA C AND D BUILDING10 mo overdueNayana Anand Kaswa · Bavadhan BK, PuneP52100009220· filed Dec 2019 → now Dec 2025· 90.9% built
- Anjani Pride10 mo overdueGeeta Developers · Mira Road (East), ThaneP51700024335· filed Jul 2025 → now Dec 2025· 88.6% built
- VEDANT AVENUE10 mo overdueVedant Buildcon · Kasba, PuneP52100054028· 81.8% built
- Sai Ashray10 mo overdueDOORVA CONSTRUCTION · Pushpak- Vadghar, RaigarhP52000056165· filed Dec 2024 → now Dec 2025· 87.3% built
- JAYDEV HEIGHTS10 mo overdueAshwini Facility Creators LLP · Near New Karad Naka, SolapurP52600050305· 39.5% built
- Janaranjani - D Phase II at Nanded City10 mo overdueNanded City Development & Construction Co. Ltd. · Nanded Phata, PuneP52100047078· 90% built
- ANURAG ORCHID10 mo overdueANURAG DEVELOPERS · Near Dhyandeep Convet SRPF Gate No 3 Jaitala, NagpurP50500045638· 49.5% built
- VEDANT AMBER10 mo overdueYASHWANT AJABRAO KHODKE · KHAMLA, NagpurP50500048289· 90.9% built· 1 complaint
- SALISBURY TOWERS10 mo overdueATUR INDIA PRIVATE LIMITED · Gultekadi, PuneP52100003712· filed Jun 2022 → now Dec 2025· 99.8% built
- VIVANTA10 mo overdueSA BUILDERS AND DEVELOPERS · NORTH SHIVAJINAGAR, SangliP53100049872· filed Aug 2025 → now Dec 2025· 81.8% built
- MANAV MAITRY10 mo overdueMANAV REALTORS · Gaothan Village, PalgharP99000012261· filed Dec 2021 → now Dec 2025· 72.7% built
- Princetown Tower - C210 mo overdueManikchand Kumar Properties · Undri, PuneP52100045982· 90.9% built
- 33 Keshav Kunj10 mo overdueCRYSTAL PROPERTIES · Mundhawa, PuneP52100003364· filed Sept 2019 → now Dec 2025· 95.4% built
- PADMAVATI DARSHAN BUILDING NO. 110 mo overduePADMAVATI CONSTRUCTION · NA, RaigarhP52000053864· 90% built
- LAXMI NARAYAN ENCLAVE10 mo overduePRAVIN CHIMOTE · KH NO. 135 AND 136, MOUZA DABHA, CTS NO. 41 & 42, SANT JAGNADE CO OPERATIVE HOUSING SOCIETY LTD, NAGPUR, NagpurP50500049364· 75.5% built
- IDEAL COLONY PHASE- II10 mo overdueTHE IDEAL CONSTRUCTION · Sutarmala Kolhapur, KolhapurP53000034244· 72.7% built
- Balaji Heritage10 mo overdueBalaji Developers · Belavali, ThaneP51700048085· filed Dec 2024 → now Dec 2025· 79.5% built
- NAVNATH KSHITIJ10 mo overdueNAVNATH NIRMAN LLP · HARNAI BY PASS ROAD, RatnagiriP52800015457· filed Jun 2022 → now Dec 2025· 72.7% built
- Ekatva Coral10 mo overdueSynergy Developers · Pancpakhadi, ThaneP51700049059· 66.8% built
- KOEL10 mo overdueShree Shakti Developers · Chavindra, ThaneP51700007920· filed Dec 2021 → now Dec 2025· 90.9% built
- Casa Bella Homes10 mo overdueJayashri Chintaman Patil · Balwant Nagar, Behind Wisdom High School, NashikP51600048790· 56.8% built
- GULMOHAR PARK10 mo overdueSUNIL MOHANDAS MAKHIJA · Taluka Panvel, Navi Mumbai, RaigarhP52000053503· 90.5% built
- NAVKAR10 mo overdueKaro Constructions · Gulmohar Colony, Behind Architecture and engineering Hall Sangli, SangliP53100033281· 13.2% built
- MOHAMMEDIMANZIL10 mo overdueJEM DEVELOPERS AND BUILDERS · Andheri, Mumbai SuburbanP51800034489· 55.5% built
- KRUPASINDHU RESIDENCY10 mo overdueKASBA,BARAMATI, PuneP52100049989· 90.9% built
- AYANA10 mo overdueARMAAN REAL ESTATE PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800032667· 90.9% built
- SHRADDHA PEARL10 mo overdueSHRADDHA LANDMARK PRIVATE LIMITED · VILLAGE HARIYALI, Mumbai SuburbanP51800046124· 76.2% built
- ACE AMBIENCE10 mo overdueAce properties · MULUND WEST, Mumbai SuburbanP51800034328· 70.9% built
- K-SQUARE NERIUM10 mo overdueANKIT CONSTRUCTION · SOMALWADA, NagpurP50500030653· 55% built
