Delayed projects in Raigarh
1,037 MahaRERA-registered projects in Raigarh are past the possession date on file and still under 100% built. Where the promoter has formally revised the date, the original is shown alongside so you can see what changed.
Page 1 of 6
- SHUBHA8.8 yr overdueENVISION INFRA · Khalapur, RaigarhP52000002697· 81.8% built
- SAI PEARL8.8 yr overdueSHREE DEVELOPERS · Karanjade, RaigarhP52000003239· 99.1% built
- ZAHRAA RESIDENCY8.8 yr overdueAZ REALTY LLP · Ulawe, RaigarhP52000004154· 76.8% built
- SKYLINE HEIGHTS8.8 yr overduePEARL PROPERTIES · Karanjade, RaigarhP52000008413· 90.9% built
- PLATINUM LIVIANO8.8 yr overduePLATINUM LIFESTYLE LLP · Panvel, RaigarhP52000005906· 90.9% built
- ADINATH AURA8.8 yr overdueSHREE RIDDHI SIDDHI CONSTRUCTIONS · Panvel, RaigarhP51700007724· 90.9% built
- JINETE PARK8.8 yr overdueNAVKAR ENTERPRISES · Ulawe, RaigarhP52000007826· 68.5% built
- SAPPHIRE BLISS8.8 yr overdueRAJESH BIJLANI · Panvel, RaigarhP52000009941· 72.7% built
- SADHGURU8.8 yr overdueSHREEDEV ENTERPRISE · Ulawe, RaigarhP52000007337· 90.9% built
- BANKERS TOWER CO OP HSG SO8.8 yr overdueBANKERS TOWER CHS · Bamandongri, RaigarhP52000010516· 70% built
- Garva Residency-C38.8 yr overdueGarva Developers Pvt Ltd · Warse, RaigarhP52000006946· 70% built
- RAJ AMBAR8.8 yr overdueRAJ INFRA DEVELOPERS · Karanjade, RaigarhP52000001295· 90.9% built
- SIDDHIVINAYAK JEWEL8.8 yr overdueSHRIKANT DHONDU HINDALKAR · Panvel, RaigarhP52000007395· 87.1% built
- JUNCTION 4068.8 yr overdueMISHAL REALTY · Panvel, RaigarhP52000011771· 81.8% built
- VIGHNAHAR SUDAMA8.8 yr overdueMAHESH SUDAM PATIL · Pen (M Cl), RaigarhP52000014318· 90.9% built
- SHRI GANESH RESIDENCY8.8 yr overdueSHRI GANESH DEVELOPERS · Ulawe, RaigarhP52000002170· 90.9% built
- NEELKANTH PRAJAKT8.8 yr overdueNEELKANTH CONSTRUCTIONS · OLD THANA NAKA ROAD, RaigarhP52000013574· 90.9% built
- Balaji Heights8.8 yr overdueBalaji Adventures · Panvel, RaigarhP52000003788· 75.1% built
- Welkin Star8.8 yr overdueWELKIN DEVELOPERS · ULAWE, RaigarhP52000011234· 90.9% built
- LOVE SPRING8.8 yr overdueAPEX BUILDTECH · Panvel, RaigarhP52000009108· 90.9% built
- SHAGUN APARTMENT8.8 yr overdueSHREE VARAD VINAYAK DEVELOPERS · Taloje Panchnad, RaigarhP52000013848· 66.4% built
- BHOSALE ORCHID8.8 yr overdueBHOSALE LAND DEVELOPERS · Ulawe, RaigarhP52000012681· 90% built
- MAHAVIR VILLA8.8 yr overdueVIPUL BHIMSHI SATRA · Panvel, RaigarhP52000004151· 87.3% built
- NEXUS HEIGHTS8.8 yr overdueM/S NEXUS REALTY · Taloje Panchnad, RaigarhP52000013983· 97.7% built
