Delayed projects in Pune
3,375 MahaRERA-registered projects in Pune are past the possession date on file and still under 100% built. Where the promoter has formally revised the date, the original is shown alongside so you can see what changed.
Page 4 of 17
- Durvankur Apartment7.6 yr overdueVinayak Developers · Haveli, PuneP52100000784· 81.8% built
- ELEMENTA7.6 yr overdueAKSHAR LAND DEVELOPERS PRIVATE LIMITED · Tathwade, PuneP52100002903· 89.1% built
- MANGAL VATIKA7.6 yr overdueUMA CONSTRUCTION · Pimpri Chinchawad (M Corp.), PuneP52100005578· 90.9% built
- SHIVANK7.6 yr overdueNABAR ASSOCIATES · Pune City, PuneP52100009452· filed Dec 2017 → now Dec 2018· 90.9% built
- DNV ARCELIA PH 27.6 yr overdueDNV REALTY · Pimpri Chinchawad (M Corp.), PuneP52100003478· 67.4% built
- KOHINOOR BLISSPARK7.6 yr overdueKOHINOOR PROPERTIES · CHAKAN, PuneP52100007557· filed Jun 2018 → now Dec 2018· 53.2% built· 1 complaint
- SAHYADRI VISHWA B7.6 yr overdueSAHYADRI VISHWA ASSOCIATES · Haveli, PuneP52100011836· 90.9% built
- BABAR SOLANKI RESIDENCY7.6 yr overdueBABAR AND ASHA DEVELOPERS · Mulshi, PuneP52100010774· 68.4% built
- SAI VRINDAVAN7.6 yr overdueMARUTI SAYABANNA Mehetre · Haveli, PuneP52100008093· 89.1% built
- PANACHE7.6 yr overdueTRIMURTI SAI NATH INFRAS LLP · Katraj, PuneP52100005287· 54.6% built
- Tara City7.6 yr overdueNilesh Shivjee Singh · Haveli, PuneP52100009317· 62.4% built· 24 complaints
- P SQUARE PHASE 27.6 yr overdueVIJAY CONSTRUCTION NX · Pimpri Chinchawad (M Corp.), PuneP52100006015· 48.3% built
- ATHASHRI BANER COMMERCIAL7.6 yr overduePARANJAPE SCHEMES (CONSTRUCTION) LTD · Baner, PuneP52100002667· filed Dec 2017 → now Dec 2018· 81.8% built
- PAVILLION RESIDENCY7.6 yr overdueAPEX DEVELOPERS · Mahalunge, PuneP52100006615· 63.6% built
- VENKATESH GRAFFITI PHASE 27.6 yr overdueSHREE VENKATESH BUILDCON PVT LTD · KESHAVNAGAR MUNDHWA, PuneP52100001007· 90.9% built
- SPOT 97.6 yr overdueRAMNIKLAL GOPAL GANGANI · Wadagaon (CT), PuneP52100006534· 90.9% built
- Yashada Residency7.6 yr overdueAgresar Construction · Daund, PuneP52100002610· 37.2% built
- Kohinoor Shangrila Phase I7.6 yr overdueKOHINOOR PROPERTIES · PIMPRI, PuneP52100011483· filed Dec 2017 → now Dec 2018· 90.9% built· 1 complaint
- Atria Business Center7.6 yr overdueAtria Developers · Baramati (M Cl), PuneP52100001547· 81.8% built
- NARAYAN OCTAVE7.6 yr overdueANIL RATANLAL AGRAWAL · Nanekarwadi (CT), PuneP52100001806· 90.9% built
- Vaishnav Residency7.6 yr overdueVaishnav Residency · Haveli, PuneP52100000750· filed Mar 2018 → now Dec 2018· 90.9% built
- Skyi Songbirds Phase A7.6 yr overdueEnerrgia Skyi Developers · Bhugaon, PuneP52100000769· 98% built· 6 complaints