- KOHINOOR SHANGRILA PHASE 210 mo overdueKOHINOOR PROPERTIES · PIMPRI, PuneP52100030688· 94.4% built· 2 complaints
- VARADHAST APARTMENT10 mo overdueSADHNA MILIND SHINDE · REES, RaigarhP52000047651· 80% built
- AXIOM CAPITOL10 mo overdueAXIOM REFAB CONSTRUCTION (INDIA) PVT LTD · Kurla, Mumbai SuburbanP51800034787· 34.1% built
- BALAJI EXOTICA BUILDING TYPE D PHASE III10 mo overdueBALAJI WORLD · CHIKANGHAR, ThaneP51700026674· filed Jun 2023 → now Dec 2025· 90.9% built· 1 complaint
- 72 CORP10 mo overdueSKYBLU DEVELOPERS · SAKINAKA, Mumbai SuburbanP51800021663· filed Dec 2024 → now Dec 2025· 98.8% built
- ONE MERAKI - Wing A & Wing B10 mo overdueMeraki Habitats LLP · CHEMBUR, Mumbai SuburbanP51800011606· filed Dec 2023 → now Dec 2025· 99.5% built
- SWAPNASHILP10 mo overdueAKSHAY SHRIDHAR PHATAK · JALGAON, RatnagiriP52800049318· filed Mar 2024 → now Dec 2025· 90.9% built
- RUPASHRI APARTMENTS10 mo overdueYATIN S KULKARNI · PARVATI, PuneP52100030617· 90.9% built
- Kamlaba Business Avenue10 mo overdueKashibas Infratech · Gole Colony, NashikP51600052647· 43.6% built
- RAMKUNJ10 mo overdueJAYANT JAGANNATH SIRSAT · SHIVAJI PARK, Mumbai CityP51900047036· 77.1% built
- SHRI RAJ RAJESHWAR TOWER10 mo overdueSHREE SWAMI DEVELOPERS · NEAR BUS STAND, AkolaP50100077276· 34.1% built
- PREESHA PARADISE10 mo overdueVASTU REALTORS AND DEVELOPERS · Borivali west, Mumbai SuburbanP51800050024· 71.8% built
- GOKULPARK II10 mo overdueHARIHAR INFRASTRUCTURE DEVELOPMENT CORPORATION LIMITED · MANISH NAGAR, NagpurP50500048220· 80% built
- SWAPNA SADAN10 mo overdueJADHAV ASSOCIATES · DEFENCE COLONY, PuneP52100031106· 90.9% built
- Vindhyagiri10 mo overdueGio Properties · Pahadi Eksar and Pahadi Goregaon East, Mumbai SuburbanP51800034813· filed Feb 2025 → now Dec 2025· 71.9% built
- IMPERIAL MIST10 mo overdueImperial Housing · BALEWADI, PuneP52100046615· 90.9% built
- BEEZHIVE10 mo overdueBEDEKAR LIFESPACES LLP · E WARD, SHAHUPURI, KolhapurP53000029433· 70% built
- 51B Inclusive Housing10 mo overdueVilas Javdekar Eco Housing Private Limited · Balewadi, PuneP52100051227· 86.4% built
- SAPHALYA10 mo overdueDELTA DEVELOPERS · Laxmi Nagar, NagpurP50500047154· 81.8% built
- Sara Angan Phase-1 A1 -B1 Type Building10 mo overdueSara Infrastructures · Gangapur jahagir, AurangabadP51500049187· 89.5% built
- ANAND PRIDE PLUS10 mo overdueANAND CONTRACTORS & DEVELOPERS · BABRAS MALA, PuneP52100031161· filed Dec 2024 → now Dec 2025· 90.9% built
- SHREE AADITYA AKSHAY10 mo overdueARVIND MAHADEV SAWLEKAR · PANVEL, RaigarhP52000032315· 90.9% built
- SAI BABA RESIDENCY10 mo overdueTHIM CONSTRUCTION PVT. LTD. · Vasai, PalgharP99000011750· filed Jun 2021 → now Dec 2025· 90.9% built
- Kaveri Tower10 mo overdueGnanesh Virendra Lakhia · Andheri West, Mumbai SuburbanP51800051955· 77.7% built
- MAXIMUS10 mo overdueGURUVIDHA ENTERPRISES · BHAYANDAR, ThaneP51700045811· 0.9% built
- AARAV PALM SPRINGS10 mo overdueDIKSHIT RAJAN AGARWAL · Wagholi, PuneP52100051910· 81.8% built
- SAVAI APARTMENT10 mo overdueS & T Corporation LTD · Dapoli, RaigarhP52000055894· filed Dec 2024 → now Dec 2025· 90.9% built
- RESHMA HEIGHTS CO-OPERATIVE HOUSING SOCIETY LTD.10 mo overdueNestcon · Dahanukar Colony, PuneP52100051614· 68.2% built
- Mirage Tower10 mo overdueUNITY CONSTRUCTIONS · Nashik, NashikP51600046828· 72.7% built
- Empire Estate 210 mo overdueJavid Yasin Kojar · Kaman, PalgharP99000045918· 79.5% built
