Delayed projects in Nashik
993 MahaRERA-registered projects in Nashik are past the possession date on file and still under 100% built. Where the promoter has formally revised the date, the original is shown alongside so you can see what changed.
Page 5 of 5
- ARRPAN VIHAR1.8 yr overdueANANDA DEVELOPERS · HIRAWADI, NashikP51600031424· 90.9% built
- ANAND AVENUE1.8 yr overdueDEEPAK PANDURANG MATALE · AMBAD, NashikP51600033614· 59.1% built
- PARTH RENAISSANCE1.8 yr overdueBIRARI INFRATECH · Nashik, NashikP51600029998· 72.7% built
- ELIXIR GIRIK1.8 yr overdueELIXIR BUILDERS · CHANDSHI, NashikP51600033898· 90.9% built
- OMKARA PARK WING B1.8 yr overdueOMKARA BUILDCON · Dhruv Nagar, NashikP51600045585· 81.8% built
- Saujanya Co-operative Housing Society Ltd. Nashik1.8 yr overdueADIRAJ CONSTRUCTION · NEAR KBT COLLEGE, NashikP51600047395· 90.9% built
- MONSOON MIST1.8 yr overdueNITIN DAYALAL KOTHARI · Igatpuri, NashikP51600019135· filed Mar 2020 → now Dec 2024· 81.8% built
- KAUSHALYA HEIGHTS1.8 yr overdueMAULI DEVELOPERS · MAKHMALABAD, NashikP51600047905· 81.8% built
- Vitthal Park1.8 yr overdueRAMESHWAR ASSOCIATES · Samarth nagar, NashikP51600032672· 27.3% built
- PANCHARATNA HEIGHTS1.8 yr overduePANCHARATNA BUILDERS · NEAR MAULI LAWNS, NashikP51600033520· 82.5% built
- SHREE KAMAL RESIDENCY1.8 yr overdueSHREE DEVELOPERS · KAMATHWADA, NashikP51600048846· 90.9% built
- The Palm1.8 yr overdueISHWARLAL MULJI PATEL · Agartakli, NashikP51600031552· 22.7% built
- JUNNARE HEIGHTS1.8 yr overdueSAUMYA BUILDCON · GEN VAIDYA NAGAR, DWARKA, NashikP51600031205· filed Apr 2024 → now Dec 2024· 90.9% built
- NILKANTH DHAM1.8 yr overdueNILKANTH INFRA · MAKHAMALABAD, NashikP51600030816· 90.9% built
- ROONGTA FLORENZA APARTMENT1.8 yr overdueROONGTA HOMES LLP · NASHIK, NashikP51600033635· 89.1% built· 3 complaints
- YASH HEIGHTS1.8 yr overdueDEELIPRAO DAULATRAO DEORE · KAMATHWADE, NashikP51600046131· 9.1% built
- AVEN VISTA1.8 yr overdueMSK DEVELOPERS · PATHARDI, NashikP51600030853· 90.9% built
- SAI HEIGHTS APARTMENT1.7 yr overdueSHRI SAI CONSTRUCTION · SHANI CHOWK SHRAMIK NAGAR, NashikP51600033867· 90.9% built
- BHOLEBABA HEIGHTS1.7 yr overdueSHARAD DINKAR DESHMUKH · MAKHMALABAD SHIWAR, NASHIK, NashikP51600035162· 84.1% built
- NYSA BUSINESS CENTER1.7 yr overdueR D BUILDWELL · MAKHAMALABAD, NashikP51600029342· 90.9% built
- ROONGTA ASHOK VIHAR APARTMENT1.7 yr overdueSHREE CHAWO SATI BUILDERS PRIVATE LIMITED · NASHIK, NashikP51600046725· 81.8% built
- Mittal Park1.6 yr overdueAllwin Buildcon · Nandur Naka, NashikP51600022317· 85.1% built
- SHIVSRUSHTI ANNEX1.6 yr overdueVISHAL LAXMAN GADEKAR · MAKHMALABAD, NashikP51600034167· 90.9% built
- Prabhu Business Center1.6 yr overduePacific Builders · Wadala Shiwar, NashikP51600030755· 81.8% built
