- SHREEJI SHREERANG5.9 yr overdueSHREEJI BUILDCON · Nashik (M Corp.), NashikP51600011442· 51.7% built
- GREEN LEAF5.9 yr overdueM/S KWALITY DEVELOPERS · BHAVANI PETH, PuneP52100014561· filed Dec 2018 → now Dec 2020· 59.1% built
- SHIVANSH APPARTMENT5.9 yr overdueOmbuilders and develpers · Nashik (M Corp.), NashikP51600005721· 90.9% built
- Shivram Avenue5.9 yr overdueMaheshwar Enterprises · Nashik, NashikP51600010957· 81.8% built
- K M ENTERPRISES5.9 yr overdueK M ENTERPRISES · Andheri, Mumbai SuburbanP51800007922· filed Dec 2018 → now Dec 2020· 85.5% built
- PEARL RESIDENCY5.9 yr overdueBARDIA AND ASSOCIATES · JAIL ROAD, NashikP51600009618· 90.9% built
- Samarth Blossom5.9 yr overdueD G Group · Aanandwali, NashikP51600007810· 72.7% built
- AXIS CENTRA5.9 yr overdueAxis Landmarks · BANER, PuneP52100002121· filed Dec 2019 → now Dec 2020· 41.8% built
- SUKRUT APARTMENT5.9 yr overdueKESHAV KHANDU CHINCHORE · Nashik (M Corp.), NashikP51600011137· 90.9% built
- SAI EMPIRE5.9 yr overdueJAY DEVELOPERS · Nashik (M Corp.), NashikP51600011132· 90.9% built
- PEARL PARK5.9 yr overduePEARL RESIDENCY · Nashik, NashikP51600007570· 70.6% built
- Rivera5.9 yr overdueRenuka Constructions · Bendkule Nagar, NashikP51600004983· 88.6% built· 1 complaint
- The Orian5.9 yr overdueGalaxy Infra Projects · Nashik (M Corp.), NashikP51600013400· 90.9% built
- MANOHAR BLISS5.9 yr overdueBHAGYASHREE BHARAT SHASTRI · Baner, PuneP52100004676· filed Jun 2019 → now Dec 2020· 90.9% built
- SHREE RESIDENCY5.9 yr overdueHASMUKHBHAI KALUBHAI JOGANI · Nashik, NashikP51600011542· 60.9% built
- MULUND KAVITA KIRAN CHS5.9 yr overdueIndu Enterprise · Kurla, Mumbai SuburbanP51800011080· 90.9% built· 2 complaints
- SHREEJI BIZZWORLD5.9 yr overdueSHREE LAND DEVELOPERS AND BUILDERS · Nasik - Pune Highway, Kathegalli., NashikP51600011504· 81.8% built
- Aryavan Hills5.9 yr overdueSomeshwar Vitthalrao Pusatkar · Amravati (M Corp.), AmravatiP50300007847· 81.8% built
- SIDDIVINAYAK HEIGHTS5.9 yr overdueMINAKSHI CONSTRUCTIONS · Aasava Nagr, JalgaonP49900000600· 90.9% built
- Crown Square5.9 yr overdueCROWN MAKERS BUILDERS AND DEVELOPERS · Satpur, NashikP51600006414· 27.3% built
- Sonigara Excluzee5.9 yr overdueDHANRAJ KESARIMAL SONIGARA · Hinjavadi (CT), PuneP52100008799· filed Feb 2020 → now Dec 2020· 93% built
- KRISHNA HERITAGE5.9 yr overdueSHREE BALAJI CONSTRUCTION · KALYAN, ThaneP51700007118· 75% built· 1 complaint
- Vantagio5.9 yr overdueHarmony Shubham Associates · Wakad, PuneP52100003876· 90.9% built
- 24 K DREAMS5.9 yr overdueGS 24 BUILDCON · Pimpri Chinchawad (M Corp.), PuneP52100006385· 90.9% built
- OMKAR NANDAN5.9 yr overduePHOENIX ENTERPRISES · NARHE, PuneP52100004426· 72.7% built
- Naivaidya Heritage5.9 yr overdueDilip Gangji Shah · Thane, ThaneP51700014904· 81.8% built
- CLYDE HOMES5.9 yr overdueVARAD DEVELOPERS · TARABAI PARK, KolhapurP53000000356· 81.8% built· 3 complaints
