RERA projects past their possession deadline
11,770 MahaRERA-registered projects are past the possession date currently on file and still report under 100% construction progress. Both figures are the promoter's own disclosure to the regulator.
Page 56 of 59
- AASTHA RESIDENCY7 mo overdueMANOJ MADHUKAR TOSHNIWAL · TILAKWADI, NashikP51600034910· 90.5% built
- Easterlia Phase 27 mo overdueSpacemint Realty LLP · Khese Park, PuneP52100034658· 89.1% built
- ARSH GLORY7 mo overdueM/s. VIKAS INFRAVENTURES · MOUZA- KACHIMET, NagpurP50500046204· 83.2% built
- BHAGYALAXMI SWARUP7 mo overdueBHAGYALAXMI BUILDERS AND DEVELOPERS · NEAR SOMESHWAR, GANGAPUR SHIWAR, NASHIK, NashikP51600030855· 90.9% built
- Shivam Homes Wing A and B7 mo overdueShivam Homes · Badlapur East, ThaneP51700048026· 81.8% built
- NEELKANTH HEIGHTS7 mo overdueYATIN ANNASAHIB WANI · HIRE NAGAR, NashikP51600034435· 89.5% built
- BALAJI EXOTICA BUILDING TYPE D PHASE III7 mo overdueBALAJI WORLD · CHIKANGHAR, ThaneP51700026674· filed Jun 2023 → now Dec 2025· 90.9% built· 1 complaint
- ANTARIKSH AVALON7 mo overdueANTARIKSH REALTORS PRIVATE LIMITED · PANTNAGAR GHATKOPAR EAST, Mumbai SuburbanP51800030439· 87.7% built
- SHRADDHA PEARL7 mo overdueSHRADDHA LANDMARK PRIVATE LIMITED · VILLAGE HARIYALI, Mumbai SuburbanP51800046124· 76.2% built
- PARAS PLAZA7 mo overdueM.K.BUILDERS & DEVELOPERS · SAMVSHARAN CHOUK, SangliP53100034111· filed Dec 2024 → now Dec 2025· 90.9% built
- ARKADE CROWN7 mo overdueArkade Developers Private Limited · Borivali, Mumbai SuburbanP51800045342· 71.1% built
- SHIVBLISS7 mo overdueRUSHI BUILDER & DEVELOPER · Kurla, Mumbai SuburbanP51800011156· filed Dec 2018 → now Dec 2025· 77.3% built· 9 complaints
- SPLENDOUR7 mo overdueSUNNY DEVELOPERS & BUILDERS LLP · MULUND WEST, Mumbai SuburbanP51800045467· 63.6% built
- A K CROWN7 mo overdueAbdul Hai Liyaqat Qazi · Kherdi, RatnagiriP52800050649· 57.3% built
- SAPHALYA7 mo overdueDELTA DEVELOPERS · Laxmi Nagar, NagpurP50500047154· 81.8% built
- Pranjal7 mo overdueGajendra Dattatraya Pawar · PUNE, PuneP52100012334· filed Dec 2021 → now Dec 2025· 81.8% built
- USHAKIRAN7 mo overdueKapil Ulhas Trimal · SADASHIV PETH, PuneP52100046401· 45.5% built
- ISKCON RESIDENCY PHASE 17 mo overdueIskcon Realtors · AMBERNATH, ThaneP51700051160· 59.1% built
- Tricity Natraj7 mo overdueTricity Realty LLP · Wadhavali, Chembur, Mumbai SuburbanP51800050160· 77% built
- Arch Kanchan7 mo overdueARCH DEVELOPERS · Shivajinagar, AurangabadP51500029712· 81.8% built
- SURYA HEIGHTS7 mo overdueSURYAPUTRA DEVELOPERS · Junnar, PuneP52100030345· 64.5% built
- IDEAL RESIDENCY7 mo overdueNEW IDEAL DEVELOPERS · Khed-bhadgaon, RatnagiriP52800005082· filed Jan 2021 → now Dec 2025· 59.8% built
- AARAV PALM SPRINGS7 mo overdueDIKSHIT RAJAN AGARWAL · Wagholi, PuneP52100051910· 81.8% built
- Naik Kharude Heights7 mo overdueMAHADEV DEVELOPERS · AJRA, KolhapurP53000051048· 81.8% built
