RERA projects past their possession deadline
11,767 MahaRERA-registered projects are past the possession date currently on file and still report under 100% construction progress. Both figures are the promoter's own disclosure to the regulator.
Page 26 of 59
- SHIVAJI ENCLAVE - 25.8 yr overdueSUBHASH DEVIDAS BHARSAKALE · AMRAVATI, AmravatiP50300008036· 90.9% built
- PUSHKRAJ TOWER5.8 yr overduePUSHKRAJ SHRIKANT HEDDA · SHIVAJI COLLEGE, OsmanabadP52500015993· 90.9% built
- EQUILIFE HOMES PHASE I5.8 yr overdueYELLOWSTONE NIRMITI LLP · Mhalunge, PuneP52100000767· 90.9% built
- ADORA-PHASE 25.8 yr overdueNEST KRISALA ASSOCIATES · RAVET, PuneP52100016201· 39.1% built
- Kul Utsav Ph 1 C building5.8 yr overdueKumar Builders · Pune, PuneP52100007155· 81.8% built· 2 complaints
- Clio5.8 yr overduePersipina Developers Private Limited · Panvel, RaigarhP52000000184· 54.5% built· 3 complaints
- Mellona5.8 yr overduePersipina Developers Private Limited · Panvel, RaigarhP52000000260· 54.5% built· 2 complaints
- ARIHANT AAROHI PHASE I5.8 yr overdueARIHANT SUPERSTRUCTURES LIMITED · Thane, ThaneP51700004679· filed Apr 2019 → now Oct 2020· 99.1% built
- ANSHUL KANVAS A AND E BUILDING5.8 yr overdueM/S ANSHUL BHOSALE REALTY · WAGHOLI, PuneP52100001023· filed Apr 2019 → now Oct 2020· 90.9% built· 1 complaint
- DAHLIA BLDG A D AND E5.8 yr overdueHAWARE ENGINEERS AND BUILDERS PRIVATE LIMITED · Thane, ThaneP51700001515· filed Apr 2019 → now Oct 2020· 73.5% built· 3 complaints
- THARWANI SOLITAIRE PHASE II5.8 yr overdueANIL HARDASMAL THARWANI · Kalyan, ThaneP51700004565· filed Apr 2019 → now Oct 2020· 10.9% built
- SHREE RESIDENCY PHASE A5.8 yr overdueUK CONSTRUCTION · Haveli, PuneP52100004908· filed Apr 2019 → now Oct 2020· 80% built
- Imperial Shelter5.8 yr overdueImperial Shelter · Vasai, PalgharP99000001277· filed Apr 2019 → now Oct 2020· 49.5% built
- ATHARVA SANSKRUTI5.8 yr overdueSIDDHIVINAYAK BUILDTECH · Nashik (M Corp.), NashikP51600000801· filed Dec 2018 → now Oct 2020· 90.9% built
- SIddhanath apartment5.8 yr overdueSIDDHANATH DEVELOPERS · Karjat, RaigarhP52000009476· filed Apr 2018 → now Oct 2020· 57.3% built
- SHIVDARSHAN PHASE I5.8 yr overdueSPACE DEVELOPER · BHANDUP WEST, Mumbai SuburbanP51800024522· 81.5% built
- SWASTIK MANAS5.8 yr overdueSWASTIK INFRA · Mahalunge, PuneP52100008050· filed Jul 2018 → now Oct 2020· 27.3% built· 1 complaint
- Shakti Residency5.8 yr overdueShiv Shakti Developers · Panvel, RaigarhP52000010973· filed Oct 2018 → now Oct 2020· 90.9% built
- PADMADISHA PARADISE5.8 yr overduePADMADISHA PARADISE · Bhiwandi, ThaneP51700003857· filed Dec 2018 → now Oct 2020· 90.9% built· 1 complaint
- Sun Radiant5.8 yr overdueMittal Vastu Rachana LLP · -, PuneP52100001797· filed Dec 2018 → now Oct 2020· 88.6% built
- HORIZON TOWER5.8 yr overdueHORIZON REALTY · Ward FNorth, Mumbai CityP51900009490· filed Dec 2018 → now Oct 2020· 80% built· 1 complaint
- ELIXIR GANDHARVA5.8 yr overdueELIXIR BUILDERS · CHANDSHI, NashikP51600018475· 90.9% built
- Avenue Imperia5.8 yr overdueAvenue Buildcon · Baner, PuneP52100002633· filed Dec 2018 → now Oct 2020· 35% built
- TULIP SWAPNALOK5.8 yr overdueTulip Properties · Pimpri Chinchawad (M Corp.), PuneP52100011375· filed Dec 2017 → now Oct 2020· 90.9% built· 2 complaints
