Delayed projects in Palghar
666 MahaRERA-registered projects in Palghar are past the possession date on file and still under 100% built. Where the promoter has formally revised the date, the original is shown alongside so you can see what changed.
Page 2 of 4
- YASHAPARTMENTKWING6.9 yr overdueBHAVESH SHANTILAL PAREKH · Palghar, PalgharP99000013382· 18.2% built
- I.K. GROUP6.8 yr overdueI K GROUP · Palghar, PalgharP99000005540· filed Dec 2018 → now Dec 2019· 58.8% built
- VAMA PARADISE6.8 yr overdueVAMA LIFESTYLES · VIRAR WEST, PalgharP99000010889· 90.9% built
- SHRI BALAJI NIWAS6.8 yr overdueBHOOMI ENTERPRISES · PALGHAR, PalgharP99000015857· 72.7% built
- Gokul Park6.8 yr overdueSai Ganesh Realtors · Vasai, PalgharP99000000895· filed Dec 2018 → now Dec 2019· 53.6% built
- ANAND VIEW6.8 yr overdueSHREE ADESHWAR BUILDER AND DEVELOPER · Vasai, PalgharP99000003252· filed Dec 2018 → now Dec 2019· 72% built
- SS Builders Building No.76.8 yr overdueS S BUILDERS · Vasai, PalgharP99000004734· 81.8% built
- KINGSTON COURT6.8 yr overdueMAHALAXMI ENTERPRISES · Vasai, PalgharP99000003618· 70.6% built
- VINAY UNIQUE HOMES6.8 yr overdueVINAYUNIQUE REALTORS · Vasai-Virar City (M Corp), PalgharP99000007717· 88.2% built· 2 complaints
- Briza Anchor Park6.8 yr overdueLakozy Builders LLp · Vasai, PalgharP99000010053· filed Dec 2018 → now Dec 2019· 90.9% built· 4 complaints
- VINAY UNIQUE IMPERIA6.8 yr overdueIMPERIUM BUILDCON LLP · Vasai-Virar City (M Corp), PalgharP99000008596· 81.8% built· 8 complaints
- CRD Gardenia Apartments 16.8 yr overdueDr Chandrashekhar Raghunath Dound · Palghar, PalgharP99000009462· filed Dec 2018 → now Dec 2019· 81.8% built
- PENINSULA HEIGHTS6.8 yr overduePRIESKA REAL ESTATES PVT. LTD. · VIRAR WEST, PalgharP99000011703· 43.1% built
- Tulip Anchor Park6.8 yr overdueLakozy Buliders LLP · Vasai, PalgharP99000009059· filed Dec 2018 → now Dec 2019· 90.9% built· 1 complaint
- JADHAV RESIDENCY6.8 yr overduePALAK BUILDERS · Vasai, PalgharP99000011045· 90.9% built
- LAKEVIEW APARTMENT6.8 yr overdueTRIMURTI BUILDERS AND DEVELOPERS · Vasai, PalgharP99000007342· 28.8% built· 1 complaint
- SHEETAL ANJALI6.8 yr overdueD.G.LAND DEVELOPERS PRIVATE LIMITED · Vasai-Virar City (M Corp), PalgharP99000005155· filed Dec 2018 → now Dec 2019· 48.9% built
- MAHAVIR SYMPHONY6.8 yr overdueRAKESH AMRUTLAL SHAH · Vasai, PalgharP99000011172· filed Dec 2018 → now Dec 2019· 90.9% built
- OSTWAL DREAM LAND6.8 yr overdueSHREE OSTWAL BUILDERS LTD · Palghar, PalgharP99000008545· filed Dec 2018 → now Dec 2019· 90.9% built
- SWEET HOME BUILDING 16.8 yr overdueIPSIT ENTERPRISE · Shirgaon, PalgharP99000009859· 18.2% built
- VINAY UNIQUE GARDENS6.8 yr overdueVINAYUNIQUE DEVELOPERS · DONGRE, PalgharP99000012052· 86.4% built· 9 complaints
- CRYSTAL PARK - PHASE II6.8 yr overdueK K BUILDERS & DEVELOPERS · Palghar, PalgharP99000004379· 84.5% built
- VINAY UNIQUE HEIGHTS6.8 yr overdueSUV DEVELOPERS · Vasai, PalgharP99000002691· 83.6% built
- VICTORY HEIGHTS6.8 yr overduePANCHMUKHI BUILDERS AND DEVELOPERS · Vasai, PalgharP99000005198· filed Dec 2018 → now Dec 2019· 90.9% built· 3 complaints
