Delayed projects in Thane
1,593 MahaRERA-registered projects in Thane are past the possession date on file and still under 100% built. Where the promoter has formally revised the date, the original is shown alongside so you can see what changed.
Page 4 of 8
- Asmeeta Infratech Limited - Asmeeta Texpa6.6 yr overdueAsmeeta Infratech Limited · kon (CT), ThaneP51700009154· 81.8% built
- NEPTUNE SWARAJYA SECTOR 2 - 1B6.6 yr overdueNEPTUNE DEVELOPERS LTD · Kalyan-Dombivali (M Corp.), ThaneP51700003705· filed Dec 2018 → now Dec 2019· 55.6% built
- RAMESHWAR PARK (ORCHID, IRIS & ROSE)6.6 yr overdueRAMESHAWAR BUILDERS & DEVELOPERS · Thane, ThaneP51700008168· 90.9% built
- NISARG GREENS - Commercial Phase-I6.6 yr overdueNND Ambernath LLP · Morivali, ThaneP51700016412· 90.9% built
- ANA Avant Garde Phase 16.6 yr overdueSTEELFAB ENGINEERING CORPORATION · Thane, ThaneP51700001388· filed Dec 2018 → now Dec 2019· 97.4% built· 25 complaints
- AARSH AVENUE - SAAL WOOD AND SILVER WOOD6.6 yr overdueSATYAM CONSTRUCTION · BEHIND BHARAT COLLEGE, ThaneP51700013399· 90.9% built
- Chintamani Builders6.6 yr overdueChintamani Builders · Kalambhe, ThaneP51700009293· filed Dec 2018 → now Dec 2019· 90.9% built
- SHANKAR COMPLEX II6.6 yr overdueJARIMARI RESIDENCY · Kalyan, ThaneP51700010530· 44.5% built
- SHASHWAT PARK6.6 yr overdueMODERN CONSTRUCTION · Badlapur (M Cl), ThaneP51700004817· filed Dec 2018 → now Dec 2019· 17.3% built
- NEPTUNE SWARAJYA SECTOR 2 - B36.6 yr overdueNEPTUNE DEVELOPERS LTD · Kalyan-Dombivali (M Corp.), ThaneP51700009783· filed Dec 2018 → now Dec 2019· 60.2% built· 1 complaint
- SAPPHIRE6.6 yr overdueJANGID BUILDERS PRIVATE LIMITED · Mira Road East, ThaneP51700020060· 28.4% built
- Rassaz Greens6.6 yr overdueRais Ahmad · Thane, ThaneP51700008730· 50% built
- BHARGAV6.6 yr overdueR N ENTERPRISES · Thane, ThaneP51700009004· 90.9% built
- ASHWA PLATINUM6.6 yr overdueASHWAMEDH BUILDERS AND DEVELOPERS · Thane, ThaneP51700001143· 59.3% built· 1 complaint
- SHALOM JOVE6.6 yr overdueCOTTADIYIL ENTERPRISES · Thane, ThaneP51700012851· filed Dec 2018 → now Dec 2019· 90.9% built
- Joy Square6.6 yr overdueANANT SQUARE · Thane, ThaneP51700003827· 90.9% built
- AMRUT VISHWA PHASE 26.6 yr overdueSAI SHRADHA DEVELOPERS · Ambarnath, ThaneP51700000808· 51.4% built
- NILGAGAN CO-OPERATIVE HOUSING SOCIETY LIMITED6.6 yr overdueFSK BUILDERS & DEVELOPERS PRIVATE LIMITED · Thane, ThaneP51700002833· 90.9% built
- GOLDSTAR DECENT HOMES6.6 yr overdueGOLDSTAR SANKALP CONSTRUCTION · Thane, ThaneP51700000053· filed Dec 2018 → now Dec 2019· 82.9% built
- KUMKUM CORNER6.6 yr overdueRAJU JAIN · Thane, ThaneP51700003288· 99.1% built
- NANA PATIL PRIDE6.6 yr overduePATIL BUILDERS AND DEVELOPERS · Ambarnath, ThaneP51700008376· filed Dec 2018 → now Dec 2019· 80.2% built
- URBANVILLE6.6 yr overdueSAI KRUPA BUILDERS · Kalyan, ThaneP51700005910· 31% built
- NANA VISHNU HEIGHTS6.6 yr overdueAMAR CONSTRUCTION · Kalyan, ThaneP51700005351· 90.9% built
