Delayed projects in Pune
3,402 MahaRERA-registered projects in Pune are past the possession date on file and still under 100% built. Where the promoter has formally revised the date, the original is shown alongside so you can see what changed.
Page 1 of 18
- Nav Nirmal8.8 yr overdueDigamber Parulekar · Kothrud, PuneP52100003211· 81.8% built
- Arihant Avenue8.8 yr overdueDharmesh Vasantrai Shah · Haveli, PuneP52100009141· 81.4% built
- MAYUR GEMINUS - B8.8 yr overdueBUNTY PROPERTIES UNIT NO. XI · Hadapsar, PuneP52100003518· 90.9% built
- SOLITAIRE8.8 yr overdueVENUS SASCON DEVELOPERS · Pune (M Corp.), PuneP52100003846· 72.7% built
- SWARA SRUSHTI8.8 yr overdueEkvira Developers · Pimpri Chinchawad (M Corp.), PuneP52100008976· 90.9% built
- SAI DEVELPOER8.8 yr overdueSAI DEVELOPERS · Wadagaon (CT), PuneP52100005487· 90.9% built
- LODHA BELMONDO AUGUSTA C8.8 yr overdueLodha Developers Limited · Gahunje, PuneP52100000174· 90.9% built· 3 complaints
- Bhumi Pride8.8 yr overdueBhumi Shelters (India) Pvt Ltd · Pimpri Chinchawad (M Corp.), PuneP52100004657· 90.9% built
- VARAD VASTU8.8 yr overdueSHARAD KHARADE · Hinjavadi (CT), PuneP52100013534· 81.8% built
- Ashwamedh Admira8.8 yr overdueASHWAMEDH SPACES PRIVATE LIMITED · Baner, PuneP52100009195· 90.5% built
- NAMDEO RUKARI BAUG8.8 yr overdueM/s. TULSI DEVELOPERS · Haveli, PuneP52100010486· 81.8% built
- Peshwai Enclave8.8 yr overdueYemul& Sancheti Associates · Pune (CB), PuneP52100009603· 46.5% built· 2 complaints
- Kiran Sanklp8.8 yr overdueM/S KIRAN CREATORS & DEVELOPERS THROUGH PROPRIETOR MR. KASHINATH GANESH NEHETE · Sus, PuneP52100011477· 90.9% built
- SHUBHAM RESIDENCY8.8 yr overdueBHARAT SHRIKANT TIBREWALA · WAGHOLI, PuneP52100008724· 81.8% built
- Tara Ashirvaad8.8 yr overdueShivtara Properties Private Limited · WAGHOLI, PuneP52100008560· 72.7% built
- ARJUN RESIDENCY 5TH FLOOR8.8 yr overdueS M BEHARAY AND COMPANY · Pune (M Corp.), PuneP52100005625· 81.8% built
- ATHARVA BLISS PHASE I8.8 yr overdueM/s. Abhay Constructions · Bavadhan BK, PuneP52100006701· 87.9% built
- WESTWINDS Wing D8.8 yr overdueShreeram Sankalp Associates · Pune City, PuneP52100004203· 97.7% built
- HARMONY8.8 yr overdueUTTAM ASSOCIATE · Talegaon Dabhade (M Cl), PuneP52100012594· 90.9% built
- CHOWHAN RESIDENCY/ AMALTAS8.8 yr overdueThe Lifestile Realty · UNDRI, PuneP52100004955· 66.8% built
- VINAYAK HEIGHTS8.8 yr overdueR R BUILDERS & DEVELOPERS · Talegaon Dabhade (R), PuneP52100010646· 90.9% built
- Suguru Datta - C Building8.8 yr overdueSuguru Realty LLP · Pashan, PuneP52100006537· 81.8% built
- Dharmaganga8.8 yr overdueAnagha Associate · Pimpri Chinchawad (M Corp.), PuneP52100003945· 90.9% built
- Nikunj Navyangan8.8 yr overdueCALYX MERLIN VENTURES LLP · Mulshi, PuneP52100000512· 87.9% built
- SOHAM SUMY MADHURYA8.8 yr overdueSOHAM SUMY DEVELOPERS LLP · Wakad, PuneP52100009818· 64.5% built
- WHISPERING WINDS PHASE I8.8 yr overdueVYAS REALTIES PVT. LTD. · Pune (M Corp.), PuneP52100006242· 90.9% built