- ELITE RIAAN1.6 yr overdueM/s. RIAAN ANKIT REALTECH · SHRAMIK NAGAR SATPUR, NashikP51600034237· 90.9% built
- GURU AANGAN APARTMENT1.6 yr overdueRAMESH PATEL · PAWAR WADI, NashikP51600032061· 90.9% built
- SNEHABANDH CO-OP HOUSING SOCIETY LTD1.6 yr overdueJK BUILDCON · Indiranagar, NashikP51600035092· 90.9% built
- Shreement mauli1.5 yr overdueManishkumar R Zanwar · Bhagur Rural, NashikP51600010816· 48.2% built
- Shreemant Divine1.5 yr overdueManishkumar R Zanwar · Deolali (CB), NashikP51600012907· 90.9% built
- AMAR APEX1.5 yr overdueAmar Ventures · OPP. RACHANA VIDYALAYA, NashikP51600031753· filed Dec 2024 → now Mar 2025· 81.8% built
- Nayantara Presidency Phase 21.5 yr overduePancharatna Builcon Pvt. Ltd · Rajiv nagar, NashikP51600000079· filed Sept 2021 → now Mar 2025· 79.5% built· 1 complaint
- ASHAPURI NANDAN1.5 yr overdueRISHI BUILDERS AND DEVELOPERS · S NO 221/4B/4, NashikP51600032135· 31.8% built
- SHATAYU KARWA1.5 yr overdueGREEN CANOPY PROPERTIES LLP · Makhamalabad, NashikP51600033346· 90.9% built
- HARI VIJAY CO. OP. HSG. SOC. LTD1.5 yr overdueSIDDHIVINAYAK DEVELOPERS · DWARKA, NashikP51600048515· 90.9% built
- SHREENEELKANTH APARTMENT1.5 yr overdueSWAMI CONSTRUCTIONS · RAJIV NAGAR, NashikP51600045701· 90.9% built
- ALAMPAT BUSINESS CENTRE1.5 yr overdueKARTIK BUILDCON · COLLEGE ROAD, NashikP51600034684· 78.2% built
- TORNA1.5 yr overdueVASTUSHILP REALTY · ADGAON, NashikP51600050447· 81.8% built
- SHREE MURALIDHAR HEIGHTS1.5 yr overdueSHREE BUILDCON · ADGAON SHIWAR, NashikP51600047373· 90.9% built
- BRAHMA HEIGHTS1.5 yr overdueR S & CO · NASHIK, NashikP51600049647· 67.7% built
- SHIVSHANKAR APARTMENT1.5 yr overdueDATTA NIVRUTTI SHEJVAL · PIMPALGAON BAHULA SHIVAR, NASHIK, NashikP51600048646· 90.9% built
- DREAM RESIDENCY APARTMENT1.5 yr overdueDREAM BUILDTECH · ADGAON SHIWAR, NashikP51600033666· 90.9% built
- MAHADEV APARTMENT1.5 yr overdueUMIYAKRIPA BUILDCON · MHASRUL SHIWAR, NASHIK, NashikP51600047552· 90.9% built
- VEDEK GLORY1.5 yr overdueVEDEK BUILDCON · NASHIK SHIWAR, NashikP51600030503· 81.8% built
- Revati Sunanda Apartment1.5 yr overdueRevati Infra Engineers · Beside Namco Bank, Hanuman Wadi, NashikP51600046785· 81.8% built
- NILANJAN CRYSTAL1.5 yr overdueSANJAY MADHAVRAO BHAVSAR · CHINCHOLE SHIVAR, NashikP51600029266· 90.9% built
- VEDRAJ ELITE1.5 yr overdueSadguru Buildcon · TARWALA NAGAR, NashikP51600033270· filed Sept 2024 → now Apr 2025· 89.1% built· 1 complaint
- BAITUL HASAN APARTMENT WING - A1.5 yr overdueONYX CONSTRUCTIONS · MAUJE WADALA SHIWAR KHODE MALA NASHIK, NashikP51600029491· 90.9% built
- SAI RAJ1.5 yr overdueAnil Shankar Aher · RACCA GARDEN, NashikP51600026803· filed Apr 2024 → now Apr 2025· 80.5% built
- ROONGTA GRANDEZZA APARTMENT1.5 yr overdueROONGTA HOMES LLP · NASHIK, NashikP51600029147· 78.2% built
