RERA projects past their possession deadline
11,768 MahaRERA-registered projects are past the possession date currently on file and still report under 100% construction progress. Both figures are the promoter's own disclosure to the regulator.
Page 39 of 59
- Harsh Apartment3.6 yr overdueMangaldeep Associates & Developers · Rahatni, PuneP52100025753· 81.8% built
- PRAYAG YASH PHASE ll3.6 yr overduePRAYAG PROPERTIES · Near ZP School, RaigarhP52000016045· 90.9% built
- MELANGE RESIDENCES - PHASE IV3.6 yr overdueRAMA SYNERGY SPACES · Hinjawadi Phase III, PuneP52100025451· 94.5% built
- Godrej Elements3.6 yr overduePearlite Real Properties Private Limited · Godrej Elements, PuneP52100016626· 89.1% built· 5 complaints
- ARIHANT RESIDENCY3.6 yr overdueARIHANT BUILDERS AND DEVELOPERS · YADOGOPAL PETH, SataraP52700022113· 6.4% built
- SHIV RESIDENCY3.6 yr overdueRAVINDRA PUNDLIKRAO MAHALLE · AMRAVATI, AmravatiP50300021538· 81.8% built
- Vishal Viviana3.6 yr overdueVISHAL REALTORS · Mundhawa, PuneP52100000765· 90.9% built
- BALAJI EXOTICA-PHASE 13.6 yr overdueBALAJI WORLD · CHIKANGHAR, ThaneP51700015155· 90.9% built· 1 complaint
- Willowcrest3.6 yr overdueROMA BUILDERS PRIVATE LIMITED · Thane, ThaneP51700000146· 90.9% built
- K K RENUKA RESIDENCY A AND B WING3.6 yr overdueMADHU KACHHARAM ACHHRA HUF · AMBERNATH WEST, ThaneP51700021714· 81.1% built
- BHAKTI NIWAS3.6 yr overdueVISHAL RATANSHI PATEL · Panvel, RaigarhP52000015471· 90.9% built
- Sai Leela3.6 yr overdueLaxmi Associates · Borivali, Mumbai SuburbanP51800001249· filed Dec 2019 → now Dec 2022· 90.9% built
- Narhar Complex3.6 yr overdueYamuna Developers · Chowphala, SolapurP52600013908· 95.9% built
- Casa Emerald3.6 yr overdueHEMALI INVESTMENTS & FINANCE PVT.LTD. · Ward E, Mumbai CityP51900003998· 98.6% built
- AND LILY3.6 yr overdueANANTNATH DEVELOPERS · Thane, ThaneP51700008885· 90.9% built· 1 complaint
- SIDDHIVINAYAK PRATIMA3.6 yr overdueSIDDHIVINAYAK HOMES · Koyana Velhe, RaigarhP52000015123· 90.9% built
- L Square3.6 yr overdueLODHA AND LALWANI ASSOCIATES · Sector 9, PuneP52100006914· 72.7% built· 1 complaint
- Avighna IX - Building No. 43.6 yr overdueNish Developers Private Limited · CURRY ROADP51900003525· 94.4% built
- NIRAMAYA HEIGHTS3.6 yr overdueADIRAJ DEVELOPERS · Thane, ThaneP51700014303· 33.6% built
- Choudhary Bhuvi Landmarks - II3.6 yr overdueNEST DEVELOPERS · Tisgaon, AurangabadP51500005055· 66.8% built
- Tejal Pride3.6 yr overdueTejal Builders and Developers · Aurangabad (M Corp.), AurangabadP51500002379· 33.2% built
- Regalia Phase 13.6 yr overdueTirupati Tingre Builtcon · Anand ParkP52100019785· 90.9% built
- LATA APARTMENT3.6 yr overdueBabasaheb Pandurang Patil · Vengurla, SindhudurgP52900007169· 68.2% built
- LODHA SEAVIEW3.6 yr overdueMACROTECH DEVELOPERS LIMITED · Ward ABCD, Mumbai CityP51900010326· 90.9% built· 9 complaints