- SAI SAGAR A5.9 yr overdueNASA CONSTRUCTION PVT.LTD. · Nashik, NashikP51600004324· 70.5% built
- SHUBHAM GALAXY5.9 yr overdueARHAM NEEJDEEP REALTORS · Vasai-Virar City (M Corp), PalgharP99000002476· 90% built
- Enliven Homes5.9 yr overdueSiddhivinayak Properties · Hadapsar, PuneP52100013363· 45.5% built
- DREAM ENCLAVE5.8 yr overdueAAKAR DEVELOPERS · Panvel, RaigarhP52000008288· 90.9% built
- Karveer Nivasini Complex5.8 yr overdueS R Real Estate Developers · Kolhapur (M Corp.), KolhapurP53000002597· filed Jan 2020 → now Jan 2021· 82.4% built
- Sai Palacio5.8 yr overdueSATISH MALANBAI ANDHARE · Barshi, SolapurP52600003662· filed Jul 2019 → now Jan 2021· 18.2% built
- AJINKYA ROYAL5.8 yr overdueRAJESH TULSIDAS SHETYE · Kuwarbav (CT), RatnagiriP52800005310· 27.3% built
- MIDTOWN HERITAGE5.8 yr overdueMARUTI DEVELOPERS J.V. · Kalyan, ThaneP51700003931· 90.9% built
- Madhav Ashirwad5.8 yr overdueDolphin Developers · Khopoli, RaigarhP52000013759· 90.9% built
- Kashi Vishwanath Park5.8 yr overdueKRISHNA DATTATRYA ADHAV · Dasak Shiwar, NashikP51600024402· 48.5% built
- VASUDHA VIHAR5.8 yr overdueRAJENDRA VASANTRAO KHANKARI · ASHOK NAGAR, DhuleP49800013520· 90.9% built
- LAXMI CHS5.8 yr overdueADITYA DEVELOPERS · Borivali, Mumbai SuburbanP51800007179· 76.4% built· 2 complaints
- Anupama Pearl Regency5.8 yr overdueJarry Profit · Nagpur (M Corp.), NagpurP50500004233· 90.9% built
- Mittal Avenue5.8 yr overdueVedaang Builders LLP ·P51900004309· 80.9% built
- RUDRA DHAM Phase 15.8 yr overdueRudra Construction & Developers · Lingali, PuneP52100007588· 30.9% built
- Kshitij Market City Phase I5.8 yr overdueKSHITIJ DEVELOPERS · Kudal (CT), SindhudurgP52900010519· filed Dec 2019 → now Jan 2021· 23.6% built
- Atharva Heights5.8 yr overdueSantosh Sadashiv Kolettiwar · Chandrapur (M Cl), ChandrapurP50900003508· 49.1% built
- Urban Village5.8 yr overdueGirijapati Developers · Tambe Wasti, PuneP52100004861· filed Jul 2019 → now Jan 2021· 51.5% built· 1 complaint
- PARTH ESTATE5.8 yr overdueSANDEEP CONSTRUCTION COMPANY · Pune (M Corp.), PuneP52100003629· 67.3% built
- SHREYA5.8 yr overdueSAI SAMARTTHA PROPERTIES · Punavale, PuneP52100005125· filed Jul 2019 → now Jan 2021· 77.2% built
- SHREEPAD5.8 yr overdueSACHN ASHOK HARNASKAR · Bhor, PuneP52100012094· 90.9% built
- Shiv Elite Phase IV5.8 yr overdueOm Shivam Buildcon Private Limited · Shankarpur, NagpurP50500009553· 90.8% built
- Spurti Pride5.8 yr overdueSunil Kamlakar Thokale · Pimpri Chinchawad (M Corp.), PuneP52100003803· 81.8% built
- SARVESH APARTMENTS5.8 yr overduePrakash Construction Co · Daund, PuneP52100001214· filed Jul 2019 → now Jan 2021· 81.8% built
- Nakshatra I-Land - 15.8 yr overdueEllora Buildwell Pvt Ltd · Moshi, PuneP52100003804· filed Jul 2019 → now Jan 2021· 90.9% built