- SHREERAM LOTUS7.6 yr overdueR G Developers · LOHGAON, PuneP52100008339· 18.2% built
- Quadream Residences Phase 1 Bldg C D and Common Amenities7.6 yr overdueGAGAN SHARDA DEVELOPERS · Undri, PuneP52100001996· 81.8% built
- DIVYA SHANTI7.6 yr overdueAnand Properties · Sus, PuneP52100006485· 90.9% built
- TIERRA7.6 yr overdueTERRA PROPERTY · WAGHOLI, PuneP52100006109· 90.9% built
- Samyak Residency7.6 yr overdueSahebrao Dagdu Kharat · Near Chitale Bandhu Shop, PuneP52100015334· 81.8% built
- PLATINUM7.6 yr overdueRohit Infra · KALA KADAK, PuneP52100016424· 90.9% built
- Sai Nisarg7.6 yr overdueHemant Audumber Padule · Haveli, PuneP52100003763· 34.1% built
- Vishnu Greens7.6 yr overdueKeran Nanasaheb Waghere · Pimpri Chinchawad (M Corp.), PuneP52100004834· 81.1% built
- ROHAN ABHILASHA BUILDING C7.6 yr overdueROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED · WAGHOLI, PuneP52100000483· 90.9% built
- Capital City7.6 yr overdueGDS Buildcon Private Limited · Nighoje, PuneP52100004342· 70.8% built· 1 complaint
- MONTECITO PHASE I - D BUILDING PART 27.6 yr overdueAmit Vastu Ventures LLP · Parvati, PuneP52100008717· 86.9% built· 16 complaints
- SHEVANTA ENCLAVES7.6 yr overdueP.S.PROMOTERS AND DEVELOPERS · Haveli, PuneP52100008941· 84.1% built
- Adhya Rohan7.6 yr overdueADHYA PROPERTIES · Ambegaon, PuneP52100001122· 60.6% built
- Ekunj Residency7.6 yr overdueMadhuban Infracon and Developers · Pune (CB), PuneP52100002630· 81.8% built
- DREAM MAX7.6 yr overdueMOZE PROPERTIES · LOHGAON, PuneP52100010600· 90.9% built
- VARDHAMAN VILLA7.6 yr overdueVINOD PREMCHAND JAIN · Pune City, PuneP52100003372· 63.5% built
- ROHAN KRITIKA WINGS A C7.6 yr overdueROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED · Pune (M Corp.), PuneP52100000486· 76.4% built
- RAHUL EASTVIEW I7.6 yr overdueRAHUL CONSTRUCTIONS · HANDEWADI ROAD, PuneP52100000845· 56.4% built· 1 complaint
- SHARAYU CLASSIC7.6 yr overdueANIL GULABRAO PAWAR · Pune City, PuneP52100001503· 63.6% built
- AISHWARYA RESIDENCY7.6 yr overdueVYAS BUILDCON PVT. LTD. · Baner, PuneP52100002455· filed Mar 2018 → now Dec 2018· 72.4% built
- NIRMAN VIVA7.6 yr overdueNIRMAN HOMES · Ambegaon Budruk, PuneP52100006918· 56.4% built
- Sai Kunj Phase 27.6 yr overdueShree Saidatta Associates · Chikhali, PuneP52100011033· 90.9% built
- Varad Vinayak Vrundavan7.6 yr overdueOM SAI DEVELOPERS · CHARHOLI, PuneP52100013217· 38.2% built
- Golden Trellis A Building7.6 yr overdueGolden Trellis Developments · Baner, PuneP52100007351· 77.7% built· 2 complaints
- MSR REGENCY7.6 yr overdueBhandari Infrastructure & Construction Development Pvt. Ltd. · Pune (M Corp.), PuneP52100004593· filed Jul 2018 → now Dec 2018· 90.9% built