- SAVERA-23.6 yr overdueVIZION CONSTRUCTION · Junnar, PuneP52100021478· 81.8% built
- SHREE RAM KRUPA APARTMENT3.6 yr overdueVISHAL DILIP DOSHI · NEAR UBHA MARUTI, RaigarhP52000017712· 90.9% built
- FORTUNE3.6 yr overdueTIRUPATI BALAJI BUILDCON · ANANDVALLI, NashikP51600009811· filed Dec 2018 → now Dec 2022· 82.3% built
- EMPIRE ESTATE3.6 yr overdueCHHATRAPATI SAMRAJYA · IN FRONT OF SAHYADRI HOSPITAL NARAYAN COLONY KAKADE PLOT, OsmanabadP52500015208· 59.1% built
- SUNAND APARTMENT PHASE I3.6 yr overdueARCHWAY PROPERTIES · SADASHIV PETH, PuneP52100021064· 86.8% built
- Empire Industrial Centrum - Phase II3.6 yr overdueEMPIRE INDUSTRIES LIMITED · Ambarnath, ThaneP51700021315· 54.5% built
- DOLPHIN VISTA3.6 yr overdueMAHALAXMI ENTERPRISES · CHIKHALI, PuneP52100025219· 90.9% built
- MANSAROVAR RESIDENCY E WING3.6 yr overdueKIRAN REALTY · Thane, ThaneP51700006405· 90.9% built
- HARMONY COMPLEX - C - WING3.6 yr overdueGOOD LUCKDEVELOPERS · Thane, ThaneP51700004497· 39.8% built
- VENKATESH GRAFFITI ELITE PHASE 23.6 yr overdueSHREE VENKATESH DEVELOPERS · KESHAVNAGAR MUNDHWA, PuneP52100021796· 90.9% built
- MOHAN RESIDENCY3.6 yr overdueSAIRAJ ENTERPRISES · Panvel, RaigarhP52000012544· 90.9% built
- SAROVAR3.6 yr overdueS D Buildcon · Uran, RaigarhP52000001908· 70.5% built
- SHUBHKALASH A WING3.6 yr overdueTULIP DEVELOPERS · SPINE ROAD, PuneP52100017791· 72% built
- VIJAY SILICA3.6 yr overdueV Y NIKHAR & ASSOCIATES · Bhandara (M Cl), BhandaraP50600007749· 90.9% built
- Richmond Park3.6 yr overdueLA CASA SHELTERS LLP · Rahatani, PuneP52100001358· filed Jun 2021 → now Dec 2022· 96.7% built
- MADHUBAN RESIDENCY3.6 yr overdueINFINITY HEIGHTS PVT LIMITED · NANDURBAR, NandurbarP49700014888· 78.2% built
- MALHAR HEIGHTS3.6 yr overdueSAI SAMARTH DEVELOPERS · NEAR SHARDUL PETROL PUMP, SolapurP52600020963· 90.9% built
- Puraniks Abitante Phase 1B3.6 yr overduePuranik Buildcon Private Limited · Bavadhan BK, PuneP52100000569· 90.9% built
- SAUSHILYA3.6 yr overdueSILVER LEAF REALTY · Mamdapur, RaigarhP52000004115· 90.9% built
- Building no. 1 , Uptown Avenue3.6 yr overdueSimran Enterprises · Sai Nagar, RaigarhP52000016037· 90.9% built
- SHREEJI AVENUE3.6 yr overdueSHREEJI BUILDCON · WADEGHAR, ThaneP51700016300· 59.1% built
- The Serenes Villa No 93.6 yr overdueMahindra Lifespace Developers limited · Nagaon, RaigarhP52000012915· 35.5% built
- Dias Residency Park3.6 yr overdueM/s Dias Properties & Projects · Sativali, PalgharP99000007801· filed Jun 2021 → now Dec 2022· 31.5% built
- The Serenes Villa No 43.6 yr overdueMahindra Lifespace Developers limited · Nagaon, RaigarhP52000012795· 38.2% built
- SHREE DATTA3.6 yr overdueAADYASHAKTI ENTERPRISES · Thane, ThaneP51700016129· 75.5% built
- AAVISHKAR B, C AND D WING3.6 yr overdueGROW MORE LIFE SPACE · MOSHI PCMC, PuneP52100015644· 44.3% built
