Delayed projects in Nashik
993 MahaRERA-registered projects in Nashik are past the possession date on file and still under 100% built. Where the promoter has formally revised the date, the original is shown alongside so you can see what changed.
Page 1 of 5
- GURUKRUPA HEIGHTS8.8 yr overdueSANJAY KASHINATH SAYANKAR · Indiranagar, NashikP51600010234· 81.8% built
- SHREE GANESHA PARK8.8 yr overdueKRANTI BUILDCON · Nashik, NashikP51600013040· 72.7% built
- AMRUT SHILP8.8 yr overdueSUPRABHAT CONSTRUCTIONS · Nashik, NashikP51600012316· 90.9% built
- OMKAR APARTMENT8.8 yr overdueVIMALBHAI PARBATBHAI TOGADIYA · Nashik, NashikP51600003946· 90.9% built
- KARMAA GALAXY8.8 yr overdueKARMAA REALTY · Nashik (M Corp.), NashikP51600003024· 60% built
- Le Regalia Phase I BLDG C AND D8.8 yr overdueM/s. ShreePrakash Creative Buildcon J.V. · Nashik (M Corp.), NashikP51600009453· 90.9% built
- Dhatrak Heights8.8 yr overdueKhilendrakumar Dilip Mohabiya · Nashik (M Corp.), NashikP51600005757· 90.6% built
- ATHASHREE8.8 yr overdueSAPALE AGASHE ASSOCIATES · Nashik, NashikP51600005309· 81.8% built
- Sadguru Apartment8.8 yr overdueV R Construction · Nashik (M Corp.), NashikP51600008773· 90.9% built
- Aashrayan Apartment8.8 yr overdueSwapnavel Builders & Developers · Nashik, NashikP51600013037· 90.9% built
- Gurukripa Appartment8.8 yr overdueROYAL DEVELOPERS · Nashik (M Corp.), NashikP51600011997· 81.8% built
- SAMARTH ANNEX8.8 yr overdueOM SAI BUILDCON · Nashik (M Corp.), NashikP51600006646· 81.8% built
- PRATHMESH PARK8.8 yr overdueSAKAR GROUP · Nashik, NashikP51600012881· 90.9% built
- Anand Sagar8.8 yr overdueSagar Constructions · Nashik (M Corp.), NashikP51600011939· 90% built
- KULASHREE NEST8.8 yr overdueKULSHREE DEVELOPERS · Nashik (M Corp.), NashikP51600013530· 73.6% built
- MALPANI SAFFRON BUILDING NO 28.8 yr overdueGIRIRAJ ENTERPRISES · Nashik (M Corp.), NashikP51600008125· 72.7% built· 3 complaints
- SATYAM PALACE8.8 yr overdueGEETA BUILDCON · BEHIND NIGAL PARK, NashikP51600012514· 81.8% built
- GOKULDHAM APPARTMENT8.8 yr overdueSHREE BALAJI BUILDERS AND DEVELOPERS · NASHIK, NashikP51600009696· 90.9% built
- HARI ANAND8.8 yr overdueDHARAN INFRA-EPC LIMITED · Nashik, NashikP51600001348· 90.9% built
- SAMARTH HEIGHT8.8 yr overdueJAYASHREE DEVELOPERS · Nashik (M Corp.), NashikP51600013758· 90.9% built
- RUTUGANDH8.8 yr overdueROOPAYAN LIFSTYLE · Nashik, NashikP51600006166· 90.9% built
- Business Park8.8 yr overdueRoongta Buildcon Ltd. · Nashik, NashikP51600006641· 60.7% built
- Soham8.8 yr overdueS B Constructions · Nashik (M Corp.), NashikP51600013041· 81.8% built
- Crown Residency8.8 yr overdueCROWN MAKERS BUILDERS AND DEVELOPERS · Nashik (M Corp.), NashikP51600011764· 90.9% built
