RERA projects past their possession deadline
12,128 MahaRERA-registered projects are past the possession date currently on file and still report under 100% construction progress. Both figures are the promoter's own disclosure to the regulator.
Page 59 of 61
- SARVODAY SQUARE PHASE 3 BLDG NO 14 mo overdueSHREE SQUAREFEET ENTERPRISES LLP · Ambarnath, ThaneP51700027546· 81.8% built
- OLIVE HOMES - 24 mo overdueAAKAR REALTIES · Chovisawadi, PuneP52100051060· 79.1% built
- PARAS ENCLAVE4 mo overdueParas Infrastructure · LOTE, RatnagiriP52800049063· 67.7% built
- A.R VINTAGE4 mo overdueA.R ASSOCIATES · Mumbai City, Mumbai CityP51900007503· filed May 2022 → now Jun 2026· 81.8% built
- LOVE SPRING4 mo overdueAPEX ASSOCIATES · Haveli, PuneP52100020368· filed Dec 2023 → now Jun 2026· 80.9% built
- NIVETAM APARTMENT4 mo overdueSHREE MANGALMURTI ENTERPRISES · NANDADE, PalgharP99000050551· filed Jun 2025 → now Jun 2026· 81.8% built
- Majestique Towers East Phase 44 mo overdueM/s. Sharad Shree Enterprises, Sachin Date, Jayshree Date · Haveli, PuneP52100028813· 59.5% built· 1 complaint
- TATHASTU PHASE-I4 mo overdueM/s Shree Umiya Buildcon · SPINE ROAD PRADHIKARAN MOSHI, PuneP52100055321· filed Dec 2025 → now Jun 2026· 71.4% built
- PANT NAGAR SARASWATI CHSL4 mo overdueKYRAA INFRA PROJECTS · GHATKOPAR, Mumbai SuburbanP51800027377· 90.9% built· 1 complaint
- SARIKA4 mo overdueM/s ANAND CONSTRUCTIONS · Chinchwad, PuneP52100053103· 97.9% built
- SELENIA4 mo overdueRIVER EDGE CONSTRUCTION · Haveli, PuneP52100030253· 60.9% built
- Belmont Celosia4 mo overdueBelmont Properties · DhanoriP52100054248· 80.9% built
- Gayatri Heights4 mo overdueGayatri Properties · Andheri, Mumbai SuburbanP51800049323· 90.2% built
- NICE GARDEN 14 mo overdueABHA CONSTRUCTIONS · SHILL, ThaneP51700026058· 81.8% built
- Acons Prive4 mo overdueAkshay Gulati · Vidya Nagar, RaigarhP52000030437· filed Dec 2025 → now Jun 2026· 76.4% built
- BUNIYAD4 mo overdueRANADE REALTORS LLP · Karve Nagar, PuneP52100051468· 72.7% built
- Sneha Avenue4 mo overdueNandu Antaram Rajput · Mulshi, PuneP52100049963· filed Dec 2025 → now Jun 2026· 84.5% built
- BLOSSOM RESIDENCY4 mo overdueHF REALTY · Andheri, Mumbai SuburbanP51800028538· filed Jun 2024 → now Jun 2026· 90.8% built
- Devansh4 mo overduePlatinum Enterprise · New Panvel West, RaigarhP52000052652· filed Dec 2025 → now Jun 2026· 81.8% built
- GHATKOPAR AVENUE AARADHYA ONE EARTH I PHASE V4 mo overdueMAN REALTORS AND HOLDINGS PRIVATE LIMITED · Kurla, Mumbai SuburbanP51800027922· 63.6% built
- Redevelopment of Gomtibai Chawl4 mo overdueSILVERLINE ENTERPRISES · Ward E, Mumbai CityP51900029209· 67.3% built
- SHREE SAMARTH KRUPA PRASAD CO OPERATIVE HOUSING SOCIETY LIMITED4 mo overdueRAJLAXMI SAMARTH DEVELOPERS · AMBERNATH, ThaneP51700032714· filed Dec 2025 → now Jun 2026· 90.9% built
- 63 ELEGANCE4 mo overdueSIDDHARTH DEVELOPERS · Mumbai, Mumbai SuburbanP51800009011· filed Dec 2022 → now Jun 2026· 60.9% built
- YASHODHAN4 mo overdueRANADE REALTORS LLP · Kothrud, PuneP52100051695· 72.7% built
- PG AVENUE 74 mo overduePARMAR REALTORS · VIJAY NAGAR COLONY, PuneP52100049232· 81.8% built