- ANIRUDDHA ASTHA8.8 yr overdueYOGI ENTERPRISES · Panvel, RaigarhP52000007715· 90.9% built
- RASIKA BUILDERS AND DEVELOPERS NERAL8.8 yr overdueRAVINDRA RAMCHANDRA BHOIR · Mamdapur, RaigarhP52000005131· 90.9% built
- SOHAM RESIDENCY8.8 yr overdueVISHAL DUTT · Panvel, RaigarhP52000004661· 96.8% built
- BHOSALE CARNATION8.8 yr overdueLEENA ARJUN GARAD · Ulawe, RaigarhP52000012884· 75.5% built
- Sai Samartha Blessings8.8 yr overdueShree Sai Samartha Developers · Panvel, RaigarhP52000011613· 81.8% built
- SHANTI NIKETAN8.8 yr overdueSHREE SAIDATT DEVELOPERS · Karanjade, RaigarhP52000012693· 90.9% built
- Shelter Corner8.8 yr overdueRabbani Shamsuddin khan · Panvel, RaigarhP52000010366· 90.9% built
- SHREE RAM KALPANA8.8 yr overdueNEELKANTH ASSOCIATES · Panvel, RaigarhP52000013551· 90.9% built
- Tulsi Sapphire8.8 yr overdueSHREE MAHAVIR DEVELOPERS · Ulawe, RaigarhP52000001395· 90.9% built
- SIDDHIVINAYAK HOMES8.8 yr overdueRAM VASDEV BATHIJA · Panvel, RaigarhP52000010894· 90.9% built
- SIDDHIVINAYAK PHASE 18.8 yr overdueGOKA ENGINEERING COMPANY PVT LTD · Warachiwadi, RaigarhP52000002530· 81.2% built
- THE ATLANTIS8.8 yr overdueDHANYA CONSTRUCTION · Ulawe, RaigarhP52000009741· 89.1% built
- SHUBHAM RESIDENCY8.8 yr overduePOTE SONS BUILDERS & DEVELOPERS · Karanjade, RaigarhP52000006093· 90.9% built
- OM DATTAPRASAD CO OP HSG SOCIETY LTD8.8 yr overdueKIRAN NARAYAN MANORE · Panvel, RaigarhP52000003980· 94.1% built
- Ozone Residency B wing8.8 yr overdueWestcoastrealty · Alibag, RaigarhP52000007382· 90.9% built
- MAPLE VILLA8.8 yr overdueAVACHAR BEACHARA BHATHI · Karanjade, RaigarhP52000009935· 90.9% built
- ASHLESHA8.8 yr overdueSHARAD MAHADEO SARAVADE · Panvel, RaigarhP52000014125· 78.2% built
- SIDDHI BELEZZA8.8 yr overdueSIDDHITAPASWI BUILDTECH · Panvel, RaigarhP52000010558· 90.9% built
- SHREE KRUPA8.8 yr overdueSHREE GANESH DEVELOPERS · Ulawe, RaigarhP52000013063· 72.7% built
- IMAGE8.8 yr overdueIMAGE A AUTHENTICITY OF DREAM · Ulawe, RaigarhP52000009300· 45.5% built
- HIRAYS TULIP8.8 yr overdueJAGANNATH DASHARATH HIRAY · Ulawe, RaigarhP52000011105· 90.9% built
- EKDANTA CHHAYA8.8 yr overdueEkdanta Realtors · Bhuwaneshwar (CT), RaigarhP52000011877· 81.8% built
- R N AVENUE8.8 yr overdueR N BUILDERS · Karanjade, RaigarhP52000003363· 90.9% built
- VIGHNAHAR RESIDENCY8.8 yr overdueNAFIAH DEVELOPERS · Karanjade, RaigarhP52000004761· 90% built· 2 complaints
- GOLD VALLEY KONKAN8.8 yr overdueGOKA ENGINEERING CO PVT LTD · Mangaon, RaigarhP52000005331· 78.2% built· 1 complaint