- TEJ VIHAR3.6 yr overdueTEJ BUILDCON THROUGH PROPRIETOR SHIVTEJ PRAMOD JAGTAP · SAGUNAMATANAGAR, SataraP52700025315· 72.7% built
- Madonna3.6 yr overdueMichael Rodrigues · Borivali, Mumbai SuburbanP51800010569· filed Dec 2019 → now Dec 2022· 90.9% built· 2 complaints
- Shri Baba Ramdev Textile and Housing Market- Wing A-13.6 yr overdueN. Jaju Malpani Infra Pvt. Ltd. · Ichalkaranji (M Cl), KolhapurP53000009180· 23.1% built· 1 complaint
- Green Olive3.6 yr overdueGreen Olive Venture · Hinjewadi, PuneP52100013526· 87.9% built
- Blue Ridge - THE LOFTS3.6 yr overdueParanjape Schemes (Construction) Ltd. · Hinjawadi, PuneP52100000060· 99.2% built· 1 complaint
- Espree Eminence3.6 yr overdueEspree Realtors · VadgaonsheriP52100018636· 61.8% built
- Euro Ville Phase I3.6 yr overdueVastu Rachana JV · Kharade, ThaneP51700001003· 78.2% built
- SUHRUD3.6 yr overdueGANGOTREE GREENBUILD · Erandwane, PuneP52100013402· 90.9% built
- Sai Satyam Homes3.6 yr overdueSai Satyam Developers · Kalyan, ThaneP51700001809· filed Jun 2021 → now Dec 2022· 90.9% built
- KALPATARU RESIDENCY3.6 yr overdueDEVYANI R DODIA · Dadra & Nagar Haveli, Dadra & Nagar HaveliP49600000026· 50% built
- MANSAROVAR RESIDENCY C WING3.6 yr overdueKIRAN REALTY · Thane, ThaneP51700002268· 90.9% built
- Ramrai Kunj3.6 yr overdueSantosh Ramchandra Karavkar · Panvel, RaigarhP52000011536· 90.9% built
- Nilay3.6 yr overdueSiddhivinayak Developers · Haveli, PuneP52100002147· 78.8% built· 1 complaint
- Pelican Phase B3.6 yr overdueLaukik Construction Company · Pirangut, PuneP52100000949· filed Dec 2019 → now Dec 2022· 42.9% built· 1 complaint
- LOTUS PARK3.6 yr overdueREAL ENTERPRISE · SHAHPUR, ThaneP51700020522· 74.5% built
- Pari Towers3.6 yr overdueUrban Homes Realty · Narhe, PuneP52100002767· filed Jun 2021 → now Dec 2022· 90.9% built· 2 complaints
- The Serenes Villa No 473.6 yr overdueMahindra Lifespace Developers limited · nagaon, RaigarhP52000017563· 40.9% built
- MANGALAM3.6 yr overdueDEEPA SURESH GADA · Thane, ThaneP51700015621· 51.6% built· 1 complaint
- LA ROYALE - A BUILDING3.6 yr overdueDEVI SHAKTI REALTY LLP · UNDRI, PuneP52100012441· 18.2% built· 1 complaint
- MONTESOUTH-13.6 yr overdueSWAYAM REALTORS & TRADERS LLP · NEXT TO BYCULLA FIRE BRIGADEP51900001936· 93.1% built
- FIA EMERALD3.6 yr overdueNIMISH LAXMICHAND PASAD · Palghar, PalgharP99000013971· 81.8% built
- KAMALJA3.6 yr overdueM/S. SAIVIJAY BUILDERS AND DEVELOPERS JADHAV KADU · ULWE, RaigarhP52000017514· 81.8% built
- KRISHNA HERITAGE3.6 yr overdueKRISHNA ENTERPRISES · KANDIVALI WEST, Mumbai SuburbanP51800017093· 90.9% built
- GLOBE BUSINESS PARK3.6 yr overduePIONEER INDUSTRIES · Ambarnath, ThaneP51700003290· 81.8% built
- SAJAN HEIGHTS3.6 yr overdueDIKSHA DEVELOPERS · NEAR SADGURU DARSHAN, ThaneP51700009777· 36.4% built· 4 complaints
- Eternia Space3.6 yr overduePLANET SPACE · Karjat, RaigarhP52000008057· 81.8% built· 1 complaint
