RERA projects past their possession deadline
12,128 MahaRERA-registered projects are past the possession date currently on file and still report under 100% construction progress. Both figures are the promoter's own disclosure to the regulator.
Page 57 of 61
- SUKHWANI PALMS10 mo overdueSUKHWANI PROMOTERS & BUILDERS · WAGHOLI, PuneP52100030796· 58.6% built
- Shreeji Residency10 mo overdueSUGAM KISHOR CHANIYARA · Avdhoot Colony, NashikP51600033874· 90.9% built
- NIRAMAY PARK10 mo overdueMONARCH PROPERTIES · SAVEDI AHMEDNAGAR, AhmednagarP52200032266· 10.9% built
- SILVER SQUARE10 mo overdueG S SQUARE · FURSUNGI, PuneP52100034567· 80.5% built
- SURYA HEIGHTS10 mo overdueSURYAPUTRA DEVELOPERS · Junnar, PuneP52100030345· 64.5% built
- VRINDAVAN10 mo overdueDINESH AMRUTLAL THAKKAR · Borivali, Mumbai SuburbanP51800032747· 90.9% built
- Sai Bliss10 mo overdueMr Vinod Kishanchand Matani · Punawale, PuneP52100049314· 81.8% built
- MONITA PARK B BUILDING10 mo overdueUNITY DEVELOPERS · NEAR SAJAI GARDEN, SataraP52700033846· 81.8% built
- Shri Sai Mangal Co-Op Housing Society Ltd A Building10 mo overdueAMOGH ASSOCIATES · Village Chole , Thakurli, ThaneP51700050524· 84.1% built
- NOBLE HEIGHTS10 mo overdueNOBLE DEVELOPERS · M PHULE PETH, PuneP52100052207· 33.6% built
- SHARDA EMPORIO10 mo overdueSHARDA INFRA · NEAR AMAN TALKIES, ThaneP51700047731· 23.6% built
- Anand Residency10 mo overdueTapkir Associates · Haveli, PuneP52100053521· 90.9% built
- AAMOD10 mo overdueTODAY GLOBAL REALTORS · PANVEL, RaigarhP52000030717· filed Dec 2024 → now Dec 2025· 64.8% built
- RIVANSH AVENUE10 mo overdueAKSHAY SUBHASH KOTHAWADE · UNTWADI NASHIK, NashikP51600032092· 81.9% built
- SWAPNA SADAN A10 mo overdueJADHAV ASSOCIATES · Defence colony Daund, PuneP52100033815· 90.9% built
- KAMAL ELITE10 mo overdueKAMAL BUILDTECH · PATHARDI, NashikP51600034336· 81.8% built
- SHRADDHA PRIVILEGE10 mo overdueSHRADDHA LANDMARK PRIVATE LIMITED · KANNAMWAR NAGAR VIKHROLI EAST, Mumbai SuburbanP51800033921· 82.7% built
- MULTANI APARTMENT10 mo overdueSHEWALKAR DEVELOPERS LIMITED · Nagpur (M Corp.), NagpurP50500006543· filed Mar 2019 → now Jan 2026· 87.3% built
- REDEVELOPMENT OF KESAR NIKETAN CHSL10 mo overduePRANAV CONSTRUCTIONS LIMITED · BORIVALI EAST, Mumbai SuburbanP51800046669· 91.8% built
- Lakeview Co Operative Housing Limited10 mo overdueGP Infra · Neelkanthnagar, Kalyan, ThaneP51700049612· 81.8% built
- PARSHVA RESIDENCY10 mo overduePravinkumar Lalchand Jain · TEMBHODE, PalgharP99000049049· filed Dec 2025 → now Jan 2026· 81.8% built
- Samarth Elegance10 mo overdueADARSH BUILDERS AND DEVELOPERS · Nr. Jawhar Hospital, NashikP51600029252· 10.4% built
- NIKETAN CLASSIC10 mo overdueNIKETAN INFRA · NEAR MAHATMA NAGAR SATPUR, NashikP51600033592· 90.9% built
- SRI BALAJI9 mo overdueRaghukul Constructions Private Limited · SHIVAJI NAGAR NAGPUR, NagpurP50500034108· 55.5% built