- AMBAR DARSHAN8.8 yr overdueSHIVSHAKTI BUILDERS & DEVELOPERS · Haveli, PuneP52100008843· 86.4% built
- Amaya Apartment8.8 yr overdueDream Homes Developers · Pimpri Chinchawad (M Corp.), PuneP52100011186· 81.8% built
- SAI PUSHKRAJ8.8 yr overdueSAI ENTERPRISES · kondhwa BK, PuneP52100013136· 90.9% built
- Ashish8.8 yr overdueDamle Tapdia Developer · Pune (M Corp.), PuneP52100009633· 81.8% built
- BHONGADE PARK III8.8 yr overdueSHARAD BABANRAO BHONGADE · Varale, PuneP52100003152· 99.1% built
- Mahaveer Delight8.8 yr overdueYashodhan Associates · Pune (M Corp.), PuneP52100007439· 84.5% built· 38 complaints
- VARDHAMAN ELEGANCE8.8 yr overdueVARDHMAN DEVELOPERS UNIT 1 · WAGHOLI, PuneP52100006479· 77.3% built
- VENUS HEIGHTS8.8 yr overdueVENUS CONSTRUCTION · Pune (M Corp.), PuneP52100009223· 81.8% built
- LAXMIRANG HEIGHTS8.8 yr overdueJAWALKAR ASSOCIATES · Haveli, PuneP52100009335· 90.9% built
- Arihant Garden8.8 yr overdueDharmesh Vasantrai Shah · Haveli, PuneP52100009410· 81.6% built
- Shobha Chambers8.8 yr overdueRajesh Nandlal Peswani · Haveli, PuneP52100010223· 51.8% built
- Playtor Ranjangaon- Phase 18.8 yr overduePLAYTOR LIFESPACES PRIVATE LIMITED · Karegaon, PuneP52100001953· 74.7% built· 2 complaints
- VAISHNAV CONSTRUCTION8.8 yr overdueVAISHNAV CONSTRUCTION · Pimpri Chinchawad (M Corp.), PuneP52100011612· 72.7% built
- AMBER ELITE8.8 yr overdueADHAR LAND DEVELOPERS PVT. LTD. · AMBEGAON Bk, PuneP52100003416· 90.9% built
- MEGHMANAS8.8 yr overdueRANJEKAR REALTY · Pune City, PuneP52100002654· 96.8% built
- GOVIND VILAS8.8 yr overdueM/S SWAMI OM PROPERTIES · Pune City, PuneP52100008590· 90.9% built
- GURUMAULI COMPLEX8.8 yr overdueSahyadri Constructions and Developer Company · Haveli, PuneP52100014282· 84.5% built· 3 complaints
- Nirman Ajinkyatara Wing D8.8 yr overdueNIRMAN DEVELOPERS · Pune (M Corp.), PuneP52100004880· 81.8% built
- MANOJ APARTMENT CONDOMINIUM8.8 yr overdueSachiien Arun Kawale · Pune City, PuneP52100005318· 90.9% built
- KRUSHNA VIHAR8.8 yr overdueKRUSHNA ASSOCIATES · Haveli, PuneP52100000653· 83.6% built
- Amrutdhara C and D1-D28.8 yr overdueLunkad Gruh Nirman Company · CHARHOLI, PuneP52100000230· 90.9% built
- Mukti Nakshtra E and H bldg8.8 yr overdueMukti Township Development & Construction Co. Pvt. Ltd. · Baramati (M Cl), PuneP52100002811· 81.8% built
- AMBER PLAZA8.8 yr overdueADHAR LAND DEVELOPERS PVT. LTD · AMBEGAON Bk, PuneP52100005529· 90.9% built
- BALAJI PARADISE BUILDING A and D8.8 yr overdueBALAJI HOME DEVELOPER · Dhayari (Part), PuneP52100005886· 60.6% built
- DHANALAXMI ANGAN8.8 yr overdueM/S. K P DEVELOPERS & BUILDERS · Mawal, PuneP52100007205· 63.8% built
- SRRINIVAS SSKY8.8 yr overdueDIPPAK RAVINDRA WANI · VIMANNAGAR, PuneP52100010603· 90.9% built
- Platinum Square Phase 18.8 yr overdueVascon Engineers Ltd · Vimannagar, PuneP52100001434· 86.8% built
- YAMUNA VIHAR WING-C8.8 yr overdueSHAHAJI RAMRAO DHAWAN · Baramati (M Cl), PuneP52100012416· 43.4% built