- New Shiv Shubham8.8 yr overdueWaghandCompany · Nashik Road, NashikP51600013437· 90.9% built
- GANADHISH8.8 yr overdueGANESH ENTERPRISES · anandvalli, NashikP51600004373· 90.9% built
- SHREE SAI PLAZA8.8 yr overdueSHREE SAI BUILDERS AND DEVELOPERS · Nashik (M Corp.), NashikP51600005859· 81.8% built
- Bhoomi Vijay Apartment8.8 yr overdueNarayan Jankiram Deshpande · Nashik, NashikP51600012879· 74.5% built
- SHREE TULSI KUNJ8.8 yr overdueSHREE ENTERPRISES · DINDORI ROAD, NashikP51600012894· 90.9% built
- ARYA APPARTMENT8.8 yr overduePURUSHOTTAM MOHAN RAMPARIYA · Nashik (M Corp.), NashikP51600002981· 67.5% built
- GREEN ACRE8.8 yr overdueFARAZ ASLAM MULLA · Deolali (CB), NashikP51600005270· 89.1% built
- SUNNY DEVELOPERS8.8 yr overdueSUNNY DEVELOPERS · Nashik, NashikP51600008674· 96.4% built
- SUKHSAGAR NX8.8 yr overdueSagar Constructions · Nashik (M Corp.), NashikP51600012739· 81.8% built
- Bajrang8.7 yr overdueNarsibhai Mavjibhai Mavani · Nashik (M Corp.), NashikP51600011049· 90.9% built
- MAHADEV CORNER8.7 yr overdueMAHADEV CONSTRUCTION · Nashik, NashikP51600008031· 90% built
- OMKAR DEEP8.7 yr overdueOMKAR BUIDCON · Nashik (M Corp.), NashikP51600007514· 90.9% built
- SHRI SHRI SAGAR8.7 yr overdueSagar Constructions · Nashik (M Corp.), NashikP51600012595· 81.8% built
- ROYAL ORCHID8.6 yr overdueBALAJI BUILDCON · Upnagar, NashikP51600006397· 70.5% built
- SAMRUDDHI PRIDE8.6 yr overdueSAMRUDDHI BUILDERS AND DEVELOPERS · Nashik (M Corp.), NashikP51600006644· 81.8% built
- Sukruti Elite8.5 yr overdueSukruti Constructions · Nashik (M Corp.), NashikP51600010612· 90.9% built
- HARI SPARSH II8.5 yr overdueDHARAN INFRA-EPC LIMITED · Bhagur Rural, NashikP51600000119· 69.1% built
- Navshya Elite8.5 yr overdueDhruv Developers · Aanandwali, NashikP51600009682· filed Dec 2017 → now Mar 2018· 81.8% built
- AANUSHREE RESIDENCY8.5 yr overdueABHAY CHANDMAL JAIN · Indiranagar, NashikP51600000075· 30.3% built
- AASTHA RESIDENCY8.5 yr overdueYASH BUILDCON · Nashik (M Corp.), NashikP51600010855· 90.9% built
- Anushree Apartment8.5 yr overdueRavi Mahajan ( HUF ) · Nashik, NashikP51600003905· 90.9% built
- YAMUNA NIWAS AND PARK ROW BUNGLOW8.5 yr overdueSHRI SAI CONSTRUCTION · Nashik, NashikP51600013332· 81.8% built
- United Sanskruti Phase I8.5 yr overdueUnited Builders · Nashik, NashikP51600001099· 86.1% built
- ISHWAR PRESTIGE8.5 yr overdueSHANKAR GHANSHYAMDAS SAMNANI · Aanandwali, NashikP51600012272· 72.7% built
- PRABHU SPARSH8.5 yr overduePACIFIC HOUSING CORPORATION · Nashik, NashikP51600006443· 90.9% built
- YAMUNA ROW BUNGLOW8.5 yr overdueSHRI SAI CONSTRUCTION · Nashik, NashikP51600012798· 81.8% built