- SHIVALAY9 mo overdueBuildrite Realtors · New Panvel, RaigarhP52000050338· 81.8% built
- GANDHI INDUSTRIAL PARK9 mo overdueGANDHI BUILDERS PVT LTD · Ambiste Kh., PalgharP99000005517· 90.9% built
- INDU GRACIA9 mo overdueVIJAY CONSTRUCTION NEXT · Chikhali, PuneP52100025794· 46.4% built
- AADINATH GLORIA9 mo overdueAADINATH PROPERTIES · Sandesh Nagar, AurangabadP51500050856· 87.3% built
- SAI MAJESTIC PARK9 mo overdueMARUTI DEVELOPERS · ROOM NO 362 SHEET NO 42, ThaneP51700050235· 43.6% built
- SHRADDHA LIFESTYLE9 mo overdueSHRADDHA CONSTRUCTIONS · Ahmadnagar (M Corp.), AhmednagarP52200011607· 48.2% built
- HIGHNESS PLAZA9 mo overdueEKANTA CONSTRUCTION · NASHIK, NashikP51600048571· filed Jan 2025 → now Jan 2026· 63.6% built
- Nexus Atrium ABC9 mo overdueNexus Buildwell · Borhadewadi, PuneP52100032575· filed Jun 2024 → now Jan 2026· 90.9% built
- FIA EKAANT9 mo overdueFia Developers Pvt. Ltd. · MAHIM, PalgharP99000056217· filed Dec 2025 → now Feb 2026· 81.8% built
- Nirmal Park8 mo overdueNirmal Samruddhi · Nandanvan Lawns, NashikP51600053417· 86.8% built
- AKSHAR GREENS PHASE-28 mo overdueMUNIVAR DEVELOPERS · SILVASSA, Dadra & Nagar HaveliP49600000151· 72.7% built
- SHYAM AURA8 mo overdueMADHUBHAI VITHTHALBHAI VAGHELA · NASHIK, NashikP51600049765· 44.5% built
- VIHAAN GLORY APARTMENT8 mo overdueTIRUPATI BUILDCON · NEAR HINDI SCHOOL MAUJE PIMPALGAON BAHULA SHIWAR, NashikP51600047757· 90.9% built
- DEVALE DIVINE8 mo overdueOMKAR KISHOR DEVALE · BARAMATI, PuneP52100051853· 65.9% built
- Kohinoor Sapphire III8 mo overdueRISING ASSOCIATES · Tathawade, PuneP52100033835· 79.3% built· 1 complaint
- VRUSHTI PRIDE8 mo overdueVRUSHTI ENTERPRISES · NERAL, RaigarhP52000051546· 90.9% built
- RATNAPRABHA8 mo overdueASHWAMEDH SPACES PRIVATE LIMITED · Kothrud, PuneP52100045880· filed Jun 2025 → now Feb 2026· 90.5% built· 1 complaint
- KUMAR PEBBLE PARK JOY 3 - C38 mo overdueKUMAR PROPERTIES AND PROMOTERS PVT. LTD · HADAPSAR, PuneP52100026151· 90.9% built
- KLS SUPREMUS8 mo overdueRAMRAI INFRA · Pashan, PuneP52100032488· filed Jun 2025 → now Feb 2026· 99.5% built· 6 complaints
- CONSTRUCTION OF 368 EWS T/S UNDER PMAY AND 168 MIG ON S.NO.68 AT PADHEGOAN ,DIST-AURANGABAD8 mo overdueCHHATRAPATI SAMBHAJINAGAR HOUSING AND AREA DEVELOPMENT BOARD ( A REGIONAL UNIT OF MHADA) · AURANGABAD, AurangabadP51500026531· 78.2% built
- GOKUL8 mo overdueSUYASH BUILDERS AND DEVELOPERS · PEN, RaigarhP52000018431· filed Oct 2024 → now Mar 2026· 78.1% built
- TULSI VANDAN8 mo overdueTULSI CONSTRUCTION · Nashik (M Corp.), NashikP51600007665· 90.9% built
- Solitaire Ten8 mo overdueASHOK DHANRAJ CHORDIA · Bhosale Nagar, PuneP52100045976· filed Mar 2025 → now Mar 2026· 81.8% built
- LOTUS PARK7 mo overdueSRI SRI BUILDCON · MOSHI, PuneP52100054280· 81.8% built
- Padma Vishwa Mangalam7 mo overdueMangalmurti Builders · Navshya Ganpati, Sector C, NashikP51600051326· 88.6% built
- AUMSANIKA PARAS RESIDENCY7 mo overdueAUMSANIKA DEVELOPERS LLP · PUNE, PuneP52100056040· 80.9% built