- PADMAVATI NAGARI BLDG NO 1 A and B wing5.8 yr overdueS D BHALERAO CONSTRUCTIONS PVT LTD · Venkatesh Nagar, NashikP51600003238· filed Dec 2018 → now Oct 2020· 90.9% built
- VIDARBHA PREMIER NAGRI PHASE 3 KALMESHWAR5.8 yr overduePRAKASH NARAYANRAO RAOLE · KALMESHWAR, NagpurP50500010477· filed Dec 2018 → now Oct 2020· 78.2% built
- RISHABH AVENUE PHASE I5.8 yr overdueVISHWAMITRA AND RATHI · LAXMI ROAD NEAR VIJAY TALKIES, PuneP52100006466· filed Mar 2018 → now Oct 2020· 75.5% built
- SHOBHA VIHAR5.8 yr overdueANUP SATYANARAYAN SRIVASTAV · Mulshi, PuneP52100010551· filed Dec 2018 → now Oct 2020· 42.7% built
- SAFAVI CHS LTD5.8 yr overdueRAJ BUILDERS · Andheri, Mumbai SuburbanP51800009984· filed Oct 2018 → now Oct 2020· 84.5% built
- MAX VENTURE5.8 yr overdueMAX VENTURE · Vasai, PalgharP99000010434· 81.8% built
- AATMAY ELIXIR5.8 yr overdueAATMAY REALTORS · Ulawe, RaigarhP52000011324· filed May 2018 → now Oct 2020· 64.8% built· 1 complaint
- HIRANYAKESHI COMPLEX5.8 yr overdueVijay Ramchandra Godse · Gijavane, KolhapurP53000006212· filed Dec 2018 → now Oct 2020· 67.7% built
- Ornate Galaxy Phase I5.8 yr overdueSai Ornate Developers · Vasai, PalgharP99000008854· filed Dec 2018 → now Oct 2020· 85.3% built
- VASTURANG ENCLAVE G AND H WING5.8 yr overdueVASTURANG INFRASTRUCTURE PVT LTD · Ashtavinayak Nagar, Panchvati, NashikP51600013331· filed Dec 2018 → now Oct 2020· 90.9% built
- KALPAVRUKSH RESIDENCY5.8 yr overdueKALPAVRUKSH DEVELOPERS · Mukindapur, AhmednagarP52200012174· filed Dec 2018 → now Oct 2020· 90.9% built
- Mountain Valley5.8 yr overdueGayasuddin Riyazuddin Khan · Thane, ThaneP51700009583· 69.7% built
- BHALCHANDRA VATIKA5.8 yr overdueSAMARTH CHINTAMANI PROPERTIES · NEAR BALAJI TEMPLE, PuneP52100021798· 90.9% built
- BABAR POTE RECIDENCY5.8 yr overdueBABAR POTE ASSOCIATES · Pimpri Chinchawad (M Corp.), PuneP52100009503· filed Nov 2018 → now Oct 2020· 70.9% built
- VENUS HEIGHT5.8 yr overdueM/S S.NAVIN BUILDERS · Amravati (M Corp.), AmravatiP50300008918· filed Dec 2018 → now Oct 2020· 48.2% built
- PEBBLE PARK D15.8 yr overdueKumar Construction and Properties Pvt Ltd · Hadapsar, PuneP52100000073· 90.9% built
- Shree Residency5.8 yr overdueHEMENT DAMU PINGALE · Solapur (M Corp.), SolapurP52600005699· filed Dec 2018 → now Oct 2020· 86.8% built· 1 complaint
- SAI SANGAM APARTMENT5.8 yr overdueSAI SANGAM CONSTRUCTION CO · Vasai, PalgharP99000008631· filed May 2018 → now Oct 2020· 90.9% built
- PADMANABH GOLDEN VALLEY PHASE-I BUILDING B AND C5.8 yr overdueOM BALAJI PLAZA · DHAYARI, PuneP52100001995· filed Dec 2018 → now Oct 2020· 44.5% built· 1 complaint
- DREAM CITY WING D AND WING E5.8 yr overdueMAHAVIRHOMES · Ahmadnagar (M Corp.), AhmednagarP52200010321· filed Sept 2018 → now Oct 2020· 55.2% built
- TULSIHEIGHTS5.8 yr overdueJAY VELOPERS · Nashik (M Corp.), NashikP51600008515· filed Dec 2018 → now Oct 2020· 90.9% built
- VIDARBHA PREMIER SAHANIWAS JAITALA.NAGPUR5.8 yr overduePRAKASH NARAYANRAO RAOLE · JAITALA, NagpurP50500011968· filed Dec 2018 → now Oct 2020· 90.9% built
- MORYA HILLS5.8 yr overdueRAMESH BABANRAO GAVHANE · Alandi (M Cl), PuneP52100012723· filed May 2019 → now Oct 2020· 54.5% built
