RERA projects past their possession deadline
12,128 MahaRERA-registered projects are past the possession date currently on file and still report under 100% construction progress. Both figures are the promoter's own disclosure to the regulator.
Page 60 of 61
- Nakshatra Aarambh2 mo overdueJSB Shelters LLP · Vasai, PalgharP99000027563· filed Jun 2025 → now Sept 2026· 81.8% built· 1 complaint
- Varad Residency2 mo overdueVilas Bhagaji Arekar · Near bhumkar Vasti, PuneP52100050115· filed Dec 2025 → now Sept 2026· 81.8% built
- NEELAM CHS LTD2 mo overdueSapriya Developers · KANDIVALI WEST, Mumbai SuburbanP51800076794· 90.9% built
- SHREE LAXMI COOP HOUSING SOCIETY1 mo overdueMOHIT MAYURESH GANGAL · Uran, RaigarhP52000048866· 86.5% built
- IDEAL AVENUE1 mo overdueIDEAL BUILDERS · Haveli, PuneP52100027916· filed Sept 2024 → now Sept 2026· 80% built
- 1 NEW CASTLE1 mo overdueCHAVDA REALTY LLP · BANER, PuneP52100052768· filed Dec 2025 → now Sept 2026· 41.4% built
- SAI KANHUJIPOLICE SANKUL1 mo overdueHarshad Balu Gawade · BALYANI GAON, ThaneP51700016588· filed May 2024 → now Sept 2026· 80% built
- MIRA RESIDENCY1 mo overdueMIRA DEVELOPERS · Mamdapur, RaigarhP52000080229· filed May 2026 → now Sept 2026· 81.8% built
- Rajal Godavari1 mo overdueNisar Properties Private Limited · Kurla West, Mumbai SuburbanP51800045303· filed Dec 2025 → now Sept 2026· 81.8% built
- STAR VISTA - MHADA1 mo overdueRAVIE KHILUMAL OCHANNI · Ravet, PuneP52100080257· filed Aug 2025 → now Sept 2026· 72.7% built
- HEMA APARTMENTS CO-OPERATIVE HOUSING SOCIETY LIMITED1 mo overdueHEMA APPARTMENTS CO-OPERATIVE HOUSING SOCIETY LIMITED · GHATKOPAR (EAST), Mumbai SuburbanP51800053101· filed Mar 2025 → now Sept 2026· 81.8% built
- Orchid1 mo overdueD Bafna Properties · Pen, RaigarhP52000052547· filed May 2026 → now Sept 2026· 60% built
- Sky Gardens at Godrej Vihaa1 mo overdueK. R. REAL ESTATE PVT. LTD. · Ambarnath, ThaneP51700013329· filed Dec 2023 → now Sept 2026· 84.7% built· 1 complaint
- Balaji Siddhivinayak Complex Building No. 1 B Wing1 mo overdueM/s Onkareshwar Developers · Gaondevi - Dombivli West, ThaneP51700018430· filed Dec 2025 → now Sept 2026· 89.6% built· 2 complaints
- MAJESTIC RESIDENCY1 mo overdueSKYLINE INFRA · PALAKWADI WARDHA, WardhaP50400050776· filed Dec 2025 → now Sept 2026· 81.8% built
- QUEENS VILLA - 21 mo overdueSUPER REALTY · NEAR OSTWAL WONDER CITY, PalgharP99000045321· filed Mar 2025 → now Sept 2026· 78.2% built
- OM RESIDENCY1 mo overdueJALGAON PROJECTS PVT LTD · OPP SWADHYA BHAWAN JALGAON, JalgaonP49900056006· filed Sept 2025 → now Sept 2026· 75.9% built
- OSIAN NAVKAR1 mo overdueOSIAN REALTY · Pune City, PuneP52100052913· 83.6% built
- GHULE PRIDE1 mo overdueSHRAVYA DEVELOPERS · Haveli, PuneP52100050890· filed Dec 2025 → now Sept 2026· 90.9% built
- VAISHNAVI CITY PHASE 2 SECTOR 21 mo overdueVAISHNAVI CITY PHASE 2 SECTOR 2 · Haveli, PuneP52100076657· filed May 2026 → now Sept 2026· 81.8% built
- SHUBHARAMBH PARADISE1 mo overdueM/s Shubharambh Realty · Panvel, RaigarhP52000028587· filed May 2026 → now Sept 2026· 43.2% built
- GODREJ URBAN PARK1 mo overdueGODREJ PROPERTIES LIMITED · Kurla, Mumbai SuburbanP51800028364· 71.6% built· 2 complaints
- UNIQUE VISTAS MHADA BUILDING NO. 1,2,31 mo overdueMADHU HARSHAD DOSHI · MIRA ROAD EAST, ThaneP51700006925· filed Jun 2022 → now Sept 2026· 80.9% built