- RICHMOND TOWN PHASE II LAKE EXOTICA5.8 yr overdueM/S HOMAGE DEVELOPERS · Vasai, PalgharP99000004129· filed Jul 2019 → now Jan 2021· 90.9% built
- Ashritha Phase I5.8 yr overdueYogvinda Promoters & Developers Pvt. Ltd. · Haveli, PuneP52100001485· filed Dec 2018 → now Jan 2021· 33.3% built
- Success Square5.8 yr overdueSiddharth Properties · Pune City, PuneP52100001813· filed Jul 2019 → now Jan 2021· 90.9% built· 3 complaints
- ARCHIT NEST5.8 yr overdueSANDEEP RAMDAS SHINDE · Nashik (M Corp.), NashikP51600003779· filed Jul 2019 → now Jan 2021· 90.9% built
- THE JOTE MAHAL5.8 yr overdueSHIRISH MADHAV KULKARNI · Kurla, Mumbai SuburbanP51800012097· filed Jul 2019 → now Jan 2021· 75% built
- SHRI GAJANAN TOWER5.8 yr overdueTEJAS ASSOCIATES · Amravati (M Corp.), AmravatiP50300003216· filed Jul 2018 → now Jan 2021· 81.6% built
- Stanza5.8 yr overdueSaarrthi Blue Ventures LLP · Punawale, PuneP52100002571· filed Jul 2019 → now Jan 2021· 90.9% built
- Jai Ganesh Vision Commercial WIng B5.8 yr overdueSIDDHIVINAYAK KOHINOOR ASSOCIATES · pimpri chinchwad, PuneP52100011476· filed Jul 2019 → now Jan 2021· 90.9% built
- Sumit Lata5.8 yr overdueSumit Snehashish Venture · Ward FNorth, Mumbai CityP51900012481· filed Jul 2019 → now Jan 2021· 76.8% built
- Hubtown Greenwoods F Wing5.8 yr overdueHubtown Limited · Thane, ThaneP51700000602· filed Jul 2019 → now Jan 2021· 90.9% built· 10 complaints
- Atlantis City5.8 yr overdueM/s Surya Housing · Lohgaon, PuneP52100004933· filed Jul 2019 → now Jan 2021· 81.8% built
- Bloomdale Row House 75.8 yr overdueMahindra Bebanco Developers Limited · Kahpri, NagpurP50500008161· filed Jul 2019 → now Jan 2021· 80.9% built
- MANIBHADRA AVENUE5.8 yr overdueMANIBHADRA AVENUE · Vasai, PalgharP99000003027· filed Jul 2019 → now Jan 2021· 90.4% built· 1 complaint
- VIVA SHELTER - I5.8 yr overdueCHETANA BUILDERS AND DEVELOPERS · Vasai-Virar City (M Corp), PalgharP99000012456· filed Jul 2019 → now Jan 2021· 63.2% built· 1 complaint
- Hubtown Greenwoods E Wing5.8 yr overdueHubtown Limited · Thane, ThaneP51700000358· filed Jul 2019 → now Jan 2021· 81.7% built
- Prathamesh Rama Aishwarya5.8 yr overdueSachin Shringarpure Associates, Builders & Developers · Pen (M Cl), RaigarhP52000002046· 81.8% built
- SHIV MALHAR APPARTMENT5.8 yr overdueBHARAT SURESH DHERINGE · PALSE SHIWAR, NashikP51600015388· 9.1% built
- Varad Residency5.8 yr overdueVrushali Vijay Deshmukh · Haveli, PuneP52100004262· 90.9% built
- ROONGTA CHITRAKOOT APARTMENT5.8 yr overdueSHREE TIRUMALA BUILDCON · INDIRA NAGAR, NashikP51600001657· 78.2% built
- Mango Holiday Village, Guhagar - Phase 45.8 yr overdueSamir Shrinivas Kale · Kirtanwadi Tarf Guhagar, RatnagiriP52800003399· filed Jan 2020 → now Jan 2021· 66.4% built
- SAFFRON TRANQUIL LANDSCAPE5.8 yr overdueSaffron Associates · Satara, AurangabadP51500002740· filed Jul 2019 → now Jan 2021· 71.5% built