- SHRAVANAM RESIDENCY8.5 yr overduePRADEEP NARAYAN PAWAR HUF · Aanandwali, NashikP51600009252· 90.9% built
- AROHI APARTMENT8.5 yr overdueNEW AKSHARA CONSTRUCTION · Nashik (M Corp.), NashikP51600008837· 90.9% built
- WHITE FIELDS8.5 yr overduePAVAN SANJIV TUPSAKHARE · Nashik, NashikP51600011670· 90.9% built
- SHREE SIDDHI RESIDENCY8.5 yr overdueSIDDHIVINAYAK DEVELOPERS · PIMPALGAON BAHULA SHIVAR, SRAMIKNGAR, NashikP51600012965· 90.9% built
- Suniket Business Center8.5 yr overdueSuniketBuildersandDevelopers · Nashik (M Corp.), NashikP51600012237· 81.8% built
- SAMARTH EMPIRE8.5 yr overdueSAGAR PRAKASH BURHADE · Nashik, NashikP51600012439· 81.8% built
- KUNAL RESIDENCY8.5 yr overdueKUNAL BUILDERS AND DEVELOPERS · Mhasrul, NashikP51600003606· 90.9% built
- UTKARSHA HIGHTS8.5 yr overdueNEW AKSHARA CONSTRUCTION · Nashik (M Corp.), NashikP51600009858· 90.9% built
- VRINDAVAN HEIGHT8.5 yr overdueSHIVSAI BUILDCON · Nashik, NashikP51600008519· 90.9% built
- SUKH SAGAR8.5 yr overdueSagar Constructions · Nashik (M Corp.), NashikP51600012549· 63.8% built
- NIRMITI LIFESPACE8.5 yr overdueNIRMITI LIFESTYLE · Nashik, NashikP51600008064· 81.8% built
- GAJANAN KRUPA8.5 yr overdueGAJANAN DEVELOPERS · Nashik, NashikP51600005519· 90.5% built
- HARIDEEP SQUARE8.4 yr overdueHARIDEEP DEVELOPERS · Nashik (M Corp.), NashikP51600010848· 90.9% built
- SAI NIRMAL APPARTMENT8.4 yr overdueSAMRUDDHI CONSTRUCTION · Nashik, NashikP51600004394· 47.7% built
- LIBERTY NIWAS8.4 yr overdueSHRISHTI BUILDCON · Nashik, NashikP51600003961· 90.9% built
- SHIVDHARA8.3 yr overdueGEETA BUILDCON · Adgaon, NashikP51600010746· 78.2% built
- ROONGTA TOWNSHIP PHASE IV APARTMENT8.3 yr overdueROONGTA BUILDERS AND DEVELOPERS · NASHIK, NashikP51600001287· 90.9% built
- USSH KIRAN8.3 yr overdueMangesh Dashrath Gaikar · Nashik (M Corp.), NashikP51600012292· 90.9% built
- ROYALE B C D8.3 yr overdueAshoka Infraways Limited · Wadala, NashikP51600011935· filed Dec 2017 → now Jun 2018· 90.9% built
- LEELADHAR APARTMENT8.3 yr overdueSHREE KRISHNA BUILDERS · Nashik, NashikP51600006650· 51.8% built
- Parksyde Homes Phase 18.3 yr overdueJaikumar Constructions LLP · Nashik, NashikP51600002640· 97.7% built
- SHIV DARSHAN8.3 yr overdueVIJAY MAGANBHAI TANK · Nashik, NashikP51600012900· filed Dec 2017 → now Jun 2018· 52.3% built
- The Metrozone Aspen C28.3 yr overdueSanklecha Construction Private Limited · Nashik (M Corp.), NashikP51600009327· 90.9% built· 1 complaint
- YASH ORCHID8.3 yr overdueYASH CONSTRUCTIONS · Nashik (M Corp.), NashikP51600010893· 39% built
- AARADHYA RESIDENCY8.3 yr overdueABHAY CHANDMAL JAIN · Deolaligaon, NashikP51600000297· 36.4% built
- SHREE GANESH APARTMENT8.3 yr overdueSUBHADRA PROPERTIES PRIVATE LIMITED · Nashik (M Corp.), NashikP51600007091· 83.6% built
