Delayed projects in Palghar
662 MahaRERA-registered projects in Palghar are past the possession date on file and still under 100% built. Where the promoter has formally revised the date, the original is shown alongside so you can see what changed.
Page 3 of 4
- Rustomjee Virar Avenue L1-L2 And L4 Wing C and D4.1 yr overdueKEYSTONE INFRASTRUCTURE PRIVATE LIMITED · Avenue L1-L2, PalgharP99000018694· 55.7% built· 1 complaint
- Divine Residency4.0 yr overdueGuruPrabhu Builders & Developers · Vasai, PalgharP99000004430· filed Aug 2019 → now Aug 2022· 90.9% built
- VINAYAKA4.0 yr overdueAMIT HARSHAVADAN AGASKAR · Palghar, PalgharP99000022336· 27.3% built
- CRD Gardenia Apartments 63.9 yr overdueDr Chandrashekhar Raghunath Dound · Palghar, PalgharP99000009989· filed Dec 2019 → now Sept 2022· 81.8% built
- Mahindra Happinest Palghar Phase - II3.9 yr overdueMAHINDRA HAPPINEST DEVELOPERS LIMITED(Formerly known as Mahindra Happinest Developers Pvt. LTD) · Nandore Grampanchayat, PalgharP99000015481· 81.8% built· 3 complaints
- Nirman Height3.9 yr overdueNirman Builder & Developer · Palghar West, PalgharP99000015536· 90.9% built
- Ramchandra residency bldg no.13.9 yr overdueHimali Construction · Vasai, PalgharP99000010975· filed Jul 2018 → now Sept 2022· 83.6% built
- AMAN PARADISE3.9 yr overdueS K DEVELOPERS · SATIVALI VASAI, PalgharP99000020134· 33.4% built
- Shree Ambe Apartment3.9 yr overdueDivine Land Developers · Near Hanuman Tekdi, PalgharP99000028003· 90.9% built
- K. D. SAICON3.9 yr overdueK. D. VENTURE · Vasai, PalgharP99000003992· filed Mar 2019 → now Sept 2022· 81.8% built· 1 complaint
- ARPAN RESIDENCY3.7 yr overdueAKASH DEVELOPERS · Vasai, PalgharP99000005384· filed May 2019 → now Nov 2022· 90.9% built
- Navkar City Phase III Part 13.7 yr overdueNavkar Estate and Homes Pvt Ltd · Vasai-Virar City (M Corp), PalgharP99000011641· filed Jun 2021 → now Nov 2022· 89.5% built
- VIDYA SAGAR VILLA3.7 yr overdueRAVINDRA SHANKAR SAWANT · Palghar, PalgharP99000008038· 64.1% built· 2 complaints
- CD HEIGHT3.7 yr overdueKALPANA BUILDCON · Vasai, PalgharP99000005581· 60.2% built
- DEEP CLASSIC TOWER3.6 yr overdueSAI SANGAM DEVELOPERS · Vasai, PalgharP99000012178· filed Jun 2021 → now Dec 2022· 89.7% built· 6 complaints
- Mahindra Happinest Palghar Phase - IV3.6 yr overdueMAHINDRA HAPPINEST DEVELOPERS LIMITED(Formerly known as Mahindra Happinest Developers Pvt. LTD) · Nandore, PalgharP99000017770· 81.8% built· 1 complaint
- ACROPOLIS 23.6 yr overdueBhoomi & Arkade Associates · Vasai, PalgharP99000006132· 89.1% built· 42 complaints
- Trinity Heights3.6 yr overdueShreeji Realtors · Virar, PalgharP99000010210· 59.1% built
- SAI YASH COMPLEX3.6 yr overdueMahatma Infrasturcture (India) LLP · Shirgaon, PalgharP99000013008· 9.4% built
- VAJRESHWARI APARTMENT3.6 yr overdueSHREE ADESHWAR BUILDCOM · UMROLI EAST, PalgharP99000017638· 86.4% built
- Mahim Garden3.6 yr overdueShree Oshiyaji Builders & Developers LLP · Mahim, PalgharP99000013118· 45.5% built
