Delayed projects in Thane
1,619 MahaRERA-registered projects in Thane are past the possession date on file and still under 100% built. Where the promoter has formally revised the date, the original is shown alongside so you can see what changed.
Page 2 of 9
- Hubtown Greenwoods - C Wing8.2 yr overdueHubtown Limited · Thane, ThaneP51700012016· 90.4% built
- Hubtown Greenwoods B wing8.2 yr overdueHubtown Limited · Thane, ThaneP51700004458· 85.1% built
- Casa Royale - Grande8.2 yr overdueLodha Buildcon Private Ltd (Lodha Develoopers Pvt Ltd) · Thane, ThaneP51700001517· filed Jan 2018 → now Jul 2018· 81.8% built· 9 complaints
- PALAVA ELITE K TO T8.2 yr overduePalava Dwellers Private Limited · Kalyan, ThaneP51700000389· 78.2% built· 11 complaints
- SAI SAHARA PHASE 1 WING B AND C8.2 yr overdueSAI JYOT ENTERPRISES · Titwala, ThaneP51700013397· 88% built
- Shivnath Sky City8.2 yr overdueSHIVNATH DEVELOPER · Thane, ThaneP51700008666· 89.5% built
- UMA ASHISH B WING8.2 yr overduePARASIYA DEVELOPES · Ambarnath, ThaneP51700002434· 88.2% built
- SAI IMPERIA8.2 yr overdueSADASHIV INFRA · Ambarnath, ThaneP51700005142· 79.4% built
- SAMRUDDHI GURUPRASAD8.1 yr overdueSAMRUDDHI DEVELOPERS · Kalyan, ThaneP51700003156· 90.9% built
- SHULPANI8.1 yr overdueSHREE BALAJI BUILDERS & DEVELOPERS · Badlapur (M Cl), ThaneP51700005731· 30% built
- SHUBHAM8.1 yr overdueSagar Enterprise · Thane, ThaneP51700001323· 72.7% built
- Regency Sarvam Phase - 88.1 yr overdueREGENCY NIRMAN LTD · Titwala, ThaneP51700002824· 90.9% built
- SAHAKAR NIWAS8.1 yr overdueJNM ENTERPRISES · Thane, ThaneP51700005696· 88.6% built
- GLORIA VISTA8.1 yr overdueMADIREDDY KONDA REDDY · Thane, ThaneP51700007581· 86.8% built
- UNIQUE AURUM-II8.0 yr overdueUNIQUE SHANTI DEVELOPERS LLP · Thane, ThaneP51700006770· 81.8% built
- Seven Eleven Construction Apna Ghar8.0 yr overdueNarendra Lalchand Mehta · Thane, ThaneP51700002976· 61.8% built· 2 complaints
- Green Avenue 1A8.0 yr overduePARAM DEVELOPERS · Thane, ThaneP51700006566· 90.9% built· 1 complaint
- AARSH AVENUE8.0 yr overdueSHREE DEVELOPERS · Ambarnath, ThaneP51700008655· 90.9% built
- Aishwarya Heights8.0 yr overdueGauri Vinayak Builder and Developers Pvt Ltd · Kalyan, ThaneP51700012271· 82.7% built
- ENTILLA BY DEV8.0 yr overdueDEV KONARK CORPORATION · Ambarnath, ThaneP51700003667· 80.2% built
- VISHNU HEIGHTS8.0 yr overdueJAIDEEP CONSTRUCTION · Ambarnath(M Cl), ThaneP51700012586· 44.1% built
- SKYLINE-II8.0 yr overdueUNIQUE SHANTI NEMINATH DEVELOPERS LLP · Thane, ThaneP51700003362· filed Jun 2018 → now Sept 2018· 89.1% built
- KHALIDA AMIN COMPLEX8.0 yr overdueAMIR AHMED ABUJI · NIZAMPUR BEHIND ABUJI COMPLEX, ThaneP51700016280· 44.1% built
