Delayed projects in Nashik
985 MahaRERA-registered projects in Nashik are past the possession date on file and still under 100% built. Where the promoter has formally revised the date, the original is shown alongside so you can see what changed.
Page 2 of 5
- KARMAYOGI APARTMENT7.4 yr overdueKARMAYOGI BUILDERS AND DEVELOPERS · Nashik (M Corp.), NashikP51600006353· 71.4% built
- SHYAM SQUIRE7.4 yr overdueNILAM JAGDISH VAGHELA · Nashik (M Corp.), NashikP51600009778· 90.9% built
- ADITYA GOLD7.4 yr overdueNitin Laxman Jadhav · Nashik, NashikP51600010393· 79.1% built
- RIDDHESH HEIGHTS7.4 yr overdueSAMRUDDHI DEVELOPERS · Nashik, NashikP51600012650· filed Mar 2018 → now Mar 2019· 63.6% built
- SHREE TIRUMALA HARINIWAS APARTMENT7.4 yr overdueROONGTA HOMES LLP · Satpur, NashikP51600001282· 90.9% built
- Amodini Apartment7.4 yr overdueRavi Mahajan Builders & Developers Pvt.Ltd. · Nashik, NashikP51600012217· 90.9% built
- Shiv Amrut7.4 yr overdueJagdish Petha Patel · Nashik (M Corp.), NashikP51600012447· 90.9% built
- YASH REIDENCY7.4 yr overdueSEVA DEVELOPERS · GANGAPUR VILLAGE, NashikP51600012917· 82.7% built
- SHARVARI HEIGHTS7.4 yr overdueATHARVA VISHWA BUILDCON · Nashik (M Corp.), NashikP51600008067· 90.9% built
- SAPTASHRUNGI TARA7.4 yr overdueTRIMURTI GROUP · Nashik (M Corp.), NashikP51600011060· 90.9% built
- DWARKESH HEIGHT7.4 yr overdueUMA BUILDERS & DEVLOPERS · M, NashikP51600012534· 90.9% built
- RAZA ASHIYANA7.4 yr overdueNAZRULLAH NAIMUDDIN ANSARI · CHUNCHALE, NashikP51600012889· 90.9% built
- SHASHI ANAND ENCLAVE7.4 yr overdueANAND PREM ASSOCIATES · Nashik, NashikP51600003498· 68.2% built
- ISHAN HEIGHTS7.4 yr overdueRACHANACONSTRUCTION · NASHIK, NashikP51600015977· 85% built· 2 complaints
- JAIRATNA CO-OP SOCIETY7.4 yr overdueSHREE ASTAVINAYAK DEVELOPERS · Nashik, NashikP51600012430· 90.9% built
- SAGAR CASTLE7.4 yr overdueK.M. CONSTRUCTIONS · pakhal road, NashikP51600011628· 90.9% built
- SAI KIRAN APPARTMENT7.4 yr overdueSAI DEVELOPERS · Dwarka, NashikP51600011947· 90.9% built
- SHREE TIRUMALA RIVIERA PHASE II7.4 yr overdueSHREE SHYAM BUILDERS · Aanandwali, NashikP51600007719· 81.8% built
- SHAHS PARASHRAM APARTMENT7.4 yr overdueSHAH BUILDERS AND DEVELOPERS · SANSARI, NashikP51600001937· 69.1% built
- NANDAN SMRUTI7.4 yr overduePRAKASHKUMAR CHHAGANBHAI PATEL · UNTVADI, NashikP51600011972· 81.8% built
- GEMINI HEIGHTS II7.4 yr overdueVIKAS GEMINI · Nashik (M Corp.), NashikP51600010513· 90.9% built
- MALTI HEIGHTS7.3 yr overdueVashudev Developers · Nashik, NashikP51600008940· 70% built
- Godavari Heights7.3 yr overdueBHARAT JETHLAL THAKKAR · Nashik (M Corp.), NashikP51600005790· filed Mar 2018 → now May 2019· 75.5% built
- Satguru Sankul7.3 yr overdueSatguru Builders and Developers · Vidhate Nagar, NashikP51600013560· 86.4% built
