RERA projects past their possession deadline
11,767 MahaRERA-registered projects are past the possession date currently on file and still report under 100% construction progress. Both figures are the promoter's own disclosure to the regulator.
Page 27 of 59
- SILVER SPACE A WING5.6 yr overdueDAMJI VASTA MAKWANA · PIMPLE NILAKH, PuneP52100025541· 81.8% built
- SAGAR APARTMENT5.6 yr overdueVIKAS NARAYAN RAIKAR · Kurla, Mumbai SuburbanP51800002093· filed Mar 2019 → now Dec 2020· 62.7% built
- INDU GANESH HEIGHTS5.6 yr overdueTIGON REALITY PRIVATE LIMITED · Kurla, Mumbai SuburbanP51800007655· filed Mar 2019 → now Dec 2020· 42.3% built
- SAJAG CHS5.6 yr overdueNavkar Infra Projects · Borivali, Mumbai SuburbanP51800001223· filed Jun 2019 → now Dec 2020· 90.9% built
- PRITHVI APARTMENT5.6 yr overdueHITENDRA NIMBALKAR · Borivali, Mumbai SuburbanP51800016469· 90.9% built
- BALAJI GEMS5.6 yr overdueKRISHNA ENTERPRISE · SILVASSA, Dadra & Nagar HaveliP49600000015· 72.7% built
- PLATINUM TOWER - 75.6 yr overdueTIRUPATI GRUHPRAVESH LLP · Andheri, Mumbai SuburbanP51800000654· filed Jun 2019 → now Dec 2020· 90.9% built· 2 complaints
- Nexus Glorious5.6 yr overdueNEXUS ASSOCIATES · Nexus Glorious, PuneP52100000875· filed Jun 2019 → now Dec 2020· 81.8% built
- MARATHON NAGARI NX VIGO D5.6 yr overdueMARATHON REALTY PVT LTD · SHIRGAON, ThaneP51700005045· filed Jun 2019 → now Dec 2020· 90.9% built· 1 complaint
- The One5.6 yr overdueShamkant Jagannath Shende · Bhugaon, PuneP52100001943· filed Jun 2019 → now Dec 2020· 81.8% built· 4 complaints
- POLITE PRECISA5.6 yr overduePOLITE ASSOCIATES · RAVET, PuneP52100001580· filed Jun 2019 → now Dec 2020· 90.9% built
- POLITE HARMONY - B WING5.6 yr overduePOLITE PROMOTERS & BUILDERS · Haveli, PuneP52100001805· filed Jun 2019 → now Dec 2020· 90.9% built
- Ewar Complex5.6 yr overdueEWAR CONSTRUCTIONS PRIVATE LIMITED · Thane, ThaneP51700014636· filed Jun 2019 → now Dec 2020· 90.9% built
- NICON INFINITY PHASE 15.6 yr overdueNICON INFRA LLP · Vasai, PalgharP99000003227· filed Jun 2019 → now Dec 2020· 90.9% built
- Mohan Suburbia IV5.6 yr overdueMOHAN LIFESPACES LLP · Ambarnath, ThaneP51700002244· filed Jun 2019 → now Dec 2020· 90.9% built· 1 complaint
- VIVA CITY - A15.6 yr overdueVIVA WINNER VENTURE RELATORS LLP · Vasai, PalgharP99000004874· filed Jun 2019 → now Dec 2020· 56.4% built· 2 complaints
- Grandeur Residency5.6 yr overdueJadhav-Kasbekar Brothers Builders and Developers · Kolhapur (M Corp.), KolhapurP53000003115· filed Jun 2019 → now Dec 2020· 81.8% built
- SHILPA CHS5.6 yr overdueYASH INFRA · Thane, ThaneP51700009903· 90.9% built
- DEV LUXURIA5.6 yr overdueDEV VENTURES · Badlapur (M Cl), ThaneP51700006775· filed Jun 2019 → now Dec 2020· 90.9% built
- RATNADEEP5.6 yr overdueWESTIN DEVELOPERS PVT. LTD · Mumbai City, Mumbai CityP51900005835· filed Jun 2019 → now Dec 2020· 85.9% built· 6 complaints
- Rajgruhi Business Hub5.6 yr overdueRajgruhi Business Hub · Pune (M Corp.), PuneP52100010332· filed Jun 2018 → now Dec 2020· 9.7% built