- RATNAPADMA7.6 yr overdueANGAL & CO · Sheela Vihar Colony, PuneP52100000527· 81.8% built
- Yashwin E,F,G7.6 yr overdueVilas Javdekar Eco Homes · Sus, PuneP52100000775· 90.9% built
- QUEENSLAND7.6 yr overdueMOTI UDHARAM PANJABI · Moshi-Boradewadi, PuneP52100001606· 86.5% built
- SKY VIEW PH 17.6 yr overdueM D CONSTRUCTIONS · Pune (M Corp.), PuneP52100010942· filed Dec 2017 → now Dec 2018· 90.9% built
- MARVEL ARCO B BUILDING7.6 yr overdueMARVEL SIGMA HOMES PRIVATE LIMITED · Hadapsar, PuneP52100008708· 75.9% built· 4 complaints
- DELTA RACHANA7.6 yr overdueDELTA RACHANA · Pimpri Chinchawad (M Corp.), PuneP52100013828· 32.7% built· 1 complaint
- DS VRINDAVAN PHASE II7.6 yr overdueDSP DEVELOPERS · DHANORI, PuneP52100016171· 76.4% built
- SHUBHANGAN PHASE I7.6 yr overdueVenkateshwara Gangotree Associates · Pirangut, PuneP52100004294· 86.4% built
- STAR CITY B WING7.6 yr overdueAmar Builder and Promoters · Khed, PuneP52100013488· 81.8% built· 1 complaint
- Kunal Aspiree Phase II7.6 yr overdueKunal Spaces Pvt Ltd · Balewadi, PuneP52100001814· 90.9% built
- TERRAZA7.6 yr overduesanskruti city space · Baner, PuneP52100006921· filed Dec 2017 → now Dec 2018· 90.9% built· 1 complaint
- SAIRAJ COMPLEX7.6 yr overdueSHOBHA ATUL BALGUDE · Baramati (M Cl), PuneP52100003625· 33.3% built
- NIRMANA ENCLAVE7.6 yr overdueNIRMANA DEVELOPERS · Pimpri Chinchawad (M Corp.), PuneP52100001680· 90.9% built
- STARGAZE7.6 yr overdueKOLTE-PATIL DEVELOPERS LIMITED · Bavadhan BK, PuneP52100009722· 90.2% built· 1 complaint
- RICH WOODS7.6 yr overdueJAGRUTI PROMOTORS · Bhosari, PuneP52100004375· 81.8% built
- CHRISHH ARCH7.6 yr overdueARCH SPACES · MAVAL, PuneP52100008996· 90.9% built
- SHAMA NISARG RESIDENCY7.6 yr overdueAPPLE BUILDERS AND DEVELOPERS · Talegaon Dabhade (R), PuneP52100001415· 68.2% built
- VEDANT PINAKIN7.6 yr overdueVEDANT BUILDERS · MANJARI Bk, PuneP52100009780· 65.5% built
- THE RESIDENCES7.6 yr overdueOXFORD GOLF AND RESORTS PRIVATE LIMITED · Lavale, PuneP52100003843· 56.4% built· 1 complaint
- SANSKAR SAMRUDDHI7.6 yr overdueSANSKAR SAMRUDDHI · Haveli, PuneP52100005048· 90.9% built
- Legacy Urbania7.6 yr overdueLegacy Homes · near Pune Ville, PuneP52100000804· 90.9% built
- Samarth Vishwa7.6 yr overdueSHREE SAMARTH DEVELOPERS · AMBEGAON Bk, PuneP52100010501· 70.8% built
- ZELAM7.6 yr overdueDARODE JOG BUILDERS Pvt Ltd · Pune (M Corp.), PuneP52100003665· 53.6% built
- Anika Mangalam7.6 yr overdueArun Sheth Properties · Pune City, PuneP52100002636· 90.9% built
- Palaash Icon Phase 17.6 yr overdueG S PROMOTERS · Chinchwad, PuneP52100001017· 90.9% built
- Ozarde Residency7.6 yr overdueOnkar Developers · Baramati (M Cl), PuneP52100007697· 80% built
