Delayed projects in Thane
1,619 MahaRERA-registered projects in Thane are past the possession date on file and still under 100% built. Where the promoter has formally revised the date, the original is shown alongside so you can see what changed.
Page 3 of 9
- HIGHLAND HAVEN BUILDING 1A DEW-B PHASE 17.5 yr overdueSIDDHI KRISH DEVELOPERS · Thane, ThaneP51700006850· 83.9% built· 1 complaint
- Rustomjee Azziano Wing F7.5 yr overdueKapstone Constructions Private Limited · Thane, ThaneP51700001021· 90.9% built· 8 complaints
- SHIV PARVATI RESIDENCY7.5 yr overdueSHRIKRISHNA DEVELOPERS · Ambarnath, ThaneP51700005502· 43.6% built
- MARATHE FORTUNE7.5 yr overdueSAIJI DEVELOPERS · Titwala, ThaneP51700008862· 4.2% built
- MOHAN HEIGHTS -PHASE 17.5 yr overdueBHAVANI ENTERPRISES · Kalyan, ThaneP51700004730· filed Mar 2018 → now Mar 2019· 90.9% built· 1 complaint
- Madan Vilas7.5 yr overdueIshaan Enterprise · Thane, ThaneP51700001871· filed Mar 2018 → now Mar 2019· 90.9% built· 1 complaint
- JAI MATADEE7.5 yr overdueAARADHANA DEVELOPERS · Thane, ThaneP51700000884· filed Mar 2018 → now Mar 2019· 50% built
- THE PALMS7.5 yr overdueMETRO DEVELOPMENT · Thane, ThaneP51700000006· 91.5% built
- RATHADIA CO-OPERATIVE HOUSING SOCIETY LTD7.5 yr overdueJ SQUARE INFRA · KULGAON, ThaneP51700015329· 90.9% built
- SAMRUDDHI EVERGREEN-PHASE-4B7.5 yr overduePoddar Housing and Development Limited · Badlapur (M Cl), ThaneP51700009016· 70.6% built
- Mohan Ritteka7.5 yr overdueSHREE KRISHNA ENTERPRISES · Ulhasnagar, ThaneP51700004103· filed Mar 2018 → now Mar 2019· 90.9% built
- GAJANAN NANA HEIGHTS7.5 yr overdueVASTU GANESH BUILDERS AND DEVELOPERS · Kalyan, ThaneP51700010902· 46.4% built
- KONARK RESIDENCY7.5 yr overdueKonark NIrman Pvt. Ltd. · Ulhasnagar, ThaneP51700008502· 86.1% built· 1 complaint
- HIGHLAND HAVEN BUILDING 3C CORAL-B PHASE 37.5 yr overdueSIDDHI KRISH DEVELOPERS · Thane, ThaneP51700007196· 83.9% built
- ATLANTA RESIDENCY PHASE I7.5 yr overdueSRI BALAJI DEVELOPER · Bhiwandi, ThaneP51700007107· filed Mar 2018 → now Mar 2019· 89.4% built
- ARYAN ONE WING E AND F7.5 yr overdueKonark Lifespaces · Shirgaon, ThaneP51700009247· filed Apr 2018 → now Mar 2019· 90.9% built
- MANGESHI FLORA7.5 yr overdueOM REALTY · Kalyan, ThaneP51700005811· 62.7% built
- ANIRUDDHA LANDMARK7.5 yr overdueVASUDEV VISHWANATH PATIL · Navi Mumbai (M Corp.), ThaneP51700011992· 55.5% built
- HIGHLAND HAVEN BUILDING 4D CORAL-A PHASE 47.5 yr overdueSIDDHI KRISH DEVELOPERS · Thane, ThaneP51700006815· 83.9% built
- SHREE GANESH VYAPARI SANKUL7.5 yr overdueRAJDEEP BUILDERS AND DEVELOPERS · Badlapur (M Cl), ThaneP51700007269· 74.5% built
- SHANKHESHWAR PLATINUM-PHASE 17.5 yr overdueSHANKHESHWAR KREATERS · Kalyan, ThaneP51700000445· 90.9% built
- COSMOS HABITATE7.5 yr overdueCONCORDE ASSOCIATES · Majiwada, ThaneP51700006637· 44.9% built
- PUSHKAR APARTMENT7.5 yr overdueSAYALEE SANJESH PATKAR · Badlapur (M Cl), ThaneP51700010103· 41.8% built