- VIVA CITY-A25.6 yr overdueVIVA WINNER VENTURE RELATORS LLP · Virar West, PalgharP99000008341· filed Jun 2019 → now Dec 2020· 54.1% built· 10 complaints
- SAFFRON HILLS5.6 yr overdueALPHA COMBINES · Badlapur (M Cl), ThaneP51700012065· filed Jun 2019 → now Dec 2020· 68.2% built
- Woodsville Phase 1 D1 and D3 Buildings5.6 yr overduePharande Promoters and Builders · Pimpri Chinchawad (M Corp.), PuneP52100001127· filed Jun 2019 → now Dec 2020· 90.9% built
- MY HOME TALEGAON5.6 yr overdueGoyal Developers · Talegaon Dabhade (R), PuneP52100000758· filed Jun 2019 → now Dec 2020· 90.9% built· 1 complaint
- SOLITAIRE5.6 yr overdueM/s. Panache Realty · New Panvel, RaigarhP52000004091· filed Jun 2019 → now Dec 2020· 90.9% built
- ZINNIA ELEGANS5.6 yr overdueVINODE WAKADKAR ASSOCIATES · Wakad, PuneP52100008023· filed Jun 2019 → now Dec 2020· 45.5% built
- Akash Kiran CHS Ltd5.6 yr overdueShamik Enterprises Pvt Ltd. · Andheri, Mumbai SuburbanP51800005909· filed Jun 2019 → now Dec 2020· 90.9% built
- ROSE E MEHAR5.6 yr overdueVINOD PREMCHAND CHANDWANI · Haveli, PuneP52100000330· filed Jun 2019 → now Dec 2020· 58% built
- ONYX5.6 yr overdueSTRAWBERRY CONSTRUCTIONS PVT. LTD. · Thane, ThaneP51700004512· filed Jun 2019 → now Dec 2020· 50.9% built
- Vermont5.6 yr overdueSIA Developers · Moze Engineering College, PuneP52100001456· filed Jun 2019 → now Dec 2020· 81.7% built· 3 complaints
- ELIZABETH HOUSE5.6 yr overdueSURAJ ESTATE DEVELOPERS LTD · Ward GNorth, Mumbai CityP51900005428· filed Jun 2019 → now Dec 2020· 97.7% built· 1 complaint
- Rajgruhi Residency Tower A5.6 yr overdueWellbuild Merchants Private Limited · Kondhwa, PuneP52100006776· filed Jun 2019 → now Dec 2020· 88.3% built
- MUKATA LAKE CITY5.6 yr overdueKANAK REALTORS · Thane, ThaneP51700008734· filed Jun 2019 → now Dec 2020· 90.9% built
- OM SAI HOME5.6 yr overdueM/S. INFINI DEVELOPERS · Bhiwandi, ThaneP51700008960· filed Jun 2019 → now Dec 2020· 85.9% built
- CONSTRUCTION OF 648 NOS EWS TS, 620 LIG TS UNDER PH2 AT MAHALUNGE TAL KHED DIST PUNE5.6 yr overduePune Housing & Area Development Board · Mahalunge, PuneP52100005293· filed Jun 2019 → now Dec 2020· 24.5% built
- BALAJI PARADISE5.6 yr overdueSHRINIWAS ASSOCIATES · Solapur (M Corp.), SolapurP52600001842· filed Jun 2019 → now Dec 2020· 46.9% built
- Marvel Ganga Sangria K,L,M Building5.6 yr overdueMARVEL LANDMARKS PVT LTD · MOHAMMADWADI, PuneP52100002514· filed Jun 2019 → now Dec 2020· 72.4% built· 14 complaints
- NEELKANTH DEEP5.6 yr overdueKESHAV REALTY · Badlapur (M Cl), ThaneP51700011297· filed Jun 2019 → now Dec 2020· 53.6% built
- OM RESIDENCY5.6 yr overdueSHREE KULSWAMI DEVELOPERS · Thane, ThaneP51700008682· filed Jun 2019 → now Dec 2020· 78% built
- ANANDTARA WHITEFIELD RESIDENCES PHASE - I5.6 yr overdueANANDTARA INFRASTRUCTURE · LONKAR VASTI, PuneP52100007529· filed Jun 2019 → now Dec 2020· 85.4% built
- APEX LOVE5.6 yr overdueAPEX GROUP · Karanjade, RaigarhP52000010576· filed Jun 2019 → now Dec 2020· 90.9% built
- AMRUT ELLEGANCE5.6 yr overdueAMRUT ENTERPRISES · Andheri, Mumbai SuburbanP51800002223· filed Jun 2019 → now Dec 2020· 39.3% built