- SUMATI SKYLINE1 mo overdueSUBHASH SKYLINE INFRA · VILLAGE AYRE,TALUKA KALYAN, ThaneP51700052640· 81.8% built
- TOWN SQUARE1 mo overdueKRUPASINDHU DEVELOPERS · NEAR SHREEJI SHARAN BUILDING, PuneP52100052087· 90.5% built
- HAPPY HOME JASMINE C D1 mo overdueHappy Home Corporation · MANIKPUR, PalgharP99000048251· filed Mar 2026 → now Sept 2026· 81.4% built
- Vaastu Shreya1 mo overdueVaastu Shreya · Andheri, Mumbai SuburbanP51800077215· filed May 2026 → now Sept 2026· 51.8% built
- VAIBHAV CO-OPERATIVE HOUSING SOCIETY PROPOSED1 mo overdueUDAY PANDURANG SAIT · CHENDHARE, RaigarhP52000015152· filed Jul 2022 → now Sept 2026· 90.9% built
- THE NEW ANAND DEEP CHS LTD1 mo overdueSHREEJEE BUILDCON · Kurla, Mumbai SuburbanP51800048097· 60.4% built
- 7 Plumeria Drive- Phase 31 mo overdueB A Consulting · Punawale, PuneP52100050087· filed Mar 2026 → now Sept 2026· 85.3% built
- KINJAL COMPLEX II1 mo overdueKINJAL ENTERPRISES · Boisar West, PalgharP99000046746· filed Dec 2025 → now Sept 2026· 81.8% built
- AAI SATIDEVI PARADISE1 mo overdueSHREENATH DEVELOPERS · MULUND WEST, Mumbai SuburbanP51800054925· filed Mar 2026 → now Sept 2026· 78.4% built· 2 complaints
- KPCT1 mo overduePARMAR PROPERTIES PVT.LTD. · Pune City, PuneP52100008820· filed Dec 2020 → now Sept 2026· 90.9% built
- Majestique Swapnangan Wing A and Wing B1 mo overdueMajestique Horizon LLP · Haveli, PuneP52100031125· filed Dec 2025 → now Sept 2026· 87.7% built· 21 complaints
- Trade Square 4th to 7th Floor1 mo overdueATUL PROPERTIES · Andheri East, Mumbai SuburbanP51800020821· filed Mar 2025 → now Sept 2026· 54.5% built· 1 complaint
- PARSHURAM TOWER1 mo overdueMORESHWAR CONSTRUCTIONS · TALUKA KALAYN, ThaneP51700025480· filed Sept 2025 → now Sept 2026· 71.5% built
- SKY HEIGHT1 mo overdueMango Enterprises · Valivali Village, ThaneP51700045826· filed May 2026 → now Sept 2026· 83.6% built
- DALALS SQUARE1 mo overdueDalal Realty · Khoj Khuntavali, Kher Section, Ambernath, ThaneP51700049109· filed Dec 2024 → now Sept 2026· 47.5% built
- ABUNDANCE1 mo overdueGoodwill Developers · Kurla, Mumbai SuburbanP51800045501· filed Dec 2025 → now Sept 2026· 58.5% built· 1 complaint
- SWOJAS MAITREE1 mo overdueSWOJAS ENTERPRISES · ERANDWANA, PuneP52100052855· 81.4% built
- BEAUMONDE1 mo overdueKANUNGO PROPERTY · KANUNGO GARDEN CITY, MIRA ROAD EAST, ThaneP51700049442· filed Mar 2026 → now Sept 2026· 90.9% built
- AVANEESH1 mo overdueSUYASH DEVELOPERS · KATHE GALLI DWARAKA, NashikP51600023817· filed Dec 2023 → now Sept 2026· 86.8% built
- ANUTAM1 mo overdueTRULY HIGHDREAMS REALTORS LLP · Andheri, Mumbai SuburbanP51800026032· filed Sept 2023 → now Sept 2026· 14.5% built· 1 complaint
- YOGI MILAN PLUS1 mo overdueSHIV BUILDERS · SILVASSA, Dadra & Nagar HaveliP49600000091· 90.9% built
- BALAJI HERITAGE1 mo overdueBUILDFOX REALTY LLP · PUSHPAK, RaigarhP52000054682· 90.9% built
- EMERALD HEIGHTS1 mo overdueM/S. RIDDHISIDDHI DEVELOPERS · Mawal, PuneP52100076755· filed May 2026 → now Sept 2026· 67.3% built
- KING TOWER1 mo overdueSHREE MORYA DEVELOPERS · Punawale, PuneP52100053670· filed May 2026 → now Sept 2026· 35.9% built
- LAXMI HEIGHTS1 mo overdueSHREESUNDER DEVELOPERS · Pushpak Node, RaigarhP52000055442· filed Sept 2025 → now Sept 2026· 64.1% built
- MARINA BAY WORLI SEA FACE1 mo overdueSaumya Buildcon Pvt Ltd · Ward GSouth, Mumbai CityP51900011592· filed Jan 2023 → now Sept 2026· 81.8% built
