Delayed projects in Palghar
662 MahaRERA-registered projects in Palghar are past the possession date on file and still under 100% built. Where the promoter has formally revised the date, the original is shown alongside so you can see what changed.
Page 1 of 4
- STAR BUILDERS AND DEVELOPERS8.6 yr overdueSTAR BUILDERS & DEVELOPERS · Vasai, PalgharP99000005302· 90.9% built
- KRISHN KUNJ COMPLEX8.6 yr overdueKARMA CONSTRUCTION CO · Vasai, PalgharP99000005676· 90.9% built
- SHREEMANT8.6 yr overdueCHANDRASHEKHAR SHANTARAM DHURI · Vasai, PalgharP99000010256· 81.4% built
- JANAVI PLAZA, JANAVI TOWER8.6 yr overdueJANAVI BUILDERS & DEVELOPERS · WALIV, PalgharP99000012849· 88% built
- TEJAL APARTMENT8.6 yr overdueSAIRAM TRADERS · Vasai, PalgharP99000013936· 81.8% built
- VIVA VEDANTA - BLDG NO. 28.6 yr overdueVIVA HOMES PRIVATE LIMITED · Vasai, PalgharP99000007076· 90.9% built
- NEW SKY STAR DEVELOPERS8.6 yr overduenew sky star developers · Vasai-Virar City (M Corp), PalgharP99000012093· 90.9% built
- POONAM PALASH8.6 yr overdueSUMIT JAWAHARLAL JAIN · Vasai, PalgharP99000013226· 81.5% built· 1 complaint
- MAJITHIA SWASTIK GALAXY8.6 yr overdueSWASTIK ASSOCIATES · Vasai, PalgharP99000013190· 89.1% built
- MIDAS ENCLAVE8.6 yr overdueMANJULA CONSTRUCTIONS · Vasai-Virar City (M Corp), PalgharP99000008488· 87.3% built
- IPSIT NAVODAY PHASE 18.6 yr overdueIPSIT ENTERPRISE · Palghar, PalgharP99000002933· 65.5% built· 1 complaint
- VINODINI8.6 yr overdueRUBY ENTERPRISES · Vasai, PalgharP99000008946· 90.9% built
- SNEH KUNJ APARTMENT8.6 yr overdueS.K.DEVELOPERS · Palghar, PalgharP99000002592· 89.1% built
- Prakash Kunj8.6 yr overdueJeevan Asha Enterprises · Vasai, PalgharP99000011618· 72.7% built
- Pareira Paradise8.6 yr overdueTrinity Developers · Vasai, PalgharP99000006451· 89.1% built
- VIVA AAKANKSHA COMPLEX PHASE 18.6 yr overdueVIVA AAKANKSHA BUILDERS & DEVELOPERS · Vasai-Virar City (M Corp), PalgharP99000007383· 77.5% built
- Sai Sawali A8.6 yr overdueP V REALTY · Vasai, PalgharP99000004922· 90.9% built
- RAJ HILLS PHASE II8.6 yr overdueSACHIN YAGNESHWAR PATIL · Vasai, PalgharP99000005109· 86.8% built
- Y. K. NAGAR NX8.6 yr overdueSHREE ASHTAVINAYAK BUILDERS · Vasai-Virar City (M Corp), PalgharP99000010747· 90% built
- CRYSTAL RESIDENCY8.6 yr overdueSAI CRYSTAL HOMES · Vasai, PalgharP99000007345· 84.5% built
- Relax Homes8.6 yr overdueMohd Sajid Abdul Salam Pasha · Ibhadpada, PalgharP99000007696· 75.9% built
- Leona Residency8.6 yr overdueErral Poshan Furtado · Vasai, PalgharP99000005389· 57.3% built
- Arron Complex Phase 18.6 yr overdueArron Builders and Developers · Palghar, PalgharP99000006677· 86.4% built
- TANIA PLANET8.6 yr overdueFRENTANIA REALTOUCH BUILDERS PRIVATE LIMITED · Vasai, PalgharP99000008261· 73.6% built
