All MahaRERA projects
27,983 registered projects with disclosed construction progress or complaint records. Page 39 of 56.
Pune
- AERO EAST PH III · UNDRIMIRACLE GURUKRUPA DEVELOPERS · P52100049336 · possession Dec 2027 · 35.5% built
- Lavthaleshwar Heights · JejuriSachin Balkrushn Bayas proprietor of Lavthaleshwar developers · P52100049346 · possession Apr 2028 · 38% built
- MITRAKUNJ · ParvatiKishor B Sancheti · P52100049348 · possession Dec 2024 · 72.7% built
- Puraniks Abitante Fiore Phase 2C1 · MulshiPuranik Buildcon Private Limited · P52100049352 · possession Oct 2028 · 5.8% built
- AKSHAY SAMRUDDHI · NARAYAN PETHAKSHAY INFRASTRUCTURE · P52100049367 · possession Dec 2027 · 90.9% built
- KANCHANPURAM · HaveliBalaji Hari Developers AOP · P52100049368 · possession Oct 2028 · 82% built · 1 complaint
- Global Renest Phase 1 · MulshiUnknown · P52100049375 · possession Dec 2027 · 80.9% built
- Vedashree · Plot No 1M/s Bandal Constructions · P52100049385 · possession Sept 2025 · 100% built
- WEONE 121 · -GRD INFRAPROJECTS PRIVATE LIMITED · P52100049391 · possession Apr 2027 · 49.7% built
- 172W Inclusive Housing · WakadVilas Javdekar Lifestyle Developers Pvt. Ltd. · P52100049412 · possession Jun 2026 · 68.2% built
- Fusion Towers Phase IV · Hinjewadi Phase IIIRAMA SYNERGY SPACES · P52100049419 · possession Dec 2026 · 72.7% built
- OVITIRTH · HaveliROYAL LAND DEVELOPERS · P52100049427 · possession Dec 2026 · 80% built
- SONIGARA SHLOKA · HaveliRAMESH KESARIMAL SONIGARA · P52100049436 · possession Dec 2026 · 83.9% built
- SHREE GANESHA HEIGHTS · MAMURDISIDDHIVINAYAK ENTERPRISES · P52100049450 · possession Mar 2026 · 81.8% built
- DESTINATION EL PROGRESO B BUILDING · HaveliEL PROGRESO LANDMARKS · P52100049452 · possession Apr 2027 · 100% built
- Samrajya C Wing · HaveliGarve Patil Construction Company · P52100049458 · possession Apr 2029 · 69.4% built
- RADHIKA CO-OPERATIVE HOUSING SOCIETY · PIMPRIGURUKRUPA CONSTRUCTIONS · P52100049461 · possession Dec 2025 · 100% built
- Gandharv Mithila Building A Wing E, F, G · BorhadewadiVinayak Pandharinath Bhongale · P52100049462 · possession Apr 2027 · 81.8% built
- Elegance Vega · BanerElegance Landmarks · P52100049473 · possession Apr 2027 · 77.7% built
- GATHAGRAM SECTOR-3 PHASE-1 · dehuHARIT LANDMARKS LLP · P52100049477 · possession Jul 2028 · 47.4% built
- Kanishka Majestic Homes · SaswadPlatinum Lifespace Developers · P52100049484 · possession Dec 2026 · 9.1% built
- KOOL HOMES SOLITAIRE PHASE III · HaveliREPTON PROPERTIES PRIVATE LIMITED · P52100049494 · possession Oct 2030 · 25.5% built
- LONKAR RESIDENCY · BoripardhiROHINI RAJENDRA LONKAR · P52100049495 · possession Apr 2027 · 47% built
- AARAV ARCACIA · Pune CityDIKSHIT RAJAN AGARWAL · P52100049504 · possession Apr 2028 · 24.5% built
- Supreme Villagio II · SomatneTurquoise Housing LLP · P52100049506 · possession Mar 2026 · 53.9% built
- DOODLE HOMES · PUNEDOODLE HOMES LLP · P52100049510 · possession Dec 2026 · 75% built
- Global Pranam Phase 1 · Behind Daulat Petrol PumpGLOBAL CONSTRUCTIONS · P52100049518 · possession Dec 2027 · 73.6% built
- VINDHYA HEIGHTS · ShirurMHALSAKANT PROPERTIES · P52100049521 · possession Apr 2028 · 57.7% built
- Ratan Heights · HaveliDipti Harshata Construction · P52100049524 · possession Apr 2029 · 44.5% built
- MAITHILI AROMA · AT RAVET VILLAGEMARNE GROUP · P52100049541 · possession Apr 2027 · 72.6% built
- SENSORIUM, PHASE VII · Maan VillageJoyville Shapoorji Housing Private Limited · P52100049547 · possession Apr 2027 · 75.4% built
- CITY HEIGHTS · MawalSAGA CHRISHH ASSOCIATES · P52100049567 · possession Jul 2027 · 76.4% built
- GURUKRUPA · PRADHIKARAN MOSHICREATIVE REALTY · P52100049581 · possession Apr 2028 · 90.9% built
- Destination Ostia Building G1 · DudulgaonM/s D R Gavhane Landmarks LLP · P52100049587 · possession Apr 2027 · 35.5% built
- YOOVIE HOMES · BANERROHAN SUBHASH DESHMUKH · P52100049608 · possession Jul 2027 · 72.7% built
- Royal Paradise · HaveliROYAL PROPERTIES · P52100049617 · possession Oct 2027 · 26.4% built
- SHRIRAM NYSA · HaveliSHRIRAM DEVELOPER · P52100049622 · possession Apr 2028 · 30.1% built
- UK1321 Inclusive Housing · HaveliVilas Javdekar Infinitee Developers Pvt. Ltd. · P52100049638 · possession Dec 2026 · 90.9% built
- 24Life Exotica · DudulgaonTatva Landmarks LLP · P52100049643 · possession Apr 2027 · 86.4% built
- BOSTON A B C · CHARHOLI BKR P PROPERTIES · P52100049648 · possession Dec 2026 · 100% built · 1 complaint
- Gathagram Sector 4 Phase 1 · HaveliHARIT LANDMARKS LLP · P52100049661 · possession Nov 2026 · 22.8% built
- Peninsula - D · PashanKumar Agro Products Pvt Ltd · P52100049664 · possession Oct 2025 · 76.2% built
- ANANTAM SKYONE · DUDULGAONRAJSHREE LANDMARK LLP · P52100049675 · possession Oct 2026 · 81.8% built
- Mantra Mesmer Phase 4 · HaveliMANTRA ZIRCONIA PRIVATE LIMITED · P52100049679 · possession Jul 2028 · 100% built
- CASA AMANTA · Munjeri (Bibvewadi)TECHSTONE REALTY LLP · P52100049680 · possession Dec 2025 · 90.9% built
- Kumar Pratham - F Mhada · MoshiKumar Agro Products Pvt Ltd · P52100049685 · possession Mar 2024 · 100% built
- SAMARTH RESIDENCY · ALANDI KHEDSHIVSAMARTH DEVELOPERS · P52100049691 · possession Dec 2025 · 81.8% built
- Mantra Mirari Phase 3 · HaveliMANTRA RESIDENCES MUNDHWA PRIVATE LIMITED · P52100049704 · possession Oct 2026 · 100% built · 1 complaint
- Marvel Hills · M D R 53SUCCESS LAND DEVELOPERS · P52100049705 · possession Jul 2027 · 90.9% built
- Platinum Nirvana · HaveliPLATINUM DEVELOPERS · P52100049725 · possession Dec 2026 · 8% built
- STELLAR 8 · TUNGARLIIraah Lifespaces LLP · P52100049733 · possession Apr 2027 · 74.8% built
- Sushrut Residency · HaveliSHREE KAAMDHENU BUILDCON · P52100049747 · possession Dec 2026 · 100% built
- ELINA LIVA Tower I and J · HaveliRamkrishna Cine Exhibitors · P52100049751 · possession Oct 2027 · 77.3% built
- GIRISHA RESIDENCY · SHEMBEKAR MALA KASABAA J ASSOCIATES · P52100049762 · possession Dec 2026 · 63.5% built
- Green Alley Phase - II · HaveliARYAN DEVELOPERS · P52100049768 · possession Apr 2027 · 52.1% built
- Kanishka Grand Plaza · SaswadPlatinum Lifespace Developers · P52100049774 · possession Dec 2026 · 45.5% built
- ROYAL PARK · KIWALEGAIKWAD HAPSE ASSOCIATES · P52100049775 · possession Oct 2026 · 81.8% built
- KRYSTAL ONE PHASE III · ChikhaliRAMA SPACES · P52100049781 · possession Dec 2026 · 90.9% built
- LIVIENCE ALEENTA · HaveliLIVIENCE LIFESPACE PRIVATE LIMITED · P52100049795 · possession Apr 2029 · 54.8% built
- Eastern River Residency Wing C · HaveliUnknown · P52100049815 · possession Dec 2028 · 50.2% built
- Tower of Visionaries · HaveliYucca Promoters LLP · P52100049828 · possession Jul 2028 · 33.9% built