- Kaveri Krishna8.0 yr overdueShree Shakti Developers · Chavindra, ThaneP51700005237· filed Dec 2017 → now Sept 2018· 72.7% built
- Hubtown Greenwoods A wing8.0 yr overdueHubtown Limited · Thane, ThaneP51700000365· filed Jul 2018 → now Sept 2018· 87% built
- MAHAVIR PRIDE8.0 yr overdueMAATRU KRUPA ENTERPRISES · Ambarnath, ThaneP51700003354· 87% built
- SHIVAM COMPLEX WING D AND E8.0 yr overdueUMIYA ENTERPRISES · Badlapur (M Cl), ThaneP51700005023· 81.8% built
- SIDDHASHRAM CHS LTD8.0 yr overdueSTANDARD INFRASTRUCTURE · Thane, ThaneP51700015588· 37.7% built· 23 complaints
- MADHAVI RESIDENCY8.0 yr overdueSATYAM CONCAST PRIVATE LIMITED · Thane, ThaneP51700008257· 78.9% built
- YASHSHANTI8.0 yr overdueSIDDHIVINAYAK DEVELOPERS · Thane, ThaneP51700005767· 70% built· 1 complaint
- ARYAN ONE WING I AND J8.0 yr overdueKonark Lifespaces · SHIRGAON, ThaneP51700015793· 79.9% built
- GALAXY BLDG 1 AND 28.0 yr overdueBRIGHT SKY HEIGHTS BUILDERS AND DEVELOPERS PRIVATE LIMITED · Thane, ThaneP51700005683· filed May 2018 → now Oct 2018· 90.9% built· 6 complaints
- Panchamrut Bldg. No. 18.0 yr overdueShree Abhilasha Nirmiti · Titwala west, ThaneP51700005211· filed Mar 2018 → now Oct 2018· 90.9% built
- SUDAMA REGENCY BUILDING NO 1, 58.0 yr overdueSHREE SIDDHIVINAYAK ENTERPRISES · Thane, ThaneP51700000953· 71.4% built· 1 complaint
- SHUBH SRUSHTI8.0 yr overdueVINAYAK ENTERPRISES · Badlapur (M Cl), ThaneP51700010469· 55.5% built
- MAITRI PRASAD7.9 yr overdueMAITRI CONSTRUCTION · Kalyan, ThaneP51700003086· 81.8% built
- NEELS RESIDENCY7.9 yr overdueS.A. SINGH BUILDERS AND DEVELOPERS · Ambarnath(M Cl), ThaneP51700013572· 59.1% built
- MAITRI SAI SAMARTHA7.9 yr overdueMAITRI RACHANA · Kalyan, ThaneP51700003061· 90.9% built
- AKSHAR ALVARIO7.9 yr overdueTHALIA AKSHAR DEVELOPERS · Thane, ThaneP51700006864· 87.6% built
- ATLANTA EDENWORLD PHASE I7.9 yr overdueSAI BALAJI DEVELOPER · Thane, ThaneP51700003328· filed Dec 2017 → now Nov 2018· 90.4% built
- LANDSCAPE GARDEN7.9 yr overdueLANDSCAPE VENTURES · Ambarnath, ThaneP51700005570· 90.9% built
- EKDANTAY7.9 yr overdueR K BUILDCON · Titwala, ThaneP51700009599· filed Dec 2017 → now Nov 2018· 90.9% built· 1 complaint
- KRISHNA RESIDENCY7.9 yr overdueKRISHNA ENTERPRISES · Badlapur (M Cl), ThaneP51700012391· 56.4% built
- SHUBH VATIKA7.9 yr overdueSHUBH ENTERPRISES · Badlapur (M Cl), ThaneP51700009684· 90.9% built
- SHREE SIDDHIVINAYAK ENTERPRISES7.9 yr overdueSHREE SIDDHIVINAYAK ENTERPRISES · Thane, ThaneP51700004774· 60% built· 1 complaint
- VARAD VINAYAK COMPLEX7.9 yr overdueSHREE BALAJI BULDERS AND DEVELOPERS · Ambarnath, ThaneP51700003008· 70% built
- SHIV GANESH SADAN7.8 yr overdueM/S SHIVGANESH BUILDERS & DEVELOPERS · Kalyan, ThaneP51700011175· 67.7% built