- VASTU SHILP DEVELOPERS8.6 yr overdueVASTU SHILP DEVELOPERS · Vasai-Virar City (M Corp), PalgharP99000009007· 89.8% built
- BHOOMI PRIDE8.6 yr overdueMEHTA DEVELOPERS · Vasai-Virar City (M Corp), PalgharP99000008331· 90.9% built
- Swastik Laxmi8.6 yr overdueSwastik Construction · Palghar, PalgharP99000009764· 90.9% built
- SIDDHIVINAYAK TOWER8.5 yr overdueSIDDHIVINAYAK DEVELOPERS · Vasai, PalgharP99000012579· 81.6% built
- SHUBHANGAN8.5 yr overdueS.H.ENTERPRISE · Vasai, PalgharP99000010435· 90.7% built
- Siddhivinayak Arcade Bldg48.4 yr overdueSIDDHIVINAYAK DEVELOPERS · Vasai, PalgharP99000010820· 80.5% built
- Hayaat Garden8.4 yr overdueM M Enterprises · Vasai, PalgharP99000006530· 81.8% built
- DIVYARAJ VALUEHOMES - BLDG C & D8.4 yr overdueDIVYARAJ REAL ESTATE SERVICES LLP · Palghar, PalgharP51800002045· 81.8% built
- Suman Vastu Apartment8.4 yr overdueFamid Himamudin Shaikh · Ibhadpada, PalgharP99000010050· 33.6% built
- PRANAV APARTMENT8.4 yr overdueAARYA DEVELOPERS · Palghar, PalgharP99000004490· 90.9% built
- M/s Rohan Associates8.4 yr overdueROHAN ASSOCIATES · Vasai-Virar City (M Corp), PalgharP99000013458· 81.8% built
- OASIS AND GENESIS8.4 yr overdueSEA CREST CONSTRUCTION · Mahim, PalgharP99000009868· 90.9% built
- AMRUT YOG8.4 yr overdueSAVITA BUILDERS AND DEVELOPERS · Vasai-Virar City (M Corp), PalgharP99000007065· 72.9% built
- SARGAM AVENUE8.4 yr overdueShantee Housing · Vasai, PalgharP99000001489· 90.9% built· 1 complaint
- Sunshine Palace8.4 yr overdueShantee Housing · Vasai, PalgharP99000000257· 90.9% built
- sunshine8.4 yr overduehigh seas properties · Vikramgad, PalgharP99000011218· 90.9% built
- SAI SHRADDHA ENCLAVE8.4 yr overdueS K DEVELOPERS · Palghar, PalgharP99000013487· 90.9% built
- SUNSHINE GREEN PARK PHASE I8.4 yr overdueSHantee Homes Realty LLP · Vasai, PalgharP99000001370· 90.9% built· 4 complaints
- Swastik Jayshree8.4 yr overdueSwastik Construction · Palghar, PalgharP99000007637· 84.1% built
- Angel Landmark8.4 yr overdueSHREE VIMALNATH INFRA · Vasai, PalgharP99000012799· 99.5% built
- Hayaat Centre8.4 yr overdueHayaat Enterprises · Vasai-Virar City (M Corp), PalgharP99000008584· 81.8% built
- UNITY GARDEN8.4 yr overdueUNITY LAND DEVELOPERS · Palghar, PalgharP99000007688· 51.4% built
- Sai Darshan Type C8.4 yr overdueDINESH SADANAND BARI · Dahanu (M Cl), PalgharP99000005978· 52.7% built
- RUSHABH INDUSTRIAL ESTATE8.4 yr overdueRUSHABH ENTERPRISES · Vasai-Virar City (M Corp), PalgharP99000009026· 61.8% built
- Nidhi Palace8.3 yr overdueBhagawati Construction · Palghar, PalgharP99000004975· 50% built
- Imperial Classic8.3 yr overdueStar Builders · Vasai, PalgharP99000000898· 50% built