- SAKET WORLD4 mo overdueAnand Associates · Near Chetana School, ThaneP51700024797· 11.3% built
- Mont Vert Kingstown Sector 1 Residential Wings4 mo overdueNiraj Kumar Associates Pvt Ltd · Mulshi, PuneP52100026366· filed Jun 2025 → now Jun 2026· 61.5% built· 4 complaints
- EMERALD VISTA4 mo overduePADMAVATI LANDMARKS · Haveli, PuneP52100076742· 80% built
- Eastern River Residency Wing F4 mo overdueHaveli, PuneP52100026039· filed Jun 2025 → now Jun 2026· 81.8% built
- MAHINDRA ALCOVE WING D AND E4 mo overdueMahindra Lifespace Developers limited · Kurla, Mumbai SuburbanP51800028352· 29.1% built
- NAVKSHITIJ CHS LTD4 mo overdueVishwam Realtors & Developers LLP · Haveli, PuneP52100028051· 81.8% built
- PANACHE AURA4 mo overdueSHREE BHAGWATI GROUP · DUDULGAON, PuneP52100052013· filed Dec 2025 → now Jun 2026· 81.8% built
- GARUDA SHATRUNJAY4 mo overdueMESSERS SHREE UMIYA BUILDERS & DEVELOPERS · Borivali, Mumbai SuburbanP51800011329· filed Dec 2024 → now Jun 2026· 53.2% built· 23 complaints
- Sarthak Aaradhana4 mo overdueSarthak Capital Housing · Haveli, PuneP52100050994· 90.9% built
- SUNRAJ SUPREME4 mo overdueVASHDEV BACHOMAL KHUSHALANI · DOMBIVILI EAST, ThaneP51700026868· 90.9% built
- OM RESIDENCY4 mo overdueOMKAR SHIRISH KANERKAR · DEVKAR PANAND, KolhapurP53000046636· 63.4% built
- addressOne - Phase 64 mo overduePeninsula Land Limited · Mawal, PuneP52100018788· filed Jun 2024 → now Jun 2026· 67.3% built· 34 complaints
- Krishna kamal Dhwani Creations4 mo overdueDhwani Reality Private Limited · Plot No-03,Kh No 42/1 of Mauza Gadga, Corporation House No610, 610/A,610/B and 610/C, City Survey No 152, Sheet No 18 of Mauza Gadga Giripeth, NagpurP50500078618· 63.5% built
- RUKHMINI HEIGHTS4 mo overdueSPRING SHELTERS · Pachora (M Cl), JalgaonP49900011699· 72.7% built
- Shree Prasad CHSL4 mo overdueLcon Infra LLP · Naupada, ThaneP51700055985· 63.8% built
- PRATIMA GOLD4 mo overdueSIDDHIVINAYAK HOMES · GHOTCAMP KOYNAVELE, RaigarhP52000028035· 90.9% built
- 204 BLUE PARADISE4 mo overdueBLUE PEARL GROUP · Baner, PuneP52100047531· filed Mar 2025 → now Jun 2026· 76.4% built
- Nida Amisha Heights4 mo overdueSAI KRUPA DEVELOPERS · MIRA BHAYANDAR, ThaneP51700009395· 64.5% built· 3 complaints
- Green Life4 mo overdueGreen Life · Mulshi, PuneP52100022404· 84.5% built
- Kashihomes4 mo overdueKashihomes · Khalapur, RaigarhP52000002764· 39.3% built· 7 complaints
- New Kirtikar Proposed4 mo overdueNew Kirtikar Proposed · Thane, ThaneP51700004963· 49.5% built
- Vayuputra Trident4 mo overdueVayuputra Trident · Andheri, Mumbai SuburbanP51800053280· 44.7% built
- KUMAR PRAJWAL4 mo overdueKEWAL REAL ESTATE DEVELOPERS PRIVATE LIMITED · Haveli, PuneP52100017868· filed Mar 2023 → now Jul 2026· 98.5% built
- SATYABHAMA TOWERS4 mo overdueGAURAV VISHVANATH AWATI · OPP. VIJAY HOTEL, AhmednagarP52200077725· 90.9% built
- ODC 14 mo overdueNVN Buildcon LLP · Goregaon West, Mumbai SuburbanP51800046544· filed Dec 2024 → now Jul 2026· 81.8% built
- Anora Residency4 mo overdueANORA RESIDENCY · BH. PARIKH COMMERCIAL CENTER, VIRAR WEST, PalgharP99000008234· 81.5% built