- TULSIDHAM CHS1 mo overdueSM & HAPPY HOME ASSOCIATES · VILE PARLE WEST, Mumbai SuburbanP51800021413· filed Dec 2022 → now Sept 2026· 81.8% built
- Prathamesh Co-Op Housing Soc1 mo overdueJoshi Associates · Right Bhusari Colony, Kothrud, PuneP52100052452· filed Sept 2025 → now Sept 2026· 75% built
- RUDRANSH PARK1 mo overdueASHOK SHIVNARAYAN LADDHA · OZAR, NashikP51600045916· filed Sept 2025 → now Sept 2026· 89.1% built
- Pritam Pride1 mo overdueBalbir Singh Pritam Singh Renu · Civil Lines, NagpurP50500045940· filed Dec 2024 → now Sept 2026· 81.8% built
- OM MANGALAM DISHA1 mo overdueSHRI ASSOCIATES · Village Kiwale, PuneP52100048442· filed Apr 2026 → now Sept 2026· 81.8% built
- SUDARSHAN CO-OP. HSG. SOC. LTD.1 mo overdueGayatri Foundation · G.B. Patharli- Dombivli East, ThaneP51700052092· filed May 2026 → now Sept 2026· 81.8% built
- Shiv Samarth1 mo overdueMANOJ OMPRAKASH JAISWAL · Pushpak, RaigarhP52000054032· filed May 2026 → now Sept 2026· 50.2% built
- JADE CREST1 mo overdueNational Happy Homes · Mumbai City, Mumbai CityP51900033760· 93.6% built
- Wadhwa 723 Avenue1 mo overdueHarshvardhan Constructions · Andheri, Mumbai SuburbanP51800050698· filed May 2026 → now Sept 2026· 27.7% built
- Inspire1 mo overdueR K Constructions · Mumbai City, Mumbai CityP51900029171· filed Sept 2025 → now Sept 2026· 58.1% built· 8 complaints
- Modirealty Vatvriksh1 mo overdueMODIREALTY DEVELOPERS PVT LTD · Borivali, Mumbai SuburbanP51800047278· 72.7% built
- GURUVAIBHAV CO-OP.HOUSING SOCIETY LIMITED1 mo overdueSHREEPAD ASSOCIATES · RAMBAUG COLONY, PuneP52100049050· filed Mar 2025 → now Sept 2026· 90.9% built
- UNIQUE VISTAS MHADA BUILDINGNO. 4 5 6 71 mo overdueMADHU HARSHAD DOSHI · Thane (M Corp.), ThaneP51700007320· filed Dec 2020 → now Sept 2026· 80.9% built
- GOODWILL CO OPERATIVE HOUSING SOCIETY LTD1 mo overdueTRIMURTI BUILDCON BUILDERS AND DEVELOPERS · Mumbai, Mumbai SuburbanP51800049604· filed May 2025 → now Sept 2026· 81.8% built
- Sadanand Condominium1 mo overdueRajendra balakrushna Chaphalkar · Pune City, PuneP52100048959· filed Mar 2025 → now Sept 2026· 71.4% built
- ENLIVEN HOME B WING PHASE 21 mo overdueSIDDHIVINAYAK PROPERTIES · WAGHOLI, PuneP52100050030· filed Dec 2024 → now Sept 2026· 81.8% built
- STAR HOMES1 mo overdueBHIWANDI DEVELOPERS · BHIWANDI, ThaneP51700047739· filed Dec 2024 → now Sept 2026· 84.8% built
- MANRAJ VIEW1 mo overdueEkta Developers · Kurla, Mumbai SuburbanP51800011821· filed Jun 2021 → now Sept 2026· 40.9% built
- OM MANGALAM CHAITANYA1 mo overdueSHRI ASSOCIATES · Haveli, PuneP52100031241· 81.8% built
- MAYFAIR VIRAR GARDENS BUILDING NO 23, 24 and 251 mo overdueMAYFAIR HOUSING · Virar West, PalgharP99000028348· 95% built
- BANDRA BOON CHS LTD1 mo overdueMASS JAKS ASSOCIATE VENTURES · BANDRA WEST, Mumbai SuburbanP51800030090· filed Dec 2024 → now Sept 2026· 74.6% built
- Dwarkadhish Residency1 mo overdueAshish Mohanrao Jirapure · Sai Nagar, AmravatiP50300046667· 81.8% built
- ROMELL ORBIS1 mo overdueROMELL PROPERTIES PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800023625· filed Dec 2024 → now Sept 2026· 90.7% built
- Vedant Residency1 mo overdueATHARV BUILDERS AND DEVELOPERS · MANGALWAR PETH, SataraP52700026542· 90.9% built
- YASHO NANDANVAN CO-OPERATIVE HOUSING SOCIETY LTD.1 mo overdueKEDAR BUILDCON PRIVATE LIMITED · OLD PANVEL, RaigarhP52000051284· filed Mar 2026 → now Sept 2026· 81.8% built