- ATUR VALLY VISTA WING B8.8 yr overdueATUR INDIA PRIVATE LIMITED · Pisoli, PuneP52100003801· 95% built
- Swapna Yog8.8 yr overdueJadhav engg. & Associate · Daund (CT), PuneP52100002202· 90.9% built
- Anika Enclave8.8 yr overdueArun Pitamber Sheth · Pune City, PuneP52100001676· 90.9% built
- VRUNDAVAN - A WING8.8 yr overdueSHRI LAXMI BALAJI DEVELOPERS · charholi kh, PuneP52100011028· 90.9% built
- BIRDS COUNTY8.8 yr overdueD P K ASSOCIATES · Wakad, PuneP52100010148· 90.9% built
- Lakshmi Gopal Nivas8.8 yr overdueGUND AND PETHE ASSOCIATES · Peth, PuneP52100005259· 77.3% built
- Woodcrest8.8 yr overdueFlora builders & developers · Haveli, PuneP52100008054· 90.9% built
- Cosmos Greens8.8 yr overdueCosmos Realities · Daund, PuneP52100003223· 64.1% built
- Padmaansh8.8 yr overduePadmakar Shripad Joshi · Pimpri Chinchawad (M Corp.), PuneP52100010250· 90.9% built
- RIDDHI SIDDHI8.8 yr overdueDurga Associates · Baner, PuneP52100003550· 81.8% built
- JAY GANESH CONSTRUCTIONS8.8 yr overdueJAY GANESH CONSTRUCTION · Baner, PuneP52100008689· 81.8% built
- Arihant Ambience8.8 yr overdueDharmesh Vasantrai Shah · wanwadi, PuneP52100011343· 63.2% built
- ROHAN ISHAN WING A 5 TO 11 FLOOR8.8 yr overdueROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED · Mulshi, PuneP52100000816· 90.9% built
- SHYAMNATH PALACE8.8 yr overdueSUNIL JANARDAN CHAVRE · WAGHOLI, PuneP52100003425· 25.9% built
- Mid Town8.8 yr overdueAvirat Ventures · Pimpri Chinchawad (M Corp.), PuneP52100008137· 90.9% built
- Mukti Corporate Plaza8.8 yr overdueMukti Construction · Bhigavan Road, PuneP52100011632· 81.8% built
- Siddhivinayak Residency8.8 yr overdueGEET DEVELOPERS · Haveli, PuneP52100004656· 81.8% built
- Aabhalmaya8.8 yr overdueSKY REALTY · CHARHOLI, PuneP52100005453· 81.8% built
- SHREYASH SANKUL8.8 yr overdueShiv Developers · NARHE, PuneP52100005671· 90.9% built
- DESTINATION OSTIA8.8 yr overdueD R GAVHANE LANDMARKS LLP · Pimpri Chinchawad (M Corp.), PuneP52100001719· 90.9% built· 1 complaint
- MUKTI PARK8.8 yr overdueMukti No 2 Sahakari Gruhrachana Santha Marya Baramati · Vanjarwadi, PuneP52100009709· 81.6% built
- PESHWAI ARCADE8.8 yr overdueD Y DEVELOPERS · Pune (M Corp.), PuneP52100009155· 90.9% built
- Dew Drops8.8 yr overdueGreen Homes · Shirur, PuneP52100001436· 90.9% built
- Prathamesh Exotica Phase-II8.8 yr overdueAtharva Associates · Haveli, PuneP52100003533· 81.8% built
- ARNAV SIGNATURE RESIDENCES8.8 yr overdueINTELLECTUAL CONSTRUCTION AND INFRASTRUCTURE PVT. LTD · Pune (M Corp.), PuneP52100006185· 99.1% built
- IRA C BUILDING PHASE 28.8 yr overdueM/S MAJESTIQUE MANTRA INCORPORATION · UNDRI, PuneP52100002163· 90.9% built
- Maple Woodz phase-28.8 yr overdueWindsor Shelters · Taware Colony, PuneP52100009772· 90.9% built
- Premia C-1 Phase I8.8 yr overdueC.D. Developers · NARHE, PuneP52100005230· 81.8% built
- chirayu Apartment8.8 yr overdueRane Karandikar Developers · Baner, PuneP52100013186· 55% built