- Shree Ganesha Residency5.8 yr overdueTirupati Developers · Mulshi, PuneP52100005164· filed Jul 2019 → now Jan 2021· 39.5% built
- BALLARPUR BUSINESS CENTER5.8 yr overdueDILIP DADAJI MAMIDWAR · Ballarpur (M Cl), ChandrapurP50900005099· 50% built
- SAI ASPIRE5.8 yr overdueVIKAS LAXMAN CHAUDHARY · AURANGABAD, AurangabadP51500002358· filed Jul 2019 → now Jan 2021· 90.9% built
- AMOL SAMARTH5.8 yr overdueSACHIN TILAKCHAND KOTHARI · PANVEL, RaigarhP52000010947· 30.5% built
- Rajyog phase II -B Wing5.8 yr overdueRajadhiraj Developers · AMBEGAON Bk, PuneP52100013599· filed Jul 2019 → now Jan 2021· 57.3% built
- SAI PARIVAR5.8 yr overdueSAI PARIVAR CONSTRUCTION COMPANY · Vasai, PalgharP99000007079· filed Jul 2019 → now Jan 2021· 90.9% built
- VRUNDAVAN5.8 yr overdueSAGAR PANDIT TADE · NEAR AHUJA NAGAR, JalgaonP49900015439· 73.2% built
- K K SOLITAIRE5.8 yr overdueNavin M Mehta · Kurla, Mumbai SuburbanP51800012460· filed Jul 2019 → now Jan 2021· 90.9% built
- Prakash Nilay5.8 yr overduePrakash Infracon · Haveli, PuneP52100016061· 81.8% built
- Jai Ganesh Vision Commercial Wing A5.8 yr overdueSIDDHIVINAYAK KOHINOOR ASSOCIATES · pimpri chinchwad, PuneP52100010510· filed Jul 2019 → now Jan 2021· 90.9% built
- Hubtown Greenwoods D Wing5.8 yr overdueHubtown Limited · Thane, ThaneP51700000369· filed Jul 2019 → now Jan 2021· 90.9% built· 2 complaints
- Tirumala Royal5.8 yr overdueTirumala Builders · Satara (CT), AurangabadP51500002622· 62.7% built
- Vedant Heights5.8 yr overdueUmesh Shashikant Nanaware · IN FRONT MARKET YARD, PuneP52100007632· 81.8% built
- Madhav Vatika-II5.8 yr overdueShrijee Krupa Developers · Palghar East, PalgharP99000015110· 90.9% built
- DATTA KRUPA5.8 yr overdueSHREE HERAAMBH VASTU NIRMAN LLP · Kurla, Mumbai SuburbanP51800004548· 90.9% built
- RUDRAKSHA5.8 yr overdueRAJ UNIVERSAL · Borivali, Mumbai SuburbanP51800003842· 81.8% built· 1 complaint
- Mahavir Estella - Wing E5.8 yr overdueM/s. Cityscape Construction Company · Thane, ThaneP51700018330· 90.9% built
- MALHAR5.8 yr overdueHARIKRISHNA ENTERPRISES · Palghar, PalgharP99000002593· 52.7% built
- KRISHNA ICON5.8 yr overdueKRISHNA CONSTRUCTION COMPANY · charholi kh, PuneP52100004486· 85.2% built
- SARASWATI PLAZA5.8 yr overdueDILIP PYARELAL JAIN · Chiplun (M Cl), RatnagiriP52800011053· 27.3% built
- JAI GANESH RESIDENCY C WING5.8 yr overdueYASH DEVELOPERS · Pimpri Chinchawad (M Corp.), PuneP52100005820· 59.5% built
- VENKATESH GRAFFITI PHASE 45.8 yr overdueSHREE VENKATESH BUILDCON PVT LTD · KESHAV NAGAR MUNDHWA, PuneP52100015461· 90.9% built
- SARVADNYA RESIDENCY5.8 yr overdueM/S C & D ENGINEER'S & DEVELOPERS · AMRAVATI, AmravatiP50300015347· 72.7% built
- Tanai B5.8 yr overdueSurekha vishnu Kumbhar · Jalochi, PuneP52100003644· 72.7% built
- SUKHAKARTA APARTMENT5.8 yr overdueRADHESHYAM DNYANABARAO DAVHALE · cidco growth center, AurangabadP51500003110· 90.9% built