- Astavinayak Apartment8.2 yr overdueM/s RAJ RIDDHI ASSOCIATES · Palghar, PalgharP99000013684· 40.5% built
- SHRIKRISHNA HERITAGE8.2 yr overdueSHRIKRISHNA VENTURES · Palghar, PalgharP99000009732· 48.2% built
- Braj Paradise8.2 yr overdueBraj Developer · Palghar, PalgharP99000006122· 61.8% built
- Kohinoor Apartment8.2 yr overduePATRICK FRANCIS ALMEIDA · Vasai, PalgharP99000008551· 90.9% built
- CRYSTAL PALLAZO8.2 yr overdueSAURABH CONSTRUCTION · Vasai, PalgharP99000009609· 90.9% built
- GLOBAL ARENA8.2 yr overdueDDPL GLOBAL INFRASTRUCTURE PVT. LTD. · Vasai, PalgharP99000006463· filed Mar 2018 → now May 2018· 90% built· 1 complaint
- SATU AURA8.2 yr overdueSATU REALTY · Palghar, PalgharP99000009278· 90.9% built
- BLISS8.1 yr overdueSEA CRESTS BUILDCON LLP · Palghar, PalgharP99000006419· 90.9% built
- KT Garden City - Phase III8.1 yr overdueM/s. Sainagar Development Corporation · Vasai, PalgharP99000003521· 82.4% built
- AADHARSHILA SAPPHIRE8.1 yr overdueAADHARSHILA CONSTRUCTION · Palghar, PalgharP99000006075· 63.2% built
- SHREE RAGHUVEER SAMARTH APARTMENT8.1 yr overdueVED SAMARTH · Vasai, PalgharP99000006023· 90.9% built
- SHUBHANGAN GREENS8.1 yr overdueSHREE SAI DEVELOPERS · Palghar, PalgharP99000003622· 79.1% built
- MOURYA DEVELOPER8.1 yr overdueMOURYA DEVELOPER · Vasai, PalgharP99000006396· 79.1% built
- LANDMARK TOWER8.1 yr overdueLAND MARK DEVELOPERS · Vasai, PalgharP99000011555· 82.7% built
- NRK ENTERPRISES8.1 yr overdueNRK ENTERPRISES · PALGHAR, PalgharP99000011951· 85.5% built
- KINJAL COMPLEX8.1 yr overdueKINJAL ENTERPRISES · Palghar, PalgharP99000009135· 90.9% built
- PRITHVI SRISHTI8.1 yr overduePRITHVI ANAND REALTY · Palghar, PalgharP99000009593· 47.7% built
- Datta Prayag Apartment8.1 yr overdueMilind Dattatraya Mavle · Dahanu (M Cl), PalgharP99000007660· 37.7% built
- RELIABLE ALEEN A,B,C WING8.1 yr overdueRELIABLE HOMES · Vasai-Virar City (M Corp), PalgharP99000010362· 89.1% built
- RME PLAZA8.1 yr overdueRME ASSOCIATES · Vasai, PalgharP99000005850· 84.5% built
- ROOP RAJAT PARK PHASE 18.1 yr overdueMAHAVIR ASSOCIATES · Palghar, PalgharP99000009521· 82.7% built
- HARI GANGA 28.1 yr overdueBHARAT CHINTAMANI PATIL · Vasai-Virar City (M Corp), PalgharP99000008327· 45.5% built
- PUSHPAM A8.1 yr overdueARHAM REALTORS · Vasai, PalgharP99000005979· 90.9% built
- SHANTI VISTA8.1 yr overdueSHAH REALTY AND INFRA · BOISAR, PalgharP99000010164· 90.9% built
- KASHI APARTMENTS8.1 yr overdueB M DEVELOPERS · Vasai, PalgharP99000011473· 75.3% built
- Greenwood Residency8.0 yr overdueGuruprabhu Builders and Developers · Vasai, PalgharP99000008823· 90.9% built
- RAJVIR ESTATE NO. 18.0 yr overdueRAJVIR REALTY · VEVOOR, PalgharP99000014513· 81.8% built
- Moreshwar Apartments8.0 yr overdueWHITE LOTUS REALTORS PRIVATE LIMITED · Near Vaghulsar Mandir, PalgharP99000008251· 90.9% built
