Delayed projects in Nashik
985 MahaRERA-registered projects in Nashik are past the possession date on file and still under 100% built. Where the promoter has formally revised the date, the original is shown alongside so you can see what changed.
Page 3 of 5
- SAPTASHRUNGI VENU5.7 yr overdueASHOK DHONDIRAM MATALE · KHUTWAD NAGAR, NashikP51600010043· 14.1% built
- HARI DARSHAN APARTMENT5.6 yr overdueR T ENTERPRISES · Nashik (M Corp.), NashikP51600005640· 90.9% built
- Ajinkya Pride Co-operative Housing Society Ltd. Nashik5.6 yr overdueAjinkya Pride Co-operative Housing Society Limited Nashik · Uttara Nagar, NashikP51600014828· 90.9% built
- Business Center5.6 yr overdueRoongta Buildcon Ltd. · Govind nagar, NashikP51600007476· 28.2% built
- VRINDAVAN HEIGHTS5.6 yr overdueAJAY MURLIDHAR BACHHAV, VIJAY SAHEBRAO AHIRE AND PRAVIN POPATRAO BACHHAV · Nashik, NashikP51600012251· 90.9% built
- Matoshri Apartment5.6 yr overdueShirsat And Dahivelkar Malpure Associates · Gangapur Road, NashikP51600015720· 90.9% built
- ROONGTA SAKET APARTMENT5.6 yr overdueSHREE TIRUMALA BUILDCON · INDIRANAGAR, NashikP51600019564· 81.8% built
- CHINTAMANI BUILDCON5.6 yr overdueCHINTAMANI BUILDCON · Soygaon, NashikP51600022319· 37.3% built
- AMAN PARADISE5.6 yr overdueAMAN BUILDERS · Nashik, NashikP51600011143· 90.9% built
- SHANTI HIGHTS5.6 yr overdueKALPANA VIJAY TATIYA · Nashik (M Corp.), NashikP51600012584· 90.9% built
- NILANJAN DARSHAN5.6 yr overdueSANJAY MADHAVRAO BHAVSAR · DGP NAGAR, NashikP51600014947· 90.9% built
- SHIVLEKH APARTMENT5.6 yr overdueChaturbhai Dhirubhai Kacha · PATHARDI PHATA, NashikP51600021430· 81.8% built
- YASH TULIP5.6 yr overdueSUYASH SHASHIKANT TARGE · DHRUV NAGAR, NashikP51600019296· 9.1% built
- SHREEVISHWA5.6 yr overdueSWAMI CONSTRUCTIONS · BODHALE NAGAR, NashikP51600008780· 90.9% built
- Krishna Pride5.6 yr overdueShree Krishna Constructions · Nashik (M Corp.), NashikP51600004084· 90.9% built
- SHREEJI BIZZWORLD5.6 yr overdueSHREE LAND DEVELOPERS AND BUILDERS · Nasik - Pune Highway, Kathegalli., NashikP51600011504· 81.8% built
- Crown Square5.6 yr overdueCROWN MAKERS BUILDERS AND DEVELOPERS · Satpur, NashikP51600006414· 27.3% built
- Rivera5.6 yr overdueRenuka Constructions · Bendkule Nagar, NashikP51600004983· 88.6% built· 1 complaint
- Shivram Avenue5.6 yr overdueMaheshwar Enterprises · Nashik, NashikP51600010957· 81.8% built
- SAI EMPIRE5.6 yr overdueJAY DEVELOPERS · Nashik (M Corp.), NashikP51600011132· 90.9% built
- SHREEJI SHREERANG5.6 yr overdueSHREEJI BUILDCON · Nashik (M Corp.), NashikP51600011442· 51.7% built
- Samarth Blossom5.6 yr overdueD G Group · Aanandwali, NashikP51600007810· 72.7% built
- PEARL RESIDENCY5.6 yr overdueBARDIA AND ASSOCIATES · JAIL ROAD, NashikP51600009618· 90.9% built
- SUKRUT APARTMENT5.6 yr overdueKESHAV KHANDU CHINCHORE · Nashik (M Corp.), NashikP51600011137· 90.9% built