- Vishakha Co Op Hsg Society4 mo overdueVISHAKHA CHS LTD · Opposite Vasant Market, NashikP51600047219· 73.6% built
- Madhav Heights4 mo overdueKapse Developers · Vidhate Nagar, NashikP51600030695· 90.9% built
- Rudra Paradise4 mo overdueR-Stone Design and Build Private Limited · Andheri, Mumbai SuburbanP51800008159· filed Jan 2021 → now Jul 2026· 76.2% built
- PRERANA CHSL4 mo overduePRERANA CHSL · Andheri, Mumbai SuburbanP51800053537· 90.9% built
- PUSHTI ARCADE4 mo overduePUSHTI DEVELOPERS · Neat Swiss trafalgar pathardi phata, NashikP51600046887· 81.8% built
- GENESIS PLAZA3 mo overdueSATEJ REALITY · E Ward, Rajlaxmi Park, Ingale Nagar, KolhapurP53000045892· 61.5% built
- HORIZON INDUSTRIAL PARK3 mo overdueSAI INFRA INDUSTRIES · VILLAGE MASAT, SILVASSA, Dadra & Nagar HaveliP49600000102· filed Jun 2025 → now Jul 2026· 97.7% built
- URBAN Villa3 mo overdueYASH INFRA · Thane, ThaneP51700015488· filed Dec 2022 → now Jul 2026· 90.9% built
- Celia Phase 23 mo overdueCelia Phase 2 · Pune City, PuneP52100001303· filed Jan 2021 → now Jul 2026· 31.4% built· 4 complaints
- Shivratna3 mo overdueMr Rajan Vishram Palekar · Ravet, PuneP52100055201· filed Jun 2025 → now Jul 2026· 72.7% built
- BVM FLORA3 mo overdueSunny Naresh Nagdev · Tathawade, PuneP52100053235· filed Jul 2025 → now Jul 2026· 72.7% built
- Veer Galaxy3 mo overdueYash Infra · near vandana depo, ThaneP51700051438· filed Jul 2025 → now Jul 2026· 66.8% built
- GANESH DARSHAN3 mo overdueJ.V. REALTY · PENKARPADA MAHAJANWADI, ThaneP51700047281· 27.3% built
- Swastik Twin Tower3 mo overdueSwastik Builders · Haveli, PuneP52100030108· 90.9% built
- Mangeshi Ambar3 mo overdueMangesh Dashrath Gaikar · Gandhare, ThaneP51700047989· 0% built
- PADMAN RESIDENCY3 mo overdueHemant Parshuram Bhoir · Virar West, PalgharP99000048332· 69.1% built
- ASTROVA3 mo overdueKALPANA STERLING INFRA LLP · DRONAGIRI, RaigarhP52000022340· filed Jul 2024 → now Jul 2026· 81.8% built
- Hubtown Seasons - B Wing3 mo overdueJoynest Premises PrivateLimited · Kurla, Mumbai SuburbanP51800008552· filed Jul 2025 → now Jul 2026· 69.5% built
- Sandesh City Apartments 23 mo overdueSandesh Infrastructures Pvt Ltd · Jamtha, NagpurP50500010049· 66.6% built
- Mahalaxmi Heights3 mo overduePrashant Genu Pagar · Ojhar, NashikP51600053630· 81.8% built
- SILVER OAK3 mo overdueGANARAYA BUILDERS & DEVELOPERS · PRERNA CO-OP HOU SOC, NagpurP50500030531· 30.9% built
- Tranquility annexe c wing3 mo overdueK AND B ASSOCIATES · Manjri Stud Farm, PuneP52100030776· 90.9% built
- PRIMROSE3 mo overdueKaustubh Construction Private Limited · Borivali, Mumbai SuburbanP51800046761· 90.7% built
- Lodha Pune NIBM Project3 mo overdueLodha Developers Limited · Mohamadwadi, PuneP52100024215· filed Dec 2025 → now Jul 2026· 69.7% built· 2 complaints
- SAMRUDDHI IND. ESTATE3 mo overdueKRISHA BUILDTECH LLP · waliv, PalgharP99000030200· 81.8% built
- GLORIOUS TATHASTU3 mo overdueGlorious Buildcon · RAVET, PuneP52100054325· filed Dec 2025 → now Jul 2026· 90.9% built
- Shivalay3 mo overdueSUKHKARTA DEVELOPERS · Nishant Colony- Sangli, SangliP53100050271· filed Mar 2024 → now Jul 2026· 60.9% built
