RERA projects past their possession deadline
11,768 MahaRERA-registered projects are past the possession date currently on file and still report under 100% construction progress. Both figures are the promoter's own disclosure to the regulator.
Page 36 of 59
- Shree Hari Industrial Estate4.1 yr overdueParul and Mona Associates · Chinchpada, PalgharP99000026567· 45.5% built
- Shiv Pride4.1 yr overdueJagdish Babubhai Kothiya · Pathardi, NashikP51600013284· 90.9% built
- VENKATES RESIDENCY PHASE II4.1 yr overdueTIRUPATI BUILDERS AND DEVELOPERS · Aurangabad (M Corp.), AurangabadP51500004159· filed Mar 2019 → now Jun 2022· 40.9% built
- Hari Om Nagar CHS4.1 yr overdueVASTU INFRA BUILDERS & DEVELOPERS · Panvel, RaigarhP52000007638· filed Jun 2019 → now Jun 2022· 90.9% built
- SUMATI SADAN4.1 yr overdueMARK LIFE SPACE · MALAD (W), Mumbai SuburbanP51800021758· 81.8% built
- PARK IVORY PHASE II4.1 yr overdueSUNGUARD BUILDERS LLP · KALEWADI PHATA, PuneP52100015699· 90.9% built
- MEGHASRUSHTI4.1 yr overdueSIDDHI PROMOTERS · KOTHRUD, PuneP52100010408· filed Dec 2019 → now Jun 2022· 90% built
- F Residences T84.1 yr overdueBramhacorp Limited · VadgaonsheriP52100002099· 96.4% built
- SHYAM VILLA4.1 yr overdueShyam Oil Products · Khadki Bk (CT), AkolaP50100007058· filed Jun 2019 → now Jun 2022· 81.8% built
- SBI Staff Trinity CHS Ltd4.1 yr overdueRajshree Enterprise · Borivali, Mumbai SuburbanP51800008470· filed Dec 2019 → now Jun 2022· 37% built
- RAYANSH BLOSSOM4.1 yr overdueVEENA DEVELOPERS · KALWA, THANE, ThaneP51700019266· 42.7% built
- SAI SYMPHONY4.1 yr overdueSainath Realtors · Kurla, Mumbai SuburbanP51800000842· filed Dec 2018 → now Jun 2022· 92.3% built
- KUSHAL SWARNALI C44.1 yr overdueKushal Adiraj Associates · Chakan, PuneP52100004813· filed Dec 2019 → now Jun 2022· 27.3% built
- Kashmiri Heights4.1 yr overdueM.K.Enterprises · Andheri, Mumbai SuburbanP51800008802· 74.5% built· 2 complaints
- MAYURESH PRIDE4.1 yr overdueSANTOSH DATTATRAY BIDKAR · BEHIND TALATHI OFFICE, SangliP53100016193· 90.9% built
- KAKADE PLAZA PHASE 2 JVA MALL4.1 yr overdueSuryakant Kakade · Haveli, PuneP52100007918· filed Dec 2019 → now Jun 2022· 87.3% built
- GAIA Shrushti4.1 yr overdueZambad Disha Pride Infrastructure LLP · Satara Parisar, AurangabadP51500027185· 90.9% built
- Royal Orange County D wing4.1 yr overdueNavras Sthapatya LLP · Pimpri Chinchawad (M Corp.), PuneP52100004820· 90.9% built
- SAIRAJ PHASE 2-WING-A4.1 yr overdueBHASKAR JAYWANT KALE · MANDAVGAN ROAD, AhmednagarP52200026159· 81.8% built
- FLORENCIA PHASE 14.1 yr overdueSHUBHAM ASSOCIATES · Wakad, PuneP52100002881· filed Jan 2021 → now Jun 2022· 72.7% built
- Shubhankar Durvaa Phase 24.1 yr overdueAtul Dnyaneshwar Bahirat · DhanoriP52100005238· filed Jun 2021 → now Jun 2022· 81.8% built· 4 complaints
- Rustomjee Paramount - Wing C4.1 yr overdueKEYSTONE REALTORS LIMITED · Andheri, Mumbai SuburbanP51800000481· 99.2% built
- SAI SANSKRUTI4.1 yr overdueSAI RACHANA LIFE SPACES · yevalewadi, PuneP52100007881· filed Jun 2021 → now Jun 2022· 81.8% built