- G M HEIGHT6.8 yr overdueGARODIA & MAKWANA DEVELOPERS · Vasai, PalgharP99000005833· filed Mar 2018 → now Dec 2019· 70% built
- ICCHAPURTI SAI PRESTIGE6.8 yr overdueMAHAVIR VENTURES · Vasai, PalgharP99000009115· 87.9% built
- SHRINATHJI HEIGHTS6.8 yr overdueSHRINATHJI BUILDER AND DEVELOPERS · Nanivali, PalgharP99000012732· 90.9% built· 2 complaints
- SHELTER HEIGHTS6.8 yr overdueSHREE VIMALNATH REALITY · Vasai, PalgharP99000013845· 60.9% built
- KIRAN KUNJ6.8 yr overduePravinkumar Lalchand Jain · VEVOOR, PalgharP99000019305· 90.9% built
- RACHNA TOWERS6.8 yr overdueVIKRAM BUILDWELL PVT LTD · Vasai, PalgharP51900001352· 82.3% built· 2 complaints
- VINAY UNIQUE CORNER6.8 yr overdueVINAYUNIQUE CONSTRUCTION PRIVATE LIMITED · BOLINJ, PalgharP99000010331· 88.2% built
- VEENA DYNASTY PH II6.8 yr overdueNIKUNJ DEVELOPERS · Vasai, PalgharP99000007769· 89.1% built
- RITU DREAMS6.8 yr overdueRITU REALITY · Vasai, PalgharP99000002765· filed Dec 2018 → now Dec 2019· 71.4% built
- DATTANI PRISM6.8 yr overdueBRIJESH SATISH DATTANI · Vasai, PalgharP99000008471· 90.9% built· 1 complaint
- ANAND VIEW A WING6.8 yr overdueSHREE ARIHANT DEVELOPERS · Vasai, PalgharP99000005956· filed Dec 2018 → now Dec 2019· 72.5% built
- LAXMI RESIDENCY6.8 yr overdueOM SAI ENTERPRISE · Vasai-Virar City (M Corp), PalgharP99000009380· filed Dec 2018 → now Dec 2019· 90.9% built
- BLUEBELL IMPERIAL6.8 yr overdueDeepak Bhupatrai Vora · Vasai, PalgharP99000002856· 33.3% built
- Atmaram Plaza6.8 yr overdueShreeyan Developers · Vasai, PalgharP99000003881· 45.5% built
- Shree Shakun Greens6.8 yr overdueShree Shakun Realty Pvt Ltd · Vasai, PalgharP99000001708· 98.6% built· 5 complaints
- Varun Buildcon6.8 yr overdueDeepak Bhupatrai Vora · Village Sativali, PalgharP99000015763· 28.6% built
- CRYSTAL PARK PHASE III6.8 yr overdueK K BUILDERS & DEVELOPERS · Palghar, PalgharP99000005782· 34.8% built
- Rose Anchor Park6.8 yr overdueLakozy Builders LLP · Vasai, PalgharP99000011540· filed Dec 2018 → now Dec 2019· 90.9% built
- POONAM HEIGHTS6.8 yr overduePOONAM REALTY · Vasai, PalgharP99000002118· 90.9% built
- SAI RAJ6.8 yr overdueSAI DHARA ENTERPRISE · Vasai, PalgharP99000002245· 90% built
- POONAM HEIGHTS6.8 yr overduePOONAM MEGA DEVELOPERS · Vasai, PalgharP99000001663· 90.9% built· 2 complaints
- VEDANGI DEVELOPERS6.7 yr overdueVEDANGI DEVELOPERS · Vasai, PalgharP99000005089· filed Jan 2019 → now Jan 2020· 90.9% built
- Mahavir Kunj C Wing A6.7 yr overdueRajesh Realtors · Mahavir Kunj, PalgharP99000017961· 90.9% built
- INDRAPRASTHA 46.5 yr overduePREM CONSTRUCTIONS · Palghar, PalgharP99000017898· 90.9% built
- OM SAI6.2 yr overdueMAYFAIR ENTERPRISES · khairepada, PalgharP99000013687· filed Jul 2019 → now Jul 2020· 90.9% built
- ROYAL GARDEN6.2 yr overdueYSSF ENTERPRISES · MALYAN, PalgharP99000025831· 90.9% built
- NIDHI SHELTER6.1 yr overdueBMH PROPERTIES PVT LTD · GOPIPURA-E, PalgharP99000025815· 78.6% built
- JOHN RESIDENCY6.1 yr overdueJAMES JOHN DSOUZA · MASOLI, PalgharP99000025496· 90.9% built