- HARI VATIKA8.3 yr overdueDHARAN INFRA-EPC LIMITED · SANSARI, NashikP51600000220· 74.5% built
- VANRAJ SUNSHINE8.3 yr overdueABHIJIT VAMANRAO PATIL · Nashik, NashikP51600009694· 81.8% built
- GAJANAN8.3 yr overdueSIDDHARTH RAMESH SHAH · Nashik (M Corp.), NashikP51600006982· 75.9% built
- BLUE HAVEN8.3 yr overdueTALWARE BUILDERS PRIVATE LIMITED · Aanandwali, NashikP51600014066· 73.6% built
- SPRINGFIELD8.3 yr overdueVASUNDHARA CONSTRUCTION · Nashik, NashikP51600011544· 51.8% built· 2 complaints
- Shree Krishna Residency8.3 yr overdueHemant Enterprises · Nashik, NashikP51600008003· 90.9% built
- Radha Krishna8.2 yr overdueBharat Lalji Mawani · Nashik, NashikP51600005317· 72.7% built
- BHAGYA HARI ROW BUNGLOW8.2 yr overdueBHAGYA DEVELOPER · Nashik, NashikP51600005560· 63.6% built
- BHASKAR AVENUE8.2 yr overdueTUKARAM TANAJI WAGH · Nashik (M Corp.), NashikP51600012842· 90.9% built
- SAMARTH PLAZA8.2 yr overdueTUKARAM TANAJI WAGH · Nashik, NashikP51600012058· 90.9% built
- KALPRAJ APARTMENT8.2 yr overdueAKAR DEVELOPERS · Deolaligaon, NashikP51600008297· 90.9% built
- GANANAYAK RESIDENCY8.2 yr overdueSANJAY MANSING SALUNKHE · Nashik (M Corp.), NashikP51600004992· 81.8% built
- LOTUS PARK APARTMENT8.2 yr overdueLOTUS REALTY · Nashik (M Corp.), NashikP51600004238· 90.9% built
- SHREERAM CASTLE8.2 yr overdueSHREERAM BUILDERS AND DEVELOPERS · Nashik (M Corp.), NashikP51600006998· 90.9% built
- SHREE HARI APARTMENT8.2 yr overdueKISHOR JIVRAJBHAI JETHVA · Nashik, NashikP51600006111· 80.9% built
- Klassic Heights8.2 yr overdueVimla Jashanmal Jagger · Nashik, NashikP51600007189· 90.9% built
- SWAMINARAYANPARK8.2 yr overduePRAMOD VASUDEO ZAMBRE · Nashik (M Corp.), NashikP51600012604· 71.8% built
- VAKRATUNDA APPARTMENT8.2 yr overdueICCHAMANI DEVELOPERS · Nashik, NashikP51600006394· 55.9% built
- SAHAJANAND HEIGHTS8.2 yr overdueSHYAM CORPORATION · PANCHAVATI, NashikP51600005263· 90.9% built
- DURGA APARTMENT8.2 yr overduePRABHUDAS LAXMAN PATEL · Jail Road, NashikP51600008548· 90.9% built
- Prestige Residency8.2 yr overdueK For Kathiyawad Developers · Nashik, NashikP51600006827· 68.2% built
- DAMODAR HEIGHTS8.2 yr overdueSUBHAM BABULAL DHOLU · RANE NAGAR, NashikP51600011058· 68.2% built
- Husaini Tower8.2 yr overdueCITIZEN CONSTRUWELL · Nashik, NashikP51600010969· 90.9% built
- SHREE TIRUMALA VASANT APARTMENT8.1 yr overdueSHREE TIRUMALA DEVELOPERS · Nashik, NashikP51600001697· 81.8% built
- Thakkers Richmond Heights8.1 yr overduePratap Marketing Pvt Ltd · Nashik, NashikP51600008267· 81.8% built
- SHRIPAD RESIDENCY8.1 yr overdueVAASTU VAIBHAV CONSTRUCTIONS · Panchak, NashikP51600008644· 90.9% built