- 10 Square4.1 yr overdueVIJAY KAMDAR · Andheri, Mumbai SuburbanP51800004094· filed Jun 2018 → now Jun 2022· 82.7% built· 2 complaints
- WHISTLING WINDS4.1 yr overdueNarendra Shantilal Bhandari · Near Balaji Hotel, PuneP52100007671· filed Jun 2019 → now Jun 2022· 55.5% built
- HIRAKAKA LANDMARK4.1 yr overdueHIRAKAKA · Shrirampur (M Cl), AhmednagarP52200006376· 60.5% built
- Savitri Park4.1 yr overdueNAKSHATRA BUILDCON · Rao Colony , Talegaon Dabhade, PuneP52100022629· 72.7% built
- AVADHOOT RESIDENCY4.1 yr overdueAbhijit Vijaykumar Borgave · VISHRAMBAG, SangliP53100019958· 18.8% built
- OM RESIDENCY4.1 yr overdueOM GROUP OF CIVIL CONTRACTORS AND INFRASTRUCTURES DEVELOPERS · KUPWAD, SangliP53100017509· 81.8% built
- MANGALMURTI KRUPA4.1 yr overdueMANGALMURTI CONSTRUCTIONS · PARDESHI ALI, RaigarhP52000018542· 90.9% built
- Westernhills Phase 2 - B, C, D, E Buildings4.1 yr overdueHigh Seas Properties Private Limited · Pune, PuneP52100001239· 90.9% built· 3 complaints
- SHAANTAI APARTMENT4.1 yr overdueMAYURESH CONSTRUCTIONS OPC PRIVATE LIMITED · Nashik (M Corp.), NashikP51600011945· filed Dec 2019 → now Jul 2022· 65.5% built
- VIMAL HEIGHTS4.0 yr overdueSHREE VIMAL DEVELOPERS · Vasai, PalgharP99000010545· filed Jun 2019 → now Jul 2022· 90.5% built
- Rudradham B Building4.0 yr overdueRudra Construction And Developers · Daund (CT), PuneP52100010197· 72.7% built
- Sai Radha Complex4.0 yr overdueG. K. Realtors · Kurla, Mumbai SuburbanP51800010063· filed Jun 2019 → now Jul 2022· 86.1% built
- JAI GANESH4.0 yr overdueAtharv Construction and Developers · Khalapur, RaigarhP52000003906· 63.6% built
- SHREEJIS COMPLEX4.0 yr overdueSHREE NEELKANTH ESTATE · DOMBIVLI, ThaneP51700011165· filed Mar 2018 → now Jul 2022· 86.4% built
- SAI SWAMI APARTMENTS4.0 yr overduePRATIBHA NILESH MORE · SHINDE, NashikP51600021951· 96.4% built
- NIRVANA HOMES4.0 yr overdueFortune Elite · Pimpri, PuneP52100013565· filed Oct 2020 → now Jul 2022· 83.2% built
- Atharva Shrishti, Phase 1, Wing A4.0 yr overdueATHARVA BUILDCON · PUNE, PuneP52100006976· filed Jan 2021 → now Jul 2022· 72.7% built· 3 complaints
- OM GURUDEV RESIDENCY4.0 yr overdueSAKET SANJAY SAYANKAR · Gangapur ShiwarP51600021944· 90.9% built
- GODREJ VIHAA PHASE 14.0 yr overdueK. R. REAL ESTATE PVT. LTD. · Ambarnath, ThaneP51700002689· 90.9% built· 3 complaints
- VINIYOG CHS LTD.4.0 yr overdueVINAYAK DEVELOPERS · Borivali, Mumbai SuburbanP51800008768· filed Jul 2020 → now Jul 2022· 90.9% built
- LODHA AMARA - TOWER 29,314.0 yr overdueLODHA DEVELOPERS LIMITED · Thane, ThaneP51700000981· 81.8% built· 1 complaint
- JAINAM RESIDENCY4.0 yr overdueKBP CORPORATION · Ambarnath, ThaneP51700001820· filed Jan 2021 → now Jul 2022· 15.9% built
- Mantra Magic II4.0 yr overdueMantra Infrahome LLP · Chimbali, PuneP52100000137· filed Jan 2021 → now Jul 2022· 48.6% built· 2 complaints
- Sambhaji Park4.0 yr overdueSambhaji Shivaji Pawar · Gopalwadi, PuneP52100003923· 22.7% built
- ATHARVA NAGARI III4.0 yr overdueATHARVA INFRASTRUCTURES · Pipla, NagpurP50500001976· 82.7% built
- Surbhi Heights4.0 yr overdueRanjit Dinkar Jadhav · Government Colony, Hashani Ashram Road, Vishrambag,Sangli-416415, SangliP53100029186· 91.8% built