- RAVIRAJ SPRING7.8 yr overdueM/s RAVIRAJ HOUSING (PRINCE CITY) · Mira-Bhayandar (M Corp.), ThaneP51700011396· 77.3% built
- Raviraj Spring7.8 yr overdueMIra Housing Development Corporation · Mira-Bhayandar (M Corp.), ThaneP51700010445· 77.3% built
- N G Silver Spring7.8 yr overdueRNA Builders (NG) · Thane, ThaneP51700000009· 90.9% built· 1 complaint
- GURU DEV7.8 yr overdueSHREE SAMARTH SATAM MAHARAJ DEVELOPERS · Ambernath, ThaneP51700008312· 90.9% built
- 9 KRISHNA7.8 yr overdueISHAAN DEVELOPERS · Ambarnath, ThaneP51700003810· 74.5% built· 1 complaint
- Shankar Heights, Phase 37.8 yr overdueLaxmi Kamal Associates · Ambarnath, ThaneP51700010807· 90% built
- Shankar Heights Phase 2 Krishna Wing7.8 yr overdueLaxmi Kamal Associates · Ambarnath, ThaneP51700010806· 90.5% built
- Sun Orchid7.8 yr overdueMOHAMMED SIRAJ BASHEER · Thane, ThaneP51700013513· 90.9% built
- SAMARTH VATIKA7.8 yr overdueSHREE SAMARTH ASSOCIATES · Badlapur (M Cl), ThaneP51700009325· 83.2% built
- Bhagatiniwas7.8 yr overdueShri Sadguru construction · Katrap, ThaneP51700009762· 45.5% built
- OASIS ROYALE7.8 yr overdueMAGESTIC PREMISES PRIVATE LIMITED · Thane, ThaneP51700002717· 44.1% built
- HANSRAJ HEIGHTS7.8 yr overduePARSHVANATH ENTERPRISES · Thane (M Corp.), ThaneP51700008016· 90.9% built
- The Big World7.8 yr overdueSOMAN SUN CITI · Kalyan-Dombivali (M Corp.), ThaneP51700014517· 62.7% built
- GURU ASHISH7.8 yr overdueSHREE GURUKRUPA VENTURES LLP · Thane, ThaneP51700006406· 90.9% built
- AASTHA EVERSHINE7.8 yr overdueM/S. AASTHA REALTORS · Titwala, ThaneP51700011493· 52.3% built
- DHUNDIRAJ7.8 yr overdueHERAMB CONSTRUCTION · Parnaka, ThaneP51700007802· 90.9% built
- ORION SQUARE TYPE C7.8 yr overdueSQUARE FEET REAL ESTATE · Ambarnath, ThaneP51700009388· 81.8% built
- SUKHKARTA I CO-OPERATIVE HOUSING SOCIETY LIMITED7.8 yr overdueFSK BUILDERS & DEVELOPERS PRIVATE LIMITED · Thane, ThaneP51700002752· 83.6% built
- RAI S HERITAGE D Wing7.8 yr overdueRAI RESIDENCY Private Limited · Kalyan, ThaneP51700009044· 54.5% built
- ADITYA APARTMENTS7.8 yr overdueNAVIN NARANJI JAIN · Bapsai, ThaneP51700010512· 90.9% built
- ORCHID SQUARE PHASE 27.8 yr overdueM/S SQUAREFEET ECO HOUSING LLP · Thane, ThaneP51700006658· 81.8% built
- CHOICE AMBE DEEP7.8 yr overdueAMBE DEEP ENTERPRISES · Thane, ThaneP51700002104· 73.5% built
- LAND MARK RESIDENCY7.8 yr overdueRIYAZ ACHHAN KHAN · Bhiwandi, ThaneP51700009708· 47.9% built
- UNNATHI WOODS PHASE III - C17.8 yr overdueUNNATHI ESTATES · Thane, ThaneP51700003359· 90.9% built
- NEW ERA BUSINESS PARK7.8 yr overdueNEW ERA VENTURES · Thane, ThaneP51700005182· 56.4% built
- Indira Niwas Annex7.8 yr overdueShree Swami Krupa Builders and Developers · Thane, ThaneP51700010108· 90.9% built