- VISHWAJEET ELITE6.6 yr overdueVISHWAJEET MEADOWS · Ambarnath, ThaneP51700001654· filed Dec 2018 → now Dec 2019· 31.4% built
- TULIP N6.6 yr overdueROYALE URBANSPACE · SHAHAPUR, ThaneP51700011791· 53.2% built
- NEPTUNE SWARAJYA SECTOR 2 - 2B6.6 yr overdueNEPTUNE DEVELOPERS LTD · Kalyan-Dombivali (M Corp.), ThaneP51700005899· filed Dec 2018 → now Dec 2019· 54.5% built
- VARDHMAN GARDEN PHASE 16.6 yr overdueDIWALI CONSTRUCTION COMPANY · Thane, ThaneP51700010128· filed Dec 2018 → now Dec 2019· 90.9% built
- TULIP P6.6 yr overdueROYALE URBANSPACE · SHAHAPUR, ThaneP51700011815· 45.5% built· 1 complaint
- RENTAL BUILDING A-1 R26.6 yr overdueSONAM SPARK INFRA LIMITED · Thane, ThaneP51700004747· filed Sept 2020 → now Dec 2019· 56.6% built
- SHREE SIDDHIVINAYAK HEIGHTS6.6 yr overdueAJIT KRISHNAN RATNAM · Titwala, ThaneP51700003326· filed Dec 2018 → now Dec 2019· 90.9% built
- SAI KRUPA RESIDENCY6.6 yr overdueSAIRAJ DEVELOPERS · BADLAPUR, ThaneP51700015567· 90.9% built
- NEPTUNE SWARAJYA SECTOR 2 - B116.6 yr overdueNEPTUNE DEVELOPERS LTD · Kalyan-Dombivali (M Corp.), ThaneP51700010381· filed Dec 2018 → now Dec 2019· 56.6% built· 1 complaint
- LODHA FRESHIA WING D, E6.6 yr overdueLodha Developers Limited · Kalyan, ThaneP51700006149· 90.9% built
- YASH SARTHAK6.6 yr overdueakshay enterprises · Kalyan, ThaneP51700005645· 90.9% built
- Kohinoor waves6.6 yr overdueKohinoor Realties (J.V) · Ulhasnagar, ThaneP51700009303· filed Jan 2019 → now Jan 2020· 90.9% built
- DISHA CO OPERATIVE HOUSING SOCIETY LTD6.6 yr overdueGAGAN DEVELOPERS AND ENGINEERS · KALYAN WEST, ThaneP51700015245· 90.9% built
- Shree Sadan6.6 yr overdueSHRINIVAS DATTATRAY KALE · Thane, ThaneP51700005889· 82.5% built
- CRYSTAL APARTMENT6.6 yr overdueCRYSTAL CONSTRUCTION CO · Thane, ThaneP51700004766· 50.9% built· 1 complaint
- YASHWANT HEIGHTS C Wing6.6 yr overdueRAI RESIDENCY Private Limited · Kalyan, ThaneP51700008574· filed Mar 2018 → now Jan 2020· 86.2% built
- Dosti Desire-Dosti Joy6.6 yr overdueD. D. ASSOCIATES · brahmand, ThaneP51700008886· 90.9% built
- SAHAYOG NIWAS6.6 yr overdueSHREE DEVELOPERS · Thane, ThaneP51700013083· 81.8% built
- SILVER ICON6.5 yr overdueSILVER GLADES PROJECTS PRIVATE LIMITED · KONKAN, ThaneP52000001364· 90.9% built
- HERAMBKRUPA C H S LTD6.5 yr overdueSHREE SAI BUILDERS & DEVELOPERS · BHIDEWADI KANSAI SECTION, ThaneP51700016175· 81.8% built
- SIDDHIVINAYAK HEIGHT6.5 yr overdueSIDDHIVINAYAK DEVELOPERS · Thane (M Corp.), ThaneP51700012778· 54.5% built
- SAI SANKALP6.4 yr overdueJAI AMBE CONSTRUCTIONS · SAMBHAJI CHOWK, ThaneP51700016052· filed Mar 2019 → now Mar 2020· 34.1% built
- ASHTAVINAYAK NX6.4 yr overdueASHTAVINAYAK INFRASTRUCTURE · AMBARNATH EAST, ThaneP51700015495· filed Mar 2019 → now Mar 2020· 27.7% built
- LANDSCAPE HERITAGE BUILDING NO 16.4 yr overdueLANDSCAPE INFRASTRUCTURE · AMBARNATH EAST, ThaneP51700015151· 63.6% built
- TRINITY - RUDRA6.4 yr overdueRATTANRAJ LIFESPACES · AMABARNATH, ThaneP51700015840· 72.7% built