- Kumar Parc Residences - B2 · HaveliKumar Properties Infratech Developers Pvt Ltd · P52100049839 · possession Apr 2028 · 75.4% built
- SAMYAK PARADISE · -Samyak Construction · P52100049847 · possession Dec 2026 · 74.1% built
- AURA NORTH · HaveliTHAKUR RANAWARE PROMOTERS AND DEVLOPERS · P52100049878 · possession Dec 2027 · 55% built
- ANKUR · Pune CityS K FORTUNE DEVELOPERS · P52100049906 · possession Apr 2027 · 80.9% built
- Paradise - B2 and B3 · HaveliKEVIN PROPERTIES · P52100049914 · possession Oct 2026 · 79.5% built · 1 complaint
- DS UNIQUE SARVODAYA · HaveliDS UNIQUE · P52100049916 · possession Jun 2025 · 32.7% built · 2 complaints
- SOMMET Tower No. 7, Row-Houses and Commercial Building · BhugaonSANKLA BUILDCOON · P52100049928 · possession Dec 2029 · 42.9% built · 3 complaints
- ANIKA PICCADILLY PHASE 2 · MulshiArun Pitamber Sheth · P52100049940 · possession Apr 2028 · 82.7% built
- Kohinoor City I and Kohinoor City II · HaveliVISHWA DEVELOPERS · P52100049952 · possession Apr 2028 · 60.7% built
- Olina · HaveliS S PROJECTS · P52100049956 · possession Oct 2026 · 88.2% built
- KOHINOOR ARTIZE WING A · Pune CitySHIVAYOGI KASHINATH CHIKHALE · P52100049962 · possession Apr 2027 · 11.3% built
- Sneha Avenue · MulshiNandu Antaram Rajput · P52100049963 · possession Jun 2026 · 84.5% built
- SAHYADRI PLUMERIA · BORHADEWADISAHYADRI LANDMARKS · P52100049968 · possession Apr 2028 · 61.4% built
- Joyville Hadapsar Annexe Phase 16 · HaveliJoyville Shapoorji Housing Private Limited · P52100049970 · possession Apr 2027 · 86.4% built
- SHANKESHWAR MARKET · PUNE CITY WESTOM BUILDCON AND REALITY · P52100049978 · possession Jan 2028 · 81.8% built
- Bahaar at Nanded City · Nanded PhataNanded City Development & Construction Co. Ltd. · P52100049984 · possession Apr 2027 · 63% built
- KRUPASINDHU RESIDENCY · KASBA,BARAMATIP52100049989 · possession Dec 2025 · 90.9% built
- SHIVAY CONSTRUCTION · AMBEGAON BKShivay Construction · P52100049999 · possession Dec 2025 · 100% built
- Wagholikar Heritage · Wagholikar ParkWAGHOLIKAR ASSOCIATES · P52100050000 · possession Jan 2028 · 45.5% built
- MEMORIES 90 - PHASE IV · HaveliM/s NAMO DEVELOPERS · P52100050004 · possession Apr 2028 · 46.4% built
- SAMARTH BUSINESS HUB · HaveliD.A.BORADE & SONS · P52100050006 · possession Jul 2028 · 40.9% built · 2 complaints
- SAI DARSHAN PHASE II · Pune CitySAI SHRADDHA DEVELOPERS · P52100050010 · possession Dec 2026 · 90.9% built
- NAKSHATRA · Pune CityADITYARAJ BUILDERS · P52100050019 · possession Apr 2028 · 72.7% built
- ENLIVEN HOME B WING PHASE 2 · WAGHOLISIDDHIVINAYAK PROPERTIES · P52100050030 · possession Sept 2026 · 81.8% built
- 18 Jewels · ErandwaneSpaciability Developers · P52100050045 · possession Dec 2028 · 62.3% built
- VIVANTA Next · MulshiSHREE SONIGARA PUNAMIYA DEVELOPERS · P52100050053 · possession Jan 2027 · 77.9% built
- SHREE BALAJI HEIGHTS · HaveliSHREE BALAJI DEVELOPERS · P52100050055 · possession Jun 2026 · 90.4% built
- 7 Plumeria Drive- Phase 3 · PunawaleB A Consulting · P52100050087 · possession Sept 2026 · 85.3% built
- Sukhwani Sepia, 97 Sepia, Phase III · TathwadeGhanshyam Jhangaldas Sukhwani · P52100050089 · possession Apr 2028 · 60.7% built · 1 complaint
- KAILASH KUTIR PHASE-2 · HaveliKAKKAD DEVELOPMENTS · P52100050090 · possession Jan 2028 · 67.5% built
- Skyi Star City Phase V · HaveliSkyi Property Ventures LLP · P52100050099 · possession Sept 2027 · 50.2% built
- NEERAJ · HaveliUnknown · P52100050106 · possession Aug 2027 · 56.8% built
- Varad Residency · Near bhumkar VastiVilas Bhagaji Arekar · P52100050115 · possession Sept 2026 · 81.8% built
- Godrej Urban Retreat · HaveliManjari Housing Projects LLP · P52100050128 · possession Oct 2027 · 32.8% built
- VLD Heritage · HaveliM/s VLD Associates · P52100050131 · possession Apr 2027 · 75.9% built
- Ravindu · HaveliShubh Ventures · P52100050148 · possession Nov 2026 · 9.1% built
- TRIMURTI SANTKRUPA HEIGHTS · HaveliSAMBHAJI BABAN BORHADE · P52100050150 · possession Mar 2027 · 50.9% built
- SAMARTH VILLA · VISHAL NAGARD.A.BORADE & SONS · P52100050168 · possession Mar 2024 · 81.8% built
- SUNVIEW CO-OPERATIVE HOUSING SOCIETY LIMITED · PIMPRI WAGHERESAMRUDDHEE CONSTRUCTIONS · P52100050177 · possession Dec 2025 · 90.9% built
- Brain Matrix · Pune CityM/s Bora Associates · P52100050187 · possession Dec 2026 · 29.1% built
- MERLIN ELEMENTA 2.0 · MulshiMERLIN BHINGARWALA DEVELOPERS LLP · P52100050199 · possession Apr 2028 · 51.7% built
- Mungase Towers · KhedMr Santosh Vasudev Mungase · P52100050206 · possession Apr 2027 · 78% built
- Mangalmurti Residency · KharadiKRISHNAPRAKASH ASSOCIATES · P52100050222 · possession Jun 2025 · 81.8% built
- Vitthal Shanti · Somvar PethVitthal Shant Enterprises · P52100050241 · possession Jan 2025 · 81.8% built
- Bluegrass Residences Tower III · Pune CitySagitarius Ecospaces LLP · P52100050248 · possession Apr 2027 · 60.3% built
- The Midas Residences Phase 2 · BALEWADISELENITE PROPERTIES PRIVATE LIMITED · P52100050257 · possession Apr 2030 · 8.2% built
- Siddhachal - A1 · HaveliViraj Properties (Now known as Viraj Properties & Real Estate Pvt Ltd) - Amogh Construction JV · P52100050272 · possession Nov 2026 · 90.1% built
- PARK LIFE WING C · HaveliKUDALE PATIL AND JADHAV VENTURES · P52100050276 · possession Jul 2028 · 91.8% built
- Sukhwani Verde · HaveliSagar Gurmukh Sukhwani · P52100050278 · possession Dec 2027 · 48% built · 2 complaints
- POOJA CO-OP. HSG. SOC. LTD. · CHINCHWADPRATHMESH DEVELOPERS · P52100050283 · possession Feb 2027 · 61.8% built
- ADITYA ENCLAVE · PUNERAKHI PANKAJ CHOPADA · P52100050290 · possession Jul 2027 · 75% built
- MIRAI PHASE-I · MulshiAURIGAA REALTORS · P52100050306 · possession Dec 2026 · 90.9% built
- Palladio Kharadi Central · HaveliVilas Javdekar Eco Homes · P52100050357 · possession Oct 2027 · 66.2% built
- 38K Inclusive Housing · HaveliVilas Javdekar Eco Homes · P52100050359 · possession Apr 2027 · 89.8% built
- VJ Central Avenue · HaveliVilas Javdekar Eco Homes · P52100050364 · possession Apr 2027 · 98.8% built · 3 complaints
- TEJELEVIA BUILDING C · BanerTEJRAJ REALTORS LLP · P52100050379 · possession Apr 2029 · 52% built
- Swastik Platinum · HaveliSwastik Infinity · P52100050394 · possession Nov 2026 · 27.7% built
- KRUSHNAKUNJ · KOTHRUDBADHEKAR DEVELOPERS · P52100050407 · possession Dec 2025 · 81.8% built
- ROSHAN MILESTONE WING E · TATHWADERAHUL BHAGWANDAS SANKLA · P52100050418 · possession Dec 2028 · 96.4% built
- AARAMBH · HaveliR M S Developers · P52100050419 · possession May 2026 · 54.5% built
- Green Alley Phase - I · HaveliAJINKYA SANJAY TAPKIR · P52100050420 · possession Apr 2027 · 48.6% built
