RERA projects past their possession deadline
11,768 MahaRERA-registered projects are past the possession date currently on file and still report under 100% construction progress. Both figures are the promoter's own disclosure to the regulator.
Page 40 of 59
- Vijayagar3.6 yr overdueSKYLINE LANDMARK PROJECTS PRIVATE LIMITED · Borivali, Mumbai SuburbanP51800029943· 90.9% built
- Mahalaxmi City Phase IV3.6 yr overdueGruhlaxmi LIfe Space Private Limited · Bokhara, NagpurP50500002498· filed Nov 2020 → now Dec 2022· 49.5% built
- 111 HYDE PARK3.6 yr overdueMDM REALTY · Borivali, Mumbai SuburbanP51800007477· filed Jun 2022 → now Dec 2022· 90.9% built
- INFINITY PLANET C AND D WING3.6 yr overdueTULIP PROPERTIES · MOSHI, PuneP52100019792· 82.7% built· 1 complaint
- SERENA3.6 yr overdueMAVERICK DEVELOPERS DRONAGIRI · Uran, RaigarhP52000009481· filed Dec 2021 → now Dec 2022· 59.9% built
- GAYATRREE LANDMARK PHASE II3.6 yr overdueGAYATRREE SKYSCRAPERS · Dange chowk, PuneP52100007004· filed Dec 2018 → now Dec 2022· 44.8% built· 2 complaints
- AYUSH HEIGHT3.6 yr overdueHARISH MANOHARRAO GAJIMWAR · INDRAPRASTHA SOCIETY, NagpurP50500032126· 57.3% built
- MAJESTIQUE TOWERS EAST PHASE 13.6 yr overdueM/S. SHARAD SHREE ENTERPRISES · WAGHOLI, PuneP52100015020· 92.9% built· 1 complaint
- Siddhivinayak Apartment3.6 yr overdueVinayak Developers · Sudarshan Nagar, Chinchwad, PuneP52100030041· 81.8% built
- AVIVA APARTMENT3.6 yr overdueSHRINE ENTERPRISES · Mamdapur, RaigarhP52000009385· filed Dec 2018 → now Dec 2022· 72.7% built
- PLATINUM OAK3.6 yr overdueGREENSPACE CONSTRUCTION PVT LTD · VIRAR W, PalgharP99000031606· 96.4% built
- MAHALAXMI HEIGHTS3.6 yr overduemahendra gulabchand rathod · MAMURDI, PuneP52100045405· 77.3% built
- LAXMI VILLAS3.6 yr overdueUMESH BHAGWAN MUNDE · Mhasrul, NashikP51600033149· 51.8% built
- MERAKI ARENA3.6 yr overdueMeraki Habitats LLP · CHEMBUR, Mumbai SuburbanP51800007144· filed Nov 2020 → now Dec 2022· 81.8% built
- SHANDILYA VILLA3.6 yr overdueShandilya Properties LLP · Ward GSouth, Mumbai CityP51900007512· filed Jul 2022 → now Jan 2023· 90.9% built
- Satguru Antop Hill3.6 yr overdueNewlook Constructions Pvt. Ltd · Ward FNorth, Mumbai CityP51900012390· 56.9% built
- Samta Parel3.6 yr overdueNewlook Constructions Pvt. Ltd · Ward FSouth, Mumbai CityP51900006654· 56.2% built
- ADBANG RESIDENCY3.6 yr overdueNATH ESTATE · DUDULGAONP52100019126· 40% built
- SAI SHRUSHTI ANNEX3.6 yr overdueSAI SHRUSHTI ENTERPRISES · NEAR KHIDKALESHWAR MANDIR, ThaneP51700015209· 50% built
- TARAMATI TOWER WING I AND J3.6 yr overdueVAST CONSTRUCTION · PEN, RaigarhP52000021617· 53% built
- KIRAN HEIGHTS3.6 yr overdueBHASKAR RAMGONDA PATIL · NEAR SANJEEVANI HOSPITAL, KolhapurP53000017443· 81.8% built