- Aapla Ghar Chakan Phase II Amenity Bldg A3.6 yr overdueMaple Estates · Nanekarwadi (CT), PuneP52100008123· 18.2% built
- PRADNYESH RESIDENCY3.6 yr overdueM\S PRADNYESH BUILDERS AND DEVELOPERS · ZAGADE WASTI, PuneP52100008874· 81.8% built
- GNP GALAXY PHASE - I3.6 yr overdueROSHNI ENTERPRISES · Ambarnath, ThaneP51700002007· 81.8% built· 1 complaint
- MISTY GREENS3.6 yr overduePruthvi Developers · PATILNAGAR, PuneP52100017679· 90.9% built
- Shri Gurudev Samrajya E Wing3.6 yr overdueVaishanavi Builders and Developers · Khed, PuneP52100028115· 42.7% built
- Akashparv A, B3.6 yr overdueSHARADA SHRIKALP PROMOTERS & BUILDERS · Bavdhan, PuneP52100003836· filed Dec 2019 → now Dec 2022· 90.9% built
- Sanskruti Splendour3.6 yr overdueSanskruti Nirman Pvt. Ltd. · BORIVALI, Mumbai SuburbanP51800009760· 58.2% built· 1 complaint
- OLYMPIA PHASE 13.6 yr overdueOXFORD INFRA GROUP · Wakad, PuneP52100009480· filed Dec 2018 → now Dec 2022· 52.3% built· 15 complaints
- The Serenes Villa No 113.6 yr overdueMahindra Lifespace Developers limited · nagaon, RaigarhP52000012524· 40.9% built
- Marvel Piazza phase -013.6 yr overdueMARVEL ZETA DEVELOPERS PVT LTD · LOHGAON, PuneP52100003653· filed Jun 2021 → now Dec 2022· 61.1% built· 27 complaints
- Asha Harmony3.6 yr overdueVir Enterprises · Thane, ThaneP51700022377· 90.9% built
- OSHO DAYARAM3.6 yr overduePARVATI CONSTRUCTION CO. · Thane, ThaneP51700003187· 90.9% built
- PRISTINE PURVRANG PART 13.6 yr overduePADMAVATI HOMES · Perane, PuneP52100001262· 80.3% built
- GVC SHAGUN CITY PHASE 13.6 yr overdueSHAGUN ASSOCIATES · KAUTHA, NandedP51100015116· 78.2% built
- KALPITA HEIGHTS3.6 yr overdueSHRI R N GOLI DEVELOPERS · Solapur (M Corp.), SolapurP52600004884· filed Dec 2018 → now Dec 2022· 76.4% built
- N G TIVOLI Phase I3.6 yr overdueRNA Builders (NG) · Mira Road, ThaneP51700015568· 37.5% built
- Patson Orchid3.6 yr overduePatson Builders · Kolhapur (M Corp.), KolhapurP53000003032· 90.9% built
- HIRBAN RESIDENCY3.6 yr overdueHIR BAN PROMOTERS AND DEVELOPERS · Pimpri Chinchawad (M Corp.), PuneP52100010961· filed Jun 2019 → now Dec 2022· 73.3% built
- The Serenes Villa No 223.6 yr overdueMahindra Lifespace Developers limited · nagaon, RaigarhP52000012523· 40.9% built
- SHREE MAHALAXMI HOMES3.6 yr overdueMAHALXMI FORTUNE · CHIKLOLI, ThaneP51700016810· 69.7% built
- 87 NINAD3.6 yr overdueMAAULI CREATIONS PVT LTD · Mumbai City, Mumbai CityP51900018948· 0.5% built
- SHIV SHAMBHO COMPLEX3.6 yr overdueMAITREE ASSOCIATES · USARLI, RaigarhP52000019349· 61.8% built
- Goodwill Unique Zest County Phase 13.6 yr overdueZENITH BUILDCON · Lohegaon, PuneP52100016454· 90.9% built
- GREEN COUNTY3.6 yr overdueANAND DEVELOPERS · Haveli, PuneP52100004407· 64.8% built
- ITREND HOMES PHASE II WING B3.6 yr overdueHighpoint Landmark LLP · HINJEWADI, PuneP52100017586· 90.9% built
- ROYAL EXOTICA PHASE I3.6 yr overdueSVG Builders LLP · KONDHWA BUDRUK, PuneP52100018700· 89.1% built