- Fortune Spaces8.8 yr overdueFortunespaces · Pimpri Chinchawad (M Corp.), PuneP52100003020· 90.5% built
- Sai Siddhi8.8 yr overdueS.R.K PROPERTIES · Wakad, PuneP52100004213· 90.9% built
- Vizion Galaxy B8.8 yr overdueVIZION CONSTRUCTION · Junnar, PuneP52100008039· 90.9% built
- OPAL B WING8.8 yr overdueBehede Parwal Properties · Baner, PuneP52100012327· 90.9% built
- BHALCHANDRA8.8 yr overdueKALYANI VILAS · Pune City, PuneP52100012906· 72.7% built
- Misty Woods8.8 yr overduePruthvi Developers · Pimpri Chinchawad (M Corp.), PuneP52100000627· 90.9% built
- Mango One B-C8.8 yr overdueMango Lifestyle Private Limited · Malwadi, PuneP52100005400· 81.8% built
- Swarnavilas Phase 18.8 yr overdueSachin vitthal Nimhan · Pashan, PuneP52100002565· 90.9% built
- YASHWANT APARTMENT8.8 yr overdueM/S SHREERAM BUILDERS · Parvati, PuneP52100011553· 81.8% built
- Prachi Residency Phase II8.8 yr overdueSancheti Associates · Baner, PuneP52100003737· 90.9% built
- Tara Jewel8.8 yr overdueTara Jewel · Haveli, PuneP52100007418· 72.7% built
- CORE8.8 yr overdueAHURA BUILDERS · Pune (M Corp.), PuneP52100013229· 90.9% built
- Shubham Siddhi8.8 yr overdueShubham Realtors · Wadagaon (CT), PuneP52100008013· 81.8% built
- The Nest8.8 yr overdueJ J REALITY · Pimpri Chinchawad (M Corp.), PuneP52100001390· 78.8% built
- SHARVARI WINDGATES, PHASE-I8.8 yr overdueADINATH DEVELOPERS · Punawale, PuneP52100006771· 72.7% built
- BELLAGIO8.8 yr overdueSRUSHTI DEVELOPERS · Haveli, PuneP52100004894· 90.9% built
- Sanjeewani8.8 yr overdueJ J SHELTERS · Thergaon, PuneP52100002408· 81.8% built
- KAKADE RESIDENCY8.8 yr overdueBMK PROPERTIES PRIVATE LIMITED · Talegaon Dabhade (M Cl), PuneP52100004336· 81.8% built
- OM PARADISE B AND C WING8.8 yr overdueS K BUILDCON · KIWALE, PuneP52100002744· 72.7% built
- ADITYA PARADISE8.8 yr overdueMore Shinde Associates · Punawale, PuneP52100008846· 72.7% built
- GURU VIHAN8.8 yr overdueGURU DEVELOPERS AND ASSOCIATES · Wagholi, PuneP52100000553· 81.8% built
- TROPICA PHASE I8.8 yr overdueOm Developers Project Ravet · Pimpri Chinchawad (M Corp.), PuneP52100003765· 90% built
- BHUVI8.8 yr overdueM/s Vitthal Properties · Wakad, PuneP52100008707· 81.8% built
- Orchard8.8 yr overdueShiv Parvati Developers · Hadapsar, PuneP52100006525· 81.8% built
- LODHA BELMONDO ASHBRIDGE D, E8.8 yr overdueLodha Developers Limited · Gahunje, PuneP52100011522· 90.9% built· 2 complaints
- GOLDEN BELLS PHASE I8.8 yr overduePIONEER CONSTRUCTIONS · Haveli, PuneP52100004990· 90.9% built
- SAI MAJESTIC8.8 yr overdueS S DEVELOPERS · Wakad, PuneP52100002487· 55% built
- Sunshine Elite8.8 yr overdueShahin M Yasin Hawaldar · Wakad, PuneP52100007173· 81.8% built
- ASTER8.8 yr overdueKALAPI VENTURES · Pisoli, PuneP52100007322· 45.5% built
- INDRAYAN8.8 yr overdueGruha Navnirman Developers · Pune (M Corp.), PuneP52100001253· 81.8% built
- CHINTAMANI8.8 yr overdueKALYANI VILAS · Pune City, PuneP52100012978· 72.7% built