- Ruhi Mangalam Niyoshi · Pune CityRuhi Mangalam Associates · P52100050426 · possession Dec 2026 · 57.7% built
- RA URBANIA · Ganesh NagarMs Croissance Buildcon · P52100050429 · possession Dec 2025 · 81.8% built
- Rohan Abhilasha 3 · HaveliRohan Housing Pvt Ltd · P52100050453 · possession Jul 2027 · 90.9% built
- Vision New Ville · MulshiSS VENTURES AOP · P52100050454 · possession Dec 2027 · 10% built · 1 complaint
- Nakshatra i Land Phase 5 · MOSHIEllora Buildwell Pvt Ltd · P52100050468 · possession Apr 2028 · 4.5% built
- TIRUPATI-PHASE-I · -AVIOR URBAN REALTY LLP · P52100050480 · possession Dec 2026 · 100% built
- AKSHAY SHRUSHTI · Pune CityAKSHAY GROUP · P52100050484 · possession Mar 2028 · 100% built
- NARENDRA HOUSING SOCIETY · SHIVAJINAGARELITE INFRASTRUCTURE PVT LTD · P52100050494 · possession Sept 2026 · 100% built · 1 complaint
- Ceratec West Winds · ManCeratec Lifespaces LLp · P52100050497 · possession Feb 2029 · 53.4% built
- ARBOR VISTA · WakadAtul Kanhaiyalal Surana · P52100050504 · possession Apr 2028 · 38.4% built · 1 complaint
- SANJEEVAN · NABADHEKAR & PITALE PROJECTS LLP · P52100050507 · possession Apr 2027 · 71.4% built
- ADDRESS ONE · HaveliRACHIT RAHUL AGARWAL · P52100050511 · possession Apr 2028 · 26.8% built · 1 complaint
- DREAMS CARNIVAL PLATINUM · CHOVISAWADISAM DEVELOPERS · P52100050517 · possession Apr 2028 · 55.8% built
- Vaarivana Phase B-1 · MawalSanjivani Integrated Township LLP · P52100050520 · possession Jul 2027 · 37.8% built · 1 complaint
- Shree Paradise · MawalSunita Ashutosh Gosavi · P52100050527 · possession Feb 2027 · 44.1% built
- 7 SAGAR PLAZA · KhedSAGAR KALURAM PATOLE · P52100050536 · possession Dec 2026 · 52.7% built
- Courtyard 15 NXT Phase 1 · HaveliUNIVERSAL DEVELOPMENTS · P52100050572 · possession Apr 2029 · 52.7% built
- Radhika Radiance · HaveliShree Samarth Buildcom And Infra · P52100050573 · possession Apr 2027 · 100% built
- ELITE · WAGHOLIV & J DEVELOPERS · P52100050577 · possession Jan 2027 · 75.5% built
- DREAM ELEGANCE · BALEWADIDream Works Realtors · P52100050578 · possession Apr 2029 · 49.8% built · 2 complaints
- The Galaxy One · Near Renukamata TempalNikhil Machhindra Raut · P52100050580 · possession Dec 2027 · 71.4% built
- The Midas Residences Phase 3 · BalewadiSELENITE PROPERTIES PRIVATE LIMITED · P52100050581 · possession Apr 2030 · 0.5% built
- A R ATLAS · WakadA R REALTY · P52100050582 · possession Dec 2025 · 100% built
- VJ IndiLife Wakad · Opposite Sayaji HotelVilas Javdekar Lifestyle Developers Pvt. Ltd. · P52100050594 · possession Jun 2027 · 90.9% built · 5 complaints
- Life Republic/Sector R16/16th Avenue/Arezo-J, K, D Building and Shops · HinjewadiKOLTE-PATIL DEVELOPERS LIMITED · P52100050599 · possession Jul 2028 · 56.8% built
- GINI VIVANTE PHASE 02 · KIWALEGini Citicorp Realty LLP · P52100050601 · possession Apr 2028 · 39.9% built
- KEWAL KUNJ · ShirurBORA EXCELLENCY DEVELOPERS UNIT 1 · P52100050608 · possession Jul 2028 · 55.9% built
- Shree Business Icon · BaramatiSHREE ENTERPRISES · P52100050622 · possession Dec 2026 · 81.8% built
- 11th Avenue · PARMAHANS NAGAR KOTHRUDM/S HAPPHO VIJIGISHAA REALTY LLP · P52100050627 · possession Dec 2027 · 51.8% built
- ADITI · HaveliAmol Ajit Ravetkar · P52100050632 · possession Jul 2027 · 35.5% built · 3 complaints
- Portia Grande · BalewadiVilas Javdekar Eco Homes · P52100050636 · possession Apr 2028 · 107.3% built
- PRADNYESH SHRINIWAS · CHAKANJJ MAULI DEVELOPERS LLP · P52100050641 · possession Apr 2028 · 37% built
- THE RISING · KIWALESANIKET BUILDCON · P52100050643 · possession Nov 2027 · 27.2% built · 1 complaint
- ECO CITY · MawalNAMRATA PROMOTERS AND BUILDERS · P52100050644 · possession Aug 2026 · 90.9% built
- Nakshatra i Land Phase 6 · MOSHIEllora Homemakers Pvt. Ltd. · P52100050672 · possession Apr 2027 · 0% built
- Landmarkk Luxuria · DudulgaonLandmarkk Townships · P52100050679 · possession Apr 2028 · 44.5% built
- NITAARA TOWER · HaveliM/s ABC & Mittal Realty · P52100050692 · possession Jul 2028 · 49.4% built
- SOLITAIRE EMPIRE · MOSHINAGESHWAR ASSOCIATES · P52100050700 · possession Apr 2027 · 56.1% built
- Divyata Park · JunnarSHANTARAM J GADHVE · P52100050702 · possession Dec 2026 · 91.8% built
- VIJAYALAXMI SULOJAY · JunnarSHREEVIJAYALAXMI DEVELOPERS · P52100050703 · possession Apr 2027 · 56.6% built
- Indeco Primus · ErandwaneIndeco Assets · P52100050722 · possession Jul 2028 · 67.7% built
- Rachana Business Bay Commercial 2 · SusRACHANA LIFESPACES · P52100050723 · possession Dec 2027 · 81.8% built
- VIVENCIA · Pune CityKP50 DEVELOPMENT VENTURES LLP · P52100050726 · possession Apr 2027 · 84.3% built
- SAI ZION · ShirurSAI BUILTCON · P52100050738 · possession Mar 2028 · 17.2% built
- Kohinoor Westview Reserve-II · MulshiGOLDWAY REALTY PRIVATE LIMITED · P52100050739 · possession Apr 2029 · 63.6% built
- ROHAN NIDITA PHASE 1 · HINJEWADIRohan & Atul Enterprises · P52100050746 · possession Jul 2027 · 80.9% built
- NESTORIA BANER · BanerSupreme Palatial Developers LLP · P52100050769 · possession Dec 2023 · 100% built
- MOONSTONE · NEAR OLD ORBIS SCHOOLSWAMIJI DEVELOPERS · P52100050771 · possession Feb 2027 · 81.8% built
- Karha Vastu · PUNES J DEVELOPERS · P52100050777 · possession Mar 2027 · 34.1% built
- ACE ABODE PHASE 3 · Pimpri-ChinchwadACE GLOBAL REALTY · P52100050783 · possession Jun 2027 · 83.1% built · 1 complaint
- MANMOHAN RESIDENCY · PUNEHOME DEVELOPERS AND REALITY · P52100050793 · possession Dec 2025 · 86.5% built
- Navkar Anand · Pimpri-ChinchwadFOUR PILLARS · P52100050824 · possession Aug 2025 · 100% built
- 7 Square · Wakad BridgeSai Spacecon India Private Limited · P52100050825 · possession Dec 2026 · 81.8% built
- AMRUTA VIHAR · HaveliAmruta Developers · P52100050831 · possession Apr 2028 · 82.3% built
- Cloud 51 · MulshiOREE REALITY PVT LTD · P52100050833 · possession Apr 2029 · 36.4% built
- SAIDATTA PARADISE WING C · KhedSAI DATTA ENTERPRISES · P52100050847 · possession Dec 2028 · 90.9% built
- SRK GOLD · BALEWADIM/S SRK CONSTRUCTIONS · P52100050855 · possession Jul 2028 · 76.4% built
- STATE BANK OF INDIA EMPLOYEES HIMGAURI CO OPERATIVE HOUSING SOCIETY LTD · Pune CityFORTUNE DEVELOPERS · P52100050860 · possession Jan 2027 · 81.8% built
- JOYWOODS A WING · Pune CityFEEL BLISS REALTORS · P52100050863 · possession Apr 2027 · 85.5% built
- B-CAPITAL · HaveliRAHUL VASANT BHEGADE · P52100050869 · possession Jul 2028 · 23.9% built
- PRISTINE ALLURE PART2 · HaveliMAHALAXMI SHELTERS · P52100050873 · possession Apr 2028 · 40.7% built
- THE MPIRE BUILDING E · FursungiAGN VENTURE · P52100050878 · possession Dec 2026 · 63.6% built
- 5 Maidan by Skyi · BanerEnerrgia Skyi Ventures · P52100050885 · possession Jun 2028 · 68.3% built · 2 complaints