- Mahindra Happinest Palghar Phase V3.6 yr overdueMAHINDRA HAPPINEST DEVELOPERS LIMITED(Formerly known as Mahindra Happinest Developers Pvt. LTD) · nandore, PalgharP99000015852· 81.8% built· 2 complaints
- VRINDAVAN COMPLEX3.6 yr overdueKRISHNARAJ REALTORS · VILLAGE MAHIM,, PalgharP99000016299· 72.7% built
- SHARDA TOWER - I3.6 yr overdueM/S. CHETANA REALTORS · VIRAR EAST, PalgharP99000014523· 65.9% built
- AGARWAL EXOTICA3.6 yr overdueAGARWAL REALTORS · Vasai, PalgharP99000002405· 90.9% built
- Dias Residency Park3.6 yr overdueM/s Dias Properties & Projects · Sativali, PalgharP99000007801· filed Jun 2021 → now Dec 2022· 31.5% built
- Parks Developers LLP - Tanishq Gold - Phase 13.6 yr overdueParks Developers LLP · Dahanu, PalgharP99000015423· 90.9% built
- CLASSIQUE3.6 yr overdueSHRUSHTI DEVELOPERS · NEAR NAVALI PHATAK, PalgharP99000014864· 90.9% built
- C VINAYAK INDUSTRIAL ESTATE3.6 yr overdueVINAYAK CONSTRUCTION · Palghar, PalgharP99000008974· filed Dec 2018 → now Dec 2022· 72.7% built
- GREEN HEIGHTS3.6 yr overdueSAI LEELA REALTORS · Vasai, PalgharP99000008455· filed Jun 2021 → now Dec 2022· 90.9% built
- WESTERN PARK3.6 yr overdueSHAKTI DEVELOPERS · Vasai, PalgharP99000005755· filed Jun 2021 → now Dec 2022· 84.1% built
- Blue Pearl Industrial Estate3.6 yr overdueM/s Mount Realtors · Village Bapane, PalgharP99000022109· 27.3% built
- FIA EMERALD3.6 yr overdueNIMISH LAXMICHAND PASAD · Palghar, PalgharP99000013971· 81.8% built
- NILAM3.6 yr overdueNILAM RAMAKANT SANKHE · BOISAR, PalgharP99000020822· 27.3% built
- FIA PARADISE3.6 yr overdueNIMISH LAXMICHAND PASAD · PALGHAR, PalgharP99000015897· 81.8% built
- Kalash3.6 yr overdueKemi Creation earlier known as Taru Venture · Vasai, PalgharP99000003386· filed Dec 2018 → now Dec 2022· 90.9% built
- KALASH3.6 yr overdueKemi Infrastructures earlier known as Taru Realtors · Vasai, PalgharP99000008304· filed Dec 2018 → now Dec 2022· 90.9% built
- NARMADA MOHAN3.6 yr overdueK.M.DEVELOPERS · Vasai, PalgharP99000012568· filed Jul 2018 → now Dec 2022· 90.8% built· 5 complaints
- FIA REGENCY A3.6 yr overdueNIMISH LAXMICHAND PASAD · PALGHAR, PalgharP99000017479· 70.9% built
- VEER SPLENDOR3.6 yr overdueVeer Global Infraconstruction Limited · Vasai, PalgharP99000011282· filed Jun 2021 → now Dec 2022· 70% built
- Shiv Plaza3.6 yr overdueGanesh Thakur · Parasnath Nagri, PalgharP99000019525· 75% built
- MAHAVIR KUNJ D WING A TYPE C13.6 yr overdueRajesh Realtors · Palghar, PalgharP99000024188· 90.9% built
- FIA REGENCY3.6 yr overdueNIMISH LAXMICHAND PASAD · Palghar, PalgharP99000013880· 49.5% built
- TULSI APARTMENT3.6 yr overdueSHEETAL BUILDERS AND DEVELOPERS · Vasai, PalgharP99000016287· 90.9% built
- SAPPHIRE HEIGHTS3.6 yr overdueJAMALUDDIN HIMAYATALI SHAIKH · Vasai, PalgharP99000011761· filed Jun 2021 → now Dec 2022· 70% built· 1 complaint
- CARNIVAL RESIDENCY 13.6 yr overdueEMMANUEL DEVELOPERS · Vasai, PalgharP99000014179· 90.9% built
- SARGAM RESIDENCY3.6 yr overdueShantee Housing · NAIGAON, PalgharP99000016959· 87.9% built