- Vertical Oriana Phase I7.6 yr overdueVertical Infra · Mundhwa, PuneP52100003700· 51.5% built· 1 complaint
- Waheguru Dreams7.6 yr overdueWaheguru Developers · Pimpri Chinchawad (M Corp.), PuneP52100013093· filed Dec 2017 → now Dec 2018· 61.1% built
- INSIGNIA - PHASE II7.6 yr overdueM/s. K N ASSOCIATES · Baner, PuneP52100011802· 64.8% built
- SAISINDHU AVENUE7.6 yr overdueRAJESH CHAVAN · Kamshet, PuneP52100013944· 90.9% built
- SONAI PARK7.6 yr overdueRELIVE INFRASTRUCTURE · SONAI TEMPAL, PuneP52100010027· 65.5% built
- GREEN HIVE B17.6 yr overdueRAM INDIA SHELTERS · Haveli, PuneP52100002453· 81.8% built
- 7 Avenues7.6 yr overdueSai Innovision Associates · Baner, PuneP52100004977· 56.2% built
- SHREE GANESH GALAXY7.6 yr overdueMUKESH GOYAL DEVELOPERS PRIVATE LIMITED · PUNE, PuneP52100011096· 83.6% built
- Aum Apartment7.6 yr overdueDRS Constructions LLP · WAGHOLI, PuneP52100011615· filed Dec 2017 → now Dec 2018· 90.7% built
- RAJESH EAST ENIGMA7.6 yr overdueRAJESH DEVELOPERS · Haveli, PuneP52100007846· filed Mar 2018 → now Dec 2018· 81.8% built
- Swapnanagari Phase 17.6 yr overdueSANJAY DNYANOBA JAGTAP · Sasvad (M Cl), PuneP52100002791· 87.3% built
- Samarth Residency7.6 yr overdueYashoda Ashok Kalbhor · Pimpri Chinchawad (M Corp.), PuneP52100014173· 29.4% built
- Vrundavan Homes Wing A7.6 yr overduePrapti Spaces · Alandi Rural, PuneP52100005873· 81.4% built
- CLOUD 117.6 yr overdueSAINATH DEVELOPERS · charholi kh, PuneP52100007087· 90.9% built
- CHRISHH VASANT7.6 yr overdueCHRISHH HOLDINGS · TALEGAON DABHADE, PuneP52100008617· 90.9% built
- Salvia7.6 yr overdueGurudevelopers · Bhosari, PuneP52100007723· 90.9% built
- SHASHWAT RESIDENCY7.6 yr overdueDAULAT PANDURANG BHONDVE · Pimpri Chinchawad (M Corp.), PuneP52100006985· 90.9% built
- Jadhav Complex7.6 yr overdueDisha Constructions · Wadagaon (CT), PuneP52100010809· 69.1% built
- THE BLUE PLAQUES7.6 yr overdueBLUEBERRY DEVELOPERS · Somatane, PuneP52100000688· 90.9% built
- ASMANT7.6 yr overdueKULKARNI SCHEME · Sus, PuneP52100006724· 90.9% built
- Durvankur Srushti7.6 yr overdueDurvankur Vastunirmiti Private Limited · NARHE, PuneP52100010911· 89.5% built
- PEARL RESIDENCY7.6 yr overdueSHREE SAMARTH DEVELOPERS · Pimpri Chinchawad (M Corp.), PuneP52100004979· 61.5% built
- BALAJI INFINITY7.6 yr overdueBalaji Infinity · Baner, PuneP52100004356· 90.9% built· 1 complaint
- BHAKTI GULMOHAR7.6 yr overdueMEGHASWANA INFRA · Talegaon Dabhade (M Cl), PuneP52100002983· 45.5% built
- SHANTAI RESIDENCY7.6 yr overdueJSJ BUILDERS AND DEVELOPERS · Haveli, PuneP52100003599· 36.8% built
- SPRING HEIGHTS7.6 yr overdueSHRI GANESH DEVELOPERS · AMBEGAON Bk, PuneP52100003315· 75% built