- Sushila · Ganesh NagarParulekarkale Realty LLP · P52100050888 · possession Mar 2026 · 72.7% built
- GHULE PRIDE · HaveliSHRAVYA DEVELOPERS · P52100050890 · possession Sept 2026 · 90.9% built
- GARUD HOUSE APARTMENT CONDOMINIUM · Pune CityFORTUNE DEVELOPERS · P52100050895 · possession Dec 2026 · 81.8% built
- Ashapuri Vrundavan Phase II · MulshiAshapuri Developers · P52100050898 · possession Oct 2026 · 34.5% built
- Shanti Towers · Golegaon RoadBora Developers · P52100050909 · possession Dec 2025 · 72.7% built
- VISION VANESSA · HaveliP4 GROUP · P52100050912 · possession Dec 2026 · 96% built · 2 complaints
- YASHADA WINDSONG · RAVETVIVANTA REALTY · P52100050915 · possession Dec 2026 · 90.9% built · 1 complaint
- BASIL MAXIMUS WING C · PunawaleBasil Avante LLP · P52100050916 · possession Apr 2027 · 65% built
- Yashraj Nakshatra Phase 1 · HaveliVISHWAS KALURAM TUPE · P52100050917 · possession Apr 2027 · 71.6% built
- NEWQUAY · UNDRIDIVINE BUILDCON · P52100050928 · possession Oct 2027 · 46.1% built
- Sai Pleasure · WakadMr Vinod Kishanchand Matani · P52100050930 · possession Oct 2027 · 71.2% built
- SIDDHI-BUSINESS BAY · GULTEKDI , PUNEBhairav Promoters · P52100050934 · possession Apr 2027 · 44.5% built
- VNSVL Shubh Nirvana - Phase II · HaveliViman Nagar Shubh Ventures LLP · P52100050937 · possession Jun 2026 · 95.5% built
- The Golden Bell Phase II · HaveliPanchshil Hotels Pvt Ltd · P52100050964 · possession Apr 2028 · 35.5% built
- Ashiana Amodh Phase I · MawalAshiana Housing Limited · P52100050979 · possession Jul 2027 · 80.7% built · 1 complaint
- Archana Prestige · mohamadwadiKANIFNATH REALITY · P52100050992 · possession Dec 2025 · 81.8% built
- Sarthak Aaradhana · HaveliSarthak Capital Housing · P52100050994 · possession Jun 2026 · 90.9% built
- GOODWILL METROPOLIS EAST PHASE 2 · HaveliKrishna Buildcon · P52100051011 · possession Apr 2027 · 83.5% built
- MAJESTIQUE MARBELLA PHASE VI · HaveliMajestique Empire LLP · P52100051012 · possession Aug 2027 · 100% built
- Puneville Phase III Cluster C · MulshiBenchmarrk Realty LLP · P52100051020 · possession Apr 2030 · 38.5% built
- EARTH 1 BY VTP LUXE PHASE 2 · MahalungeMAHALUNGE REAL ESTATE DEVELOPERS PVT. LTD. · P52100051025 · possession Feb 2029 · 44.1% built · 4 complaints
- Avaneesh · BanerAmbika Nawu Buildcon · P52100051029 · possession Aug 2027 · 43.2% built
- TALAV SANGAM · AMBEGAON KhRAYS INFRA · P52100051032 · possession Apr 2028 · 51.8% built
- SIDDHAAYA PARK · HaveliS K REALTY GROUP · P52100051035 · possession Dec 2026 · 53.2% built
- AARAMBHA VASTU · KhedSAI SHAGUN BUILDERS AND DEVELOPERS · P52100051037 · possession Jun 2027 · 48.2% built
- MITHILA RESIDENCY · Plot No 3, Gat No 187/2/A, Jalochi, BaramatiSHREEYASH ASSOCIATES · P52100051051 · possession Apr 2026 · 79.1% built
- OLIVE HOMES - 2 · ChovisawadiAAKAR REALTIES · P52100051060 · possession Jun 2026 · 79.1% built
- A G LANDMARK · WakadA G LANDMARKS · P52100051063 · possession Apr 2027 · 34.3% built
- SARVATRA CO-OP HSG SOCIETY LTD · KOTHRUD NORTHSuryakant Kakade · P52100051071 · possession Apr 2029 · 35.2% built · 7 complaints
- SUNDER MOTI · CHINCHWADDILIP MOTILALJI CHORDIA · P52100051080 · possession Sept 2025 · 81.4% built
- Mangalam Melizma · KivaleVed Mangalam Associates · P52100051095 · possession Apr 2027 · 70.9% built
- EKDANT · HaveliSWOJAS ICON ASSOCIATES LLP · P52100051099 · possession Dec 2026 · 68.6% built
- WISTERIA · AmbegaonJND CONSTRUCTION · P52100051103 · possession Apr 2028 · 77.7% built
- Pioneer Residency · Near Govindbaug SocietyPioneer Developers · P52100051111 · possession Oct 2026 · 79.1% built
- B N HEIGHTS · chikhaliMEGHSPARSH ASSOCIATES LLP · P52100051145 · possession Apr 2028 · 81.8% built
- UNITY PARK · HaveliSHRIRAM VISION · P52100051156 · possession Apr 2027 · 41.8% built
- CHINTAMANI RESIDENCY · KATRAJG P K DEVELOPERS · P52100051165 · possession Apr 2027 · 74.5% built
- AVISA · SASWADGAJDANT INFRA PRIVATE LIMITED · P52100051171 · possession Dec 2027 · 81.8% built
- River Nest Building A Wing C · CharoliAmarnath Group of Companies · P52100051184 · possession Oct 2027 · 54.5% built
- Godrej Emerald Waters · HaveliGodrej Properties Limited · P52100051200 · possession Jun 2029 · 42.3% built · 5 complaints
- ELINA PREMIUM · SatavnagarBINAWAT REALTY LLP · P52100051205 · possession Apr 2027 · 88.6% built
- VISION PRISA · HaveliP4 GROUP · P52100051225 · possession Jun 2025 · 90.9% built
- 51B Inclusive Housing · BalewadiVilas Javdekar Eco Housing Private Limited · P52100051227 · possession Dec 2025 · 86.4% built
- SELF REDEVELOPMENT OF RAJNEEL CHS · KOTHRUDRAJNEEL CHS LTD · P52100051229 · possession Jul 2027 · 90% built
- NYATI EMERALD I · BANERNYATI BUILDERS PRIVATE LIMITED · P52100051235 · possession Sept 2027 · 72.5% built · 1 complaint
- TRIDENT · HaveliShamraj Constructions · P52100051240 · possession Apr 2029 · 86.4% built
- PRIMUS · KhedM/S SURAJ GROUP PRAMOTERS AND BUILDERS · P52100051251 · possession Dec 2025 · 100% built
- TORAN · AUNDHPANDIT JAVDEKAR ASSOCIATES · P52100051254 · possession Dec 2026 · 72.7% built
- Hinjewadi Project-Tower 1 · HinjawadiLodha Developers Limited · P52100051257 · possession Oct 2027 · 46.4% built · 1 complaint
- CLONE TIARA · DudulgaonCLONE PROPERTIES LLP · P52100051274 · possession Mar 2027 · 73.9% built
- Jare Aangan · ChikhaliSachin Vasant Jare · P52100051275 · possession Dec 2026 · 72.5% built
- HILL TOWN · PirangutSuprabha Properties · P52100051279 · possession Jul 2027 · 28.4% built
- BHUMI SILVERIIO PHASE 3 · DEHU ALANDI ROADBhumi Shelters (INDIA) PRIVATE LIMITED · P52100051295 · possession Apr 2027 · 58.2% built
- Bhakti Shrinidhi · ChinchwadBHAKTI BUILDERS · P52100051298 · possession Sept 2025 · 81.8% built
- EVERNEST SHIVSHRUSHTI · HaveliEVERNEST PERFECTINFRA LLP · P52100051305 · possession Dec 2026 · 52.3% built · 1 complaint
- IKON12 · Pune CityS AND S ASSOCIATES · P52100051315 · possession Mar 2024 · 100% built
- 24K Altura - Tower A and B · BanerKOLTE-PATIL DEVELOPERS LIMITED · P52100051316 · possession Jul 2028 · 58% built
- Castle Gate B Wing · HaveliRavikumar Ambalal Shah · P52100051321 · possession Apr 2029 · 45.9% built
- BASIL MAXIMUS WING D AND E · PUNAWALEBasil Avante LLP · P52100051323 · possession Apr 2028 · 63% built
- Smart Nest Samruddhi · SASWADAasara Properties · P52100051337 · possession Feb 2028 · 29.5% built
- Matoshri Prime · WadmukhwadiShrimatoshri Infrabuild LLP · P52100051338 · possession Nov 2026 · 81.8% built
- Nexus Kinaara A · HaveliNexus Enterprises · P52100051339 · possession Aug 2028 · 56.8% built
- Hill Avenue · Near Pashan HillsILMS SHELTERS PVT LTD · P52100051340 · possession Dec 2025 · 81.8% built
- THE BHANPURAWALAS · Pune CityTHE BHANPURAWALAS · P52100051342 · possession Apr 2029 · 39.1% built