- SHIVALIK RESIDENCY8.1 yr overdueBHARAT VITHALBHAI AJUGIA · Nashik Road, NashikP51600007978· 51.5% built
- Thakkers Paradise8.1 yr overdueMotel Kutir Nirman Pvt. Ltd. · Nashik, NashikP51600003938· 70.5% built
- SAI PRERNA APARTMENT8.1 yr overdueJATINBHAI GOPALBHAI GOL · Nashik (M Corp.), NashikP51600011931· 90.9% built
- Royal Empire8.1 yr overduePekhale Patil Construction · Nashik (M Corp.), NashikP51600005059· 90.9% built
- Arsh Residency8.1 yr overdueTabeer Properties · Rehnuma Nagar, NashikP51600005289· 90.9% built
- SHREE YOG ROW BUNGLOW8.1 yr overdueSHIVAM REALTORS · Nashik, NashikP51600008328· 90.9% built
- PARIJAT SAHNIWAS8.1 yr overdueANIKET ANANT PATIL · Nashik (M Corp.), NashikP51600005366· 90.9% built
- SIDDHIVINAYAK RESIDENCY8.1 yr overdueM/S. SIDDHI VINAYAK CONSTRUCTION · NASHIK MUNICIPAL CORPORATION, NashikP51600015942· 72.7% built
- SHREE SAI RESIDENCY8.1 yr overdueSHREE SAI CONSTRUCTIONS · Nashik (M Corp.), NashikP51600009143· 58.6% built
- HARI NAMAN8.1 yr overdueDHARAN INFRA-EPC LIMITED · Deolaligaon, NashikP51600000228· filed Dec 2017 → now Sept 2018· 81.8% built
- GURU ASHISH APARTMENT A WING8.0 yr overdueVELANI DEVELOPERS · CHEHADI PUMPING ROAD, NashikP51600011898· 66.4% built
- The Metrozone Aspen C18.0 yr overdueSanklecha Construction Private Limited · INDIRA NAGAR, NashikP51600005208· filed Mar 2018 → now Sept 2018· 90.9% built· 1 complaint
- The Metrozone Athens A18.0 yr overdueSanklecha Construction Private Limited · INDIRA NAGAR, NashikP51600005033· filed Mar 2018 → now Sept 2018· 90.9% built· 5 complaints
- SPACE ORION BUILDING E8.0 yr overdueSPACE DEVELOPERS CORPORATION JOINT VENTURE · Dada Saheb Phalke Road, NashikP51600005108· 90.9% built
- AARYAVARTA SECTOR 4 - B TO H8.0 yr overdueLINKER SHELTER PRIVATE LIMITED · Nashik, NashikP51600002169· filed May 2018 → now Sept 2018· 90.9% built· 12 complaints
- The Metrozone Hampston B18.0 yr overdueSanklecha Construction Private Limited · INDIRA NAGAR, NashikP51600007133· filed Mar 2018 → now Sept 2018· 90.9% built
- SHREE RIDDHI SIDDHI DEVELOPERS8.0 yr overdueSHREE RIDDHI SIDDHI DEVELOPERS · Nashik (M Corp.), NashikP51600008972· 63.8% built
- ADIGURU8.0 yr overdueMAHAJAN BUILDCON · Nashik, NashikP51600003687· 90.9% built
- KSHITIJ CO OP HOUSING SOCIETY LIMITED8.0 yr overdueYOG BUILDERS AND DEVELOPERS · Nashik, NashikP51600012914· 73.2% built
- Raman Park - Phase - I8.0 yr overdueARHAM CONSTROTECH PVT LTD · Yeola, NashikP51600004598· 56.4% built
- Raj Laxmi8.0 yr overdueJANOEYA CONSTRUCTION · Nashik, NashikP51600011657· 90.9% built
- SAI HEIGHTS7.9 yr overdueKRISHNADEEP BUILDERS & DEVELOPERS · Nashik, NashikP51600011048· 89.1% built
- Shri Samarth Sai Niwas7.9 yr overdueShri Sai Samartha Constructions · SANSARI, NashikP51600009839· 84.8% built