- SAI SHRADDHA RESIDENCY7 mo overdueSHRI SAI BUILDERS AND DEVELOPERS · BRIJWADI, AurangabadP51500046576· 81.8% built
- PREESHA PARADISE7 mo overdueVASTU REALTORS AND DEVELOPERS · Borivali west, Mumbai SuburbanP51800050024· 71.8% built
- KHANOLKAR BHAVAN CHSL - PARADISE7 mo overdueC H PATIL AND SONS LLP · GOREGAON EAST, Mumbai SuburbanP51800046246· 9.1% built
- SUKRUT APARTMENTS7 mo overdueSHODHAN YASHWANT JOSHI · OSMANPURA, DARGAH ROAD, AurangabadP51500033918· 81.8% built
- TRINITY EMPIRE7 mo overdueTRINITY GROUP ENGINEERS AND DEVELOPERS · Jasingrao Park, KolhapurP53000034847· filed Dec 2023 → now Dec 2025· 51.8% built
- Manisha Prime7 mo overdueMANISHA ELITE REALTY PRIVATE LIMITED · Mulund East, Mumbai SuburbanP51800047877· 89.1% built
- VALLABHNIWAS CO-OP HOUSING SOCIETY LTD7 mo overdueSWOJAS REALTORS LLP · RAMBAUG COLONY, PuneP52100046809· 73.2% built
- SHIVNERI RESIDENCY7 mo overdueNice Home · PATOLE MALA, NASHIK ROAD, NashikP51600048370· 90.9% built
- Avenue Daffodil7 mo overdueAVENUE REALTY · Baner, PuneP52100003389· filed Dec 2018 → now Dec 2025· 81.7% built
- RISHABRAJ PARK VISTAS7 mo overdueH RISHABRAJ REALTY · BORIVALI WEST, Mumbai SuburbanP51800033442· 59.1% built
- SUNVIEW CO-OPERATIVE HOUSING SOCIETY LIMITED7 mo overdueSAMRUDDHEE CONSTRUCTIONS · PIMPRI WAGHERE, PuneP52100050177· filed May 2025 → now Dec 2025· 90.9% built
- AMBAI RESIDENCY7 mo overdueM/S HARMONY INFRA · Rankala west, KolhapurP53000032399· 88.6% built
- RAUNAK RESIDENCY7 mo overdueUNNATHI ESTATES · Thane, ThaneP51700009540· filed Jun 2024 → now Dec 2025· 69.5% built· 1 complaint
- SAMARTH RESIDENCY7 mo overdueSHIVSAMARTH DEVELOPERS · ALANDI KHED, PuneP52100049691· 81.8% built
- SANKALP HEIGHTS7 mo overdueDaiwik Developers · OLD EMPLOYMENT CHOWK, SolapurP52600032739· 54.5% built
- NOBLE HEIGHTS7 mo overdueNOBLE DEVELOPERS · M PHULE PETH, PuneP52100052207· 33.6% built
- SHEETALKUNJ SAHAKARI GRUHARACHANA SANSATHA MARYADIT7 mo overdueICON PROPERTIES · SHIVAJI NAGAR, PuneP52100034994· 81.8% built
- Gagan 457 mo overdueGagangiri Developers · Kurla, Mumbai SuburbanP51800033764· 90.9% built
- SILVER SQUARE7 mo overdueG S SQUARE · FURSUNGI, PuneP52100034567· 80.5% built
- PADMAVATI DARSHAN BUILDING NO. 17 mo overduePADMAVATI CONSTRUCTION · NA, RaigarhP52000053864· 90% built
- VISTA7 mo overdueSARVSHUBH ENTERPRISES · MULUND EAST, Mumbai SuburbanP51800045286· 44.6% built
- EKTA CREST7 mo overdueEKTA HOUSING PRIVATE LIMITED · CHEMBUR, Mumbai SuburbanP51800046149· 93.9% built
- CHORDIYA GALAXY7 mo overdueN K ASSOCIATES · KONDHWA BK, PuneP52100052801· 79.1% built
- SALISBURY TOWERS7 mo overdueATUR INDIA PRIVATE LIMITED · Gultekadi, PuneP52100003712· filed Jun 2022 → now Dec 2025· 99.8% built
- SHRADDHA ELITE7 mo overdueSHRADDHA DEVELOPERS & REALTORS · BORIVALI WEST, Mumbai SuburbanP51800045452· 90.5% built
- AXIOM CAPITOL7 mo overdueAXIOM REFAB CONSTRUCTION (INDIA) PVT LTD · Kurla, Mumbai SuburbanP51800034787· 34.1% built