- Celestial City Phase II Building I, J, K1 mo overdueRAMA SYNERGY SPACES · Haveli, PuneP52100028977· filed Jun 2024 → now Sept 2026· 99.9% built
- ANANDVANN PHASE II1 mo overdueANAND KHATTAR · GONDE PHATA, NashikP51600023766· filed Dec 2024 → now Sept 2026· 19.5% built
- VRUNDAVAN PLAZA1 mo overdueVRUNDAVAN BUILDCON · Infront of Lokmanya Hospital, DhuleP49800011285· filed Aug 2020 → now Sept 2026· 90.9% built
- Sai Aura1 mo overdueWJV LANDMARKS LLP · Pimple Saudagar, PuneP52100051930· filed Mar 2026 → now Sept 2026· 78.2% built
- Metropolis Bayside1 mo overdueANANT SQUARE · Kasarvadavli, ThaneP51700046653· filed May 2026 → now Sept 2026· 86.4% built
- CITY ONE SKYVE1 mo overdueSHREE SAI CAPITAL · Haveli, PuneP52100033011· filed Dec 2025 → now Sept 2026· 93.5% built· 2 complaints
- ARUNALI1 mo overdueBadhekar Properties · Haveli, PuneP52100030309· filed Jun 2025 → now Sept 2026· 81.8% built
- ROMELL MYRA1 mo overdueROMELL PROPERTIES PRIVATE LIMITED · CTS 382, Mumbai SuburbanP51800023520· filed Dec 2024 → now Sept 2026· 0.8% built
- Venkateshwara Landmark1 mo overdueVenkateshwara Builders and Developers · Apte Nagar, KolhapurP53000033376· filed Jun 2023 → now Sept 2026· 90.9% built
- DivyaJal1 mo overdueDivyaraj Properties LLP · Navapur Road, PalgharP99000019490· filed Sept 2021 → now Sept 2026· 70% built
- AARADHANA RESIDENCY - B1 mo overdueA C JAIN BUILDERS AND DEVELOPERS LLP · OPP GOPAL NAGAR, NashikP51600025163· filed Dec 2022 → now Sept 2026· 81.8% built
- Bhaveshwar Heights1 mo overdueBhaveshwar Heights · Borivali, Mumbai SuburbanP51800052429· filed Jun 2026 → now Sept 2026· 81.8% built
- Shreeji Plaza Wing A1 mo overdueSIDDHARTH ENTERPRISES · MALAD WEST, Mumbai SuburbanP51800007051· filed Jun 2023 → now Sept 2026· 90.9% built· 6 complaints
- DREAMS HEIGHTS BUILDING NO- I1 mo overdueLODHA BUILDERS AND DEVELOPERS · NAIGAON, PalgharP99000009825· filed Dec 2019 → now Sept 2026· 87.3% built
- Kohinoor Eden Ph 21 mo overdueKGI REALTY PRIVATE LIMITED · Kalyan East, ThaneP51700034683· 79.1% built
- VALENCIA RIVERSIDE APARTMENT1 mo overdueVINAYAKA BUILDERS · Gangapur Road, NashikP51600034969· filed Mar 2026 → now Sept 2026· 86.8% built
- Shreeji Plaza Wing B1 mo overdueSIDDHARTH ENTERPRISES · BORIVALI, Mumbai SuburbanP51800011168· filed Jun 2025 → now Sept 2026· 90.5% built· 1 complaint
- SAI RAJWADA 211 mo overdueAICD INFRAVENTURE · AMBAZARI, NagpurP50500050900· filed Sept 2024 → now Sept 2026· 81.8% built
- Siddhivinayak-Laxmi1 mo overdueBalaji Associates · Krushnali Vasahat, SangliP53100055749· 64.1% built
- YAMUNA MAHARANI HEIGHTS1 mo overdueK B ASSOCIATES · Borivali, Mumbai SuburbanP51800028829· filed Sept 2024 → now Sept 2026· 52.3% built· 2 complaints
- Shree Hari Krupa1 mo overdueShree Hari Krupa · Borivali, Mumbai SuburbanP51800055568· filed Dec 2025 → now Sept 2026· 67.3% built
- Laizer Elegance1 mo overdueLaizer Elegance · Kurla, Mumbai SuburbanP51800029739· 9.1% built
- Sahakar Revanta1 mo overdueSAHAKAR BUILDERS & DEVELOPERS · Borivali, Mumbai SuburbanP51800051407· 72.7% built
- ARIHANT CLAN AALISHAN PHASE I1 mo overdueARIHANT VATIKA REALTY PRIVATE LIMITED · Panvel, RaigarhP52000006391· filed Mar 2025 → now Sept 2026· 95.1% built· 14 complaints
- Trinity Oasis1 mo overdueHarsh Tirupati Developers LLP · Naigaon East, PalgharP99000049405· 49.6% built