- ROYAL RESIDENCY6.1 yr overdueHIMANSHU SHAM TENDULKAR · opp .filteration plant, PalgharP99000014529· 90.9% built
- JAAI PHASE II6.0 yr overdueVERSATILEREALTORSPRIVATELIMITED · Vasai, PalgharP99000016273· 90.9% built
- SHRI INDUSTRIAL ESTATE6.0 yr overdueSHRI ENTERPRISES · Vasai, PalgharP99000008391· 65.5% built
- Earth Residency6.0 yr overdueEarth Builder & Developers · Palghar, PalgharP99000007170· filed Mar 2019 → now Sept 2020· 90.9% built
- SHANTI ENCLAVE6.0 yr overdueSADGURU BUILDERS AND DEVELOPERS · Vasai, PalgharP99000009944· filed Mar 2019 → now Sept 2020· 45.1% built
- Emerald Tower6.0 yr overdueS M Enterprises · Vasai, PalgharP99000004995· filed Mar 2018 → now Sept 2020· 90% built
- AARKAY GOLD6.0 yr overdueAAR KAY ENTERPRISES · Vasai, PalgharP99000005943· 65.5% built
- DARSHAN SWAPNALOK PHASE 16.0 yr overdueINTELLIGENT LANDMARKS LLP · Palghar, PalgharP99000013108· 81.8% built
- PRITHVI SRISHTI6.0 yr overduePrithvi Anand Housing and Land Developers · Palghar, PalgharP99000014102· 90% built
- Sky Heights6.0 yr overdueSadguru Developers · Vasai, PalgharP99000003527· filed Mar 2018 → now Sept 2020· 90.9% built
- DEEP GARDEN6.0 yr overdueATHARVA DEVELOPER · Vasai, PalgharP99000010593· filed May 2018 → now Sept 2020· 81.8% built
- Imperial Shelter6.0 yr overdueImperial Shelter · Vasai, PalgharP99000001277· filed Apr 2019 → now Oct 2020· 49.5% built
- MAX VENTURE6.0 yr overdueMAX VENTURE · Vasai, PalgharP99000010434· 81.8% built
- SAI SANGAM APARTMENT6.0 yr overdueSAI SANGAM CONSTRUCTION CO · Vasai, PalgharP99000008631· filed May 2018 → now Oct 2020· 90.9% built
- Ornate Galaxy Phase I6.0 yr overdueSai Ornate Developers · Vasai, PalgharP99000008854· filed Dec 2018 → now Oct 2020· 85.3% built
- Mittal Enclave Gokul Sector Bldg No 46.0 yr overdueSealink Construction Co. Pvt. Ltd. · Vasai, PalgharP99000006573· filed Dec 2018 → now Oct 2020· 90% built
- SUNSHINE SAPPHIRE5.9 yr overdueShantee Housing · Vasai, PalgharP99000001441· filed May 2019 → now Nov 2020· 90.9% built· 9 complaints
- BROOKLYN PARK PHASE I5.9 yr overdueEKTA PARKSVILLE HOMES PVT. LTD. · Vasai, PalgharP99000000134· filed May 2019 → now Nov 2020· 89.4% built· 7 complaints
- VRINDAVAN COMPLEX5.9 yr overduePATIL BUILDERS · Palghar, PalgharP99000000827· filed May 2019 → now Nov 2020· 90.9% built
- New Haven Boisar II Phase II5.9 yr overdueSMART VALUE HOMES (BOISAR) PRIVATE LIMITED · Palghar, PalgharP99000000997· filed May 2019 → now Nov 2020· 72.7% built· 3 complaints
- PRAGATI TULIP5.9 yr overduePRAGATI CORPORATION · Palghar, PalgharP99000011793· filed May 2019 → now Nov 2020· 51.8% built
- Happinest Boisar Phase IV5.9 yr overdueMahindra Lifespace Developers limited · Palghar, PalgharP99000014293· 81.8% built· 2 complaints
- New Haven Compact Boisar II Phase I5.9 yr overdueSMART VALUE HOMES (BOISAR) PRIVATE LIMITED · Palghar, PalgharP99000000811· filed May 2019 → now Nov 2020· 78.2% built· 13 complaints
- BLDG NO-9 M.BARIA TWIN TOWER5.9 yr overdueM/s MAGNATES ENTERPRISES · Vasai, PalgharP99000003970· filed May 2018 → now Nov 2020· 98.2% built