- Shree Ganesh Residency5.8 yr overdueAmol Padmakar Tarmale · Asangaon (CT), ThaneP51700011204· 90.9% built
- Mayuresh Pride5.8 yr overdueSHRI MAYURESH CONSTRUCTION · Solapur (M Corp.), SolapurP52600003150· 90.9% built
- MAHADEVSHREE5.8 yr overdueM.M.CONSTRUCTION · Mira-Bhayandar (M Corp.), ThaneP51700009145· 81.8% built
- SMRUTIGANDHA APARTMENT5.8 yr overdueSUNIL UTTAMRAO FURDE · GANESH NAGAR, SolapurP52600015291· 89.1% built
- Ganesh Niwas5.8 yr overdueShree Yashraj Real Estate Developers Pvt Ltd · Ward FNorth, Mumbai CityP51900001972· 90.9% built
- OMKAR COMPLEX5.8 yr overduePALASH DEVELOPERS · Baramati (M Cl), PuneP52100010343· 90.9% built
- PARVATI VANDAN5.8 yr overdueNiwas Enterprises · Pune (M Corp.), PuneP52100014273· 90.9% built
- Dhamma Heights5.8 yr overduePrapti Properties · Goraksh Nagar, Near Mhasrul police station, NashikP51600025693· 27.3% built
- GALAXY EMPIRE5.8 yr overdueGALAXY CONSTRUCTION AND DEVELOPERS · Sangli Miraj Kupwad (M Corp.), SangliP53100003286· 18.2% built
- SHREE GAJANAN APARTMENT5.8 yr overdueSHRI GAJANAN BUILDERS & DEVELOPERS · Nagpur (M Corp.), NagpurP50500008624· 90.9% built
- Sayali Heights5.8 yr overdueRahul Developers · Vasant Vihar, SolapurP52600011460· 54.5% built
- VIVA RAM NIWAS C.H.S.5.8 yr overdueVIVA ENTERPRISES LIMITED · Ward FSouth, Mumbai CityP51900012295· filed Aug 2019 → now Jan 2021· 90.9% built
- Shubhankar Classic5.8 yr overdueShiv Properties · Thergaon, PuneP52100001956· 32.7% built
- MALHAR RESIDENCY5.8 yr overdueRANJEET DEVELOPERS · Mawal, PuneP52100003817· filed Dec 2018 → now Jan 2021· 90.9% built
- Shiv Brighton Phase I5.8 yr overdueOm Shivam Buildcon Private Limited · Panjari farm, NagpurP50500006203· 90.9% built
- Shiv Brighton Phase II5.8 yr overdueOm Shivam Buildcon Private Limited · Panjari farm, NagpurP50500006295· 90.5% built
- Saidarshan Residency5.8 yr overdueGajanan Katod Shelavale · Shahapur, ThaneP51700016548· 90.9% built
- TAJ ENCLAVE5.8 yr overdueAloka Commercial Private Limited · Mumbai City, Mumbai CityP51900013712· 90.9% built
- SHREEJI RESIDENCY5.8 yr overdueShree Siddhivinayak Construction Co · MULUND WEST, Mumbai SuburbanP51800015912· 33.6% built
- SHRI SAMARTH COMPLEX5.8 yr overdueSHREE SAMARTHKRUPA BUILDERS AND DEVELOPERS · Khed (M Cl), RatnagiriP52800002000· 73.6% built
- SIDDHESHWAR TOWER5.8 yr overdueS S PROMOTERS AND DEVELOPERS · Satara (M Cl), SataraP52700009477· 72.7% built
- YASHODHARA CO-OP HOUSING SOCIETY5.8 yr overdueSURESH KESHAVRAO YASHVANTRAO · Ambarnath, ThaneP51700002868· 9.1% built
- GRAND HERITAGE5.8 yr overdueUJJWALA SATISH HAWARE · Wakad, PuneP52100014251· 90.9% built
- Horizon5.8 yr overdueZara Habitats LLP · Ward GNorth, Mumbai CityP51900011721· filed Aug 2019 → now Jan 2021· 76.4% built· 1 complaint
- AKSHAY GLORY5.8 yr overdueSHREE DEVELOPMENT CORPORATION · Pune (M Corp.), PuneP52100006319· 81.8% built