- Salasar Aarpan A Wing6.1 yr overdueSalangpur Gruh Nirman · Mira-Bhayandar (M Corp.), ThaneP51700010292· filed Jun 2019 → now Jun 2020· 90.9% built· 1 complaint
- Pandurang smruti6.1 yr overdueLote Constructions · Kalyan, ThaneP51700013381· filed Jul 2019 → now Jun 2020· 82.5% built
- Omega Business Park5.9 yr overdueArha Buildpro LLP · Thane, ThaneP51700015589· 81.8% built
- Dhruvika Enclave5.9 yr overdueManoyadnya Developers · Joveli Gaon, ThaneP51700015355· 81.8% built
- Shivani Heritage5.9 yr overdueGajanan Shyamrao Khabale · Thane, ThaneP51700008458· filed Mar 2019 → now Sept 2020· 57% built
- CHINTAMANI HABITAT DAFFODILS TYPE G - E5.9 yr overdueJASHNANI CONSTRUCTION PRIVATE LIMITED · Shahapur (CT), ThaneP51700001853· 63% built
- MADHUBAN F1 F25.9 yr overdueAbhilasha Venture · Titwala, ThaneP51700002614· filed Mar 2019 → now Sept 2020· 90.9% built
- AMIKRUPA5.9 yr overdueAAROHI DEVELOPMENT CORPORATION · Chikanghar, ThaneP51700008884· 90.9% built
- MANGESHI DAZZLE - III5.9 yr overdueKALYAN DEVELOPMENT CORPORATION · Kalyan, ThaneP51700005137· filed Mar 2019 → now Sept 2020· 84.2% built
- EMPRESS C WING5.9 yr overdueVENTURE BUILDERS · Titwala, ThaneP51700007775· 84.5% built
- PANVELKAR OPTIMA5.9 yr overdueVARAD VINAYAK DEVELOPERS · AAPTEWADI, ThaneP51700015392· 40.2% built
- Apollo Retail5.9 yr overdueLODHA DEVELOPERS LIMITED · Thane, ThaneP51700016927· 81.8% built
- INDRAPRASTH WING C5.9 yr overdueSONAM SPARK INFRA LIMITED · Thane, ThaneP51700002491· 57% built
- HATKESH HEIGHTS5.9 yr overdueS. M. INFRASTRUCTURES · Thane, ThaneP51700008077· 90.9% built· 13 complaints
- Hiraco Eminence Phase 15.9 yr overdueKASHIMIRA CERAMIC PRODUCTS LLP · Thane, ThaneP51800008105· 88.6% built· 99 complaints
- Haware Pinnacle5.9 yr overdueSuresh Kashinath Haware · Bhiwandi, ThaneP51700000464· 78.2% built
- MORYA RESIDENCY5.9 yr overdueSAIRATNA CONSTRUCTION · Badlapur (M Cl), ThaneP51700012171· 80% built
- Sindhusmruti5.9 yr overdueYogiraj Powertech Pvt Ltd · Thane, ThaneP51700006699· filed Nov 2018 → now Sept 2020· 47.7% built· 1 complaint
- SARVODAY SNEH5.9 yr overdueEKTA LAND DEVELOPERS · THAKURLI EAST, ThaneP51700015356· 90.9% built
- SANDHYA BUILDING5.9 yr overdueS D BHALERAO CONSTRUCTIONS PVT LTD - SANDHYA · Thane, ThaneP51700005398· filed Mar 2019 → now Sept 2020· 90.9% built· 2 complaints
- ARIHANT AAROHI PHASE I5.8 yr overdueARIHANT SUPERSTRUCTURES LIMITED · Thane, ThaneP51700004679· filed Apr 2019 → now Oct 2020· 99.1% built
- THARWANI SOLITAIRE PHASE II5.8 yr overdueANIL HARDASMAL THARWANI · Kalyan, ThaneP51700004565· filed Apr 2019 → now Oct 2020· 10.9% built
- DAHLIA BLDG A D AND E5.8 yr overdueHAWARE ENGINEERS AND BUILDERS PRIVATE LIMITED · Thane, ThaneP51700001515· filed Apr 2019 → now Oct 2020· 73.5% built· 3 complaints
- Jangid Galaxy Tower 35.8 yr overdueJangid Contructions · Thane, ThaneP51700004127· filed Dec 2018 → now Oct 2020· 44.9% built· 21 complaints
- Mountain Valley5.8 yr overdueGayasuddin Riyazuddin Khan · Thane, ThaneP51700009583· 69.7% built