- GOLD CREST ENCLAVE8.8 yr overdueGOLDCREST BUILDERS & DEVELOPERS · Ulawe, RaigarhP52000009124· 88.2% built· 1 complaint
- CROWN EUREKA8.8 yr overdueASGARALI HUSEINIBHAI CONTRACTOR · Panvel, RaigarhP52000012036· 90.9% built
- SHREEJI RESIDENCY8.7 yr overdueSHREE HARI DEVELOPER · Panvel, RaigarhP52000004504· 90.9% built
- ROYAL BELLEZA8.7 yr overdueANANDKUMAR HARIDAS SONI · Ulawe, RaigarhP52000006588· 90.9% built
- SAI AANGAN8.7 yr overdueSAIJYOTBUILDERS&DEVELOPERS · Ulawe, RaigarhP52000003244· 90.9% built
- Gold Coast8.7 yr overdueA SQUARE CONSTRUCTION · Alibag, RaigarhP51800002294· 90.9% built
- Garva Residency-B28.7 yr overdueGarva Developers Pvt Ltd · Warse, RaigarhP52000004481· 43.2% built
- SAI DURGA HILLS8.7 yr overdueSAI DURGA DEVELOPERS · Bopele, RaigarhP52000003811· 84.5% built
- MAHAVIR ANANT8.7 yr overdueRAHUL PUKHRAJ SINGHVI · Ulawe, RaigarhP52000012352· 90.9% built
- SAI AARADHYA8.6 yr overdueM/S PILLARS INDIA CONSTRUCTIONS · Ulawe, RaigarhP52000010167· 58.5% built
- MARBLE ARCH8.6 yr overdueSHINING SUN CONSTRUCTIONS · Panvel, RaigarhP52000013234· 98.2% built· 1 complaint
- PRIME NEW HORIZON8.5 yr overduePRASHANT CHANDRAKANT BHOIR · Pen (M Cl), RaigarhP52000004080· 79.5% built
- SOHAM PRATHAMESH8.5 yr overdueSOHAM BUILDERS · Deulwadi, RaigarhP52000012015· 51.4% built
- SAVITRI NIWAS8.5 yr overdueRAMESH GULAB TUPE · Chinchpada, RaigarhP52000011962· 90.9% built
- RAM SUBHADRA8.5 yr overdueRachana Construction · Panvel, RaigarhP52000010669· 90.9% built
- Vasant Paradise8.5 yr overdueShri Vasant Developers · Karjat, RaigarhP52000011025· 80% built
- BALAJI GARDEN8.5 yr overdueSHREE BALAJI ENTERPRISES · Malyan, RaigarhP52000009986· 90.9% built
- LAMER RESIDENCY8.5 yr overdueLAMER DEVELOPERS · Panvel, RaigarhP52000002060· 90% built
- Samarth Samruddhi8.5 yr overdueMandar Madhukar Karandikar · Pen (M Cl), RaigarhP52000007981· 43.2% built
- Ashiyana C.H.S Redevelopment8.5 yr overduePUNIT ENTERPRISES · Panvel, RaigarhP52000007021· 90.9% built
- SAI SAMRUDDHI8.5 yr overdueOM SAI CONSTRUCTION · Nadgaon Tarf Birwadi (CT), RaigarhP52000011177· 37.3% built
- POOJA ANGAN8.5 yr overdueRAJENDRA THORAT · KARANJADE, RaigarhP52000002558· 76.2% built
- Esquire Homes - B8.5 yr overdueEsquire Realtors · Panvel, RaigarhP52000012887· 90.9% built
- SAURABH APARTMENT8.5 yr overdueTARACHAND HASTIMAL CHHAJED · Bopele, RaigarhP52000012557· 78.6% built
- Esquire homes - A8.5 yr overdueEsquire Realtors · Panvel, RaigarhP52000012661· 90.9% built