- Vtp Cygnus- Nation R1-Tower73.6 yr overdueAshdan Developers Private Limited · Manjri, PuneP52100009524· filed Jul 2021 → now Jan 2023· 90.9% built· 37 complaints
- Shiv Sai Parth Phase - II3.5 yr overdueS.R.P. Developers · Alefata (N.V.), PuneP52100005608· filed Jul 2019 → now Jan 2023· 70.9% built
- Laxmi Mahal3.5 yr overduePranav Uday Gaidhani · Nashik (M Corp.), NashikP51600010611· 26.9% built
- AARAMBH WING C -D3.5 yr overdueSATELLITE DEVELOPERS PVT LTD · Borivali, Mumbai SuburbanP51800015002· 72.7% built· 2 complaints
- J P Park3.5 yr overdueJ p builders & land developers · Nashik (M Corp.), NashikP51600002589· 31.8% built
- TCG PANORAMA PHASE-II BLDG - B3.5 yr overdueTHE CONSTRUCTION & DEVELOPMENT COMPANY · AMBEGAON B, PuneP52100001924· 90.9% built
- Lifestyle City Kalyan- Platano A3.5 yr overdueNirmal Lifestyle (Kalyan) Private Limited · Kalyan, ThaneP51700005583· filed Dec 2018 → now Jan 2023· 69.1% built· 51 complaints
- SWOJAS PRASHANT3.5 yr overdueSWOJAS PROPERTIES · ERANDWANA, PuneP52100020926· 90.9% built
- SAI AANGAN3.5 yr overduePINNACLE REALTORS · BADLAPUR GAON BADLAPUR WEST, ThaneP51700014960· 90.9% built
- VARAD VENKATESH3.5 yr overdueNAKSHATRA INFRA · CHINMAY PARK AREA, SangliP53100025887· 81.8% built
- Lifestyle City Kalyan- Platano B3.5 yr overdueNirmal Lifestyle (Kalyan) Private Limited · Kalyan, ThaneP51700003540· filed Dec 2018 → now Jan 2023· 68.2% built· 40 complaints
- GOVIND ELITE3.5 yr overdueGOVIND BHAUSAHEB MADHWAI · ADGAON, NashikP51600024470· 99.5% built
- ORION3.5 yr overdueSHETH & SONAL DEVELOPERS · ANDHERI, Mumbai SuburbanP51800008348· filed Jul 2021 → now Jan 2023· 57.4% built· 1 complaint
- Lifestyle City Kalyan- Platano C3.5 yr overdueNirmal Lifestyle (Kalyan) Private Limited · Vadavali Kh., ThaneP51700006766· filed Dec 2018 → now Jan 2023· 68.2% built· 69 complaints
- Shantadurga3.5 yr overdueLAKSHMI BUILDERS AND DEVELOPERS · Ward FSouth, Mumbai CityP51900015604· 90.9% built
- WAMAN-DATTA APARTMENT3.5 yr overdueSAWANT AND SAWANT DEVELOPERS · BANDA, SindhudurgP52900014726· 34.1% built
- PALAVA CROWN3.5 yr overduePalava Dwellers Private Limited · Kalyan, ThaneP51700010935· 81.8% built· 1 complaint
- TCG PANORAMA PHASE-I BLDG - C3.5 yr overdueTHE CONSTRUCTION & DEVELOPMENT COMPANY · AMBEGAON K., PuneP52100001435· 90.9% built
- SIDDHI TOWERS A WING3.5 yr overdueSATISH BASWANT PATIL · Haveli, PuneP52100007014· filed Dec 2019 → now Jan 2023· 58.2% built
- VTP Beaumonde-Nation R2 Tower43.5 yr overdueAshdan Developers Private ltd · manjri, PuneP52100009533· filed Apr 2021 → now Jan 2023· 90.9% built· 27 complaints
- SHUBH VASTU3.5 yr overdueSHUBH VASTU CONSTRUCTIONS · Nashik, NashikP51600011441· 88.2% built
- Sunrise Orlem 2A Phase 13.5 yr overdueDhaval Housing AOP · Borivali, Mumbai SuburbanP51800007706· filed Dec 2019 → now Jan 2023· 90.9% built