- AMRAPALI RESIDENCY5.6 yr overdueVISHAL SHIVAJI MATALE · Kamatwada, NashikP51600005577· 90.9% built
- The Orian5.6 yr overdueGalaxy Infra Projects · Nashik (M Corp.), NashikP51600013400· 90.9% built
- PEARL PARK5.6 yr overduePEARL RESIDENCY · Nashik, NashikP51600007570· 70.6% built
- SHIVANSH APPARTMENT5.6 yr overdueOmbuilders and develpers · Nashik (M Corp.), NashikP51600005721· 90.9% built
- SHREE RESIDENCY5.6 yr overdueHASMUKHBHAI KALUBHAI JOGANI · Nashik, NashikP51600011542· 60.9% built
- SHREE RAVI RESIDENCY5.6 yr overdueSANJAY MANAK PATIL · Nashik (M Corp.), NashikP51600010553· 90.9% built
- Shiv Ganga Avenue5.6 yr overdueShiv Enterprises · Nashik, NashikP51600011494· 81.8% built
- FORTUNES KUSUMGULAB5.6 yr overdueFORTUNE BUILDCON · Nashik, NashikP51600009996· 81.8% built
- SAI SAGAR A5.6 yr overdueNASA CONSTRUCTION PVT.LTD. · Nashik, NashikP51600004324· 70.5% built
- Kashi Vishwanath Park5.6 yr overdueKRISHNA DATTATRYA ADHAV · Dasak Shiwar, NashikP51600024402· 48.5% built
- ARCHIT NEST5.6 yr overdueSANDEEP RAMDAS SHINDE · Nashik (M Corp.), NashikP51600003779· filed Jul 2019 → now Jan 2021· 90.9% built
- SHIV MALHAR APPARTMENT5.6 yr overdueBHARAT SURESH DHERINGE · PALSE SHIWAR, NashikP51600015388· 9.1% built
- ROONGTA CHITRAKOOT APARTMENT5.6 yr overdueSHREE TIRUMALA BUILDCON · INDIRA NAGAR, NashikP51600001657· 78.2% built
- Dhamma Heights5.6 yr overduePrapti Properties · Goraksh Nagar, Near Mhasrul police station, NashikP51600025693· 27.3% built
- GENESIS5.6 yr overduePRAKASH RAMAN CHAUDHARI · Kute Marg, NashikP51600005245· 72.7% built
- AMBIKA ENCLAVE5.5 yr overdueCompact Builders & Developers · Mayur Vihar Colony, NashikP51600014204· 90.9% built
- Vastu Park5.5 yr overdueNarayan Labhu Sarode · Nashik, NashikP51600013306· 81.8% built
- KRISSH INFRA5.4 yr overdueKRISSH INFRA · CHEHEDI BK, NashikP51600013543· filed Sept 2019 → now Mar 2021· 90.9% built
- The Metrozone Athens A35.4 yr overdueSanklecha Construction Private Limited · INDIRA NAGAR, NashikP51600009518· filed Sept 2018 → now Mar 2021· 90.9% built· 1 complaint
- NILKANTH APPARTMENT5.2 yr overdueANGIRA INFRA DEVELOPER PVT LTD · Nashik, NashikP51600005210· filed Jul 2020 → now Jun 2021· 89.1% built
- MADHOORS TALEKAR CHAMBER5.1 yr overdueMadhoor Buildwell Pvt. Ltd. · Ashok Stambh, NashikP51600017279· 53% built
- Rudra Heights4.8 yr overdueMinakshi Datta Sonawane · Nashik (M Corp.), NashikP51600014310· 81.8% built
- PUSHKARAJ HEIGHTS4.8 yr overdueATUL ANIL NERPAGAR · NASHIK SHIWAR, NASHIK, NashikP51600016236· 90.9% built
- SAI KRISHNA AVENUE4.8 yr overdueHITESH MANSUKHBHAI VIRPARA · Nashik, NashikP51600003101· 49.5% built
- UTKARSH PALACE4.7 yr overdueUTKARSH BUILDERS AND DEVELOPERS · Nashik (M Corp.), NashikP51600009009· filed Jul 2019 → now Nov 2021· 90.9% built
- sagar tarang b4.7 yr overduesagar m bonde · panchavati, NashikP51600015745· 90.9% built
- Pawan Sut Row Houses4.7 yr overdueChampaben Dhirajlal Metalia · Ambad, NashikP51600025642· 72.9% built