- SURYA EXCELLENCY7 mo overdueSURYAKANT MANGALDAS SAMANI AND CHAMPABEN VASANJI MASHRU · NARPOLI, ThaneP51700015832· 86.2% built
- Amber Galaxy C Wing7 mo overduePANDHARINATH SITARAM PATIL · VITAWA, ThaneP51700024773· filed Jan 2024 → now Mar 2026· 26.8% built· 1 complaint
- NIRVANA LIFECITY7 mo overdueNIRVANA LIFECITY LLP · NEAR NYATI EVITA, PuneP52100020070· 89.1% built
- Ocean Towers - Phase I7 mo overdueMarine Drive Hospitality And Realty Private Limited · Marine Lines, Mumbai CityP51900015638· 7.6% built
- AAIJI PINK CITY7 mo overdueAAIJI REALTY · SATHE VASTI, PuneP52100023905· 81.8% built
- M M CITY7 mo overdueFINE CONSTRUCTION COMPANY · NEW SHILL, ThaneP51700022075· 84.1% built
- SOBHA NESARA BLOCK-17 mo overdueSOBHA LIMITED · KOTHRUD, PuneP52100020057· filed Mar 2025 → now Mar 2026· 98.2% built· 4 complaints
- SUMITRA HEIGHTS7 mo overdueSWAMI NARAYAN ENTERPRISES · KALYAN DOMBIVLI M CORP, ThaneP51700052785· 90.9% built
- Ocean Towers - Phase II7 mo overdueMarine Drive Hospitality And Realty Private Limited · Marine Lines, Mumbai CityP51900015653· 7.6% built
- Yashwin SuperNova7 mo overdueVilas Javdekar Eco Shelters Private Limited · Near Indira College, Wakad Pune, PuneP52100028652· 99.8% built· 1 complaint
- MAHESHWAR KRIPA CHSL7 mo overdueMAHESHWAR KRIPA C0-OPERATIVE HOUSING SOCIETY LIMITED · GHATKOPAR EAST, Mumbai SuburbanP51800033398· filed Mar 2025 → now Mar 2026· 81.8% built
- Swapna-Niketan by NMC7 mo overdueSANDEEP DWELLERS PVT. LTD. · Wanjara, NagpurP50500050570· filed Mar 2025 → now Mar 2026· 73.2% built· 2 complaints
- SAI VIJAY HERITAGE7 mo overdueVIJAY LALSINGH THAKUR · Ulhasnagar, ThaneP51700034485· filed Mar 2025 → now Mar 2026· 51.8% built
- EKAM7 mo overdueA P PROPERTIES · Andheri, Mumbai SuburbanP51800002628· filed Mar 2025 → now Mar 2026· 72.6% built
- SHANMUKHI ALAYAM7 mo overdueSHANMUKHI BUILDCON · OLD PANVEL, RaigarhP52000054283· 87.7% built
- Indu Park7 mo overdueSONAWANE INFRA · Eknath Nagar, NashikP51600049869· filed Mar 2024 → now Mar 2026· 90.9% built
- Sunrise Apartment7 mo overduePurushottam Naran Patel · Mane Nagar, NashikP51600047549· 81.8% built
- SAMRUDDHI PARK7 mo overdueDG INFRA · DHATRAK PHATA, NashikP51600031113· 81.8% built
- Abhiram7 mo overdueMakarand Madhav Kulkarni · Bhistabag, Ahmednagar, AhmednagarP52200049407· 81.8% built
- WEST AVENUE7 mo overdueM/s Dhabalia Enterprises · Borivali (West), Mumbai SuburbanP51800051576· 90.9% built
- GROUP HOUSING SCHEME7 mo overdueVAKRATUND DEVELOPERS · PISADEVI, AurangabadP51500051044· 21.4% built
- SAMRUDDHI VILLA7 mo overdueSANSKAR BUILDERS AND DEVELOPERS · NASHIK, NashikP51600078888· 74.5% built
- Skylark Apartments RVR 7A at Riverview City7 mo overdueRiverview City Constructions Ltd · Haveli, PuneP52100047628· 56.5% built
- Horizon Heights7 mo overdueI.R.Developers LLP · Sher-E-Punjab Colony, Andheri East, Mumbai SuburbanP51800050202· 0% built· 1 complaint