- Shivalic Heights8.5 yr overdueGeetanjali Construction · Panvel, RaigarhP52000004882· 90.9% built
- THE DREAM8.5 yr overdueTRIVENI BUILDERS& DEVELOPERS · Panvel, RaigarhP52000003799· 83.8% built· 1 complaint
- NIRAVANA ENCLAVE8.5 yr overdueJAGDISH LAKHMICHAND MOHINANI · Neral, RaigarhP52000001635· 90.9% built
- CLASSIC RESIDENCY8.5 yr overdueCLASSIC CONVENTURE · Uran, RaigarhP52000002944· 75.9% built
- HIRAYS ANGELICA8.5 yr overdueJAGANNATH DASHARATH HIRAY · Ulawe, RaigarhP52000002616· 90.9% built
- GOVIND HARMONY8.5 yr overduePRIYAL HOMES · Panvel, RaigarhP52000002096· 82.7% built
- PRAMUKH PARADISE8.5 yr overduePRAMUKH DEVELOPERS · Panvel, RaigarhP52000004384· 90.9% built
- ROYAL PRIDE8.5 yr overdueROYAL BUILDERS AND DEVELOPERS · Panvel, RaigarhP52000002329· 90.9% built
- DEVKI PLAZA8.5 yr overduePOWER INFRA DEVELOPERS · Panvel, RaigarhP52000009782· 76.4% built
- BALAJI COMPLEX - PLOT NO 11, 12, 138.5 yr overdueBALAJI INFRA · Khalapur, RaigarhP52000001600· 90.9% built
- SKYLINE CORNER8.5 yr overdueSKYLINE DEVELOPERS · Karanjade, RaigarhP52000007766· 90.9% built
- Lamer Solitaire8.5 yr overdueLAMER DEVELOPERS · Panvel, RaigarhP52000004491· 89.1% built
- SHREYAS VILLA8.5 yr overdueVINODRAI PREMJIBHAI TRAPASIA · Karanjade, RaigarhP52000010176· 90.9% built
- VANKVANIS ELA8.5 yr overdueSuresh Vankvani · Ulawe, RaigarhP52000007221· 49.5% built· 4 complaints
- SAI ANCHIT8.5 yr overdueVANDANA PRASHANT PINGLE · Karanjade, RaigarhP52000009263· 66.7% built
- SAMARTH RESIDENCY8.5 yr overdueSIDDHI DEVELOPERS · Ulawe, RaigarhP52000010559· filed Dec 2017 → now Mar 2018· 99.5% built
- NEEL GALAXY8.5 yr overdueNEELKANTHESHWAR CONSTRUCTION · Karanjade, RaigarhP52000007270· 79.2% built
- GENESIS8.5 yr overdueTODAY PRACHAR REALTY · Panvel, RaigarhP52000002114· 90.9% built
- SEA STAR8.5 yr overdueRAJESH AND DSOUZA ASSOCIATES · Ulawe, RaigarhP52000011974· 86.8% built· 4 complaints
- SHIV ASHIRWAD8.5 yr overdueSHIVKRUPA ENTERPRISES · Karanjade, RaigarhP52000010827· 72.5% built
- PARVATI AVENUE8.5 yr overdueR D Realtors · Panvel, RaigarhP52000005819· 90.9% built
- TULSI CORNER8.5 yr overdueMAHADEV LIFESPACES · Ulawe, RaigarhP52000003668· 80.9% built
- SHIV DRISHTI8.5 yr overdueSHIVKRUPA ENTERPRISES · Karanjade, RaigarhP52000003991· 77.7% built
- EXCELLENCE RESIDENCY8.5 yr overdueEXCELLENCE INFRA · Panvel, RaigarhP52000005743· 69.1% built
- VANKVANIS BLISS8.5 yr overdueRahul Suresh Vankvani · Ulawe, RaigarhP52000011609· 3.6% built
- SHASHWAT SANKUL8.5 yr overdueSAI SMARAN CONSTRUCTION · Bopele, RaigarhP52000007561· 68.6% built