- NIRMITI MUNDEKAR PLAZA4.0 yr overdueNIRMITI BUILDERS · Karad (M Cl), SataraP52700007158· filed Jan 2021 → now Jul 2022· 36.4% built
- Arihant Royalty4.0 yr overdueDharmesh Vasantrai Shah · Haveli, PuneP52100011091· filed Dec 2017 → now Jul 2022· 90.7% built
- SP EMPIRE4.0 yr overdueSPK DEVELOPERS · WEST SIDE, KolhapurP53000023194· 72.7% built
- TEENMURTY SUMMIT4.0 yr overdueM/s Teenmurty Summit Realty LLP · Borivali, Mumbai SuburbanP51800006085· 90.9% built
- GK SAPPHIRE4.0 yr overdueG K BUILDCON · Pimpale Saudagar, PuneP52100000466· 81.8% built
- ATHASHRI SYNERGY4.0 yr overduePARANJAPE SCHEMES (CONSTRUCTION) LTD · MAHALUNGE, PuneP52100001787· 90.9% built
- f RESIDENCES-MALAD4.0 yr overdueM/S RIDDHI SIDDHI CONSTRUCTION · Borivali, Mumbai SuburbanP51800007547· 81.4% built· 11 complaints
- Khinvasara Icon4.0 yr overdueRavindra Champalal Khinvasara · Khinvasara Park East, AurangabadP51500017660· 30.5% built
- RELIABLE UTKARSH C , D WING4.0 yr overdueRELIABLE PRISM CONSTRUCTION CO. · VASAI, PalgharP99000008640· filed Jun 2019 → now Jul 2022· 42.5% built
- Almighty Villas4.0 yr overdueAlmighty Developers · Vasai, PalgharP99000008997· filed Jan 2021 → now Jul 2022· 72.4% built
- City Centre - 24.0 yr overdueBadjate Real Estates · MIDC, NagpurP50500003869· 90.9% built
- VASTU APPARTMENTS4.0 yr overdueVASTU DEVELOPERS · Haveli, PuneP52100032529· 90.9% built
- SARVODAY PATWARDHAN BAUG4.0 yr overdueSARVODAY DEVELOPER · Kalyan, ThaneP51700005076· filed Jan 2021 → now Jul 2022· 90.9% built
- RELIABLE UTKARSH A,B WING4.0 yr overdueRELIABLE PRISM CONSTRUCTION CO. · Vasai, PalgharP99000005891· filed Jun 2018 → now Jul 2022· 47.3% built
- Megapolis Symphony Phase I4.0 yr overduePegasus Properties Pvt. Ltd. · Hinjawadi, PuneP52100000887· 90.9% built· 2 complaints
- Rustomjee Virar Avenue L1-L2 And L4 Wing C and D4.0 yr overdueKEYSTONE INFRASTRUCTURE PRIVATE LIMITED · Avenue L1-L2, PalgharP99000018694· 55.7% built· 1 complaint
- GUNESH HERITAGE4.0 yr overdueAbhijit Vijaykumar Borgave · SANGLI MIRAJ ROAD, SangliP53100020512· 6.4% built
- SWAMI PRIDE4.0 yr overdueSWAMI BUILDCON · Nashik (M Corp.), NashikP51600012711· 81.8% built
- SP AADI ARCADE4.0 yr overdueS P DEVELOPERS AND BUILDERS · 8TH LANE, KolhapurP53000003322· 81.8% built
- Vaastu4.0 yr overdueVaswani 108 Lifespaces LLP · Ward FNorth, Mumbai CityP51900016680· 85.9% built
- NYATI ETHOS I - B34.0 yr overdueNYATI BUILDERS PRIVATE LIMITED · undri, PuneP52100002024· 37.5% built
- Terraform Arcade4.0 yr overdueMoney Magnum Constructions · Thane, ThaneP51700002110· 63.6% built
- MAHALAXMI RESIDENCY4.0 yr overdueSHREE GURUKRUPA DEVELOPERS · Vasai-Virar City (M Corp), PalgharP99000012076· filed Jul 2018 → now Jul 2022· 63.6% built
- FINSWELL4.0 yr overdueLMS REALTY · LOHGAON, PuneP52100008359· 80.5% built· 3 complaints
- NYATI ETHOS I - A1-Part4.0 yr overdueNYATI BUILDERS PRIVATE LIMITED · Undri, PuneP52100001879· 37.3% built
- Samarth sankul Heights4.0 yr overdueM K ASSOCIATES · Gopalwadi, PuneP52100011465· filed Jul 2018 → now Jul 2022· 54.5% built