- Madhuvan Residency7.3 yr overdueSri Sri Radha Madan Gopal Construction and developers · Nashik, NashikP51600004865· 38.4% built
- DREAM HEIGHTS7.3 yr overdueH M BUILDERS · Nashik (M Corp.), NashikP51600004361· 65.5% built
- HINGLAJ7.2 yr overdueBHARAT JETHLAL THAKKAR · HIRAWADI, PANCHAVATI NASIK, NashikP51600014802· 90.9% built
- Antariksha Apartment7.2 yr overdueRavi Mahajan Builders & Developers Pvt.Ltd. · Nashik, NashikP51600009960· 90.9% built
- GURUMAULI RESIDENCY7.2 yr overdueSUVARNA SANJAY SAYANKAR · Nashik (M Corp.), NashikP51600006854· 81.8% built
- SHIVRAI APARTMENT7.1 yr overdueCHANDRIKA SHIVPRASAD ROY · NASHIK, NashikP51600015341· 27.7% built
- Avnish Residency7.1 yr overduePrathamesh Buildwell · Collage Road, NashikP51600014671· 90.9% built
- ABHINANDAN HEIGHTS7.1 yr overdueABHAY CHANDMAL JAIN · MAKHAMALABAD, NashikP51600015311· 73.2% built
- Nishant iken Phase 17.1 yr overdueGanesh kashiram ahire · Nashik (M Corp.), NashikP51600004851· 76.1% built
- GOVINDA HEIGHTS7.1 yr overdueRADHE DEVELOPERS · Nashik, NashikP51600004718· 52.7% built
- SAIRAJ SKY COURT APARTMENTS7.1 yr overdueSAIRAJ BUILDERS AND DEVELOPERS · Karmayogi Nagar, NashikP51600007109· filed Jun 2018 → now Jun 2019· 90.9% built
- OZONE7.1 yr overdueAMMA BUILDERS AND DEVELOPERS · Nashik (M Corp.), NashikP51600011883· filed Jun 2018 → now Jun 2019· 90.9% built
- SHIVGANGA DUPLEX ROW HOUSE7.1 yr overdueC S BUILDERS AND DEVELOPERS · Nashik (M Corp.), NashikP51600008595· 36.8% built
- SAKET HEIGHTS APARTMENT7.1 yr overdueGEETA LAND DEVELOPERS · Deolaligaon, NashikP51600003851· filed Jun 2018 → now Jun 2019· 90.9% built
- HARI SPARSH PHASE III7.1 yr overdueDHARAN INFRA-EPC LIMITED · Bhagur Rural, NashikP51600000225· 90.5% built
- SHRUSHTI-AYAAN HEIGHTS7.1 yr overdueSPARSH BUILDCON · Jail Road, NashikP51600013998· 2% built
- SHAHS KAMAL SANKUL7.1 yr overdueSHAH BUILDERS AND DEVELOPERS · NASHIK, NashikP51600014862· 72.7% built
- KARMAA PINNACLE7.1 yr overdueKARMAA BUILDERS · Nashik Road, NashikP51600001393· 90.9% built· 2 complaints
- IMPERIAL MEADOWS PHASE 17.1 yr overdueTALWARE BUILDERS PRIVATE LIMITED · Nashik, NashikP51600014067· 38.5% built
- SHUBH NAKASHTRA7.1 yr overdueSHUBH DEVELOPERS · RAHU HOTEL, NashikP51600010875· 63.6% built
- Guru Villa7.1 yr overdueAllwin Infrastructure · Nashik (M Corp.), NashikP51600011745· 81.8% built
- Shivmudra Darshan Appartment7.1 yr overdueShivmudra Builders and Developers · Nashik, NashikP51600012624· filed Jul 2018 → now Jul 2019· 65.5% built
- KARMAA PINNACLE7.1 yr overduePINNACLE HABITATS LLP · Nashik, NashikP51600009298· 73.6% built
- Shreya Heights7.1 yr overdueShreya Properties PVT. LTD. · Nashik, NashikP51600008371· 90.9% built
- Savali Sankul7.1 yr overdueSAVALI INFRASTRUCTURE PVT. LTD. · Sinnar(M Cl), NashikP51600001803· 90.9% built
- SAI RATAN RESIDENCY7.1 yr overdueDEEPAK KALYANJI CHANDE · Nashik Road, NashikP51600001978· 90.9% built