- Rajesh Presidency8.5 yr overdueSAI SHRI HOME MAKERS · Ulawe, RaigarhP52000011010· 88.2% built· 3 complaints
- Pushpak8.5 yr overdueA R Constructions · Karanjade, RaigarhP52000001781· 90.9% built
- SABHARI CO-OP HSG SOCIETY8.4 yr overdueSHUBHAM ENTERPRISES · ULWE, RaigarhP52000010782· 90.9% built
- BHOSALE DAFFODIL8.4 yr overdueBHOSALE HOMES · Ulawe, RaigarhP52000005903· 75.5% built
- BLUE KEY REALTYS ESCALATE8.4 yr overdueBlue Key Realty · Ulawe, RaigarhP52000003043· 70.6% built
- NAKSHTRA PLAZA8.4 yr overdueSHARVARI BUILDERS & DEVELOPERS · Pen (M Cl), RaigarhP52000011253· 50% built
- BHOSALE TULIP8.4 yr overdueBHOSALE GROUP · Ulawe, RaigarhP52000012566· 78.2% built
- SAI SHRUSTI8.4 yr overdueSAI ENTERPRISES · Mahad (M Cl), RaigarhP52000008583· 60% built
- SHREE MAHALAKSHMI PARK BUILDING NO 18.4 yr overdueSHREE MAHALAXMI HOME MAKERS · Dhamote,Neral, RaigarhP52000010984· 90.9% built
- PRAMUKH DARSHAN8.4 yr overduePRAMUKH ENTERPRISES · Dhamote, RaigarhP52000010357· 90.9% built
- BHUVANESHWAR PLAZA8.4 yr overdueOM BUILDERS · Bhuwaneshwar (CT), RaigarhP52000010401· 80% built
- SHIVSHANKAR KALASH8.4 yr overdueSURESH SHIVSHANKAR SHARMA · Navi Mumbai Panvel Rigardh (CT), RaigarhP52000010959· 90.9% built
- PRAJAPATI VIHAR8.3 yr overduePRAJAPATI CONSTRUCTIONS LIMITED · Uran, RaigarhP52000002200· 90.9% built· 1 complaint
- SND SIGNATURE8.3 yr overdueS N DAMANI INFRA PRIVATE LIMITED · ULWE, RaigarhP52000008586· 90.9% built
- SIDDHIVINAYAK TWINS8.3 yr overdueLACHHMAN VASDEV BATHIJA · Kalamboli, RaigarhP52000003619· 80.5% built· 6 complaints
- SHREM SILVER BEACH8.3 yr overdueHitesh RamPraksash Chhatwal · Alibag, RaigarhP52000012541· filed Mar 2018 → now Jun 2018· 70.9% built
- ANANT AURA8.3 yr overdueANANT INFRA · Panvel, RaigarhP52000003434· 90.9% built
- HARI ANMOL8.3 yr overdueHARI OM ENTERPRISE · Ulawe, RaigarhP52000012646· 41% built
- HARI OM NIRMAL8.3 yr overdueHARI OM ENTERPRISE · Ulawe, RaigarhP52000012709· 49.1% built· 5 complaints
- PARVATI AANGAN8.3 yr overdueR D INFRA · Panvel, RaigarhP52000009728· 76% built
- SIDDHI ENTERPRISES8.3 yr overdueSIDDHI ENTERPRISES · Bopele, RaigarhP52000004194· 90.9% built
- PACIFIC AURA8.3 yr overduePACIFIC ENTERPRISES · Panvel, RaigarhP52000004638· 90.9% built
- Jay Raj Deep Apartement8.3 yr overdueJay raj Deep Corporation · Dronagiri, RaigarhP52000014667· 72.5% built
- Today royal elisium8.3 yr overdueTODAY ROYAL BUILDERS & DEVELOPERS · Karanjade, RaigarhP52000001258· 86.6% built