- NOVA RESIDENCY3.6 yr overdueAMIT JUGALKISHOR RATHI · BEHIND RAJASHREE SHAU COLLEGE, PuneP52100018498· 95.5% built
- DYNAMIC CREST PHASE I - RIMO/EVEREST3.6 yr overdueSNEH MAKEWELL LLP · DOMBIVALI, ThaneP51800001460· filed Jun 2021 → now Dec 2022· 72.7% built
- KSHIPRA3.6 yr overdueSARA REALTY · Thane, ThaneP51700015011· 90.9% built
- Apratim Park Uttam Nagari3.6 yr overdueGanesh Parvatrao Jaybhaye · Aurangabad (M Corp.), AurangabadP51500002890· 39.8% built· 1 complaint
- Mahindra Happinest Palghar Phase - IV3.6 yr overdueMAHINDRA HAPPINEST DEVELOPERS LIMITED(Formerly known as Mahindra Happinest Developers Pvt. LTD) · Nandore, PalgharP99000017770· 81.8% built· 1 complaint
- SHREEJI SKYGREENS3.6 yr overdueSHREEJI REALTY · NEAR CITY CENTER MALL, NashikP51600014841· 46.8% built
- Laxmi Madhav Tread Center3.6 yr overdueLaxmi Constructions · Opp Bus stand, SataraP52700015366· 32.7% built
- Legacy Crest3.6 yr overdueLegacy Homes · Jambe- Punawale road, PuneP52100019089· 81.8% built· 1 complaint
- Supare Nagar Township3.6 yr overdueS. K. Constructions · Yerkheda (CT), NagpurP50500006297· 78.2% built
- Manaswi Apartment3.6 yr overdueNitin Amrutkar & Associates · Indiranagar, NashikP51600013686· 90.9% built
- Samraat Nucleus Project 023.6 yr overdueM/S Shweta Infrastructure & Housing (I) Pvt. Ltd. · BHABHA NAGAR, NashikP51600020077· 90.9% built
- APEX SHUKAN3.6 yr overdueAPEX BUILDCON · PUSHPAK, RaigarhP52000021219· 81.8% built
- vrundavan residency3.6 yr overdueTejal Builders and Developers · Aurangabad (M Corp.), AurangabadP51500006020· 71.8% built
- Krushna Apartment3.6 yr overdueDATTA KRUPA ENTERPRISES · Pushpak New, RaigarhP52000021703· 55.5% built
- SUNRISE GLORY PHASE II3.6 yr overdueSUNRISE LIFESPACES LLP · Thane, ThaneP51700003397· 90.9% built· 10 complaints
- Zelam3.6 yr overdueGokhale Constructions · Erandwana, PuneP52100020973· 42.7% built
- TEJ PARK3.6 yr overdueSHREE PADMAVATI DEVELOPERS · Nashik (M Corp.), NashikP51600007571· 90.9% built
- Peace Paradise3.6 yr overdueS P Developers · Ravet, PuneP52100021250· 32.7% built
- Anmol Fortune - III3.6 yr overdueWadhwa Realty Pvt Ltd. · Borivali, Mumbai SuburbanP51800001912· 90% built· 4 complaints
- KARTIKIASHWINI3.6 yr overdueASHWINI BUILDER'S & DEVELOPERS Pvt. Ltd. · SANGAMNAGAR, SataraP52700014192· 90.7% built
- GRACIA3.6 yr overdueSAGA CHRISHH ASSOCIATES · TALEGAON DABHADE, PuneP52100023014· 27.3% built
- SAIDATTA PARADISE WING A3.6 yr overdueSAI DATTA ENTERPRISES · Chakan, PuneP52100014071· filed Jun 2021 → now Dec 2022· 90.9% built
- SIGNATURE BUSINESS PARK3.6 yr overdueSwastik Developers · Chembur, Mumbai SuburbanP51800007575· 79.1% built· 1 complaint
- WINDCHIME HOMES PHASE 23.6 yr overdueSUJAY VENTURES · -, PuneP52100004047· filed Jun 2021 → now Dec 2022· 57.5% built