- ORIANA BUSINESS PARK7.5 yr overdueDREAM BUSINESS VENTURE · Thane, ThaneP51700001659· 35.9% built
- Ganesh Pratima7.5 yr overdueHome Makers · Titwala, ThaneP51700007373· 60.3% built
- Jeevan Lifestyles7.5 yr overdueJEEVAN ENTERPRISES · Badlapur (M Cl), ThaneP51700004929· 72.7% built
- Munisuvrat Arc - Building 1 Plot 1 and Munisuvrat Royal - Building 2 on Plot 27.5 yr overdueShree Munisuvrat Realty · Bhiwandi, ThaneP51700004825· 57.3% built
- AVIGHNA KARAN WING A7.5 yr overdueAVIGHNA KARAN · Kalyan, ThaneP51700010306· 90.9% built
- ORCHID7.5 yr overdueMEHTA REALTORS · Thane, ThaneP51700001234· 72.7% built
- Mohan Suburbia IIB7.5 yr overdueMOHAN LIFESPACES LLP · Ambernath, ThaneP51700010658· filed Mar 2018 → now Mar 2019· 89.1% built· 1 complaint
- Purva Apartment7.5 yr overdueDEEPAK MOTIRAM DALAL · AMBERNATH, ThaneP51700014812· 18.2% built
- Saket Iris7.5 yr overdueANIL SHILPAYATAN PRIVATE LIMITED · Kalyan, ThaneP51700001875· 90.9% built
- GLOBE ESTATE PHASE 27.5 yr overdueGLOBE ENTERPRISES · MIDC PHASE 1,, ThaneP51700015240· 81.8% built
- PANVELKAR DAFFODIL7.5 yr overdueAMEYA DEVELOPERS · AMBERNATH, ThaneP51700019159· 90.9% built
- SKY HILL7.5 yr overdueSEVEN HILL BUILDCON · Ambarnath, ThaneP51700002510· 81.8% built· 2 complaints
- KRISHNA ENCLAVE7.5 yr overdueOM SAI DEVELOPERS · jarimari mata mandir, ThaneP51700007291· 40.5% built
- DHARMAVIHAR7.5 yr overdueMKY Infrastructure · Bhiwandi, ThaneP51700010249· filed Jul 2018 → now Apr 2019· 90.9% built· 1 complaint
- PARSHVADHARA7.5 yr overduePARSHVANATH DEVELOPERS · Badlapur (M Cl), ThaneP51700010323· 70.2% built· 1 complaint
- Rustomjee Azziano Wing H7.4 yr overdueKapstone Constructions Private Limited · Thane, ThaneP51700001453· 89.1% built
- PANVELKAR SANKALP WING B7.4 yr overdueGEETAI ENTERPRISES · Ambarnath, ThaneP51700011019· 90.9% built
- Parshuram Residency7.4 yr overdueShree Radha Developers · Ambarnath(M Cl), ThaneP51700013256· 39.6% built
- PLATINUM HERITAGE7.4 yr overdueDARSHAN SAGAR DEVELOPERS · patlipada, ThaneP51700005172· filed May 2018 → now May 2019· 78.2% built· 12 complaints
- SAMRUDDHI7.4 yr overdueKishor Ramchandra Kulkarni · DOMBIVLI, ThaneP51700013478· 74.5% built
- GIRIVIHAR7.4 yr overdueABHINANDAN ENTERPRISE · Thane, ThaneP51700009018· 48.2% built
- RACHANA HEIGHTS7.3 yr overdueRESHMA VIKAS BAMBULKAR · Badlapur (M Cl), ThaneP51700014144· 74.1% built
- LODHA SPLENDORA PLATINO E TO G , VIVANT A TO D7.3 yr overdueLODHA DEVELOPERS LIMITED · Thane, ThaneP51700000199· 78.2% built· 14 complaints
- COSMOS ORCHID7.3 yr overdueMONARCH DEVELOPERS · Thane (M Corp.), ThaneP51700011044· 87.3% built
- OPAL SQUARE7.3 yr overdueShuban Buildpro LLP · Thane, ThaneP51700005705· 63.6% built
- VASUDEV SKY HIGH7.3 yr overdueSHREE PRATHAMESH DEVELOPER · Thane, ThaneP51700003503· 59% built
- SIDDHICITY7.3 yr overdueSiddhitech Homes Private Limited · Ambarnath, ThaneP51700001597· filed Jun 2018 → now Jun 2019· 85.2% built· 24 complaints