- Krishna Kamal1 mo overdueVakratund Reality · Sadashiv Peth, PuneP52100032848· filed Dec 2024 → now Sept 2026· 85.9% built
- MAJESTIQUE LANDMARK1 mo overdueORNATE PROPERTIES · MEHRUN SHIVAR, JalgaonP49900076967· 90.9% built
- GULRAJ PARADISE1 mo overdueM/S RELIABLE CONSTRUCTION · Kurla, Mumbai SuburbanP51800004371· filed Jun 2021 → now Sept 2026· 52.1% built· 22 complaints
- Majestic Planet1 mo overdue365DAYS CONSTRUCTION LLP · Sector 20, RaigarhP52000028719· 94.8% built
- Shreejis Gujral Arcade1 mo overdueSHREEJI LIFE SPACE · Dwarka, Nashik, NashikP51600034337· filed Mar 2026 → now Sept 2026· 99.5% built
- Kohinoor Eden1 mo overdueKGI REALTY PRIVATE LIMITED · Kalyan East, ThaneP51700030888· filed Dec 2025 → now Sept 2026· 90.9% built· 3 complaints
- PENTAGON BUSINESS HUB1 mo overdueCOSMIC INFRASTRUCTURE · Haveli, PuneP52100034525· filed Apr 2024 → now Sept 2026· 89.5% built
- OM PRIYADARSHANI1 mo overdueAAKRUTI ENTERPRISES · GHATKOPAR EAST, Mumbai SuburbanP51800052127· 88.2% built
- ROYALE1 mo overdueKHOKER SYNERGY DEVELOPERS · Andheri, Mumbai SuburbanP51800006143· filed Jul 2023 → now Sept 2026· 81.8% built· 3 complaints
- Leela Kutir1 mo overdueINSPIRA REALTY LLP · Nakshatrawadi, AurangabadP51500047125· 78.1% built
- Shikhhar1 mo overdueMAHAVIR LAND DEVELOPER · Borivali, Mumbai SuburbanP51800051096· 90.9% built
- Seva Smruti1 mo overdueNeelpadma Associates · Ayre, ThaneP51700045235· filed May 2024 → now Sept 2026· 72.7% built
- GANGA HEIGHTS1 mo overdueSHRI RAM DEVELOPERS · Pushpak New, RaigarhP52000023576· filed Oct 2023 → now Sept 2026· 72.7% built
- ANUPAM VILLA CHSL1 mo overdueM E INFRAPROJECTS PVT LTD · Kurla, Mumbai SuburbanP51800011219· filed Dec 2019 → now Sept 2026· 99.5% built
- SADGURU KRUPA II PHASE1 mo overdueCHIRAG ENTERPRISES · VARAP, ThaneP51700023944· filed May 2024 → now Oct 2026· 90.9% built
- Anand Homes- Phase 21 mo overdueM/s. MORYA GROUP · Behind Ganesh Vidya Mandir, ThaneP51700053225· filed Jun 2026 → now Oct 2026· 81.8% built
- SHREERANG KUTIR1 mo overdueSHREE PRABHA CONSTRUCTION · AYODHYA NAGARI, DOMBIVLI (EAST), ThaneP51700052997· filed Jun 2026 → now Oct 2026· 81.4% built
- SHANTAI CLASSIC1 mo overdueSHANTAI GROUP · Haveli, PuneP52100023007· filed Dec 2024 → now Oct 2026· 70.8% built
- MAHAVIR RESIDENCY1 mo overdueSHREE SALASAR REALTY · ADARSH PARK, ThaneP51700012556· filed Dec 2021 → now Oct 2026· 72.7% built
- VRAJ SAMARTH1 mo overdueDHAIRYA DEVELOPERS · INDIRA NAGAR, NashikP51600048496· 81.8% built
- Gursahani Twin Tower1 mo overdueShree Hinglajmata Constructions · N4 Cidco, AurangabadP51500048239· filed Oct 2024 → now Oct 2026· 90.9% built
- Solitaire Business Hub Baner - II1 mo overduePure Landmarks LLP · Baner, PuneP52100048718· filed Mar 2026 → now Oct 2026· 81.8% built
- VATIKA SUDARSAN1 mo overdueVATIKA SUDARSAN · Andheri, Mumbai SuburbanP51800056335· filed Jun 2026 → now Oct 2026· 81.8% built
- Paradise - B2 and B31 mo overdueKEVIN PROPERTIES · Haveli, PuneP52100049914· filed Jun 2026 → now Oct 2026· 79.5% built· 1 complaint
- SANMUKH SUNSHINE1 mo overdueSANMUKH SUNSHINE · Palghar, PalgharP99000013607· filed Sept 2020 → now Oct 2026· 34.5% built
- GSA GRANDEUR1 mo overdueG S A CONSTRUCTIONS · -, Mumbai CityP51900009097· filed Jun 2021 → now Oct 2026· 90.9% built· 3 complaints