- BAITUL HUSSAIN APARTMENT WING - B1.5 yr overdueMEHREIN BUILDERS and DEVELOPERS · MAUJE WADALA SHIWAR KHODE MALA NASHIK, NashikP51600029511· 90.9% built
- Devdatta Apartment1.4 yr overdueAjay Madhavrao Mahajan And Makarand Sudhakar Puranik · Wadala Shivar, Nashik, NashikP51600047601· filed Jan 2024 → now May 2025· 90.9% built
- SHRIYA RESIDENCY1.4 yr overdueDHATINGAN ASSOCIATES · MAKHAMALABAD NASHIK, NashikP51600048985· 90.9% built
- SHREE RAM KRUSHNA HEIGHTS1.4 yr overdueKISAN SHIVRAM BALLAL · NASHIK, NashikP51600050495· 56.4% built
- The Exchange1.4 yr overdueViraj Estates Pvt. Ltd. & Others · Near Durga Garden, Besides NMC Building, Deolali, NashikP51600031795· 81.8% built
- MANSI RESIDENCY1.4 yr overdueSHRADDHA DEVELOPERS · PATHARDI SHIWAR NASHIK, NashikP51600051139· 90.9% built
- ASHAPURI GIRIJA1.4 yr overdueEKDANT DEVELOPERS · NASHIK, NashikP51600049826· 79.1% built
- SHREE SAMARTH HEIGHTS1.4 yr overdueSHRI SWAMI SAMARTH BUILDERS AND DEVELOPERS · NASHIK, NashikP51600052209· 81.8% built
- Welcome Co-Operative Housing Society Ltd.1.3 yr overdueWeclome Co-Operative Housing Society Ltd · Panchavati, NashikP51600048204· 90.9% built
- Ambika Harmony1.3 yr overdueAmbika Buildcon · Mayur Vihar Colony, NashikP51600045830· filed Jun 2024 → now Jun 2025· 78.2% built
- SAKAR PRIME1.3 yr overdueMUKTABEN PURUSHOTTAM NARODIA · Morade Nagar, Mhasrul Shivar, NashikP51600048611· filed Mar 2025 → now Jun 2025· 81.8% built
- Parksyde Homes Phase 5A1.3 yr overdueJaikumar Constructions LLP · Hanuman Nagar, NashikP51600004799· 89.1% built
- ATHARVA VANDAN1.3 yr overdueSIDDHIVINAYAK BUILDTECH · ADGAON, NashikP51600026106· 63.6% built
- SHREE RAM LALLA NIWAS APARTMENT1.3 yr overdueROONGTA HOMES LLP · NASHIK, NashikP51600045450· 78.2% built· 1 complaint
- SHREE SAI RESIDENCY1.3 yr overdueDHANDAI CONSTRUCTIONS BUILDERS and DEVELOPERS · GAVTHAN AREA SAMBHAJI CHOWK NR CARBON NAKA, NashikP51600030197· 90.9% built
- DA Mathura Residency1.3 yr overdueDA ASSOCIATES · Mhasrul, NashikP51600027338· 90.9% built
- GOVIND HEIGHTS APARTMENT1.3 yr overdueS S CONSTRUCTIONS · MAKHMALABAD SHIVAR SHANTI NAGAR PANCHVATI NASHIK, NashikP51600027872· 90.9% built
- Sarathi Heights1.3 yr overdueSAKET SANJAY SAYANKAR · Satpur, NashikP51600050717· 76.4% built
- MORYA RESIDENCY1.3 yr overdueSHRIRAM BUILDERS AND DEVELOPERS · NEAR ADITYA HALL, INDIRA NAGAR, NASHIK, NashikP51600033550· 90.9% built
- SHREENANDAN1.3 yr overdueSHREEYOG PROPERTIES · KATHE GALLI NASHIK, NashikP51600032910· filed Dec 2024 → now Jun 2025· 90.9% built
- MAHADEO SHRUSHTI1.3 yr overdueMAHADEO BUILDCON · NASHIK, NashikP51600049425· 82.3% built
- SAKAR PRIDE1.3 yr overdueOM DEVELOPERS · HIRAWADI, NashikP51600026720· 90.9% built