- PATEL ESTATES7.3 yr overdueVINOD GORDHANBHAI PATEL · GANDHI CHOWK, ThaneP51700010036· 72.7% built
- COSMOS ENCLAVE7.3 yr overdueASHIRWAD DEVELOPERS · Thane, ThaneP51700001476· 33.9% built· 1 complaint
- KONARK SOLITAIRE - PHASE 17.3 yr overdueKONARK REALTIES J.V. · NEXT TO KDMC "A" WARD, ThaneP51700009356· 90.9% built
- Sahajeevan Residency Bldg 2, C-Wing7.3 yr overduePappu Developers & Group · Kalyan, ThaneP51700010437· 81.8% built
- Girnar Tirth7.3 yr overdueParshwa Associates · Kalyan, ThaneP51700007746· 45.5% built· 2 complaints
- POONAM ESTATE CL 2 BLG NO 7 8 97.3 yr overdueRavi Developments · Thane, ThaneP51700008166· 68.2% built
- Mohan Willows I7.3 yr overdueMOHAN LIFESPACES LLP · Ambarnath, ThaneP51700002731· filed Jun 2018 → now Jun 2019· 90.9% built· 1 complaint
- VASANT SPRINGWOODS PHASE 27.3 yr overdueM/S SHREE CONSTRUCTIONS · Badlapur (M Cl), ThaneP51700008622· 90.9% built
- NAMDEV PLAZA7.3 yr overdueMETRO INFRA · Ambarnath, ThaneP51700003887· 58.2% built
- Uma Vatika7.3 yr overdueUma Creative · Ambarnath, ThaneP51700003281· 66.8% built
- UNIQUE GREEN7.3 yr overdueMADHU HARSHAD DOSHI · Thane (M Corp.), ThaneP51700009563· filed Jun 2018 → now Jun 2019· 90.9% built· 11 complaints
- Vrindavan Park7.3 yr overdueMohammed Salim Yusuf · Kalyan, ThaneP51700003010· 88.5% built
- METRO HIGHLAND PHASE I7.3 yr overdueMETRO DEVELOPERS · Ambarnath, ThaneP51700005374· filed Jun 2018 → now Jun 2019· 90.5% built
- MAYFAIR AASAAN7.3 yr overdueMAYFAIR HOUSING PRIVATE LIMITED · VALSHET, ThaneP51700013741· 83.7% built
- MOTIRAM DARSHAN NX7.3 yr overdueMOTIRAM DARSHAN NX · Ambarnath, ThaneP51700006708· 38.6% built
- VASANT ELITE7.3 yr overdueM/S VASANT BUILDERS AND DEVELOPERS · Kalyan, ThaneP51700003400· filed Jun 2018 → now Jun 2019· 90.9% built
- SHIVSHAKTI COMPLEX7.3 yr overdueSHIV SHAKTI CORPORATION · Ambarnath, ThaneP51700006887· 51.9% built
- SRI HERITAGE7.3 yr overdueFOURWAY REALTY · Ambarnath, ThaneP51700004111· 77.3% built· 1 complaint
- UMIYA DARSHAN7.3 yr overdueSHREE UMIYA GROUP · Badlapur (M Cl), ThaneP51700008860· filed Jun 2018 → now Jun 2019· 70.5% built· 2 complaints
- MAITRI HILLS7.3 yr overdueESHWAR ENTERPRISES · Badlapur (M Cl), ThaneP51700011254· 54.5% built
- NEELKANTH JYOT7.3 yr overduePRAPTI ENTERPRISES · Sape, ThaneP51700010769· 90.9% built
- ANNAPURNA JEWELS7.3 yr overdueANNAPURNA CREATORS · Thane, ThaneP51700000893· 88.2% built
- VALLABH C H S LTD PROPOSED7.3 yr overdueSpendor Shelters Private Limited · Kalyan, ThaneP51700001106· 31.8% built
- KRISHNA PARADISE7.3 yr overdueGOPAL KRISHNA DEVELOPERS · Kalyan-Dombivali (M Corp.), ThaneP51700012318· 90.9% built
- Riverview Classic Building No.2,Phase II7.3 yr overdueRUTU BUILDERS · Kalyan, ThaneP51700001351· 98.6% built· 1 complaint
- BHAIRAAV SIGNATURE7.3 yr overdueSHARPMIND INFRASTRUCTURE PRIVATE LIMITED · Thane, ThaneP51700003768· filed Jun 2018 → now Jun 2019· 98.2% built