- DARPAN TOWER APARTMENT7.8 yr overdueDILIP KARBHARI BHAMARE · PANCHAVATI, NashikP51600002845· 90.9% built
- Subodh Hights7.8 yr overdueS M BUILDERS AND DEVOLOPERS · Bhagur Rural, NashikP51600010874· 43.2% built
- GLENDALE COPERATIVE HOUSING SOCIETY LIMITED7.8 yr overdueGLENDALE COOPERATIVE HOUSING SOCIETY LIMITED · Nashik (M Corp.), NashikP51600007451· 76.4% built
- SHREE SAI ENCLAVE7.8 yr overdueSHREE SAI ASSOCIATES · Nashik (M Corp.), NashikP51600009958· 58.2% built
- Lotus Pride7.8 yr overdueLotus Buildcon · Pandav Nagri, NashikP51600007403· filed Dec 2017 → now Dec 2018· 90.9% built
- MERU BHOOMI7.8 yr overdueAMIT BUILDERS · Deolali (CB), NashikP51600006374· 43.7% built
- MOTKARIS GRAVITY7.8 yr overdueMOTKARI CONSTRUCTIONS PRIVATE LIMITED · Govind Nagar, NashikP51600007839· 90.9% built
- KALA RESIDENCY7.8 yr overdueVIJAY BHASKAR AHIRRAO · Nashik, NashikP51600007667· 90% built
- SHREE SIDDHI VINAYAK APPARTMENT7.8 yr overdueRIDDHI SIDDI DEVELOPERS · Nashik (M Corp.), NashikP51600004980· 90.9% built
- VIJAY GALAXY7.8 yr overdueJAYDEVELOPERS · Nashik (M Corp.), NashikP51600006062· 72.7% built
- Sai Aanand Plaza7.8 yr overdueVishwas Builders & Developers · Nashik (M Corp.), NashikP51600008613· 80.5% built
- ORBIT CASA7.8 yr overdueB-ORBIT VENTURES · Nashik, NashikP51600009915· 59.1% built
- HARI KIRAN7.8 yr overdueKARDA BUILDCON PRIVATE LIMITED · VIHITGAON, NashikP51600000349· 90.9% built
- TIRUMALLA GLORY7.8 yr overdueSHREE VENKATESH DEVELOPERS · Nashik (M Corp.), NashikP51600011071· 90.5% built
- TULIP TOWER7.8 yr overdueCLASSIC BUILDERS AND DEVELOPERS · NASHIK, NashikP51600015100· 85% built
- Gurudev Heights7.8 yr overdueAmit Gangadhar Jadhav · Indiranagar, NashikP51600003352· 90.9% built
- SHREE SHYAM7.8 yr overdueKALPESH CHHAGANBHAI AJAGIYA · Panchvati, NashikP51600007475· 90.9% built
- Mirage7.8 yr overdueGREENWOOD BUILDER PVT LTD · Aanandwali, NashikP51600008731· 90.9% built
- OJAS DREAM HOME7.8 yr overdueOJAS BUILD TECH · Nashik, NashikP51600010730· 36.4% built
- OM HEIGHTS7.8 yr overdueVISION ASSOCIATES · Nashik (M Corp.), NashikP51600011955· 90.9% built
- SHILP KALA7.8 yr overdueSHILP KALA CO-OPERATIVE HOUSING SOCIETY LIMITED · Adarsh Nagar, NashikP51600009737· 81.8% built
- NANDAN SHILP7.8 yr overdueNARESHKUMAR JAYANTIBHAI PATEL · PRABHAT NAGAR, NashikP51600009425· 81.8% built
- VIJAY SONNET7.8 yr overdueJAY DEVELOPERS · Nashik (M Corp.), NashikP51600011372· 90.9% built
- EMPIREO HEIGHTS7.8 yr overduePINGALE BROTHERS · Nashik (M Corp.), NashikP51600007360· filed Dec 2017 → now Dec 2018· 90.9% built
- RADHIKA PRIDE7.8 yr overdueBRIJWASI BUILDCON · Nashik (M Corp.), NashikP51600010716· 90.9% built