- Pant Nagar Gulmohar Chs Ltd7 mo overduePragati Developers · Ghatkopar, Mumbai, Mumbai SuburbanP51800026241· filed Dec 2024 → now Mar 2026· 81.8% built
- GOLDEN VISTA7 mo overdueGOLDEN HOMES INFRASTRUCTURES · PIPLA, NagpurP50500050049· filed Mar 2025 → now Mar 2026· 74.9% built· 1 complaint
- AROHAN7 mo overdueRVR CONSTRUCTION · TALEGAON DABHADE, PuneP52100052715· 90.9% built
- Naksh Imperial7 mo overdueKishore Mukundlal Agrawal · Akola, AkolaP50100052961· 59.5% built
- LAKE TOWN D-6, WING - A and B7 mo overdueVENKATESH ASSOCIATES · KATRAJ, PuneP52100053248· filed Dec 2025 → now Mar 2026· 98.3% built· 1 complaint
- JEEVAN SHOBHA CHSL AND BHANSALI CHSL7 mo overdueHIRANI REALTORS LLP · BORIVALI EAST, Mumbai SuburbanP51800047979· 81.8% built
- SHOBHA HERITAGE7 mo overdueNilesh Vasantrao Chavan · SAVEDI, AhmednagarP52200050972· 45.5% built
- Daffodil7 mo overdueRajendra Harikishan Dhawan · Off Ganpapur Road, NashikP51600052382· 81.8% built
- BHAGYA GARDEN CITY PHASE I7 mo overdueBHAGYA CONSTRUCTION · VRUNDAWAN GARDEN, AurangabadP51500045263· filed Dec 2024 → now Mar 2026· 90.9% built
- NIRMAN SIGNATURE7 mo overdueSHREE SHA DEVELOPERS · Badlapur (W), ThaneP51700050640· 81.8% built
- ATHARVA NEST7 mo overdueATHARVA ENGINEERS AND DEVELOPERS · E WARD, KolhapurP53000045232· 90.9% built
- SAI TARA7 mo overdueSHREE HARI GROUP · PLOT NO 78 SECTOR 52 DRONAGIRI, RaigarhP52000014901· filed Mar 2022 → now Mar 2026· 90.9% built
- 97 SONIGARA BIZZ7 mo overdueDHANASHRI CONSTRUCTION · RAVET, PuneP52100052052· filed Jun 2025 → now Mar 2026· 72.4% built
- MEHTACORNER7 mo overdueADESHWAR BUILDERS · SHRIGONDA, AhmednagarP52200049897· 31.8% built
- UMIYA VIJAY APARTMENT7 mo overdueIMPERIAL REALTY · NEAR BALI MANDIR, PANCHAVATI, NashikP51600047270· 49.1% built
- Kalpataru Magnus7 mo overdueKalpataru Properties Pvt. Ltd. · Andheri, Mumbai SuburbanP51800004029· filed Jun 2024 → now Mar 2026· 83.9% built· 66 complaints
- DEM ICON7 mo overdueDEM Developers LLP · Charkop, Mumbai SuburbanP51800050731· 86.6% built
- HARIOM ENCLAVE7 mo overdueHARIOM GROUP · KSHIRSAGAR COLONY, NashikP51600051993· 77.3% built
- Rose Garden7 mo overdueVinayaka Realtors and Developers · Andheri, Mumbai SuburbanP51800022587· filed Dec 2023 → now Mar 2026· 90.9% built
- SAYBA ELEGANT7 mo overdueSAYBA ELEGANT · Kurla, Mumbai SuburbanP51800051973· 90.9% built
- Sushila7 mo overdueParulekarkale Realty LLP · Ganesh Nagar, PuneP52100050888· filed Jun 2025 → now Mar 2026· 72.7% built
- SHAMIKH BUILDING7 mo overdueTAMOS ASSOCIATES · ANDHERI EAST, Mumbai SuburbanP51800048394· 82.3% built
- MANASAROVAR7 mo overdueHARASIDDH PROJECTS · Kandivali (W), Mumbai SuburbanP51800078732· 98.2% built
- MATRIX7 mo overdueBHARAT HASTIMAL JAIN · MUNJERI BIBVEWADI, PuneP52100048463· 27.3% built
- Supreme Villagio II7 mo overdueTurquoise Housing LLP · Somatne, PuneP52100049506· 53.9% built