- Skyline riverside wing G8.3 yr overdueSkyline Millars Limited · Karjat, RaigarhP52000003852· filed Dec 2017 → now Jun 2018· 90.9% built
- RAVECHI COMPLEX8.3 yr overdueLIVE ENTERPRISES · Karanjade, RaigarhP52000003850· 81.8% built
- TITANIUM WOODS8.3 yr overdueTITANIUM CONSTRUCTION COMPANY · Panvel, RaigarhP52000001013· 90.1% built
- Sonai Residency8.3 yr overdueAayushi Enterprises · Karanjade, RaigarhP52000006156· 72.7% built
- TATER FLORENCE ORCHID8.3 yr overdueTATER REALTY · Karjat, RaigarhP52000003661· 90.9% built
- SHIVGANESH8.3 yr overdueVISHWANATH MADHUKAR MHATRE · Pargaon, RaigarhP52000013379· 65% built
- Shubharambh Heritage8.3 yr overdueM/s Shubharambh Realty · Panvel, RaigarhP52000009499· 81.8% built
- TATER FLORENCE OLIVE8.3 yr overdueTATER REALTY · Karjat, RaigarhP52000003313· 90.9% built
- HARI OM DARSHAN8.3 yr overdueHARI OM ENTERPRISE · Ulawe, RaigarhP52000012855· 42.7% built
- SMART HEIGHTS8.3 yr overdueMUBIN MOHAMMED IQBAL JUMANI · Khopoli, RaigarhP52000012807· 66.4% built
- SAPHIRE ORIEL8.3 yr overdueSAPHIRE ASSOCIATES · Karanjade, RaigarhP52000003173· 89.1% built· 1 complaint
- Olympeo Riverside - Phase 18.3 yr overdueOlympeo Riverside Projects LLP · Neral, RaigarhP52000002351· 76.7% built
- CALLISTO8.3 yr overdueTODAY GLOBAL ENTERPRISES · Panvel, RaigarhP52000004871· 81.8% built
- SAI DHAM8.3 yr overdueNAMDEV KASHINATH PATIL · Panvel, RaigarhP52000008443· 80% built
- Discover Condos8.2 yr overdueSilvex Realty Private Limited · Karjat, RaigarhP52000006498· 78.2% built
- SIDDHIVINAYAK RESIDENCY8.2 yr overdueVIJAY AMRUTRAO SALVI · Ulawe, RaigarhP52000012280· 71.4% built
- ROSABELLA BUILDING NUMBER 28.2 yr overdueSVS GROUPS · Karjat, RaigarhP52000007466· 90.9% built
- VAKRATUNDA RESIDENCY8.2 yr overdueS CUBE BUILDCON · Kalundre (CT), RaigarhP52000013046· 36.8% built
- BRAMHA RESIDENCY B8.2 yr overdueSHREE BRAMHA ENTERPRISES · Mamdapur, RaigarhP52000006789· 59.1% built
- Omkar Apartments8.2 yr overdueDurvankur Developers · Panvel, RaigarhP52000012831· 80.9% built
- PRABHAVATI COMPLEX8.2 yr overdueRAHIL ROSHAN SOMJEE · Pen (M Cl), RaigarhP52000012067· 55.5% built
- Zinnia8.2 yr overdueAdhiraj Constructions Private Limited · Panvel, RaigarhP52000009171· 72.7% built
- SHREE SARASWATI ARCADE8.2 yr overdueJITENDRA GOVARDHAN MHATRE · Panvel, RaigarhP52000011021· 90.9% built
- Mahindra The Serenes- 8 Villas8.2 yr overdueMahindra Lifespace Developers limited · Nagaon, RaigarhP52000000461· filed Jun 2018 → now Aug 2018· 78.2% built
- YASH HOMES8.1 yr overdueNILESH NAIK · Navade, RaigarhP52000010629· 75.9% built