- DA Marvel4.7 yr overdueDhanait Ahire Associates · Mhasrul, NashikP51600015377· 90.9% built
- Shyam Flora4.7 yr overdueShardaben Madhubhai Vaghela · Wadala Shiwar, NashikP51600015630· 81.8% built
- CONSTRUCTION OF 49 TS MIG4.6 yr overdueNASHIK HOUSING AND AREA DEVELOPMENT BOARD · Nashik, NashikP51600013395· 90.9% built
- SHILP DARSHAN COOP HOUSING SOCIETY4.6 yr overdueSHILP DARSHAN COOP HOUSING SOCIETY · PANCHAK, JAIL RAOD, NashikP51600014943· 90.9% built
- VINAYAK HEIGHT4.6 yr overdueVINAYAK PREMISES PRIVATE LTD · NASHIK, NashikP51600020006· 81.8% built
- SAI VISHWA4.6 yr overdueSai Reality · Anandvalli, NashikP51600019370· 90.9% built
- Ruturaj Appartment4.6 yr overdueOmprakash Muniraj Yadav · Nashik, NashikP51600019017· 90.9% built
- SUYOJIT GREENS4.6 yr overdueCITADEL GREENS PVT. LTD · Lavate Nagar, Nashik Road, Nashik, NashikP51600002051· filed Mar 2019 → now Dec 2021· 79.5% built
- SAI SANGAM APARTMENT4.6 yr overdueSUDHIR SUBHASH GHULE · CHUNCHALE SHIVAR, NashikP51600018027· 90.9% built
- Anmol Nayantara City One Phase 54.6 yr overdueBafna Realtors Pvt Ltd · Nashik, NashikP51600001252· filed Dec 2019 → now Dec 2021· 56.7% built· 1 complaint
- ANAY RESIDENCY4.6 yr overdueGOVINDA CONSTRUCTION · DGP NAGAR NO.2, AMBAD, NASHIK, NashikP51600015947· 90.9% built
- BHAGYALAXMI VISHWA4.6 yr overdueBHAGYALAXMI BUILDERS AND DEVELOPERS · OPP DHRUV NAGAR BUS STOP, NashikP51600014237· 72.7% built
- JINENDRA ESTATE4.6 yr overdueOSWAL DEVELOPERS · SAUBHAGYA NAGAR, NashikP51600016250· 0% built· 1 complaint
- Madhoor Maitri4.6 yr overdueMadhoor Mangal Associates · Mahatma Nagar, NashikP51600001608· filed Dec 2019 → now Dec 2021· 85.9% built
- MANGALDEEP APARTMENT4.6 yr overdueVINAYAK PREMISES PRIVATE LTD · PATHARDI PHATA, NashikP51600019914· 81.8% built
- SAMRUDHHI PLAZA -B4.6 yr overdueSUNITA LAXMAN GOMASE · PATHARDI SHIVAR, NashikP51600020247· 32.7% built
- Atmamalik Apartment4.6 yr overdueHrishita Buildcon & Infrastructures Pvt. Ltd. · Shiwar, NashikP51600010688· filed Dec 2018 → now Dec 2021· 55.2% built
- SHREE GANESH LUXURIA4.6 yr overdueSHRINIVAS BUILDWELL · PRASHANT NAGAR, PATHARDI PHATA, NashikP51600022205· 71.8% built
- Kalpataru Ph-14.6 yr overdueAshoka Infraways Limited · Near Indian Oil Corporation Petrol Pump, Chunchale Shiwar, NashikP51600014684· 39.4% built
- SAI LAXMI VILLAS4.6 yr overdueVINAY MAGANLAL KARNAVAT · NASHIK ROAD, NashikP51600016097· 89.1% built
- ULTRA OVATION4.6 yr overdueSANJEEV SITARAM DANGE · Nashik, NashikP51600005527· filed Dec 2020 → now Dec 2021· 34.5% built
- SHAHS GARDEN RESIDENCY PHASE II4.6 yr overdueSHAH BUILDERS AND DEVELOPERS · Bhagur Rural, NashikP51600001356· 63% built
- DAKSH ATRIUM4.6 yr overdueDAKSH CONSTRUCTION · INDIRA NAGAR, NashikP51600017429· 45.4% built
- OMKAR PARK4.6 yr overdueOMKAR BUIDCON · Nashik (M Corp.), NashikP51600014305· 90.9% built