- SARA ABHIMAN7 mo overdueJAGRUTSARA STRUCTURES LLP · TALEGAON CHAKAN, PuneP52100046745· 88.5% built
- GAIKWAD NIRVANAS7 mo overdueGAIKWAD DEVELOPERS · WAKAD, PuneP52100047315· 75.5% built
- KRISHNA CORNER7 mo overdueDHIRAJ KISAN KENI · PLOT NO 54, RaigarhP52000051045· 40.9% built
- LEO GALAXY-047 mo overdueMahendra Rishabhchand Jain · BORGAON, NagpurP50500048415· 90.9% built
- PUROHIT MANSION7 mo overdueGANESH BUILDERS · ABHYANKAR NAGAR LAYOUT, NagpurP50500050586· 87.7% built
- Kalpataru Jade Residences H7 mo overdueAstrum Developments Private Limited · Baner, PuneP52100046423· 80.2% built
- KAPIL BLING7 mo overdueTRIDENT BUILDERS AND DEVELOPERS · BHIWANDI, ThaneP51700032751· filed Dec 2024 → now Mar 2026· 27.3% built
- SHWESH CHAMPARAN7 mo overdueSHWESH DEVELOPERS PRIVATE LIMITED · MATUNGA EAST, Mumbai CityP51900033818· filed Dec 2024 → now Mar 2026· 47.1% built
- VISION ARISTO7 mo overdueVISION CREATIVE PROMOTERS · KIWALE, PuneP52100030708· 90.9% built
- VTP AETHEREUS HIGH STREET7 mo overdueHOME RISING CONSTRUCTION LLP · Mahalunge, PuneP52100055356· filed Mar 2025 → now Mar 2026· 59.1% built· 1 complaint
- GALAXYGARDEN PLOT NO 2 AND PLOT NO 47 mo overdueS K DEVELOPERS · VANGANI, RaigarhP52000018423· filed Jun 2022 → now Mar 2026· 98.5% built
- Navratna7 mo overdueOm Navratna Enterprises LLP · Vileparle, Mumbai SuburbanP51800050281· 90.9% built
- SATISH OAK HEIGHT7 mo overdueSHREE SAI PRATHAMESH DEVELOPERS · BADLAPUR WEST, ThaneP51700030403· 36.4% built
- Adiyogi7 mo overdueKIDPL ADIYOGI PRIVATE LIMITED · Pune, PuneP52100054560· filed Jul 2025 → now Mar 2026· 90.9% built
- EMPIRE TOWERS7 mo overdueRAM AND J K ASSOCIATES · NEAR NAMJOSHI PETROL PUMP, SataraP52700030634· filed Mar 2025 → now Mar 2026· 71.8% built
- Smriti7 mo overdueMahesh Balkrishna Sambhus · GOREGAON EAST, Mumbai SuburbanP51800050592· 81.8% built
- Sunflower7 mo overdueKedar Buildcon · Old Panvel, RaigarhP52000045642· filed Dec 2025 → now Mar 2026· 81.8% built
- BHAMA CENTER7 mo overdueAASTHA INFRA BUILDCON · WAKAD, PuneP52100022965· filed Dec 2022 → now Mar 2026· 81.1% built
- Shree Ram Radha Damodar7 mo overdueADITYA BUILDCON · Near Aditya Mangal Karyalaya, ThaneP51700050634· 72.7% built
- West Winds7 mo overdueGhatkopar Neelkanth Kunj CHSL · GHATKOPAR EAST, Mumbai SuburbanP51800045813· 75% built
- Hari Sanskruti Phase I7 mo overdueDHARAN INFRA-EPC LIMITED · Deolali, NashikP51600001194· filed Sept 2020 → now Mar 2026· 84.5% built
- SHREE GANESHA HEIGHTS7 mo overdueSIDDHIVINAYAK ENTERPRISES · MAMURDI, PuneP52100049450· 81.8% built
- ROYAL HEIGHTS7 mo overdueUTTAM MAROTRAO KHADGI · MOUZA BORGAON, NagpurP50500051087· 89.4% built
- RUDRADEEP7 mo overdueRAGHVENDRA MAHARUDRA TULSHIBAGWALE · SAHKAR NAGAR, PuneP52100046351· filed May 2024 → now Mar 2026· 80.9% built
- SAI WORLD7 mo overduePINNACLE CORPORATION · BORADPADA ROAD, ThaneP51700034155· 90.9% built
- RENUKA POOJA APARTMENT7 mo overdueA K INFRA · PATHARDI PHATA, NashikP51600046005· 90.9% built