- Shantiniketan Wing C7.8 yr overdueAnmol Associates · Bhopar, ThaneP51700012214· 85% built
- MARUTI PRAKRUTI DHAM7.8 yr overdueAVISHKAR DEVELOPERS · Ambarnath, ThaneP51700003338· 49.6% built
- ASHAR 16 WING C PHASE III7.8 yr overdueMs ASHAR REALTORS · Thane, ThaneP51700000972· 90.9% built
- VIHAN APARTMENT7.8 yr overdueMANOJ ATMARAM PAWAR · Titwala, ThaneP51700014150· 59.1% built
- VARDHAMAN HOMES7.8 yr overdueJAY AMBE DEVELOPERS · Ambarnath, ThaneP51700006153· 42.7% built
- PARSHURAM VEDANT7.8 yr overdueRAM KRISHNA HARI ENTERPRISES · Ambarnath(M Cl), ThaneP51700007493· 50.9% built
- Trimurti Residency7.8 yr overdueTrimurti Construction Co · Thane, ThaneP51700005837· 62.7% built
- PATELS PRIDE7.8 yr overduePRIDE INFRASTRUCTURE · Ambarnath, ThaneP51700000874· 81.8% built
- Platinum7.8 yr overdueSilver Enterprises · Thane, ThaneP51700001981· 81.8% built
- SATYAM IMPERIAL HEIGHTS7.8 yr overdueSATYAM BUILDERS AND DEVELOPERS · Thane, ThaneP51700004307· 90.9% built
- M/s. Shubham Karoti Complex Phase - II7.8 yr overdueM/s. Shubham Karoti Enterprises · Badlapur (M Cl), ThaneP51700012010· 36.4% built
- OM SRUSHTI DARSHAN7.8 yr overdueVINAYAK DEVELOPERS · THANE KHOPAT, ThaneP51900009084· 90.9% built
- OM KRISHNA HEIGHTS7.8 yr overdueOM KRISHNA INFRA · Ambarnath, ThaneP51700004255· 81.8% built
- ARKADE ART PHASE 17.8 yr overdueARKADE REALTY · Thane, ThaneP51700004429· 72% built· 12 complaints
- JAI SHREE SWAMI SAMARTH7.8 yr overdueBhalchandra Vinayak Wadnerkar · Kalyan, ThaneP51700007190· 90.9% built
- Dandelia7.8 yr overdueAcme Housing India Private Limited · Thane, ThaneP51700001032· 82.3% built
- Cloud 36-Phase II7.8 yr overdueGeeCee Ventures Limited · Thane, ThaneP51700004872· 53.6% built
- Paradise7.8 yr overdueOm Sai Riddhi Siddhi Developers · Thane, ThaneP51700008580· 84.5% built
- SHREE HARI RESIDENCY7.8 yr overdueM/s SHREE ODHAV DEVELOPERS · Kalyan, ThaneP51700004461· filed Jun 2018 → now Dec 2018· 90.9% built
- PINNACOLO7.8 yr overdueSKD REALTY LLP · Thane, ThaneP51700008205· filed Jun 2018 → now Dec 2018· 78.4% built· 1 complaint
- M M VALLEY C17.8 yr overdueALFA ENTERPRISES · Thane, ThaneP51700009447· 90.9% built· 5 complaints
- ASHAR 16 WING E PHASE I7.8 yr overdueMs ASHAR REALTORS · Thane, ThaneP51700001081· 90.9% built
- Saarvi Corner7.8 yr overdueSaarvi Infratech · Thane, ThaneP51700002720· 9.6% built
- AUDUMBER7.8 yr overdueAADYASHAKTI ENTERPRISES · Thane, ThaneP51700012435· 89.5% built
- OSTWAL HEIGHT - 57.8 yr overdueSHREE OSTWAL BUILDERS LTD · Thane, ThaneP51700008433· 90.9% built
- FUTURE GOLD7.8 yr overdueFUTURE HOMES DEVELOPERS · Thane, ThaneP51700007006· 90.9% built