- VISHWESHWAR NAGAR PHASE - 17.6 yr overdueM/S. VISION GROUP · ALANDI, PuneP52100006647· 81.8% built
- Golden Trellis F and G7.6 yr overdueGolden Trellis Developments · Baner, PuneP52100006717· 85.2% built
- Sai Pearl Phase 17.6 yr overdueSSD PROMOTERS AND BUILDERS · Pimpale Saudagar, PuneP52100001207· 89.2% built
- ARUN APARTMENT7.6 yr overdueZINNIA SPACES PVT LTD · Pune (M Corp.), PuneP52100002034· 65.6% built· 2 complaints
- GLOBAL SQUARE7.6 yr overdueGlobal Square Realty LLP · Pune City, PuneP52100005129· 63.2% built
- Aayush Park II7.6 yr overdueEarnest and Shah Ventures · Varale, PuneP52100000222· 81.8% built
- VENKATESH LAKE ORCHID7.6 yr overdueSHREE VENKATESH BUILDCON PVT LTD · AMBEGAON KHURD, PuneP52100000977· 86.4% built
- PANACHE7.6 yr overdueSHREE MAHALAXMI DEVELOPERS · Pune City, PuneP52100008087· 70.9% built
- JAYSHREE APARTMENTS PHASE I7.6 yr overdueARCHWAY PROPERTIES · NEW SADASHIV PETH, PuneP52100005789· 90.9% built
- MOTA PARADISE7.6 yr overdueRAMANIK RAMJI MOTA · Baramati (M Cl), PuneP52100010625· 90.9% built
- DNV ARCELIA PH 37.6 yr overdueDNV REALTY · Pimpri Chinchawad (M Corp.), PuneP52100013972· 79.6% built
- Ayush Park7.6 yr overdueShubhankar Developers · Talegaon Dabhade (M Cl), PuneP52100012062· 90.9% built
- HARIT DEVELOPERS7.6 yr overdueHARIT DEVELOPERS · RAHATNI, PuneP52100003855· 90.9% built· 2 complaints
- ORIENT PALACE7.6 yr overdueBOKHARA BUILDTECH · Haveli, PuneP52100013287· 90.9% built
- OM SIDDHI7.6 yr overdueRamesh Baliba Karanjawane · Haveli, PuneP52100012876· 70.9% built
- Tarangana Nakshatra7.6 yr overdueTarangana Nakshatra · Hadapsar, PuneP52100008669· 49.3% built
- GANESH ORCHID7.6 yr overdueEKDANTA NEST LLP · Haveli, PuneP52100004941· 45.5% built
- Marvel Fuego7.6 yr overdueMARVEL REALTORS AND DEVELOPERS LTD · Hadapsar, PuneP52100006192· 86.4% built· 5 complaints
- ROHAN ABHILASHA BUILDING E7.6 yr overdueROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED · WAGHOLI, PuneP52100000832· 90.7% built· 3 complaints
- Nirman Ajinkyatara7.6 yr overdueNIRMAN DEVELOPERS · Ambegaon Budruk, PuneP52100002423· 72% built· 1 complaint
- Snehalbaug Co-operative Housing Society Limited7.6 yr overdueKelkar Pinnac Housing LLP · Parvati, PuneP52100004563· 50.9% built
- Shri Sai Palace7.6 yr overdueAbhijit Madhukar Jagtap · Saswad Rural, PuneP52100005801· 16.7% built
- TATHASTU7.6 yr overdueBALASAI ASSOCIATES · Mawal, PuneP52100001658· 81.8% built
- MARVEL ARCO E BUILDING7.6 yr overdueMARVEL SIGMA HOMES PRIVATE LIMITED · Hadapsar, PuneP52100007022· 96.8% built· 3 complaints
- ONELLA-27.6 yr overdueNimhan Associates · Sus, PuneP52100007329· 56% built