- K K PLAZA APPARTMENT4.0 yr overdueShivam Developers · Pathardi Phata, NashikP51600022203· 90.9% built
- NINE STAR RESIDENCY ROHINI BUILDING4.0 yr overdueTRINITY CONCRETE STRUCTURES PRIVATE LIMITED · Palghar, PalgharP99000005167· filed Jul 2018 → now Jul 2022· 72.7% built
- VAASTU ADARSH4.0 yr overdueVAASTU Builders & Developers · Ulwe, RaigarhP52000017291· 54.5% built
- Udaan Avenue4.0 yr overdueUDAAN DEVELOPERS · NERAL, RaigarhP52000012197· 85.5% built
- The Villas4.0 yr overdueSukhwani Associates · Pangaloli, PuneP52100001774· 78.2% built
- Vasavi 44.0 yr overdueVasavi Developers · Bramhapuri, ChandrapurP50900031338· 90.9% built
- NANDANVAN RESIDENCY4.0 yr overdueGANPAT BHASKAR KAVITAKE · Zadgaon CT, RatnagiriP52800008547· 81.8% built
- Heritage Park4.0 yr overdueVelentine Developers · Andheri, Mumbai SuburbanP51800004034· 90.9% built
- SARVODAYA LEELA BUILDING NO 14.0 yr overdueSWASTIK REALTORS · Kalyan, ThaneP51700003692· 88.6% built· 1 complaint
- Siddhivinayak Complex4.0 yr overduePrasad Pramod Khot · Ajgaon, SindhudurgP52900011092· 81.8% built
- Paradise park 24.0 yr overdueCREATIONPROPERTIES · Wanleswadi, SangliP53100025749· 50% built
- Spine City Residency Building C4.0 yr overdueSpine Developers · Kharabwadi, PuneP52100010634· filed Feb 2021 → now Aug 2022· 90.9% built
- RANJANA HEIGHTS4.0 yr overdueNAYAK REALTY · Kurla, Mumbai SuburbanP51800005503· filed Dec 2018 → now Aug 2022· 90.9% built· 1 complaint
- SADASHIV RESIDENCY4.0 yr overdueOMKAR DEVELOPERS · Pune (M Corp.), PuneP52100004338· filed Mar 2020 → now Aug 2022· 9.1% built
- Suvarna Pushpa4.0 yr overdueMohite Shaw Builders And Developers · Shiye, KolhapurP53000008881· 46.2% built
- VIDYA HEIGHTS4.0 yr overdueLandmark Builders And Developers · PANVEL, RaigarhP52000017850· 27.3% built
- GODREJ VIHAA PHASE 24.0 yr overdueK. R. REAL ESTATE PVT. LTD. · Ambarnath, ThaneP51700002442· 90.9% built· 1 complaint
- FINE RESIDENCY4.0 yr overdueFINE DEVELOPMENTS · Andheri, Mumbai SuburbanP51800004690· 90.9% built
- LOTUS HEIGHTS4.0 yr overdueJAINAM DEVELOPERS · PANCHWATI, NashikP51600023000· 9.1% built
- YUGANDHARA HIGHTS4.0 yr overdueANIL RAMCHANDRA NIMBALKAR · Baramati (M Cl), PuneP52100009368· filed Jul 2019 → now Aug 2022· 83.6% built
- SUYOG4.0 yr overdueB.Kalyanji Realty · KATANG, RaigarhP52000026252· 90.9% built
- Park Infinia Phase IV4.0 yr overdueKumar Properties and Real Estate Pvt. Ltd. · Hadapsar, PuneP52100014939· 90.8% built
- A SINGAPORE LIFE CITY THE MILLENNIUM4.0 yr overdueSANJEEV ASHOK JAISWAL · MAUZA GOTADPANJRI, POST BELA, NagpurP50500016203· filed Apr 2022 → now Aug 2022· 72.7% built· 1 complaint
- Shree Modkeshwar Apartment4.0 yr overdueSaiPrasad Builders and Developers · TulsaBhawani Chowk Nashik, NashikP51600018442· 90.9% built
- SHRIATHARVABHAVAN3.9 yr overdueSHRI SIDDHAKALA DEVELOPERS · BAPAT MALA, SangliP53100015441· 81.8% built
- MAHALAXMI HIGHTS3.9 yr overdueDP BUILDERS & DEVELOPERS · Kolhapur (M Corp.), KolhapurP53000007919· filed Feb 2021 → now Aug 2022· 90.9% built
- Tamrind Park Phase - 13.9 yr overdueDhankawade Pokale Developers · Dhareshwar Temple, PuneP52100001405· filed Feb 2020 → now Aug 2022· 87.9% built