- Mango Holiday Village Guhagar Bungalow No 1091 mo overdueSamir Shrinivas Kale · Kirtanwadi, RatnagiriP52800066569· 63.6% built
- Sai Platinum Residency1 mo overdueMM Landmark Realty LLP · Kalher, ThaneP51700047437· filed Dec 2024 → now Oct 2026· 81.8% built
- VILE PARLE MAMATA CHSL1 mo overdueDHRUV INFRASTRUCTURE · VILE PARLE EAST, Mumbai SuburbanP51800066486· 63.6% built
- VAISHNAVI HERITAGE1 mo overdueVAISHNAVI INFRA · KATHORA NAKA, AmravatiP50300049656· 27.3% built· 1 complaint
- AKASH CHSL1 mo overdueAKASH CHSL · Borivali, Mumbai SuburbanP51800077950· filed Jun 2026 → now Oct 2026· 48.2% built
- SHRI ASHTAVINAYAK PARK1 mo overdueAJAY BUILDERS AND ASSOCIATES DAUND · DAUND, PuneP52100048366· 78.2% built
- SHIV KRUPA0 mo overdueSHIVAAY REALTY · Gut 184/A , Umroli Village, PalgharP99000021088· filed Nov 2022 → now Oct 2026· 80.5% built
- Prime Avenue0 mo overdueM/s Prasad Developers · Haveli, PuneP52100047879· filed Jun 2025 → now Oct 2026· 81.8% built
- PRISMA HOMES0 mo overduePrisma Realty Pvt Ltd · Haveli, PuneP52100046647· filed Jun 2025 → now Oct 2026· 75.5% built
- RAM KANTA APARTMENTS0 mo overduePHADTARE BUILDCON · Haveli, PuneP52100048674· filed Jun 2025 → now Oct 2026· 62.3% built
- SHREE PRADYUMNA CO. OP. HSG. SOC. LTD.0 mo overdueJOSHI AND YASH REALTORS LLP · Charai, ThaneP51700050336· filed Jun 2025 → now Oct 2026· 52.7% built
- Balaji Avvante - Building No. 11 and 120 mo overdueVishesh Greenscape LLP · Vakadi , Panvel, RaigarhP52000047141· filed Dec 2025 → now Oct 2026· 84.3% built· 2 complaints
- MARATHON MILLENNIUM 20 mo overdueTERRAPOLIS ASSETS PVT LTD · Kurla, Mumbai SuburbanP51800021203· filed Jun 2026 → now Oct 2026· 27.9% built
- Centropolis0 mo overdueSkywards Ashtika Lifestyle · Pune City, PuneP52100018529· filed Sept 2020 → now Oct 2026· 65.9% built· 2 complaints
- SHREEJI ICON0 mo overdueShreeji Lifespaces Group · Ulwe, RaigarhP52000078215· 90.9% built
- RUTURAJ VASTUSHILP PHASE II A B C WINGS0 mo overdueRUTURAJ VASTUSHILP · Vasai, PalgharP99000008517· filed Jun 2021 → now Oct 2026· 80% built
- GOODWILL DYNASTY0 mo overdueGOODWILL DYNASTY · Panvel, RaigarhP52000033729· filed Dec 2023 → now Oct 2026· 90.9% built
- Kshitij Apartment0 mo overdueSiddhhidata Developer · Chinchwad, PuneP52100076699· filed Jun 2026 → now Oct 2026· 77.7% built
- AUSTIN ONE0 mo overdueAUSTIN REAL INFRA LLP · Haveli, PuneP52100029297· filed Dec 2025 → now Oct 2026· 64.4% built· 1 complaint
- TULSHIRAM HEIGHTS0 mo overdueMS RAM LAXMAN DEVELOPERS · ULWE, RaigarhP52000080181· filed Mar 2026 → now Oct 2026· 80.3% built
- Ghodawat Skystar LLP0 mo overdueGhodawat Skystar LLP · Borivali, Mumbai SuburbanP51800032000· filed Dec 2025 → now Oct 2026· 64.1% built
- PEHLWAN PRATAP SINGH PLAZA0 mo overdueMODERN GROUP · Haveli, PuneP52100022797· filed Sept 2023 → now Oct 2026· 90.9% built
- COMMERZ 540 mo overdueSHREE VINAYAK REALITY PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800020069· filed Dec 2022 → now Oct 2026· 52.1% built
- PLATINUM VISTA0 mo overduePLATINUMCORP SKYTOWERS LLP · Andheri, Mumbai SuburbanP51800049496· filed Jun 2026 → now Oct 2026· 90.9% built
- Hallmark Savera0 mo overdueMohammed Ismail Abdul Latif Patel · Taloja Panchnand, RaigarhP52000046462· filed Jun 2026 → now Oct 2026· 80.3% built
- Green Meadows Phase 10 mo overdueNANDAN RAINBOW REALTIES LLP · Pachane, PuneP52100054816· filed Jun 2025 → now Oct 2026· 78.2% built