- DEEP ENCLAVE7.3 yr overdueDATTAGURU ENTERPRISES · BADLAPUR, ThaneP51700014690· 20.5% built
- PALAVA EVIVA K to T, URBANO A, B, C and F, URBANO I to T7.3 yr overdueLodha Developers Limited · Kalyan, ThaneP51700000419· 78.2% built· 5 complaints
- SHIVNERI7.3 yr overdueAAVISHKAR ASSOCIATES · Kalyan, ThaneP51700008705· filed Dec 2018 → now Jul 2019· 90.9% built
- MARUTI DARSHAN7.2 yr overdueKOMAL DREAM BUILDERS PRIVATE LIMITED · Thane, ThaneP51700002727· 73.4% built
- Lifestyle City Kalyan - Victory A7.2 yr overdueNirmal Lifestyle (Kalyan) Private Limited · Kalyan, ThaneP51700003212· filed Jul 2018 → now Jul 2019· 64.6% built· 13 complaints
- ARYAN ONE WING G AND H7.2 yr overdueKonark Lifespaces · Ambarnath, ThaneP51700002130· filed Jul 2018 → now Jul 2019· 89.5% built
- HERAMB PARK PHASE II7.2 yr overdueSAI SAMRUDDHI CONSTRUCTION CO · Badlapur (M Cl), ThaneP51700004551· 44.8% built
- Lifestyle City Kalyan - Victory B7.2 yr overdueNirmal Lifestyle (Kalyan) Private Limited · Kalyan, ThaneP51700003544· filed Jul 2018 → now Jul 2019· 64.6% built· 7 complaints
- MAHALAXMI PARADISE7.2 yr overdueSHREE MAHALAXMI BUILDERS AND DEVELOPERS · Ambarnath, ThaneP51700003224· 52.7% built
- SHREE SAVALI WING B7.2 yr overdueUMESH RAOSAHEB PAWAR PATIL HUF · Thane, ThaneP51700005638· 90.9% built
- THARWANIS MEGHNA MONTANA PHASE - I7.2 yr overdueTHARWANI CONSTRUCTIONS PVT LTD · Ambarnath, ThaneP51700004242· filed Jun 2018 → now Jul 2019· 89.1% built· 40 complaints
- Mayurs Nature Glory Phase-37.2 yr overdueMukund Balu Keni · Thane, ThaneP51700008450· 81.9% built
- MAHADEV PARADISE7.2 yr overdueNANDKUMAR MAHADEV PATIL · BHAYANDAR, ThaneP51700010608· 61.5% built
- ORCHID7.2 yr overdueROYALE URBANSPACE LLP · SHAHAPUR, ThaneP51700011790· 90.9% built· 2 complaints
- DHOLES EMPIRE7.2 yr overdueELITE DEVELOPERS · Thane, ThaneP51700011206· 90.9% built
- IDEAL PARK7.2 yr overdueIDEAL BUILDER & DEVELOPERS · Mira-Bhayandar (M Corp.), ThaneP51700009100· 90.9% built
- AVANTIKA RESIDENCY7.1 yr overdueSANCHITA CONSTRUCTION · Badlapur (M Cl), ThaneP51700010159· filed Aug 2018 → now Aug 2019· 90.9% built
- MAN OPUS7.1 yr overdueMAN GLOBAL LTD. · Thane, ThaneP51700008395· filed Dec 2018 → now Aug 2019· 65.6% built· 112 complaints
- SRUSHTI RESIDENCY D TYPE WING 17.1 yr overdueM/S. KULSWAMINI BUILDERS · DOMBIVLI, ThaneP51700012479· 41.4% built
- SEASONS ELITE7.1 yr overdueSAI MAHAVIR DEVELOPERS · Thane, ThaneP51700012166· 81.8% built
- SRUSHTI RESIDENCY D-TYPE WING-27.1 yr overdueKulswamini Builders · Kalyan, ThaneP51700005884· 60.5% built
- PEARL7.1 yr overdueSagar Enterprise · Thane, ThaneP51700002276· 90.9% built
- KULSWAMINI PRASSANNA7.1 yr overdueKULSWAMINI DEVELOPERS · DOMBIVLI, ThaneP51700012480· 90.9% built
- ADITI VILLA7.0 yr overdueATLANTIC CONSTRUCTION · Badlapur (M Cl), ThaneP51700008416· 43.2% built
- RAGHUNANDAN-NX7.0 yr overdueVASTU DEVELOPERS · NAVAPADA GANESH NAGAR, ThaneP51700014552· 90.9% built