- NINE REALTORS8.0 yr overdueNine Realtors · Vasai, PalgharP99000008995· 90.9% built
- Gomes Garden8.0 yr overdueJudith Builders & Devlopers · Vasai, PalgharP99000008786· 90% built
- BUILDING NO. 10 PEREIRA HOUSING COMPLEX8.0 yr overdueTHE ALPS DEVELOPERS · Vasai, PalgharP99000011259· 72.3% built
- PRITHVI SRUSHTI PHASE 17.9 yr overduePRITHVI ANAND REALTY · Palghar, PalgharP99000012951· 46.6% built
- SIGNATURE C - CREST7.9 yr overdueANS REALTY · Palghar, PalgharP99000008275· 90.9% built
- LAXMI COMPLEX7.9 yr overdueSHUBHLAXMI REALTORS · Palghar, PalgharP99000001371· filed Mar 2018 → now Sept 2018· 81.8% built
- VINAYRAJ REGENCY7.9 yr overdueSHUBH ASSOCIATES · Palghar, PalgharP99000007254· 88% built
- Kuber Kunj7.8 yr overdueMahalaxmi Realtors · Palghar, PalgharP99000009752· 50% built
- SUPREME POINT PHASE I7.7 yr overdueK K INFRASTRUCUTRE · Palghar, PalgharP99000002058· filed Apr 2018 → now Nov 2018· 90.9% built
- Sai Paradise7.7 yr overdueSai Paradise · Palghar, PalgharP99000010380· 47.4% built
- BLISS INDUSTRIAL ESTATE -027.7 yr overdueBLISS DEVELOPERS · Vasai, PalgharP99000004226· 34.5% built
- SHIV PARADISE7.7 yr overdueHIMANSHU SHAM TENDULKAR · saaki naka, PalgharP99000011602· 72.7% built
- Bafna Meadows Phase 17.7 yr overdueSuvidha Realtors · Palghar, PalgharP99000006123· 79.7% built
- Rani minnat enclave7.7 yr overdueAMKB BUILDER AND DEVELOPERS · Dahanu, PalgharP99000012845· 78.8% built· 4 complaints
- APEKSHA SHOPPING CENTRE7.6 yr overdueKOTHARI CONSTRUCTION CO · Vasai-Virar City (M Corp), PalgharP99000010073· filed Dec 2017 → now Dec 2018· 78.2% built
- Shadawal Impression Building C1 C27.6 yr overdueKailash Builders · Palghar, PalgharP99000008322· 74.1% built
- TULIP RESIDENCY7.6 yr overdueBRRIGHT REALTORS · Palghar, PalgharP99000002162· filed Mar 2018 → now Dec 2018· 90.9% built
- Mittal Enclave Bldg no 3 Wing CDE7.6 yr overdueSealink Construction Co. Pvt. Ltd. · Vasai, PalgharP99000008509· 90.9% built
- Laxmi Dhule Complex7.6 yr overdueDhule Construction Co · Vasai, PalgharP99000012699· 82% built
- SHREE BALAJI ENTERPRISES7.6 yr overdueSHREE BALAJI ENTERPRISES · Vasai-Virar City (M Corp), PalgharP99000013515· 65.5% built
- VISHAKA7.6 yr overdueKRISHA LIFESPACE DEVELOPERS · Palghar, PalgharP99000007992· 35.2% built
- PARADISE7.6 yr overdueSAFFRON DEVELOPERS · Vevoor, PalgharP99000010941· 90.9% built
- NEST LOTUS7.6 yr overdueNEST ENTERPRISES · Palghar, PalgharP99000010260· 58.2% built· 2 complaints
- INFINITI INDUSTRIAL ESTATE I7.6 yr overdueACETRON CONSTRUCTION LLP · Vasai-Virar City (M Corp), PalgharP99000002356· 32.1% built
- Ambrosia building 17.6 yr overduePawan Abhimanyu Singh · Palghar, PalgharP99000007608· 41.8% built