- Sai Darshan · WadmukhwadiRICH DEVELOPERS · P52100051352 · possession Apr 2029 · 29.5% built
- Akshara Serenity B and C · TathwadeGarve Developers and Promoters · P52100051358 · possession Dec 2026 · 72.7% built
- ADVIKA PHASE III - F · PISOLIADVIKA CONSTRUCTIONS PVT.LTD · P52100051370 · possession Mar 2028 · 90.9% built
- Palm Spring D Wing · RavetAryavedant promoters & builders · P52100051379 · possession Sept 2028 · 36.8% built
- NIRMAN COSMOPOLIS · TathwadeRealcon Properties LLP · P52100051380 · possession Apr 2031 · 63.8% built
- GBs Business Hub · Pune CityGrowstone Ventures LLP · P52100051394 · possession Apr 2029 · 46.8% built
- VIJAY SKYLINE · Akurdi PradhikaranCHAYA REALITIES · P52100051395 · possession Jul 2027 · 90.5% built
- TRIO ALPHA · TATHWADETRIO SPACES · P52100051396 · possession Apr 2027 · 73.9% built
- VENKATESH LITTLE HEART · NEAR PANCHAYAT SAMITIVenkatesh Construction · P52100051419 · possession Dec 2028 · 60.5% built
- TIRUPATI ETERNIA GREENS · CHARHOLI BKS S DEVELOPERS · P52100051439 · possession Apr 2027 · 84.8% built
- CITY RISE · KOTHRUDBHUPAL PATWARDHAN AND SONS LLP · P52100051462 · possession Apr 2028 · 67.6% built
- BUNIYAD · Karve NagarRANADE REALTORS LLP · P52100051468 · possession Jun 2026 · 72.7% built
- GULMOHAR PARK · BARAMATIDEEPAK BHAUSAHEB KATE · P52100051482 · possession Oct 2025 · 38.1% built
- RADHIKA RESIDENCY · HaveliMYBHOOMI VASTUSPACE · P52100051486 · possession Dec 2026 · 62.7% built
- Shree Ganesh Heights · HaveliShree Ganesh Developers · P52100051487 · possession Dec 2024 · 90.9% built
- SKY TOWER · PCNTDABMC REALTY · P52100051495 · possession Apr 2027 · 57.4% built
- YOGANAND PARK 2 · KOTHRUDBELVALKAR HOUSING LLP · P52100051502 · possession Dec 2025 · 72.7% built
- Apex Headquarters · HaveliOneapex Realty · P52100051519 · possession Dec 2027 · 42.3% built
- KSHITIJ B · Pune CityPAVONINE ASSOCIATES LLP · P52100051523 · possession Mar 2027 · 77.3% built
- Varad Residency · Otur JunnarQuality Construction · P52100051529 · possession Jul 2027 · 28.2% built
- BASANT BAHAR · ERANDWANEICON PROPERTIES · P52100051530 · possession Nov 2027 · 45.5% built
- Audumber Residency · HaveliShama Construction Through Properiter Vikram Manohar Kamthe · P52100051532 · possession Mar 2027 · 58.2% built
- HUES OF SKY · HaveliBramhacorp Limited · P52100051537 · possession Apr 2030 · 30.2% built
- AUM VERTEX · HaveliAum Buildcon · P52100051544 · possession Apr 2027 · 81.8% built
- AKSHA VRUNDAVAN III · HaveliAKSHA ENTERPRISES · P52100051549 · possession Apr 2028 · 75.2% built
- PRIMEROSE · AMBEGAON BKGURUKRUPA DEVELOPERS · P52100051551 · possession Jul 2027 · 61.8% built
- MEANDER WING C · NEAR KESHANAN PHATAEASTEND SPACES LLP · P52100051553 · possession Dec 2026 · 79.5% built
- PLATINUM TOWERS · HaveliSAMARTHA LANDMARK · P52100051557 · possession Apr 2030 · 44% built
- TARANGAN APARTMENTS · SHUKRAWAR PETHHINDUSTAN BUILDERS · P52100051558 · possession Mar 2024 · 86.8% built
- SIDDHIGIRI · Metro Greens SocietyAnand Homes · P52100051569 · possession Apr 2027 · 79.5% built
- Skyways Pratham · CharholiM/s Malhar Promoters and Land Developers LLP · P52100051577 · possession Dec 2027 · 42.7% built
- Quality Royal Park · OturQuality Construction · P52100051581 · possession Mar 2027 · 81.8% built
- Prithvi Paradise · Near Jai Malhar HotelPrithvi Buildcon · P52100051588 · possession Apr 2027 · 107.3% built
- Palladio Balewadi Central Phase 1 · HaveliVilas Javdekar Eco Housing Private Limited · P52100051590 · possession Apr 2028 · 73.7% built · 2 complaints
- ONYX HOMES 52 KONDHWA PHASE - I · Kondhwa, PuneM/s.Onyx Noble Realtors LLP · P52100051595 · possession Mar 2027 · 38.2% built
- RESHMA HEIGHTS CO-OPERATIVE HOUSING SOCIETY LTD. · Dahanukar ColonyNestcon · P52100051614 · possession Dec 2025 · 68.2% built
- ROSHAN MILESTONE WING H · Buchude WastiRAHUL BHAGWANDAS SANKLA · P52100051615 · possession Dec 2028 · 96.4% built
- KOHINOOR FAMVILLE · MaanYELLOWSTONE SKYSCRAPERS LLP · P52100051623 · possession Apr 2029 · 58% built
- INDRAYANI RIVERVIEW RESIDENCY · DUDULGAONSHREENATH DEVELOPERS · P52100051634 · possession Oct 2026 · 80.5% built
- ANP AUTOGRAPH · PunawaleANP LANDMARKS LLP · P52100051641 · possession Jun 2028 · 35.7% built
- SUVARNALATA SAHAKARI GRUHRACHANA SANSTHA MARYADIT · ERANDWANASWOJAS UNITED CONSTRUCTIONS LLP · P52100051649 · possession Mar 2027 · 44.5% built
- NIRMAN ADI · Pune CityNIRMAN DEVELOPERS · P52100051655 · possession Apr 2026 · 59.1% built · 1 complaint
- NIRMAN HILLSIDE · DHANKAWADI-EXTMR GURURAJ NARSINHA JOSHI · P52100051666 · possession Oct 2027 · 70% built
- AVANTIKA · HaveliRanjekar Realty LLP · P52100051675 · possession Apr 2027 · 10.9% built
- YASHODHAN · KothrudRANADE REALTORS LLP · P52100051695 · possession Jun 2026 · 72.7% built
- OXY FLORA PHASE 3 · HaveliYOGESH DEVELOPERS · P52100051700 · possession Dec 2026 · 27.7% built
- Siddhivinayak Park Part 1 · Borhadewadi MoshiNilesh Uddhav Borate · P52100051715 · possession Apr 2027 · 40% built
- VIVESTA · SECTOR NO. CDCNIYATI LIFESPACES PRIVATE LIMITED · P52100051718 · possession Mar 2025 · 90.9% built
- SHIVSAHYADRI · JunnarNANDANVAN DEVELOPERS · P52100051720 · possession Apr 2028 · 19.6% built
- Shree Apartment · Near Veer Baba MandirS R Developers · P52100051723 · possession Dec 2025 · 90.9% built
- Dev Residency · HaveliShiv Pragati Developers · P52100051724 · possession Dec 2030 · 19.8% built
- Empress Greens · Canal RoadAnand Landmarks · P52100051728 · possession Jun 2030 · 8.2% built · 1 complaint
- STELLA APEX · HaveliVASTUSPACE REALTY PROMOTERS AND DEVELOPERS LLP · P52100051730 · possession Feb 2027 · 90.9% built
- SKY VILLAS · Nr Tanishk PulpMALHAR DEVELOPERS · P52100051750 · possession Oct 2026 · 90.9% built
- Prakruti Palladium Phase 2 · KondhawaAspire Realty Spaces LLP · P52100051757 · possession Jul 2027 · 13.2% built
- MISTY PARK · HaveliPruthvi Developers · P52100051759 · possession Dec 2026 · 72.7% built
- Life Republic Sector R22/22nd Avenue - Atmos/Phase - I · HinjewadiKOLTE-PATIL DEVELOPERS LIMITED · P52100051765 · possession Feb 2028 · 48.2% built · 2 complaints
- FORESTIA WING A · DUDULGAONSHAKUNTAL DEVELOPERS · P52100051767 · possession Oct 2026 · 82.7% built
- Shree Samarth Shrushti · KhedJagdamba Developers · P52100051776 · possession Jan 2027 · 18.6% built
- ACE ATMOSPHERE PHASE I · RavetJHAMTANI REALTY PRIVATE LIMITED · P52100051778 · possession Jan 2029 · 45.5% built
- 41 Zillenia · PunawalaTirupati Skyscrapers LLP · P52100051790 · possession Sept 2027 · 69.6% built · 2 complaints
- Ephelia Phase 2 · Kondhwa KhurdMajestique Giga Homes LLP · P52100051801 · possession Apr 2029 · 22% built