- EKTA TRINITY3.6 yr overdueEKTA HOUSING PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800005021· 94.3% built
- SANKAT MOCHAN3.6 yr overdueMARUTI CORPORATION · BHIWANDI, ThaneP51700014096· 90.9% built
- COMFORT ZONE3.6 yr overdueADITYA SHAGUN DEVELOPERS · BALEWADI, PuneP52100014406· 78.2% built· 1 complaint
- ACROPOLIS 23.6 yr overdueBhoomi & Arkade Associates · Vasai, PalgharP99000006132· 89.1% built· 42 complaints
- VASANT OASIS BLUEBELL BLDG 93.6 yr overdueNEEPA REAL ESTATES PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800000762· 76.4% built· 3 complaints
- NAVNEET SADAN CHS LTD3.6 yr overdueSHREE SWAMI SAMARTH BUILDERS & DEVELOPERS · Kurla, Mumbai SuburbanP51800011489· 80% built
- SHREE KRISHNA RESIDENCY3.6 yr overdueKARWA CONSTRUCTIONS AND DEVELOPERS · Golwadi, AurangabadP51500013874· 90% built
- HILL VIEW RESIDENCY PHASE I PROJECT II BUILDING A AND B3.6 yr overdueKUMAR BEHARAY PROPERTIES LLP · BEHIND MAHATMA SOCIETY KOTHRUD, PuneP52100014848· 90.9% built
- SHREE GAURANG3.6 yr overdueGAURANG ASSOCIATES · NAUPADA, ThaneP51700015176· 0% built· 7 complaints
- ASHAINFRA3.6 yr overdueASHAINFRA · SADASHIV PETH, PuneP52100014949· 63.6% built
- VEDANT HEIGHTS3.6 yr overduePatil Bhagwat Developers & Builder · Ichalkaranji (M Cl), KolhapurP53000007238· 90.9% built· 2 complaints
- PARK EXPRESS PHASE III3.6 yr overduePARK EXPRESS JOINT VENTURE · BALEWADI, PuneP52100018658· 65.5% built
- SADHANA RESIDENCY APARTMENT3.6 yr overdueVISHAL LAXMAN GADEKAR · MAKHMALABAD, NashikP51600017808· 90.9% built
- Raheja Imperia - I3.6 yr overdueRaheja Universal (Pvt.) Ltd. · Ward GSouth, Mumbai CityP51900009379· 99.5% built· 7 complaints
- ADARSSH ONE3.6 yr overdueADARSSH BUILDCON · Near Sacred Heart School, NashikP51600017599· 90.9% built
- VARAD HEIGHTS3.6 yr overdueSHARAD RAGHUNATH MHATRE · KAMATGHAR, ThaneP51700014942· 90.9% built
- ALANKAAR RESIDENCY3.6 yr overdueS P DEVELOPERS · HOC COLONY, RaigarhP52000014698· 90.9% built
- 22 Dhuleva3.6 yr overdueSafal realtor and Developers Pvt Ltd · Ward ABCD, Mumbai CityP51900005991· filed Dec 2019 → now Dec 2022· 62.7% built· 1 complaint
- Mont Vert Yolo3.6 yr overdueMont Vert Elegance · Bhugaon, PuneP52100007210· 24.7% built
- PANCHAMI RESIDENCY3.6 yr overdueS K BUILDCON · PATHARDI, NashikP51600018928· 90.9% built
- Eagleton3.6 yr overdueROMA BUILDERS PRIVATE LIMITED · Thane, ThaneP51700000089· 90.9% built
- Mohan Areca3.6 yr overdueMOHAN LIFESPACES LLP · Ambarnath, ThaneP51700000829· filed Dec 2019 → now Dec 2022· 88.6% built· 14 complaints
- DIVYARATNA RESIDENCY3.6 yr overdueIDHANT CONSTRUCTION AND DEVELOPERS · Barshi, SolapurP52600001054· 29.1% built
- Barrington3.6 yr overdueROMA BUILDERS PRIVATE LIMITED · Thane, ThaneP51700000117· 90.9% built
- Preston3.6 yr overdueROMA BUILDERS PRIVATE LIMITED · Thane, ThaneP51700000139· 90.9% built
- Fairway3.6 yr overdueROMA BUILDERS PRIVATE LIMITED · Thane, ThaneP51700000152· 90.9% built