- Happinest Boisar Phase V CFC5.9 yr overdueMahindra Lifespace Developers limited · Palghar, PalgharP99000014295· 81.8% built
- N G SHREE RAM VAN PHASE I5.8 yr overdueJ M G REALTORS PVT LTD · ., PalgharP99000000747· filed Dec 2019 → now Dec 2020· 82% built
- VIVA CITY-A25.8 yr overdueVIVA WINNER VENTURE RELATORS LLP · Virar West, PalgharP99000008341· filed Jun 2019 → now Dec 2020· 54.1% built· 10 complaints
- NICON INFINITY PHASE 15.8 yr overdueNICON INFRA LLP · Vasai, PalgharP99000003227· filed Jun 2019 → now Dec 2020· 90.9% built
- VIVA CITY - A15.8 yr overdueVIVA WINNER VENTURE RELATORS LLP · Vasai, PalgharP99000004874· filed Jun 2019 → now Dec 2020· 56.4% built· 2 complaints
- Mahavir Kunj B5.8 yr overdueRajesh Realtors · Palghar, PalgharP99000018657· 90.9% built
- MUNISH SMRITI5.8 yr overdueSMRITI INFRAHEIGHTS PRIVATE LIMITED · Vasai-Virar City (M Corp), PalgharP99000009677· filed Jun 2019 → now Dec 2020· 9.1% built
- Ganapati Apartment5.8 yr overdueJai Bajarang Construction · Palghar West, PalgharP99000015531· filed Dec 2019 → now Dec 2020· 87.3% built
- Rebecca Queen5.8 yr overdueRebecca Ventures · Vasai, PalgharP99000005006· filed Jun 2019 → now Dec 2020· 73.6% built
- Mahavir Niwas B5.8 yr overdueRAJESH ENTERPRISES · Palghar, PalgharP99000017806· 90.9% built
- SHUBHAM GALAXY5.8 yr overdueARHAM NEEJDEEP REALTORS · Vasai-Virar City (M Corp), PalgharP99000002476· 90% built
- RICHMOND TOWN PHASE II LAKE EXOTICA5.7 yr overdueM/S HOMAGE DEVELOPERS · Vasai, PalgharP99000004129· filed Jul 2019 → now Jan 2021· 90.9% built
- MANIBHADRA AVENUE5.7 yr overdueMANIBHADRA AVENUE · Vasai, PalgharP99000003027· filed Jul 2019 → now Jan 2021· 90.4% built· 1 complaint
- SAI PARIVAR5.7 yr overdueSAI PARIVAR CONSTRUCTION COMPANY · Vasai, PalgharP99000007079· filed Jul 2019 → now Jan 2021· 90.9% built
- VIVA SHELTER - I5.7 yr overdueCHETANA BUILDERS AND DEVELOPERS · Vasai-Virar City (M Corp), PalgharP99000012456· filed Jul 2019 → now Jan 2021· 63.2% built· 1 complaint
- MALHAR5.7 yr overdueHARIKRISHNA ENTERPRISES · Palghar, PalgharP99000002593· 52.7% built
- Madhav Vatika-II5.7 yr overdueShrijee Krupa Developers · Palghar East, PalgharP99000015110· 90.9% built
- NAKODA HEIGHTS 45.7 yr overdueSHRINATH REALTORS · Vasai, PalgharP99000008910· 90.9% built· 1 complaint
- ROMAN RESIDENCY5.6 yr overdueShantee Housing · Vasai, PalgharP99000002849· filed Aug 2019 → now Feb 2021· 88.3% built
- MANSI APARTMRNT5.6 yr overdueANMOL DEVELOPERS · Swastik Complex, PalgharP99000025054· 90.9% built
- Somershwar Apartment5.5 yr overdueHarihar Builders & Developers · Palghar, PalgharP99000011912· filed Oct 2018 → now Mar 2021· 53.6% built· 1 complaint
- KISHOR KUNJ5.5 yr overdueBHAGWATI BUILDERS AND DEVELOPERS · Vasai, PalgharP99000006836· filed Dec 2017 → now Mar 2021· 90.9% built
- PRITHVI REGENCY5.5 yr overduePRITHVI PROPERTY DEVELOPERS · PALGHAR, PalgharP99000015122· 90.9% built
- BLISS NIRMAN INDUSTRIAL ESTATE5.3 yr overdueBLISS DEVELOPERS · Goraipada, PalgharP99000029700· 81.8% built