- DESHPANDE HEIGHTS7.1 yr overdueH M BUILDERS · Nashik (M Corp.), NashikP51600004222· 51.8% built
- LAXMI KRUPA APARTMENT7.1 yr overdueLAKHAMSI RAJA PATEL · Nashik Road, NashikP51600004128· 90.9% built
- VRUSHALI PARK COOPERATIVE HOUSING SOCIETY7.1 yr overdueGREEN WOODS COMBINE · Nashik, NashikP51600011541· 48.2% built
- Rajal Heights7.1 yr overdueAakar Enterprises · Nashik (M Corp.), NashikP51600012089· filed Jul 2018 → now Jul 2019· 90.9% built
- SHUBH SANSKRUTI7.1 yr overdueSHUBH DEVELOPERS · RAHU HOTEL, NashikP51600010418· 63.6% built
- AMAR VIHAR ROW BUNGLOW7.1 yr overdueAMAR INFRASTRUCTURES · SHIVAJI NAGAR, NashikP51600016312· 81.8% built
- PARK AVENUE7.1 yr overdueRAJIV DEVELOPERS · Nashik (M Corp.), NashikP51600011557· 81.8% built
- Orchard Meadow7.1 yr overdueChetan Dilip Patkar · GOVIND NAGAR, NashikP51600008737· 90.9% built
- Harith7.1 yr overdueRajesh H Bhalla · Nashik, NashikP51600010279· 60.5% built
- TAJ TAHZEEB7.1 yr overdueKALIM NIAZODDIN SHAIKH AND OTHERS · NASHIK, NashikP51600005531· 81.8% built
- Prabhat Prestige7.1 yr overduePrabhat Developers · Nashik (M Corp.), NashikP51600010637· 81.9% built
- Vrundavan7.0 yr overdueAllwin Infrastructure · Nashik (M Corp.), NashikP51600011268· 90.9% built
- SHREE SAI PARK7.0 yr overdueSHREE SAI ASSOCIATES · Nashik (M Corp.), NashikP51600014258· 65% built
- SHRI ANAND VAIBHAV7.0 yr overdueSANDEEP KANTILAL KOCHAR · -, NashikP51600015421· 90.9% built
- Navkar Apartment7.0 yr overdueAshok Narottam Vanara · JATARA HOTEL CHOWK, NashikP51600013114· filed Aug 2018 → now Aug 2019· 90.9% built
- OLIVE ARCADE7.0 yr overdueSMB DEVELOPERS & CONTRACTORS · Nashik (M Corp.), NashikP51600004778· 80% built
- RAGHUNANDAN APPARTMENT7.0 yr overdueSHRINATHJI DEVELOPERS · Nashik (M Corp.), NashikP51600007090· 90.9% built
- LOTUS APPARTMENT7.0 yr overdueJAY AMBE ASSOCIATES · Nashik, NashikP51600008569· 90.9% built
- LOTUS PARK7.0 yr overdueNEW JAY AMBE ASSOCIATES · Nashik, NashikP51600004411· 90.9% built
- NEW PUSHKRAJ APPARTMENT7.0 yr overdueM/S NEW PUSHKARAJ CONSTRUCTION · Nashik, NashikP51600004791· 90.9% built
- SAI VANDAN PARK6.9 yr overdueJIDNYASA REALTORS · Saradwadi, NashikP51600013671· 82.3% built
- THE WATERFRONT6.9 yr overdueHARISH VEERAPPA KANCHAN · JALALPUR, NashikP51600000543· filed Sept 2018 → now Sept 2019· 46.4% built
- PRIME RESIDENCY6.9 yr overdueRAJESH SHANKAR KASHMIRE · PANCHVATI, NashikP51600010552· 90.9% built
- SHREE TIRUMALA PARADISE APARTMENT6.9 yr overdueROONGTA HOMES LLP · NASHIK, NashikP51600001631· 81.8% built
- PERFECT RESIDENCY6.9 yr overduePERFECT DEVELOPERS · Nashik, NashikP51600002318· 67.3% built
- JAJOO NAIKS AMAR VRINDAVAN APARTMENT6.9 yr overdueAMAR BUILDTECH PVT LTD · TRIMURTI CHOWCK, NashikP51600008287· 81.8% built
- GURUSNEH6.8 yr overdueM M ASSOCIATES · Nashik, NashikP51600009138· filed Oct 2018 → now Oct 2019· 84.5% built