- KRUSHNAPURAM APARTMENT4.6 yr overdueSAMADHAN KRUSHNA GODSE · KRUSHNABAN COLONY, NashikP51600018546· 70.9% built
- CARNATION4.6 yr overdueKANAKLAXMI DEVELOPERS · Nashik, NashikP51600012060· filed Dec 2019 → now Dec 2021· 90.9% built
- BLUE OCEAN ROW HOUSES APPARTMENT4.6 yr overdueBLUE OCEAN BUILDERS AND DEVELOPERS · Near Jain Mandir, NashikP51600013997· 63.6% built
- SUVARNAGODA SANKUL4.6 yr overdueSAMRUDDHI DEVELOPERS · SARAF BAZAAR, NashikP51600025825· 81.8% built
- SHREE SAMARTH KRUPA CO OP HOUSING SOCIETY LTD4.6 yr overdueSHANTAI DEVELOPERS · Behind Rasbihari School, Bali Marg, NashikP51600013315· 72.7% built
- CHAITRA MOHOR APARTMENT4.6 yr overdueG. K. INFRA · PANCHVATI, NashikP51600015023· 90.9% built
- YOGMALA APPARTMENT WING B4.6 yr overdueSWASTIK ESTATES · Jail Road, NashikP51600006719· filed Dec 2019 → now Dec 2021· 90.9% built
- Royale4.6 yr overdueAshoka Infraways Limited · Wadala, NashikP51600008360· filed Dec 2018 → now Dec 2021· 90.5% built
- SAI KRUSHNABOOMI APARTMENT4.6 yr overdueR V CONSTRUCTION · CIDCO, NashikP51600021162· 55.5% built
- Anmol Nayantara City One phase 44.6 yr overdueBafna Realtors Pvt Ltd · Nashik, NashikP51600000299· filed Dec 2019 → now Dec 2021· 71.2% built
- AMRUT PARK4.6 yr overdueAARADHANA DEVELOPERS · Nashik, NashikP51600011238· 81.8% built
- Aaradhya Apartment4.6 yr overdueAnuraj Buildcon · Dwarka Nashik, NashikP51600014697· 90.9% built
- RAJKUMAR HOUSING SOCIETY4.6 yr overdueAUDUMBAR CONSTRUWELL PVT.LTD. · Nashik, NashikP51600007446· filed May 2018 → now Dec 2021· 63.6% built
- Arya Apartment4.6 yr overdueAvinash Omprakash Yadav · Nr. Holy Flower School, NashikP51600019053· 90.9% built
- Shree Laxmi Gokuldham4.6 yr overdueShree Laxmi Realty · Belatgavhan, NashikP51600001646· filed Dec 2019 → now Dec 2021· 59.6% built
- SAMRUDDHI PLAZA- A4.6 yr overdueLAXMAN EKNATH GOMASE · DAMODAR CHOWK PATHARDI PHATA NASHIK, NashikP51600015539· 36.4% built
- Shree Venkatesh Nagar - Rosewood4.6 yr overdueIshanya Buildcon · Shree Venkatesh Nagar, NashikP51600014751· 83.6% built
- ARCHIT GALAXY4.6 yr overdueV S ENTERPRISES · SERENE MEADOWS, NashikP51600014613· 90.9% built
- Kalpataru Ph-24.6 yr overdueAshoka Infraways Limited · Near Indian Oil Corporation Petrol Pump, Chunchale Shiwar, NashikP51600018371· 54.5% built
- SWANANDI BLOSSOM4.6 yr overdueAHIRRAO BUILDCON PVT LTD · Gangapur Shiwar, NashikP51600012647· 90.9% built
- GAJANAN VILLAS4.6 yr overdueDINESH EKNATH KHANDRE · DASAK, NashikP51600015044· 81.8% built
- AARKAY BLOSSOM4.6 yr overdueMAITRA BUILDTECH PRIVATE LIMITED · PANCHAVATI, NashikP51600015371· 90.9% built
- SHREEJI CENTRUM4.6 yr overdueSHREEJI CONSTRUCTION · Mumbai - Agra Highway Nasik, NashikP51600012350· 81.8% built
- Ajinkya Heights4.6 yr overdueAnand Constructions · Gangapur, NashikP51600015402· 43.2% built
- SHREE GANESH BLISS4.5 yr overduePRAKASH RAMAN CHAUDHARI · UTTARA NAGAR, NashikP51600015415· 90.9% built