- CRD Gardenia Apartments 6 - Phase II5.3 yr overdueDr Chandrashekhar Raghunath Dound · Velgaon, PalgharP99000019665· 81.8% built
- MAHAVIR SADAN A5.3 yr overdueRajesh Construction · Palghar, PalgharP99000021076· 90.9% built
- RAJ KIRTI INDUSTRIAL ESTATE5.1 yr overdueRAJ DEVELOPERS · VASAI, PalgharP99000029685· 81.8% built
- VASANT VILLA5.0 yr overdueVASANT CONSTRUCTION · ADARSH NAGAR, PalgharP99000015257· filed Sept 2020 → now Sept 2021· 0% built· 1 complaint
- Hayaat Moon5.0 yr overdueNewstar Builders · Vasai, PalgharP99000003825· filed Oct 2019 → now Oct 2021· 22.7% built
- DIVYAL HEIGHTS5.0 yr overdueDISHANT BUILDERS AND LAND DEVELOPERS · Vasai, PalgharP99000005192· filed Jul 2018 → now Oct 2021· 90.9% built
- FIA CONSTRUCTION COMPANY FIA IMPERIA5.0 yr overdueNIMISH LAXMICHAND PASAD · Palghar, PalgharP99000003189· 62.7% built
- MALHAR LIFESPACES4.9 yr overdueMALHAR LIFESPACES · PALGHAR CITY, PalgharP99000014945· 90.9% built
- Nikhil Tower Building No 24.9 yr overdueM/S. SAMARTH BUILDERS & LAND DEVELOPERS · Vasai-Virar City (M Corp), PalgharP99000007481· filed Jun 2019 → now Nov 2021· 90.9% built
- Prutha Residency4.8 yr overdueM/s Aum Jivdani Associates · Dahanu, PalgharP99000014796· 90.9% built
- CASITA ENCLAVE4.8 yr overdueM/S PLATINUM REALTORS · Vasai, PalgharP99000003868· 90.9% built
- NAVKAR CITY PHASE II PART 34.8 yr overdueNAVKAR ESTATE AND HOMES PVT LTD · naigaon, PalgharP99000009716· 89.6% built
- NAVKAR CITY Phase I part 34.8 yr overdueNavkar Estate and Homes Pvt.Ltd. · Vasai, PalgharP99000004573· 89.7% built
- SS BUILDERS BUILDING NO. 84.8 yr overdueS S BUILDERS · Vasai, PalgharP99000004466· filed Dec 2019 → now Dec 2021· 61.4% built
- VANAMALA4.8 yr overdueNAVINKUMAR SUBHASH CHORGHE · Vasai, PalgharP99000006045· 90.9% built
- COSMOS SQUARE4.8 yr overdueSHRIPAL DEVELOPERS · Vasai, PalgharP51900010992· 32.7% built
- Nine Star Landmark Ph-I Bldg-1 ASTER4.8 yr overdueNINE HOMEMAKERS · Palghar, PalgharP99000009255· filed Dec 2019 → now Dec 2021· 9.1% built
- NEELKANTH INDUSTRY4.8 yr overdueSurendra Ramanlal Patel · Vasai East, PalgharP99000024700· 39.8% built
- LUIZA HOMES4.8 yr overdueLUIZA HOMES · Vasai-Virar City (M Corp), PalgharP99000008748· filed Dec 2019 → now Dec 2021· 15.9% built
- RUSTOMJEE VIRAR AVENUE D1 WING A AND WING B AND RETAIL BUILDING4.8 yr overdueKEYSTONE INFRASTRUCTURE PRIVATE LIMITED · AVENUE D1, PalgharP99000018043· 81.8% built
- SHRI SAI DARSHAN4.8 yr overdueOM SAI BUILDERS AND DEVELOEPRS · Palghar, PalgharP99000013904· 90.9% built
- Maple Terraces Building No. A-154.8 yr overdueMessrs. Axis Dwellings LLP · Palghar, PalgharP99000005233· filed Mar 2018 → now Dec 2021· 80.9% built
- FALAK NUMA4.8 yr overdueNAVID MOHAMMED HUSSAIN CHINDE · Vasai, PalgharP99000008662· 72.7% built
- THE WOODS MAPLE AVENUE B WING4.8 yr overduePIMENTA DEVELOPERS · Vasai, PalgharP99000005658· 90.9% built
- SPACE HEIGHTS4.8 yr overdueSPACE ASSOCIATES · Waliv, PalgharP99000008214· 43.6% built
- NAVKAR CITY PHASE II PART I4.8 yr overdueNavkar Estate and Homes Pvt Ltd · naigaon, PalgharP99000009437· 89.9% built