- SHREE SAI POOJA APARTMENT7.0 yr overdueOM SAI REALTY · BADLAPUR, ThaneP51700020600· 85.5% built
- Sai Savitri Villa7.0 yr overdueSavitri Group · Thane, ThaneP51700010636· 90.9% built· 2 complaints
- Vijay Vatika -57.0 yr overdueVIJAY SURAKSHA REALTY LLP · Village Kavesar, Ghodbunder Road, ThaneP51700005805· filed Sept 2018 → now Sept 2019· 90.9% built
- TEEJADEEP HEIGHTS7.0 yr overdueTEEJADEEP DEVELOPERS · Thane, ThaneP51700010345· filed Sept 2018 → now Sept 2019· 91.8% built· 1 complaint
- VISHWAJEET PARADISE7.0 yr overdueKOHINOOR INFRA DEVELOPMENT · Ambarnath, ThaneP51700008406· filed Sept 2018 → now Sept 2019· 81.8% built· 1 complaint
- VASTU SIDDHI7.0 yr overdueSIDDHIVINAYAK GROUP · Ambarnath (R), ThaneP51700011663· 90% built
- RABIYA RESIDENCY7.0 yr overdueA R CONSTRUCTION · Bhiwandi (M Corp.), ThaneP51700013542· 47.3% built
- KAVITA PEARL7.0 yr overdueKAVITA INFRA · Kalyan-Dombivali (M Corp.), ThaneP51700007502· 90.9% built
- PATELS ELYSIUM - 17.0 yr overdueAPACE REALTY · Ambarnath(M Cl), ThaneP51700009543· 87.3% built
- GRAND ARENA6.9 yr overdueS H CONSTRUCTIONS · Thane, ThaneP51700012136· filed Nov 2018 → now Nov 2019· 66.3% built· 1 complaint
- PENTAGON HEIGHTS6.9 yr overdueDAMJI HARI CONSTRUCTIONS · Bhiwandi, ThaneP51700010871· filed Nov 2018 → now Nov 2019· 90.9% built· 7 complaints
- vedant imperial ABC phase 16.9 yr overdueMOHAN HARDASMAL THARWANI · Badlapur (M Cl), ThaneP51700006197· 78.5% built
- SHREE ASHTAVINAYAK VASTU PRAKALPA6.9 yr overdueBALKRISHNA KASHINATH BHOIR · Badlapur (M Cl), ThaneP51700007934· 73.9% built
- LODHA AMARA - TOWER 1 - 5, 7 - 196.9 yr overdueLODHA DEVELOPERS LIMITED · Thane, ThaneP51700001065· 78.2% built· 26 complaints
- Pranjee Garden City Phase -II6.9 yr overduePranjee Properties Pvt. Ltd · Katrap, ThaneP51700005963· filed Nov 2018 → now Nov 2019· 81.5% built· 6 complaints
- NG GRAND PLAZA PHASE I6.8 yr overdueOM NAMAH SHIVAY DEVELOPERS PRIVATE LIMITED · Thane, ThaneP51700000068· 54.8% built
- SADGURU RESIDENCY6.8 yr overdueRAM LAXMAN DEVELOPERS · DAIGHAR VILLAGE, ThaneP51700019675· 90.9% built
- N G CANARY6.8 yr overdueRNA Builders (NG) · Thane, ThaneP51700000320· 39.1% built
- UMIYA NAKSHATRA6.8 yr overdueM/s. Jigar Enterprise · Badlapur (M Cl), ThaneP51700008369· 90.9% built
- WOODLAND6.8 yr overdueSHAURYA INFRA BUILDERS AND DEVELOPERS · Ambarnath, ThaneP51700005808· filed Dec 2018 → now Dec 2019· 90.9% built
- VASANT VIHAR6.8 yr overdueJAIDEEP CONSTRUCTION · AMBERNATH EAST, ThaneP51700019139· 81.8% built
- GAJANAN SMRUTI6.8 yr overdueJAIDEEP CONSTRUCTION · AMBERNATH EAST, ThaneP51700019112· 81.8% built
- Panvelkar Nisarg Phase-I6.8 yr overduePanvelkar Realty Private Limited · Ambarnath, ThaneP51700004393· filed Dec 2018 → now Dec 2019· 90.9% built
- SHREE KRISHNA PLAZA6.8 yr overdueSHREE HANUMAN ENTERPRISES · Thakurli, Cholegaon, ThaneP51700014660· 90.9% built· 2 complaints