- PRISTINE AAKANKSHA7.6 yr overdueSACHIN ISHWARCHAND GOYAL · Bakori, PuneP52100001896· 72.7% built
- OPTIMA HEIGHTS B BUILDING7.6 yr overdueAVNEE AND VEDA ASSOCIATES · Kesnand, PuneP52100006655· 68.2% built
- AISHWARYA LAXMI7.6 yr overdueOM SIDDHAKALA ASSOCIATES · WAGHOLI, PuneP52100005746· filed Dec 2017 → now Dec 2018· 90.9% built
- Shree Ganesh Residency7.6 yr overdueAV Associates · TALEGAON, PuneP52100005787· 90.9% built
- Ozarde Complex7.6 yr overdueOnkar Developers · Baramati (M Cl), PuneP52100009428· 80% built
- RIVER BREEZE7.6 yr overduePUSHPA DEVELOPERS · Pimpri Chinchawad (M Corp.), PuneP52100013499· filed Dec 2017 → now Dec 2018· 80.9% built
- Shatavari Apartments7.6 yr overdueWAGHOLIKAR ASSOCIATES · Jalochi, PuneP52100001138· 69.1% built
- Siyona Phase - I7.6 yr overduePETHKAR PROJECTS · Punawale, PuneP52100000155· 89.1% built· 1 complaint
- SAHADU CONSTRUCTION CO.7.6 yr overdueSAHADU CONSTRUCTION CO · Khed, PuneP52100012673· 72.7% built
- Basil Park A and B Wing7.6 yr overdueM/s Yogesh Enterprises · Haveli, PuneP52100002663· 81.8% built
- DNV ARCELIA PH 17.6 yr overdueDNV REALTY · Pimpri Chinchawad (M Corp.), PuneP52100001934· 90.5% built
- PATIL HILL VIEW7.6 yr overdueP.S.CONSTRUCTIONS · Hadapsar, PuneP52100005848· 75% built
- DWARKA PROJECT 17.6 yr overdueNAIKNAVAREHOUSINGDEVELOPEMENTSPVTLTD · CHAKAN, PuneP52100000164· 76% built
- Sun Exotica Phase 17.6 yr overdueJindal Mittal Graha Nirman Pvt. Ltd. · -, PuneP52100001696· 85.5% built
- GRACE RESIDENCY7.6 yr overdueNimhan Developers · Pune (M Corp.), PuneP52100009942· 82.3% built
- SILVER HEIGHTS7.6 yr overdueTITANIC PROMOTERS AND DEVELOPERS · Mawal, PuneP52100002577· 36.4% built· 1 complaint
- INDRAPRASTHA7.6 yr overdueVARDHAMAN BUILDCON · Kusgaon Bk. (CT), PuneP52100011073· 47.3% built
- PARK EXPRESS PHASE II7.6 yr overduePARK EXPRESS JOINT VENTURE · BALEWADI, PuneP52100000939· 68.8% built· 4 complaints
- SAIYOG RESIDENCY7.6 yr overdueBHOSALE CREATIONS · Haveli, PuneP52100000318· 40.9% built
- BALAJI EMPIRE7.6 yr overdueAAKAR DEVELOPERS · Pimpri Chinchawad (M Corp.), PuneP52100001661· filed Mar 2018 → now Dec 2018· 72.7% built
- SAI LEELA7.6 yr overdueJADHAV DEVELOPERS · Pune City, PuneP52100004397· 81.4% built
- ROHAN ABHILASHA BUILDING A7.6 yr overdueROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED · WAGHOLI, PuneP52100000471· 88.8% built· 3 complaints
- KUSHAL SAGAR GALAXY7.6 yr overdueKUSHAL SAGAR BUILDERS · Shewalewadi, PuneP52100004886· 90.9% built
- Shriniwas Aangan7.6 yr overduePoonam Nilesh Shedge · Haveli, PuneP52100007136· 81.8% built
- Green County Phase II Wing-C7.6 yr overdueAnand Developers · Fursungi, PuneP52100011772· 82.7% built