- KRUSHNAI5.8 yr overdueWELFARE CONSTRUCTION · Kalyan, ThaneP51700010252· filed Apr 2018 → now Oct 2020· 82.7% built
- MAPLE ENCLAVE5.8 yr overdueVINOD RAMASHRY TRIPATHI · Wagdara (536054), NagpurP50500013298· filed Dec 2018 → now Oct 2020· 90.5% built
- GORAI SHREE RAM TOWER CHS LTD5.8 yr overdueJAGANNATH LAXMAN MORE · Borivali, Mumbai SuburbanP51800006753· filed Jun 2018 → now Oct 2020· 90.9% built
- PLOT NO 3 CHARKOP SECTOR 85.8 yr overdueMAHARASHTRA HOUSING AND AREA DEVELOPMENT AUTHORITY · Borivali, Mumbai SuburbanP51800000017· filed Dec 2018 → now Oct 2020· 88.2% built
- Palazzo Greens5.8 yr overdueUnique Multicon India Pvt. Ltd. · Mawal, PuneP52100000948· filed Dec 2018 → now Oct 2020· 53.6% built· 7 complaints
- Vaishnavi Heights5.8 yr overdueSanjay Shantaram Kankoshe · Kalyan-Dombivali (M Corp.), ThaneP51700011393· filed Dec 2017 → now Oct 2020· 82.1% built
- Construction of 96Ts EWS 36Ts MIG 8 Shops and 4 Office Chambers at site No 125 Datala New Chandrapur5.8 yr overdueMHADA ( Nagpur Board ) · datala, ChandrapurP50900001085· 78.3% built
- YOGI KRISHNA5.8 yr overdueSONAL DEV-CON PVT LTD · -, RaigarhP52000001667· 81.8% built
- Avneesh5.8 yr overdueSai Nirmiti Promoters & Builders · Pimpri Waghere, PuneP52100011082· 81.8% built· 1 complaint
- DinkarHeights5.8 yr overdueM/s. ShreePrakash Developers Pvt Ltd · Nashik (M Corp.), NashikP51600010492· filed Dec 2018 → now Oct 2020· 79.1% built
- Construction of 83 LIG Ts on Guest plot CTS no 43 Pt of Unnatagar, Village Pahadi goregaon5.8 yr overdueMUMBAI HOUSING AND AREA DEVELOPMENT BOARD · Andheri, Mumbai SuburbanP51800000023· filed Dec 2018 → now Oct 2020· 90.9% built
- GURUDATTA RESIDENCY5.8 yr overdueGURUDATTA DEVELOPERS · Pune (M Corp.), PuneP52100014253· filed Dec 2018 → now Oct 2020· 66.4% built
- ROYAL PALMS5.8 yr overduePALMS REALTY · Aurangabad (M Corp.), AurangabadP51500001328· filed Jun 2018 → now Oct 2020· 90.9% built
- ASHOK RESIDENCY5.8 yr overdueJitu Ashok Pawar · Nashik, NashikP51600006162· filed Dec 2018 → now Oct 2020· 72.3% built
- SHETH EXOTICA5.8 yr overdueM/S SHETH PROPERTIES PVT LTD · Ghatkopar, Mumbai SuburbanP51800009092· filed Oct 2018 → now Oct 2020· 90.8% built
- SAMPADA HEIGHTS5.8 yr overdueSAMPADA REALTORS · Ward FSouth, Mumbai CityP51900004994· filed Dec 2018 → now Oct 2020· 53.6% built· 5 complaints
- Eden Spaces5.8 yr overdueElysian Realty · Kivale, PuneP52100006898· filed Oct 2019 → now Oct 2020· 66.4% built
- Mittal Enclave Gokul Sector Bldg No 45.8 yr overdueSealink Construction Co. Pvt. Ltd. · Vasai, PalgharP99000006573· filed Dec 2018 → now Oct 2020· 90% built
- MEGHDOOT ENCLAVE5.8 yr overdueRAGHAV ASSOCIATES · HUDKESHWAR, NagpurP50500006571· filed Dec 2018 → now Oct 2020· 83.1% built
- Site No.124, Datala, New Chandrapur5.8 yr overdueMHADA(Nagpur Board) · datala, ChandrapurP50900000159· 82.6% built
- Suparshwa Eternia5.8 yr overdueSuparshwa Estate · Andheri, Mumbai SuburbanP51800007773· filed Dec 2019 → now Oct 2020· 53.2% built
- ORANGE COUNTY5.8 yr overdueDNYANESHWAR NAMDEVRAO WANKHADE · AMRAVATI, AmravatiP50300011513· filed Dec 2018 → now Oct 2020· 57.5% built
- LOTUS BUILDING A35.8 yr overdueORIENT SHIVAM DEVELOPERS · YAWALEWADI, PuneP52100002253· filed Jun 2018 → now Oct 2020· 90.9% built· 1 complaint