- NEPTUNE SWARAJYA SECTOR 2 - B46.8 yr overdueNEPTUNE DEVELOPERS LTD · Kalyan-Dombivali (M Corp.), ThaneP51700005949· filed Dec 2018 → now Dec 2019· 63.9% built
- NEPTUNE SWARAJYA SECTOR 2 - B136.8 yr overdueNEPTUNE DEVELOPERS LTD · Kalyan-Dombivali (M Corp.), ThaneP51700012000· filed Dec 2018 → now Dec 2019· 62.7% built
- NEPTUNE SWARAJYA SECTOR 2 - B96.8 yr overdueNEPTUNE DEVELOPERS LTD · Kalyan-Dombivali (M Corp.), ThaneP51700005264· filed Dec 2018 → now Dec 2019· 53.4% built
- BALAJI AANGAN SHIVAM - C WING6.8 yr overdueSHREE SAI BALAJI ENTERPRISES · Kalyan, ThaneP51700007601· 75.9% built
- VISHWAJEET MANOR6.8 yr overdueABHIJEET REALTY · Ambarnath, ThaneP51700001321· 45.5% built
- LODHA FRESHIA WING D, E6.8 yr overdueLodha Developers Limited · Kalyan, ThaneP51700006149· 90.9% built
- NANA VISHNU HEIGHTS6.8 yr overdueAMAR CONSTRUCTION · Kalyan, ThaneP51700005351· 90.9% built
- QUALITY HEIGHTS I6.8 yr overdueQUALITY CONSTRUCTION CO · Thane, ThaneP51700010184· filed Dec 2018 → now Dec 2019· 90.9% built
- NEPTUNE SWARAJYA SECTOR 2 - B186.8 yr overdueNEPTUNE DEVELOPERS LTD · Kalyan-Dombivali (M Corp.), ThaneP51700008868· filed Dec 2018 → now Dec 2019· 57.1% built
- AND SUNFLOWER6.8 yr overdueANANTNATH DEVELOPERS · Thane, ThaneP51700002966· 90.9% built· 1 complaint
- SHANTI SEVEN6.8 yr overdueSHANTISTAR BUILDERS · Thane, ThaneP51700002572· 89.1% built
- FENNEL D6.8 yr overdueROYALE URBANSPACE LLP · SHAHAPUR, ThaneP51700005481· 73.5% built
- Chintamani Builders6.8 yr overdueChintamani Builders · Kalambhe, ThaneP51700009293· filed Dec 2018 → now Dec 2019· 90.9% built
- VISHWAJEET ELITE6.8 yr overdueVISHWAJEET MEADOWS · Ambarnath, ThaneP51700001654· filed Dec 2018 → now Dec 2019· 31.4% built
- THANEKAR PARKLAND6.8 yr overdueAJAY MADHUKAR THANEKAR · Ambarnath, ThaneP51700000644· 43.9% built· 3 complaints
- Rassaz Greens6.8 yr overdueRais Ahmad · Thane, ThaneP51700008730· 50% built
- NEPTUNE SWARAJYA SECTOR 2 - B36.8 yr overdueNEPTUNE DEVELOPERS LTD · Kalyan-Dombivali (M Corp.), ThaneP51700009783· filed Dec 2018 → now Dec 2019· 60.2% built· 1 complaint
- SHANKAR COMPLEX II6.8 yr overdueJARIMARI RESIDENCY · Kalyan, ThaneP51700010530· 44.5% built
- NILGAGAN CO-OPERATIVE HOUSING SOCIETY LIMITED6.8 yr overdueFSK BUILDERS & DEVELOPERS PRIVATE LIMITED · Thane, ThaneP51700002833· 90.9% built
- RENTAL BUILDING A-1 R26.8 yr overdueSONAM SPARK INFRA LIMITED · Thane, ThaneP51700004747· filed Sept 2020 → now Dec 2019· 56.6% built
- Shantiniketan Wing B36.8 yr overdueAnmol Associates · Kalyan, ThaneP51700010374· 75% built
- Mohan Greenwoods Building 16.8 yr overdueMOHAN LIFESPACES LLP · Manjarli, ThaneP51700015601· 90.9% built
- SAI KRUPA RESIDENCY6.8 yr overdueSAIRAJ DEVELOPERS · BADLAPUR, ThaneP51700015567· 90.9% built
- ARIHANT PLAZA6.8 yr overdueARIHANT DEVELOPERS · Thane, ThaneP51700006068· 72.3% built
- BHARGAV6.8 yr overdueR N ENTERPRISES · Thane, ThaneP51700009004· 90.9% built
- YASH SARTHAK6.8 yr overdueAkshay Enterprises · Kalyan, ThaneP51700005645· 90.9% built