- Vaishnavi Heights5.8 yr overdueSanjay Shantaram Kankoshe · Kalyan-Dombivali (M Corp.), ThaneP51700011393· filed Dec 2017 → now Oct 2020· 82.1% built
- KRUSHNAI5.8 yr overdueWELFARE CONSTRUCTION · Kalyan, ThaneP51700010252· filed Apr 2018 → now Oct 2020· 82.7% built
- RANGAI APARTMENTS5.8 yr overdueA V CONSTRUCTION · AYRE VILLAGE, ThaneP51700018389· 34.5% built
- PADMADISHA PARADISE5.8 yr overduePADMADISHA PARADISE · Bhiwandi, ThaneP51700003857· filed Dec 2018 → now Oct 2020· 90.9% built· 1 complaint
- SHIVA PLAZA5.8 yr overdueKRUTIKA BUILDERS AND DEVELOPERS · Kalyan, ThaneP51700008806· filed May 2018 → now Nov 2020· 39.1% built
- PLATINUM SAGAR JEWEL WING D AND E5.7 yr overduePLATINUM SAGAR HOMES · Badlapur (M Cl), ThaneP51700005294· filed May 2019 → now Nov 2020· 44.5% built
- UMIYA COMPLEX PHASE II5.7 yr overdueUmiya Associates · Badlapur (M Cl), ThaneP51700009284· 90.9% built
- ANITA COOPERATIVE HOUSING SOCIETY LTD.5.7 yr overdueGYANDEV BUILDERS & DEVELOPERS · VADAVLI SECTION, ThaneP51700014693· 81.8% built
- shree siddhivinayak residency5.7 yr overdueSUNIL BHAGCHAND TALREJA · Ambernath, ThaneP51700013467· filed May 2018 → now Nov 2020· 61.4% built
- SHUBHAM GALAXY5.7 yr overdueNAVKAR & ASSOCIATES · Kalyan, ThaneP51700010970· 52.7% built
- RADHAKRISHNA5.7 yr overdueM/S NIRMAAN DEVELOPERS · Thane, ThaneP51700015161· 90.9% built
- PANVELKAR SANKALP WING A5.7 yr overdueGEETAI ENTERPRISES · Ambarnath, ThaneP51700010787· 90.9% built
- GALAXY AURA5.7 yr overdueOMPRAKASH WADHURAM WADHWA · Thane, ThaneP51700007306· filed Jun 2019 → now Dec 2020· 98.2% built
- OM RESIDENCY5.6 yr overdueSHREE KULSWAMI DEVELOPERS · Thane, ThaneP51700008682· filed Jun 2019 → now Dec 2020· 78% built
- SHILPA CHS5.6 yr overdueYASH INFRA · Thane, ThaneP51700009903· 90.9% built
- SAFFRON HILLS5.6 yr overdueALPHA COMBINES · Badlapur (M Cl), ThaneP51700012065· filed Jun 2019 → now Dec 2020· 68.2% built
- DEV LUXURIA5.6 yr overdueDEV VENTURES · Badlapur (M Cl), ThaneP51700006775· filed Jun 2019 → now Dec 2020· 90.9% built
- ONYX5.6 yr overdueSTRAWBERRY CONSTRUCTIONS PVT. LTD. · Thane, ThaneP51700004512· filed Jun 2019 → now Dec 2020· 50.9% built
- Ewar Complex5.6 yr overdueEWAR CONSTRUCTIONS PRIVATE LIMITED · Thane, ThaneP51700014636· filed Jun 2019 → now Dec 2020· 90.9% built
- Mohan Suburbia IV5.6 yr overdueMOHAN LIFESPACES LLP · Ambarnath, ThaneP51700002244· filed Jun 2019 → now Dec 2020· 90.9% built· 1 complaint
- MUKATA LAKE CITY5.6 yr overdueKANAK REALTORS · Thane, ThaneP51700008734· filed Jun 2019 → now Dec 2020· 90.9% built
- OM SAI HOME5.6 yr overdueM/S. INFINI DEVELOPERS · Bhiwandi, ThaneP51700008960· filed Jun 2019 → now Dec 2020· 85.9% built
- NEELKANTH DEEP5.6 yr overdueKESHAV REALTY · Badlapur (M Cl), ThaneP51700011297· filed Jun 2019 → now Dec 2020· 53.6% built
- MARATHON NAGARI NX VIGO D5.6 yr overdueMARATHON REALTY PVT LTD · SHIRGAON, ThaneP51700005045· filed Jun 2019 → now Dec 2020· 90.9% built· 1 complaint