- CELLO DECENT HOMES PHASE 33.6 yr overdueDECENT HOMES · NEAR STATION PALGHAR, PalgharP99000016928· 71.5% built
- Vakratund Heights3.6 yr overdueShivanjali Infrastructure · Palghar East, PalgharP99000020206· 90.5% built
- SAI RESIDENCY3.6 yr overdueSAI RIDDHI CONSTRUCTION · Vasai, PalgharP99000008335· filed Jun 2019 → now Dec 2022· 48.6% built
- Mohak House No.3 A Wing3.6 yr overdueV.S. Enterprises · Vasai, PalgharP99000011684· filed Dec 2019 → now Dec 2022· 90.9% built· 1 complaint
- CRD Gardenia Apartments 23.6 yr overdueDr Chandrashekhar Raghunath Dound · Palghar, PalgharP99000010008· filed Dec 2019 → now Dec 2022· 56.8% built
- PLATINUM OAK3.6 yr overdueGREENSPACE CONSTRUCTION PVT LTD · VIRAR W, PalgharP99000031606· 96.4% built
- KRISHNA APARTMENT3.6 yr overdueASHOK THAKORBHAI PATEL · PALGHAR, PalgharP99000030577· filed Dec 2021 → now Dec 2022· 90.9% built
- MANIBHADRA HEIGHTS3.6 yr overdueSHREE CONSTRUCTION · Vasai, PalgharP99000001594· filed Dec 2019 → now Dec 2022· 88.3% built
- AVENUE 2243.6 yr overdueASHOK MOHANLAL MEHTA · NILEMORE, PalgharP99000023729· 76.4% built
- VBHC Greenglade3.5 yr overdueVBHC MUMBAI VALUE HOMES PRIVATE LIMITED · Palghar, PalgharP99000000542· filed Feb 2020 → now Feb 2023· 81.8% built
- SHREE LAMBODAR HEIGHTS3.5 yr overdueshree sadguru enterprises · Vasai, PalgharP99000007786· 90.9% built
- Apeksha Imperial3.4 yr overdueKOTHARI CREATION · Vasai, PalgharP99000006604· filed Mar 2019 → now Mar 2023· 78% built· 2 complaints
- GODAI APARTMENT3.4 yr overdueBALWANT ATMARAM PATIL · PALGHAR, PalgharP99000014419· 90.9% built
- RUTURAJ VASTUSHILP PHASE II D E F WINGS3.4 yr overdueRUTURAJ VASTUSHILP · Vasai, PalgharP99000010069· 90.9% built
- SAUBHAGYA APARTMENT3.4 yr overdueMANDA PRAKASH PATIL · DEAF & DUMB SCHOOL, PalgharP99000014504· 27.3% built
- DONDE HEIGHTS3.4 yr overdueGURUPRABHU REALTORS · Vasai, PalgharP99000021303· 90.9% built
- Sadguru Aarambh3.4 yr overdueVisharia Sadguru Bhoomi LLP · Palghar, PalgharP99000021488· 90.9% built
- KT ASPIRE INDUSTRIAL HUB3.4 yr overdueKT 3D SCAPES · GOLANI, PalgharP99000033169· 35.9% built
- NEW NANDDHAM3.4 yr overdueKIRAN ENTERPRISES · Vasai, PalgharP99000004153· filed Jun 2022 → now Mar 2023· 81.8% built
- HERAMB VILLA3.4 yr overdueSHILPA DEVELOPERS · PALGHAR EAST, PalgharP99000010104· filed Dec 2019 → now Mar 2023· 90.9% built
- OPAL FAIRY BELL3.3 yr overdueSYLVA LAND DEVELOPERS · Vasai, PalgharP99000009979· 90.9% built
- Asher Enclave3.3 yr overdueAmol Anthony Pereira · Vasai, PalgharP99000006117· filed Dec 2018 → now May 2023· 75.3% built
- OAKWOOD PHASE-13.2 yr overdueJEEVDANI BUILDERS & DEVELOPERS LLP · Nalasopara West, PalgharP99000029645· filed May 2022 → now May 2023· 58.6% built
- Paramount Heights3.1 yr overdueM/s Zion Constructions · Vasai, PalgharP99000010275· filed Jun 2021 → now Jun 2023· 43.2% built· 1 complaint
- OM SAI HEIGHTS II3.1 yr overdueCREATIVE ENTERPRISES · Palghar, PalgharP99000012565· filed Dec 2022 → now Jun 2023· 90.7% built