- PADMAVISHWA DREAM SQUARE1.2 yr overdueJAI PADMAVATI BUILDERS · MAUJE WADALA SHIWAR SHIVAJI NAGAR, NashikP51600022190· 90.9% built
- BALAJI PRIDE APARTMENT1.2 yr overdueSHREE BALAJI BUILDERS and DEVELOPERS · DHRUVA NAGAR NR MOTIWALA MEDICAL COLLEGE, NashikP51600030424· 90.9% built
- SHYAM AASHIRWAD1.2 yr overdueJAIDEEP VINODRAI TANK · PANCHAVATI, NashikP51600047309· 54.5% built
- SHYAM ANAND1.2 yr overdueHEENA SATISHBHAI CHAVDA · MAKHAMALABAD, NashikP51600049282· 81.8% built
- SULOCHANA PARK1.1 yr overdueANIL HIRAMAN RIKAME · NASHIK SHIWAR, NashikP51600028850· 6.4% built
- SHYAM ICON1.1 yr overdueRAMDEV CONSTRUCTION · NEAR RTO CORNER MERI, NashikP51600031542· 72.7% built
- KEYSTONE RESIDENCY APARTMENT1.0 yr overdueKEYSTONE DEVELOPERS · NASHIK SHIVAR, NashikP51600022554· 90.9% built
- KALASH PALACE C WING1.0 yr overdueSWASTIK ESTATES · NR. MSEB GODOWN, NashikP51600026544· 81.8% built
- ROONGTA PRECISO APARTMENT1.0 yr overdueROONGTA HOMES LLP · NASHIK, NashikP51600046804· 53.9% built· 3 complaints
- Jai Jinendra Apartment1.0 yr overdueH D DEVELOPERS · Mhasrul Shivar, NashikP51600048859· 61.8% built
- DHRUVA TOWER1.0 yr overdueAPURVA BUILDERS and DEVELOPERS · MAUJE GANGAPUR SHIWAR NR MOTIWALA MEDICLE COLLAGE, NashikP51600031244· 95.5% built
- OZONE1.0 yr overdueSURE DEAL MARKETING PVT LTD · VIMAL NAGAR OZAR NIPHAD NASHIK, NashikP51600031592· 81.8% built
- BUSINESS CAPITAL1.0 yr overdueRAM CONSTRUCTIONS · Wadala, NashikP51600023619· 81.8% built
- TEMPLE VIEW APARTMENT1.0 yr overdueFATTECHAND GHEVARCHAND BAGMAR · GULMOHAR NAGAR MHASRUL PANCHVATI NASHIK, NashikP51600048539· 90.9% built
- ASHIRWAD SYMPHONY APARTMENT11 mo overdueASHIRWAD BUILDWELL · OLD ADGAON NAKA PANCHVATI NASHIK, NashikP51600032197· 90.9% built
- SHREE VAIBHAV CLASSIC11 mo overdueDSJ GROUP · RANE NAGAR, NashikP51600049625· 90.9% built
- BALAJI RESIDENCY11 mo overdueSHREE BALAJI DEVELOPERS · NASHIK SHIWAR, NashikP51600045391· 81.8% built
- Samraat AmOzon11 mo overdueM/S Shweta Infrastructure & Housing (I) Pvt. Ltd. · Serene Meadows, NashikP51600023135· filed Nov 2024 → now Nov 2025· 89.1% built
- SHREE MURLIDHAR HEIGHTS10 mo overdueHARSHAL ANIL HANMANTE · MHASRUL, NashikP51600016397· 10% built
- SAI PUJA ROW HOUSES10 mo overdueVISHWAS CONSTRUCTION · MAKHMALABAD SHIWAR, NashikP51600025018· 90.9% built
- SAKAR VATIKA APARTMENT10 mo overdueMANISH PURSHOTTAM NARODIA · SWAMI SAMARTH NAGAR, NashikP51600031190· 81.8% built
- CUBOID URBAN TRADE CENTRE9 mo overdueUDAY KASHINATH GHUGE · NASHIK, NashikP51600021295· 81.8% built
- Tabeer Spaces9 mo overdueTabeer Properties · Royal Colony, NashikP51600023179· 90.9% built
- Atharva Heights9 mo overdueViva Highways Limited · Dasak Shiwar, NashikP51600015843· 90.9% built