- AMAAN7.6 yr overdueKALBAY ABBAS SAYED RIZVI · Vasai, PalgharP99000014133· 76.4% built
- SEAGULL BLDG 37.6 yr overdueDANGE DEVELOPERS · Vasai, PalgharP99000007599· filed Dec 2017 → now Dec 2018· 78.1% built
- GOKUL DHAM7.6 yr overdueM/s. Sai Ashirwad Developers · Vasai, PalgharP99000010766· 81.8% built
- OCEAN PEARL7.6 yr overdueOCEAN DEVELOPERS · Palghar, PalgharP99000004132· 37.3% built
- EMANUEL BUILDING7.6 yr overdueD & M BUILDERS · Vasai, PalgharP99000008922· 90.9% built
- YASHWANT HEIGHTS7.6 yr overdueMANGALMURTI DEVELOPERS · Vasai, PalgharP99000004110· 90.9% built
- RELIABLE TOWNSHIP / RT- L TO O WING7.6 yr overdueRELIABLE REALTORS · Vasai, PalgharP99000003390· filed Dec 2017 → now Dec 2018· 81.8% built
- SANTAN ARCADE7.6 yr overdueMANUEL DIAGO ALPHUNSO · Vasai, PalgharP99000010892· filed Dec 2017 → now Dec 2018· 81.8% built
- Mittal Enclave Mittal Centre Shopping B-37.6 yr overdueSealink Construction Co. Pvt. Ltd. · Vasai, PalgharP99000005104· 72.7% built
- Sunshine Phase II7.6 yr overdueSTAR DEVELOPERS · Vasai, PalgharP99000003797· filed Dec 2017 → now Dec 2018· 63.6% built
- NEST RESIDENCY7.6 yr overdueTASHA NEST HOME MAKERS PVT LTD · Tembhi, PalgharP99000010898· 90.9% built· 1 complaint
- NINE STAR RESIDENCY KRITIKA7.6 yr overdueYOGESH BIDYE · MAKANE, PalgharP99000009956· 50.5% built
- RAJYOG ELANZAA7.6 yr overdueRAJYOG INFRA · Palghar, PalgharP99000011072· 10.9% built
- VASTUSRUSHTI NIRVANA7.6 yr overdueOrion Realtors · Palghar, PalgharP99000003358· 8.4% built
- Unnatti Anmol7.6 yr overdueUnnatti Infra · Palghar, PalgharP99000004567· 72.7% built
- Riddhi Siddhi Greens7.6 yr overdueRiddhi Siddhi Realtors · Palghar, PalgharP99000003664· 81.8% built
- RELIABLE TOWNSHIP /RT-C TO K WING7.6 yr overdueRELIABLE REALTORS · Vasai, PalgharP99000007052· filed Dec 2017 → now Dec 2018· 78.2% built
- Ambrosia building 27.6 yr overduePawan Abhimanyu Singh · Palghar, PalgharP99000006358· 40.5% built
- Nine Star Residency Revati7.6 yr overdueNINE LIFESPACE DEVELOPERS · Palghar, PalgharP99000007772· 60.9% built
- Ambrosia building 37.6 yr overduePawan Abhimanyu Singh · Palghar, PalgharP99000006660· 37.3% built· 1 complaint
- Mittal Enclave Mittal Centre Shopping B-17.6 yr overdueSealink Construction Co. Pvt. Ltd. · Vasai-Virar City (M Corp), PalgharP99000008632· 72.7% built
- VASTUSRUSHTI7.6 yr overdueVASTUSRUSHTI REALTORS LLP · Palghar, PalgharP99000005981· 8.4% built
- Emerald Sky7.6 yr overdueShalem Rojes Gonsalves · Vasai, PalgharP99000007524· 73.6% built
- Mahavir Kunj C7.6 yr overdueRajesh Realtors · Palghar, PalgharP99000013519· 90.9% built
- NINE STAR RESIDENCY PHALGUNI7.6 yr overdueKRISHA CONSTRUCTIONS · Palghar, PalgharP99000007286· 81.8% built