- Royal Palm7.8 yr overdueTabeer Properties · Khode Nagar, NashikP51600010474· 90.9% built
- Gokul 17.8 yr overdueGokul Infrastructure · Satpur, NashikP51600007108· 71.5% built
- LOTUS COURT7.8 yr overdueBORA HOSPITALITY LLP · panchwati, NashikP51600002017· 70.9% built
- Anmol Nayantara City One Phase 37.8 yr overdueBafna Realtors Pvt Ltd · Nashik, NashikP51600000354· 69.8% built
- SAMRUDHIPALACE7.8 yr overdueJAY DEVELOPERS · Nashik (M Corp.), NashikP51600010696· 90.9% built
- KAABIL APARTMENT7.8 yr overduePARVIN GAMIR SHAIKH · MAUJE WADALA SHIVAR, NashikP51600014779· 90.9% built
- OM RESIDENCY APPARTMENT7.8 yr overdueSIDDHIVINAYAK BUILDERS AND DEVELOPERS · Nashik (M Corp.), NashikP51600012992· 90.9% built
- KALYAN SAMRUDDHI7.8 yr overdueKALYAN TOLL INFRASTRUCTURE LTD · DHRUVA NAGAR, NashikP51600011079· 90.9% built
- Sejal Harmony7.8 yr overdueR R CONSTRUCTIONS · Nashik (M Corp.), NashikP51600012494· 81.8% built
- FERNDALE7.8 yr overdueAMAR JITENDRA VASANI · Deolali (CB), NashikP51600005763· 55.3% built
- NANDANVAN GARDEN APARTMENT7.8 yr overdueSHREE ASSOCIATES · Nashik (M Corp.), NashikP51600011042· 81.8% built
- THE RENAISSANCE7.8 yr overdueVAKRATUNDA PROPERTIES · GOVIND NAGAR, NashikP51600006900· 90.9% built
- NILANJAN SHRI7.8 yr overdueBY BUILDERS & DEVELOPERS · DRUVA NAGAR, NashikP51600005856· 90.9% built
- SURYA PARK-G7.8 yr overdueRAMCHANDRA VITTHAL SURYAWANSHI · PAWAR MALA OPP. RTO OFFICE, NashikP51600012959· 72.2% built
- Anmol Nayantara City One Phase 17.8 yr overdueBafna Realtors Pvt Ltd · Nashik, NashikP51600000539· 79.6% built· 1 complaint
- Vastu shilp7.8 yr overdueShilp Buildcon · Nashik (M Corp.), NashikP51600007256· 45.5% built· 1 complaint
- SHREESAMARTH APARTMENT7.8 yr overdueSHREEYOG PROPERTIES · WADALA SHIWAR, NashikP51600000748· 90.9% built
- VIJAY ROYAL7.8 yr overdueJAY DEVELOPERS · Nashik (M Corp.), NashikP51600011816· 81.8% built
- SHRI GIRIDHAR APARTMENT7.8 yr overdueLALIT BHANUBHAI KAMANI · Nashik, NashikP51600009585· 51.8% built
- Gajanan Plaza Apartment7.8 yr overdueMahesh Joshi & Narendra Kulkarni Associates · Indira Nagar, NashikP51600004168· 90.9% built
- Tirupati Garden Phase III7.8 yr overdueRIDDHI SIDDHI CONSTRUCTIONS · Bhagur (M Cl), NashikP51600008472· 90.9% built
- MORAYA APARTMENT7.8 yr overdueSIDDHARTH RAMESH SHAH · Makhmalabad, NashikP51600006906· 81.8% built
- GANGADHAR NAGAR A WING7.8 yr overdueONKAR NIVRUTTI MAHALE HUF · Nashik, NashikP51600013925· 55.5% built
- RIDGEWOOD7.8 yr overdueTIRUPATI DEVELOPERS · OFF GANGAPUR ROAD, NashikP51600012301· 90.9% built
- KOTHARI CHAMBERS7.8 yr overdueNITIN DAYALAL KOTHARI · Nashik, NashikP51600006974· 89.1% built
- TOWN SQUARRE7.8 yr overdueNIRMITI BUILDTECH · Panchavati, NashikP51600012818· 63.6% built