- DYNAMIC ULTIMA - BLISS5.6 yr overdueTRIVENI LIFE STYLE DEVELOPERS LLP · Kalyan-Dombivali (M Corp.), ThaneP51800004249· 90.9% built
- SAI DARSHAN5.6 yr overdueUNITY INFRATECH · Badlapur (M Cl), ThaneP51700007036· 90.9% built
- Bhoomi Lawns , Phase II5.6 yr overdueGajra Home Makers Pvt. Ltd. · Thane, ThaneP51700004303· 90.9% built· 14 complaints
- PALAVA CLARA E - I5.6 yr overdueLodha Developers Limited · Kalyan, ThaneP51700000540· 81.8% built· 1 complaint
- SUNANDA CIRCLE A WING AND C WING PHASE II5.6 yr overdueRUDIS DEVELOPERS · Thane, ThaneP51700015111· 0% built· 1 complaint
- Anjani Regency5.6 yr overdueGeeta Developers · Thane, ThaneP51700004541· 90.9% built
- UNIQUE ORBIT-I5.6 yr overdueUNIQUE SHANTI REALTORS · Thane, ThaneP51700005412· 90.9% built· 1 complaint
- ANAND HOMES5.6 yr overdueShrinath Developers · Kalyan, ThaneP51700005026· 27.3% built
- Puneet Kanchanganga Phase 2 Floor 26 to Floor 285.6 yr overduePuneet Developers · Thane, ThaneP51700005601· filed Dec 2018 → now Dec 2020· 90.9% built
- SAI SRUSHTI5.6 yr overdueJYOTIRMAY DEVELOPERS · KALYAN, ThaneP51700007099· filed May 2018 → now Dec 2020· 60% built
- Rustomjee Azziano Wing I5.6 yr overdueKapstone Constructions Private Limited · Thane, ThaneP51700001093· 75.8% built· 1 complaint
- PALAVA FONTANA C - H5.6 yr overduePalava Dwellers Private Limited · Kalyan, ThaneP51700000596· 78.2% built· 2 complaints
- BAHINAI BHUVAN5.6 yr overdueMANOJ VASUDEV VAIDYA · Badlapur (M Cl), ThaneP51700003746· 9.1% built
- Puneet Kanchanganga Phase One Floor 0 to Floor 255.6 yr overduePuneet Developers · Thane, ThaneP51700011319· filed Dec 2018 → now Dec 2020· 90.9% built· 3 complaints
- SHREE SAI PANACHE5.6 yr overdueGYANDEV BUILDERS & DEVELOPERS · Ambarnath, ThaneP51700000216· 81.8% built
- PANVELKAR ICON5.6 yr overduePANVELKAR GROUP BUILDERS AND DEVELOPERS · Ambarnath, ThaneP51700004577· 50% built
- Kohinoor Lifestyle5.6 yr overdueSonu Anil Hotchandani · Kalyan, ThaneP51700002787· 90.9% built· 1 complaint
- PALACIA PHASE-II5.6 yr overdueSHREE SACHDHANAND DEVELOPERS · Thane, ThaneP51700009592· filed Dec 2019 → now Dec 2020· 90.9% built
- GOLDCREST RESIDENCY - PHASE 15.6 yr overdueSAVITA HOMEMAKERS LLP · Thane, ThaneP51700012365· filed Dec 2019 → now Dec 2020· 97.4% built· 12 complaints
- Shree Siddhivinayak Tower5.6 yr overdueEkdant Constructions and Developers Private Limited · Thane, ThaneP51700012381· 90.9% built· 1 complaint
- Salasar Aarpan B Wing5.6 yr overdueSalangpur Gruh Nirman · Mira-Bhayandar (M Corp.), ThaneP51700010843· filed Dec 2019 → now Dec 2020· 90.9% built· 1 complaint
- KRISHNA HERITAGE5.6 yr overdueSHREE BALAJI CONSTRUCTION · KALYAN, ThaneP51700007118· 75% built· 1 complaint
- Naivaidya Heritage5.6 yr overdueDilip Gangji Shah · Thane, ThaneP51700014904· 81.8% built
- MIDTOWN HERITAGE5.6 yr overdueMARUTI DEVELOPERS J.V. · Kalyan, ThaneP51700003931· 90.9% built
- Hubtown Greenwoods E Wing5.6 yr overdueHubtown Limited · Thane, ThaneP51700000358· filed Jul 2019 → now Jan 2021· 81.7% built