- OM YASHWANT PLAZA7.8 yr overdueOMPRAKASH RAMCHANDRA PANDEY · BADLAPUR, ThaneP51700015200· 87.3% built
- PRIDE PALMS MAJESTY A1-B1 PHASE 17.8 yr overdueLARKINS REALTORS · Thane, ThaneP51700006280· 98.6% built· 1 complaint
- KAVERI7.8 yr overdueSAMARTH DEVELOPERS · Kalyan, ThaneP51700010020· 58.2% built
- Shantiniketan Wing B7.8 yr overdueAnmol Associates · Kalyan, ThaneP51700010349· 87.2% built
- Mini Market7.8 yr overdueHemant S Jain · Thane, ThaneP51700013859· 90.9% built· 1 complaint
- Delta Avenue7.8 yr overdueDELTA REALTORS · Thane, ThaneP51700011834· 74.1% built
- Cosmos Classique7.8 yr overdueConcorde Builders · Patlipada, ThaneP51700004457· 64.6% built
- RAMBHUVAN RESIDENCY7.8 yr overdueABHAY ANANT KAMAT · Kalyan, ThaneP51700008571· filed Dec 2017 → now Dec 2018· 81.7% built
- RADHESHYAM REGENCY7.8 yr overdueSHRI SATIMA ENTERPRISE · Thane, ThaneP51700009169· 90% built
- ASHAR 16 WING D PHASE II7.8 yr overdueMs ASHAR REALTORS · Thane, ThaneP51700001926· 90.9% built· 1 complaint
- SOLITAIRE INDUSTRIAL ESTATE7.8 yr overdueShelter Construction · Kalyan, ThaneP51700007963· 81.8% built
- JIJABAI PARK7.8 yr overdueDNYANESHWAR MAULI BUILDER & DEVELOPERS · Badlapur (M Cl), ThaneP51700006524· 54.5% built
- Atulya Shubh Vastu7.8 yr overdueATULYA TOWNSHIP BUILDCOM PVT LTD · Aatgaon Station, ThaneP51700011737· 10% built
- MANSAROVAR7.8 yr overdueRK CONSTRUCTION · Ambarnath, ThaneP51700008427· 90.9% built· 3 complaints
- MANAS VASUDHA7.8 yr overdueM/S SHREE MANAS DEVELOPRS · Thane, ThaneP51700003568· 82.7% built
- Surval Heights7.8 yr overdueGayatri Developers · Ambarnath, ThaneP51700004370· 57.3% built
- FORTUNE HEIGHTS7.8 yr overdueSONY NOORIE REALITY · Thane, ThaneP51700009190· 87.7% built
- SHANKHESHWAR CRYSTAL-PHASE 17.8 yr overdueSHANKHESHWAR KREATERS · Titwala, ThaneP51700000463· 90.9% built
- PREMIER SEAVIEW7.8 yr overdueAYUB HUSAIN KHATRI · Thane, ThaneP51700001286· 90.9% built
- PRIDE RESIDENCY DAFFODIL7.8 yr overdueSAHIL DEVELOPERS · Thane, ThaneP51700004934· 90.9% built
- VRINDAVAN NIKETAN7.8 yr overduePRAKASH BHOJRAJ SHEWANI · Badlapur (M Cl), ThaneP51700010990· 78.2% built
- MRUNALI PARADISE7.8 yr overdueTUKARAM BARKU MHATRE · Badlapur (M Cl), ThaneP51700007167· 53.2% built
- ATMARAM KENE RESIDENCY7.8 yr overdueMEGA DEVELOPERS · Kalyan, ThaneP51700004471· 42.7% built
- YASHWANT RESIDENCY7.8 yr overdueSHREE SAI GANESH ENTERPRISES · Manda, ThaneP51700014382· 59.1% built
- SHASHWAT PARK -PHASE II -Z4B7.8 yr overdueSHASHWAT HOMES · Badlapur (M Cl), ThaneP51700005512· 74.5% built
- SAI SHRUSHTI HEIGHTS-B47.8 yr overdueSAI SHRUSHTI ENTERPRISES · Thane, ThaneP51700000450· 63.6% built
- VAIJNATH7.8 yr overduePRAKASH LELE CONSTRUCTION · Kalyan, ThaneP51700005444· 40.5% built