- PARIJAT BUILDING A8.8 yr overdueSHRI VENKATESH SHARADA INFRACON · AMBEGAON, PuneP52100005323· 81.8% built· 4 complaints
- Swapneel Phase 28.8 yr overdueM/S Waman Constructions · Pimpri Chinchawad (M Corp.), PuneP52100003744· 90.9% built
- VARDHAMAN PARK8.8 yr overdueCHRISHH OMKARA CONSTRUCTIONS · Varale, PuneP52100008190· 90.9% built
- SITA SADAN8.8 yr overdueSUN CONSTRUCTION · Talegaon Dabhade (M Cl), PuneP52100006393· 81.8% built
- Dhanwantari Terrace Cooperative Housing Society Limited8.8 yr overdueDigamber Parulekar · Kothrud, PuneP52100005496· 81.8% built
- Sumeet Co-operative Housing Society8.8 yr overdueM/S SHREERAM BUILDERS · Parvati, PuneP52100009620· 81.8% built
- VASTUPURTI8.8 yr overdueUnity Spaces LLP · Wadagaon (CT), PuneP52100013189· 90.9% built
- JADE RESIDENCES - 28.8 yr overdueCREATOZ BUILDERS PRIVATE LIMITED · WAGHOLI, PuneP52100005242· 86.4% built· 18 complaints
- HIRAMANDA HEIGHTS8.8 yr overdueHIRAMANDA DEVELOPERS · Shirur, PuneP52100004488· 90.9% built
- SWASTIK MUHURTAM8.8 yr overdueSWASTIKCONSTRUCTION · Mahalunge, PuneP52100007639· 90.9% built
- GANGA ELIKA8.8 yr overdueGOEL AVISHKAR PROMOTERS · Haveli, PuneP52100003750· 90% built
- SHIVSAHYADRI8.8 yr overdueNANDANVAN DEVELOPERS · Junnar, PuneP52100009463· 90.9% built
- SAMARTH RESIDENCY8.8 yr overdueM M DEVLOPERS · Haveli, PuneP52100008277· 73.1% built
- Tulsai Heights8.8 yr overdueSachin Kishanrao Padwal · Bhosari, PuneP52100002513· 90.9% built
- Swami Krupa8.8 yr overdueMeenal Prakash Rao · Wadagaon (CT), PuneP52100012744· 81.8% built
- Mont Vert Vivant8.8 yr overduePatel Associates · Wakad, PuneP52100001586· 90.9% built
- Audumbar8.8 yr overdueMawlankar Lagad Associates · Baner, PuneP52100004181· 81.8% built
- Destination Ankur - A and B Building8.8 yr overdueKIRTILANDMARKS · CHARHOLI, PuneP52100006234· 68% built
- KALPVRUKSH8.8 yr overdueKALPVRUKSH DEVELOPERS · Pimpri Chinchawad (M Corp.), PuneP52100007850· 81.8% built
- PUSHKARAJ8.8 yr overdueINOVIIC DEVELOPER · Kothrud, PuneP52100008994· 90.9% built· 1 complaint
- J.P. business Plaza8.7 yr overdueD.G.T. Developers · Shirur, PuneP52100012741· 90.9% built
- SWARAJ8.7 yr overdueRAMAN BABASO KHAMKAR · Patas, PuneP52100007657· 78.2% built
- P SQUARE PHASE 18.7 yr overdueVIJAY CONSTRUCTION NX · Haveli, PuneP52100004354· 60% built
- Vizion Galaxy A8.7 yr overdueVIZION CONSTRUCTION · Junnar, PuneP52100004006· 90.9% built
- Shri Sai8.7 yr overdueSai Ram Builders and Developers · Shirur, PuneP52100010822· 77.7% built
- Pragati Greenwoods8.7 yr overduePragati Construction · Waksai, PuneP52100008279· 89.1% built
- RAJ RESIDENCY8.7 yr overdueVastu Developers and Promotors · Talegaon Dabhade (M Cl), PuneP52100013370· 90.9% built
- SIDDHIVINAYAK PRIDE8.7 yr overdueSAGAR DILIP RUKARI · MANJARI Bk, PuneP52100000491· filed Dec 2017 → now Feb 2018· 83.6% built
- Shubharambh8.6 yr overdueNIRMAN RESIDENCY · Dehu Road (CB), PuneP52100008363· 63.6% built
- KOYANA CONDOMINIUM8.6 yr overdueK J REALTORS · Kothrud, PuneP52100008222· 69% built