- Sairaj Residency Apartment4.5 yr overdueGANESHA INFRA · Nashik, NashikP51600010878· 90.9% built
- SUNDERBAN CO OP SOC4.5 yr overdueSUNDERBAN CO OP HSG SOC · PANCHAVATI, NashikP51600026666· 38.2% built
- SHAHS RENUKA ENCLAVE4.5 yr overdueSHAH BUILDERS AND DEVELOPERS · KASAR MALA, NashikP51600016183· 63.6% built
- CHAMPA SANSKRUTI APARTMENT4.4 yr overdueGAUTAM JAYANTILAL BHANDARI · MHASRUL, NashikP51600016062· 90.9% built
- SHANTANIWAS CO-OP HOUSING SOCIETY4.4 yr overdueSAI CONSTRUCTION · DEOLALI NASHIK ROAD, NashikP51600017884· 90.9% built
- TARANGAN APARTMENT4.4 yr overdueSTAR BUILDERS AND DEVELOPERS · PIMPALGAON BAHULA, NashikP51600025558· 57.3% built
- SHREE GANESH KRUPA4.4 yr overdueSHREE GAJANAN BUILDERS AND REALTORS · ANAND NAGAR, NashikP51600024064· 63.6% built
- SAKAAR RESIDENCY4.4 yr overdueGALAXY BUILDCON · PANDURANG CHOWK, NashikP51600021319· 81.8% built
- VRINDAVAN ARCADE4.4 yr overdueSAI KRIPA BUILDCON · SONAWANE MALLA, NashikP51600016570· 81.8% built
- RAJLAKSHMI4.4 yr overdueAvinash Omprakash Yadav · Gandharv Nagari, NashikP51600023406· 90.9% built
- KULSWAMINI APARTMENT4.4 yr overdueOM DEVELOPERS · SINNER FATA, NashikP51600011503· filed Jul 2021 → now Mar 2022· 53.6% built
- The Wave Phase 14.4 yr overdueJineshwar Constructions · Nashik (M Corp.), NashikP51600010965· 90.9% built
- CONSTRUCTION OF 448 TS EWS UNDER PMAY AND 32 SHOPS4.4 yr overdueNASHIK HOUSING AND AREA DEVELOPMENT BOARD · NEAR NEW ENGLISH SCHOOL, NashikP51600010485· 90.9% built
- Laxmi Chayya4.4 yr overdueLaxmikripa Developers · Nashik, NashikP51600008182· filed Oct 2020 → now Apr 2022· 22.7% built
- SHREE TIRUMALA REGENCY APARTMENT4.3 yr overdueROONGTA HOMES LLP · DEEPALI NAGAR, NashikP51600016235· 81.8% built
- GOKULDHAM APARTMENT4.2 yr overdueSHRINATHJI DEVELOPER · GANGAPUR ROAD, NashikP51600016370· 81.8% built
- DWARKESHDHAM APARTMENT4.2 yr overdueVAIDEHI CONSTRUCTION · NEAR MAHA BANG, NashikP51600010508· 81.8% built
- OM HEIGHTS4.1 yr overdueYOGESH WADNERE AND KISHOR WADNERE · Nashik, NashikP51600012257· 90.9% built
- SHREENIWAS APARTMENT4.1 yr overdueKRISHNA CONSTRUCTION · WADALA SHIWAR, NashikP51600022902· 90.9% built
- RENUKA DARSHAN4.1 yr overdueRENUKA DEVELOPERS · VIHITGAON, NashikP51600004063· filed Dec 2020 → now Jun 2022· 48.2% built· 1 complaint
- MINAKSHI HEIGHTS4.1 yr overdueVIJAYKUMAR KISANLAL GHODELLA · Nashik (M Corp.), NashikP51600010319· 55% built
- Laxmi Residency4.1 yr overdueShivshakti Buildcon · kadwe nagar, NashikP51600010392· 90.9% built
- PARVATI HEIGHTS4.1 yr overdueLAXMINARAYAN CONSTRUCTIONS · Nashik, NashikP51600007938· filed Dec 2020 → now Jun 2022· 90.9% built
- SIDDHI ELITE4.1 yr overduePatani Shah Associates · INDIRA NAGAR, NashikP51600005829· 90.9% built
- Shiv Pride4.1 yr overdueJagdish Babubhai Kothiya · Pathardi, NashikP51600013284· 90.9% built
- OM SAI PLAZA4.1 yr overdueOM DEVELOPERS · DAMODAR NAGAR, NashikP51600022335· 90.9% built