- Lotus Heights7 mo overdueSamruddhi Developers · Malkapur, AkolaP50100045220· 90.9% built
- AUROVILLE A AND B WING7 mo overdueARYA CONSTRUCTION · SANDAP, ThaneP51700047056· 81.8% built
- PURPLE AASHRAY APARTMENT7 mo overdueKIRAN JAYANTIBHAI PATEL · SATPUR, NashikP51600050208· 90.9% built
- NIVASA ELEVIA - PHASE I7 mo overdueShree Samarth Spaces · KESHAVNAGAR, PuneP52100031816· filed Dec 2024 → now Dec 2025· 60% built· 1 complaint
- SHREE AADITYA AKSHAY7 mo overdueARVIND MAHADEV SAWLEKAR · PANVEL, RaigarhP52000032315· 90.9% built
- KEDARDHAM7 mo overdueSANDEEP GUNDAJI SAWANT · Nevali, RaigarhP52000050341· 90.9% built
- Komal7 mo overduePrasad Construction · Pushapk New, RaigarhP52000056454· filed Nov 2024 → now Dec 2025· 43.5% built
- SOHO RESIDENCY7 mo overdueMAHAVIR CONSTRUCTION COMPANY · NEAR 70 GALA, PalgharP99000030867· 90.9% built
- GAYATRI NIWAS7 mo overdueGayatri Builders · CHIKANGHAR, ThaneP51700029816· 90.9% built
- NAVNATH KSHITIJ7 mo overdueNAVNATH NIRMAN LLP · HARNAI BY PASS ROAD, RatnagiriP52800015457· filed Jun 2022 → now Dec 2025· 72.7% built
- CHARKOP SHWETAMBARA CO OPERATIVE HOUSING SOCIETY LIMITED7 mo overdueCHARKOP SHWETAMBARA COOPERATIVE HOUSING SOCIETY LIMITED · CHARKOP KANDIVALI WEST, Mumbai SuburbanP51800029344· 90.9% built· 1 complaint
- SHAH S SADGURU RESIDENCY PHASE II7 mo overdueSHAH BUILDERS · CHEHADI PUMPING, NashikP51600047168· 72.7% built
- Anjani Pride7 mo overdueGeeta Developers · Mira Road (East), ThaneP51700024335· filed Jul 2025 → now Dec 2025· 88.6% built
- CASA AMANTA7 mo overdueTECHSTONE REALTY LLP · Munjeri (Bibvewadi), PuneP52100049680· 90.9% built
- GV7 CAPITAL 47 mo overdueChirag Developers · Ambegaon Budruk, PuneP52100022958· filed Mar 2022 → now Dec 2025· 7.7% built
- 24 SUNSHINE TOWERS7 mo overdueSHIV ASSOCIATES · CHIKHALI, PuneP52100029620· 81.8% built
- PHOTON APARTMENT PHASE II7 mo overdueB B Constructions · Pratibhanagar Extensions, KolhapurP53000032978· 49.5% built
- VRINDAVAN7 mo overdueDINESH AMRUTLAL THAKKAR · Borivali, Mumbai SuburbanP51800032747· 90.9% built
- PARKSYDE NEST PHASE-3A7 mo overdueJAIKUMAR CONSTRUCTIONS LTD · PANCHAVATI ANNEX, NashikP51600033065· 92.3% built
- Abhishek Heights7 mo overdueAjaysinh V Desai Developers · Tarabai Park, KolhapurP53000021112· filed Nov 2023 → now Dec 2025· 81.8% built
- Ekatva Coral7 mo overdueSynergy Developers · Pancpakhadi, ThaneP51700049059· 66.8% built
- SUMATI SUMAN7 mo overdueSACHIN SUMATILAL BEDMUTHA · VIJAY NAGAR TO KUPWAD ROAD, SangliP53100032400· 80.9% built
- ROYAL ANNEX7 mo overdueSUSHANT VIJAY BHALBAR · AKHILESH PARK KAGAL, KolhapurP53000017431· filed Nov 2023 → now Dec 2025· 55.3% built
- SAI BABA RESIDENCY7 mo overdueTHIM CONSTRUCTION PVT. LTD. · Vasai, PalgharP99000011750· filed Jun 2021 → now Dec 2025· 90.9% built
- AYANA7 mo overdueARMAAN REAL ESTATE PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800032667· 90.9% built