- GIRIRAJ DARSHAN3.1 yr overdueKISHORE S. DUBE · Palghar, PalgharP99000009715· filed Mar 2019 → now Jun 2023· 81.8% built
- SHUBHAM PARADISE3.1 yr overdueARHAM REALTORS · Vasai-Virar City (M Corp), PalgharP99000008958· 90.5% built
- STAR GLORIOUS3.1 yr overdueSTARLITE CONSTRUCTIONS · Vasai-Virar City (M Corp), PalgharP99000008579· filed Dec 2019 → now Jun 2023· 90% built
- Acciano-Aurelia No. 13.1 yr overdueM/s Ideal Enterprises · Vasai, PalgharP99000019904· 32.7% built
- PARADISE GRANDEUR3.1 yr overduePARIKH INVESTMENT AND DEVELOPMENT PVT. LTD. · Vasai, PalgharP99000004547· filed Dec 2020 → now Jun 2023· 36.4% built
- DEEP PRIDE ATO E WING3.1 yr overdueDEEP HOMES · Vasai, PalgharP99000010595· filed Dec 2018 → now Jun 2023· 90.9% built
- SEA GRAPES3.1 yr overdueNINE REALTY BUILDERS · Vasai, PalgharP99000002584· filed Dec 2019 → now Jun 2023· 90.7% built
- SHREE SAMARTH KRUPA APARTMENT3.1 yr overdueL P DEVELOPERS · VIRAR WEST, PalgharP99000027447· 28.6% built
- ZAHRA LAND3.1 yr overdueZAHRA LAND DEVELOPERS · Vasai-Virar City (M Corp), PalgharP99000005947· 36.9% built
- KUMKUM Sector 7 Building 23 Wing F3.1 yr overdueKalash Developers · Vasai-Virar City (M Corp), PalgharP99000007366· filed Dec 2019 → now Jul 2023· 90.9% built
- EKTA PARKSVILLE PHASE I3.1 yr overdueEKTA PARKSVILLE HOMES PVT. LTD. · Vasai, PalgharP99000000116· filed Dec 2019 → now Jul 2023· 98.9% built· 32 complaints
- MAHALAXMI NAGAR3.1 yr overdueMAHALAXMI HOMEMAKERS PRIVATE LIMITED · Chandrapada, PalgharP99000013575· 40.5% built
- BROOKLYN PARK PHASE III3.1 yr overdueEKTA PARKSVILLE HOMES PVT. LTD. · Vasai, PalgharP99000000148· filed Feb 2020 → now Jul 2023· 88.6% built· 17 complaints
- ANCHAL GALAXY3.0 yr overdueCLORIS CONSTRUCTION PRIVATE LIMITED · Palghar, PalgharP99000021893· 0% built· 1 complaint
- Joyville Virar Phase 53.0 yr overdueJoyville Shapoorji Housing Private Limited · virar, PalgharP99000019531· 99.8% built
- BROOKLYN PARK PHASE II2.9 yr overdueEKTA PARKSVILLE HOMES PVT. LTD. · Vasai, PalgharP99000000110· filed Oct 2019 → now Sept 2023· 89.8% built· 13 complaints
- Sunteck West World 1, Tivri, Naigaon East2.9 yr overdueSunteck Realty Limited · Tivri, PalgharP99000017606· 90.9% built· 27 complaints
- Gokul Aura2.8 yr overdueMehta Ventures · Virar West, PalgharP99000035169· 90.9% built
- KANCHAN VATIKA2.8 yr overdueNovel Build-con · Palghar, PalgharP99000026327· 90.9% built
- Omkar2.7 yr overdueOmkar Developers · Vasai, PalgharP99000002389· 86.4% built
- MARBLE ARCH2.7 yr overdueAvvesh Developers LLP · Vasai-Virar City (M Corp), PalgharP99000011971· filed Dec 2019 → now Nov 2023· 90.9% built
- Oasis Gracia2.7 yr overdueOasis Developers · Vasai, PalgharP99000022370· filed Dec 2022 → now Dec 2023· 51.8% built
- Shanti Enclave Phase II2.6 yr overdueSadguru Builders and Developers · Agashi, PalgharP99000024526· 44.1% built
- DATTANI LINEAR WING ABC PHASE I2.6 yr overdueBRIJESH SATISH DATTANI · Vasai, PalgharP99000008218· 81.4% built· 1 complaint