- EKTA GREENVILLE PHASE 1 WING I AND J6.8 yr overdueEKTA HOUSING PRIVATE LIMITED · Nashik, NashikP51600001224· filed Oct 2018 → now Oct 2019· 88.1% built· 1 complaint
- SHIV NAKSHATRA6.8 yr overdueLandmark infra · Jail Road, NashikP51600006926· 27.3% built
- LAXMI VANDAN APARTMENT6.7 yr overdueRISHI BUILDERS AND DEVELOPERS · Deolaligaon, NashikP51600001553· filed Nov 2018 → now Nov 2019· 89.1% built
- KRUSHNATARA SANKUL6.7 yr overdueVIPUL DILIP GARJE · Nashik (M Corp.), NashikP51600007734· 22.7% built
- bhagyasiddhi heights6.7 yr overdueBHAGYA DEVELOPER · Nashik, NashikP51600006032· 67.3% built
- AAKAR ELITE6.7 yr overdueAAKAR BUILDCON · Nashik (M Corp.), NashikP51600005824· 63.6% built
- Swapna Vastu6.7 yr overdueKrishna Developers · Nashik (M Corp.), NashikP51600011487· 63.6% built
- HARI AAKRUTI6.7 yr overdueKARDA BUILDCON PRIVATE LIMITED · Kathe Galli, NashikP51600000423· filed Dec 2018 → now Dec 2019· 90.9% built· 4 complaints
- SHIVDARSHAN APARTMENT6.7 yr overdueSAHYADRI BUILDCON · Nashik (M Corp.), NashikP51600010151· 90.9% built
- SHIVANAND APARTMENT6.6 yr overdueDEAL CONSTRUCTION · Nashik, NashikP51600003142· 90.9% built
- Sai Arcade6.6 yr overdueKiran Patel · Jail Road, NashikP51600011987· 76.4% built
- RAJ TOWER6.6 yr overdueJAYBHAVE BUILDERS · RANE NAGAR, NashikP51600011857· filed Dec 2018 → now Dec 2019· 86.8% built· 1 complaint
- Sri Gurumangal6.6 yr overdueManisha Vishnu Rane · Nashik, NashikP51600010391· 90.5% built
- Sri Guruashish6.6 yr overdueVishnu Shankar Rane · Nashik, NashikP51600010609· 90% built
- VAKRATUND HEIGHTS6.6 yr overdueRAVIRAJ BUILDCON · Chandsi, NashikP51600013690· 90.9% built
- CHINTAMANI RESIDENCY6.6 yr overdueGOVINDA CONSTRUCTION · Nashik (M Corp.), NashikP51600012540· 90.9% built
- GANESH AVENUE6.6 yr overdueNERKAR PROPERTIES LLP · Nashik (M Corp.), NashikP51600007654· filed Dec 2018 → now Dec 2019· 69.5% built
- SHREEJI PALACE6.6 yr overdueRIMALKUMAR KISHORBHAI PATEL · Panchavati, NashikP51600005247· 81.8% built
- CRESCENT APARTMENT6.6 yr overdueJHALA INFRATECH · Gangapur Road, NashikP51600001071· 68.2% built
- GANESH SPARSH6.6 yr overdueNERKAR PROPERTIES LLP · Nashik (M Corp.), NashikP51600008749· filed Dec 2018 → now Dec 2019· 22.4% built
- JYOTI POOJA APARTMENT6.6 yr overdueJYOTI BUILDCON · Nashik, NashikP51600009580· 90.9% built
- BALAJI HEIGHTS6.6 yr overdueLALAN BALJI SHAH · Nashik, NashikP51600010064· filed Dec 2018 → now Dec 2019· 50.9% built
- MATOSHREE YASHODA RESIDANCY6.6 yr overdueDYNESHWAR KESHAVRAO BHOSALE · RAVIVAR PETH, NashikP51600016562· 36.4% built
- CHOPDA TWIN TOWER BUILDING B6.6 yr overdueARHUM HILLS-N-LANDS PRIVATE LIMITED · NEAR CHOPDA LAWNS, NashikP51600010586· filed Jan 2019 → now Dec 2019· 90.9% built
- Saideep Apartment6.6 yr overdueTithi Enterprises · Nashik (M Corp.), NashikP51600010856· 90.9% built