- Rudra Sai7.6 yr overdueRudra Sai Appartment · Palghar, PalgharP99000010012· 90.9% built
- FIA CONSTRUCTION COMPANY - FIA PRIDE7.6 yr overdueNIMISH LAXMICHAND PASAD · Palghar, PalgharP99000000701· 90.9% built
- Aadinath Complex Bldg No 1 and 27.6 yr overdueChamunda Developers · Palghar East, PalgharP99000012472· 90.9% built
- KONARK EMBESSY7.6 yr overdueUNIVERSAL REALTORS · Vasai, PalgharP99000006316· 88.6% built
- Sahakar Residency7.6 yr overdueSahakar Infracon Projects Private Limited · Vasai, PalgharP51700009131· filed Dec 2017 → now Dec 2018· 90.9% built
- RELIABLE TOWNSHIP / RT- A, B WING7.6 yr overdueRELIABLE REALTORS · Vasai-Virar City (M Corp), PalgharP99000012236· filed Dec 2017 → now Dec 2018· 81.8% built
- RAJHANS KSHITIJ IRIS WING E F G7.6 yr overduePRAGATI INFRASTRUCTURES · Vasai, PalgharP99000003532· 86.4% built
- NINE STAR RESIDENCY PURVA7.6 yr overdueSai Mudraa Construction · Palghar, PalgharP99000007206· 50% built
- VASAI ONE -BLDG 27.6 yr overdueVASAI ONE REALTY · Vasai, PalgharP99000008656· 90% built
- KONARK RESIDENCY7.6 yr overdueUNIVERSAL REALTORS · Vasai, PalgharP99000003440· 83% built
- SIGNATURE B - BLISS7.6 yr overdueANS REALTY · Palghar, PalgharP99000004350· 90.9% built
- RAJHANS KSHITIJ, ASPEN, WING C7.6 yr overdueAJMERA DEVELOPERS · Vasai, PalgharP99000006700· 90.9% built
- THE WOODS7.6 yr overdueVILEENA ALLEN GONSALVES · Vasai, PalgharP99000007560· 90.9% built
- BLUEBELL7.6 yr overdueNemichand Poonamchand Jain · Vasai, PalgharP99000011370· 81.8% built
- Happinest Boisar Phase III7.6 yr overdueMahindra Lifespace Developers limited · Palghar, PalgharP99000000106· 81.8% built· 1 complaint
- SOLITAIRE HIGHWAY7.6 yr overdueAAKAR REALTORS · VASAI, PalgharP99000012069· 81.8% built
- FIA DAFFODILS7.6 yr overdueNIMISH LAXMICHAND PASAD · Palghar, PalgharP99000001022· 81.8% built
- Mittal Enclave7.6 yr overdueSealink Construction Co. Pvt. Ltd. · Vasai-Virar City (M Corp), PalgharP99000012403· 90.9% built
- Imperial Residency7.6 yr overdueShree Ganesh Coporation · Vasai, PalgharP99000001975· 35.2% built
- Navpad Nidhi7.6 yr overdueNavpad Realtors · Palghar, PalgharP99000007326· 90.9% built
- Poonam Prime7.6 yr overduePrime Developers · Vasai, PalgharP99000006206· 81.8% built
- Atmaram Park7.6 yr overdueSuyash Developers · Vasai, PalgharP99000002606· 81.8% built
- Pratham residency7.6 yr overdueCreative Constructions · Tembhode, PalgharP99000009497· filed Sept 2018 → now Jan 2019· 81.8% built
- Golden Eye Phase III7.5 yr overdueKotak Sons · Palghar, PalgharP99000014416· 12.9% built
- Hayaat Green7.4 yr overdueM M Enterprises · Vasai, PalgharP99000003365· filed Mar 2018 → now Mar 2019· 90.9% built
- SANDEEP HEIGHTS7.4 yr overdueSB LIFESPACES PVT LTD · Vasai, PalgharP99000010491· filed Mar 2018 → now Mar 2019· 90.9% built· 1 complaint