- Venkatesh Graffiti Elite Phase 13.9 yr overdueSHREE VENKATESH DEVELOPERS · Keshav Nagar, PuneP52100017577· 90.9% built
- SAI PARADISE3.9 yr overdueS K DEVELOPERS · Karjat, RaigarhP52000005424· 57.7% built
- Shiv Elite Phase IV Geranium3.9 yr overdueOm Shivam Buildcon Private Limited · Shankarpur Wardha Road Nagpur, NagpurP50500017835· 45.2% built
- Anand Tarang A building3.9 yr overdueR K LUNKAD BUILDERS AND PROMOTERS · Charoli Phata , Chovisawadi, PuneP52100022482· 78.2% built
- SHREE SAI APARTMENT3.9 yr overdueS K DEVELOPERS · Karjat, RaigarhP52000008128· 47.3% built
- SIGMA EMERALD3.9 yr overdueSIGMA REALTORS (INDIA) PRIVATE LIMITED · ANDHERI, Mumbai SuburbanP51800009738· 90% built
- Skyi Star Town Phase I3.9 yr overduePate Life Melange Developers Pvt Ltd · Bhukum, PuneP52100012998· filed Feb 2021 → now Aug 2022· 90.9% built· 1 complaint
- Divine Residency3.9 yr overdueGuruPrabhu Builders & Developers · Vasai, PalgharP99000004430· filed Aug 2019 → now Aug 2022· 90.9% built
- AANGAN3.9 yr overdueGULSHAN HOMEZ AND DEVELOPERS · VAZRE VILLAGE, SindhudurgP52900015873· 81.7% built· 2 complaints
- Amity Apartments3.9 yr overdueRaajyam Realty LLP · Andheri, Mumbai SuburbanP51800004960· filed Aug 2018 → now Aug 2022· 68.6% built· 1 complaint
- LODHA AMARA - TOWER 32,333.9 yr overdueLODHA DEVELOPERS LIMITED · Thane, ThaneP51700001030· 81.8% built· 5 complaints
- Lodha Supremus - Andheri3.9 yr overdueLODHA DEVELOPERS LIMITED · Andheri, Mumbai SuburbanP51800013696· 90.9% built· 1 complaint
- IMP GREENS PRAKRITI BUILDING PHASE II3.9 yr overdueIMP REALTY PRIVATE LIMITED · SAIFUL, SolapurP52600000136· 90.9% built
- Princeville - B4 and B53.9 yr overdueKumar Construction and Properties Pvt Ltd · Borhadewadi, PuneP52100015685· 90.9% built
- SAMRUDDHI SHELTERS3.9 yr overdueSAMRUDDHI SHELTERS · Zadgaon CT, RatnagiriP52800005756· filed Aug 2019 → now Aug 2022· 90.9% built
- VINAYAKA3.9 yr overdueAMIT HARSHAVADAN AGASKAR · Palghar, PalgharP99000022336· 27.3% built
- Sai Exotique D Wing3.9 yr overdueSAIBABA SALES PRIVATE LIMITED · Haveli, PuneP52100004171· filed Aug 2020 → now Aug 2022· 56.8% built· 1 complaint
- THE HUB WING-A-YOGESHWAR3.9 yr overdueNISHAM DEVELOPERS PVT LTD · NEAR TITAN SHOWROOM, NashikP51600018797· 90.7% built
- Skyi Star Town Phase II3.9 yr overduePate Life Melange Developers Pvt Ltd · Bhukum, PuneP52100014662· 86.4% built· 1 complaint
- Arcadia3.9 yr overdueJangid Properties · Thane, ThaneP51700008907· filed Apr 2018 → now Aug 2022· 65.5% built
- The Midtwon3.9 yr overdueSanjay Lakhmichand Gangwani · SANGLI, SangliP53100001824· filed Jun 2018 → now Aug 2022· 81.8% built
- Empire Marvel3.9 yr overdueShilpa Estate · CHEHEDI BK, NashikP51600004867· filed Feb 2022 → now Aug 2022· 90.9% built
- SATYAM PARADISE3.9 yr overdueArjun Amarsing Mohandas · New Christian Colony, PuneP52100032584· 73.2% built
- GAURI HERITAGE3.9 yr overduePATIL AND PAWAR ASSOCIATES · MEHRUN SHIWAR, JalgaonP49900018073· 90.9% built
- SUNRISE SEVEN3.9 yr overdueSUNRISE BUILDERS AND DEVELOPERS · KARANJADE, RaigarhP52000020814· 67.3% built