- Swastik Paradise3 mo overdueGHUDE ENTERPRISES · Chikhaloli, ThaneP51700056372· filed Dec 2025 → now Jul 2026· 81.5% built
- SAYBA ARCADIA3 mo overdueSTAR EMPIRE · Kurla West, Mumbai SuburbanP51800055257· filed Mar 2026 → now Jul 2026· 81.8% built
- SHREE SAI RESIDENCY3 mo overdueJ M DEVELOPERS · GODOLI, SataraP52700030258· filed Jul 2025 → now Jul 2026· 80.1% built· 1 complaint
- RAM SWAR-MED SPACE CENTRAL3 mo overdueGOPAL RAMKARAN MEHADIA · LOKMAT SQUARE, NagpurP50500034324· filed Mar 2026 → now Jul 2026· 77.7% built
- FLORA GALAXIA3 mo overdueIMAGE SPACE INCORPORATED · NEAR IMS SCHOO, JULE SOLAPUR, MAJAREWADI, SOLAPUR, SolapurP52600022162· 81.8% built
- RISHABRAJ ARADHANA3 mo overdueRISHABRAJ ARADHANA · Borivali, Mumbai SuburbanP51800053420· 61.4% built
- RAJ SILVERSTONE PHASE-23 mo overdueSKYSPACE BUILTEK · BELAVALI BADLAPUR WEST, ThaneP51700047261· filed Jul 2025 → now Jul 2026· 71.4% built
- DEM PHOENIX3 mo overdueDEM BUILDWELL · Borivali, Mumbai SuburbanP51800048376· filed Oct 2025 → now Jul 2026· 82.1% built
- SAHAKAR VISTA3 mo overdueSAHAKAR VISTA · Borivali, Mumbai SuburbanP51800053793· 67.3% built
- QUEENS VILLA3 mo overdueSHASHI KULDEEP OSTWAL · Palghar, PalgharP99000005836· 40.3% built
- DITYA PALACE3 mo overdueSHREE RAVEKAR BUILDERS & DEVELOPERS · SAI SEVASHARAM SAHAKARI GRUAHNIRMAN SANSTHA LTD, NagpurP50500050658· 30% built
- MANORAMA3 mo overduePANDIT JAVDEKAR ASSOCIATES · Haveli, PuneP52100049035· 81.8% built
- Hubtown Premiere Residences - Bel Air3 mo overdueHubtown Limited · Andheri, Mumbai SuburbanP51800005688· 58.4% built
- SHREEJI GREENS3 mo overdueDEEP LAXMI ASSOCIATES · BADLAPUR, ThaneP51700046293· 81.8% built
- Gada Elina3 mo overdueKubix Realties LLP · Haveli, PuneP52100054293· 33.6% built
- DEV HEIGHTS3 mo overdueDNYANDEV VASANT KALE · JALGAON, JalgaonP49900051528· 57.3% built
- Gharonda3 mo overdueParulekar Realty LLP · Haveli, PuneP52100053024· 61.4% built
- MADHAV VATIKA - VI3 mo overdueR M N H DEVELOPERS LLP · Navali Village, PalgharP99000035073· 81.8% built
- VEER KOHINOOR TOWER3 mo overdueVIRENDRA CONSTRUCTIONS · SONIYA NAGAR, SolapurP52600019433· filed Dec 2024 → now Jul 2026· 10.7% built
- RKL Durvankur Jaswand3 mo overdueLUNKAD VISHWA DEVELOPER · Alandi Devachi, PuneP52100045975· filed Apr 2025 → now Jul 2026· 72.7% built
- SHREEJI MEADOWS3 mo overdueDEEPLAXMI DEVELOPERS · BELAVLI, ThaneP51700031453· 81.8% built
- SAVALIYA RESIDENCY3 mo overdueShree Savaliya Housing LLP · Mira Road East, ThaneP51700027312· filed Jun 2025 → now Jul 2026· 75.9% built
- RYANS RESIDENCY3 mo overdueSANCHETI GAUTAM KACHARDAS · SHIOOR, AurangabadP51500017633· filed Aug 2024 → now Jul 2026· 87.9% built
- Hubtown Premiere Residences - Commercial3 mo overdueHubtown Limited · Andheri, Mumbai SuburbanP51800003575· 72.7% built· 2 complaints
- SAIRAJ AVENUE WING B3 mo overdueVIRENDRA ATMARAM SALUNKHE · BEHIND SHREE COMPLEX BADLAPUR WEST, ThaneP51700049787· filed May 2024 → now Jul 2026· 90.9% built
- AMRUT SAI PLAZA PH 23 mo overdueShree Amrut Sai Developer Pvt.Ltd · Silk Mill Colony, AurangabadP51500011307· filed Jul 2023 → now Jul 2026· 78.2% built