- LAXMI CASTELLO5.8 yr overdueLAXMI GLOBAL · Bopele, RaigarhP52000001905· 89.1% built
- Mayuri Optimum5.8 yr overdueVinesh Naresh Kumar Oswal · UNDRI, PuneP52100002131· filed Aug 2019 → now Jan 2021· 54.5% built
- ATHARVA HEIGHTS5.8 yr overdueAtharva Estate Developers · Kolhapur (M Corp.), KolhapurP53000012126· 81.8% built
- VIGHNESHWAR HOUSE5.8 yr overdueVIVEK CHIMANRAO KATE · JHAVERY COLONY, PuneP52100015901· 90.9% built
- SIDDHI COMPLEX5.8 yr overdueSIDDHI DEVELOPERS · PUNE, PuneP52100004668· 90.9% built
- SKY VILLAS5.8 yr overdueAGREEN INFRASTRUCTURE PVT LTD · forest escpes, SataraP52700010285· 81.8% built
- MAHAVIR HEIGHTS NX5.8 yr overdueVIRA THEATRES PVT LTD · Kalyan, ThaneP51700008098· 0% built
- DWARKA SAI5.8 yr overdueG K FORTUNE · Pimple Saudagar, PuneP52100001761· 81.8% built
- Green Avenue5.8 yr overdueGreen Concept Builders & Developers · Baner, PuneP52100006788· 38.6% built
- CREATIVE HOMES AURAA5.8 yr overdueDEVRAJ Kundanlal DHAWAN · Nagpur (M Corp.), NagpurP50500011211· 72.7% built· 1 complaint
- PRITIVARDHAN PLAZA5.8 yr overdueSAMRUDDHI DEVELOPERS · Chiplun (M Cl), RatnagiriP52800007516· 90.9% built
- Divine Dew5.8 yr overdueSHIV ASSOCIATES · RAHATANI, PuneP52100001385· 95.5% built
- SRI SAI CHAITHANYA5.8 yr overduePerinjelil Madhusoodanan Pillai · Baner, PuneP52100005831· 81.8% built
- LIFESPACE TEMPLEBELLS5.8 yr overdueLIFESPACE PROPERTIES · Ulawe, RaigarhP52000001134· 44.3% built
- SHAKUNTAL COMPLEX5.8 yr overdueAKHTAR LAMBADE · Mahad, RaigarhP52000013863· 70.9% built
- SANSKRUTI RESIDENCY5.8 yr overduePALASH DEVELOPERS · Baramati (M Cl), PuneP52100009432· 90.9% built
- VANTAGE-95.8 yr overdueSOHANLAL SHANKARLAL VISHNOI · Baner, PuneP52100003199· 90.9% built
- NYATI UNITREE II5.8 yr overdueNYATI BUILDERS PRIVATE LIMITED · Pune City, PuneP52100001629· 37.4% built
- GAURI CLASSIC5.8 yr overduePATIL AND DESHMUKH ASSOCIATES · BHIKAMCHAND JAIN NAGAR, JalgaonP49900015982· 41.8% built
- GENESIS5.8 yr overduePRAKASH RAMAN CHAUDHARI · Kute Marg, NashikP51600005245· 72.7% built
- AURUM Heights5.8 yr overdueKomal Developers · Ward E, Mumbai CityP51900010998· 90.4% built
- MALHARI GHORPADE ARCADE BUILDING NO 4 AND 55.8 yr overdueYAMUNA ENTERPRISES · Kulgaon, ThaneP51700010573· filed Dec 2019 → now Feb 2021· 59.8% built
- VIJAYRAJ MARVEL5.8 yr overdueARUNA AMAR BIRAJDAR · Prem Nagar, SolapurP52600013555· 90.9% built
- AMBIKA ENCLAVE5.7 yr overdueCompact Builders & Developers · Mayur Vihar Colony, NashikP51600014204· 90.9% built
- SHREE OM APARTMENT5.7 yr overdueSHREE OM PROPERTIES · SAWANTWADI, SindhudurgP52900009948· filed Mar 2019 → now Feb 2021· 81.8% built
- RASHMI SHEELA5.7 yr overdueMODIS NAVNIRMAN LLP · Borivali, Mumbai SuburbanP51800014151· 90.9% built
- Ankur Palace5.7 yr overdueOSHO Developers · Borivali, Mumbai SuburbanP51800010439· filed Aug 2019 → now Feb 2021· 70.5% built· 2 complaints