- Hrishita Apartment4.1 yr overdueHrishita Buildcon & Infrastructures Pvt. Ltd · SHIVAR, NashikP51600011155· filed Aug 2018 → now Jun 2022· 23.5% built
- SAI KRUPA APARTMENT4.1 yr overdueVIJAN REALTY PRIVATE LIMITED · Nashik (M Corp.), NashikP51600004180· filed Mar 2018 → now Jun 2022· 90.9% built
- SHREE TIRUMALA PARAMOUNT APARTMENT4.1 yr overdueROONGTA HOMES LLP · DEEPALI NAGAR, NashikP51600016034· 90.9% built
- ABH SAMRUDDHI4.1 yr overdueTANU REALITY LLP · HANUMAN WADI, NashikP51600023767· 90.9% built
- SHAANTAI APARTMENT4.1 yr overdueMAYURESH CONSTRUCTIONS OPC PRIVATE LIMITED · Nashik (M Corp.), NashikP51600011945· filed Dec 2019 → now Jul 2022· 65.5% built
- SAI SWAMI APARTMENTS4.1 yr overduePRATIBHA NILESH MORE · SHINDE, NashikP51600021951· 96.4% built
- SWAMI PRIDE4.1 yr overdueSWAMI BUILDCON · Nashik (M Corp.), NashikP51600012711· 81.8% built
- K K PLAZA APPARTMENT4.1 yr overdueShivam Developers · Pathardi Phata, NashikP51600022203· 90.9% built
- LOTUS HEIGHTS4.0 yr overdueJAINAM DEVELOPERS · PANCHWATI, NashikP51600023000· 9.1% built
- Shree Modkeshwar Apartment4.0 yr overdueSaiPrasad Builders and Developers · TulsaBhawani Chowk Nashik, NashikP51600018442· 90.9% built
- THE HUB WING-A-YOGESHWAR4.0 yr overdueNISHAM DEVELOPERS PVT LTD · NEAR TITAN SHOWROOM, NashikP51600018797· 90.7% built
- Empire Marvel4.0 yr overdueShilpa Estate · CHEHEDI BK, NashikP51600004867· filed Feb 2022 → now Aug 2022· 90.9% built
- RAM TANAY APARTMENTS4.0 yr overdueGOPAL DHUNDIRAJ CHIPLUNKAR · NASHIK (M CORP), NashikP51600013307· 90.9% built
- AMRUT DARSHAN3.9 yr overduePRAKASH GIRIDHAR AMRUTKAR · Nashik (M Corp.), NashikP51600012605· filed Jan 2018 → now Sept 2022· 90.9% built
- NEW CASTLE3.9 yr overdueMAHALAXMI ESTATES · Nashik, NashikP51600014622· 90.9% built
- ANAND VISHVA3.9 yr overdueVishvakarma Builders · Tagor Nagar, NashikP51600019856· 82.3% built
- SHREENAVSHAKTI APARTMENT3.9 yr overdueSWAMI CONSTRUCTIONS · BHABHA NAGAR MUMBAI NAKA, NashikP51600022623· 90.9% built
- SAI SNEH SAHNIWAS3.9 yr overdueANIKET ANANT PATIL · INDIRA NAGAR, NashikP51600019316· 81.8% built
- Kamal Pride3.9 yr overdueAnil Sharad Kulkarni · Nashik (M Corp.), NashikP51600013677· filed Mar 2021 → now Sept 2022· 19.1% built
- BEVERLLY HILLS PHASE - III3.9 yr overdueMadhoor Buildwell Pvt. Ltd. · Dwarka, NashikP51600000718· 39.2% built
- SAI MEGHDOOT3.9 yr overdueANIL SHANKAR AHER · HANUMANWADI, NashikP51600013390· 63.6% built
- The Metrozone Athens A23.8 yr overdueSanklecha Construction Private Limited · INDIRA NAGAR, NashikP51600005464· filed Sept 2018 → now Oct 2022· 90.9% built· 10 complaints
- The Metrozone Hampston B23.8 yr overdueSanklecha Construction Private Limited · INDIRA NAGAR, NashikP51600008309· filed Jun 2018 → now Oct 2022· 90.9% built
- The Metrozone Aspen C33.8 yr overdueSanklecha Construction Private Limited · Nashik (M Corp.), NashikP51600007130· filed Jun 2018 → now Oct 2022· 90.9% built