- Nexus One7 mo overdueAmar Chandrakant Dhamane · Mahadik Vasahat, KolhapurP53000052508· 77.3% built
- ADVAIT APARTMENT7 mo overdueGRANDMARK SPACES · GOVIND NAGAR, NashikP51600048825· 81.8% built
- Jaydev Imperia7 mo overdueJAYDEV LIFESPACE LLP · Pushpak, Vahal, RaigarhP52000051712· 37.7% built
- PADMA MADHAV7 mo overdueVriddhi Realty Parvati LLP · KOTHRUD, PuneP52100052040· filed Jun 2025 → now Dec 2025· 66.8% built
- AMARILLO TOWN7 mo overdueWAKADKAR BROTHERS · RAVET, PuneP52100035039· 90% built
- KRUPASINDHU RESIDENCY7 mo overdueKASBA,BARAMATI, PuneP52100049989· 90.9% built
- EPITOME7 mo overdueTHOROUGHBRED REALTY LLP · GARODIA NAGAR, Mumbai SuburbanP51800034589· 99.5% built
- Redevelopment of Gurudeo Geetanjali CHS Ltd.7 mo overdueHeritage Lifestyles LLP · Chembur, Mumbai SuburbanP51800034564· 90.9% built
- Sai Heritage7 mo overdueShashank Enterprises · Ambernath, ThaneP51700053065· 80.5% built
- SHEETAL VAIBHAV7 mo overdueD.G.S TOWNSHIP PRIVATE LIMITED · KHAR WEST, Mumbai SuburbanP51800019010· filed May 2022 → now Dec 2025· 89.5% built
- MULTANI APARTMENT7 mo overdueSHEWALKAR DEVELOPERS LIMITED · Nagpur (M Corp.), NagpurP50500006543· filed Mar 2019 → now Jan 2026· 87.3% built
- REDEVELOPMENT OF KESAR NIKETAN CHSL7 mo overduePRANAV CONSTRUCTIONS LIMITED · BORIVALI EAST, Mumbai SuburbanP51800046669· 91.8% built
- Lakeview Co Operative Housing Limited7 mo overdueGP Infra · Neelkanthnagar, Kalyan, ThaneP51700049612· 81.8% built
- PARSHVA RESIDENCY7 mo overduePravinkumar Lalchand Jain · TEMBHODE, PalgharP99000049049· filed Dec 2025 → now Jan 2026· 81.8% built
- NIKETAN CLASSIC7 mo overdueNIKETAN INFRA · NEAR MAHATMA NAGAR SATPUR, NashikP51600033592· 90.9% built
- Samarth Elegance7 mo overdueADARSH BUILDERS AND DEVELOPERS · Nr. Jawhar Hospital, NashikP51600029252· 10.4% built
- SRI BALAJI6 mo overdueRaghukul Constructions Private Limited · SHIVAJI NAGAR NAGPUR, NagpurP50500034108· 55.5% built
- SHIVALAY6 mo overdueBuildrite Realtors · New Panvel, RaigarhP52000050338· 81.8% built
- GANDHI INDUSTRIAL PARK6 mo overdueGANDHI BUILDERS PVT LTD · Ambiste Kh., PalgharP99000005517· 90.9% built
- Nexus Atrium ABC6 mo overdueNexus Buildwell · Borhadewadi, PuneP52100032575· filed Jun 2024 → now Jan 2026· 90.9% built
- AADINATH GLORIA6 mo overdueAADINATH PROPERTIES · Sandesh Nagar, AurangabadP51500050856· 87.3% built
- HIGHNESS PLAZA6 mo overdueEKANTA CONSTRUCTION · NASHIK, NashikP51600048571· filed Jan 2025 → now Jan 2026· 63.6% built
- INDU GRACIA6 mo overdueVIJAY CONSTRUCTION NEXT · Chikhali, PuneP52100025794· 46.4% built
- SHRADDHA LIFESTYLE6 mo overdueSHRADDHA CONSTRUCTIONS · Ahmadnagar (M Corp.), AhmednagarP52200011607· 48.2% built
- SAI MAJESTIC PARK6 mo overdueMARUTI DEVELOPERS · ROOM NO 362 SHEET NO 42, ThaneP51700050235· 43.6% built
- FIA EKAANT6 mo overdueFia Developers Pvt. Ltd. · MAHIM, PalgharP99000056217· filed Dec 2025 → now Feb 2026· 81.8% built