- IMPERIAL COMMERCIAL SPACES5.6 yr overdueMERIDIAN · Pune City, PuneP52100007362· filed Jun 2019 → now Dec 2020· 66.4% built· 1 complaint
- SALE BUILDING NO 1 VAASTU SHANTI WING A B C5.6 yr overdueM/S ANSHUMAN DEVELOPERS · Andheri, Mumbai SuburbanP51800006806· filed Jun 2019 → now Dec 2020· 90.6% built
- Indraprastha5.6 yr overdueA R Constructions · Karanjade, RaigarhP52000001877· filed Jun 2019 → now Dec 2020· 90.9% built
- PUNYA PRAVAH5.6 yr overduePRARTHANA INFRA · MAHAVEER COLLEGE PREMISE NAGALA PARK, KolhapurP53000002843· filed Jun 2019 → now Dec 2020· 90.9% built
- GOKHALE BLOSSOM5.6 yr overdueSUDHIR MAHADEV GOKHALE · KIRKATWADI, PuneP52100016483· 81.8% built
- KALAVATI NARAYAN RESIDENCY5.6 yr overdueMAITREE DEVELOPERS · Gokul NagarP52100013059· filed Oct 2018 → now Dec 2020· 26.8% built
- SAI DARSHAN5.6 yr overdueUNITY INFRATECH · Badlapur (M Cl), ThaneP51700007036· 90.9% built
- BAHINAI BHUVAN5.6 yr overdueMANOJ VASUDEV VAIDYA · Badlapur (M Cl), ThaneP51700003746· 9.1% built
- YAMUNA CLASSIC5.6 yr overdueCHINMAY INFRA · SOUTH SHIVAJI NAGAR, SangliP53100014582· 36.4% built
- ANAND HOMES5.6 yr overdueShrinath Developers · Kalyan, ThaneP51700005026· 27.3% built
- Embassy5.6 yr overdueDrushti Realtors Private Limited · Kurla, Mumbai SuburbanP51800008398· 68.6% built
- Anjani Regency5.6 yr overdueGeeta Developers · Thane, ThaneP51700004541· 90.9% built
- Green Florencia5.6 yr overdueGreen Buildcon · Sus, PuneP52100004175· filed Dec 2019 → now Dec 2020· 90.9% built
- BURHANI BUILDING5.6 yr overdueMS DEVELOPERS · Borivali, Mumbai SuburbanP51800003165· 90.9% built
- Puneet Kanchanganga Phase One Floor 0 to Floor 255.6 yr overduePuneet Developers · Thane, ThaneP51700011319· filed Dec 2018 → now Dec 2020· 90.9% built· 3 complaints
- AMBAJI NIKETAN CO-OP. HOUSING SOCIETY LTD.5.6 yr overdueBHOLENATH DEVELOPERS LTD. · Kurla, Mumbai SuburbanP51800000759· filed Jun 2018 → now Dec 2020· 90.9% built
- YashONE Phase - I5.6 yr overdueVilas Javdekar Eco Homes · Mulshi, PuneP52100014585· 78.8% built· 1 complaint
- Shree Siddhivinayak Tower5.6 yr overdueEkdant Constructions and Developers Private Limited · Thane, ThaneP51700012381· 90.9% built· 1 complaint
- Konark Riva5.6 yr overdueKonark and Leeshaa · Keshavnagar, PuneP52100000825· 90.9% built
- MELANGE RESIDENCES - PHASE II5.6 yr overdueRAMA SYNERGY SPACES · Hinjawadi Phase III, PuneP52100003047· filed Jun 2019 → now Dec 2020· 87.7% built
- SUN-VISON SOLITAIRE5.6 yr overdueDHAN INTERNATIONAL PVT LTD · Andheri, Mumbai SuburbanP51800001637· filed Mar 2018 → now Dec 2020· 60% built· 2 complaints
- Milan Residency5.6 yr overdueM/s Milan Builders · Borivali, Mumbai SuburbanP51800005484· filed Dec 2018 → now Dec 2020· 71.8% built
- GLORIA5.6 yr overdueDRUSHTI DEVELOPERS · Katraj, PuneP52100012808· filed Dec 2018 → now Dec 2020· 90.9% built· 12 complaints
- KESAR TREE TOWN5.6 yr overdueKESAR VIGHNAHARTA GROUP · MOSHI, PuneP52100006616· 90.6% built
- BLOSSOM5.6 yr overdueNG RATHI ASSOCIATES · WAGHOLI, PuneP52100007572· 51.8% built· 4 complaints
- SHIVLEKH APARTMENT5.6 yr overdueChaturbhai Dhirubhai Kacha · PATHARDI PHATA, NashikP51600021430· 81.8% built