- RAM TANAY APARTMENTS3.9 yr overdueGOPAL DHUNDIRAJ CHIPLUNKAR · NASHIK (M CORP), NashikP51600013307· 90.9% built
- SOLITAIRE PALMS D3.9 yr overdueRAJKUMARI GULAB CHOITHRAMANI · BORHADEWADI, PuneP52100002144· filed Mar 2021 → now Sept 2022· 63.6% built· 2 complaints
- SAI PLAZA3.9 yr overdueSHREE DEVELOPERS · AMBEGAON Bk, PuneP52100011700· 74.5% built
- SAI MAJESTIC3.9 yr overdueM/S SHREE BHAIRAVNATH DEVELOPERS · AMBEGAON Bk, PuneP52100011086· 61.4% built
- AMRUT DARSHAN3.9 yr overduePRAKASH GIRIDHAR AMRUTKAR · Nashik (M Corp.), NashikP51600012605· filed Jan 2018 → now Sept 2022· 90.9% built
- VIJAYALAXMI3.9 yr overdueAVITA SANTOSH KARANDE · NEAR PURVA GARDEN HOTEL, SangliP53100026704· 81.8% built
- Pratik Srushti3.9 yr overdueASHISH ASHOK KAWDE · Nakshtrawadi, AurangabadP51500004587· filed Jan 2019 → now Sept 2022· 87.3% built· 1 complaint
- Redevelopment of Jai Vijay CHSL - Phase I3.9 yr overdueKOLTE-PATIL DEVELOPERS LIMITED · Mumbai, Mumbai SuburbanP51800004446· filed Sept 2019 → now Sept 2022· 63.6% built· 2 complaints
- LUMIERE3.9 yr overdueNEW SIDDHARTH ENTERPRISES · Ward GNorth, Mumbai CityP51900005337· filed Dec 2020 → now Sept 2022· 56.4% built· 1 complaint
- Bloomdale Bloomdale 073.9 yr overdueMahindra Bebanco Developers Limited · Khapri, NagpurP50500005448· filed Sept 2020 → now Sept 2022· 90.9% built
- SHIV PARK3.9 yr overdueTRIMURTI DEVELOPERS · RADHESHWARI HOUSING CO-OPERATIVE SOCIETY, PuneP52100015980· filed Mar 2022 → now Sept 2022· 90.9% built
- ATMARAM CHSL3.9 yr overdueNAMOREALTY AND INFRA LLP · Borivali, Mumbai SuburbanP51800011731· filed Oct 2019 → now Sept 2022· 80% built
- ANANTYA3.9 yr overdueSHREE KRISHNA HOMES PVT. LTD. · Pant Nagar, Ghatkopar (East), Mumbai SuburbanP51800020909· 57.3% built
- DESTINATION OSIYAN WING AB3.9 yr overdueD R GAVHANE LANDMARKS LLP · CHARHOLI, PuneP52100009718· 80% built
- PRIDE CENTURY EDEN GARDEN3.9 yr overdueABAD ESTATE AOP · Pannalal Nagar, AurangabadP51500013235· 90.9% built
- UJVAL3.9 yr overduePARANJAPE SCHEMES (CONSTRUCTION) LTD · Borivali, Mumbai SuburbanP51800000657· filed Dec 2019 → now Sept 2022· 86.6% built· 1 complaint
- ICCHAPURTI RESIDENCY3.9 yr overdueSANTOSH VASANT IDATE · JALGAON, RatnagiriP52800015841· 9.1% built
- GAURAV PARK3.9 yr overdueRENUKA CONSTRUCTIONS · TAPODHAM COLONY, PuneP52100012750· filed Sept 2019 → now Sept 2022· 90.9% built
- Rachana Park Wing J3.9 yr overdueShree Construction Builders and Developers · Bhama Nagar, AhmednagarP52200027764· 81.8% built
- EVA HOMES3.9 yr overdueS M REALTY · Chikhali, PuneP52100016702· 81.8% built
- AXIS PROXIMA3.9 yr overdueIKAI SPACES LLP · Haveli, PuneP52100030209· 81.8% built
- P S SANKALP3.9 yr overdueP S DEVELOPERS · DHANORI, PuneP52100028596· 11.5% built
- K. D. SAICON3.9 yr overdueK. D. VENTURE · Vasai, PalgharP99000003992· filed Mar 2019 → now Sept 2022· 81.8% built· 1 complaint
- Tanishq Wisteria3.9 yr overdueAakaar Tanishq Nirmaan J. V. · Ward FSouth, Mumbai CityP51900006567· filed Aug 2019 → now Sept 2022· 76.8% built· 2 complaints
- NEW CASTLE3.9 yr overdueMAHALAXMI ESTATES · Nashik, NashikP51600014622· 90.9% built