- KAMALRAJ NISHIGANDH B AND C BUILDING5.8 yr overdueKamalraj Realtors ·P52100001887· filed Nov 2018 → now Oct 2020· 90.9% built
- NAMRATA MAGIC5.8 yr overdueNAMRATA DEVELOPERS · Kokane Chowk, PuneP52100018637· 90.9% built· 1 complaint
- PUSHPAK PRIDE5.8 yr overdueSHASHIKALA AJIT SHINGI · Nashik, NashikP51600005139· filed Oct 2018 → now Oct 2020· 81.8% built
- PUSHP RESIDENCY5.8 yr overdueSUKHAKARTA REAALTY AND DEVELOPER · Bhom, SindhudurgP52900003398· filed Jun 2018 → now Oct 2020· 90.9% built
- Kul Utsav Phase I - Building D5.8 yr overdueKumar Builders · pune, PuneP52100007160· filed May 2019 → now Oct 2020· 90.9% built· 1 complaint
- SILICON ENCLAVE5.8 yr overdueSHILPRIYA BUILDERS AND DEVELOPERS · Kurla, Mumbai SuburbanP51800007484· filed Dec 2019 → now Oct 2020· 90.9% built
- NANDAN ASPIRA5.8 yr overdueSHAMKANT KESHAV KOTKAR · Pune City, PuneP52100000971· filed Mar 2019 → now Oct 2020· 90.9% built· 1 complaint
- Shree Samarth Residency5.8 yr overdueSamarth Developers · Malwan (M Cl), SindhudurgP52900006080· filed Dec 2017 → now Oct 2020· 51.4% built· 1 complaint
- SALONI ENCLAVE5.8 yr overdueNIKHIL BUILDERS · Kurla, Mumbai SuburbanP51800007822· filed Sept 2018 → now Oct 2020· 62.6% built
- Vista II5.8 yr overdueVascon Engineers Ltd · Wadala, NashikP51600001313· filed Mar 2018 → now Oct 2020· 99.6% built
- Suparshwa Urbana5.8 yr overdueSuparshwa Estate · Andheri, Mumbai SuburbanP51800010166· filed Dec 2019 → now Oct 2020· 86.4% built
- CHANDRA VITHOBA HEIGHTS5.8 yr overdueOM SAI RAM INFRAVENTURE · Jamtha, NagpurP50500014247· filed Dec 2018 → now Oct 2020· 38.2% built
- Jangid Galaxy Tower 35.8 yr overdueJangid Contructions · Thane, ThaneP51700004127· filed Dec 2018 → now Oct 2020· 44.9% built· 21 complaints
- VASTURANG ENCLAVE A AND B WING5.8 yr overdueVASTURANG INFRASTRUCTURE PVT LTD] · Nashik, NashikP51600012901· filed Jan 2018 → now Oct 2020· 90.9% built
- Swastik Plaza C CHS Ltd-AVANA5.8 yr overduePRATIBHA VEEKAY REAL ESTATE LLP · Kurla, Mumbai SuburbanP51800004923· filed Dec 2018 → now Oct 2020· 90.9% built
- NATEKAR HEIGHTS5.8 yr overdueSabari Developers LLP · Kurla, Mumbai SuburbanP51800002547· filed May 2019 → now Oct 2020· 82.7% built
- Pratiksha Nagar Phase IV5.8 yr overdueMHADA · Ward FNorth, Mumbai CityP51900000050· filed Dec 2017 → now Oct 2020· 90.9% built
- Vitthal Residency5.8 yr overdueSandeep Tukaram Raut · Pimpri Chinchawad (M Corp.), PuneP52100002758· filed Apr 2019 → now Oct 2020· 90.9% built
- ANKIT FIONA PHASE 15.8 yr overdueMAHESH SUHAS PADALKAR · BHUWANESHWAR, RaigarhP52000012190· filed Dec 2018 → now Oct 2020· 81.8% built
- KRISHNA CHAITANYA RAJBHAVAN CHSL5.8 yr overdueEthics Infra Development Pvt. Ltd. · Andheri, Mumbai SuburbanP51800000078· filed Dec 2018 → now Oct 2020· 90.9% built· 2 complaints
- SWARGANDH5.8 yr overduePRIDE PROPERTIES & INFRASTRUCTURE · Gujrat colony, PuneP52100009418· filed Nov 2018 → now Oct 2020· 81.8% built
- RANGAI APARTMENTS5.8 yr overdueA V CONSTRUCTION · AYRE VILLAGE, ThaneP51700018389· 34.5% built
- MADHUBAN A AND A1 WING5.8 yr overdueM.D. DEVELOPERS · Borivali, Mumbai SuburbanP51800010413· filed Dec 2018 → now Oct 2020· 90.9% built· 3 complaints
- JIJAI COMPLEX5.8 yr overdueSHUBHAM BUILDERS & DEVELOPERS · NEAR BY TALOJA, RaigarhP52000012017· filed Dec 2018 → now Oct 2020· 85.5% built· 2 complaints