- DWARKA SAI WONDERS PHASE 25.6 yr overdueG K DEVELOPERS · PIMPLE SAUDAGAR, PuneP52100000609· 81.8% built
- Woodsville Phase 3 Cluster B5.6 yr overduePharande Promoters and Builders · Boradewadi, PuneP52100000246· 90.9% built
- Ajinkya Pride Co-operative Housing Society Ltd. Nashik5.6 yr overdueAjinkya Pride Co-operative Housing Society Limited Nashik · Uttara Nagar, NashikP51600014828· 90.9% built
- SHREEVISHWA5.6 yr overdueSWAMI CONSTRUCTIONS · BODHALE NAGAR, NashikP51600008780· 90.9% built
- RAKA PARK5.6 yr overdueADINATH INFRASTRUCTURE · Walwadi (CT), DhuleP49800009342· filed Aug 2018 → now Dec 2020· 65.9% built
- Cherekar Pristine5.6 yr overduePremkumar Bapurao Kulkarni · Bhagyanagar, AurangabadP51500022297· 62.3% built
- Rajshree Status5.6 yr overdueJetalaal Laxmiechand Dedhia · Kurla, Mumbai SuburbanP51800002062· 90.9% built
- Matoshri Apartment5.6 yr overdueShirsat And Dahivelkar Malpure Associates · Gangapur Road, NashikP51600015720· 90.9% built
- SUNANDA CIRCLE A WING AND C WING PHASE II5.6 yr overdueRUDIS DEVELOPERS · Thane, ThaneP51700015111· 0% built· 1 complaint
- NISHIRAJ5.6 yr overdueUNIQUE BUILDERS & DEVELOPERS · Borivali, Mumbai SuburbanP51800008181· filed Mar 2019 → now Dec 2020· 45.5% built
- AL-BURHAN CHS-Phase-I5.6 yr overdueRAJ ROMELL REALTORS · Andheri, Mumbai SuburbanP51800009971· 80.5% built
- UNIQUE ORBIT-I5.6 yr overdueUNIQUE SHANTI REALTORS · Thane, ThaneP51700005412· 90.9% built· 1 complaint
- KRISHNA VALLEY- PHASE 15.6 yr overduePRISHTI VENTURE PRIVATE LIMITED · Khalapur, RaigarhP52000000557· 90.9% built
- PANVELKAR ICON5.6 yr overduePANVELKAR GROUP BUILDERS AND DEVELOPERS · Ambarnath, ThaneP51700004577· 50% built
- INSIGNIA5.6 yr overdueATHARVA REALTORS · BANER,, PuneP52100022043· 54.5% built
- Business Center5.6 yr overdueRoongta Buildcon Ltd. · Govind nagar, NashikP51600007476· 28.2% built
- NEETI HERITAGE5.6 yr overdueNEETI CONSTRUCTION · Pune (M Corp.), PuneP52100002822· 67.3% built
- RAGHUKUL SAHANIWAS5.6 yr overdueEKDANT CONSTRUCTION · Sangli Miraj Kupwad (M Corp.), SangliP53100009884· filed Jun 2019 → now Dec 2020· 45.9% built
- VASTUYOG AMOD5.6 yr overdueVASTUYOG DEVELOPERS · Near ST stand, Sangli, SangliP53100017485· 90.9% built
- VARDHMAN EMPIRE5.6 yr overdueVARDHMAN DEVELOPERS LTD · Borivali, Mumbai SuburbanP51800006315· filed Dec 2018 → now Dec 2020· 90.9% built· 2 complaints
- Eden Garden5.6 yr overdueM C Babu · Uran, RaigarhP52000005932· filed Dec 2019 → now Dec 2020· 90.9% built
- AMAN PARADISE5.6 yr overdueAMAN BUILDERS · Nashik, NashikP51600011143· 90.9% built
- PARAG - RESERVE CO-OP HSG SOC5.6 yr overdueSADGURU BUILDSPACESPVT. LTD. · Borivali, Mumbai SuburbanP51800004572· 62.5% built
- Sai Tirupati Greens Phase 35.6 yr overdueSai Tirupati Properties · Wadmukhwadi, PuneP52100007487· 90.9% built· 1 complaint
- AMAR SADANAND TECH PARK5.6 yr overdueAMAR BUILDERS AND DEVELOPERS · BANER, PuneP52100014439· 90.9% built
- SKY Pavilion Phase I5.6 yr overdueSKP Corp Private Limited · Undri, PuneP52100013569· 81.8% built