- Imperial Heritage4.8 yr overdueShree Ganesh Ventures · Vasai, PalgharP99000001053· filed Dec 2018 → now Dec 2021· 90.9% built
- ELEGANCE4.8 yr overdueSHRUSHTI DEVELOPERS · Palghar, PalgharP99000014549· 90.9% built
- SAI ENCLAVE4.8 yr overdueM/S. RADHEYA CONSTRUCTION COMPANY · Vasai, PalgharP99000004529· 60.6% built
- Mahindra Happinest Palghar Phase - I4.8 yr overdueMAHINDRA HAPPINEST DEVELOPERS LIMITED(Formerly known as Mahindra Happinest Developers Pvt. LTD) · Nandore, PalgharP99000014911· 81.8% built· 38 complaints
- KANTI REGENCY4.8 yr overdueMAHAVIR PROPERTIES · Vasai, PalgharP99000010163· filed Dec 2019 → now Dec 2021· 90.9% built
- Nakshatra Ozone4.8 yr overdueJSB Homes LLP · Tivari, PalgharP99000009297· filed Dec 2019 → now Dec 2021· 90.9% built
- FIA ORION4.8 yr overdueNIMISH LAXMICHAND PASAD · PALGHAR, PalgharP99000015786· 90.9% built
- HAYAAT GALAXY4.8 yr overdueM M Enterprises · Vasai, PalgharP99000003445· filed Dec 2019 → now Dec 2021· 90.9% built
- PRESTIGE APARTMENT4.8 yr overdueSAIJAYSHREEBUILDERS · Palghar, PalgharP99000015069· 45.5% built
- RUSTOMJEE VIRAR AVENUE D1 WING C AND WING D4.8 yr overdueKEYSTONE INFRASTRUCTURE PRIVATE LIMITED · AVENUE D1, PalgharP99000017942· 81.8% built· 2 complaints
- CASITA ENCLAVE4.8 yr overdueBHOIR ENTERPRISES · Vasai-Virar City (M Corp), PalgharP99000012590· 90.9% built
- Maple Terraces Building No. B-114.8 yr overdueMessrs. Axis Dwellings LLP · shelwali, PalgharP99000010117· filed Mar 2018 → now Dec 2021· 90% built
- PARADISE RESIDENCY4.8 yr overduePARIKH INVESTMENT AND DEVELOPMENT PVT. LTD. · Vasai, PalgharP99000004196· filed Dec 2019 → now Dec 2021· 40.9% built
- THE WOODS JUNIPER B WING4.8 yr overduePLATINUM REALTY · Vasai, PalgharP99000009479· 90.9% built
- Nakshatra Greens - Phase II4.8 yr overdueJSB Buildcon LLP · Vasai, PalgharP99000008753· filed Dec 2019 → now Dec 2021· 90.9% built· 1 complaint
- THE WOODS- MAPLE AVENUE A WING4.8 yr overdueSURE DWELL DEVELOPERS · Vasai, PalgharP99000005435· 90.9% built
- PARASNATH NAGARI BUILDING NO 54.8 yr overdueSHREE PARASNATH BUILDERS · Vasai, PalgharP99000007350· filed Dec 2019 → now Dec 2021· 63.3% built
- MAITRY POOJA BUILDING NO.34.8 yr overdueMAITRY POOJA BUILDERS & DEVELOPERS · Vasai-Virar City (M Corp), PalgharP99000008122· 90.9% built
- RITU GARDENIA PHASE 14.8 yr overdueRITU BUILDERS AND DEVELOPERS · Vasai, PalgharP99000011391· 94.3% built· 1 complaint
- Ameya Woods4.8 yr overdueAmeya Squares · Vasai, PalgharP99000006892· 90.9% built
- SUBWAY RESIDENCY4.8 yr overdueRAJ ASSOCIATES · VIRAR, PalgharP99000010520· 41.4% built
- OSTWAL WONDER CITY4.8 yr overdueSHREE OSTWAL BUILDERS LTD · Palghar, PalgharP99000006909· 89.1% built
- SHRI KAMBESHWAR HEIGHTS4.8 yr overdueSHRI KAMBESHWAR & SONS · Vasai, PalgharP99000006801· 90.4% built
- VIVAAN HEIGHTS4.8 yr overdueMAHAVIR PROPERTIES · Vasai, PalgharP99000009840· filed Dec 2019 → now Dec 2021· 90.9% built
- KANTI AVENUE4.8 yr overdueMAHAVIR REALITY · Vasai, PalgharP99000006288· filed Mar 2018 → now Dec 2021· 95.5% built