- KRISHNA KUNJ8.1 yr overdueGLOBE HITECH BUILDERS · Panvel, RaigarhP52000003790· 61.4% built
- AMARPREET8.1 yr overdueAMARDEEP DEVELOPERS · Mamdapur, RaigarhP52000008784· 85.7% built
- VAISHNAVI8.1 yr overduePRAMOD VASANT BHOIR · Uran, RaigarhP52000008787· 85.5% built
- VARDHMAN VATIKA8.1 yr overdueKashyap And Associates · Karanjade, RaigarhP52000003204· 62.7% built
- SHREE HINGAD PALACE8.1 yr overdueS.M. DEVELOPERS · Dhamote, RaigarhP52000008554· 73.6% built
- MISRI VILLA HEIGHT8.1 yr overdueSHREY INFRA PROJECT · Uran, RaigarhP52000003140· filed May 2018 → now Aug 2018· 72.8% built
- HILL VIEW8.1 yr overdueGAD REALTY · NERAL, RaigarhP52000015312· 64.3% built
- DEEP RISE8.1 yr overdueKIRTI SHAH · Panvel, RaigarhP52000000516· 72.7% built
- DEEP PRIDE8.1 yr overdueKIRTI SHAH · Karanjade, RaigarhP52000000770· 72.7% built
- SHREE GANESH8.0 yr overdueNAVEEN OMPRAKASH JAISWAL · Panvel, RaigarhP52000009973· 90.9% built
- MEERA ENCLAVE8.0 yr overdueSUNRAYS CONSTRUCTIONS · Panvel, RaigarhP52000010678· 47.3% built
- SAIRAJ GOLDEN VIEW8.0 yr overdueSHIVAM DEVELOPER · Panvel, RaigarhP52000006625· filed Dec 2017 → now Sept 2018· 56.9% built
- TULSI AASHRAY8.0 yr overdueSHUBH ENTERPRISES · Pashane, RaigarhP52000000020· 90.9% built
- LANDMARK8.0 yr overdueLANDINFRA DEVELOPERS · Karanjade, RaigarhP52000001621· 56.4% built
- GOVIND CHHAYA8.0 yr overdueEURO REALITY · Navade, RaigarhP52000012790· 76.4% built
- SHIV SADAN8.0 yr overdueSANIYA DEVELOPERS · Pen (M Cl), RaigarhP52000010956· 38.2% built
- DURGA RESIDENCY8.0 yr overdueSHREE GANESH BUILDERS & DEVELOPERS · Panvel, RaigarhP52000011005· 50% built
- HIMALAYA COMPLEX8.0 yr overdueHIMALAYA BUILDERS AND DEVELOPERS LLP · Pashane, RaigarhP99000004617· 84.1% built
- APEX NEST8.0 yr overdueAPEX GROUP · Karanjade, RaigarhP52000005821· 90.9% built
- PRIDE VILLA8.0 yr overduePride Builders · Ulawe, RaigarhP52000003405· 90.9% built
- SHIVAMRIT COMPLEX8.0 yr overdueBHARATI DHARMA JOSHI · Ulawe, RaigarhP52000005184· 65.1% built
- AB EXOTICA8.0 yr overdueAB BUDGET HOMES · Uran, RaigarhP52000009570· 49.1% built
- GOURI VARADVINAYAK8.0 yr overdueSHANKAR SADU MHATRE · Khopoli, RaigarhP52000011255· 41.3% built
- VARD VINAYAK8.0 yr overdueSHREE VARDVINAYAK ENTERPRISES · Karanjade, RaigarhP52000003001· 68.2% built
- JAI NEELKANTH8.0 yr overdueM/S JAI DEVELOPERS · Panvel, RaigarhP52000007385· 54.5% built
- KESHAV WINDS8.0 yr overdueWINDFIELD STOCKS AND SECURITIES PVT LTD · Panvel, RaigarhP52000008209· filed Apr 2018 → now Oct 2018· 95.9% built