- MADHUSHREE · DhayariKPL BUILD CON LLP · P52100051809 · possession May 2026 · 81.8% built
- VRINDAVAN · HaveliParmeshwari Schemes · P52100051813 · possession Nov 2027 · 22.7% built · 2 complaints
- KRUPA · SANAS NAGARPAM REALTY PVT LTD · P52100051817 · possession Apr 2027 · 65.5% built
- VTP DOLCE VITA Phase 1 · HaveliAshdan Developers Private Limited · P52100051819 · possession Apr 2029 · 44.9% built · 18 complaints
- Shri Deodoot · HaveliParulekar Realty LLP · P52100051833 · possession Feb 2027 · 60.9% built
- MAJESTIQUE SIGNATURE TOWERS A1 · BALEWADIMAJESTIQUE HOMES LLP · P52100051835 · possession Oct 2027 · 65.9% built
- The Canary Phase 3 · BalewadiGROW INDIA NIRMITI LLP · P52100051845 · possession Apr 2028 · 58.1% built · 1 complaint
- Oxygen Park Phase I · Bajarpeth RoadYogiraj Developers and Construction · P52100051846 · possession Apr 2027 · 88% built
- DEVALE DIVINE · BARAMATIOMKAR KISHOR DEVALE · P52100051853 · possession Feb 2026 · 65.9% built
- QUE 914 PHASE II · MundhwaUnique Choice Associates LLP · P52100051858 · possession Jun 2027 · 78.6% built
- SKY VIEW RESIDENCY · KhedMangesh Vasant Gundal · P52100051864 · possession Feb 2028 · 30.3% built
- VISHNU GREENS · FursungiJAI GANESH PROPERTIES · P52100051865 · possession Mar 2026 · 90.9% built
- NISARG RESIDENCY WING C · Near Water TankSHREE DATTAKRUPABUILDERS AND DEVELOPERS · P52100051871 · possession Apr 2030 · 89.1% built
- CAPELLA · AMBEGAOND K REALTIES · P52100051877 · possession Dec 2026 · 65.9% built
- BASIL SERENITY · CHARHOLI BKBASIL DEVELOPERS · P52100051897 · possession Jun 2026 · 89.1% built
- AARAV PALM SPRINGS · WagholiDIKSHIT RAJAN AGARWAL · P52100051910 · possession Dec 2025 · 81.8% built
- Sai Aura · Pimple SaudagarWJV LANDMARKS LLP · P52100051930 · possession Sept 2026 · 78.2% built
- BOULEVARD TOWER A2 · HaveliBramhacorp Limited · P52100051975 · possession Apr 2027 · 90.9% built
- AARNA REGENCY · PUNAWALEAARNA ASSOCIATES · P52100051977 · possession Oct 2027 · 50.9% built
- SWAPNAPURTI · VIVEK PATIL NAGAR CO.OP HOUSING SOCIETYMandar Shrikant Sikachi · P52100051983 · possession Apr 2027 · 51.6% built
- AADHYA ANKOOR · BANERANKOOR DEVELOPERS · P52100052004 · possession May 2027 · 30.9% built
- VEDANT BUILDERS AND ASSOCIATES · HaveliVEDANT BUILDERS AND ASSOCIATES · P52100052006 · possession Mar 2028 · 9.1% built
- GANRAJ APARTMENT · JALOCHIVAASTU VISHWA DEVELOPERSSS · P52100052009 · possession Sept 2025 · 90.9% built
- PANACHE AURA · DUDULGAONSHREE BHAGWATI GROUP · P52100052013 · possession Jun 2026 · 81.8% built
- Amanora Arbano Towers 73,74,75 and 76 · HaveliCity Corporation Limited · P52100052019 · possession Sept 2028 · 75.2% built · 1 complaint
- Varad Heights · Behind Nakshatra GardenSACHIN VIJAY GADHAVE · P52100052028 · possession Apr 2028 · 24.4% built
- Skyi Manas Lake Phase VIII · MulshiEnerrgia Skyi Ventures LLP · P52100052033 · possession May 2026 · 48.1% built
- PADMA MADHAV · KOTHRUDVriddhi Realty Parvati LLP · P52100052040 · possession Dec 2025 · 66.8% built
- SIGNATURE RITZ · THERGAONSHREE SONIGARA REALCON · P52100052042 · possession Apr 2029 · 29.5% built · 1 complaint
- 97 SONIGARA BIZZ · RAVETDHANASHRI CONSTRUCTION · P52100052052 · possession Mar 2026 · 72.4% built
- Petal Greens · SangvadeA R Associates · P52100052059 · possession Apr 2027 · 75.7% built
- JAY GURUDEV RESIDENCY WING B · ChikhliJAY GURUDEV DEVELOPERS · P52100052064 · possession Apr 2025 · 100% built
- Shiv Shakti Heights · KhedSahyadri Buildcon · P52100052070 · possession Apr 2028 · 24.5% built
- ROYAL KP STELLAR · MOHAMADWADIKANIFNATH REALITY · P52100052077 · possession Dec 2027 · 84.1% built
- V3 Villa Phase- II · WagholiPanchshil Infrastructure Holdings Pvt. Ltd. · P52100052083 · possession Dec 2027 · 0% built
- TOWN SQUARE · NEAR SHREEJI SHARAN BUILDINGKRUPASINDHU DEVELOPERS · P52100052087 · possession Sept 2026 · 90.5% built
- INFINITO SERENO · BANERINFINITO DEVELOPERS · P52100052088 · possession Apr 2029 · 33.6% built
- MAGNACITY - Tower A3 · HaveliMalnad Project (I) Pvt Ltd · P52100052096 · possession Sept 2028 · 65.1% built · 2 complaints
- SHRIRAM SKYPARK · PuneSHRIRAM SAMRUDDHI DEVELOPERS · P52100052123 · possession Oct 2027 · 0% built
- RAJYOG C WING · -SANTOSH SHANKAR TATHE · P52100052153 · possession Dec 2026 · 84.5% built
- OPULENCE TOWERS · HaveliNABAR ASSOCIATES · P52100052161 · possession Apr 2030 · 12.7% built
- STAR ALTAIR PHASE II · NEAR WINDMILL VILLAGEARYAVART ASSOCIATES · P52100052165 · possession Apr 2027 · 45% built
- RAJNAKSHATRA PALACE · Shiv Shambhu NagarDEVGIRI BUILDCON · P52100052170 · possession Jul 2027 · 51.8% built
- RVK ARIA WING A B · HaveliRVK REALTY · P52100052177 · possession Apr 2028 · 38.6% built
- Pradhan Mantri Awas Yojana-Dudulgaon · DudulgaonPIMPRI CHINCHWAD MUNICIPAL CORPORATION · P52100052195 · possession Oct 2027 · 79.1% built
- Shilp Shantivan · MamurdiEcho Stone Buildcon · P52100052197 · possession Oct 2028 · 50% built
- NOBLE HEIGHTS · M PHULE PETHNOBLE DEVELOPERS · P52100052207 · possession Dec 2025 · 33.6% built
- SENTOSA ELITE · WAKADSHANTI CONSTRUCTIONS · P52100052208 · possession Apr 2027 · 73.6% built
- Aranya · MawalNaiknavare Township LLP. · P52100052216 · possession Jul 2027 · 75.5% built
- ARYABAN · Kiwale, PuneAURIGAA REALTORS · P52100052225 · possession Dec 2027 · 87.9% built
- DNYANGANGA · ALANDI DEVACHIINDRAYANI VENTURES · P52100052228 · possession Jul 2033 · 13.9% built
- NAKSHATRA RESIDENCY · RAVETNAKSHATRA RESIDENCY · P52100052229 · possession Jul 2027 · 69.3% built
- Nilay · Shivajinagar (Bhamburda)ANGAL & CO · P52100052245 · possession Jun 2026 · 63.2% built
- ECO GRAM PHASE 3 · ShirurSHRI SIDDHIVINAYAK BUILDERS · P52100052248 · possession Apr 2029 · 51.1% built
- Laxmi Bliss · Santosh NagarSHREE MAHALAXMI ASSOCIATES · P52100052254 · possession May 2027 · 25.5% built
- TRANQUILITY ANNEXE D WING · HaveliK AND B ASSOCIATES · P52100052256 · possession Jun 2028 · 90.5% built
- Geras Island of Joy Project A · HaveliGera Developments Private Limited · P52100052259 · possession Sept 2028 · 44.4% built · 6 complaints
- CASTEL ROYALE TOWER NINE · HaveliAVINASH BHOSALE GROUP · P52100052260 · possession Sept 2029 · 29% built
- MHADA-TCG GARDENIA · BALKAWADE NAGARTHE CONSTRUCTION & DEVELOPMENT CO · P52100052286 · possession Dec 2027 · 56.8% built
- MAJESTIQUE SIGNATURE TOWERS A2 · BalewadiM/s. Samarth Builders · P52100052295 · possession Oct 2027 · 51.4% built
- Rohan Ekam Phase 1 · HaveliROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED · P52100052298 · possession Apr 2028 · 45.1% built · 2 complaints
- TEJ MIDTOWN · Pune CityTEJRAJ GANPATRAO PATIL · P52100052300 · possession Mar 2029 · 15% built
- Yog Mudra · ChikhaliPawan Enterprises Through Madhukar Dattatraya Shinde · P52100052302 · possession Oct 2027 · 44.5% built