- OM KAVISH EXCELLENCY2.6 yr overdueOM JAI KAVISH REALTORS · VALAN NAKA, PalgharP99000020278· 78.2% built
- Navkar Tower Part 12.6 yr overdueNavkar Estate and Homes Pvt Ltd · Vasai, PalgharP99000007525· 90.4% built
- PEACE PLAZA2.6 yr overdueMOHAMMED NAJIB CHAWRE & OTHERS · NEAR ASHOKA KANISHKA, PalgharP99000021979· 36.4% built
- MIT INDUSTRIAL ESTATE NO 22.6 yr overdueBHOOMI ENTERPRISE · Vasai-Virar City (M Corp), PalgharP99000005277· 30.3% built
- ROMAN RESIDENCY2.6 yr overdueShantee Housing · Vasai, PalgharP99000021827· 90% built
- CLASSIC RESIDENCY2.6 yr overdueCLASSIC CONSTRUCTION CO. · Vasai, PalgharP99000005113· 90.9% built
- PALM SPRINGS PHASE - I2.6 yr overdueArvel Developers · ALIYALI VILLAGE, PalgharP99000016750· 89.1% built
- VARAD VINAYAK RESIDENCY2.6 yr overdueHIMANSHU SHAM TENDULKAR · MAHADEV ALI, PalgharP99000019232· 90.9% built
- Bellezon2.6 yr overdueVivek Patrick Pimenta · Khopwadi, PalgharP99000022464· 20% built
- FIA EKDANTA2.6 yr overdueMYSTIQUE DEVELOPERS · NEAR NEST HOTEL, PalgharP99000020344· 90.9% built
- DATTANI VERTEX WING CD PHASE III2.6 yr overdueBRIJESH SATISH DATTANI · Vasai, PalgharP99000005990· 90.5% built
- INDUSTRIAL BUILDING NO 12.6 yr overdueSHREE NARAYAN INDUSTRIAL DEVELOPERS · Vasai-Virar City (M Corp), PalgharP99000011126· filed Dec 2021 → now Dec 2023· 57.1% built
- DATTANI VERTEX WING AB PHASE I2.6 yr overdueBRIJESH SATISH DATTANI · Vasai, PalgharP99000008090· 90.5% built
- CELLO MAGIC TOUCH PHASE 12.6 yr overdueCELLO MAGIC TOUGH · PALGHAR EAST, PalgharP99000018271· 36.4% built
- MAHAVIR SADAN B2.6 yr overdueRajesh Construction · Palghar, PalgharP99000028787· 90.9% built
- GOPALKRISHNA SANKUL2.6 yr overdueMAAD CONSTRUCTION · NAIGAON EAST, PalgharP99000010352· 87.3% built
- MAHAVIR KUNJ D WING B TYPE C2.6 yr overdueRajesh Realtors · Palghar, PalgharP99000028618· 90.9% built
- PRIDE INDUSTRIAL ESTATE2.6 yr overdueRIDDHI DEVELOPERS · Vasai, PalgharP99000003219· 81.8% built
- NINE STAR GRANDEUR2.6 yr overdueNINE STAR HOME MAKERS · SHIVAJI CHAUK, PalgharP99000021931· 3% built
- FIA FLORENZA2.6 yr overdueNIMISH LAXMICHAND PASAD · PALGHAR, PalgharP99000016116· 90.9% built
- Sunteck West World 2, Tivri, Naigaon East2.6 yr overdueSunteck Realty Limited · Tivri, PalgharP99000017627· 90.9% built· 8 complaints
- DLASA HEIGHTS2.6 yr overdueDLASA DEVELOPERS · Vasai, PalgharP99000010299· filed Dec 2018 → now Dec 2023· 95.5% built
- AGARWAL PARAMOUNT2.6 yr overdueAGARWAL REALTORS · Vasai, PalgharP99000002207· 90.9% built
- DECENT LIFE SPACE 12.6 yr overdueADINATH ASSOCIATES · PALGHAR EAST, PalgharP99000020318· 90.9% built
- GALAXY APARTMENT2.6 yr overdueORCHID CONSTRUCTION · Vasai-Virar City (M Corp), PalgharP99000011081· filed Dec 2018 → now Dec 2023· 90.9% built
- CRD Gardenia Apartments 6 - Phase III2.6 yr overdueDr Chandrashekhar Raghunath Dound · Palghar, PalgharP99000049411· 81.8% built
- SPACE HEIGHTS - PHASE 22.6 yr overdueSPACE ASSOCIATES · Waliv, PalgharP99000030163· 90.9% built
- SUDHA2.6 yr overdueSAMARTH REALTY · TEMBHODE, PalgharP99000022954· filed Dec 2022 → now Dec 2023· 90.9% built· 1 complaint