- Lodha Kandivali Project - Tower 53 mo overdueLodha Developers Limited · Borivali, Mumbai SuburbanP51800032605· filed Sept 2025 → now Jul 2026· 81.8% built
- ANAND VISTA3 mo overdueSHUBH ANAND REALTY · NEAR KESHAR GULAB MANGAL KARYALAY, AhmednagarP52200049796· 24.5% built
- PRITHVI ANAND KUBER COMPLEX3 mo overduePrithvi Anand Housing and Land Developers · Near St. John College, PalgharP99000025647· filed Jun 2025 → now Jul 2026· 88.6% built· 1 complaint
- New Jasmine Apartment Co Op Hsg Soc3 mo overdueR K Engineers & Developers · Gangapur Road, NashikP51600031621· 90.9% built
- AMBAJI RESIDENCY3 mo overdueVISHAL TUKARAM PATIL · NODE-PUSHPAK NAGAR, RaigarhP52000052731· filed May 2025 → now Jul 2026· 90.9% built
- VITHAI BUILDING A3 mo overdueSARITA CORPORATION · PALPENE, RatnagiriP52800021724· filed May 2022 → now Jul 2026· 81.8% built
- Vidyalankar CHSL3 mo overdueDESAI RESIDENCY PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800052458· filed Jul 2025 → now Jul 2026· 79.1% built
- REAL DREAM HOMES WING C AND D3 mo overdueREAL BUILDCON BUILDERS AND DEVELOPERS · Mawal, PuneP52100046267· 58.5% built
- SAI KRUPA VALLEY- PHASE 13 mo overdueSAI KRUPA DEVELOPERS · Neral, RaigarhP52000000739· filed Aug 2025 → now Aug 2026· 92.4% built
- ARIHANT HEIGHTS - JARIWALA AND KADUSKAR3 mo overdueDINESH JYOTICHAND JAIN · Ward E, Mumbai CityP51900016804· filed Oct 2018 → now Aug 2026· 98.2% built
- Jai Kamal3 mo overdueJai Kamal · Kurla, Mumbai SuburbanP51800052049· 64% built
- Anantsavitri Ratna Heights3 mo overdueKrisha Realty · Near Maxus Mall, ThaneP51700032014· filed Dec 2024 → now Aug 2026· 90.9% built
- Fortune DP Nano-2 Phase-13 mo overdueG B AND ASSOCIATES · Village Kachigam, DamanP49500000011· filed Mar 2023 → now Aug 2026· 89.1% built
- Vastu Avenue3 mo overdueApurva Builders & Developers · Dhruv Nagar, NashikP51600051304· filed Apr 2025 → now Aug 2026· 72.7% built
- VARAD HEIGHTS3 mo overdueToke And Dhake Associates · Vivekanand Nagar, JalgaonP49900031133· 90.9% built
- UNIQUE PARK3 mo overdueUNIQUEDEVELOPERS · MIRAJ ROAD, SolapurP52600022291· 0% built· 1 complaint
- 127 RAJ HOMES A WING3 mo overdueRAJ HOMES · Penkar Pada ( Mahajanwadi), ThaneP51700034776· filed Sept 2025 → now Aug 2026· 90.9% built· 1 complaint
- RAJYOG3 mo overdueBALAJI DEVELOPERS · NEAR SHAURAV HONDA, KolhapurP53000053204· 90.9% built
- THE KOLLAGE3 mo overdueZIRE RUSHI CONSTRUCTION · Andheri (East), Mumbai SuburbanP51800012084· filed Dec 2022 → now Aug 2026· 99.9% built· 4 complaints
- Brand one wadala - A Wing3 mo overdueAM Constructions · WADALA EASTP51900010447· filed Aug 2023 → now Aug 2026· 37.3% built· 14 complaints
- Brand one wadala - B Wing3 mo overdueAM Constructions · WADALA EASTP51900006138· filed Aug 2023 → now Aug 2026· 6.8% built· 2 complaints
- F.W.TOWER3 mo overdueCrystal Construction Corporation ·P51900009073· 21.8% built
- SHREE DATTA MEHER HERITAGE3 mo overdueSHREE ASSOCIATES INFRASTRUCTURE AND DEVELOPER · Pisadevi, AurangabadP51500002641· 42.7% built
- GURUKUNJ3 mo overdueRAJU PRALHADRAO KALBANDE · HOUSE NO 7, WARD NO 21 , MAHANANDA/VINOBA NAGAR SAMASAYA NIWARAN SOCIETY NAGPUR, MOUZA DIGHORI, NagpurP50500053869· 36.4% built