- Siddhivinayak Angan7.6 yr overdueSiddhivinayak Developers · Daund, PuneP52100001701· 90.9% built
- AASTHA7.6 yr overdueRADHE DEVELOPERS · Haveli, PuneP52100014227· 55.1% built
- CERATEC CITY PHASE I PART 27.6 yr overdueCERATEC CONSTRUCTION · YAWALEWADI, PuneP52100001332· 90.9% built
- Kingston Serene B1 Building Phase 17.6 yr overdueVedant Realtors · Handewadi, PuneP52100006952· 90.9% built· 1 complaint
- GANRAYA PLAZA7.6 yr overdueVASANT VISHNU BANKHELE WITH ATUL BALIRAM THORAT ASSOCIATION OF PERSONS · Ambegaon, PuneP52100009301· 64.5% built
- ISHANA ASSOCIATES7.6 yr overdueISHANA ASSOCIATES · Ambegaon, PuneP52100011826· filed Dec 2017 → now Dec 2018· 72.7% built
- Mahavirs NATURA7.6 yr overdueMas Creations · Mawal, PuneP52100004246· 75% built
- SHRI SAMARTH7.6 yr overdueKHINVASARA ASSOCIATES SHREE SAMARTH · Pimpri Chinchawad (M Corp.), PuneP52100008537· 40% built
- DEEPALI ENCLAVE7.6 yr overdueBALKRISHNA BAHIRAT · Mulshi, PuneP52100015229· 90.9% built
- VRUNDAVAN7.6 yr overdueSHRI LAXMI BALAJI DEVELOPERS · charholi kh, PuneP52100008543· 90.9% built
- TULIP RESIDENCY7.6 yr overdueSWAROOP DEVELOPERS · Mawal, PuneP52100004920· 57.3% built
- Alliance Aishwary7.6 yr overdueAlliance Buildcon · AMBEGAON Bk, PuneP52100001501· 72.7% built
- Mahaveer Residency7.6 yr overdueYashodhan Associates · Pune (M Corp.), PuneP52100004257· filed Dec 2017 → now Dec 2018· 89.4% built· 3 complaints
- SUNWINDS COMMERCIAL7.6 yr overdueSANIKET INFRASTRUCTURES · Bavdhan Kh., PuneP52100002154· filed Feb 2018 → now Dec 2018· 90.9% built
- Swapnalok Nagari Building no. 34,35,36,377.6 yr overdueSWAPNALOK DEVELOPERS · Bhor, PuneP52100001827· 90.9% built
- Pratham7.6 yr overduePrimary Housing Corporation LLP · Shirur, PuneP52100008426· filed Dec 2017 → now Dec 2018· 89.1% built
- Karan Suncoast7.6 yr overdueKaran Developers · Bavadhan BK, PuneP52100000474· 87.7% built
- MELANGE RESIDENCES - PHASE I7.6 yr overdueRAMA SYNERGY SPACES · Hinjawadi Phase III, PuneP52100002877· 91.8% built· 1 complaint
- Aashirwad7.6 yr overdueBlue Properties · Haveli, PuneP52100000931· 90.9% built
- AZALEA B7.6 yr overdueACME SAWANT VENTURES · BHILAREWADI, PuneP52100014721· 33.7% built
- PANDURANG PRESTIGE POINT PHASE 17.6 yr overdueSUKHSHANTI DEVELOPERS · Baramati (M Cl), PuneP52100005862· 90.9% built
- Moraya Construction7.6 yr overdueMoraya Construction · WAGHOLI, PuneP52100012562· 41.8% built
- LAMOUR7.6 yr overdueSPARK LINK VENTURE · Pimpri Chinchawad (M Corp.), PuneP52100009669· filed Jan 2018 → now Jan 2019· 62.7% built
- HAKIMI BAUG II7.6 yr overduePYRAMID INFRASTRUCTURE · Pune (M Corp.), PuneP52100009002· 81.8% built
- Moraya palace7.6 yr overdueSagar Mahadev Kate · Baramati Rural, PuneP52100013003· 80% built