- Empire Estate 12.6 yr overdueJaved Yasin Kojar · Kaman village, PalgharP99000030913· 74.4% built
- CRD Gardenia Apartments 2 - Phase III2.6 yr overdueDr Chandrashekhar Raghunath Dound · Velgaon, PalgharP99000049393· 81.8% built
- ARIHANT ESTATE2.6 yr overdueARIHANT CREATION · SATVALI, PalgharP99000030630· 33.6% built
- REGALIA2.6 yr overdueYASHODHAN SHANTI REALTORS · Vasai-Virar City (M Corp), PalgharP99000009586· filed Dec 2020 → now Dec 2023· 90.9% built
- Riddhi Siddhi Industrial Complex2.6 yr overdueRiddhi Siddhi Builders & Developers · Vasai, PalgharP99000002625· 81.8% built
- Virar Bolinj Yogiraj CHS Ltd2.6 yr overdueShree Jivdani Samarpan Developers · Vasai-Virar City (M Corp), PalgharP99000004134· filed Dec 2020 → now Jan 2024· 90.9% built
- VIMAL RESIDENCY2.5 yr overdueVIMAL DEVELOPERS · NILEMORE, PalgharP99000011244· filed Mar 2019 → now Feb 2024· 99.9% built· 1 complaint
- VITHAL HARI TOWER2.4 yr overdueVITHAL ENTERPRISES · Vasai, PalgharP99000006107· filed Mar 2023 → now Mar 2024· 46.4% built
- OSWAL LIFESPACES - PHASE 12.4 yr overdueOSWAL LIFESPACES · Palghar, PalgharP99000002598· filed Mar 2023 → now Mar 2024· 81.8% built· 1 complaint
- YASHWANT PANDHARI2.4 yr overdueSHREE DATTA ENTERPRISES · NALLASOPARA, PalgharP99000032419· 90.9% built
- ZEAL REGENCY2.4 yr overdueBLUE BARON REALTORS · Vasai, PalgharP99000003182· filed Dec 2018 → now Mar 2024· 81.8% built· 14 complaints
- GLOBE PRATHAM2.3 yr overdueGLOBE CORP · Palghar, PalgharP99000032857· 68.2% built
- SHAMROCK RESIDENCY2.3 yr overdueSHantee Homes Realty LLP · Vasai, PalgharP99000020998· 80.9% built
- Arihant Residency2.3 yr overdueAditya Deepak Karnawat · Dahanu East, PalgharP99000032477· 74.1% built
- PALM RESIDENCY2.2 yr overdueFIRDAUS DINSHAW IRANI · LONIPADA, PalgharP99000028359· 90.9% built
- Dmellos Residency2.1 yr overdueM/s Ideal Properties · Manikpure Circle, PalgharP99000025569· 76.1% built
- VISHNUPUSHP KUTIR2.1 yr overdueL P DEVELOPERS · GOKHIVARE, PalgharP99000050499· 90.9% built
- KAILASH HEIGHTS2.1 yr overdueKAILASH DEVELOPERS · Vasai-Virar City (M Corp), PalgharP99000008653· filed Dec 2019 → now Jun 2024· 90% built
- IPSIT NAVODAY PHASE 52.1 yr overdueIPSIT ENTERPRISE · Palghar, PalgharP99000003777· filed Mar 2019 → now Jun 2024· 60.5% built
- MALOO MARVEL2.1 yr overdueRAJIV MOHANLAL MALOO · TUNGARESHWAR PHATA, PalgharP99000027988· 81.8% built
- VELSONS HEIGHTS2.1 yr overdueVELSONS DEVELOPERS · Vasai-Virar City (M Corp), PalgharP99000006958· filed Dec 2019 → now Jun 2024· 90.7% built
- NINE STAR PRIDE II BUILDING NO. 062.1 yr overdueNINE HOME REALTORS · Palghar, PalgharP99000026178· 45.5% built
- PARASNATH NAGARI BUILDING NO. 12.1 yr overdueSHREE PARASNATH BUILDERS · Vasai, PalgharP99000009841· filed Jun 2018 → now Jun 2024· 80% built· 6 complaints
- NINE STAR PRIDE II BUILDING NO. 072.1 yr overdueNINE HOME REALTORS · Palghar, PalgharP99000026194· 45.5% built
- KANCHAN BUSINESS CENTER2.1 yr overdueNOVEL BUILDCON · PALGHAR, PalgharP99000020390· 90.9% built