- Ekdant Srushti Phase-23.6 yr overdueNANDA SANJEEVKUMAR KANKARIYA · Aurangabad (CB), AurangabadP51500013266· 14.5% built
- The Serenes Villa No 193.6 yr overdueMahindra Lifespace Developers limited · nagaon, RaigarhP52000013839· 40.9% built
- Town Square Heights3.6 yr overdueTown Square Builders · Opp. Gujral Petrol Pump, JalgaonP49900018986· 81.8% built
- EVERGREEN RESIDENCY C WING3.6 yr overdueBALAJI CONSTRUCTION · BADLAPUR GAON, ThaneP51700001677· 90.9% built
- SAI RESIDENCY3.6 yr overdueREVANJI RAMU CHOUGULE · NEAR RAJPUT COMPLEX, KolhapurP53000025158· 90.9% built
- The Serenes Villa No 133.6 yr overdueMahindra Lifespace Developers limited · nagaon, RaigarhP52000012781· 81.8% built
- FUSION TOWERS PHASE II3.6 yr overdueRAMA SYNERGY SPACES · Hinjawadi - Phase III, PuneP52100019797· 98.2% built· 2 complaints
- MARVEL SERA A,B,C BUILDING3.6 yr overdueMARVEL SIGMA HOMES PRIVATE LIMITED · Hadapsar, PuneP52100001878· 0% built· 9 complaints
- GAUTAMI MAI FLEUR3.6 yr overdueNitin Baburao Jirge · Tarabai Park, KolhapurP53000016326· 38.6% built
- VIHANGS VERMONT3.6 yr overdueVIHANG ENTERPRISES · Thane, ThaneP51700001458· 84% built· 3 complaints
- BALAJI SHRUSHTI3.6 yr overdueVARSHA BUILDCON · Thane, ThaneP51700014837· 80.9% built
- Urban Park3.6 yr overdueUrban Developers · Haveli, PuneP52100014555· 90.9% built
- SUSHAN3.6 yr overdueVENUS REALTORS · Thane, ThaneP51700015064· 18.2% built
- SHRI SIDDHIVINAYAK HEIGHTS3.6 yr overdueShri Ganesh Construction · Shramik Nagar, SatpurP51600023513· 81.8% built
- SAI CHARAN COMPLEX BUILDING NO 33.6 yr overdueOM SAI CHARAN BUILDERS · Thane, ThaneP51700001132· 90.9% built
- DEV LUXURIA3.6 yr overdueDevkrupa Enterprises · Uran, RaigarhP52000004220· filed Jun 2021 → now Dec 2022· 96.4% built
- NILAM3.6 yr overdueNILAM RAMAKANT SANKHE · BOISAR, PalgharP99000020822· 27.3% built
- RADHAKRISHNA CHS LTD3.6 yr overdueWESTIN SANKALP DEVELOPERS · Kandivli West, Mumbai SuburbanP51800018207· 90.9% built
- RADHA KRISHNA3.6 yr overdueRAMPRASAD SOHANLAL AGRAWAL · Thane, ThaneP51700016450· 90.9% built
- GREEN BASIL3.6 yr overdueSUMANA INFRA · DHANKUDE VASTI, PuneP52100030560· 81.8% built
- Mohak House No.3 A Wing3.6 yr overdueV.S. Enterprises · Vasai, PalgharP99000011684· filed Dec 2019 → now Dec 2022· 90.9% built· 1 complaint
- CASA BELLA3.6 yr overdueVIKRAM PUNDALIK GADADE · PRAGATI COLOY, SangliP53100029466· 49.5% built
- KAMALRAJ DEVGIRI3.6 yr overdueKAMALRAJ REALTORS · DIGHI GAONP52100031738· 72.7% built
- SUYOJIT ONE WORLD PHASE-II, COMMERCIAL AND HOSPITAL3.6 yr overdueSUN INFRASTRUCTURES PVT. LTD · NEAR BIRLA HOSPITAL, NASHIK ROAD, NashikP51600002585· filed Mar 2019 → now Dec 2022· 72.7% built· 1 complaint
- KRISHNA APARTMENT3.6 yr overdueASHOK THAKORBHAI PATEL · PALGHAR, PalgharP99000030577· filed Dec 2021 → now Dec 2022· 90.9% built