- Gandharv Marigold RH 19 to 24 · HaveliYogesh Properties thro Prop Vijaya Vinayak Bhongale · P52100052305 · possession Oct 2027 · 68.3% built
- Akshardham Phase 2 · PuneShreyan Ventures · P52100052307 · possession Apr 2027 · 76.5% built · 1 complaint
- B. T. SQUARE · HaveliAJAY JAYAWANT BHOSLE · P52100052316 · possession Apr 2028 · 24.6% built
- Vaishnav Gaatha · HaveliKalbhor Realtors And Services LLP · P52100052318 · possession Apr 2027 · 53.6% built
- Sai Arham · Kondhwa-BudrukSai Anand Builders & Developers · P52100052337 · possession Dec 2026 · 90.9% built
- PLATINUM PRIDE · GUJARWADI KATRAJSHREE MAULI DEVELOPERS · P52100052347 · possession Mar 2028 · 68.6% built
- 24 ELEMENTS · AmbegaonS.P. BUILDERS AND DEVELOPERS · P52100052370 · possession May 2026 · 72.7% built
- THE COLLECTION - W5 AND W6 · HaveliBramhacorp Limited · P52100052374 · possession Apr 2030 · 42.1% built
- Golfland I and II · MulshiIMAGE REALTY PRIVATE LIMITED · P52100052376 · possession Apr 2029 · 21.3% built
- HARIVISHVA INFINIA PHASE 2 · TathawadeHARIVISHVA DEVELOPERS LLP · P52100052385 · possession Apr 2028 · 80% built · 1 complaint
- NB CRYSTAL A PHASE II · Near Podar International SchoolNanasaheb Bhintade Spacess Pvt Ltd · P52100052388 · possession Oct 2026 · 46.4% built
- METRO LIFE ULTIMA RESIDENCES PHASE II · TATHWADERAMA SYNERGY SPACES · P52100052394 · possession Oct 2028 · 14.5% built
- Akshara Harmony · WakadGarve Developers and Promoters · P52100052405 · possession Dec 2026 · 81.8% built
- EARTH 1 BY VTP LUXE PHASE 3 · MAHALUNGEMAHALUNGE REAL ESTATE DEVELOPERS PVT. LTD. · P52100052414 · possession Aug 2029 · 45.4% built · 2 complaints
- ARYA SQUARE · SHAIVAJI CHOUKSAIRAJ INFRA · P52100052419 · possession Oct 2028 · 54.5% built
- GRACE PALLACIO · HaveliUnicorn Developers · P52100052422 · possession Jul 2028 · 75.2% built
- HOLLYHOCK CITY BUILDING NO 2 WING D · HaveliKATE MOZZE ASSOCIATES · P52100052430 · possession Jul 2027 · 65.5% built
- Ved Anandghan · PuneRe Nirmitee Projects · P52100052437 · possession May 2027 · 90.9% built
- Gandharv Marigold RH 13 to 18 · HaveliYogesh Properties throu Prop Vijaya Vinayak Bhongale · P52100052440 · possession Oct 2027 · 52.6% built
- JAGDEEP · ErandwaneRanjekar Realty LLP · P52100052446 · possession Nov 2026 · 172.7% built
- Prathamesh Co-Op Housing Soc · Right Bhusari Colony, KothrudJoshi Associates · P52100052452 · possession Sept 2026 · 75% built
- MONTAGE · HaveliGOLDEN KALASH HOUSING LLP · P52100052457 · possession Apr 2027 · 60% built
- Melliza Towers- Commercial · HaveliMOONLIGHT HOUSING SCHEMES LLP · P52100052462 · possession Oct 2027 · 52.7% built · 1 complaint
- ARIHANT WISDOM · BORHADEWADIARIHANT BUILDCON · P52100052464 · possession Jul 2027 · 72.7% built
- Geras Island of Joy Project B · HaveliGera Developments Private Limited · P52100052474 · possession Oct 2028 · 36.6% built · 4 complaints
- Solitaire Palms A Wing · Borahdewadi MoshiRajkumari Gulab Choithramani · P52100052480 · possession Apr 2030 · 45.5% built
- SKY WORLD · WAKADSIYARAM DEVELOPERS · P52100052484 · possession Oct 2027 · 73.2% built · 1 complaint
- SHIVAAY LANDMARK · CHAROLISHIVAAY REALITY · P52100052494 · possession Dec 2025 · 81.8% built
- Pride Heritage · ChinchwadBHAKTI INFRA · P52100052501 · possession Oct 2026 · 89.5% built
- Chhatrapati Square · OturSACHIN JAYRAM NALAWADE · P52100052511 · possession Apr 2027 · 24.2% built
- INDIAN BANK STAFF CO-OPERATIVE HOUSING SOCIETY LTD · Pune CityRAICHANDANI CONSTRUCTIONS PRIVATE LIMITED · P52100052515 · possession Aug 2026 · 62.3% built
- Golfland III and IV · MulshiIMAGE REALTY PRIVATE LIMITED · P52100052522 · possession Apr 2029 · 21.2% built
- MAGNETIC HOME · KhandobanagarRAHUL BALASAHEB TARU · P52100052528 · possession Dec 2026 · 54.1% built
- MANTRA MESMER PHASE 6 · HaveliMANTRA ZIRCONIA PRIVATE LIMITED · P52100052535 · possession Apr 2028 · 93.7% built
- SIDDHIVINAYAK RESIDENCY · KhedKATE BUILDERS · P52100052538 · possession Jul 2027 · 65.4% built
- LA VISTA · BHOSALE NAGAR, SHIVAJI NAGARDARSHANRAJ REALITY · P52100052539 · possession Apr 2026 · 78.2% built
- Swapnashilp · HaveliTirupati Developers · P52100052543 · possession Apr 2027 · 81.8% built
- Menlo Professional Park · HaveliMENLO REALTY LLP · P52100052546 · possession Apr 2027 · 75.3% built
- ELINA LUXE TOWER G and H · HaveliRamkrishna Cine Exhibitors · P52100052556 · possession Oct 2027 · 49.3% built
- Mahindra Happinest Tathawade Phase 3 · TathawadeMahindra Lifespace Developers limited · P52100052559 · possession Apr 2028 · 18.2% built
- DAFFODIL HOMES · NEAR DARSHAN HALLPRATHMESH DEVELOPERS · P52100052560 · possession Apr 2027 · 31.4% built
- Melliza Towers- Residential · HaveliMOONLIGHT HOUSING SCHEMES LLP · P52100052564 · possession Jun 2027 · 26.1% built · 1 complaint
- THE SHASHWAT · Bankar VastiMs Shree Sai Ram Properties · P52100052566 · possession Apr 2027 · 47.1% built
- Serenity Springs · ShivajinagarBUTTEPATIL PROPERTIES · P52100052567 · possession Jan 2027 · 90.9% built
- Chandreshi Complex · HaveliRathod & Sons · P52100052580 · possession Jul 2028 · 50% built
- TREASURE TROVES · PUNEREALCON HOMES LLP · P52100052582 · possession Apr 2031 · 43.1% built
- SADHGURU HOMES · KIWALEASHOK MOTIRAM TARAS · P52100052586 · possession Jan 2027 · 81.8% built
- Ashiana Malhar Phase II · PuneAshiana Housing Limited · P52100052593 · possession Sept 2027 · 82.7% built
- VARADSIDDHI PLAZA · HaveliVARADSIDDHI ASSOCIATES · P52100052597 · possession Jun 2026 · 81.8% built
- SAI VATIKA BLDG - E · ChankhedABHILASHA DEVELOPERS · P52100052605 · possession Apr 2027 · 30.9% built
- Amanora Arbano Towers 71 and 72 · HaveliCity Corporation Limited · P52100052614 · possession Sept 2028 · 73% built
- UJWAL SACHI · SUTARWADINATU DHAMALE CONSTRUCTION · P52100052662 · possession Apr 2029 · 43.6% built
- TEJ NAVYA · ERANDWANETEJRAJ PROFILE BUILDERS LLP · P52100052664 · possession Dec 2026 · 69.1% built
- Padmavati Hills A Wing · Bavdhan BudrukSuyog City Developers · P52100052667 · possession Jul 2027 · 45% built
- SURBHI SAMRUDHI · HaveliPrakriti Space LLP · P52100052668 · possession Jun 2026 · 88.7% built
- EASTERN ROYALE BUILDING NO. 2 · HaveliM/S KATE MOZZE ASSOCIATES · P52100052671 · possession Jul 2027 · 61.8% built
- Yashone Eternitee Phase 2 · MaanVilas Javdekar Infinitee Developers Pvt. Ltd. · P52100052676 · possession Oct 2027 · 95% built · 1 complaint
- NB TOWERS · NEAR TULSI LANDMARKSHEKHAR INFRATECH · P52100052677 · possession Jun 2026 · 79.8% built
- Mango Tree Villa Tower 1 · HaveliPalchin Real Estates Private Limited · P52100052683 · possession Oct 2027 · 48.4% built