- NANDANVAN PARADISE5.6 yr overdueshree devlopers · kondhawe, SataraP52700005735· filed Jul 2019 → now Dec 2020· 90.9% built
- Excalibur by Nahar5.6 yr overdueNAHAR EXCALIBUR PROJECT PRIVATE LIMITED · Ward E, Mumbai CityP51900000138· filed Jun 2019 → now Dec 2020· 90.8% built
- DYNAMIC ULTIMA - BLISS5.6 yr overdueTRIVENI LIFE STYLE DEVELOPERS LLP · Kalyan-Dombivali (M Corp.), ThaneP51800004249· 90.9% built
- LIVA ROCA5.6 yr overdueParinee Shelters Pvt. Ltd. · Andheri, Mumbai SuburbanP51800001785· 43.6% built
- SATELLITE GLORY5.6 yr overdueSATELLITE DEVELOPERS PVT LTD · Andheri, Mumbai SuburbanP51800005350· 80.3% built
- AUSTIN PARK A BUILDING5.6 yr overdueYASHADA SHRAVNI GROUP · Tathwade, PuneP52100007500· 90.9% built
- MUNISH SMRITI5.6 yr overdueSMRITI INFRAHEIGHTS PRIVATE LIMITED · Vasai-Virar City (M Corp), PalgharP99000009677· filed Jun 2019 → now Dec 2020· 9.1% built
- SHRIRAM SAHANIWAS5.6 yr overdueHIMALAYA DWELLERS PRIVATE LIMITED · BOREGAON RINGROAD SQUARE, NagpurP50500000638· 89.1% built
- NEW CUFFE PARADE - LODHA EVOQ 41st Floor5.6 yr overdueLODHA DEVELOPERS LIMITED · Ward FNorth, Mumbai CityP51900000567· filed Jun 2018 → now Dec 2020· 81.8% built· 8 complaints
- Govind Sadan5.6 yr overdueSugee Developers Pvt Ltd · Ward GNorth, Mumbai CityP51900000834· 90.9% built
- VISION INDRAMEGH5.6 yr overdueVISION INFRA · Koyate Wasti, PuneP52100005558· 90.9% built
- CHINTAMANI BUILDCON5.6 yr overdueCHINTAMANI BUILDCON · Soygaon, NashikP51600022319· 37.3% built
- COURTYARD 155.6 yr overdueUNICON DEVELOPMENTS · Haveli, PuneP52100001345· filed Dec 2019 → now Dec 2020· 58.7% built
- Sai Tirupati Greens Phase-25.6 yr overdueSai Tirupati Properties · Wadmukhwadi, PuneP52100007106· 81.8% built
- VRINDAVAN HEIGHTS5.6 yr overdueAJAY MURLIDHAR BACHHAV, VIJAY SAHEBRAO AHIRE AND PRAVIN POPATRAO BACHHAV · Nashik, NashikP51600012251· 90.9% built
- Panvelkar Swarajya Phase-I5.6 yr overduePanvelkar Infrastructures Private Limited · Karjat, RaigarhP52000001562· filed Dec 2019 → now Dec 2020· 30.1% built
- Dnyanai Residency5.6 yr overdueBharat Badshah Satpute · Rase, PuneP52100014606· 72.7% built
- SAHYADRI VISHWA A5.6 yr overdueSAHYADRI VISHWA ASSOCIATES · Haveli, PuneP52100010857· filed Jul 2019 → now Dec 2020· 90.9% built
- SAGAR PLAZA5.6 yr overdueSILVER LAND DEVELOPERS · Neral, RaigarhP52000014190· filed Dec 2019 → now Dec 2020· 90.9% built
- GULAB HEIGHTS5.6 yr overdueBUTTEPATIL ENTERPRISES · SHIVAJINAGAR, PuneP52100015219· 60% built
- SIGNATURE 285.6 yr overdueJagrutsara Structures LLP · CHAKAN, PuneP52100015061· 89.1% built
- BLUE RIDGE5.6 yr overdueSKY LINE DEVELOPERS · ULWE, RaigarhP52000015346· 90.9% built· 2 complaints
- MAGNEUM MARVEL5.6 yr overdueMAGNEUM DEVELOPERS · DEVNAGARI, RaigarhP52000016244· 27.3% built
- PALAVA FONTANA C - H5.6 yr overduePalava Dwellers Private Limited · Kalyan, ThaneP51700000596· 78.2% built· 2 complaints
- Vistaar Icon5.6 yr overdueVistaar Realty · Balewadi, PuneP52100000866· filed Jun 2019 → now Dec 2020· 80.9% built
- CITY AVENUE5.6 yr overdueCARNATION LANDMARKS LLP · Near Bhumkar Chauk, PuneP52100003760· 90.9% built· 2 complaints