- Dynasty8.6 yr overdueShiv Enterprises · Pimpri Chinchawad (M Corp.), PuneP52100009988· 90.9% built· 3 complaints
- Sanghvi Shells8.6 yr overdueMukesh Shantilal Sanghvi · Baner, PuneP52100002539· 72.7% built
- Prathamesh Residency8.6 yr overdueSiddhivinayak Developers · CHARHOLI, PuneP52100002315· 85.5% built
- SKY POINT PHASE I B AND C WING8.6 yr overdueShubh Enterprises · Mundhawa, PuneP52100007993· 86.4% built
- SUWARNALAY8.6 yr overdueNATH ASSOCIATES · Pimpri Chinchawad (M Corp.), PuneP52100012078· 58.6% built
- YASHWANT NAGAR PLUS8.6 yr overdueNAMRATA MARK VENTURES · Varale, PuneP52100012929· 90.5% built
- Star Woods Phase I8.6 yr overdueVaishnavi Space Creator · Tathwade, PuneP52100007153· 50% built
- Riddhish Residency8.6 yr overdueDamle Gandhe LLP · Baner, PuneP52100009314· 41.2% built
- JUBILATION8.6 yr overdueAAKANKSSHA ASSOCIEATES · WAGHOLI, PuneP52100007279· 90.9% built
- MONICA CORNER8.6 yr overdueMONICA CONSTRUCTION & BUILDERS · Hadapsar, PuneP52100011180· 77.3% built
- VISION WOODS 1 PHASE 18.6 yr overdueSHUBBAN REALTORS · Jambhul, PuneP52100012489· 87.2% built
- srishtee spaces Phase I8.5 yr overdueSRISHTEES Preet Homes · Pimpale Saudagar, PuneP52100003753· 72.7% built
- DATTAKRUPA HEIGHTS8.5 yr overdueDHANANJAY DAMODHAR DAREKAR · Pimpri Chinchawad (M Corp.), PuneP52100005110· 72.7% built
- Eisha Erica D Bldg8.5 yr overdueEISHA VASTU CONSTRUCTION · Dhayari (Part), PuneP52100003882· 84.6% built· 1 complaint
- CHANDRA AVENUE8.5 yr overdueCHANDRA REALITY · Shirur, PuneP52100006420· 89.1% built
- DAFFODILS AVENUE PHASE 38.5 yr overduePENTAGON SHREEMANGAL VISHHRAM VENTURES · Somatane, PuneP52100012406· 88.2% built· 2 complaints
- SHREE GURUDATTA DEVELOPERS8.5 yr overdueDATTATRAY DAGADU BORKAR · Talegaon Dabhade (R), PuneP52100012893· 54.5% built
- SHRUTI PRESTIGE B WING8.5 yr overdueM/S. SHRUTI DEVELOPERS · AMBEGAON Bk, PuneP52100004965· 81.8% built
- AADITYA MALHAR8.5 yr overdueVAKRATUND REALITIES · Pimpri Chinchawad (M Corp.), PuneP52100010158· 99.8% built· 1 complaint
- SHIVRAM HEIGHTS8.5 yr overdueSHIVRAM PROPERTIES · Punawale, PuneP52100011332· 77.7% built
- Ashok Nirvaan Villa 438.5 yr overdueTruewin Realty Limited · Lonavala (M Cl), PuneP52100009630· 81.8% built
- VASTU FOREST NEST8.5 yr overdueVASTUSHILPBUILDERS & DEVELOPERS · Chakan (CT), PuneP52100012962· 89.1% built· 7 complaints
- WATERS EDGE PHASE IV8.5 yr overdueOM SAGAR DEVELOPERS · PIMPLE NILAKH, PuneP52100001678· 90.9% built
- ORIANA8.5 yr overdueM/S.Kishor Builders Promoters And Developers · Baner, PuneP52100002537· 81.8% built
- VISION 9 Phase I8.5 yr overdueSiddhivinayak Govind Ventures · Pimpale Saudagar, PuneP52100004019· 74.5% built
- BALAJI REGENCY8.5 yr overdueK.M.S. PROMOTERS & BUILDERS · Talegaon Dabhade (M Cl), PuneP52100005120· 90.9% built
- VASTU VINTAGE PHASE 18.5 yr overdueVASTUSHILPBUILDERS & DEVELOPERS · medankarwadi, PuneP52100012756· 81.4% built· 3 complaints