- Armaan Crystal Uptown3 mo overdueArmaan Housing LLP · Vasai East, PalgharP99000009714· 22.7% built· 1 complaint
- SAFALYA HEIGHTS3 mo overdueGAURAV VISHVANATH AWATI · WARD NO. 06, AhmednagarP52200078266· 90.9% built
- Swastik Paradise2 mo overdueNA ASSOCIATES · Ravet, PuneP52100077811· filed Mar 2026 → now Aug 2026· 72.7% built
- GIRIJA NMH CITY2 mo overdueNILKANTH HINDURAO MOHITE · GOLESHWAR, SataraP52700017764· 31.5% built
- TECHOPSGRAND2 mo overdueTechops Infrastructure Pvt. Ltd. · SAKKARDARA NAGPUR, NagpurP50500022373· filed Aug 2025 → now Aug 2026· 90.9% built
- The crown2 mo overdueElite Associates · Kurla, Mumbai SuburbanP51800048225· filed Apr 2026 → now Aug 2026· 86.8% built
- COCONUT COUNTY PHASE 22 mo overdueDSQUARE DEVELOPERS AND DEVELOPERS · Kshetrafal, SindhudurgP52900000962· 6.1% built
- Bhairav Enclave2 mo overdueLeena Estate Venture · Thane, ThaneP51700028700· 90.9% built
- Richmen Homes2 mo overdueGreen Edifice Infraventures Private Limited · Jafar Nagar, NagpurP50500022496· 51.8% built
- MAHALAXMI ACRAD2 mo overdueMAHALAXMI REALTORS · sawantwadi, SindhudurgP52900009862· 90.9% built· 1 complaint
- SHRI DWARAKA MAI COMPLEX2 mo overdueSUNIL KRISHNA NIRAVDEKAR · Sawantwadi (M Cl), SindhudurgP52900010099· 80.7% built
- UNIQUE AVENUE 2102 mo overdueMANGALMURTI LAND DEVELOPERS · NILEMORE, NALASOPARA WEST, PalgharP99000030889· 89% built
- Dnyantara Complex2 mo overdueS.P.S. Developers · Sadarbazar, SataraP52700031376· 78% built
- Aqua Life2 mo overdueLegacy Lifespaces LLP · Ravet, PuneP52100078125· 63.6% built
- Saraswati Niwas2 mo overdueSugee Twenty Three Developers LLP · Ward GNorth, Mumbai CityP51900048130· filed Apr 2026 → now Aug 2026· 81.8% built
- SHRADDHA EVOQUE2 mo overdueSHRADDHA LANDMARK PRIVATE LIMITED · Ram Rahim Udyog Nagar, Sadan wadi, Bhandup West, Mumbai SuburbanP51800008864· filed Dec 2023 → now Aug 2026· 92.4% built
- VILLA 792 mo overdueMehta Jaising Builders LLP · Andheri, Mumbai SuburbanP51800052707· filed Apr 2026 → now Aug 2026· 63.6% built
- YASH SHRINE2 mo overdueYASHWANT SAMPATRAJ GANDHI · Borivali, Mumbai SuburbanP51800027389· filed Apr 2026 → now Aug 2026· 9.1% built
- GLOBE BUSINESS SQUARE2 mo overdueGLOBE REALTY · Kalyan, ThaneP51700020338· filed Apr 2026 → now Aug 2026· 72.7% built
- INDIAN BANK STAFF CO-OPERATIVE HOUSING SOCIETY LTD2 mo overdueRAICHANDANI CONSTRUCTIONS PRIVATE LIMITED · Pune City, PuneP52100052515· filed Dec 2025 → now Aug 2026· 62.3% built
- NAV CHETNA2 mo overdueForishna Developers LLP · Andheri, Mumbai SuburbanP51800048061· filed Apr 2026 → now Aug 2026· 42.7% built
- Bluegrass Residences Tower II2 mo overdueSagitarius Ecospaces LLP · Pune City, PuneP52100024441· filed Apr 2026 → now Aug 2026· 81.8% built
- GANGA DHAM TOWER A..2 mo overdueLegends County Landmark Pvt Ltd · Pune City, PuneP52100000393· filed Apr 2026 → now Aug 2026· 69.7% built· 5 complaints
- CHAITANYA DHAM2 mo overdueRAPID DEVELOPERS · -, SataraP52700030902· filed Mar 2025 → now Aug 2026· 90.9% built