- PARAM LUXURIA7 mo overduePARAM INFRASPACE · BEHIND JAIN MANDIR ADGAON, NashikP51600053436· 48.2% built
- VISHNU GREENS7 mo overdueJAI GANESH PROPERTIES · Fursungi, PuneP52100051865· 90.9% built
- Mam Trilok7 mo overdueLEELA ENTERPRISES · Kurla, Mumbai SuburbanP51800011162· filed Sept 2020 → now Mar 2026· 90.9% built
- KALASH LANDMARK7 mo overdueKALASH GROUP · TISGAON, AurangabadP51500047227· 87.3% built
- SNEHAKUNJ7 mo overdueSHIVAJI SAHEBRAV SHINDE · KODOLI, SataraP52700051207· filed Jun 2025 → now Mar 2026· 72.7% built
- ACHARYA ASHRAM SAHAKARI GRIHA RACHANA SANSTHA MARYADIT7 mo overdueVASTU DARSHAN DEVELOPERS LLP · OPP DON BOSCO SCHOOL, VAZIRA, BORIVALI WEST, Mumbai SuburbanP51800027379· filed Oct 2023 → now Mar 2026· 90.9% built
- THE ORCHID7 mo overdueNILESH KISHOR VYAVAHARE · PRATIBHANAGAR, KolhapurP53000047516· 78.6% built
- PAREKH RADIANCE7 mo overduePAREKH BUILDPROJECTS PRIVATE LIMITED · KANDIVALI WEST, Mumbai SuburbanP51800046909· 81.8% built
- JITEN CHS7 mo overdueM/s Keytech · ANDHERI WEST, Mumbai SuburbanP51800032184· filed Dec 2024 → now Mar 2026· 99.8% built
- EMPIRE TOWERS7 mo overdueLAKHANI REALTY LLP · Naupada Thane, ThaneP51700005215· filed Jul 2024 → now Mar 2026· 38.2% built· 2 complaints
- SAI CHHAYA APARTMENT7 mo overduePM BUILDERS AND DEVELOPERS · KALASKAR NAGAR, NEAR TRIKONI BUNGLOW, NashikP51600050145· 49.1% built
- Agrawal Exotica7 mo overdueMR AGRAWAL NILESH NEMICHAND (HUF) · Sanglikar mala, Miraj, SangliP53100051821· 50.9% built
- JADE AVENUE COMMERCIAL WING7 mo overdueJAIRAJHAPPYHOMES · MATUNGA CENTRAL, Mumbai CityP51900050274· filed Jun 2025 → now Mar 2026· 88.2% built
- PHOENIX7 mo overdueNEMINATH CORP · Borivali, Mumbai SuburbanP51800029237· filed Mar 2025 → now Mar 2026· 90.9% built
- SAURABH HEIGHTS7 mo overdueS K DEVELOPERS · Badlapur, ThaneP51700051500· 90.9% built
- NILKANTH HEIGHTS APARTMENT7 mo overdueVINAYAK INFRA · PRASHANT NAGAR, NashikP51600048774· 90.9% built
- Gayatri CHS LTD7 mo overdueShree Angarak Enterprises Builders and Developers · Thane, ThaneP51700032690· filed Dec 2023 → now Mar 2026· 81.8% built
- Merushikhar7 mo overdueSavvy Infrastructure Private Limited · Mogra, Andheri East, Mumbai SuburbanP51800049155· 55% built· 1 complaint
- NISHIGANDH APARTMENT7 mo overdueC B CONSTRUCTION · KAMATWADE, NashikP51600045379· 90.9% built
- Mithila Residency7 mo overdueSantosh Kumar Jha · Behind Ashoka NagarP52100029255· 90.9% built
- SIDDHIVINAYAK RESIDENCY7 mo overdueSHASHIKANT JOMA GAIKWAD · Pushpak New, RaigarhP52000022401· filed Mar 2023 → now Mar 2026· 81.8% built
- LOTUS RESIDENCY7 mo overdueLOTUS INFRA · LAMKHEDE MALA, NashikP51600046349· 90.9% built
- BORIVALI SAGAR CHSL7 mo overdueMAHAVIR INFRAPROJECTS · BORIVALI WEST, Mumbai SuburbanP51800052089· 60.5% built
- ESTELLE - BUNGALOW7 mo overdueIRAAH LIFESPACES · Katalpada, RaigarhP52000047983· filed Dec 2024 → now Mar 2026· 45.5% built