- Runwal Arcade5.6 yr overdueRunwal Developers · Haveli, PuneP52100001264· 90.9% built
- PALAVA CLARA E - I5.6 yr overdueLodha Developers Limited · Kalyan, ThaneP51700000540· 81.8% built· 1 complaint
- SAI SRUSHTI5.6 yr overdueJYOTIRMAY DEVELOPERS · KALYAN, ThaneP51700007099· filed May 2018 → now Dec 2020· 60% built
- SPLENDID COUNTY PHASE II5.6 yr overdueYASHADA BUILDERS · LOHGAON, PuneP52100004533· 90.9% built
- Puneet Kanchanganga Phase 2 Floor 26 to Floor 285.6 yr overduePuneet Developers · Thane, ThaneP51700005601· filed Dec 2018 → now Dec 2020· 90.9% built
- RAHULKUNJ5.6 yr overdueGokhale Shelters LLP · Rambaug Colony, PuneP52100014157· 90.9% built
- Ganapati Apartment5.6 yr overdueJai Bajarang Construction · Palghar West, PalgharP99000015531· filed Dec 2019 → now Dec 2020· 87.3% built
- Vishnuchandra Sky5.6 yr overduePragatej Builders And Developers Pvt Ltds · Ward FNorth, Mumbai CityP51900005324· 99.5% built· 3 complaints
- NILANJAN DARSHAN5.6 yr overdueSANJAY MADHAVRAO BHAVSAR · DGP NAGAR, NashikP51600014947· 90.9% built
- SHREEYOGIRAJ ASHISH5.6 yr overdueSHREEYOGIRAJ HOMEMAKERS PRIVATE LIMITED · LAXMINAGAR, NagpurP50500014519· 34.5% built
- Kohinoor Lifestyle5.6 yr overdueSonu Anil Hotchandani · Kalyan, ThaneP51700002787· 90.9% built· 1 complaint
- SHIVPURI BUILDING NO.10 CHS LTD - SHIVAM HEIGHTS5.6 yr overdueSIDHIVINAYAK CONSTRUCTIONS · CHEMBUR, Mumbai SuburbanP51800008516· filed Dec 2018 → now Dec 2020· 81.8% built
- Rustomjee Azziano Wing I5.6 yr overdueKapstone Constructions Private Limited · Thane, ThaneP51700001093· 75.8% built· 1 complaint
- Aayush Business Square5.6 yr overdueEarnest and Shah Ventures · Near D Y Patil Engineering College - Varale, PuneP52100019102· 77.3% built
- MAYADEVI/ VIKUTHDHAM5.6 yr overdueHOME TODAY RENOVATION INDIA PVT.LTD · Borivali, Mumbai SuburbanP51800006678· filed Dec 2018 → now Dec 2020· 47.5% built
- Aspen Park5.6 yr overdueMessrs. Unique Real Estate Developers · Borivali, Mumbai SuburbanP51800001218· 97.5% built
- RBI Employees Siddhivinayak CHS Ltd5.6 yr overdueVASUNDHARA BUILDERS · Borivali, Mumbai SuburbanP51800012461· 72.9% built
- Sairaj Floor 1, 2 and 225.6 yr overdueOmkar Realtors and Developers Private Limited · Ward FSouth, Mumbai CityP51900006458· 90.9% built
- ELITE COLOSSAL-II5.6 yr overduePREMIER DEVELOPERS · Pune (M Corp.), PuneP52100009643· 81.8% built
- Jeevan Heights5.6 yr overdueJ. P. Realtors · Kandivali West, Mumbai SuburbanP51800012228· 56.1% built
- GALAXY APARTMENT5.6 yr overdueFRIENDS DEVELOPERS · Desaiganj (M Cl), GadchiroliP50800014432· 9.4% built
- NAVRANGE APARTMENT5.6 yr overdueFurqan Shafi Navrange · Uran, RaigarhP52000000374· 90.9% built
- GYANGANGA E5.6 yr overdueGANGA GALAXY PROMOTERS · RAHATANI, PuneP52100024597· 99.1% built
- Balaji Sanyog5.6 yr overdueSanyog Construction Co. · Besa, NagpurP50500004586· 90.9% built
- Udyanjali Chs5.6 yr overdueASHRAY DEVELOPERS · Andheri, Mumbai SuburbanP51800004917· 39.1% built
- Kuber Varshatai Tower5.6 yr overdueANAND DATTATRAYA PATIL · Kurla, Mumbai SuburbanP51800001601· filed Dec 2019 → now Dec 2020· 72.3% built