- KUKREJA GARDENS WING B2 mo overdueTOLARAM AND CO · Kurla, Mumbai SuburbanP51800021344· filed Apr 2026 → now Aug 2026· 32.5% built· 1 complaint
- PITTIE PARADISE2 mo overdueVICTORIA ENTERPRISES LIMITED · Mumbai City, Mumbai CityP51900033030· filed Apr 2026 → now Aug 2026· 68.7% built
- ECO CITY2 mo overdueNAMRATA PROMOTERS AND BUILDERS · Mawal, PuneP52100050644· filed Jan 2026 → now Aug 2026· 90.9% built
- A.N. HEIGHTS2 mo overdueH SQUARE BUILDERS · Borivali, Mumbai SuburbanP51800005739· filed Jun 2021 → now Aug 2026· 90.5% built· 2 complaints
- RAY2 mo overdueManish Builders & Developers · Borivali, Mumbai SuburbanP51800031492· filed Oct 2025 → now Aug 2026· 81.1% built· 1 complaint
- PROFITBAY - BT KAWADE ROAD2 mo overdueVENTURESPRO PROJECTS LLP · Haveli, PuneP52100033914· filed Aug 2023 → now Aug 2026· 71.7% built
- G G CAPITAL2 mo overdueGG BUILDERS AND DEVELOPERS · Jalochi, PuneP52100055383· 65.5% built
- RISING HILLS2 mo overdueUnknown · Haveli, PuneP52100033495· filed Mar 2025 → now Aug 2026· 90.9% built
- DNS ANUUTHAM2 mo overdueDNS CONSTRUCTIONS PRIVATE LIMITED · Sion WestP51900047962· filed Dec 2025 → now Aug 2026· 90.9% built
- TUNGABHADRA CO OP HSG SOC2 mo overdueUnknown · Haveli, PuneP52100046370· filed Apr 2025 → now Aug 2026· 81.8% built
- TruSpace Platina2 mo overdueAtharva Developments · Balewadi, PuneP52100078268· 68.2% built
- LE PALAZZO2 mo overdueSri Harsh Developers · Ward ABCD, Mumbai CityP51900012304· filed Apr 2019 → now Aug 2026· 85% built· 26 complaints
- KRISHNA VALLEY - PHASE 32 mo overduePRISHTI VENTURE PRIVATE LIMITED · THAKURWADI OPP INDIA STEEL FACTORY, RaigarhP52000031990· 71.8% built
- Prime Space2 mo overdueNath Estate · Dudulgaon, PuneP52100054765· filed Dec 2025 → now Aug 2026· 72.7% built
- Yamuna Business Park2 mo overdueMarvel Trinity Real Estate LLP · National Highway No. 6, AkolaP50100053326· 81.8% built
- Dwarka Adreno2 mo overdueM/S Randive Builders and Developers · Kolhapur (M Corp.), KolhapurP53000003557· filed Oct 2020 → now Aug 2026· 90.4% built
- AK-FLORENZA2 mo overdueANKLESH NATHUJI KHAIRE · BALLARPUR, ChandrapurP50900047503· filed Aug 2025 → now Aug 2026· 99.9% built
- OM RESIDENCY2 mo overdueSHIVSHAKTI DEVELOPERS · B WARD, KolhapurP53000055106· filed Dec 2025 → now Aug 2026· 90.9% built
- CHARKOP ASHRAY CO OP HOUSING SOCIETY LTD2 mo overdueCHARKOP ASHRAY CO OPERATIVE HOUSING SOCIETY LTD · CHARKOP, Mumbai SuburbanP51800027472· filed Dec 2024 → now Aug 2026· 81.8% built· 3 complaints
- The Waterfront2 mo overdueM/s Orbit Developers · Andheri, Mumbai SuburbanP51800050617· filed Aug 2025 → now Aug 2026· 60.5% built· 1 complaint
- Yogamrut2 mo overdueJay Ganesh Buildcon · Ambegaon Bk, PuneP52100033612· filed May 2024 → now Aug 2026· 81.8% built
- CHANDRA APARTMENT2 mo overdueDESHPANDE LANDMARK PRIVATE LIMITED · Kothrud, PuneP52100045316· filed May 2024 → now Aug 2026· 63.6% built
- UMA RESIDENCY, PHASE I2 mo overdueADARSH INFRA DEVELOPERS · NA, ThaneP51700011302· filed Jun 2021 → now Aug 2026· 48.8% built
- GREENFIELD 32 mo overdueL G DEVELOPERS AND BUILDERS · NEAR D MART, NagpurP50500047072· 86.4% built