- Reliable Commercial Complex9 mo overdueShree Balaji Developers · Nashik, NashikP51600052728· filed Dec 2024 → now Dec 2025· 72.7% built
- INDU HEIGHTS APARTMENT9 mo overdueMAULI BUILDERS · MANKAR NAGAR MAKHMALABAD PANCHVATI NASIK, NashikP51600025725· 90.9% built
- SHRIJEE RESIDENCY9 mo overdueValjibhai Mohanbhai Makwana · opp. maruti temple, NashikP51600024651· 9.1% built
- Verizon9 mo overdueBafna Realtors Pvt Ltd · Nashik, NashikP51600014206· 0% built
- Ashtavinayak Granduer9 mo overdueManisha Mahendrakumar Sharma · Serene Meadows, Anandwalli, NashikP51600051234· filed Dec 2024 → now Dec 2025· 90.9% built
- AATMAJ APARTMENT CO OPERATIVE HOUSING SOCIETY LIMITED9 mo overdueDMASS DEVELOPERS · MAHATMA NAGAR, NashikP51600048016· filed Dec 2024 → now Dec 2025· 61.4% built
- SHRI GANESH APARTMENT9 mo overdueANIL HIRALAL BHANDARI · MHASRUL, NashikP51600050646· 0.9% built
- SHAH S SADGURU RESIDENCY PHASE II9 mo overdueSHAH BUILDERS · CHEHADI PUMPING, NashikP51600047168· 72.7% built
- PURPLE AASHRAY APARTMENT9 mo overdueKIRAN JAYANTIBHAI PATEL · SATPUR, NashikP51600050208· 90.9% built
- VEDANT AARTI APARTMENT9 mo overdueVANDANA GORAKSHNATH MHASKE · MAUJE SINNAR - 1 SHIWAR, NashikP51600033600· 90.9% built
- V N PLEDGE APARTMENT9 mo overdueCENTURY BUILDERS and DEVELOPERS · MANEKSHA NAGAR, NashikP51600034299· 90.9% built
- ADVAIT APARTMENT9 mo overdueGRANDMARK SPACES · GOVIND NAGAR, NashikP51600048825· 81.8% built
- CHHATRAPATI CHAMBERS9 mo overdueSAI CONSTRUCTION · NR NAVAN CHAWL NASHIK ROAD CENTRAL JAIL ROAD NASHIK ROAD NASHIK, NashikP51600033617· 90.9% built
- Yogesh Co-Operative Housing Society9 mo overdueRavindra Developers Private Limited · Kulkarni Garden, NashikP51600048451· 90.9% built
- AASTHA RESIDENCY9 mo overdueMANOJ MADHUKAR TOSHNIWAL · TILAKWADI, NashikP51600034910· 90.5% built
- ROONGTA ELEGANTE APARTMENT9 mo overdueROONGTA LANDMARKS LLP · NASHIK, NashikP51600033975· 58.7% built· 5 complaints
- The Wellness Square9 mo overdueV Qube · Pathardi Phata, Nashik, NashikP51600045927· 50.5% built
- VASANTPUSHPA9 mo overdueKTG ASSOCIATES · INDIRANAGAR, NashikP51600049199· 90.9% built
- SHREE BHAGWATI CO-OP HSG SOCIETY9 mo overdueVINAY MAGANLAL KARNAVAT · BYTCO POINT, NashikP51600047578· 90.9% built
- PARKSYDE NEST PHASE-3A9 mo overdueJAIKUMAR CONSTRUCTIONS LTD · PANCHAVATI ANNEX, NashikP51600033065· 92.3% built
- BHAGYALAXMI SWARUP9 mo overdueBHAGYALAXMI BUILDERS AND DEVELOPERS · NEAR SOMESHWAR, GANGAPUR SHIWAR, NASHIK, NashikP51600030855· 90.9% built
- SAPTASHRUNGI TOWER9 mo overduePRAKASH AMBADAS DAGALE(HUF) · NASHIK, NashikP51600029748· 72.7% built
- Mirage Tower9 mo overdueUNITY CONSTRUCTIONS · Nashik, NashikP51600046828· 72.7% built
- OM TRYAMBAK PLAZA9 mo overdueANITA PRALHAD KESKAR · VASAN NAGAR, NashikP51600029012· 90.9% built