- CASA RARE3.9 yr overdueGEOPRENEUR CORP PVT LTD · Borivali, Mumbai SuburbanP51800008439· filed Mar 2019 → now Sept 2022· 87.5% built· 1 complaint
- Shivtirth Apartment3.9 yr overduePRAMOD MADHUKAR GHUGE · Raisony Nagar, JalgaonP49900025719· 90.9% built
- LITTLE MALABAR HILL3.9 yr overduePARDIS CONSTRUCTION LLP · Kurla, Mumbai SuburbanP51800003603· filed Sept 2020 → now Sept 2022· 90.9% built
- Amarsons Entallia3.9 yr overdueD T CORPORATION · konkan, Mumbai CityP51900009079· filed Mar 2020 → now Sept 2022· 71.7% built
- SHASHITARA HILLS3.9 yr overdueSHRIKANT SHASHIKANT JAGTAP · Haveli, PuneP52100008119· filed Jan 2018 → now Sept 2022· 51.8% built
- Shree Apartment3.9 yr overdueRevive Homes LLP · Model Colony, PuneP52100021408· 81.8% built
- SPANDAN APARTMENT3.9 yr overdueSUBODH RAMCHANDRA BHOSALE · Sudhagad, RaigarhP52000025690· 66.8% built
- MAULI3.9 yr overdueAA ASSOCIATES · BANER, PuneP52100024756· 90.9% built
- Alankapuram Ph 3 B and C building3.9 yr overdueR K Lunkad Housing corporation · wadmukhwadi, PuneP52100020392· 81.8% built
- Plot 2 Sector Sector 10 GHANSOLI3.9 yr overdueCIDCO of Maharashtra Ltd. · Thane, ThaneP51700017421· filed Apr 2021 → now Sept 2022· 78.2% built
- Kamal Pride3.9 yr overdueAnil Sharad Kulkarni · Nashik (M Corp.), NashikP51600013677· filed Mar 2021 → now Sept 2022· 19.1% built
- BEVERLLY HILLS PHASE - III3.9 yr overdueMadhoor Buildwell Pvt. Ltd. · Dwarka, NashikP51600000718· 39.2% built
- SECTOR 15 ROADPALI KALAMBOLI3.9 yr overdueCity and Industrial Development Corporation Of Mahrastra Ltd · Roadpali, RaigarhP52000017437· filed Mar 2021 → now Sept 2022· 78.2% built
- Mahindra Happinest Palghar Phase - II3.9 yr overdueMAHINDRA HAPPINEST DEVELOPERS LIMITED(Formerly known as Mahindra Happinest Developers Pvt. LTD) · Nandore Grampanchayat, PalgharP99000015481· 81.8% built· 2 complaints
- Shri Abhivishwa3.9 yr overdueSachin Bapurao Khupse · Kudalwadi , Chikhali , Pune, PuneP52100015164· filed Mar 2020 → now Sept 2022· 72.7% built
- Sara Sanskruti3.9 yr overdueJagrutsara Structures LLP · Chakan, PuneP52100013952· 90% built
- ACE AUGUSTA3.9 yr overdueACEAUGUSTA · Near The Quardron Business Park, Maan Pune, PuneP52100000080· filed Mar 2021 → now Sept 2022· 90.5% built· 2 complaints
- Upper Thane Ecopolis A - B3.9 yr overdueLODHA DEVELOPERS LIMITED · Bhiwandi, ThaneP51700007192· 77.3% built· 2 complaints
- ROYAL ELEGANCE3.9 yr overduePRAKASH CONSTRUCTION COMPANY · Village RAHATANI, PuneP52100016850· 77.3% built
- Shree Ambe Apartment3.9 yr overdueDivine Land Developers · Near Hanuman Tekdi, PalgharP99000028003· 90.9% built
- SOMNATH PALACE 23.9 yr overdueJAY SOMNATH BUILDERS AND DEVELOPERS · Beltarodi, NagpurP50500013934· filed Dec 2018 → now Sept 2022· 58.2% built
- ANAND VISHVA3.9 yr overdueVishvakarma Builders · Tagor Nagar, NashikP51600019856· 82.3% built
- SRI SRI BALAJI PALACE3.9 yr overdueDINESH BHATU FULPAGARE · DEOPUR, DhuleP49800031582· 90.9% built
- Nirman Height3.9 yr overdueNirman Builder & Developer · Palghar West, PalgharP99000015536· 90.9% built