- GREENVILLE BUILDING A4 · HADAPSARVision Realtors · P52100052689 · possession Jun 2024 · 90.9% built
- PRISTINE ALLURE PART 3 · HaveliMAHALAXMI SHELTERS · P52100052693 · possession Apr 2028 · 42% built
- AKSHAY · ERANDWANEUNIKO ENTERPRISES LLP · P52100052698 · possession Apr 2028 · 39.5% built
- LOTUS SHEETAL · KothrudLotus Landmarks · P52100052702 · possession May 2030 · 3% built
- Hillview Residency P Commercial · Behind Mahatma Society KothrudKUMAR BEHARAY PROPERTIES LLP · P52100052705 · possession Sept 2025 · 81.8% built
- KAMAL BAUG · ShirurSAPTARSHI BUILDCON · P52100052708 · possession Dec 2030 · 6.7% built
- PRIME PRESTIGE · JunnarPRIME CONSTRUCTION · P52100052709 · possession Jun 2026 · 81.8% built
- GRAZIA · KOTHRUDSBM SPACE REALTY LLP · P52100052712 · possession Jun 2026 · 80% built
- Lake N Hills · Near Sindhuratna Pure VegUnicus Developers · P52100052713 · possession Apr 2027 · 27.3% built
- AROHAN · TALEGAON DABHADERVR CONSTRUCTION · P52100052715 · possession Mar 2026 · 90.9% built
- MAINLAND ETERNIA · HaveliMAINLAND SPACES LLP · P52100052716 · possession Dec 2026 · 51.8% built
- THE UNICORN BUILDING C WING C1 & C2 · RAVETDOLPHIN BUILDCON · P52100052724 · possession Apr 2028
- Chandrangan Revanta C Wing · HaveliChandrangan Buildcon · P52100052736 · possession Apr 2027 · 67.3% built
- AKSHAY VISTA · HaveliAKSHAY SKYSCRAPERS PRIVATE LIMITED · P52100052741 · possession May 2027 · 47.3% built
- Shree Gauri · Pune CityShree Omkareshwar Developers · P52100052744 · possession Oct 2027 · 57.3% built
- 37 GRANDSTAND · BANERSPACE BUILDERS AND DEVELOPERS · P52100052752 · possession Sept 2027 · 50.4% built
- SAMARTH RESIDENCY · Awachat EstateD S Construction · P52100052755 · possession Dec 2027 · 37.2% built
- KAKADE SWAPANASHILP · TALEGAONSAMARTH DEVELOPERS · P52100052756 · possession May 2027 · 90.9% built
- OMKAR · Karve NagarRanjekar Realty LLP · P52100052757 · possession Dec 2025 · 81.8% built
- DHANASAMPADA · HaveliRanjekar Realty LLP · P52100052758 · possession Jul 2027 · 47.2% built
- GARDEN CITY · ShikrapurSUBHAJ CONSTRUCTION AND DEVELOPMENTS LLP · P52100052761 · possession Oct 2028 · 33.6% built
- NIWANT CO OPERATIVE HOUSING SOCIETY LTD · Pune CityBELVALKAR HOUSING LLP · P52100052764 · possession Apr 2027 · 64.7% built
- 1 NEW CASTLE · BANERCHAVDA REALTY LLP · P52100052768 · possession Sept 2026 · 41.4% built
- Nithyam Phase II · Charholi KhG and S Associates · P52100052791 · possession Dec 2027 · 62.1% built
- CHORDIYA GALAXY · KONDHWA BKN K ASSOCIATES · P52100052801 · possession Dec 2025 · 79.1% built
- MIDORI TOWER PHASE 5 · HaveliVIKRAM DEVELOPERS AND PROMOTERS · P52100052802 · possession Apr 2028 · 41.6% built
- GREENVILLE BUILDING A3 · HADAPSARVision Realtors · P52100052806 · possession Jun 2025 · 68.2% built
- Netizen · HinjewadiArun Venunath Kharde Patil · P52100052811 · possession Nov 2027 · 85.9% built
- PARAM · WAKADPRASANNA INFRACON LLP · P52100052816 · possession Apr 2028 · 49.5% built
- Satvik Villa · BanerMak Developers Through Damji Vasta Makwana · P52100052821 · possession Apr 2026 · 63.6% built
- KAMAL GALAXY · YEWALEWADIRaj Properties · P52100052832 · possession Dec 2027 · 48.2% built
- Avishkar Ridhima · MaanARUN BABAN MARATHE · P52100052836 · possession Apr 2028 · 68.2% built
- Sai Nagari Phase III · Pune CitySaikedareshwar Developers LLP · P52100052837 · possession Sept 2029 · 42.3% built
- Millennium Amara · MamurdiMillennium Developers · P52100052838 · possession Jul 2028 · 89.5% built
- UMASHANKAR PRASAD · HaveliRanjekar Realty LLP · P52100052840 · possession Jun 2028 · 5.5% built
- AISHWARYAM HAMARA ABHIMAAN · CHIKHALISAI ESSEN DEVELOPERS · P52100052847 · possession Dec 2025 · 50.2% built · 3 complaints
- Golden Core · Pune CityGhule Patil Developers · P52100052849 · possession Jun 2026 · 72.7% built
- SWOJAS MAITREE · ERANDWANASWOJAS ENTERPRISES · P52100052855 · possession Sept 2026 · 81.4% built
- THE ANTHEM · Pune CityC S Sanghavi Estate Division · P52100052869 · possession Dec 2026 · 81.8% built · 1 complaint
- Chandrangan Rajgad · HaveliChandrangan Buildcon · P52100052894 · possession Apr 2027 · 90.9% built
- JAGANNATH HERITAGE · HaveliASCENT LANDMARKS · P52100052896 · possession Mar 2027 · 81.8% built
- K City Phase 3 · KeshavnagarUnique Triaa Ventures · P52100052901 · possession Apr 2029 · 93.8% built
- SIDDHI NISARG C BUILDING · WAKADSIDDHI NISARG ASSOCIATES · P52100052910 · possession Apr 2027 · 90.9% built
- Megapolis Shimmer - A1 · Rajiv Gandhi Infotech Park Phase 3Pegasus Properties Pvt. Ltd. · P52100052912 · possession Mar 2029 · 64.8% built · 1 complaint
- OSIAN NAVKAR · Pune CityOSIAN REALTY · P52100052913 · possession Sept 2026 · 83.6% built
- Kumar Primeview E2 · HaveliKumar Properties & Promoters Private Limited · P52100052915 · possession Apr 2029 · 54.5% built
- Shreenath Residency · Jamdade EstateChandrakant Gulab Jamdade · P52100052917 · possession Apr 2026 · 81.8% built
- Palmspring Towers - A1, A2 and A3 · HaveliKUMAR KERING DEVELOPERS LLP · P52100052923 · possession Apr 2029 · 66.4% built
- Upavan · DhayariDeep Developers · P52100052935 · possession Jul 2027 · 90.9% built
- 47 East - B Wing B, C and D · HaveliKumar Properties and Developers LLP · P52100052955 · possession Apr 2029 · 51.9% built
- Godrej River Royale · MahalungeMahalunge Township Developers Private Limited · P52100052957 · possession Jul 2029 · 39.6% built · 1 complaint
- Skyi Iris, RaceCourse Phase I · HaveliEnerrgia Skyi Landmarks · P52100052969 · possession Oct 2027 · 30.3% built
- ROHAN HARITA PHASE 1 · TATHAWADEROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED · P52100052972 · possession Apr 2028 · 49% built · 1 complaint
- Redision Royal · Kondhwa BkRSMS9 Infrastructure LLP · P52100052985 · possession Mar 2034 · 13.6% built
- Sai Nagari Phase I · HaveliSaikedareshwar Developers LLP · P52100052996 · possession Sept 2029 · 14.1% built
- LINI HOMES · HaveliVIJAY CONSTRUCTION NEXT · P52100053001 · possession Apr 2030 · 54.1% built
- Gathagram Sector 2 · HaveliHARIT LANDMARKS LLP · P52100053002 · possession Mar 2029 · 42.5% built
- Meriton Heights · MamurdiRBS Builder & Developers · P52100053019 · possession Apr 2028 · 46.5% built
- Gharonda · HaveliParulekar Realty LLP · P52100053024 · possession Jul 2026 · 61.4% built
- KOHINOOR VIVA PIXEL- PHASE I · HaveliRISING ASSOCIATES · P52100053030 · possession Sept 2027 · 85.9% built · 1 complaint
- OM Residency · Bhusari colonySamarth Developers · P52100053038 · possession Apr 2028 · 72.7% built
- Destination Ostia Building E1 · DudulgaonD R GAVHANE LANDMARKS LLP · P52100053043 · possession Apr 2027 · 42.7% built
- THE TRINITY · WAGHOLIEH REALITY LLP · P52100053045 · possession Apr 2028 · 10.5% built · 6 complaints