- SANSKAR PRIDE9 mo overdueLAXMAN EKNATH GOMASE · GIRIDHAR NAGAR PATHARDI PHATA NASHIK, NashikP51600032398· 90.9% built
- BELLE VUE ISLE9 mo overdueBELLE VUE INFRA · GOVIND NAGAR, NashikP51600047823· 47.3% built
- Shreeji Residency9 mo overdueSUGAM KISHOR CHANIYARA · Avdhoot Colony, NashikP51600033874· 90.9% built
- Rushi Hans9 mo overdueAnkur Chaturbhai Rakholiya · Aanandwalli, Chandshi, NashikP51600033251· 9.1% built
- NEELKANTH HEIGHTS9 mo overdueYATIN ANNASAHIB WANI · HIRE NAGAR, NashikP51600034435· 89.5% built
- KAMAL ELITE9 mo overdueKAMAL BUILDTECH · PATHARDI, NashikP51600034336· 81.8% built
- RIVANSH AVENUE9 mo overdueAKSHAY SUBHASH KOTHAWADE · UNTWADI NASHIK, NashikP51600032092· 81.9% built
- KESAR CLASSIC9 mo overdueKESAR INFRASPACES LLP · Anand Nagar, Nashik Road, NashikP51600054090· 56.8% built
- SWAPNAPURTI APPARTMENT9 mo overdueAVHAD BUILDERS AND DEVELOPERS LIMITED · SAIKHEDA, NashikP51600049930· 90.9% built
- MADHAV PRIDE9 mo overdueFourth Dimension Properties · ADGAON, NashikP51600034272· 90.9% built
- Casa Bella Homes9 mo overdueJayashri Chintaman Patil · Balwant Nagar, Behind Wisdom High School, NashikP51600048790· 56.8% built
- Aurum Apartment9 mo overdueLahoti Builders And Developers · Lahoti Nagar, NashikP51600046156· 90.9% built· 1 complaint
- Tapovan Orchid9 mo overdueRUDDHI BUILDCON PVT. LTD. · Dwarka, NashikP51600047487· 69.5% built
- SHREEMALHAR APARTMENT9 mo overdueSHREESWAMI CONSTRUCTIONS · GANGAPUR ROAD, NashikP51600048639· filed Dec 2024 → now Dec 2025· 90.9% built
- JAY PRAKASH CO. HSG. SOCIETY9 mo overdueJ B DEVELOPERS · NASHIK ROAD, NashikP51600049535· 90.9% built
- Kamlaba Business Avenue9 mo overdueKashibas Infratech · Gole Colony, NashikP51600052647· 43.6% built
- YASH PRIME9 mo overdueSHAHSIKANT YASHWANT TARGE · SHIVAJI NAGAR, NashikP51600045511· 88.6% built
- SHIVNERI RESIDENCY9 mo overdueNice Home · PATOLE MALA, NASHIK ROAD, NashikP51600048370· 90.9% built
- ABD PRIDE9 mo overdueANUP BUILDERS & DEVELOPERS · NEAR RTO OFFICE, NashikP51600048494· 90% built
- Samarth Elegance9 mo overdueADARSH BUILDERS AND DEVELOPERS · Nr. Jawhar Hospital, NashikP51600029252· 10.4% built
- NIKETAN CLASSIC9 mo overdueNIKETAN INFRA · NEAR MAHATMA NAGAR SATPUR, NashikP51600033592· 90.9% built
- HIGHNESS PLAZA8 mo overdueEKANTA CONSTRUCTION · NASHIK, NashikP51600048571· filed Jan 2025 → now Jan 2026· 63.6% built
- Nirmal Park8 mo overdueNirmal Samruddhi · Nandanvan Lawns, NashikP51600053417· 86.8% built
- VIHAAN GLORY APARTMENT7 mo overdueTIRUPATI BUILDCON · NEAR HINDI SCHOOL MAUJE PIMPALGAON BAHULA SHIWAR, NashikP51600047757· 90.9% built
- SHYAM AURA7 mo overdueMADHUBHAI VITHTHALBHAI VAGHELA · NASHIK, NashikP51600049765· 44.5% built
- TULSI VANDAN7 mo overdueTULSI CONSTRUCTION · Nashik (M Corp.), NashikP51600007665· 90.9% built