- PINNACLE7 mo overdueKAILAS PRABHAKAR BANKHELE · WAHAL, RaigarhP52000048599· filed Dec 2025 → now Mar 2026· 90% built
- ZEE ASHTAVINAYAK7 mo overdueZEE LAND DEVELOPMENT SERVICES · ANDHERI WEST, Mumbai SuburbanP51800045964· 90.9% built· 2 complaints
- RAI ORCHID7 mo overdueR RAI UDYOG BUILDERS LLP · OPP DOMINO PIZZA, NagpurP50500050472· 90.9% built
- MAHAVEER RESIDENCY7 mo overdueSUNITA SURESHKUMAR LALWANI · SHAHPUR, KolhapurP53000050315· 27.3% built
- MAHALAXMI VRUNDAVAN7 mo overdueSHREE MAHALAXMI CONSTRUCTION · NASHIK, NashikP51600048721· 81.8% built
- SHREE MAHALAXMI SAUBHAGYA-027 mo overdueSWAPNIL MORESHWAR KULKARNI · SATARA PARISAR, AurangabadP51500048109· 90.9% built
- PADMA-PRATAP HERITAGE7 mo overdueUdaysingh Ramchandra Killedar · Opp. Sagare Hospital, KolhapurP53000030610· filed Feb 2025 → now Mar 2026· 69.1% built
- GOVIND RIVERINE7 mo overdueBHARAT SITARAM KATE · Haveli, PuneP52100054850· 90.9% built
- ATHARVED-III7 mo overdueAIR DEVELOPERS · DIXIT NAGAR NARI-56/1, NagpurP50500054313· 72.7% built
- Sukoon Heights7 mo overdueVIRANI CONSTRUCTION COMPANY · Thane, ThaneP51700004837· 97% built
- 24 HIGH7 mo overdueDREAM APEX REALTIES LIMITED · OPP DY PATIL STADIUM, ThaneP51700025150· 60.9% built· 1 complaint
- Mahalakshmi Heights7 mo overdueParth Infra · Mustafabad, AurangabadP51500028095· 63.6% built
- DEVGIRI ROW BUNGALOWS7 mo overduePERFECT BUILDERS AND DEVELOPERS · -, SataraP52700080506· 89.5% built
- saroj sadan CHSL7 mo overduePritesh Damji Savla · Kurar, Mumbai SuburbanP51800012908· filed Dec 2018 → now Apr 2026· 90.9% built· 1 complaint
- JANKI LEGACY7 mo overdueMihir Nandkumar papaiya · Mira Road East, ThaneP51700020239· 42.7% built
- Euphoria Pride Building A West Side6 mo overdueSwastik Vastu Private Limited · North Shivaji Nagar, SangliP53100047641· filed Jul 2025 → now Apr 2026· 81.8% built· 2 complaints
- Snehsagar Apartment6 mo overdueSagar Mahadev Jarad · Shirwal, Shirke Colony, SataraP52700045366· 90.9% built
- YashONE Eternitee Phase 16 mo overdueVilas Javdekar Infinitee Developers Pvt. Ltd. · Maan, PuneP52100046122· 89.5% built· 5 complaints
- YOGI NIWAS6 mo overdueELITE INFRASTRUCTURE · AMBERNATH, ThaneP51700015565· 1.8% built
- GANGA DHAM TOWER B..6 mo overdueLegends County Landmark Pvt Ltd · Pune City, PuneP52100000212· 60% built
- ALPINE ASTONIA6 mo overdueALPINE LANDMARKS LLP · Mawal, PuneP52100047595· 80.9% built
- Shreenath Residency6 mo overdueChandrakant Gulab Jamdade · Jamdade Estate, PuneP52100052917· filed May 2025 → now Apr 2026· 81.8% built
- J.K. PRIDE6 mo overdueJ.K.INFRACON · PUSHPAK NODE, RaigarhP52000051271· 80.7% built
- Satvik Villa6 mo overdueMak Developers Through Damji Vasta Makwana · Baner, PuneP52100052821· filed Apr 2025 → now Apr 2026· 63.6% built
- ATLANTA SQUARE6 mo overdueUTTAM ASSOCIATE · Mawal, PuneP52100054714· filed Dec 2025 → now Apr 2026· 78.2% built
- LA VISTA6 mo overdueDARSHANRAJ REALITY · BHOSALE NAGAR, SHIVAJI NAGAR, PuneP52100052539· 78.2% built