- PALACIA PHASE-II5.6 yr overdueSHREE SACHDHANAND DEVELOPERS · Thane, ThaneP51700009592· filed Dec 2019 → now Dec 2020· 90.9% built
- Antheia A35.6 yr overdueMahindra Lifespace Developers limited · Haveli, PuneP52100000171· 90.9% built
- KAPILASHRAM PHASE II5.6 yr overdueRAMRAI Buildcon LLP · Ganjave Chowk, PuneP52100022227· 67.3% built
- PRABHA CITY5.6 yr overdueRUPALI GHARDE · Pawangaon, NagpurP50500012752· 72.9% built
- Kalpataru5.6 yr overdueShree Maruti Buildcon · Chakan, PuneP52100012215· filed Dec 2019 → now Dec 2020· 81.8% built
- SHANTI HIGHTS5.6 yr overdueKALPANA VIJAY TATIYA · Nashik (M Corp.), NashikP51600012584· 90.9% built
- A K HERITAGE5.6 yr overdueUBEDULLA ABDUL KARIM PATEL · KHOPOLI, RaigarhP52000020168· 29.1% built
- Mahavir Niwas B5.6 yr overdueRAJESH ENTERPRISES · Palghar, PalgharP99000017806· 90.9% built
- THE RESIDENCE5.6 yr overdueRUNWAL DEVELOPERS PVT LTD · Ward ABCD, Mumbai CityP51900011063· 90.9% built
- YASH TULIP5.6 yr overdueSUYASH SHASHIKANT TARGE · DHRUV NAGAR, NashikP51600019296· 9.1% built
- URBAN VISTA II5.6 yr overdueARP INFRA · Khalapur, RaigarhP52000005780· 90.9% built
- ANAND PARK5.6 yr overdueAadinath Builders and Developers · Roha, RaigarhP52000000187· 90.9% built· 1 complaint
- ROONGTA SAKET APARTMENT5.6 yr overdueSHREE TIRUMALA BUILDCON · INDIRANAGAR, NashikP51600019564· 81.8% built
- ROYAL PARK5.6 yr overdueSAIGURU ENTERPRISES · Karjat, RaigarhP52000005980· filed Dec 2019 → now Dec 2020· 22.7% built
- SAIRATNA HEIGHTS5.6 yr overdueMALHAR BUILDERS AND DEVELOPERS · Alefata (N.V.), PuneP52100012748· 82.2% built· 1 complaint
- AMAR KRISHNA KUNJ5.6 yr overdueAMAR BUILDERS AND DEVELOPERS · UTTRANAGRI, AurangabadP51500011448· 90.9% built
- SHERKAR-BANKAR RESIDENCY5.6 yr overdueSACHIN SAYAJI BANKAR · SURAYANAGARI, PuneP52100023248· 90.9% built
- Nav Vani5.6 yr overdueGiriraj builders and developers · Ghatkopar, Mumbai SuburbanP51800015835· 86.4% built
- HARI DARSHAN APARTMENT5.6 yr overdueR T ENTERPRISES · Nashik (M Corp.), NashikP51600005640· 90.9% built
- YASH TWIN TOWER5.6 yr overdueYASH INFRA CITY REALTY PRIVATE LIMITED · Baner, PuneP52100008049· filed Jul 2019 → now Dec 2020· 71% built· 14 complaints
- ORCHID BLISS5.6 yr overdueSUNNY BUILDTECH PRIVATE LIMITED · Ulawe, RaigarhP52000002967· filed Dec 2019 → now Dec 2020· 99.5% built· 1 complaint
- Bhalchandra Puram5.6 yr overduePolite Buildwell · RAVET, PuneP52100002143· filed Jun 2019 → now Dec 2020· 90.9% built
- Rebecca Queen5.6 yr overdueRebecca Ventures · Vasai, PalgharP99000005006· filed Jun 2019 → now Dec 2020· 73.6% built
- Eakadanta Sankul Phase-I5.6 yr overdueEAKADANTA REALTORS · Kondale, RaigarhP52000005394· 90.9% built
- Bhoomi Lawns , Phase II5.6 yr overdueGajra Home Makers Pvt. Ltd. · Thane, ThaneP51700004303· 90.9% built· 14 complaints
- GULAB VISHWA5.6 yr overduePROPERTY VISHWA DEVELOPERS · Bhavsing pura, AurangabadP51500012690· filed Jun 2019 → now Dec 2020· 61.4% built
- WINDSOR5.6 yr overdueTHE WINDSOR · Andheri, Mumbai SuburbanP51800011781· 72.7% built