- RAUNAK DELIGHT7.8 yr overdueUNNATHI ASSOCIATES · Thane, ThaneP51700002037· 90.9% built
- Panvelkar Crown7.8 yr overdueRahul Vijay Panvelkar · Ambarnath, ThaneP51700000598· 90.9% built
- Shantiniketan Wing B17.8 yr overdueAnmol Associates · Kalyan, ThaneP51700004738· 87.2% built
- RAI PARADISE7.8 yr overdueRAI RESIDENCY Private Limited · Kalyan, ThaneP51700012449· 80% built
- AMBER ARCADE7.8 yr overdueMAITRI DEVELOPERS · Badlapur (M Cl), ThaneP51700010130· 81.8% built
- KASHIDHAM7.8 yr overdueSHAH AND DASWANI · Thane, ThaneP51700011016· filed Dec 2017 → now Dec 2018· 45% built
- SUKUR ENCLAVE PHASE 17.8 yr overdueRAJARAM CONSTRUCTION · Thane, ThaneP51700001982· 90.9% built
- UNIQUE GREEN - MHADA7.8 yr overdueMADHU HARSHAD DOSHI · Thane (M Corp.), ThaneP51700007437· filed Jun 2018 → now Dec 2018· 80.9% built
- Shree Sai Jalaram Builders and Developers7.8 yr overdueShree Sai Jalaram Builders & Developers · Thane, ThaneP51700016463· 70.9% built
- PARIJAT CO OPERATIVE HOUSING SOCIETY LIMITED PHASE II7.8 yr overdueROHRA CONSTRUCTIONS · AMBERNATH, ThaneP51700016225· 38.6% built
- SHALINA HEIGHTS7.8 yr overdueMOONSHINE REALTORS PVT LTD · Bhiwandi, ThaneP51700005966· 90.9% built
- GOPALDHAM7.8 yr overdueSHREE HARI DEVELOPERS · Thane, ThaneP51700011339· 34.1% built
- NEWA BUSINESS PARK BUILDING A PHASE 17.8 yr overdueNEWA REALITY INFRASTRUCTURE · Thane, ThaneP51700008497· 90.9% built
- PARADISE HEIGHT7.8 yr overdueFRIENDS GROUP · Thane, ThaneP51700009471· 90.9% built
- SADGURU KRIPA APARTMENT7.8 yr overdueSADGURU DEVELOPER · Ambarnath, ThaneP51700009917· 40.9% built
- Virat Vastu7.8 yr overdueSHREEJI REALTY · Kalyan-Dombivali (M Corp.), ThaneP51700002467· 93.2% built
- SAI AANGAN - C WING7.8 yr overdueSHREE SAI CHATRA DEVELOPERS · Badlapur (M Cl), ThaneP51700014326· 36.4% built
- SHASHWAT PARK - PHASE I - WING P7.8 yr overdueSHASHWAT HOMES · Badlapur (M Cl), ThaneP51700009814· 70.9% built
- ASHAR 16 WING A PHASE V7.8 yr overdueMs ASHAR REALTORS · Thane, ThaneP51700001159· 90.9% built
- Manali Heights A Wing7.8 yr overdueMITALI CONSTRUCTION · Chikanghar, ThaneP51700006692· 61.8% built
- RISHITA APARTMENT7.8 yr overdueSHANTI ENTERPRISE · Mira-Bhayandar (M Corp.), ThaneP51700005397· 90.9% built
- SAIDEEP7.8 yr overdueSHREE SAI SIDDHI ASSOCIATES · Thane, ThaneP51700007128· 68.2% built
- Tai-Nana Sadan7.8 yr overdueShree Samarth Developers · Kalyan, ThaneP51700002666· 39.1% built
- SHREEMAN RESIDENCY7.8 yr overdueOM ENTERPRISES · MANDA, ThaneP51700011833· 90.9% built
- RAUNAK CITY SECTOR II - B77.8 yr overdueRAUNAK CORPORATION · Kalyan, ThaneP51700006182· 90.9% built
- Riddhi Siddhi7.8 yr overdueSHREEJI & INNOVATIVE DEVELOPERS · Badlapur (M Cl), ThaneP51700012445· 81.8% built