- TULSI ANAND6.8 yr overdueANAND HOMES · Eranjade, ThaneP51700008015· 48.5% built
- VARDHMAN VATIKA6.8 yr overdueDIWALI DEVELOPERS · Thane, ThaneP51700018906· 90.9% built
- SAGAR SRUSHTI B WING6.8 yr overdueUMA SAGAR HOMES · Kalyan, ThaneP51700010980· filed Dec 2018 → now Dec 2019· 90.7% built
- Rosa Oasis Phase 26.8 yr overdueUma Enterprises · Thane, ThaneP51700005311· filed Dec 2018 → now Dec 2019· 99% built
- Amanda Shopping6.8 yr overdueHIRANANDANI PROPERTIES PRIVATE LIMITED · Thane, ThaneP51700000704· 90.9% built
- SAPPHIRE6.8 yr overdueJANGID BUILDERS PRIVATE LIMITED · Mira Road East, ThaneP51700020060· 28.4% built
- SWAMI HIGHLANDS6.8 yr overdueSHREE SWAMI SAMARTH ASSOCIATES · Badlapur (M Cl), ThaneP51700002816· 90.9% built
- PUNYODAYA BHAVAN6.8 yr overdueHARAKCHAND NENMAL JAIN · Kalyan, ThaneP51700005373· 81.8% built
- Balaji Arcade Wing C6.8 yr overdueSHIKHAR DEVELOPERS · Kalyan, ThaneP51700005709· 61.4% built
- VIRAT AANGAN BUILDING NO 16.8 yr overdueSIDDHIVINAYAK DEVELOPERS · GANESH NAGAR, ThaneP51700007977· 72.7% built
- LAABH NEELKANTH6.8 yr overdueLAABH BUILDTECH · Thane, ThaneP51700010195· 83.9% built
- NANA PATIL PRIDE6.8 yr overduePATIL BUILDERS AND DEVELOPERS · Ambarnath, ThaneP51700008376· filed Dec 2018 → now Dec 2019· 80.2% built
- Mohan Nano estates II6.8 yr overdueMOHAN LIFESPACES LLP · AMBERNATH, ThaneP51700013253· 90.9% built
- SAI APARTMENTS6.8 yr overdueGAJANAN KOTKAR & NANDINI KOTKAR · Thane, ThaneP51700004665· filed Dec 2018 → now Dec 2019· 9.1% built
- NEPTUNE SWARAJYA SECTOR 2 - B126.8 yr overdueNEPTUNE DEVELOPERS LTD · Kalyan-Dombivali (M Corp.), ThaneP51700008852· filed Dec 2018 → now Dec 2019· 60.2% built
- GARDEN COURT TYPE B26.8 yr overdueDEEAARDEE ENTERPRISES · VASANT LEELA, ThaneP51700014836· 90.9% built
- SHALOM JOVE6.8 yr overdueCOTTADIYIL ENTERPRISES · Thane, ThaneP51700012851· filed Dec 2018 → now Dec 2019· 90.9% built
- Geetanjali6.8 yr overdueHonest Homes · Chikanghar, ThaneP51700009495· 90.9% built
- NEPTUNE SWARAJYA SECTOR 2 - 2B6.8 yr overdueNEPTUNE DEVELOPERS LTD · Kalyan-Dombivali (M Corp.), ThaneP51700005899· filed Dec 2018 → now Dec 2019· 54.5% built
- RAJ HEIGHT A WING6.8 yr overdueBhavani Enterprises · SHIRGOAN, ThaneP51700020263· 81.8% built
- SUNCITY ORION6.8 yr overdueNESTOR SAI DEVELOPERS PVT LTD · Bhiwandi, ThaneP51700008247· filed Dec 2018 → now Dec 2019· 90.9% built
- Mohan Areca II6.8 yr overdueMOHAN LIFESPACES LLP · Shirgaon, ThaneP51700017925· 90.9% built
- ANA Avant Garde Phase 16.8 yr overdueSTEELFAB ENGINEERING CORPORATION · Thane, ThaneP51700001388· filed Dec 2018 → now Dec 2019· 97.4% built· 25 complaints
- VIMAL RAJ WING A-1, MEDITYARAVIRAJ COMPLEX6.8 yr overdueRITESH RAMESH JAIN · Thane, ThaneP51700007634· 84.5% built
- NEPTUNE SWARAJYA SECTOR 2 - B 196.8 yr overdueNEPTUNE DEVELOPERS LTD · Kalyan-Dombivali (M Corp.), ThaneP51700009912· filed Dec 2018 → now Dec 2019· 57.1% built