- Hubtown Greenwoods D Wing5.6 yr overdueHubtown Limited · Thane, ThaneP51700000369· filed Jul 2019 → now Jan 2021· 90.9% built· 2 complaints
- Hubtown Greenwoods F Wing5.6 yr overdueHubtown Limited · Thane, ThaneP51700000602· filed Jul 2019 → now Jan 2021· 90.9% built· 7 complaints
- Saidarshan Residency5.6 yr overdueGajanan Katod Shelavale · Shahapur, ThaneP51700016548· 90.9% built
- Mahavir Estella - Wing E5.6 yr overdueM/s. Cityscape Construction Company · Thane, ThaneP51700018330· 90.9% built
- YASHODHARA CO-OP HOUSING SOCIETY5.6 yr overdueSURESH KESHAVRAO YASHVANTRAO · Ambarnath, ThaneP51700002868· 9.1% built
- Shree Ganesh Residency5.6 yr overdueAmol Padmakar Tarmale · Asangaon (CT), ThaneP51700011204· 90.9% built
- MAHADEVSHREE5.6 yr overdueM.M.CONSTRUCTION · Mira-Bhayandar (M Corp.), ThaneP51700009145· 81.8% built
- MAHAVIR HEIGHTS NX5.6 yr overdueVIRA THEATRES PVT LTD · Kalyan, ThaneP51700008098· 0% built
- MALHARI GHORPADE ARCADE BUILDING NO 4 AND 55.6 yr overdueYAMUNA ENTERPRISES · Kulgaon, ThaneP51700010573· filed Dec 2019 → now Feb 2021· 59.8% built
- SARVODAY JYOT5.5 yr overdueBHAVI ENTERPRISES · Kalyan, ThaneP51700003758· 90.9% built
- Dosti Desire-Dosti Pearl5.5 yr overdueD. D. ASSOCIATES · brahmand, ThaneP51700005623· 86.4% built· 2 complaints
- PALAVA SAVANA AND SIENA5.5 yr overdueLodha Developers Limited · Kalyan, ThaneP51700000546· 90.9% built· 6 complaints
- VRINDAWAN RESIDENCY5.4 yr overdueSANKALP DEVELOPERS · NR DNYANDEEP NAGAR, ThaneP51700015683· 45.5% built
- Kohinoor Castles5.4 yr overdueKohinoor Castles · Ambarnath, ThaneP51700001641· 90.9% built
- DASARATH PLAZA5.4 yr overduePRABHAT BUILDERS & DEVELOPERS · Kalyan, ThaneP51700013428· 65.5% built
- Varija Apartment5.4 yr overdueGanesha Developers · Kalyan, ThaneP51700004648· 9.1% built
- TULSI TOWER5.4 yr overdueSHRI KALKI ENTERPRISES · Village Vadavali, ThaneP51700016781· filed Sept 2020 → now Mar 2021· 18.2% built
- CHARMS HEIGHTS PHASE-II A1-A25.4 yr overdueCharms Developers · Titwala, ThaneP51700002670· filed Mar 2019 → now Mar 2021· 90.9% built
- SAI LOTUS5.3 yr overdueMAKHIJA CONSTRUCTION · Ulhasnagar, ThaneP51700014625· 35.5% built
- Palm5.2 yr overduePranjee Properties Pvt. Ltd · Katrap, ThaneP51700004695· 9.1% built· 1 complaint
- Neelkanth Woods Olivia5.2 yr overdueT Bhimjyani Realty Pvt.Ltd. · Thane, ThaneP51700004591· 93.5% built· 78 complaints
- VARSHA MEADOWS5.2 yr overdueJAYESH BUILDCON · Kalyan, ThaneP51700005257· 80.6% built· 5 complaints
- JP REGENCY PHASE 15.1 yr overdueJP DEVELOPERS · AMBERNATH OLD VILLAGE, ThaneP51700013777· 87.9% built
- SAI VYANKATESH5.1 yr overdueANJANA SAHEBRAO CHAVAN · NEAR CHATRI BUNGLOW, BEHIND ALISHAN RESIDENCY, ThaneP51700016410· 88.9% built
- Automatic Co-Operative Housing Society Ltd5.1 yr overdueJOSHI ENTERPRISES · Thane, ThaneP51700014895· 91.4% built
- SAI SHARNAM- TYBE B5.1 yr overdueANJANA SAHEBRAO CHAVAN · WADEGHAR, ThaneP51700015504· 40.9% built
- MATOSHRI HEIGHTS5.1 yr overdueSUJAL DEVELOPERS · Kalyan, ThaneP51700010731· 90.9% built