- Usha Enclave6 mo overdueKalash Developers · Mangalmurti Colony, Sangli, SangliP53100050076· filed Dec 2025 → now Apr 2026· 62.3% built
- SHUBH LABH HEIGHTS6 mo overdueBhuvi Landmarks LLP · GARKHEDA, AurangabadP51500026771· 72.7% built
- NIRMAN ADI6 mo overdueNIRMAN DEVELOPERS · Pune City, PuneP52100051655· 59.1% built· 1 complaint
- KUSH AVENUEE6 mo overdueKUSH AVENUEE · Kurla, Mumbai SuburbanP51800052873· 68.2% built
- 42 EAST PARK6 mo overdueMADHUPURI HOMES · Mumbai City, Mumbai CityP51900048224· 97.3% built
- MITHILA RESIDENCY6 mo overdueSHREEYASH ASSOCIATES · Plot No 3, Gat No 187/2/A, Jalochi, Baramati, PuneP52100051051· 79.1% built
- Trupti Park6 mo overdueDhanraj Baburao Patwari · Aurangabad, AurangabadP51500046390· 77.7% built
- Gangawas6 mo overdueArchway Estates DB Gangawas LLP · Erandawane, PuneP52100034138· filed Dec 2024 → now Apr 2026· 80.8% built
- GIRDHARI HEIGHTS6 mo overdueSHREE KRISHNA DEVELOPERS · Vasai, PalgharP99000029298· filed Dec 2024 → now Apr 2026· 80.5% built
- SDPL Om6 mo overdueSANDEEP DWELLERS PVT. LTD. · Small Factory Area, NagpurP50500026827· 93.2% built
- MY HOME KIWALE6 mo overdueRAVET LAND DEVELOPERS LLP · KIWALE, PuneP52100026833· 63.6% built· 3 complaints
- PALAASH OAK PRIME6 mo overdueBhakti Sagar Developers · -, PuneP52100047171· filed Dec 2025 → now Apr 2026· 90.9% built
- Indira6 mo overdueSugee Developers Pvt. Ltd. · Shivaji Park, Dadar, Mumbai CityP51900048976· 50.9% built· 2 complaints
- NAVRANG NAVKAR6 mo overdueOXFORD NAVRANG REALTY LLP · Borivali, Mumbai SuburbanP51800047342· filed Oct 2025 → now Apr 2026· 81.8% built
- ROONGTA FUTUREX APARTMENT6 mo overdueROONGTA LANDMARKS LLP · NASHIK, NashikP51600029167· 81.8% built· 18 complaints
- SWOJAS ADVAIT6 mo overdueSWOJAS REALTORS LLP · Pune City, PuneP52100045710· filed Oct 2025 → now Apr 2026· 81.8% built
- SAI WORLD LEGEND6 mo overdueParadise Lifestyles Private Limited · Ulhasnagar, ThaneP51700025002· 45.8% built
- Jeevan Anand6 mo overdueReal Buildcon · Mhasrul, NashikP51600045594· 81.8% built
- VRUNDAVAN CITY PHASE-2A6 mo overdueKalyani Associates · AGASHIVNAGAR, SataraP52700054596· 9.1% built
- 24 ELEMENTS6 mo overdueS.P. BUILDERS AND DEVELOPERS · Ambegaon, PuneP52100052370· 72.7% built
- Terraform K - Residences6 mo overdueMoney Magnum Constructions · Thane, ThaneP51700002673· filed Sept 2023 → now May 2026· 90.9% built
- BHAGIRATHI HEIGHTS6 mo overdueGAURAV VISHVANATH AWATI · AGARKAR MALA, AhmednagarP52200076748· 90.9% built
- SAHYADRI PRIDE6 mo overdueSAHYADRI DEVELOPERS · KUPWAD ROAD, SangliP53100020127· 97.7% built
- SAI SRUSHTI6 mo overdueOM CONSTRUCTION AND DEVELOPERS · CHIKHALE, RaigarhP52000011327· filed Dec 2019 → now May 2026· 90.9% built· 2 complaints
- PadmaVishwa BusinessHub6 mo overdueSiddhi Construction · Adwait Colony, NashikP51600027405· 90.9% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.