- SAMYEKDARSHAN2.1 yr overdueDARSHAN BUILDERS & DEVELOPERS · NAVALI, PalgharP99000028611· 25.9% built
- BRAHMAND RESIDENCY2.1 yr overdueBHAVI REALITY LLP · MASOLI, PalgharP99000002353· 90.9% built
- SAI BABA NAGAR2.1 yr overdueSai Developers · Mahim, PalgharP99000008318· filed Dec 2019 → now Jun 2024· 46.8% built
- VIRKUD PLAZA2.1 yr overdueSANJARI BUILDERS · Palghar, PalgharP99000025589· 90.9% built
- ELITE HOMES2.1 yr overdueCRYSTAL HOMES · NALASOPARA WEST, PalgharP99000026203· 90.9% built
- Swastick Heights2.1 yr overdueShree Swastick Builders · Vasai, PalgharP99000011121· filed Jan 2019 → now Jun 2024· 90.9% built· 3 complaints
- Mahavir Kalp2.1 yr overdueRAJESH BUILDERS · Palghar, PalgharP99000021428· 90.9% built
- Morning Star2.1 yr overdueM/s. Star Enterprises · Bhabhola, PalgharP99000027877· 51.8% built
- YASHVANT SRUSTI2.1 yr overdueINSTACROISSANCE LIMITED · Palghar, PalgharP99000007915· 90.9% built
- MARIGOLD2.0 yr overdueSHRIJEEKRUPA REALTORS LLP · Navali Village, PalgharP99000033174· filed Jul 2024 → now Aug 2024· 78.2% built
- Rustomjee Virar Avenue L1-L2 and L4 Wing K1.9 yr overdueKEYSTONE INFRASTRUCTURE PRIVATE LIMITED · Avenue L4, PalgharP99000020235· filed Sept 2023 → now Sept 2024· 50% built
- MOONSTONE-WING A1.9 yr overdueB. J. ENTERPRISE · Vasai, PalgharP99000018357· 39.1% built
- AGAMI SAPPHIRE1.9 yr overdueAGAMI ENTERPRISES · BOISAR EAST, PalgharP99000020242· 89.1% built
- AV CRYSTAL1.8 yr overdueA V Crystal Housing LLP · Nallasopara East, PalgharP99000018477· 90.5% built
- SHREE GANESH HERITAGE1.8 yr overdueHIMANSHU SHAM TENDULKAR · JAWHAR, PalgharP99000032281· 81.8% built
- SIMANDHAR INDUSRIAL ESTATE1.8 yr overdueSPACE INFRATECH · VASAI EAST, PalgharP99000034285· 81.8% built
- KASHI ARCADE1.8 yr overdueVEDIT ENTERPRISES · TULINJ, PalgharP99000049487· 90.9% built
- GALAXY ABHINANDAN1.7 yr overdueAAKAR DEVELOPER · NAVALI, PalgharP99000051390· filed Nov 2023 → now Nov 2024· 90.9% built
- KRISH MANSION1.7 yr overdueKBAFNA INFRAA PRIVATE LIMITED · PALGHAR, PalgharP99000030304· 81.8% built
- DATTAGANGA1.7 yr overdueGanesh LAnd Developers and Construction Private Limited · Dattaganga Complex, PalgharP99000018314· filed Feb 2021 → now Dec 2024· 51.8% built
- GARDEN COURT COMPLEX1.6 yr overdueOZONE PUNIT JV · ADARSHA NAGAR, PalgharP99000020722· filed Dec 2023 → now Dec 2024· 72.7% built
- DEEP HEIGHTS1.6 yr overdueSUPER STAR DEVELOPERS · Vasai, PalgharP99000020604· 90.9% built
- BAFNA CENTRUM PHASE-11.6 yr overdueSUN REALTORS · Palghar West, PalgharP99000018461· 90.9% built
- NEST LEAF1.6 yr overdueNEST INFRA · TEMBODE, PalgharP99000011341· 81.8% built· 1 complaint
- NIRVANA ECO HOMES1.6 yr overdueBALAJI CONSTRUCTION CO. · PALGHAR, PalgharP99000015865· 22.7% built
- AUDERY AVENUE1.6 yr overdueMENEZES DEVELOPERS · Vasai-Virar City (M Corp), PalgharP99000013842· filed Dec 2018 → now Dec 2024· 81.4% built
- Imperial Heritage - B,C Wing1.6 yr overdueShree Ganesh Ventures · Vasai, PalgharP99000020908· 90.9% built