- REWILLAX TANISHQ3.6 yr overdueREWILLAX BUILDCON · Karjat, RaigarhP52000002166· filed Dec 2020 → now Dec 2022· 90.9% built
- Suraj Residency3.6 yr overdueOm Sai Builder and Developers · nashik, NashikP51600029137· 90.9% built
- AL ABBAS3.6 yr overdueAYMAN INFRA CONSTRUCTIONS · Bhiwandi, ThaneP51700005893· filed Dec 2023 → now Dec 2022· 75.8% built
- OXY FLORA PHASE 23.6 yr overdueOXY FLORA PHASE 2 · LONIKAND, PuneP52100015940· filed Dec 2021 → now Dec 2022· 37.5% built
- Dhoot Sky Residency-New Sonali CHSL3.6 yr overdueDHOOT DEVELOPERS PVT. LTD. · Malad West, Mumbai SuburbanP51800008715· filed Jun 2021 → now Dec 2022· 54.1% built
- Kumar Primrose C Building3.6 yr overdueKUMAR PROPERTIES AND PROMOTERS PVT. LTD · Near Ganga ConstelaP52100030114· 50.5% built· 2 complaints
- Marvel Mountain3.6 yr overdueMarvel Buildcons · Ulhasnagar, ThaneP51700004847· filed Dec 2018 → now Dec 2022· 81.8% built
- MANIBHADRA HEIGHTS3.6 yr overdueSHREE CONSTRUCTION · Vasai, PalgharP99000001594· filed Dec 2019 → now Dec 2022· 88.3% built
- BALAJI HEIGHTS3.6 yr overdueYUVRAJ LANDMARK · BANER, PuneP52100033638· 41.8% built
- RATANRAJ3.6 yr overdueRamnivas Gupta · Lokmanyanagar, PuneP52100034094· 80.9% built
- ORCHID PARK3.6 yr overdueUNITED ONE REALTY LLP · MAMDAPUR, RaigarhP52000016238· filed Dec 2019 → now Dec 2022· 86.8% built
- INNARA RESIDENCY3.6 yr overdueSIDDHIDATA DEVELOPERS · NEAR BHUMKAR CHOWK, PuneP52100029850· 53.6% built
- Shree Gajanan Anex3.6 yr overdueKamal Wamanrao Jejurkar · khode mala, Nashik, NashikP51600029114· 73.2% built
- ANURADHA TOWER3.6 yr overdueDinesh Shivajirao Ghadage · Ward FNorth, Mumbai CityP51900005892· filed Dec 2018 → now Dec 2022· 90.9% built· 30 complaints
- AVENUE 2243.6 yr overdueASHOK MOHANLAL MEHTA · NILEMORE, PalgharP99000023729· 76.4% built
- SHRI KRUPA CLASSIC3.6 yr overdueTATYASAHEB SAMBHAJI KHOT · VISHRAMBAGH SANGLI, SangliP53100030848· 74.5% built
- Mahalaxmi City Phase III3.6 yr overdueGruhlamxi Life Space Private Limited · Bokhara, NagpurP50500003127· filed Nov 2020 → now Dec 2022· 50.2% built
- PRIDE CORNER3.6 yr overduePRIDE CONSTRUCTIONS · ANANDNAGAR, PuneP52100032253· 27.3% built
- CRD Gardenia Apartments 23.6 yr overdueDr Chandrashekhar Raghunath Dound · Palghar, PalgharP99000010008· filed Dec 2019 → now Dec 2022· 56.8% built
- TAPSYA CHSL PHASE II ADDITIONAL FSI FROM 16TH TO 22ND FLOOR3.6 yr overdueNEMINATH HOMES PRIVATE LIMITED · VERSOVA 4 BUNGLOWS, Mumbai SuburbanP51800029453· 54.5% built
- ONE KIYO PHASE-I3.6 yr overdueONEARTH CREATORS LLP · MAMDAPUR, RaigarhP52000002212· filed Dec 2020 → now Dec 2022· 65.7% built
- Bhairaav Blessings3.6 yr overdueBHAIRAAV ERECTORS LIMITED · Mumbai City, Mumbai CityP51900029741· 71.1% built
- VED VIHAR3.6 yr overduePRAKASH BHONDWE · Pimpri Chinchawad (M Corp.), PuneP52100011964· filed Dec 2019 → now Dec 2022· 33.3% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.