- VIJAYPRIDE5.8 yr overdueLALWANI CONSTUCTION · Nashik (M Corp.), NashikP51600012211· filed Dec 2018 → now Oct 2020· 82.4% built
- SAI AURA5.8 yr overdueDATTA PROJECTS PVT LTD · ULTAN FALIYA, Dadra & Nagar HaveliP49600000003· 90.9% built
- malad shanti5.8 yr overduesachit thakkar · Borivali, Mumbai SuburbanP51800010257· filed Dec 2018 → now Oct 2020· 22.4% built
- BHASKAR VASTUPURTI APARTMENT5.8 yr overduePRATIK BUILDCON · Aurangabad (M Corp.), AurangabadP51500011897· filed Dec 2018 → now Oct 2020· 55.9% built
- CRYSTAL CORNER5.8 yr overdueSAPTGIRI DEVELOPERS · Haveli, PuneP52100004065· filed Mar 2018 → now Oct 2020· 71.8% built
- PRASHANT CO-OPERATIVE HOUSING SOCIETY LIMITED5.8 yr overdueFIFTHWALL BUILDERS PRIVATE LIMITED · Ward ABCD, Mumbai CityP51900008249· filed Dec 2017 → now Oct 2020· 81.8% built
- KABRA HEIGHTS5.8 yr overdueManoj Madhukar Toshniwal · KARMAYOGINAGAR, NashikP51600004790· filed Dec 2017 → now Oct 2020· 90.9% built
- SHREE KRUSHNA APARTMENT5.8 yr overdueVASTULAXMI BUILDERS AND CONTRACTORS · Nashik (M Corp.), NashikP51600008523· filed Aug 2019 → now Oct 2020· 59.1% built
- UDYAM BIZHUB5.8 yr overdueKADU REALTY LLP · SASWAD, PuneP52100016421· 81.8% built
- NOTTING HILL PHASE II5.8 yr overduePARADISE REALTY · KONDHWA BUDRUK, PuneP52100018617· 72.7% built
- USHA BHASKAR CHIPLUNKAR SANKUL5.8 yr overduePRASHANT MANOHAR DINGANKAR · Tilak Ali, RatnagiriP52800020939· 90.9% built
- RUCHA SOLITAIRE5.8 yr overdueCHINTAMANI PROJECTS · Neral, RaigarhP52000000208· 90.9% built
- TIRUMALA PRIDE5.8 yr overduePRACHI AVINASH PAMPATTIWAR · Wadgaon (CT), YavatmalP51000014307· 90.9% built
- SAMRUDDHI NIWAS5.8 yr overdueMODEL DEVELOPERS AND BUILDERS · Ramacha Got, SataraP52700004270· 81.8% built
- Vardhaman Residency5.8 yr overdueAMAR KALYANI BIRAJDAR · Solapur (M Corp.), SolapurP52600013768· 81.8% built
- LOTUS PLAZA5.7 yr overdueCHOICE REALTY PRIVATE LIMITED · Vengurla (M Cl), SindhudurgP52900013372· filed May 2019 → now Nov 2020· 50% built
- MARIYAH HEIGHTS5.7 yr overdueSAYED NAVEED AHEMD · Junnar, PuneP52100016027· 45.5% built
- SHIVA PLAZA5.7 yr overdueKRUTIKA BUILDERS AND DEVELOPERS · Kalyan, ThaneP51700008806· filed May 2018 → now Nov 2020· 39.1% built
- Kul Utsav Ph I E Building5.7 yr overdueKumar Builders · Pune, PuneP52100007157· filed May 2019 → now Nov 2020· 90.9% built
- Belmac Residences E5.7 yr overdueSUPREME HOLDINGS & HOSPITALITY (INDIA) LIMITED · PUNEP52100000131· filed May 2019 → now Nov 2020· 93.9% built· 3 complaints
- PAWAR PALACE5.7 yr overdueSUPRIYA SUKHADEV PAWAR · Bharane, RatnagiriP52800010580· 90.9% built
- AURA VILLAGE PHASE 15.7 yr overdueVECTOR LIFESPACE LLP · pen, RaigarhP52000010261· 83.2% built
- VasantRekha Heights5.7 yr overdueSURABHI DEVELOPERS · Ichalkaranji (M Cl), KolhapurP53000003458· filed May 2019 → now Nov 2020· 90.9% built
- Cluster C5.7 yr overdueShibam Associates · Neral, RaigarhP52000006617· filed Nov 2019 → now Nov 2020· 90.9% built
- Shindeshahi PhaseII5.7 yr overdueTIRUPATI CONSTRUCTION PROMOTERS & DEVELOPERS · Samatanagar, SolapurP52600013888· 86.4% built
- Aura5.7 yr overduePersipina Developers Private Limited · Panvel, RaigarhP52000000263· 54.5% built· 2 complaints