- BHAIRAAV MILESTONE7.8 yr overdueSharpmind Consultancy Services Private Limited · Thane, ThaneP51700015119· 55% built
- LAXMI ICON7.8 yr overdueANIRUDDHA BUILDERS AND DEVELOPERS · Navi Mumbai (M Corp.), ThaneP51700005005· 97.3% built
- UNNATHI WOODS PHASE VI - F27.8 yr overdueUNNATHI ESTATES · Thane, ThaneP51700004330· 90.9% built
- SHAILJEET HEIGHTS7.8 yr overdueMANDAKINI KESHAV TOKRE · Kalyan, ThaneP51700008334· 60.9% built
- OSTWAL POINT7.8 yr overdueSHREE OSTWAL BUILDERS LTD · Thane, ThaneP51700008381· 81.8% built
- MANAS RESIDENCY7.8 yr overdueMANAS ENTERPRISES · Ambarnath, ThaneP51700004698· 65% built
- PALAVA REGALIA A to F7.8 yr overduePalava Dwellers Private Limited · Kalyan, ThaneP51700000390· 78.2% built· 2 complaints
- BRITTO HOUSE7.8 yr overdueSHREE SAI BUILDERS & DEVELOPERS · Ambarnath, ThaneP51700000235· 81.8% built
- BALAJI AANGAN SHIVAM-A WING7.8 yr overdueSHREE SAI BALAJI ENTERPRISES · Kalyan, ThaneP51700011189· 78.6% built
- JALAL MANSION7.8 yr overdueMARYAM ENTERPRISES · Kalyan-Dombivali (M Corp.), ThaneP51700010284· 44.5% built
- AMRUT PEARL BUILDING NO. 5 AND 67.8 yr overdueAMRUT BUILDERS · Gauripada, ThaneP51700008092· 90.9% built
- SHREE KRUPA HEIGHTS7.8 yr overdueShree Krupa Builders & Developers · Kalyan, ThaneP51700004754· 81.8% built· 1 complaint
- SAI RAJ RESIDENCY7.8 yr overdueSHRIRAM DEVELOPERS · Badlapur (M Cl), ThaneP51700009581· 90.9% built
- Radha Regency7.8 yr overdueV.R. Construction Co. · Mira-Bhayandar (M Corp.), ThaneP51700011369· 73.6% built· 1 complaint
- VIHANG HILLS7.8 yr overdueVIHANG ENTERPRISES · Thane (M Corp.), ThaneP51700007590· 95.5% built· 5 complaints
- Zenia7.8 yr overdueROMA BUILDERS PRIVATE LIMITED · Thane, ThaneP51700002912· 72.7% built
- NEELAM7.8 yr overdueRAMCHANDRA PARSHURAM VARAK · Syndicate, ThaneP51700009063· 27.3% built· 1 complaint
- The Residences7.8 yr overdueVaijanath Realtors LLP · Kalyan, ThaneP51700010368· 72.7% built
- Mahavir Estella - Wing A and B7.8 yr overdueCityscape Construction Co · Thane, ThaneP51700003600· 85.5% built
- Palava Cielo A - F7.8 yr overduePalava Dwellers Private Limited · Kalyan, ThaneP51700000378· 81.8% built· 2 complaints
- THARWANI MIRACLE7.8 yr overdueANIL HARDASMAL THARWANI · BARAVE VILLAGE, ThaneP51700007310· 39% built
- APTE HOMES7.8 yr overdueSHREE SIDDHI DEVELOPERS · Badlapur (M Cl), ThaneP51700005931· 70% built
- SWAMI CHINTAMANI7.8 yr overdueMEENA SADASHIV AGALAVE · GANDHI CHOWK KALYAN WEST, ThaneP51700010673· 40.9% built
- Shantiniketan Wing A7.8 yr overdueAnmol Associates · Kalyan, ThaneP51700010899· 87.2% built
- SILVER ARCADE7.8 yr overdueSIDDHIVINAYAK ENTERPRISES · Thane, ThaneP51700009261· 90.9% built