- SAI REGENCY7.4 yr overdueSHREE GURUDATTA ENTERPRISES · Vasai, PalgharP99000014353· 56.4% built
- Solitaire II7.4 yr overdueShree Satya Sai Developers · Vasai, PalgharP99000003564· filed Mar 2018 → now Mar 2019· 95.5% built
- Suncity Complex7.4 yr overdueSWASTIK BUILDER AND DEVELOPERS · Palghar, PalgharP99000009723· 90.9% built
- NITYA DARSHAN7.4 yr overdueNemi Buildcon · PALGHAR, PalgharP99000014653· 36.4% built
- Sai Anand7.4 yr overdueSairam Corporation · Vasai, PalgharP99000005553· filed Mar 2018 → now Mar 2019· 90.9% built
- AGARWAL SOLITAIRE7.4 yr overdueAGARWAL BUILDERS · Vasai, PalgharP99000003833· 90.5% built· 1 complaint
- Riddhi Siddhi Park7.4 yr overdueRiddhi Siddhi Builders · Palghar, PalgharP99000012373· 90.9% built
- MIDAS GLORY7.4 yr overdueDHMP INFRA · Vasai, PalgharP99000006814· filed Mar 2018 → now Mar 2019· 54.5% built
- SPANISH RESIDENCY7.4 yr overdueSHANTEE REALTY AND LIFE SPACE · Vasai, PalgharP99000001765· 89.1% built· 3 complaints
- VAKRATUNDA7.4 yr overdueAMIT HARSHAVADAN AGASKAR · Palghar, PalgharP99000008078· 90.9% built
- Sky Avenue7.4 yr overdueShreeji Corporation · Vasai, PalgharP99000003755· filed Mar 2018 → now Mar 2019· 90.9% built
- VIVA KINGSTON CROWN7.4 yr overdueViva Mahalaxmi Associates · Vasai-Virar City (M Corp), PalgharP99000008460· 90.9% built
- Apex Wildernest7.4 yr overdueApex Creators · Vasai, PalgharP99000005939· filed Mar 2018 → now Mar 2019· 53.9% built
- KANTI NX7.4 yr overdueMAHAVIR REALTORS · Vasai, PalgharP99000005321· filed Mar 2018 → now Mar 2019· 90.9% built
- Hayaat Hill7.3 yr overdueM M Developers · Vasai-Virar City (M Corp), PalgharP99000012187· filed Mar 2018 → now Apr 2019· 81.8% built
- Hayaat Tower7.3 yr overdueSky Developers · Vasai, PalgharP99000003783· filed Mar 2018 → now Apr 2019· 81.8% built
- Sumit Greendale NX7.3 yr overdueSumit Pragati Shelters LLP · Palghar, PalgharP99000004678· filed Oct 2018 → now Apr 2019· 83.4% built
- STAR SHERATON7.2 yr overdueSTAR BUILDERS & DEVELOPERS · Vasai-Virar City (M Corp), PalgharP99000012499· filed May 2018 → now May 2019· 90.9% built
- GULMOHAR HERITAGE BUILDING NO 3 WING C AND D7.2 yr overdueVIVA SWASTIK HOMES · Vasai, PalgharP99000002070· filed Jun 2018 → now May 2019· 90.9% built
- Gundecha Woods Phase 17.2 yr overdueGundechaConstructionPvtLtd · Palghar, PalgharP99000003314· filed May 2018 → now May 2019· 89.1% built· 1 complaint
- CLEMENT REGENCY7.2 yr overdueCLEMENT REGENCY · Vasai, PalgharP99000009464· 54.5% built
- Nakshatra Greens7.1 yr overdueJSB Buildcon LLP · Vasai, PalgharP99000005051· filed Jun 2018 → now Jun 2019· 90.9% built· 1 complaint
- Sai Darshan7.1 yr overdueZenith Enterprises · Tembhode, PalgharP99000014724· 90.9% built