- Rudraksha Towers5.7 yr overdueRUDRA PROMOTER PVT. LTD. · Karanje Tarf, Satara, SataraP52700000147· filed May 2019 → now Nov 2020· 90.9% built
- PLATINUM SAGAR JEWEL WING D AND E5.7 yr overduePLATINUM SAGAR HOMES · Badlapur (M Cl), ThaneP51700005294· filed May 2019 → now Nov 2020· 44.5% built
- Argus5.7 yr overduePersipina Developers Private Limited · Panvel, RaigarhP52000000265· 54.5% built· 4 complaints
- SUNSHINE SAPPHIRE5.7 yr overdueShantee Housing · Vasai, PalgharP99000001441· filed May 2019 → now Nov 2020· 90.9% built· 9 complaints
- SHUBHAM GALAXY5.7 yr overdueNAVKAR & ASSOCIATES · Kalyan, ThaneP51700010970· 52.7% built
- PANVELKAR SANKALP WING A5.7 yr overdueGEETAI ENTERPRISES · Ambarnath, ThaneP51700010787· 90.9% built
- Saarrthi Skybay5.7 yr overdueSiddharth Properties · Mahalunge, PuneP52100004803· filed May 2019 → now Nov 2020· 90.9% built· 19 complaints
- NEELKANTH VIHAR PHASE I5.7 yr overdueNEELKANTH CONSTRUCTIONS · NEW PANVEL, RaigarhP52000005312· filed Sept 2019 → now Nov 2020· 56.8% built· 5 complaints
- Solitaire Nine5.7 yr overdueAtul Builders · BANER, PuneP52100009238· filed May 2019 → now Nov 2020· 72.7% built
- Sterling Towers5.7 yr overdueICON DEVELOPERS · Haveli, PuneP52100016114· 56.7% built
- DESTINATION ANKUR C BUILDING5.7 yr overdueKIRTI LANDMARKS · CHOVISAWADI, PuneP52100008620· 31.3% built
- Rustomjee Paramount - Wing E5.7 yr overdueKEYSTONE REALTORS LIMITED · Andheri, Mumbai SuburbanP51800000862· 96.9% built
- SHREE TIRUMALA PLATINUM APARTMENT5.7 yr overdueROONGTA HOMES LLP · COLLEGE ROAD, NashikP51600014568· 81.8% built
- DESAI HARMONY5.7 yr overdueDESAI RESIDENCY PRIVATE LIMITED · Mumbai City, Mumbai CityP51900009455· filed May 2019 → now Nov 2020· 67% built· 4 complaints
- RAVI RACHANA5.7 yr overdueR.R.BUILDERS & DEVELOPERS · Panvel, RaigarhP52000001742· filed May 2019 → now Nov 2020· 84.5% built
- ROYAL RESIDENCY5.7 yr overdueDESIGN DEVELOPERS PRIVATE LIMITED · Nagpur (M Corp.), NagpurP50500000348· 90.9% built
- NARMADA RESIDENCY5.7 yr overdueRAMESH RAMCHANDRA MASAL · KHATAL NAGAR, SangliP53100017976· 44.5% built
- KASTURI FLORIDUS5.7 yr overdueSHIVAAY DEVELOPERS · NAROLI MAIN ROAD, Dadra & Nagar HaveliP49600000044· 81.8% built
- Eternia Phase 15.7 yr overdueVENTURESPRO PROJECTS LLP · Haveli, PuneP52100003139· filed May 2019 → now Nov 2020· 66.7% built· 4 complaints
- ABP VASTAV5.7 yr overdueABP BUILDERS & DEVELOPERS · Pen (M Cl), RaigarhP52000012512· filed May 2019 → now Nov 2020· 36.4% built
- VRINDAVAN COMPLEX5.7 yr overduePATIL BUILDERS · Palghar, PalgharP99000000827· filed May 2019 → now Nov 2020· 90.9% built
- PRIDE RESIDENCY5.7 yr overdueSHAHED KHA PATHAN · Majalgaon, BeedP52300023654· 59.1% built
- UMIYA COMPLEX PHASE II5.7 yr overdueUmiya Associates · Badlapur (M Cl), ThaneP51700009284· 90.9% built
- Redevelopment of GKW Sankey Employees chsl5.7 yr overdueHeritage Lifestyles & Developers Pvt. Ltd.e · Kurla, Mumbai SuburbanP51800001655· filed May 2019 → now Nov 2020· 85.2% built· 1 complaint
- ROYAL PALMS APARTMENT5.7 yr overdueCHARUDATTA MORESHWAR MULAY · rasnenagar, AhmednagarP52200001966· filed May 2019 → now Nov 2020· 33.6% built
- GANESHA RESIDENCY5.7 yr overdueGAJANAN MORESHWAR NILAWAR · Chandrapur (M Cl), ChandrapurP50900010219· filed Dec 2019 → now Nov 2020· 81.8% built