- HORIZON CLASSIQUE-25.1 yr overdueSACHIN ENTERPRISES · OWALA, ThaneP51700015081· 90.9% built
- ELEMENTS5.1 yr overdueUMA REALTY · Thane, ThaneP51700015118· 90.9% built
- SANVEG RESIDENCY - PHASE I5.1 yr overdueOM VASTU HOMES · BADLAPUR GAON, ThaneP51700014705· 99.5% built
- Plot 1 Sector 10 GHANSOLI5.1 yr overdueCIDCO of Maharashtra Ltd. · Thane, ThaneP51700017366· 81.8% built
- METRO IMPERIAL5.1 yr overdueMETRO BALAJI DEVELOPERS · BADLAPUR, ThaneP51700015305· 90.9% built
- WAMAN HEIGHTS5.1 yr overdueLAXMI DEVELOPERS · Kalyan, ThaneP51700015114· 90.5% built
- BALKRUSHNA ARCADE4.9 yr overdueSHIVAJI PARSHURAM KATHORE · OPP TALATHI OFFICE, BADLAPUR WEST, ThaneP51700020212· 31.8% built
- ATMIYA LUXURIA4.8 yr overdueAKSHAR BUILDERS AND DEVELOPER · Sonavale, ThaneP51700009857· 90.9% built
- SHEETAL ARCADE4.8 yr overdueSHIVRAM CONSTRUCTION · NEAR BUS DEPO, ThaneP51700022304· filed Oct 2020 → now Oct 2021· 50% built
- Datar Heights4.8 yr overdueSaleem Abdul Shaikh · Badlapur (M Cl), ThaneP51700010631· filed Oct 2019 → now Oct 2021· 41.4% built
- BAMUBAI SADAN4.8 yr overdueSAMARTH DEVELOPERS · Kalyan, ThaneP51700003704· filed Oct 2019 → now Oct 2021· 58.6% built
- Neelkanth Woods Bungalow L 574.7 yr overdueT Bhimjyani Realty Pvt.Ltd. · Thane, ThaneP51700003404· 95.5% built
- Om Shiv Vatika A Wings4.7 yr overdueOm Shiv Developers · Badlapur (M Cl), ThaneP51700014398· 90.9% built
- BISTURIBAI TOWER4.7 yr overdueGauri Vinayak Builder and Developers Pvt Ltd · Vadavali Bk., ThaneP51700011660· filed May 2018 → now Nov 2021· 53.6% built
- SARVODAY SQUARE PHASE 1 BLDG. NO. 3,4 AND 74.7 yr overdueSHREE SQUAREFEET ENTERPRISES LLP · Ambarnath, ThaneP51700010034· 90.9% built
- M K Thakur Complex Phase 14.7 yr overdueVraj Ratan Buildcon Pvt Ltd · Thane, ThaneP51700009111· 89.9% built
- GREEN WOODS4.7 yr overdueVANTAGE LAND DEVELOPERS · Thane, ThaneP51700010446· 96.4% built· 1 complaint
- PURUSHOTTAM KSHITIJ4.7 yr overdueabhijit bhaskar kelkar · Kalyan, ThaneP51700008243· filed Dec 2019 → now Dec 2021· 90.9% built
- N G BAVENO4.7 yr overdueRNA Builders (NG) · Thane, ThaneP51700000589· filed Dec 2019 → now Dec 2021· 30.3% built
- MORAJ PRIDE4.7 yr overdueMORAJ INFRATECH PRIVATE LIMITED · Thane, ThaneP51700008474· 55.5% built
- MURLIDHAR PLAZA4.7 yr overdueSAIPOOJAN ENTERPRISES · Badlapur (M Cl), ThaneP51700010173· 45.5% built
- NEW THANA CHS4.7 yr overdueGAURANG PROPERTIES PVT. LTD. · BHASKAR COLONY, ThaneP51700007377· filed Dec 2019 → now Dec 2021· 18.2% built
- REDEVELOPMENT OF PARIJAT BUILDING OF SANKSRITI NAGAR COOP HSG SOC LTD4.7 yr overdueOJASS CONSTRUCTIONS · Thane, ThaneP51700001851· 90.9% built
- JADHAV MARKET4.7 yr overdueS J Construction Co · Badlapur (M Cl), ThaneP51700005308· 81.8% built
- NAYANTARA ASSOCIATES4.7 yr overdueNAYANTARA ASSOCIATES · Kalyan, ThaneP51700010238· 84.5% built
- SHUBH NISARG4.7 yr overdueVARDHAMAN AND VASTU ASSOCIATES · Badlapur (M Cl), ThaneP51700013375· 16.1% built