- AMBRE HEIGHTS7.8 yr overdueOM SAI BUILDERS AND DEVELOPERS · Chikanghar, ThaneP51700010860· 18.2% built
- Kondilkar Residency7.8 yr overdueAditi Construction · Ambarnath, ThaneP51700000782· 90.9% built
- VICTORIA HOUSE PHASE I7.7 yr overdueLIFESPACE REALTY · Ambarnath, ThaneP51700008522· filed Jun 2018 → now Jan 2019· 78.6% built
- UNIQUE7.7 yr overdueVS DEVELOPERS · THANE, ThaneP51700005344· 53.6% built
- SONAL CO-OP HOUSING SOCIETY7.7 yr overdueSOHAM DEVELOPERS · Badlapur (M Cl), ThaneP51700005982· 54.5% built
- ATLANTIC ORRA7.6 yr overdueATLANTIC WINDS INFRASTRUCTURE PVT.LTD. · Kalyan, ThaneP51700005954· 45.5% built
- BALAJI AANGAN SHIVAM-B WING7.6 yr overdueSHREE SAI BALAJI ENTERPRISES · Kalyan, ThaneP51700012104· 78.2% built
- PALAVA PRIMIA E to J7.6 yr overduePalava Dwellers Private Limited · Kalyan, ThaneP51700000391· 78.2% built
- SHUBAN Society7.6 yr overdueShrikrishna Marathe · Kalyan, ThaneP51700003453· 58.2% built
- Rustomjee Azziano Wing J7.5 yr overdueKapstone Constructions Private Limited · Thane, ThaneP51700000950· 87% built· 1 complaint
- HIGHLAND HAVEN BUILDING 2B DEW-A PHASE 27.5 yr overdueSIDDHI KRISH DEVELOPERS · Thane, ThaneP51700005689· 83.9% built· 1 complaint
- GAJANAN NANA HEIGHTS7.5 yr overdueVASTU GANESH BUILDERS AND DEVELOPERS · Kalyan, ThaneP51700010902· 46.4% built
- PATELS RESIDENCY7.5 yr overduePARAM BUILDERS AND DEVELOPERS · Ambarnath, ThaneP51700000865· filed Mar 2018 → now Mar 2019· 56.4% built
- Rustomjee Azziano Wing G7.5 yr overdueKapstone Constructions Private Limited · Thane, ThaneP51700001060· 90.9% built· 4 complaints
- HIGHLAND HAVEN BUILDING 1A DEW-B PHASE 17.5 yr overdueSIDDHI KRISH DEVELOPERS · Thane, ThaneP51700006850· 83.9% built· 1 complaint
- SHANKHESHWAR PLATINUM-PHASE 17.5 yr overdueSHANKHESHWAR KREATERS · Kalyan, ThaneP51700000445· 90.9% built
- HIGHLAND HAVEN BUILDING 3C CORAL-B PHASE 37.5 yr overdueSIDDHI KRISH DEVELOPERS · Thane, ThaneP51700007196· 83.9% built
- LODHA SPLENDORA - PLATINO - B7.5 yr overdueLODHA DEVELOPERS LIMITED · Thane, ThaneP51700000258· 81.8% built
- CHINTAMANI HEIGHTS TYPE E WING Q R S7.5 yr overdueJASHNANI CONSTRUCTION PRIVATE LIMITED · Cherpoli, ThaneP51700004624· 81.8% built
- RATHADIA CO-OPERATIVE HOUSING SOCIETY LTD7.5 yr overdueJ SQUARE INFRA · KULGAON, ThaneP51700015329· 90.9% built
- SHIV PARVATI RESIDENCY7.5 yr overdueSHRIKRISHNA DEVELOPERS · Ambarnath, ThaneP51700005502· 43.6% built
- Rustomjee Azziano Wing F7.5 yr overdueKapstone Constructions Private Limited · Thane, ThaneP51700001021· 90.9% built· 8 complaints
- JAI MATADEE7.5 yr overdueAARADHANA DEVELOPERS · Thane, ThaneP51700000884· filed Mar 2018 → now Mar 2019· 50% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.