- EKDANT GALAXY3.7 yr overdueVSK CONSTRUCTION · Datir Nagar, NashikP51600025336· 90.9% built
- SAI NAKSHATRA APARTMENT3.7 yr overdueDilip Veljibhai Patel · Sadguru Nagar, NashikP51600023278· 90.9% built
- NAMAN MADHUMALTI HEIGHTS3.7 yr overdueANAND GROUP BUILDERS AND DEVELOPERS · MANIK NAGAR, NashikP51600019581· 90.9% built
- DATTA MAULI CO-OPERATIVE HOUSING SOCIETY3.7 yr overdueDATTA MAULI CO-OPERATIVE HOUSING SOCIETY LIMITED · Nashik Road, NashikP51600004846· filed Oct 2018 → now Dec 2022· 81.8% built
- NIRMANS MANGALUM3.7 yr overdueNIRMAN ESTATE DEVELOPERS PVT LTD · BEHIND GURUJI RUGNALAYA, OFF GANGAPUR ROAD, NashikP51600018587· 78.2% built
- SWAMI HEIGHTS3.7 yr overdueMAULI BUILDERS AND DEVELOPERS · NEAR SWAMI SAMARTH KENDRA ROAD, NashikP51600022664· 90.9% built
- PURPLEHEIGHTS3.7 yr overdueKIRAN JAYANTIBHAI PATEL · PANCHAVATI, NashikP51600017085· 72.7% built
- SADHANA RESIDENCY APARTMENT3.6 yr overdueVISHAL LAXMAN GADEKAR · MAKHMALABAD, NashikP51600017808· 90.9% built
- Samraat Gokuldham Project 023.6 yr overdueM/S Shweta Infrastructure & Housing (I) Pvt. Ltd. · Hirawadi, NashikP51600020375· 90.9% built
- SANSKAR PLAZA3.6 yr overdueLAXMAN EKNATH GOMASE · PATHARDI PHATA, NASHIK-10, NashikP51600021281· 90.9% built
- SONALI EDIFICE3.6 yr overdueASHOKKUMAR PANDURANG KADAM · NEAR SAI SHRADHHA HP PETROL PUMP, AYODHYA NAGARI NASHIK, NashikP51600021415· 90.9% built
- SHIVALIK SPARSH3.6 yr overdueMADHUBHAI BABUBHAI KOTHIYA · PATHARDI, NashikP51600016159· 90.9% built
- EKAVIRA APARTMENT3.6 yr overdueMATOSHRI BUILDCON · ADGAON, NashikP51600016085· 90.9% built
- SAPTASHRUNGI SAHARA3.6 yr overduePRAGATI DEVELOPERS · GAMANE STADIUM, NashikP51600021736· 48.2% built
- VIMAL ICON3.6 yr overduePRAMOD NARAYAN PATKAR · Nashik, NashikP51600006454· 29.1% built
- SHIVKRUPA HEIGHTS3.6 yr overdueSHIVKRUPA BUILDERS AND LAND DEVELOPERS · DATTA NAGAR, CHUNCHALE, NASHIK, NashikP51600023921· 90.9% built
- SHREEJI SKYGREENS3.6 yr overdueSHREEJI REALTY · NEAR CITY CENTER MALL, NashikP51600014841· 46.8% built
- Manaswi Apartment3.6 yr overdueNitin Amrutkar & Associates · Indiranagar, NashikP51600013686· 90.9% built
- Samraat Nucleus Project 023.6 yr overdueM/S Shweta Infrastructure & Housing (I) Pvt. Ltd. · BHABHA NAGAR, NashikP51600020077· 90.9% built
- PANCHAMI RESIDENCY3.6 yr overdueS K BUILDCON · PATHARDI, NashikP51600018928· 90.9% built
- ADARSSH ONE3.6 yr overdueADARSSH BUILDCON · Near Sacred Heart School, NashikP51600017599· 90.9% built
- TEJ PARK3.6 yr overdueSHREE PADMAVATI DEVELOPERS · Nashik (M Corp.), NashikP51600007571· 90.9% built
- AMAR ELITE APARTMENT3.6 yr overdueAMAR BUILDTECH PRIVATE LIMITED · AUDUMBAR STOP, NashikP51600022938· 81.8% built
- FORTUNE3.6 yr overdueTIRUPATI BALAJI BUILDCON · ANANDVALLI, NashikP51600009811· filed Dec 2018 → now Dec 2022· 82.3% built