- Padma Vishwa Mangalam7 mo overdueMangalmurti Builders · Navshya Ganpati, Sector C, NashikP51600051326· 88.6% built
- Indu Park7 mo overdueSONAWANE INFRA · Eknath Nagar, NashikP51600049869· filed Mar 2024 → now Mar 2026· 90.9% built
- HARIOM ENCLAVE6 mo overdueHARIOM GROUP · KSHIRSAGAR COLONY, NashikP51600051993· 77.3% built
- NISHIGANDH APARTMENT6 mo overdueC B CONSTRUCTION · KAMATWADE, NashikP51600045379· 90.9% built
- Daffodil6 mo overdueRajendra Harikishan Dhawan · Off Ganpapur Road, NashikP51600052382· 81.8% built
- LOTUS RESIDENCY6 mo overdueLOTUS INFRA · LAMKHEDE MALA, NashikP51600046349· 90.9% built
- PARAM LUXURIA6 mo overduePARAM INFRASPACE · BEHIND JAIN MANDIR ADGAON, NashikP51600053436· 48.2% built
- Hari Sanskruti Phase I6 mo overdueDHARAN INFRA-EPC LIMITED · Deolali, NashikP51600001194· filed Sept 2020 → now Mar 2026· 84.5% built
- SAMRUDDHI VILLA6 mo overdueSANSKAR BUILDERS AND DEVELOPERS · NASHIK, NashikP51600078888· 74.5% built
- RENUKA POOJA APARTMENT6 mo overdueA K INFRA · PATHARDI PHATA, NashikP51600046005· 90.9% built
- UMIYA VIJAY APARTMENT6 mo overdueIMPERIAL REALTY · NEAR BALI MANDIR, PANCHAVATI, NashikP51600047270· 49.1% built
- Sunrise Apartment6 mo overduePurushottam Naran Patel · Mane Nagar, NashikP51600047549· 81.8% built
- MAHALAXMI VRUNDAVAN6 mo overdueSHREE MAHALAXMI CONSTRUCTION · NASHIK, NashikP51600048721· 81.8% built
- SAMRUDDHI PARK6 mo overdueDG INFRA · DHATRAK PHATA, NashikP51600031113· 81.8% built
- NILKANTH HEIGHTS APARTMENT6 mo overdueVINAYAK INFRA · PRASHANT NAGAR, NashikP51600048774· 90.9% built
- SAI CHHAYA APARTMENT6 mo overduePM BUILDERS AND DEVELOPERS · KALASKAR NAGAR, NEAR TRIKONI BUNGLOW, NashikP51600050145· 49.1% built
- ROONGTA FUTUREX APARTMENT5 mo overdueROONGTA LANDMARKS LLP · NASHIK, NashikP51600029167· 81.8% built· 18 complaints
- Jeevan Anand5 mo overdueReal Buildcon · Mhasrul, NashikP51600045594· 81.8% built
- PadmaVishwa BusinessHub5 mo overdueSiddhi Construction · Adwait Colony, NashikP51600027405· 90.9% built
- Akruti Co-operative Housing Society Limited4 mo overdueSPITI CONSTRUCTION PRIVATE LIMITED · Nashik, NashikP51600052998· 73.6% built
- THE SIGNET4 mo overdueKRISHNA POOJA BUILDCON · GAIKWAD NAGAR, NashikP51600029475· 49.1% built
- TULSI NIRVANA APARTMENT4 mo overdueTULSI CONSTRUCTION · NASHIK, NashikP51600034546· 68.2% built
- YOGESHWAR VANDAN4 mo overdueYOGESHWAR PROPERTIES · Nashik Road, NashikP51600004876· 90.9% built
- THE EMPIRE3 mo overdueBHAVIK & SARAF VENTURES · Tilakwadi, NashikP51600025617· 77.3% built
- PARKSYDE NEST PHASE - 33 mo overdueJAIKUMAR CONSTRUCTIONS LTD · [ANCHAVATI ANNEX, NashikP51600025687· 97.4% built
- Sunrise Tower3 mo overdueAkshay Vinod Tatiya And Pratik Prakash Badgujar · Nashik, NashikP51600045705· filed Dec 2025 → now Jun 2026· 72.7% built