- RADHA RESIDENCY6.6 yr overdueGOVINDA CONSTRUCTION · Nashik (M Corp.), NashikP51600012697· 90.9% built
- KRISHNA DARSHAN6.6 yr overdueBODKE BUILDCON · KAMATWADE, NashikP51600014276· 90.9% built· 2 complaints
- Anmol Nayantara Gold6.6 yr overdueBafna Builders and Land Developers · Nashik, NashikP51600002894· filed Dec 2018 → now Dec 2019· 71.5% built· 2 complaints
- IMPERIUM APARTMENTS6.6 yr overdueKALASH DEVELOPERS ASSOCIATES · nashik, NashikP51600010643· filed Dec 2018 → now Dec 2019· 80% built
- RAVI RENAISSANCE6.6 yr overdueRAVINDRA DEVELOPERS PVT LTD · Parthardi, NashikP51600012691· 90.9% built
- EKTA GREENVILLE PHASE 36.6 yr overdueEKTA HOUSING PRIVATE LIMITED · Nashik, NashikP51600001510· filed Dec 2018 → now Dec 2019· 71.7% built· 3 complaints
- NAMAN RESIDENCY6.6 yr overdueKIRANBHAI VITTHALBHAI PATEL · Nashik, NashikP51600011915· 43.6% built
- SHREE RAVI ENCLAVE6.6 yr overdueRAVINDRA DEVELOPERS PVT LTD · Nashik (M Corp.), NashikP51600011917· 90.9% built
- SAKET PLAZA6.6 yr overdueS S BUILDERS AND DEVELOPERS · AYODYA NAGARI NASHIK, NashikP51600016202· 40.9% built
- Raza Imperial6.6 yr overdueShakeel Ahmad Abdul Gafoor Quazi · Raza Colony, NashikP51600009442· 90.9% built
- Anmol Nayantara City Two phase 16.6 yr overdueBafna Realtors Pvt Ltd · Karmayogi nagar, NashikP51600001967· filed Dec 2018 → now Dec 2019· 81.7% built
- PADMAJA RESIDENCY6.6 yr overduePADMA BUILDCON · Nashik (M Corp.), NashikP51600013300· filed Dec 2018 → now Dec 2019· 90.9% built
- PANDAV CASITA6.6 yr overdueS R BUILDWELL · Nashik (M Corp.), NashikP51600011954· 90.9% built
- SAISERENITY6.6 yr overdueJAYINFRASTREUCTURIES · Anandwalli Nashik, NashikP51600007991· 90.9% built· 1 complaint
- GOVINDA B6.6 yr overdueSAI ANAND BUILDERS · Nashik, NashikP51600007264· filed Dec 2018 → now Dec 2019· 90.9% built
- SHAJANAND PARK6.6 yr overdueSHREE HARIKRUSHNA DEVELOPERS · Nashik, NashikP51600009666· 27.3% built
- URBAN BRICKS6.6 yr overdueRATAN CIVIL ASSOCIATES PVT LTD · Nashik, NashikP51600013094· 59.1% built
- LAXMI AND SHAKUNTALA HEIGHTS6.6 yr overdueJ K ASSOCIATES · Nashik, NashikP51600012259· 82.5% built
- SHRIRANG RESIDENCY6.6 yr overdueS M CONSTRUCTIONS · Nashik (M Corp.), NashikP51600012796· 72.7% built
- SAIVIJAY6.6 yr overdueJAY DEVELOPERS · NASHIK, NashikP51600006235· 90.9% built
- SHREEJI VANDAN6.6 yr overdueSHREE LAND DEVELOPERS AND BUILDERS · Indira Nagar, NashikP51600011735· 90.9% built
- SHAH GOVIND APARTMENT PHASE II6.6 yr overdueSHAH BUILDERS AND DEVELOPERS · Bhagur Rural, NashikP51600001700· 64.1% built
- SAMRUDDHI HEIGHTS6.6 yr overdueLAXMAN EKNATH GOMASE · Nashik (M Corp.), NashikP51600013275· 90.9% built
- GANESH ATRIA6.6 yr overdueZENITH DEVELOPERS · AMBAD, NashikP51600004173· filed Dec 2018 → now Dec 2019· 60.9% built