- Lok Nagari Developer Ph - II4.6 yr overdueLok Nagari Developer · Ambarnath East, ThaneP51700010802· filed Dec 2019 → now Dec 2021· 90.9% built· 4 complaints
- RAMESHWAR PARK - LILAC4.6 yr overdueRAMESHAWAR BUILDERS & DEVELOPERS · Dawale Gaon, Near Sai Baba Mandir, ThaneP51700017242· 55.9% built
- HARSH RESIDENCY AND THE CORPORATE LOUNGE4.6 yr overdueHARSH REAL ESTATE PRIVATE LIMITED · Kashimira, ThaneP51700005806· 60.7% built
- SHIV SAI DARSHAN4.6 yr overdueSAI BALAJI DEVELOPERS · Kalyan-Dombivali (M Corp.), ThaneP51700009348· filed Dec 2019 → now Dec 2021· 56.4% built
- JP SYNERGY4.6 yr overdueAASHVI DEVELOPERS · Ambarnath(M Cl), ThaneP51700013804· 21.6% built
- SAMRIDDHI4.6 yr overdueA G SUPERSTRUCTURES PVT LTD · Thane, ThaneP51700001636· filed Dec 2019 → now Dec 2021· 98.9% built
- HARISHREE RESIDENCY-14.6 yr overdueHARISHREE CREATIONS · Ambarnath(M Cl), ThaneP51700013029· 66.4% built
- Panvelkar Utsav Phase I4.6 yr overdueSai Swarg Enterprises · Valivli, ThaneP51700013199· 90.9% built
- YUVAANSH APARTMENT4.6 yr overdueMANVI CONSTRUCTION · KON, ThaneP51700014634· 90.9% built
- HYDE PARK RESIDENCY F4 BUILDING PHASE4.6 yr overdueNEXUS BUILDERS AND DEVELOPERS PVT LTD · Thane, ThaneP51700018186· 90.9% built
- Saurabh Arcade4.6 yr overdueM/s Krishna Builders & Developers · Badlapur (M Cl), ThaneP51700014233· 56.8% built
- SAI RESIDENCY4.6 yr overdueSAI RAJ DEVELOPERS · kharvai, ThaneP51700013477· 90.5% built
- Indralok Phase I4.6 yr overdueHonest Enterprise · Kalyan-Dombivali (M Corp.), ThaneP51700010974· filed Dec 2019 → now Dec 2021· 90.9% built
- RITU RAYYAN4.6 yr overdueRITU INFRASTRUCTURE PVT LTD · Thane, ThaneP51700003099· 50% built
- DBR Classic4.6 yr overdueDBR CONSTRUCTIONS PVT LTD · Badlapur, ThaneP51700008402· 90.9% built
- Shri Swami Samarth Residency4.6 yr overdueShri Swami Samartha Developers · Thane, ThaneP51700010749· filed Jan 2020 → now Dec 2021· 4.5% built
- JAI ESTATE PHASE III4.6 yr overdueSWARLAND DEVELOPERS LIMITED · Kalyan, ThaneP51700008354· 73.2% built
- NAIR HEIGHTS4.6 yr overdueSHREE SAI DEVELOPERS · AMBERNATH, ThaneP51700011109· 31.8% built
- VENKATESH JYOT BLDG NO 54.6 yr overdueSHREE BALAJI BUILDERS AND DEVELOPERS · Thane, ThaneP51700006779· 90.9% built
- ANNAPURNA JYOTI4.6 yr overdueANNAPURNA ASSOCIATES · Thane, ThaneP51700000957· 90.9% built
- SHANTAI4.6 yr overdueJANARDHAN SAKHARAM BHOIR · Thane, ThaneP51700008654· filed Dec 2019 → now Dec 2021· 81.8% built
- METRO RESIDENCY G WING4.6 yr overdueMETRO CONSTRUCTION · Badlapur (M Cl), ThaneP51700011345· filed Dec 2020 → now Dec 2021· 90.9% built
- Krishna Vihar Co-operative Housing Society Limited4.6 yr overdueBAL GANAPATI LAABH DEVELOPERS · Naupada, ThaneP51700019510· 48.3% built
- Ornate Kallisto Phase I4.6 yr overdueOrnate Buildcon Developers · Bhiwandi, ThaneP51700011610· filed Dec 2019 → now Dec 2021· 81.8% built· 1 complaint
- Nirmaldhara4.6 yr overdueHAZEL ENTERPRISE · Bhiwandi, ThaneP51700006777· 90.9% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.