- AAKAR IMPERIA3.6 yr overdueAAKAR BUILDWELL · Dwaraka, NashikP51600015799· 90.9% built
- SUNDARAM PALACE APARTMENT3.6 yr overdueHASMUKHBHAI JERAMBHAI SUHAGIYA · MAKHMALABAD SHIVAR, NashikP51600015731· 89.4% built
- Durga Palace3.6 yr overdueHardik Developers · Anandvalli, NashikP51600015780· 90.9% built
- CHANDRAMA HEIGHTS3.6 yr overdueBABANRAO DAGU JADHAV · KAMATWADA, NashikP51600023390· 81.8% built
- SHANTI VAIBHAV APARTMENT3.6 yr overdueSAHYOG VASTU UDYOG · BEHIND PALM HOTEL, NashikP51600018728· 90.9% built
- Avadha Annexe3.6 yr overdueVrundavan Developers · Samarth Nagar, Pathardi, NashikP51600015198· 90.9% built
- SUYOJIT ONE WORLD PHASE-II, COMMERCIAL AND HOSPITAL3.6 yr overdueSUN INFRASTRUCTURES PVT. LTD · NEAR BIRLA HOSPITAL, NASHIK ROAD, NashikP51600002585· filed Mar 2019 → now Dec 2022· 72.7% built· 1 complaint
- Shree Gajanan Anex3.6 yr overdueKamal Wamanrao Jejurkar · khode mala, Nashik, NashikP51600029114· 73.2% built
- Suraj Residency3.6 yr overdueOm Sai Builder and Developers · nashik, NashikP51600029137· 90.9% built
- LAXMI VILLAS3.6 yr overdueUMESH BHAGWAN MUNDE · Mhasrul, NashikP51600033149· 51.8% built
- Laxmi Mahal3.6 yr overduePranav Uday Gaidhani · Nashik (M Corp.), NashikP51600010611· 26.9% built
- J P Park3.6 yr overdueJ p builders & land developers · Nashik (M Corp.), NashikP51600002589· 31.8% built
- GOVIND ELITE3.6 yr overdueGOVIND BHAUSAHEB MADHWAI · ADGAON, NashikP51600024470· 99.5% built
- HOME PARADISE3.6 yr overduePRASHANT FAKIRA KHAIRNAR · NEAR HOTEL JATRA, NashikP51600000771· 88.2% built
- HOME CLASSIC3.6 yr overdueSHAILENDRA TUKARAM SALUNKE · Nashik (M Corp.), NashikP51600000742· 86.8% built
- SHUBH VASTU3.6 yr overdueSHUBH VASTU CONSTRUCTIONS · Nashik, NashikP51600011441· 88.2% built
- SAMRUDDHI HEIGHTS APARTMENTS3.5 yr overdueSAMRUDDHI BUILDERS AND DEVELOPERS · VADJE MALA, BEHIND AKASH PETROLEUM, MHASRUL SHIWAR, NashikP51600020349· 30.9% built
- AMRUT YOG3.5 yr overduePRAKASH GIRIDHAR AMRUTKAR · Nashik (M Corp.), NashikP51600009867· filed Jul 2018 → now Feb 2023· 90.9% built
- NILANJAN PUJA3.5 yr overdueSANJAY MADHAVRAO BHAVSAR · AMBAD, NashikP51600022133· 90.9% built
- YASHRAJ APARTMENT3.5 yr overdueCHINTAMANI ENTERPRISES · PIMPALGAON BAHULA SHIVAR, NashikP51600024781· 90.9% built· 1 complaint
- RAVI RESIDENCY3.5 yr overdueRAVI CONSTRUCTION COMPANY · Nashik (M Corp.), NashikP51600010877· 90.9% built
- Padmavati Nagag3.5 yr overdueRIDDHI SIDDHI CONSTRUCTIONS · SANSARI, NashikP51600010866· 36.4% built
- SUNRISE RESIDENCY3.5 yr overdueSUNRISE GROUP · KAMAL NAGAR, NashikP51600011993· 90.9% built
- VAKRATUND HEIGHTS3.5 yr overdueRAVIRAJ BUILDCON · LAMKHADE MALA, NashikP51600011056· 90.9% built
- BHAVANI RESIDENCY3.5 yr overdueSUNRISE GROUP · Nashik (M Corp.), NashikP51600009926· 90.9% built
- RAVI APARTMENT3.5 yr overdueRAVI CONSTRUCTION COMPANY · Peth Road, NashikP51600009601· 90.9% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.