- FOG CITY PHASE-2 NSV6.6 yr overdueNEW STEP VENTURES · Igatpuri (M Cl), NashikP51600001046· 82.7% built
- Mayur Majesty6.6 yr overdueKirtikumar Jadhavji Pokar · Nashik (M Corp.), NashikP51600008879· filed Dec 2018 → now Dec 2019· 90.9% built
- SHREEJI UNIPARC6.6 yr overdueSHREEJI LIFE SPACE · NASHIK, NashikP51600011842· 90.9% built
- Anmol Nayantara Empire6.6 yr overdueBafna Builders and Land Developers · Nashik, NashikP51600001304· filed Dec 2018 → now Dec 2019· 72.7% built
- Akshar Jyot6.6 yr overdueAkshar Enterprises · Near rau hotel, Peth road, NashikP51600018428· 43.6% built
- DHAWAL RESIDENCY6.6 yr overdueDHAVAL CONSTRUCTION · MAKHAMALABAD, NashikP51600015450· 90.9% built
- SAIVIJAYTRADECENTER6.6 yr overdueJAY DEVELOPERS · Nashik (M Corp.), NashikP51600006432· 90.9% built
- RAJ RESIDENCY6.6 yr overdueRAMESHWAR CONSTRUCTIONS · Nashik (M Corp.), NashikP51600009461· 89.1% built
- Time Blossom6.6 yr overdueSudeep Rajendra Chhajed · Sadashiv Nagar, NashikP51600017542· 90.9% built
- Shree Gajanan Estate6.6 yr overdueShree Buildcon realty · CHEHEDI BK, NashikP51600001483· 66.5% built
- SHILP SIDDHI6.6 yr overdueHemant Dattatraya Gaikwad · Shivram Nagar, NashikP51600011679· 81.8% built
- RUDRAKSH RESIDENCY6.6 yr overdueMUGDHA SANDEEP BODKE · satpur, NashikP51600012753· 90.9% built
- SAIVIJAYICON6.6 yr overdueJAY DEVELOPERS · Nashik (M Corp.), NashikP51600009951· 81.8% built
- Samraat Nucleus - Project 016.6 yr overdueM/S Shweta Infrastructure & Housing (I) Pvt. Ltd. · Bhabha Nagar, NashikP51600001208· 88.6% built
- GANESH GUNJAN6.6 yr overdueNERKAR PROPERTIES LLP · Nashik (M Corp.), NashikP51600006346· filed Dec 2018 → now Dec 2019· 65% built
- AVNI LANDMARK6.6 yr overdueNISARG ENTERPRISES · Nashik (M Corp.), NashikP51600009262· 63.6% built
- EKA PHASE II - E BUILDING6.6 yr overdueAmit Builders · Pathardi, NashikP51600006366· 88.6% built· 2 complaints
- DEV PRIDE APARTMENT6.6 yr overdueDEVSHREE DEVELOPRS · Nashik (M Corp.), NashikP51600010024· 49.1% built
- Padmanabh Pride6.6 yr overduePadmanabh Properties · Nashik, NashikP51600005546· 90.5% built
- ASHIRWAD GLORY6.6 yr overdueYUG BUILDERS · Nasik Shivar, NashikP51600012250· 90.9% built
- Tulip C Eco6.6 yr overdueAshoka Township (AOP) · Kajikhore, NashikP51600015179· 27.3% built
- SHREEHARI APPARTMENT6.6 yr overdueSUNIL BHAUSING PAWAR · KAMATWADE, NashikP51600015983· 90.9% built
- MITTAL APPARTMENT6.6 yr overdueMOHAMMAD ILIYAS ABDUL SATTAR GORI · NEW TIDKE COLONOY, NashikP51600010217· filed Jan 2019 → now Jan 2020· 90.9% built
- URJA ANEX6.6 yr overdueHARESH SHANTILAL RAMANI · Nashik, NashikP51600003034· 40% built
- HIGHLAND TOWER6.6 yr overdueALI JANAMUDDIN SIDDIQUI · AADGON SHIVAR, NashikP51600017325· 90.9% built
- BHASKAR PLANET APARTMENT6.6 yr overdueCHANDUBHAI LAXMANBHAI PATEL · Nashik (M Corp.), NashikP51600006743· filed Dec 2018 → now Jan 2020· 78.2% built