- SHREE SANDGURU BUILDERS AND DEVELOPERS7.1 yr overdueJAWAHAR MULCHAND BHEDA · VIRAR EAST, PalgharP99000012068· filed Jun 2018 → now Jun 2019· 90.9% built
- VBHC Greenwoods7.1 yr overdueVBHDC Bangalore Value Homes Private Limited · Palghar, PalgharP99000001539· filed Jun 2018 → now Jun 2019· 81.8% built· 3 complaints
- HEAVEN HILLS7.1 yr overdueXL REALTORZ · Palghar, PalgharP99000002974· filed Jun 2018 → now Jun 2019· 81.8% built· 2 complaints
- Regency Homes7.1 yr overdueWILSON V MANUEL GONSALVES · Vasai, PalgharP99000006502· 34.5% built
- VBHC Greenwoods7.1 yr overdueVBHDC Bangalore Value Homes Private Limited · Palghar, PalgharP99000000974· filed Jun 2018 → now Jun 2019· 81.8% built· 1 complaint
- Nakshatra Primus7.1 yr overdueJSB Dream Homes Private Limited · Vasai, PalgharP99000006041· filed Jun 2018 → now Jun 2019· 87.3% built· 1 complaint
- MEENAKSHI HEIGHTS PHASE 17.1 yr overdueVIVA MEENAKSHI REALTY · Vasai, PalgharP99000007255· 32.5% built
- BHOOMI NIWAS7.1 yr overdueBHOOMI CORPARATION · PALGHAR, PalgharP99000015823· 0.5% built
- Avenue D - Phase III7.1 yr overdueVenus Developers · Vasai, PalgharP99000002430· 34.1% built· 1 complaint
- SAI SIDDHI7.1 yr overdueDHARMENDRA SINGH PARIHAR · SAPHALE, PalgharP99000014781· 52.7% built
- lily palace7.1 yr overdueCaptain Varghese & Sons · Vasai, PalgharP99000011171· filed Jul 2018 → now Jul 2019· 55% built
- Serenity Garden Wing D7.1 yr overdueUnity Estates & Developers · Vasai, PalgharP99000003766· filed Jul 2018 → now Jul 2019· 88.5% built
- CELLO DECENT HOMES PHASE 27.1 yr overdueDECENT HOMES · PALGHAR, PalgharP99000008582· 90.9% built
- VBHC Greendew7.1 yr overdueVBHC MUMBAI VALUE HOMES PRIVATE LIMITED · Palghar, PalgharP99000000515· filed Jul 2018 → now Jul 2019· 33.2% built· 1 complaint
- OSTWAL VALLEY7.1 yr overdueSHREE OSTWAL BUILDERS LTD · Palghar, PalgharP99000006087· 86.4% built
- OLA MANSION7.0 yr overdueANIL BHERULAL BOHARA · NEAR TATA HOUSING, PalgharP99000013342· 81.8% built
- Shree Krishna Apartment7.0 yr overdueSagar Bhuvanesh Patil · Vasai, PalgharP99000011860· 38.2% built
- Raj Icon7.0 yr overdueNeelshrushti Builders & Developers · Palghar West, PalgharP99000009957· 90.9% built
- ALOK REGENCY6.9 yr overdueALOK CONSTRUCTION · Vasai, PalgharP99000004517· filed Sept 2018 → now Sept 2019· 80% built
- VIJAY HEIGHTS6.8 yr overdueVIJAY HEIGHTS · Vasai, PalgharP99000007422· 45.5% built
- MAHAVIR UTSAV B6.8 yr overdueRajesh Construction · Palghar, PalgharP99000015701· 90.9% built
- SHIVARCHAN6.7 yr overdueOjas Constructions · Vasai, PalgharP99000013953· 90.9% built
- YASHAPARTMENTKWING6.7 yr overdueBHAVESH SHANTILAL PAREKH · Palghar, PalgharP99000013382· 18.2% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.