- VASUDEV APARTMENT7.8 yr overdueJAY BALAJI BUILDCON · Nashik (M Corp.), NashikP51600010213· 86.8% built
- KOMAL ORCHID7.8 yr overdueKISHAN HOLARAM ADWANI · WADALA, NashikP51600008588· 90.9% built
- Anmol Nayantara City One phase 27.8 yr overdueBafna Realtors Pvt Ltd · Nashik, NashikP51600000565· 70.2% built· 1 complaint
- SHREE TIRUMALA SWASTIK APARTMENT7.8 yr overdueROONGTA HOMES LLP · Indiranagar, NashikP51600005646· 90.9% built
- M AND M COUNTY7.8 yr overdueM & M Infrasolutions Pvt. Ltd. · Nashik (M Corp.), NashikP51600011825· 83.2% built
- RENUKA PRASANNA7.8 yr overdueRENUKA DEVLOPERS · VIHITGAON, NashikP51600006623· 70.9% built
- VRINDAVAN7.8 yr overdueNIRMITI BUILDERS AND DEVELOPERS · Nashik (M Corp.), NashikP51600004972· filed Dec 2017 → now Dec 2018· 89.5% built· 1 complaint
- URJA RESIDENCY7.8 yr overdueURJA BUILDERS AND DEVELOPERS · KHODE MALA, NashikP51600014599· 71.8% built
- VIJAY RESIDENCY7.8 yr overdueJAY DEVELOPERS · Aanandwali, NashikP51600007898· 72.7% built
- VIJAYPARADISEPARK7.8 yr overdueJAY DEVELOPERS · Nashik (M Corp.), NashikP51600004967· 63.6% built
- TREASURE PARK PHRASE -17.8 yr overdueKANAKLAXMI DEVELOPERS · Nashik, NashikP51600006300· filed Dec 2017 → now Dec 2018· 72.7% built
- SHREE VILLA7.8 yr overdueSHREE BUILD CRAFTS · Nashik (M Corp.), NashikP51600009776· 47.7% built
- Shree Gajanan Park7.8 yr overdueShree Buildcon & Associates · Deolaligaon, NashikP51600006279· 49.9% built
- SHAHS GOVIND APARTMENT PHASE I7.8 yr overdueSHAH BUILDERS AND DEVELOPERS · NEAR RENUKA MATA MANDIR, NashikP51600007197· 72.7% built
- GEETA HEIGHTS7.8 yr overdueGEETA DEVELOPERS · Nashik (M Corp.), NashikP51600011008· 73.6% built
- OMKAR APARTMENT7.8 yr overdueOmkar Developers · Nashik (M Corp.), NashikP51600012527· 65% built
- Param Heights7.7 yr overdueBharat Lalji Mawani · Vrindawan Nagar, NashikP51600007240· 65.5% built
- Shivam appartment7.6 yr overdueRavindra Maind · Nashik (M Corp.), NashikP51600010850· filed Mar 2018 → now Mar 2019· 69.1% built
- AADINATH PARK7.6 yr overdueSUJATA PRITESH CHHAJED · BEHED, NashikP51600015818· 81.8% built
- NANDAN SRUSHTI7.6 yr overdueHITESH RAMANBHAI PATEL · SAGAR VILLAGE, NashikP51600006992· 81.8% built
- RISHIK APPT7.6 yr overdueDARSHIT PURUSHOTTAM PATEL · Nashik, NashikP51600011144· 63.6% built
- HARI KRISHNA PHASE III7.5 yr overdueNARESH JAGUMAL KARDA · Deolaligaon, NashikP51600000375· filed Mar 2018 → now Mar 2019· 90.9% built
- RAZA ASHIYANA7.5 yr overdueNAZRULLAH NAIMUDDIN ANSARI · CHUNCHALE, NashikP51600012889· 90.9% built
- KAPALESHWAR CO. - OP. HSG. SOC.7.5 yr overdueABHAY CHANDMAL JAIN · NASIK ROAD, NashikP51600016108· 37.3% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.