- OSCAR PLAZZA6.6 yr overdueSHUBHAM DEVELOPERS · Nashik (M Corp.), NashikP51600011286· 81.8% built
- Gajanan Annex6.4 yr overdueLaxmi Associates · Makhmalabad, NashikP51600005393· 90.9% built
- SHREE TIRUMALA AASHIYANA APARTMENT6.4 yr overdueSHREE CHAWO SATI BUILDERS PRIVATE LIMITED · NASHIK, NashikP51600001825· 90.9% built
- SHREE TIRUMALA BHUMIKA APARTMENT- B WING6.4 yr overdueROONGTA BUILDERS AND DEVELOPERS · Nashik, NashikP51600002388· 81.8% built
- Prabhu Fort6.4 yr overduePacific Builders · DGP NAGAR, NashikP51600007154· 72.7% built
- SWARAJ SPANDAN6.4 yr overdueHARAK PATIL REALTORS · Bhagur Rural, NashikP51600012984· 72.7% built
- AASHIRWAD ROW HOUSE6.4 yr overdueVISHWAKARMA BUILDWELL CONSTRUCTION · Nashik (M Corp.), NashikP51600009685· 81.8% built
- PRAYAG GREENS6.4 yr overduePRAYAG DEVELOPER · Nashik (M Corp.), NashikP51600008173· 60% built
- SAPTSHRUNGI ROW HOUSE6.1 yr overdueBHAVANI CONSTRUCTION · Nashik, NashikP51600010741· 72.7% built
- AKSHAR DEEP6.1 yr overdueAkshar Enterprises · Nashik (M Corp.), NashikP51600008239· 72.7% built
- NIRMAN DWARKAPURAM6.1 yr overdueNIRMAN ESTATE DEVELOPERS PVT LTD · DWARKA ANNEX, NashikP51600001184· 90.9% built
- LAXMI RESIDENCY6.1 yr overdueARUN PUNDLIK NIKAM · Nashik, NashikP51600010591· 50% built
- Rajmudra Pride6.1 yr overdueAnurag Rohidas Aher · Nashik (M Corp.), NashikP51600006713· 72.5% built
- ROONGTA HORIZON APARTMENT6.1 yr overdueROONGTA HOMES LLP · NASHIK, NashikP51600001399· 81.8% built
- ROONGTA IMPERIA APARTMENT6.1 yr overdueROONGTA HOMES LLP · NASHIK, NashikP51600001327· 81.8% built
- OMKAR HEIGHTS CO-OP HOUSING SOCIETY LTD6.1 yr overdueOMKAR HEIGHTS CO-OP HOUSING SOCIETY LTD. · Jail Road, NashikP51600007817· 81.8% built
- AVNI SPARSH6.1 yr overdueNISARGA DEVELOPERS · Nashik (M Corp.), NashikP51600012356· 41.4% built
- Vande Residency6.1 yr overdueVANDE DEVELOPERS · Nashik, NashikP51600009139· 49.1% built
- NA6.0 yr overdueSanghi Builders and Developers · Nashik, NashikP51600008840· 96.4% built
- MAHAVIR AVENUE6.0 yr overdueAbhishek Builders · Nashik (M Corp.), NashikP51600009340· 81.8% built
- SWAGAT PARK5.9 yr overdueSHRI SANDERI GROUP · DHRUV NAGAR, OFF GANGAPUR ROAD, NashikP51600006695· 79.1% built
- SWAGAT SYMPHONY5.9 yr overdueMODERNGROUP · Nashik (M Corp.), NashikP51600003257· 57.3% built
- SWAGAT VILLA5.9 yr overdueSHRI SANDERI GROUP · DHRUV NAGAR, OFF GANGAPUR ROAD, NashikP51600007624· 31.8% built
- BUSINESS SQUARE5.9 yr overdueVASTUKRUPA CONSTRUCTION (INDIA) PVT LTD · Nashik, NashikP51600000211· filed Mar 2019 → now Sept 2020· 90.9% built
- Vrundavan5.9 yr overdueYogesh Kishorbhai Dattani HUF · Besides Meet Abhas, NashikP51600021653· 90.9% built
- DEV RESIDENCY5.9 yr overdueCHUPON BUILDCON · PATHARDI, NashikP51600016087· 81.8% built
- SUYOJIT ONE WORLD PHASE-I, RESIDENTIAL SECTOR5.9 yr overdueSUN INFRASTRUCTURES PVT. LTD · Near Birla Hospital, Nashik Road, Nashik, NashikP51600002632· filed Mar 2019 → now Sept 2020· 90.5% built