- Gandharva Nagari Phase II, Project II, G-125.6 yr overdueVinayak Pandharinath Bhongale · Opp Kendriya Vihar, PuneP52100007134· 29.1% built
- VISHAKHA REGENCCY5.6 yr overdueVISHAKHA DEVELOPER · WADGAON BK, PuneP52100008301· filed Jul 2019 → now Dec 2020· 81.8% built
- SHREE SAI PANACHE5.6 yr overdueGYANDEV BUILDERS & DEVELOPERS · Ambarnath, ThaneP51700000216· 81.8% built
- SHRUTI APARTMENT A WING PHASE 15.6 yr overdueRADHIKA SHRIKRISHNA HAVAL · BANER, PuneP52100018846· 30% built
- ELITE COLOSSAL - I5.6 yr overduePREMIER DEVELOPERS · Pune City, PuneP52100004606· 81.8% built
- APPLE GLORY5.6 yr overdueAPPLE BUILDERS AND DEVELOPERS · MARUNJI, PuneP52100016004· 7.3% built
- GOLDCREST RESIDENCY - PHASE 15.6 yr overdueSAVITA HOMEMAKERS LLP · Thane, ThaneP51700012365· filed Dec 2019 → now Dec 2020· 97.4% built· 11 complaints
- SHRIRAM PLAZA II5.6 yr overdueSHRIRAM SM ASSOCIATES BUILDERS AND DEVELOPERS · Nagpur (M Corp.), NagpurP50500013510· filed Jul 2018 → now Dec 2020· 41.8% built
- Namrata Eco City 2.05.6 yr overdueNAMRATA DEVELOPERS PVT. LTD · s, PuneP52100000227· 89.1% built· 2 complaints
- Mahavir Kunj B5.6 yr overdueRajesh Realtors · Palghar, PalgharP99000018657· 90.9% built
- Samarth Blossom5.6 yr overdueD G Group · Aanandwali, NashikP51600007810· 72.7% built
- Shivram Avenue5.6 yr overdueMaheshwar Enterprises · Nashik, NashikP51600010957· 81.8% built
- Sonigara Excluzee5.6 yr overdueDHANRAJ KESARIMAL SONIGARA · Hinjavadi (CT), PuneP52100008799· filed Feb 2020 → now Dec 2020· 93% built
- PEARL RESIDENCY5.6 yr overdueBARDIA AND ASSOCIATES · JAIL ROAD, NashikP51600009618· 90.9% built
- Voyage to the Stars - Phase I5.6 yr overdueAcropolis Purple Developers · PUNE, PuneP52100004160· filed Jun 2021 → now Dec 2020· 98.9% built· 12 complaints
- MANOHAR BLISS5.6 yr overdueBHAGYASHREE BHARAT SHASTRI · Baner, PuneP52100004676· filed Jun 2019 → now Dec 2020· 90.9% built
- SHREE RAVI RESIDENCY5.6 yr overdueSANJAY MANAK PATIL · Nashik (M Corp.), NashikP51600010553· 90.9% built
- GALAXY COMPLEX5.6 yr overdueKHALID HUSSAIN MULLAJI · ., RatnagiriP51700009927· filed Mar 2019 → now Dec 2020· 44.1% built
- Krishna Pride5.6 yr overdueShree Krishna Constructions · Nashik (M Corp.), NashikP51600004084· 90.9% built
- SUKRUT APARTMENT5.6 yr overdueKESHAV KHANDU CHINCHORE · Nashik (M Corp.), NashikP51600011137· 90.9% built
- KRISHNA HERITAGE5.6 yr overdueSHREE BALAJI CONSTRUCTION · KALYAN, ThaneP51700007118· 75% built· 1 complaint
- AXIS CENTRA5.6 yr overdueAxis Landmarks · BANER, PuneP52100002121· filed Dec 2019 → now Dec 2020· 41.8% built
- The Orian5.6 yr overdueGalaxy Infra Projects · Nashik (M Corp.), NashikP51600013400· 90.9% built
- GREEN LEAF5.6 yr overdueM/S KWALITY DEVELOPERS · BHAVANI PETH, PuneP52100014561· filed Dec 2018 → now Dec 2020· 59.1% built
- SIDDIVINAYAK HEIGHTS5.6 yr overdueMINAKSHI CONSTRUCTIONS · Aasava Nagr, JalgaonP49900000600· 90.9% built
- MULUND KAVITA KIRAN CHS5.6 yr overdueIndu Enterprise · Kurla, Mumbai SuburbanP51800011080· 90.9% built· 2 complaints
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.