- Sanghvi One3.9 yr overdueRameshwar Enterprises · Ghatkopar West, Mumbai CityP51900014379· 90.9% built
- BLUE BIRD CO OPERATIVE SOCIETY LTD3.9 yr overdueASHA ARUN SANE · PUNE, PuneP52100018398· 81.8% built
- PLOT NO 68 SECTOR 12 DRONAGIRI3.9 yr overdueCITY AND INDUSTRIAL DEVELOPEMENT CORPORATION OF MAHARASHTRA LTD · Uran, RaigarhP52000017368· filed Mar 2021 → now Sept 2022· 78.2% built
- SHRI VASTU3.9 yr overdueVIDYADHAR VITHOBA DESHMUKH · Yadogopal peth, SataraP52700013388· 90.9% built· 1 complaint
- Godrej 243.9 yr overduePearlite Real Properties Private Limited · Hinjavadi (CT), PuneP52100001005· 89.1% built· 13 complaints
- THE ENCLAVE3.9 yr overdueKhivansara Associates · kondhwa BK, PuneP52100006195· filed Dec 2019 → now Sept 2022· 57.5% built
- SHREE MANGALMURTI BUILDERS AND DEVELOPERS3.9 yr overdueVASANTI KASHINATH CHAUDHARI · MURBAD, ThaneP51700027105· 82.2% built
- SAI SNEH SAHNIWAS3.9 yr overdueANIKET ANANT PATIL · INDIRA NAGAR, NashikP51600019316· 81.8% built
- KRISHNA COMPLEX3.9 yr overdueSHASHIKANT MARUTIRAO JIDDIMANI · SOUTH KASBA, SolapurP52600025458· 81.8% built
- Rachana Sahira Wing B3.9 yr overdueRachana construction Co. (Nagpur) Pvt. Ltd. · Chinchbhuvan, NagpurP50500020517· 90.9% built
- Upper Thane Treetops A - C, C1, C2, D - F3.9 yr overdueLODHA DEVELOPERS LIMITED · Bhiwandi, ThaneP51700008449· 78.2% built· 8 complaints
- AMAN PARADISE3.9 yr overdueS K DEVELOPERS · SATIVALI VASAI, PalgharP99000020134· 33.4% built
- SHREENAVSHAKTI APARTMENT3.9 yr overdueSWAMI CONSTRUCTIONS · BHABHA NAGAR MUMBAI NAKA, NashikP51600022623· 90.9% built
- SECTOR 21 TALOJA3.9 yr overdueCITY AND INDUSTRIAL DEVELOPMENT CORPORATION OF MAHARASHTRA LIMITED · SECTOR 21 TALOJA, RaigarhP52000017439· filed Dec 2020 → now Sept 2022· 78.2% built
- CRD Gardenia Apartments 63.9 yr overdueDr Chandrashekhar Raghunath Dound · Palghar, PalgharP99000009989· filed Dec 2019 → now Sept 2022· 81.8% built
- ARIHANT3.9 yr overduePLAHA AND MEHTA ASSOCIATES · Kurla, Mumbai SuburbanP51800010147· filed Dec 2019 → now Sept 2022· 80.7% built
- PRATHAMESH RESIDENCY3.9 yr overduePRALHAD RAMBHAU SHIRSATH · MOHAN NAGAR, PuneP52100027691· 90.9% built
- Joyville Hinjawadi - 1, Phase 73.9 yr overdueJoyville Shapoorji Housing Private Limited · maan, Mumbai CityP51900030420· 72.7% built
- NISARG VATIKA3.9 yr overdueM/s Shubh Ganesh Properties · Mawal, PuneP52100004252· filed Jul 2019 → now Sept 2022· 90.9% built
- Upper Thane - Ecopolis A3.9 yr overdueLODHA DEVELOPERS LIMITED · Upper thane, ThaneP51700016666· 81.8% built· 1 complaint
- Upper Thane Greenville A - E, E1, F - I3.9 yr overdueLODHA DEVELOPERS LIMITED · Bhiwandi, ThaneP51700006147· 75.2% built· 8 complaints
- MEGHMALHAR3.9 yr overdueTRAILOKYA DEVELOPERS · Warje, PuneP52100005209· filed Jul 2020 → now Sept 2022· 18.2% built
- Ramchandra residency bldg no.13.9 yr overdueHimali Construction · Vasai, PalgharP99000010975· filed Jul 2018 → now Sept 2022· 83.6% built
- Deluxe Apartments3.9 yr overdueWest Avenue Realtors Private Limited · Andheri, Mumbai SuburbanP51800000819· filed Apr 2021 → now Sept 2022· 36.4% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.