- EDEN HEIGHTS5.9 yr overduePARTRACT ESTATE & INVESTMENT PVT. LTD. · Gangapur Gaon, NashikP51600010798· filed Mar 2019 → now Sept 2020· 90.9% built
- SHILP SAMRUDDHI5.9 yr overdueHEMANT DATTATRAYA GAIKWAD · Shivram Nagar, NashikP51600010415· 81.8% built
- United Courtyard Phase I5.9 yr overdueUnited Builders · BEHIND INOX, NashikP51600001925· filed Mar 2019 → now Sept 2020· 90.9% built
- Shyam Heaven5.9 yr overdueMAA BUILDWELL · Nashik (M Corp.), NashikP51600014299· 81.8% built
- TULSIHEIGHTS5.8 yr overdueJAY VELOPERS · Nashik (M Corp.), NashikP51600008515· filed Dec 2018 → now Oct 2020· 90.9% built
- Vista II5.8 yr overdueVascon Engineers Ltd · Wadala, NashikP51600001313· filed Mar 2018 → now Oct 2020· 99.6% built
- PUSHPAK PRIDE5.8 yr overdueSHASHIKALA AJIT SHINGI · Nashik, NashikP51600005139· filed Oct 2018 → now Oct 2020· 81.8% built
- VIJAYPRIDE5.8 yr overdueLALWANI CONSTUCTION · Nashik (M Corp.), NashikP51600012211· filed Dec 2018 → now Oct 2020· 82.4% built
- PADMAVATI NAGARI BLDG NO 1 A and B wing5.8 yr overdueS D BHALERAO CONSTRUCTIONS PVT LTD · Venkatesh Nagar, NashikP51600003238· filed Dec 2018 → now Oct 2020· 90.9% built
- VASTURANG ENCLAVE A AND B WING5.8 yr overdueVASTURANG INFRASTRUCTURE PVT LTD] · Nashik, NashikP51600012901· filed Jan 2018 → now Oct 2020· 90.9% built
- SHREE KRUSHNA APARTMENT5.8 yr overdueVASTULAXMI BUILDERS AND CONTRACTORS · Nashik (M Corp.), NashikP51600008523· filed Aug 2019 → now Oct 2020· 59.1% built
- KABRA HEIGHTS5.8 yr overdueManoj Madhukar Toshniwal · KARMAYOGINAGAR, NashikP51600004790· filed Dec 2017 → now Oct 2020· 90.9% built
- VASTURANG ENCLAVE G AND H WING5.8 yr overdueVASTURANG INFRASTRUCTURE PVT LTD · Ashtavinayak Nagar, Panchvati, NashikP51600013331· filed Dec 2018 → now Oct 2020· 90.9% built
- ATHARVA SANSKRUTI5.8 yr overdueSIDDHIVINAYAK BUILDTECH · Nashik (M Corp.), NashikP51600000801· filed Dec 2018 → now Oct 2020· 90.9% built
- DinkarHeights5.8 yr overdueM/s. ShreePrakash Developers Pvt Ltd · Nashik (M Corp.), NashikP51600010492· filed Dec 2018 → now Oct 2020· 79.1% built
- ASHOK RESIDENCY5.8 yr overdueJitu Ashok Pawar · Nashik, NashikP51600006162· filed Dec 2018 → now Oct 2020· 72.3% built
- ELIXIR GANDHARVA5.8 yr overdueELIXIR BUILDERS · CHANDSHI, NashikP51600018475· 90.9% built
- SHREE TIRUMALA PLATINUM APARTMENT5.7 yr overdueROONGTA HOMES LLP · COLLEGE ROAD, NashikP51600014568· 81.8% built
- GARDEN VIEW5.7 yr overdueAJIT SURESH BANE · Panchak, NashikP51600000880· 81.8% built
- SAMARTH VILLA5.7 yr overdueNATH BUILDCON · Nashik (M Corp.), NashikP51600012550· 90.9% built
- RENUKA FLORA5.7 yr overdueRENUKA BUILDERS ARCHITECT AND DEVELOPERS · KOLWADI CHOWFULI, NashikP51600025639· 81.8% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.