- Nirmal Park5 mo overdueNirmal Samruddhi · Nandanvan Lawns, NashikP51600053417· 86.8% built
- AKSHAR GREENS PHASE-25 mo overdueMUNIVAR DEVELOPERS · SILVASSA, Dadra & Nagar HaveliP49600000151· 72.7% built
- VIHAAN GLORY APARTMENT5 mo overdueTIRUPATI BUILDCON · NEAR HINDI SCHOOL MAUJE PIMPALGAON BAHULA SHIWAR, NashikP51600047757· 90.9% built
- RATNAPRABHA5 mo overdueASHWAMEDH SPACES PRIVATE LIMITED · Kothrud, PuneP52100045880· filed Jun 2025 → now Feb 2026· 90.5% built· 1 complaint
- DEVALE DIVINE5 mo overdueOMKAR KISHOR DEVALE · BARAMATI, PuneP52100051853· 65.9% built
- KLS SUPREMUS5 mo overdueRAMRAI INFRA · Pashan, PuneP52100032488· filed Jun 2025 → now Feb 2026· 99.5% built· 1 complaint
- KUMAR PEBBLE PARK JOY 3 - C35 mo overdueKUMAR PROPERTIES AND PROMOTERS PVT. LTD · HADAPSAR, PuneP52100026151· 90.9% built
- SHYAM AURA5 mo overdueMADHUBHAI VITHTHALBHAI VAGHELA · NASHIK, NashikP51600049765· 44.5% built
- VRUSHTI PRIDE5 mo overdueVRUSHTI ENTERPRISES · NERAL, RaigarhP52000051546· 90.9% built
- CONSTRUCTION OF 368 EWS T/S UNDER PMAY AND 168 MIG ON S.NO.68 AT PADHEGOAN ,DIST-AURANGABAD5 mo overdueCHHATRAPATI SAMBHAJINAGAR HOUSING AND AREA DEVELOPMENT BOARD ( A REGIONAL UNIT OF MHADA) · AURANGABAD, AurangabadP51500026531· 78.2% built
- GOKUL5 mo overdueSUYASH BUILDERS AND DEVELOPERS · PEN, RaigarhP52000018431· filed Oct 2024 → now Mar 2026· 78.1% built
- TULSI VANDAN5 mo overdueTULSI CONSTRUCTION · Nashik (M Corp.), NashikP51600007665· 90.9% built
- Solitaire Ten5 mo overdueASHOK DHANRAJ CHORDIA · Bhosale Nagar, PuneP52100045976· filed Mar 2025 → now Mar 2026· 81.8% built
- Padma Vishwa Mangalam4 mo overdueMangalmurti Builders · Navshya Ganpati, Sector C, NashikP51600051326· 88.6% built
- Ocean Towers - Phase I4 mo overdueMarine Drive Hospitality And Realty Private Limited · Marine Lines, Mumbai CityP51900015638· 7.6% built
- EKAM4 mo overdueA P PROPERTIES · Andheri, Mumbai SuburbanP51800002628· filed Mar 2025 → now Mar 2026· 72.6% built
- SUMITRA HEIGHTS4 mo overdueSWAMI NARAYAN ENTERPRISES · KALYAN DOMBIVLI M CORP, ThaneP51700052785· 90.9% built
- SOBHA NESARA BLOCK-14 mo overdueSOBHA LIMITED · KOTHRUD, PuneP52100020057· filed Mar 2025 → now Mar 2026· 98.2% built· 3 complaints
- SAI VIJAY HERITAGE4 mo overdueVIJAY LALSINGH THAKUR · Ulhasnagar, ThaneP51700034485· filed Mar 2025 → now Mar 2026· 51.8% built
- SHANMUKHI ALAYAM4 mo overdueSHANMUKHI BUILDCON · OLD PANVEL, RaigarhP52000054283· 87.7% built
- MAHESHWAR KRIPA CHSL4 mo overdueMAHESHWAR KRIPA C0-OPERATIVE HOUSING SOCIETY LIMITED · GHATKOPAR EAST, Mumbai SuburbanP51800033398· filed Mar 2025 → now Mar 2026· 81.8% built
- Yashwin SuperNova4 mo overdueVilas Javdekar Eco Shelters Private Limited · Near Indira College, Wakad Pune, PuneP52100028652· 99.8% built· 1 complaint
- AAIJI PINK CITY4 mo overdueAAIJI REALTY · SATHE VASTI, PuneP52100023905· 81.8% built