- Manek Regency0 mo overdueB. U. Bhandari Landmarks · Pune City, PuneP52100018550· filed Dec 2024 → now Oct 2026· 50% built
- BARCODE0 mo overdueRAMA VENTURES · Haveli, PuneP52100026713· filed Jun 2023 → now Oct 2026· 81.8% built
- Olina0 mo overdueS S PROJECTS · Haveli, PuneP52100049956· filed Dec 2025 → now Oct 2026· 88.2% built
- SHUBHAM ATHENA0 mo overdueSHUBHAM ATHENA · Kurla, Mumbai SuburbanP51800054167· filed Jun 2026 → now Oct 2026· 38.5% built
- BHOOMI ICON0 mo overdueFORNAX REALTY · Thane, ThaneP51700026412· filed Jun 2024 → now Oct 2026· 81.8% built
- Solaris 14th Floor0 mo overdueHubtown Limited · Andheri, Mumbai SuburbanP51800028276· filed Jun 2026 → now Oct 2026· 41.5% built
- Alfa Padma Vasant0 mo overdueZakiruddin Gaffar Sayyed · Kurla, Mumbai SuburbanP51800051797· filed Jun 2026 → now Oct 2026· 38.6% built
- FORESTIA WING A0 mo overdueSHAKUNTAL DEVELOPERS · DUDULGAON, PuneP52100051767· filed Jun 2026 → now Oct 2026· 82.7% built
- ORCHID HEIGHTS0 mo overdueNIMESH KIRTIKUMAR SHAH · Borivali, Mumbai SuburbanP51800029631· filed Jun 2024 → now Oct 2026· 90.9% built
- Pashmina Casa0 mo overduePashmina Buildcon Private Limited · Andheri, Mumbai SuburbanP51800047054· filed Jun 2026 → now Oct 2026· 81.7% built· 4 complaints
- NB CRYSTAL A PHASE II0 mo overdueNanasaheb Bhintade Spacess Pvt Ltd · Near Podar International School, PuneP52100052388· filed Jun 2026 → now Oct 2026· 46.4% built
- SAROVAR DARSHAN0 mo overdueSHRI KHATU CONSTRUCTION · Bhiwandi, ThaneP51700010720· filed Mar 2019 → now Oct 2026· 88.5% built
- W2.O BY SANDU DEVELOPERS0 mo overdueSandu Developers · Kurla, Mumbai SuburbanP51800027979· filed Jun 2026 → now Oct 2026· 55.9% built
- PLATINUM SQUARE0 mo overduePLATINUM PROMOTERS · Mulshi, PuneP52100046699· filed Jun 2026 → now Oct 2026· 63.2% built
- Ashapuri Vrundavan Phase I0 mo overdueAshapuri Developers · Mulshi, PuneP52100046393· filed Jun 2025 → now Oct 2026· 72.7% built
- SHUBHAM AURUM0 mo overdueSHUBHAM AURUM · Kurla, Mumbai SuburbanP51800054393· filed Jun 2026 → now Oct 2026· 38.5% built
- ZARION0 mo overdueAYG HOMES CONSTRUCTIONS PRIVATE LIMITED · Ward GNorth, Mumbai CityP51900031858· filed Jun 2026 → now Oct 2026· 99.5% built
- Welworth Purnam0 mo overdueGrow India Realcon LLP · Pune, PuneP52100030356· filed Dec 2025 → now Oct 2026· 81.4% built· 10 complaints
- UNICORN0 mo overdueSaroj Landmark Realty LLP · Andheri, Mumbai SuburbanP51800028365· filed Jun 2026 → now Oct 2026· 99.1% built· 4 complaints
- aashirwad garden building no.1 wing A0 mo overdueGajanan Anant Patil · Vasai-Virar City (M Corp), PalgharP99000013030· filed Dec 2018 → now Oct 2026· 47.3% built
- MAZAGON DOCK SWAPNAPURTI CO-OP HSG SOC LTD0 mo overdueMAZAGON DOCK SWAPNAPURTI CO-OP HSG SOC LTD · NEW PANVEL WEST, RaigarhP52000020663· filed Nov 2023 → now Oct 2026· 40.5% built
- LARKINS NEST0 mo overduePRIDE PROPERTY DEVELOPERS · VILLAGE WADAVALI, ThaneP51700046980· filed Dec 2025 → now Oct 2026· 80.5% built
- JYOTI COMPLEX0 mo overdueMANOJ KUMAR SINGH · PANVEL, RaigarhP52000033382· filed Jun 2023 → now Oct 2026· 76.8% built
- SKY VILLAS0 mo overdueMALHAR DEVELOPERS · Nr Tanishk Pulp, PuneP52100051750· filed Jun 2026 → now Oct 2026· 90.9% built
- PARTH SKYONE0 mo overdueParth Parikh · MIDC, ThaneP51700015994· filed Dec 2023 → now Oct 2026· 70% built