- RASHMI PRIYA CO-OP HSG SOC LTD2 mo overdueSHREE RIDDHI SIDDHI INFRAPROJECT · NEAR MODEL SCHOOL, ThaneP51700050768· filed May 2025 → now Aug 2026· 81.8% built
- ANANTA2 mo overdueANANTA · Kurla, Mumbai SuburbanP51800053780· filed Aug 2025 → now Aug 2026· 60% built· 1 complaint
- SHUBH EVAN C1 WING2 mo overdueKALASH ENTERPRISES · Haveli, PuneP52100026420· filed Dec 2024 → now Aug 2026· 90.9% built
- DATTA PREM APARTMENT2 mo overduePREMCHAND NIMBAJI PATIL · JAIL ROAD NASHIK ROAD NASHIK, NashikP51600050475· filed Aug 2025 → now Aug 2026· 81.8% built
- Samarth Shivani Co-Operative Housing Society Limited2 mo overdueGURURAJ ENTERPRISES BUILDERS AND DEVELOPERS · Shirgaon, ThaneP51700052991· filed Aug 2025 → now Aug 2026· 70.9% built
- AISHWARYA COOPERATIVE HOUSING SOCIETY2 mo overdueROYAL ENTERPRISES · PRABHUALI, RaigarhP52000048300· filed Jul 2024 → now Aug 2026· 54.5% built
- ROYAL ALTEZZA2 mo overdueSHRI GANESH DEVELOPERS · Kurla, Mumbai SuburbanP51800030908· filed Aug 2025 → now Aug 2026· 94.1% built
- STAR LINE2 mo overdueDEEPAK KALYANJI CHANDE · NEAR TRACTOR HOUSE, NashikP51600013960· filed Sept 2019 → now Aug 2026· 49.1% built
- AVIGHNA KARAN WING C2 mo overdueAVIGHNA KARAN · Kalyan east, ThaneP51700030327· filed Dec 2024 → now Aug 2026· 72.7% built
- JAI SHREERAM PRASANNA CHSL2 mo overdueRIYAZ RAMZAN SHAH · Kurla, Mumbai SuburbanP51800011427· filed Jun 2022 → now Aug 2026· 72.6% built· 1 complaint
- SADANALINI RESIDENCY2 mo overdueAZARUDDIN PATEL · ULWE, RaigarhP52000028934· filed Dec 2023 → now Aug 2026· 90.9% built
- HILL SPRING2 mo overdueASHA INFRATECH · BHADVAD, ThaneP51700004477· filed Dec 2023 → now Aug 2026· 90.9% built· 4 complaints
- Luxuria2 mo overdueLuxuria · Mawal, PuneP52100078634· 44.1% built
- Ventures ALTA MONTE2 mo overdueVENTURES KUBER REALITY LLP · Andheri, Mumbai SuburbanP51800007794· filed Dec 2018 → now Sept 2026· 47.5% built
- Eshwari Apartment2 mo overdueVinayak Narayan Pophale · Gangapuri, SataraP52700030616· 90.9% built
- SHREE GANESH KRUPA RESIDENCY2 mo overdueNUTAN CONSTRUCTION CO · PALGHAR, PalgharP99000034691· 81.2% built
- MRUDULA RESIDENCY2 mo overdueSAMARTH ASSOCIATES · Haveli, PuneP52100022729· 72.7% built
- ALI TOWER2 mo overdueALAMDAR INFRASTRUCTURE PVT LTD · Ward ABCD, Mumbai CityP51900028809· filed May 2026 → now Sept 2026· 65% built
- Swami Datta Krupa2 mo overdueDinesh Laxman Sonawane · Kalyan, ThaneP51700077368· 27.3% built· 4 complaints
- Gandharv Nagari Building A3 Wing A, B2 mo overdueVinayak Pandharinath Bhongale · Gandharv Nagari, PuneP52100048889· filed Sept 2025 → now Sept 2026· 91.4% built
- Sai Om Residency2 mo overdueDream World Constructions LLP · Satara, SataraP52700033263· 29.1% built
- 34 Western Pavillion2 mo overdueBLUE PEARL PROMOTERS AND DEVELOPERS · Haveli, PuneP52100027431· filed Apr 2024 → now Sept 2026· 81.8% built
- Mohan Residency2 mo overdueDayma Builders and Developers · New Mhasoba Mandir, Nashik, NashikP51600052380· filed Dec 2025 → now Sept 2026· 81.8% built
- Mahaveer Heights2 mo overdueMahaveer Builders and Developers · Nashik, NashikP51600034067· filed Dec 2025 → now Sept 2026· 81.8% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.