- Indu Park4 mo overdueSONAWANE INFRA · Eknath Nagar, NashikP51600049869· filed Mar 2024 → now Mar 2026· 90.9% built
- Ocean Towers - Phase II4 mo overdueMarine Drive Hospitality And Realty Private Limited · Marine Lines, Mumbai CityP51900015653· 7.6% built
- Swapna-Niketan by NMC4 mo overdueSANDEEP DWELLERS PVT. LTD. · Wanjara, NagpurP50500050570· filed Mar 2025 → now Mar 2026· 73.2% built· 2 complaints
- Amber Galaxy C Wing4 mo overduePANDHARINATH SITARAM PATIL · VITAWA, ThaneP51700024773· filed Jan 2024 → now Mar 2026· 26.8% built· 1 complaint
- SURYA EXCELLENCY4 mo overdueSURYAKANT MANGALDAS SAMANI AND CHAMPABEN VASANJI MASHRU · NARPOLI, ThaneP51700015832· 86.2% built
- M M CITY4 mo overdueFINE CONSTRUCTION COMPANY · NEW SHILL, ThaneP51700022075· 84.1% built
- NIRVANA LIFECITY4 mo overdueNIRVANA LIFECITY LLP · NEAR NYATI EVITA, PuneP52100020070· 89.1% built
- AUMSANIKA PARAS RESIDENCY4 mo overdueAUMSANIKA DEVELOPERS LLP · PUNE, PuneP52100056040· 80.9% built
- GOLDEN VISTA4 mo overdueGOLDEN HOMES INFRASTRUCTURES · PIPLA, NagpurP50500050049· filed Mar 2025 → now Mar 2026· 74.9% built
- VTP AETHEREUS HIGH STREET4 mo overdueHOME RISING CONSTRUCTION LLP · Mahalunge, PuneP52100055356· filed Mar 2025 → now Mar 2026· 59.1% built· 1 complaint
- NISHIGANDH APARTMENT4 mo overdueC B CONSTRUCTION · KAMATWADE, NashikP51600045379· 90.9% built
- Agrawal Exotica4 mo overdueMR AGRAWAL NILESH NEMICHAND (HUF) · Sanglikar mala, Miraj, SangliP53100051821· 50.9% built
- BORIVALI SAGAR CHSL4 mo overdueMAHAVIR INFRAPROJECTS · BORIVALI WEST, Mumbai SuburbanP51800052089· 60.5% built
- NILKANTH HEIGHTS APARTMENT4 mo overdueVINAYAK INFRA · PRASHANT NAGAR, NashikP51600048774· 90.9% built
- Shree Ram Radha Damodar4 mo overdueADITYA BUILDCON · Near Aditya Mangal Karyalaya, ThaneP51700050634· 72.7% built
- SAI TARA4 mo overdueSHREE HARI GROUP · PLOT NO 78 SECTOR 52 DRONAGIRI, RaigarhP52000014901· filed Mar 2022 → now Mar 2026· 90.9% built
- EMPIRE TOWERS4 mo overdueRAM AND J K ASSOCIATES · NEAR NAMJOSHI PETROL PUMP, SataraP52700030634· filed Mar 2025 → now Mar 2026· 71.8% built
- JADE AVENUE COMMERCIAL WING4 mo overdueJAIRAJHAPPYHOMES · MATUNGA CENTRAL, Mumbai CityP51900050274· filed Jun 2025 → now Mar 2026· 88.2% built
- JEEVAN SHOBHA CHSL AND BHANSALI CHSL4 mo overdueHIRANI REALTORS LLP · BORIVALI EAST, Mumbai SuburbanP51800047979· 81.8% built
- BHAGYA GARDEN CITY PHASE I4 mo overdueBHAGYA CONSTRUCTION · VRUNDAWAN GARDEN, AurangabadP51500045263· filed Dec 2024 → now Mar 2026· 90.9% built
- THE ORCHID4 mo overdueNILESH KISHOR VYAVAHARE · PRATIBHANAGAR, KolhapurP53000047516· 78.6% built
- SAMRUDDHI VILLA4 mo overdueSANSKAR BUILDERS AND DEVELOPERS · NASHIK, NashikP51600078888· 74.5% built
- SAI CHHAYA APARTMENT4 mo overduePM BUILDERS AND DEVELOPERS · KALASKAR NAGAR, NEAR TRIKONI BUNGLOW, NashikP51600050145· 49.1% built