- Aabhas Phase I5.7 yr overdueVEDNIRMITEE REALITIES · medankarwadi, PuneP52100013811· 40.9% built
- TRIMURTI5.7 yr overdueGruha Navnirman Developers · Pune (M Corp.), PuneP52100001969· filed Oct 2018 → now Feb 2021· 32.9% built
- NAKODA HEIGHTS 45.7 yr overdueSHRINATH REALTORS · Vasai, PalgharP99000008910· 90.9% built· 1 complaint
- RAJYOG RESIDANCY5.7 yr overdueDEEPAK VASANTRAO SURYAWANSHI · KHANBHAG, SangliP53100014997· 81.8% built
- Vastu Park5.7 yr overdueNarayan Labhu Sarode · Nashik, NashikP51600013306· 81.8% built
- SOLITAIRE PALMS C5.7 yr overdueRAJKUMARI GULAB CHOITHRAMANI · Borhadewadi, Moshi, PuneP52100002126· filed Aug 2019 → now Feb 2021· 27.3% built
- SARA GOKULDHAM - A BUILDING5.7 yr overdueJagrutsara Structures LLP · CHIKALTHANA, AurangabadP51500003721· 90.9% built
- SADANAND RESIDENCY5.7 yr overdueSHRINIWAS CONSTRUCTIONS · SOUTH SHIVAINAGA NEAR CHOPADE HOSPITAL, SangliP53100016270· 90.9% built
- GOVINDA SKY5.7 yr overdueVijay Nanakram Talda · Amravati (M Corp.), AmravatiP50300000544· 9.1% built
- Gokul Residency5.7 yr overdueMEHTA BUILDERS · Suryanagari, PuneP52100016313· 90.9% built
- Shree Muktai Comlex5.7 yr overdueSAMARTH DEVELOPERS · Junnar, PuneP52100014225· 78.8% built
- Sudesh5.7 yr overdueAnkur Premises Developers LLP · Andheri, Mumbai SuburbanP51800014138· 88.2% built
- BAVADEKAR RESIDENCY5.7 yr overdueUTTAM BABURAO BAWADEKAR · Sangli Miraj Kupwad (M Corp.), SangliP53100005486· filed Sept 2018 → now Feb 2021· 40.9% built· 1 complaint
- Rachana 24 Carat5.7 yr overdueRachana construction Co. (Nagpur) Pvt. Ltd. · RAMDASPETH, NagpurP50500002136· filed Aug 2018 → now Feb 2021· 90.9% built
- Tinsel County Phase II5.7 yr overdueGrow India Realcon LLP · HINJEWADI, PuneP52100008206· 80.8% built
- Dosti Desire-Dosti Pearl5.7 yr overdueD. D. ASSOCIATES · brahmand, ThaneP51700005623· 86.4% built· 2 complaints
- REGENT HILLS5.7 yr overdueRadheshyam Promoters and Builders · GHOTAWADE PHATA, PuneP52100003965· 90.9% built· 1 complaint
- Rajashree Simandhar5.7 yr overdueRajashree Realty · Haveli, PuneP52100001297· 90.9% built
- ROMAN RESIDENCY5.7 yr overdueShantee Housing · Vasai, PalgharP99000002849· filed Aug 2019 → now Feb 2021· 88.3% built
- VISION ETERNITY5.7 yr overdueVISION DEVELOPERS · Marunji, PuneP52100002472· filed Aug 2019 → now Feb 2021· 90.9% built
- SWAPNASHILP5.7 yr overdueKALAJE ASSOCIATES · KALAJEWADI, PuneP52100002380· filed Sept 2019 → now Feb 2021· 72.7% built
- MANSI APARTMRNT5.7 yr overdueANMOL DEVELOPERS · Swastik Complex, PalgharP99000025054· 90.9% built
- BALAJI DHAM5.7 yr overdueBALAJI INFRA · Panvel, RaigarhP52000015212· 27.3% built
- SWOJAS VEDANT5.7 yr overdueASHISH RASIKLAL SHAH · ERANDVANA, PuneP52100017492· 8.2% built
- SANSKRUTI TATVA5.7 yr overdueBHAVESH DEVRAO KUCHANWAR · Nagpur (M Corp.), NagpurP50500011178· filed Apr 2018 → now Feb 2021· 74.7% built