- OSTWAL WOODS1.6 yr overdueSHREE OSTWAL BUILDERS LTD · OPP. UNION PARK, PalgharP99000019832· 48.2% built
- KAILASH TOWER1.6 yr overdueKAILASH DEVELOPERS · VASAI, PalgharP99000008452· filed Dec 2019 → now Dec 2024· 90.9% built· 5 complaints
- GHANSHYAM ENCLAVE-GREEN MEADOWS-E WING1.6 yr overdueGHANSHYAM ENTERPRISES · BHABHOLA BANGLI ROAD, PalgharP99000003723· 90.9% built
- DAULAT GARDENS1.6 yr overdueAhura Construction JV · Palghar, PalgharP99000001241· 79.8% built
- FIA CONSTRUCTION COMPANY A/C FIA ENCLAVE1.6 yr overdueNIMISH LAXMICHAND PASAD · Palghar, PalgharP99000029790· 90.9% built
- MAITRY HEIGHTS1.6 yr overdueRAJ MAITRY & ESKON DEVELOPERS · Vasai, PalgharP99000005628· filed Jul 2019 → now Dec 2024· 56.7% built
- KANTHARIA LAKESIDE1.6 yr overduePROACTIVE HOUSING LLP · Vasai, PalgharP99000020016· filed Dec 2022 → now Dec 2024· 81.8% built
- C D GURUDEV1.6 yr overdueCHETAN HARISHCHANDRA DESAI · VIRAR, PalgharP99000029320· 73.6% built
- FIA CONSTRUCTION COMPANY A/C FIA ENIGMA1.6 yr overdueNIMISH LAXMICHAND PASAD · Palghar, PalgharP99000029742· 90.9% built
- ELITE1.6 yr overdueSHRUSHTI DEVELOPERS · TEMBHODE, PalgharP99000035038· 90.9% built
- NIDHI REALTY PHASE I1.6 yr overdueLALIT NAGINDAS DOSHI · Vasai, PalgharP99000002258· filed Dec 2018 → now Dec 2024· 80.2% built
- KARMA PALACE1.6 yr overdueSHREE SAI DEVELOPERS · TEMBHODE, PalgharP99000031586· 90.9% built
- CRESCENTPOINT-II1.6 yr overdueK K CONSTRUCTION · KALAWATI MANDIR AREA, PalgharP99000020521· filed Dec 2022 → now Dec 2024· 90.9% built
- APEX DEVELOPERS1.6 yr overdueAPEX DEVELOPERS · Vasai-Virar City (M Corp), PalgharP99000007741· filed Jun 2022 → now Jan 2025· 70.9% built
- STAR HEIGHT1.5 yr overdueERIC INFRASTRUCTURE · Vasai-Virar City (M Corp), PalgharP99000008026· filed Jun 2019 → now Mar 2025· 90.9% built
- NARAYAN SHOPPING PARK1.4 yr overduePOOJA GROUP OF COMPANY · NEAR GANESH KUND, BOISAR(EAST) , Dist.-PALGHAR, PalgharP99000016863· filed Dec 2023 → now Mar 2025· 89.1% built
- Anand Park Mamta Heights1.4 yr overdueSachin Shantilal Joshi · Palghar, PalgharP99000004112· filed Dec 2019 → now Mar 2025· 77.3% built· 1 complaint
- VINOD PARK1.4 yr overdueH V PAJWANI HUF · Dahanu Road East, PalgharP99000047407· 90.9% built
- Joyville Virar Phase 61.4 yr overdueJoyville Shapoorji Housing Private Limited · Virar, Bolinj, PalgharP99000031256· 72.4% built· 3 complaints
- MOONSTONE WING B AND C1.4 yr overdueBJ ENTERPRISE · VASAI, PalgharP99000031455· 66.4% built
- AVIGHNA1.4 yr overdueDHAVAL JAYESH AJMERA · BARAMPUR, PalgharP99000048704· 59.1% built
- TAAL1.4 yr overdueAce Property Developers · Near Global City, PalgharP99000010690· filed Mar 2019 → now Apr 2025· 90.9% built
- YESHWANT VINAYAK COMPLEX1.2 yr overdueSHREE CHINTAMANI DEVELOPERS · Vasai, PalgharP99000003231· filed Jun 2021 → now May 2025· 90.9% built
- VIJAY APARTMENT CHSL1.2 yr overdueCASA BUILDERS AND DEVELOPERS · VASAI, PalgharP99000048569· 72.7% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.