- PRAGATI TOWER10 mo overdueSHALIMAR CONSTRUCTIONS · NA, OsmanabadP52500052771· filed Dec 2024 → now Dec 2025· 69.2% built
- Borivli Vasundhara CHS Ltd.10 mo overdueShree Sai Shraddha Developers · Borivali East, Mumbai SuburbanP51800006294· filed Jan 2020 → now Dec 2025· 72.7% built
- ALFA PREMIO PHASE 110 mo overdueARK PREM CONSTRUCTIONS · VIMAN NAGAR, PuneP52100000855· filed Sept 2018 → now Dec 2025· 95.9% built· 2 complaints
- Rati Vighnarta10 mo overdueRATI BUILDERS AND DEVELOPERS · Vahal- Node Pushpak, RaigarhP52000077197· 90.9% built
- Pranjal10 mo overdueGajendra Dattatraya Pawar · PUNE, PuneP52100012334· filed Dec 2021 → now Dec 2025· 81.8% built
- Avenue Daffodil10 mo overdueAVENUE REALTY · Baner, PuneP52100003389· filed Dec 2018 → now Dec 2025· 81.7% built
- ROYAL RESIDENCY10 mo overdueSKYLINE SHELTERS · VASAI, PalgharP99000047035· filed Aug 2024 → now Dec 2025· 89.5% built
- Madhusha Legacy10 mo overdueShree Dattaguru Construction Company · Mouje Mudre Khurd, RaigarhP52000053026· 81.8% built
- PARAS PLAZA10 mo overdueM.K.BUILDERS & DEVELOPERS · SAMVSHARAN CHOUK, SangliP53100034111· filed Dec 2024 → now Dec 2025· 90.9% built
- Sun Stone10 mo overdueMahesh Brijmohan Agarwal · Pushpak (Dapoli), RaigarhP52000050961· 71.3% built· 1 complaint
- Gagan 4510 mo overdueGagangiri Developers · Kurla, Mumbai SuburbanP51800033764· 90.9% built
- OMKAR RESIDENCY10 mo overdueM/s OMKAR ASSOCIATES · manda, ThaneP51700029285· 81.8% built
- PRIME LEGACY10 mo overduePRIME GROUP · Dahisar, Mumbai SuburbanP51800046428· filed Dec 2024 → now Dec 2025· 81.8% built
- Aranya Phase II10 mo overduePRASHANT MOHAN BARGE · Satara, SataraP52700051909· 29.1% built
- Joyville Hadapsar Annexe Phase 1410 mo overdueJoyville Shapoorji Housing Private Limited · Shewalewadi, PuneP52100031515· 57% built
- Raj Apartments10 mo overdueSainath Construction · Aundh, Pune, PuneP52100056085· 51.8% built
- SHIVBLISS10 mo overdueRUSHI BUILDER & DEVELOPER · Kurla, Mumbai SuburbanP51800011156· filed Dec 2018 → now Dec 2025· 77.3% built· 10 complaints
- SHEETAL VAIBHAV10 mo overdueD.G.S TOWNSHIP PRIVATE LIMITED · KHAR WEST, Mumbai SuburbanP51800019010· filed May 2022 → now Dec 2025· 89.5% built
- CASA AMANTA10 mo overdueTECHSTONE REALTY LLP · Munjeri (Bibvewadi), PuneP52100049680· 90.9% built
- NEW MUKTI CO-OPERATIVE HOUSING SOCIETY LIMITED10 mo overdueSAI SIDDHI BUILDERS AND DEVELOPERS · NALLASOPARA WEST, PalgharP99000048123· 90.9% built
- SPLENDOUR10 mo overdueSUNNY DEVELOPERS & BUILDERS LLP · MULUND WEST, Mumbai SuburbanP51800045467· 63.6% built
- SAMARTH RESIDENCY10 mo overdueSHIVSAMARTH DEVELOPERS · ALANDI KHED, PuneP52100049691· 81.8% built
- FIA CONSTRUCTION COMPANY FIA ORION - GRANDE10 mo overdueNIMISH LAXMICHAND PASAD · NAVALI PALGHAR, PalgharP99000032530· 81.8% built
- VEDANT AARTI APARTMENT10 mo overdueVANDANA GORAKSHNATH MHASKE · MAUJE SINNAR - 1 SHIWAR, NashikP51600033600· 90.9% built
- OMEGA COMMERCIAL COMPLEX - SOHAM ICON10 mo overdueSoham Developers · Haveli, PuneP52100006261· filed Dec 2019 → now Dec 2025· 67.3% built
- KSHIPRA HOMES10 mo overdueNEELKANTH BUILDERS · Takala, KolhapurP53000050147· 90.9% built
- Kalpataru Serenity - Bldg. 310 mo overdueKalpataru Gardens Pvt. Ltd. · Pune, PuneP52100034075· 65.9% built
- ATHARVA SANCHIT10 mo overdueNITISH HEMANT KULKARNI · MALI COLONY, KolhapurP53000046739· 90.9% built
- Archana Prestige10 mo overdueKANIFNATH REALITY · mohamadwadi, PuneP52100050992· 81.8% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.