- ANAND PROSPERA B WING5.7 yr overdueVIHANG ASHOK SHAH · RANKALA LAKE, KolhapurP53000015137· 90.9% built
- Aurora5.7 yr overduePersipina Developers Private Limited · Panvel, RaigarhP52000000256· 54.5% built
- Courtyard One Phase 15.7 yr overdueSIGMA ONE DHOOT VENTURES Previously Sigmaone Remonesa Ventures · WAKAD, PuneP52100005050· filed May 2019 → now Nov 2020· 89.1% built· 2 complaints
- MALHARI SANKUL5.7 yr overdueYUVARAJ APPASAHEB NEHARKAR · ZARI BAG, SangliP53100015915· 40.5% built
- Happinest Boisar Phase V CFC5.7 yr overdueMahindra Lifespace Developers limited · Palghar, PalgharP99000014295· 81.8% built
- SILVER WOODS5.7 yr overdueHARIKRISHNA BUILDCON · mascernhes colony, PuneP52100011298· 50.9% built
- ROYAL PALMS II WING5.7 yr overdueCHARUDATTA MORESHWAR MULAY · RASNE NAGAR, AhmednagarP52200021307· 9.1% built
- BROOKLYN PARK PHASE I5.7 yr overdueEKTA PARKSVILLE HOMES PVT. LTD. · Vasai, PalgharP99000000134· filed May 2019 → now Nov 2020· 89.4% built· 7 complaints
- Shrivardhan Apartment5.7 yr overdueMJP Builders and Developers · Kolhapur (M Corp.), KolhapurP53000014428· 64.5% built
- CREATIVE KRISHNA SANKUL5.7 yr overdueCREATIVE TRUNKEY PROJECTS PVT LTD · NEAR SAI SERVICE, KolhapurP53000018936· 9.7% built
- PRAGATI TULIP5.7 yr overduePRAGATI CORPORATION · Palghar, PalgharP99000011793· filed May 2019 → now Nov 2020· 51.8% built
- Rustomjee Paramount - Wing D5.7 yr overdueKEYSTONE REALTORS LIMITED · Andheri, Mumbai SuburbanP51800000619· 97.5% built
- Tiara5.7 yr overdueRaj Gul Bijlani · Kurla, Mumbai SuburbanP51800008126· filed May 2019 → now Nov 2020· 36.2% built
- BLDG NO-9 M.BARIA TWIN TOWER5.7 yr overdueM/s MAGNATES ENTERPRISES · Vasai, PalgharP99000003970· filed May 2018 → now Nov 2020· 98.2% built
- Happinest Boisar Phase IV5.7 yr overdueMahindra Lifespace Developers limited · Palghar, PalgharP99000014293· 81.8% built· 2 complaints
- HARSHAD HARMONY5.7 yr overdueANAND ASHOK GANDHI · Dhayari (Part), PuneP52100014463· 81.8% built
- RUTURAJ EMPIRE5.7 yr overdueCHAITANYA SURESH KAMBLI · Malwan (M Cl), SindhudurgP52900006409· filed May 2019 → now Nov 2020· 18.2% built
- BHONDVE RESIDENCY5.7 yr overdueBHONDVE TEMGIRE ASSOCIATES · Pimpri Chinchawad (M Corp.), PuneP52100009836· filed Jun 2019 → now Nov 2020· 31.8% built
- shree siddhivinayak residency5.7 yr overdueSUNIL BHAGCHAND TALREJA · Ambernath, ThaneP51700013467· filed May 2018 → now Nov 2020· 61.4% built
- NAKSHTRAM APARTMENT5.7 yr overdueVASANTI SHANKAR UTEKAR · PRABHAT COLONY, RaigarhP52000015651· 81.8% built
- New Haven Boisar II Phase II5.7 yr overdueSMART VALUE HOMES (BOISAR) PRIVATE LIMITED · Palghar, PalgharP99000000997· filed May 2019 → now Nov 2020· 72.7% built· 3 complaints
- Mahavir Aquila5.7 yr overdueMilestone Developers · Kurla, Mumbai SuburbanP51800000424· filed May 2019 → now Nov 2020· 81.8% built
- 39 AVENUE5.7 yr overdueR R LUNKAD VENTURES LLP · Wakad, PuneP52100001410· 90.9% built
- KOHINOOR PRESTIGE5.7 yr overdueJAIN AND JAIN CONSTRUCTION COMPANY · Nachane (CT), RatnagiriP52800004038· 90.9% built
- Janaranjani B at Nanded City5.7 yr overdueNanded City Development & Construction Co. Ltd. · Nanded City, PuneP52100015725· 73.4% built