- SONIGARA OPAL8.5 yr overdueDEVIKE CONSTRUCTION AND DEVELOPRS PVT. LTD. · Haveli, PuneP52100012121· 81.8% built
- Madhuban8.5 yr overdueM/s Kakkad Developments · Pune (M Corp.), PuneP52100011669· 81.8% built
- PRIMERO CASA8.5 yr overdueGAURI LIVELY SPACES · Pimpri Chinchawad (M Corp.), PuneP52100012820· 71.4% built
- KESHAV CAPITAL8.5 yr overdueSAMARTHSHREE PROMOTERS AND DEVELOPERS · Mundhawa, PuneP52100002968· 51.9% built· 1 complaint
- Palaash Icon Phase 28.5 yr overdueG S PROMOTERS · Chinchwad, PuneP52100000740· 81.8% built
- VENKATESH GRAFFITI PHASE - 78.5 yr overdueSHREE VENKATESH BUILDCON PVT LTD · KESHAVNAGAR MUNDHWA, PuneP52100014978· 81.8% built
- Sukh Vastu8.5 yr overdueA V Bhat Builders Pvt Ltd · Haveli, PuneP52100005379· 90.9% built· 3 complaints
- Signature Heights8.5 yr overdueSamruddhi Properties · Wakad, PuneP52100007417· 53.6% built
- ALIVE8.5 yr overdueNIMANI CONSTRUCTIONS · Pune (M Corp.), PuneP52100004256· 81.8% built
- CROSSROADS8.5 yr overdueSHREE RAVIRAJ PASHANKAR DEVELOPERS · Wakad, PuneP52100007186· 56.2% built
- SAMARTH KRISHNA8.5 yr overdueSAMARTH DEVELOPERS · kondhwa BK, PuneP52100003841· 58.2% built
- SOMANI RESIDENCY8.5 yr overdueNITIN PRABHUDAS SOMANI · Punawale, PuneP52100002216· 65% built
- BLUE SAPPHIRE8.5 yr overdueBLUEBERRY DEVELOPERS · Somatane, PuneP52100007703· 90.9% built
- SILVER CREST8.5 yr overdueAVNEE LANDMARKS LLP · Haveli, PuneP52100000641· 90.9% built
- Emanate8.5 yr overdueAmit Shashikant Golande · Handewadi, PuneP52100001633· 90.9% built
- REGENCY ORION A18.5 yr overdueREGENCY HOUSING · Pune (M Corp.), PuneP52100005336· 81.8% built
- ATHARVA PLAZA8.5 yr overdueD G ASSOCIATES · Pune (M Corp.), PuneP52100008518· 81.8% built
- PHASE I VISION ROYALLE8.5 yr overdueSHUBBAN PROPERTIES VISION ROIYALLE · Wadagaon (CT), PuneP52100005624· 89.1% built· 1 complaint
- Shreeram Residency8.5 yr overdueSHRIRAM DEVELOPERS · Pimpri Chinchawad (M Corp.), PuneP52100004468· 50.9% built
- Antheia C18.5 yr overdueMahindra Lifespace Developers limited · Haveli, PuneP52100000217· 81.8% built
- AKSHAY COUNTY8.5 yr overdueSHREE PROPERTIES · Pune City, PuneP52100005138· 56.4% built
- Irene8.5 yr overdueColosseum Developers Pvt.Ltd. · Hadapsar, PuneP52100000313· 90.9% built
- SWAMI VIHAR8.5 yr overdueHARSHAL MADHAV SHELKE · Daund, PuneP52100012043· 90.9% built
- SHREE SAMARTH RESIDENCY8.5 yr overdueM/s. Dampdar Pote And Associates · Pirangut, PuneP52100014342· 47% built
- SHYAM VIHAR8.5 yr overdueKRISHNA DEVELOPERS · KATRAJ, PuneP52100012911· 81.8% built
- NANDAN AMAIRA8.5 yr overdueNANDAN ASSOCIATES · Pune (M Corp.), PuneP52100000883· 90.9% built
- NYATI ETERNITY COMMERCIAL I8.5 yr overdueNITIN DWARKADAS NYATI · UNDRI, PuneP52100000954· 81.8% built
- RAHI COMPLEX8.5 yr overdueSHRI SIDDHI DEVELOPERS · NARHE, PuneP52100012377· 62.3% built
- LIFE MONTAGE PHASE 18.5 yr overdueGHODAWAT INFRA LLP · Sus, PuneP53000007829· 64.3% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.