- Anshul Ela E Building0 mo overdueM/s Anshul Rutuja Promoters and Builders LLP · Village Moshi, PuneP52100028177· 90.9% built· 1 complaint
- AUDUMBER FLOWER VALLEY0 mo overdueAUDUMBER SUPERSTRUCTURES · JUVELI, ThaneP51700032044· filed Jun 2025 → now Oct 2026· 89% built
- APEX GREEN WOOD0 mo overdueAPEX INFRATEC · Borivali, Mumbai SuburbanP51800047381· filed Jun 2026 → now Oct 2026· 72.7% built
- SAI SAVLI0 mo overdueDEEPAK BALKRUSHNA REPALE · Junnar, PuneP52100027937· filed Jun 2024 → now Oct 2026· 30.3% built
- KASTURI PALAZA0 mo overdueARFA CONSTRUCTION · TITWALA, ThaneP51700034954· filed Mar 2024 → now Oct 2026· 57.3% built
- SPARKLE Phase II0 mo overdueSKYRISE VENTURES LLP · Haveli, PuneP52100055140· filed Jun 2026 → now Oct 2026· 45.5% built
- SIGNATURE ELANZA0 mo overdueJAYRAJ BUILDCON PVT LTD · ULWE, RaigarhP52000025121· filed Dec 2024 → now Oct 2026· 90.9% built
- PANNA0 mo overdueNABAR ASSOCIATES · Haveli, PuneP52100045604· filed Jun 2024 → now Oct 2026· 81.8% built
- Ruparel Livia0 mo overdueShree Siddhivinayak Classic Construction Private Limited · Kurla, Mumbai SuburbanP51800026450· filed Jun 2024 → now Oct 2026· 67.7% built· 10 complaints
- MAHINDRA ALCOVE WING A AND C0 mo overdueMahindra Lifespace Developers limited · Kurla, Mumbai SuburbanP51800033573· filed Jun 2026 → now Oct 2026· 13.2% built
- SHAVIRA RESIDENCY0 mo overdueSHAVIRA DEVELOPERS LLP · Pune City, PuneP52100046402· filed Dec 2025 → now Oct 2026· 64.7% built
- ASHTAVINAYAK APARTMENTS0 mo overdueSHIV SHRUTI DEVELOPERS LLP · Andheri, Mumbai SuburbanP51800049920· filed Dec 2025 → now Oct 2026· 77.7% built
- SHREE MAHALAKSHMI RESIDENCY0 mo overdueSHREE MAHALAKSHMI CONSTRUCTIONS · Mumbai City, Mumbai CityP51900045601· filed Jun 2025 → now Oct 2026· 94.5% built
- SNEH SERENE0 mo overdueSNEH BUILDCON · SHIVAJI NAGAR & GAONDEVI VILLAGE, DOMBIVLI WEST, ThaneP51700030955· filed Jun 2025 → now Oct 2026· 87.5% built
- KUBER VILLA0 mo overdueKUBER VILLA · Andheri, Mumbai SuburbanP51800054808· filed Jun 2026 → now Oct 2026· 81.8% built
- INDRAYANI RIVERVIEW RESIDENCY0 mo overdueSHREENATH DEVELOPERS · DUDULGAON, PuneP52100051634· filed Dec 2024 → now Oct 2026· 80.5% built
- 24K Sereno Building E0 mo overdueNOW Realty Promoters and Builders Private Limited · Haveli, PuneP52100024374· filed Jun 2025 → now Oct 2026· 84.5% built· 1 complaint
- KJ TOWER0 mo overdueKALYAN JAGANNATH JADHAV · Haveli, PuneP52100008908· filed Mar 2024 → now Oct 2026· 96.5% built· 3 complaints
- MARIGOLD AANGAN0 mo overdueMARIGOLD CONSTRUCTIONS · Kurla, Mumbai SuburbanP51800029006· filed Mar 2024 → now Oct 2026· 81.8% built· 1 complaint
- TULSI CHAMBERS0 mo overdueSURANA CONSTRUCTION (CHEMBUR ) · Kurla, Mumbai SuburbanP51800012437· filed Jun 2021 → now Oct 2026· 90% built· 15 complaints
- Eakadanta Sankul Phase- III0 mo overdueEAKADANTA REALTORS · Kondale, RaigarhP52000004372· filed Jun 2026 → now Oct 2026· 3% built
- Al Marjaan0 mo overdueBriskband Associates · Haveli, PuneP52100019898· filed Dec 2024 → now Oct 2026· 50.9% built· 9 complaints
- MAVERICK MOOLDEEP0 mo overdueJAI SUN MAVERICK REALTORS · Kurla, Mumbai SuburbanP51800003963· filed Dec 2022 → now Oct 2026· 83.2% built· 2 complaints
- KSHITIJ EMINENCE0 mo overdueKSHITIJ DEVELOPERS · Kurla, Mumbai SuburbanP51800028688· filed Jun 2026 → now Oct 2026· 99.5% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.