- RAI ORCHID4 mo overdueR RAI UDYOG BUILDERS LLP · OPP DOMINO PIZZA, NagpurP50500050472· 90.9% built
- PARAM LUXURIA4 mo overduePARAM INFRASPACE · BEHIND JAIN MANDIR ADGAON, NashikP51600053436· 48.2% built
- Hari Sanskruti Phase I4 mo overdueDHARAN INFRA-EPC LIMITED · Deolali, NashikP51600001194· filed Sept 2020 → now Mar 2026· 84.5% built
- KRISHNA CORNER4 mo overdueDHIRAJ KISAN KENI · PLOT NO 54, RaigarhP52000051045· 40.9% built
- SAURABH HEIGHTS4 mo overdueS K DEVELOPERS · Badlapur, ThaneP51700051500· 90.9% built
- SAMRUDDHI PARK4 mo overdueDG INFRA · DHATRAK PHATA, NashikP51600031113· 81.8% built
- Smriti4 mo overdueMahesh Balkrishna Sambhus · GOREGAON EAST, Mumbai SuburbanP51800050592· 81.8% built
- MAHALAXMI VRUNDAVAN4 mo overdueSHREE MAHALAXMI CONSTRUCTION · NASHIK, NashikP51600048721· 81.8% built
- HARIOM ENCLAVE4 mo overdueHARIOM GROUP · KSHIRSAGAR COLONY, NashikP51600051993· 77.3% built
- SHREE MAHALAXMI SAUBHAGYA-024 mo overdueSWAPNIL MORESHWAR KULKARNI · SATARA PARISAR, AurangabadP51500048109· 90.9% built
- JITEN CHS4 mo overdueM/s Keytech · ANDHERI WEST, Mumbai SuburbanP51800032184· filed Dec 2024 → now Mar 2026· 99.8% built
- DEM ICON4 mo overdueDEM Developers LLP · Charkop, Mumbai SuburbanP51800050731· 86.6% built
- West Winds4 mo overdueGhatkopar Neelkanth Kunj CHSL · GHATKOPAR EAST, Mumbai SuburbanP51800045813· 75% built
- LOTUS RESIDENCY4 mo overdueLOTUS INFRA · LAMKHEDE MALA, NashikP51600046349· 90.9% built
- MANASAROVAR4 mo overdueHARASIDDH PROJECTS · Kandivali (W), Mumbai SuburbanP51800078732· 98.2% built
- PUROHIT MANSION4 mo overdueGANESH BUILDERS · ABHYANKAR NAGAR LAYOUT, NagpurP50500050586· 87.7% built
- SIDDHIVINAYAK RESIDENCY4 mo overdueSHASHIKANT JOMA GAIKWAD · Pushpak New, RaigarhP52000022401· filed Mar 2023 → now Mar 2026· 81.8% built
- mam trilok4 mo overdueLEELA ENTERPRISES · Kurla, Mumbai SuburbanP51800011162· filed Sept 2020 → now Mar 2026· 90.9% built
- Abhiram4 mo overdueMakarand Madhav Kulkarni · Bhistabag, Ahmednagar, AhmednagarP52200049407· 81.8% built
- SAI WORLD4 mo overduePINNACLE CORPORATION · BORADPADA ROAD, ThaneP51700034155· 90.9% built
- MEHTACORNER4 mo overdueADESHWAR BUILDERS · SHRIGONDA, AhmednagarP52200049897· 31.8% built
- NIRMAN SIGNATURE4 mo overdueSHREE SHA DEVELOPERS · Badlapur (W), ThaneP51700050640· 81.8% built
- SATISH OAK HEIGHT4 mo overdueSHREE SAI PRATHAMESH DEVELOPERS · BADLAPUR WEST, ThaneP51700030403· 36.4% built
- Mithila Residency4 mo overdueSantosh Kumar Jha · Behind Ashoka NagarP52100029255· 90.9% built
- Navratna4 mo overdueOm Navratna Enterprises LLP · Vileparle, Mumbai SuburbanP51800050281· 90.9% built
- PAREKH RADIANCE4 mo overduePAREKH BUILDPROJECTS PRIVATE LIMITED · KANDIVALI WEST, Mumbai SuburbanP51800046909· 81.8% built
- Gayatri CHS LTD4 mo overdueShree Angarak Enterprises Builders and Developers · Thane, ThaneP51700032690· filed Dec 2023 → now Mar 2026· 81.8% built