- Ganesh Heights6.8 yr overdueShiv Builders and Developers · Badlapur (M Cl), ThaneP51700006830· 90.9% built
- NEPTUNE SWARAJYA SECTOR 2 - B56.8 yr overdueNEPTUNE DEVELOPERS LTD · Kalyan-Dombivali (M Corp.), ThaneP51700011913· filed Dec 2018 → now Dec 2019· 49% built· 2 complaints
- BALAJI ARCADE WING B6.8 yr overdueSHIKHAR DEVELOPERS · Kalyan, ThaneP51700010369· 78.2% built
- REGENCY PLATINUM6.8 yr overdueDHAANIYA ENTERPRISES · Ulhasnagar, ThaneP51700021512· 90.9% built
- NISARG GREENS - Commercial Phase-I6.8 yr overdueNND Ambernath LLP · Morivali, ThaneP51700016412· 90.9% built
- DEEP AANGAN6.8 yr overduePAREKH INFRAPROJECTS · Ambarnath, ThaneP51700001986· 33.4% built
- GRAPE CITY PHASE I6.8 yr overdueMs AMBER ESTATE · ANANDVALLI BEHIND SHRI GURUJI HOSPITAL, ThaneP51700001499· filed Dec 2018 → now Dec 2019· 90.9% built
- Mohan Willows II6.8 yr overdueMOHAN LIFESPACES LLP · Ambarnath, ThaneP51700003971· filed Dec 2018 → now Dec 2019· 90.9% built
- NEPTUNE SWARAJYA SECTOR 2 - B15 AND B176.8 yr overdueNEPTUNE DEVELOPERS LTD · Kalyan-Dombivali (M Corp.), ThaneP51700006446· filed Dec 2018 → now Dec 2019· 70.5% built· 2 complaints
- AMRUT VISHWA PHASE 26.8 yr overdueSAI SHRADHA DEVELOPERS · Ambarnath, ThaneP51700000808· 51.4% built
- MANORAMA CHS6.8 yr overdueRUPA PROPERTIES & SECURITIES PVT. LTD. · Thane, ThaneP51700005251· 90.9% built
- NEPTUNE SWARAJYA SECTOR 2 - B 146.8 yr overdueNEPTUNE DEVELOPERS LTD · Kalyan-Dombivali (M Corp.), ThaneP51700003706· filed Dec 2018 → now Dec 2019· 65.8% built· 1 complaint
- GOLDSTAR DECENT HOMES6.8 yr overdueGOLDSTAR SANKALP CONSTRUCTION · Thane, ThaneP51700000053· filed Dec 2018 → now Dec 2019· 82.9% built
- NEPTUNE SWARAJYA SECTOR 2 - B116.8 yr overdueNEPTUNE DEVELOPERS LTD · Kalyan-Dombivali (M Corp.), ThaneP51700010381· filed Dec 2018 → now Dec 2019· 56.6% built· 1 complaint
- KUMKUM CORNER6.8 yr overdueRAJU JAIN · Thane, ThaneP51700003288· 99.1% built
- Panvelkar Estate - Rockford6.8 yr overdueVijay Ramchandra Panvelkar · Ambarnath, ThaneP51700000431· 72.7% built
- SATYAM OLEANDER6.8 yr overdueSAHYOG GROUP · Ambarnath(M Cl), ThaneP51700010440· 74.2% built· 2 complaints
- TULIP N6.8 yr overdueROYALE URBANSPACE · SHAHAPUR, ThaneP51700011791· 53.2% built
- NEPTUNE SWARAJYA SECTOR 2 - B66.8 yr overdueNEPTUNE DEVELOPERS LTD · Kalyan-Dombivali (M Corp.), ThaneP51700008931· filed Dec 2018 → now Dec 2019· 49% built· 3 complaints
- SAI DHAM RESIDENCY6.8 yr overdueBUILDCON ENGINEERS · Bhiwandi, ThaneP51700009855· 81.8% built
- Chintamani Heights6.8 yr overdueYASH ENTERPRISES · Kulgaon, ThaneP51700014730· 90.9% built
- ASHOK SMRUTI DEFG6.8 yr overdueM/s Keytech · Thane, ThaneP51700000864· 84.5% built
- Balaji Arcade Wing A6.8 yr overdueSHIKHAR DEVELOPERS · Kalyan, ThaneP51700012219· 90.9% built
- URBANVILLE6.8 yr overdueSAI KRUPA BUILDERS · Kalyan, ThaneP51700005910· 31% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.