- JUIE4.8 yr overdueVERSATILEREALTORSPRIVATELIMITED · Vasai, PalgharP99000012019· filed Dec 2019 → now Dec 2021· 90.9% built
- Maple Terraces Building No. B-104.8 yr overdueMessrs. Axis Dwellings LLP · shelwali, PalgharP99000008935· filed Mar 2018 → now Dec 2021· 90% built
- FIA SAPPHIRE4.8 yr overdueNIMISH LAXMICHAND PASAD · PALGHAR, PalgharP99000014626· 90.9% built
- INDUSTRIAL PROJECT4.8 yr overdueSUVIDHA BUILDERS AND DEVELOPERS · Vasai-Virar City (M Corp), PalgharP99000009165· 81.8% built
- REGAL HEIGHTS4.8 yr overdueSUVIDHA ENTERPRISES · Vasai, PalgharP99000009178· 49.1% built
- SHRI RAJENDRA SRUSHTI4.8 yr overdueSRUSHTI DEVELOPERS · Palghar, PalgharP99000005173· 81.8% built
- SAI SHIKHAR4.8 yr overdueN K PARIVAR BUILDERS & DEVELOPERS · Vasai-Virar City (M Corp), PalgharP99000012192· filed Dec 2019 → now Dec 2021· 69.1% built
- NAVKAR CITY PHASE I PART 14.8 yr overdueNavkar Estate and Homes Pvt Ltd · don bosco, PalgharP99000011999· 90.2% built· 5 complaints
- Acropolis 14.8 yr overdueBhoomi & Arkade Associates · Virar West, PalgharP99000007415· 89.1% built· 29 complaints
- POONAM PALLAZO4.8 yr overduePOONAM SHANTI DEVELOPERS · Vasai, PalgharP99000007365· filed Dec 2019 → now Dec 2021· 90.9% built
- FIA IMPERIA4.8 yr overdueFIA LUXURY HOME DEVELOPERS · Palghar, PalgharP99000006476· 90.9% built
- Dhanya Sativali Nagri Building 104.8 yr overdueSandesh Lakhuji Jadhav · Vasai-Virar City (M Corp), PalgharP99000010377· 86.4% built
- GLOBAL ARCADE4.8 yr overdueNINE ASSOCIATE DEVELOPERS · Vasai, PalgharP99000003305· filed Dec 2019 → now Dec 2021· 79.1% built
- SAI APARTMENT4.8 yr overdueHARI OM BUILDERS AND DEVELOPERS · NAVAL NAGAR, PalgharP99000014827· 89.1% built
- Sai Prasad4.7 yr overdueSai Prasad Developers · Vasai, PalgharP99000015349· 90.9% built
- ROYAL ABODE4.7 yr overdueKAWALI AND ASSOCIATES · Vasai, PalgharP99000015017· 90.9% built
- KUSUM PARK4.7 yr overdueSUNSHINE BUILDERS · Palghar, PalgharP99000009057· filed Dec 2021 → now Feb 2022· 54.1% built
- SAI HEIGHTS4.5 yr overdueKULSWAMINI MAHALAXMI DEVELOPERS · Vasai-Virar City (M Corp), PalgharP99000012928· filed May 2018 → now Mar 2022· 30.3% built
- BLDG NO-1 M.BARIA EVEREST4.5 yr overdueMORESHWAR KRUSHNA BARIA · Vasai, PalgharP99000004326· filed Dec 2017 → now Mar 2022· 90.9% built· 6 complaints
- BLDG NO-3 ROSE4.5 yr overdueM/s AMEYA BUILDERS & PROPERTY DEVELOPERS · YASHWANT NAGAR, PalgharP99000008563· filed Mar 2019 → now Mar 2022· 90.9% built
- WONDER RESIDENCY C WING BUILDING NO 24.5 yr overdueNEW GALAXY ENTERPRISES · GOKHIVIRE, VASAI, PalgharP99000020475· 90.9% built
- CRD Gardenia Apartments 2 - Phase II4.5 yr overdueDr Chandrashekhar Raghunath Dound · Velgaon, PalgharP99000019691· 52.3% built
- Nine Star Residency - Imperia4.5 yr overdueM/s A.K. Developers · Palghar, PalgharP99000015888· 48.2% built
- DANDEKAR RESIDENCY4.5 yr overdueJAYANT VISHNU DANDEKAR · NEAR VIJAYA BANK, PalgharP99000019704· 81.8% built
- MITHILA DHAM4.5 yr overdueNAVAL RAMBAHADUR SINGH · Palghar, PalgharP99000006624· 61.8% built