- Sai Radiance8.0 yr overduePRASAD ESTATE · Panvel, RaigarhP52000006076· 36.9% built
- Landmaark Lexus8.0 yr overdueSagar Ravindra Malwade · Ulawe, RaigarhP52000007361· 90.9% built
- MORAJ MAA SHRISHTI7.8 yr overdueMORAJ INFRATECH PRIVATE LIMITED · Khalapur, RaigarhP52000000480· 32.7% built
- AARTI PRIDE7.8 yr overdueRAMESH BANDU RETAREKAR · UPPER KHOPOLI, RaigarhP52000015340· 58.2% built
- DHARTI VILLA7.8 yr overdueRHYTHM ENTERPRISES · Ulawe, RaigarhP52000001102· 66.5% built
- OM IMPERIA7.8 yr overdueCAPITAL ASSOCIATES · Karanjade, RaigarhP52000003265· 75% built· 1 complaint
- ROYAL PLAZA7.8 yr overdueRoyal Enterprise · Khopoli, RaigarhP52000011853· 68.9% built
- Muneera Heights7.8 yr overdueIsmail Hamdule · Kamothe, RaigarhP52000009492· 90.9% built
- ARIHANT AMISHA PHASE I7.8 yr overdueARIHANT AASHIYANA PRIVATE LIMITED · Panvel, RaigarhP52000008203· 89.1% built
- ARIHANT ANAIKA PHASE I7.8 yr overdueARIHANT VATIKA REALTY PRIVATE LIMITED · Panvel, RaigarhP52000001869· 89.1% built· 1 complaint
- SIMRAN COMPLEX7.8 yr overdueF & R DEVELOPERS · MAHAD, RaigarhP52000012954· 66.4% built· 1 complaint
- SIDDHIVINAYAK HERITAGE7.8 yr overdueSIDDHIVINAYAK DEVELOPERS · Panvel, RaigarhP52000002557· 90.9% built
- Payal Palace7.8 yr overdueNanji Murji Dama · near ramseth thakur stadium, RaigarhP52000009512· 90.9% built
- PRAGATI AVENUE7.8 yr overduePRAGATI REALTY · -, RaigarhP52000012345· 68.1% built
- SIMRAN MAJESTIC7.8 yr overdueVIKRANT VIKAS RAIKAR · Panvel, RaigarhP52000002117· filed Jun 2018 → now Dec 2018· 82% built
- MUNOTH EMPRESS7.8 yr overdueARHAM DEVELOPERS · Panvel, RaigarhP52000002872· 79.1% built
- INSIGNIA7.8 yr overdueShagun Realty · Ulawe, RaigarhP52000005695· 48.6% built
- GURUKUL RESIDENCY7.8 yr overdueSHREE BRAMHA ENTERPRISES · Mamdapur, RaigarhP52000011499· 21.8% built
- BHOSALE MARIGOLD7.8 yr overdueLEENA ARJUN GARAD · Ulawe, RaigarhP52000012668· 90.9% built
- WHITE CARNATION7.8 yr overdueSPS CONSTRUCTION · ULWE, RaigarhP52000001088· 90.9% built
- MY SKY RESIDENCY PHASE I7.8 yr overdueASHAPURA ABODE · Dhamote, RaigarhP52000001455· 61.4% built
- Zion7.8 yr overdueSai Mahaavir Developers · Panvel, RaigarhP52000001426· 90.9% built
- KOHINOOR7.8 yr overdueSALEJI CONSTRUCTION PRIVATE LIMITED · Khalapur, RaigarhP52000009096· 89.1% built
- SHREE HARI NISARG RESIDENCY7.8 yr overdueSHREE HARI REALTORS · Bopele, RaigarhP52000001148· 90.9% built
- SAUBHAGYA DARSHAN7.8 yr overdueSAUBHAGYA BUILDERS · Karanjade, RaigarhP52000003233· 63.6% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.