- SNEHAKUNJ4 mo overdueSHIVAJI SAHEBRAV SHINDE · KODOLI, SataraP52700051207· filed Jun 2025 → now Mar 2026· 72.7% built
- VISION ARISTO4 mo overdueVISION CREATIVE PROMOTERS · KIWALE, PuneP52100030708· 90.9% built
- Kalpataru Jade Residences H4 mo overdueAstrum Developments Private Limited · Baner, PuneP52100046423· 80.2% built
- PADMA-PRATAP HERITAGE4 mo overdueUdaysingh Ramchandra Killedar · Opp. Sagare Hospital, KolhapurP53000030610· filed Feb 2025 → now Mar 2026· 69.1% built
- RUDRADEEP4 mo overdueRAGHVENDRA MAHARUDRA TULSHIBAGWALE · SAHKAR NAGAR, PuneP52100046351· filed May 2024 → now Mar 2026· 80.9% built
- WEST AVENUE4 mo overdueM/s Dhabalia Enterprises · Borivali (West), Mumbai SuburbanP51800051576· 90.9% built
- SHWESH CHAMPARAN4 mo overdueSHWESH DEVELOPERS PRIVATE LIMITED · MATUNGA EAST, Mumbai CityP51900033818· filed Dec 2024 → now Mar 2026· 47.1% built
- MATRIX4 mo overdueBHARAT HASTIMAL JAIN · MUNJERI BIBVEWADI, PuneP52100048463· 27.3% built
- SHAMIKH BUILDING4 mo overdueTAMOS ASSOCIATES · ANDHERI EAST, Mumbai SuburbanP51800048394· 82.3% built
- SAYBA ELEGANT4 mo overdueSAYBA ELEGANT · Kurla, Mumbai SuburbanP51800051973· 90.9% built
- SHOBHA HERITAGE4 mo overdueNilesh Vasantrao Chavan · SAVEDI, AhmednagarP52200050972· 45.5% built
- 97 SONIGARA BIZZ4 mo overdueDHANASHRI CONSTRUCTION · RAVET, PuneP52100052052· filed Jun 2025 → now Mar 2026· 72.4% built
- Rose Garden4 mo overdueVinayaka Realtors and Developers · Andheri, Mumbai SuburbanP51800022587· filed Dec 2023 → now Mar 2026· 90.9% built
- GROUP HOUSING SCHEME4 mo overdueVAKRATUND DEVELOPERS · PISADEVI, AurangabadP51500051044· 21.4% built
- GOVIND RIVERINE4 mo overdueBHARAT SITARAM KATE · Haveli, PuneP52100054850· 90.9% built
- Merushikhar4 mo overdueSavvy Infrastructure Private Limited · Mogra, Andheri East, Mumbai SuburbanP51800049155· 55% built· 1 complaint
- KAPIL BLING4 mo overdueTRIDENT BUILDERS AND DEVELOPERS · BHIWANDI, ThaneP51700032751· filed Dec 2024 → now Mar 2026· 27.3% built
- MAHAVEER RESIDENCY4 mo overdueSUNITA SURESHKUMAR LALWANI · SHAHPUR, KolhapurP53000050315· 27.3% built
- GAIKWAD NIRVANAS4 mo overdueGAIKWAD DEVELOPERS · WAKAD, PuneP52100047315· 75.5% built
- ESTELLE - BUNGALOW4 mo overdueIRAAH LIFESPACES · Katalpada, RaigarhP52000047983· filed Dec 2024 → now Mar 2026· 45.5% built
- RENUKA POOJA APARTMENT4 mo overdueA K INFRA · PATHARDI PHATA, NashikP51600046005· 90.9% built
- KALASH LANDMARK4 mo overdueKALASH GROUP · TISGAON, AurangabadP51500047227· 87.3% built
- Skylark Apartments RVR 7A at Riverview City4 mo overdueRiverview City Constructions Ltd · Haveli, PuneP52100047628· 56.5% built
- Daffodil4 mo overdueRajendra Harikishan Dhawan · Off Ganpapur Road, NashikP51600052382· 81.8% built
- Naksh Imperial4 mo overdueKishore Mukundlal Agrawal · Akola, AkolaP50100052961· 59.5% built
- AROHAN4 mo overdueRVR CONSTRUCTION · TALEGAON DABHADE, PuneP52100052715· 90.9% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.