- Tulip Tower5.7 yr overdueV4 Infra · Chichala, WardhaP50400013538· filed Aug 2019 → now Feb 2021· 81.8% built
- SHREE SADGURU AUDUMBAR5.7 yr overdueSUNIL BAPUSAHEB SHINDE · RASTA PETH, PuneP52100018627· 81.8% built
- GOKUL5.7 yr overdueHARICONSTRUCTION · rajland colony, PuneP52100017933· 81.8% built
- Skyi Star Towers Phase II5.7 yr overdueEnerrgia Skyi Ventures · Bhukum, PuneP52100000690· 86.8% built· 1 complaint
- SHRAVANDHARA5.7 yr overdueKIRTIVARDHAN DEVELOPERS AND BUILDERS · Kothrud, PuneP52100002928· 72.7% built
- Un Named5.7 yr overdueSanjay Fakirchand Garg · Borivali, Mumbai SuburbanP51800012444· 44.5% built
- ASPIRE RESIDENCY5.7 yr overdueASPIRE RESIDENCY LLP · MULUND WEST, Mumbai SuburbanP51800011875· filed Aug 2019 → now Feb 2021· 90.9% built
- Redevelopment of Tirandaz Subha Niketan CHS Ltd.5.7 yr overdueheritage Lifestyles & Developers Pvt. Ltd. · Mumbai, Mumbai SuburbanP51800001807· filed Mar 2019 → now Feb 2021· 90.9% built
- MAHARSHEE MANOHAR5.7 yr overdueMAHARSHEE BUILDERS · WANJARI NAGAR, NagpurP50500015440· 27.3% built
- INDRAPRASTHA5.7 yr overdueOMKAR DEVELOPERS · GAT NO 698/2/3, PuneP52100007400· filed Aug 2019 → now Feb 2021· 81.8% built
- SHRIKRISHNA ENCLAVE A WING 15.7 yr overdueSHRIKRISHNA INFRASTRUCTURE · Nagpur (M Corp.), NagpurP50500003054· 80.9% built
- SARVODAY JYOT5.7 yr overdueBHAVI ENTERPRISES · Kalyan, ThaneP51700003758· 90.9% built
- GANGOTRI CROWN5.7 yr overduePANDE BUILDCON · Godhani (Railway), NagpurP50500010713· 90.9% built
- Divyatej5.7 yr overdueTejraj Promoters & Builders · Senapati Bapat Road, PuneP52100017295· 90.3% built
- LAXMISATYAM RESIDENCY5.7 yr overdueVIJAYLAXMI DEVELOPMENTS · Kamal ParkP52100002061· 88.2% built
- AQ HEIGHTS5.7 yr overdueAQ INFRASTRUCTURE PRIVATE LIMITED · Aurangabad (M Corp.), AurangabadP51500011237· 76.4% built
- NIRANKA COOP HSG SOC5.7 yr overdueRAJESH DINESH VYAS · IDEAL COLONY KOTHRUD, PuneP52100006326· 81.8% built
- PALAVA SAVANA AND SIENA5.7 yr overdueLodha Developers Limited · Kalyan, ThaneP51700000546· 90.9% built· 6 complaints
- SHIVAI 2 COOPERATIVE HOUSING SOCIETY5.7 yr overdueVISHWATAMAK ASSOCIATES · Parvati, PuneP52100003552· 51.8% built
- SHANKAR PLAZA5.7 yr overduePRASHANT MANOHAR NIKAM · Amalner (M Cl), JalgaonP49900011123· filed Dec 2019 → now Mar 2021· 27.3% built
- SAI DHAM APARTMENT5.7 yr overdueROHIT MORESHWAR GURAV · Mirjole, RatnagiriP52800004689· 90.9% built
- ARCH GULMOHAR5.7 yr overdueARCH DEVELOPERS · Aurangabad (M Corp.), AurangabadP51500012291· 90.9% built
- Manjri Green woods phase 2 H1 building5.7 yr overdueMaloji Constructions · Manjari Budruk, PuneP52100000613· 90.9% built
- URVASHI CHS5.6 yr overdueADITYA DEVELOPERS · Borivali, Mumbai SuburbanP51800008896· 17.6% built
- VENKATESH ORCHID5.6 yr overdueM/S SHREE SAI DEVELOPERS · AMBEGAON Bk, PuneP52100011026· 13.6% built