- GARDEN VIEW5.7 yr overdueAJIT SURESH BANE · Panchak, NashikP51600000880· 81.8% built
- KALKAI SANKUL5.7 yr overdueKALKAI DEVELOPERS · bharne naka, RatnagiriP52800003269· filed Dec 2019 → now Nov 2020· 72.7% built
- HAZEL VIEW5.7 yr overdueSHIV ASSOCIATES · HINJEWADI, PuneP52100001732· filed Jun 2019 → now Nov 2020· 69.7% built
- River View5.7 yr overdueMANGO HOMES · Panvel, RaigarhP52000005972· 46.5% built
- New Haven Compact Boisar II Phase I5.7 yr overdueSMART VALUE HOMES (BOISAR) PRIVATE LIMITED · Palghar, PalgharP99000000811· filed May 2019 → now Nov 2020· 78.2% built· 13 complaints
- Helios5.7 yr overduePersipina Developers Private Limited · Panvel, RaigarhP52000000261· 54.5% built
- Athrva Pride5.7 yr overdueDevendra Vasudeo Sangolkar · PANDHARPUR, SolapurP52600001397· 90.9% built
- AKSHAY CITY A AND B BUILDING5.7 yr overdueRAJENDRA RAMANLAL LUNAKD · Mawal, PuneP52100002357· filed May 2019 → now Nov 2020· 86.4% built
- MOHAN RESIDENCY5.7 yr overdueABHAY SHARAD WALAWALKAR · Kudal (CT), SindhudurgP52900005042· 88.5% built
- ANITA COOPERATIVE HOUSING SOCIETY LTD.5.7 yr overdueGYANDEV BUILDERS & DEVELOPERS · VADAVLI SECTION, ThaneP51700014693· 81.8% built
- Indiabulls Savroli - 25.7 yr overdueSylvanus Properties Limited · Khalapur, RaigarhP52000001567· 75.9% built· 7 complaints
- RADHAKRISHNA5.7 yr overdueM/S NIRMAAN DEVELOPERS · Thane, ThaneP51700015161· 90.9% built
- Mundada Tower5.7 yr overdueJYOTI SUNIL MUNDADA · JALNA, JalnaP51400018142· 70.9% built
- SAMARTH VILLA5.7 yr overdueNATH BUILDCON · Nashik (M Corp.), NashikP51600012550· 90.9% built
- 5 AUDUMBER5.7 yr overdueLALITA DHARAMCHAND FULFAGAR · Shirur, PuneP52100015030· 72.4% built
- GAURI GREEN APPARTMENT5.7 yr overdueGAURI CONSTRUCTIONS BUILDERS AND DEVELOPERS · RAMANAND NAGAR, JalgaonP49900015806· 36.4% built
- Ayeshakiran Township5.7 yr overdueAyesha Township · Jalna (M Cl), JalnaP51400004767· 69.1% built
- AUSTIN PARK D BUILDING5.7 yr overdueDIVYA SHRAVANI DEVELOPERS · Tathwade, PuneP52100009291· 90.9% built
- RENUKA FLORA5.7 yr overdueRENUKA BUILDERS ARCHITECT AND DEVELOPERS · KOLWADI CHOWFULI, NashikP51600025639· 81.8% built
- Tirupati Plaza5.7 yr overdueTirupati Builders · Jalna (M Cl), JalnaP51400002779· 97.7% built
- MAHAVIR HEIGHT5.6 yr overdueSAHYOG CREATIONS · Pachora (M Cl), JalgaonP49900011000· 91.2% built
- SIGNATURE HEIGHTS5.6 yr overdueSHRI BALAJI REALITY · SILVASSA, Dadra & Nagar HaveliP49600000048· filed Dec 2019 → now Dec 2020· 90.5% built
- N G SHREE RAM VAN PHASE I5.6 yr overdueJ M G REALTORS PVT LTD · ., PalgharP99000000747· filed Dec 2019 → now Dec 2020· 82% built
- GALAXY AURA5.6 yr overdueOMPRAKASH WADHURAM WADHWA · Thane, ThaneP51700007306· filed Jun 2019 → now Dec 2020· 98.2% built
- Regal Residency5.6 yr overdueShamshuddin Abdul Samad Choudhary · Chikahli, PuneP52100009843· 49.1% built
- LIFE MONTAGE PHASE 25.6 yr overdueGHODAWAT INFRA LLP · SUS, PuneP53000006727· filed Jun 2019 → now Dec 2020· 48.2% built
- SAFFRON -PHASE-II5.6 yr overdueM/S SOBA ASSOCIATES · KOTHRUD, PuneP52100014668· 81.8% built
- SAFFRON5.6 yr overdueSOBA ASSOCIATES · Kothrud, PuneP52100013262· 81.8% built
- SILVER SPACE A WING5.6 yr overdueDAMJI VASTA MAKWANA · PIMPLE NILAKH, PuneP52100025541· 81.8% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.