- SAI SWAMI7.6 yr overdueNandadeep Builders & Developers · Daund (CT), PuneP52100012146· 90.9% built
- Lakshmi Plaza Building D7.6 yr overdueIndus Realty · Haveli, PuneP52100002883· 58.2% built
- RUDRA PHASE II7.6 yr overdueAandDConstructions · Pune (M Corp.), PuneP52100013267· 81.8% built
- Jay Ganesh Apartment7.6 yr overdueHemant Arun Upare · CHARHOLI, PuneP52100007865· filed Jan 2018 → now Jan 2019· 90.9% built
- NYATI ELAN COMMERCIAL7.6 yr overduePSQUARE BUILDERS LLP · WAGHOLI, PuneP52100001374· 73.6% built· 1 complaint
- SAPTARANG HEIGHT7.6 yr overdueSAPTASHRUNGI REALTORS · Haveli, PuneP52100004786· 50.9% built
- SHRI KRISHNA OASIS7.6 yr overdueSHRI BUILDCON · Pune (M Corp.), PuneP52100011176· 33.3% built
- Kate pride7.5 yr overdueSagar Mahadev Kate · Jalochi, PuneP52100013121· 81.8% built
- AVADHUT RESIDENCY7.5 yr overdueYOGESH BALASAHEB TAWARE · Malegaon Bk, PuneP52100012487· 72.7% built
- The Turf7.5 yr overdueAMA Properties · Ghorpadi, PuneP52100000632· 90.9% built· 1 complaint
- Seven Green Phase 17.4 yr overdueDinesh Buildcon · Rui, PuneP52100011773· 81.8% built
- Tathastu Paradise7.4 yr overdueROYAL DEVELOPERS · Haveli, PuneP52100003490· 69.3% built
- Kakade Township7.4 yr overdueSuryakant Kakade · Pimpri Chinchawad (M Corp.), PuneP52100011673· 90.9% built
- AKSHAY AANGAN7.4 yr overdueAkshay Properties · Wadgaon, PuneP52100014607· 68.6% built
- VISHWA KUNJ PHASE 17.4 yr overdueArchway Realltors · Pune City, PuneP52100012495· filed Mar 2018 → now Mar 2019· 78.7% built
- SELENA B7.4 yr overdueKumar Construction and Properties Pvt Ltd · Pashan, PuneP52100000252· 69.7% built
- GAGAN CEFIRO PHASE 27.4 yr overdueGAGAN UNNATI PROMOTERS · Undri, PuneP52100002365· 90.9% built
- LA CABANA7.4 yr overdueSigma one shilp ventures · Sus Gaon, PuneP52100009637· filed Mar 2018 → now Mar 2019· 77.3% built· 7 complaints
- Shivangan7.4 yr overdueJK2 Associates · Wakad, PuneP52100008075· 71.4% built
- RMKNATURESCLASSIC7.4 yr overdueRANJEET RAMDAS KAKADE · Talegaon Dabhade (M Cl), PuneP52100001545· 61.6% built
- 93 AVENUE PHASE- 17.4 yr overdueRAVIRAJ BOKADIA CREATIVE · Pune City, PuneP52100015538· 81.8% built
- SAMARTH CARINA7.4 yr overdueMAHESH ZUMBARLAL KHINVASARA · Thergaon, PuneP52100009646· 19.1% built
- 33 MILESTONE PHASE III7.4 yr overdueLABH PROMOTERS AND DEVELOPERS · TATHAWADE, PuneP52100013749· 52.7% built
- Windermere Phase 27.4 yr overdueVascon Engineers Ltd · Haveli, PuneP52100002368· 80% built· 2 complaints
- West Square7.4 yr overdueSiddharth Properties · Pune City, PuneP52100016161· 67.3% built
- ALCON STYLUS7.4 yr overdueALCON LANDMRKS · kondhwa BK, PuneP52100001398· 76.8% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.