- Vanraj Flora3 mo overdueABHIJIT VAMANRAO PATIL · Gangapur Road, NashikP51600033720· 72.7% built
- PUSHKRAJ NAKSHATRA3 mo overduePUSHKRAJ BUILDCON · Satpur, NashikP51600052964· 81.8% built
- Gurudeep Apartment3 mo overdueANUP BUILDCON · NASHIK ROAD, NashikP51600053395· 84.1% built
- VRAJ LIFE SPACE3 mo overdueSHREE INFRA PROJECT · MAKHAMALABAD SHIVAR PETH ROAD, NEAR APMC MARKET, NashikP51600026362· 81.8% built
- CELESTIA APARTMENT3 mo overdueSHRI VRINDAVAN BUILDERS & DEVELOPERS LLP · DWARKA, NashikP51600027562· 58.7% built
- Vishakha Co Op Hsg Society3 mo overdueVISHAKHA CHS LTD · Opposite Vasant Market, NashikP51600047219· 73.6% built
- Madhav Heights3 mo overdueKapse Developers · Vidhate Nagar, NashikP51600030695· 90.9% built
- PUSHTI ARCADE3 mo overduePUSHTI DEVELOPERS · Neat Swiss trafalgar pathardi phata, NashikP51600046887· 81.8% built
- Mahalaxmi Heights2 mo overduePrashant Genu Pagar · Ojhar, NashikP51600053630· 81.8% built
- New Jasmine Apartment Co Op Hsg Soc2 mo overdueR K Engineers & Developers · Gangapur Road, NashikP51600031621· 90.9% built
- Vastu Avenue2 mo overdueApurva Builders & Developers · Dhruv Nagar, NashikP51600051304· filed Apr 2025 → now Aug 2026· 72.7% built
- STAR LINE1 mo overdueDEEPAK KALYANJI CHANDE · NEAR TRACTOR HOUSE, NashikP51600013960· filed Sept 2019 → now Aug 2026· 49.1% built
- DATTA PREM APARTMENT1 mo overduePREMCHAND NIMBAJI PATIL · JAIL ROAD NASHIK ROAD NASHIK, NashikP51600050475· filed Aug 2025 → now Aug 2026· 81.8% built
- Mohan Residency1 mo overdueDayma Builders and Developers · New Mhasoba Mandir, Nashik, NashikP51600052380· filed Dec 2025 → now Sept 2026· 81.8% built
- Mahaveer Heights1 mo overdueMahaveer Builders and Developers · Nashik, NashikP51600034067· filed Dec 2025 → now Sept 2026· 81.8% built
- RUDRANSH PARK0 mo overdueASHOK SHIVNARAYAN LADDHA · OZAR, NashikP51600045916· filed Sept 2025 → now Sept 2026· 89.1% built
- Shreejis Gujral Arcade0 mo overdueSHREEJI LIFE SPACE · Dwarka, Nashik, NashikP51600034337· filed Mar 2026 → now Sept 2026· 99.5% built
- AVANEESH0 mo overdueSUYASH DEVELOPERS · KATHE GALLI DWARAKA, NashikP51600023817· filed Dec 2023 → now Sept 2026· 86.8% built
- ANANDVANN PHASE II0 mo overdueANAND KHATTAR · GONDE PHATA, NashikP51600023766· filed Dec 2024 → now Sept 2026· 19.5% built
- VALENCIA RIVERSIDE APARTMENT0 mo overdueVINAYAKA BUILDERS · Gangapur Road, NashikP51600034969· filed Mar 2026 → now Sept 2026· 86.8% built
- AARADHANA RESIDENCY - B0 mo overdueA C JAIN BUILDERS AND DEVELOPERS LLP · OPP GOPAL NAGAR, NashikP51600025163· filed Dec 2022 → now Sept 2026· 81.8% built
- VRAJ SAMARTH0 mo overdueDHAIRYA DEVELOPERS · INDIRA NAGAR, NashikP51600048496· 81.8% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.