- BLDG NO-16 VIOLET4.5 yr overdueM/s AMEYA BUILDERS & PROPERTY DEVELOPERS · Vasai, PalgharP99000002573· filed Mar 2018 → now Mar 2022· 87% built
- UNIQUE CORNER BUILDING NO 2 B WING4.5 yr overdueUNIQUE LAND REALTY PVT LTD · STELLA, VASAI WEST, PalgharP99000023334· 54.5% built
- Riddhivinayak Apartment4.5 yr overdueJai Bajarang Construction · Navali, PalgharP99000014934· filed Nov 2019 → now Mar 2022· 87.7% built
- Aditi Empire4.5 yr overdueRakhumai Developers · Vasai, PalgharP99000010761· 20% built
- Nisarg Shrushti Phase-14.5 yr overdueArvel Realtors · Behind Mahavir Garden, PalgharP99000009330· filed Oct 2020 → now Apr 2022· 90.9% built
- INDRAPRASTH COMPLEX4.5 yr overdueSWASTIK DEVELOPERS · Palghar, PalgharP99000001847· filed Jan 2019 → now Apr 2022· 90.9% built
- Devakinagar4.5 yr overdueEmpire Developers · Palghar, PalgharP99000003256· filed Feb 2019 → now Apr 2022· 90.9% built
- Mohak City Florence4.5 yr overdueV.M.S Enterprises · Vasai, PalgharP99000011207· filed Oct 2020 → now Apr 2022· 90.9% built
- GALAXY AVENUE4.4 yr overduePARSHWANATH REALTORS · rajnagar, PalgharP99000010944· filed Jun 2019 → now May 2022· 90.9% built
- MUKUNDA HEIGHTS4.4 yr overdueSai Mukunda Builder and Developers · Vasai, PalgharP99000000853· 46.4% built· 1 complaint
- M BARIA LAKE VIEW4.4 yr overdueMORESHWAR KRUSHNA BARIA · VIRAT NAGAR, PalgharP99000029111· 54.5% built
- Joyville Virar Phase 14.3 yr overdueJoyville Shapoorji Housing Private Limited · Vasai, PalgharP51900000444· 72.7% built· 1 complaint
- GAJANANA4.3 yr overdueAMIT HARSHAVADAN AGASKAR · Palghar, PalgharP99000016205· filed Dec 2020 → now Jun 2022· 50% built
- Mahavir Niwas A4.3 yr overdueRAJESH ENTERPRISES · Palghar, PalgharP99000021942· 90.9% built
- Shree Hari Industrial Estate4.3 yr overdueParul and Mona Associates · Chinchpada, PalgharP99000026567· 45.5% built
- OMKARA4.3 yr overdueANH NIRMAN · Palghar, PalgharP99000016447· filed Dec 2020 → now Jun 2022· 56.8% built
- MIRAYA4.3 yr overdueAMIT HARSHAVADAN AGASKAR · MAHIM, PalgharP99000016401· filed Dec 2020 → now Jun 2022· 49.1% built
- AADESHWAR-24.3 yr overdueSHREE ADESHWAR BUILDCOM · Palghar, PalgharP99000011704· filed Dec 2020 → now Jun 2022· 90.9% built
- VIMAL HEIGHTS4.2 yr overdueSHREE VIMAL DEVELOPERS · Vasai, PalgharP99000010545· filed Jun 2019 → now Jul 2022· 90.5% built
- MAHALAXMI RESIDENCY4.2 yr overdueSHREE GURUKRUPA DEVELOPERS · Vasai-Virar City (M Corp), PalgharP99000012076· filed Jul 2018 → now Jul 2022· 63.6% built
- RELIABLE UTKARSH C , D WING4.2 yr overdueRELIABLE PRISM CONSTRUCTION CO. · VASAI, PalgharP99000008640· filed Jun 2019 → now Jul 2022· 42.5% built
- Almighty Villas4.2 yr overdueAlmighty Developers · Vasai, PalgharP99000008997· filed Jan 2021 → now Jul 2022· 72.4% built
- Rustomjee Virar Avenue L1-L2 And L4 Wing C and D4.2 yr overdueKEYSTONE INFRASTRUCTURE PRIVATE LIMITED · Avenue L1-L2, PalgharP99000018694· 55.7% built· 1 complaint
- RELIABLE UTKARSH A,B WING4.2 yr overdueRELIABLE PRISM CONSTRUCTION CO. · Vasai, PalgharP99000005891· filed Jun 2018 → now Jul 2022· 47.3% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.