- Prime Classic3.5 yr overduePRIME GROUP LLP · Borivali, Mumbai SuburbanP51800026230· 90.9% built
- HOME PARADISE3.5 yr overduePRASHANT FAKIRA KHAIRNAR · NEAR HOTEL JATRA, NashikP51600000771· 88.2% built
- KAMALRAJ HARIDWAR C BUILDING3.5 yr overdueKAMALRAJ ASSOCIATES ·P52100010254· filed Dec 2019 → now Jan 2023· 90.9% built
- HOME CLASSIC3.5 yr overdueSHAILENDRA TUKARAM SALUNKE · Nashik (M Corp.), NashikP51600000742· 86.8% built
- Aaroh3.5 yr overdueBhide Kulkarni Promoters and Builders · Behind Abhiruchi Mall, PuneP52100030828· 60.5% built
- GOLDEN VALLEY3.5 yr overdueA PLUS REALTY · Ambarnath, ThaneP51700002661· 67.3% built
- VASANT RESIDANCY3.5 yr overdueDEEPAK VASANTRAO SURYAWANSHI · SWAYAMBHU PARK, SangliP53100015684· 90.9% built
- ASHOK DEEP3.5 yr overdueDreamWorld Builders And Developers · Malkapur, SataraP52700019543· 99.1% built
- NIRMITI HEIGHTS3.5 yr overdueANNAPURNA DEVELOPERS · JAITALA, NagpurP50500015526· filed Feb 2022 → now Feb 2023· 52.3% built
- SAMRUDDHI HEIGHTS APARTMENTS3.5 yr overdueSAMRUDDHI BUILDERS AND DEVELOPERS · VADJE MALA, BEHIND AKASH PETROLEUM, MHASRUL SHIWAR, NashikP51600020349· 30.9% built
- SAMRUDDHI RESIDENCY3.5 yr overduePune City, PuneP52100006236· filed Jul 2019 → now Feb 2023· 81.8% built
- AMRUT YOG3.5 yr overduePRAKASH GIRIDHAR AMRUTKAR · Nashik (M Corp.), NashikP51600009867· filed Jul 2018 → now Feb 2023· 90.9% built
- NILANJAN PUJA3.5 yr overdueSANJAY MADHAVRAO BHAVSAR · AMBAD, NashikP51600022133· 90.9% built
- AJMERA EXOTICA3.5 yr overdueGopinath Developers LLP · Wagholi gaonthan, PuneP52100015618· 47.3% built
- Dwarka Ravaji3.4 yr overdueM/S Randive Builders and Developers · Kolhapur (M Corp.), KolhapurP53000005706· filed Feb 2021 → now Feb 2023· 75.6% built
- YASHRAJ APARTMENT3.4 yr overdueCHINTAMANI ENTERPRISES · PIMPALGAON BAHULA SHIVAR, NashikP51600024781· 90.9% built· 1 complaint
- Padmavati Nagag3.4 yr overdueRIDDHI SIDDHI CONSTRUCTIONS · SANSARI, NashikP51600010866· 36.4% built
- Centro MHADA3.4 yr overdueMahindra Lifespace Developers limited · Pimpri, PuneP52100030814· 62.7% built· 1 complaint
- RAVI APARTMENT3.4 yr overdueRAVI CONSTRUCTION COMPANY · Peth Road, NashikP51600009601· 90.9% built
- PANOM PARK WING E Sale Building No.33.4 yr overduePANOM DEVELOPERS LLP · Andheri, Mumbai SuburbanP51800029092· 90.9% built
- RAVI RESIDENCY3.4 yr overdueRAVI CONSTRUCTION COMPANY · Nashik (M Corp.), NashikP51600010877· 90.9% built
- Alibag Horizon3.4 yr overdueACORP · vidyanagar, RaigarhP52000019811· 90.9% built
- BHAVANI RESIDENCY3.4 yr overdueSUNRISE GROUP · Nashik (M Corp.), NashikP51600009926· 90.9% built
- VAKRATUND HEIGHTS3.4 yr overdueRAVIRAJ BUILDCON · LAMKHADE MALA, NashikP51600011056· 90.9% built
- CRYSTAL PARK3.4 yr overdueTRIMURTI DEVELOPERS · MOHOMMADWADI, PuneP52100019837· 31.4% built
- RUSTOMJEE AZZIANO WING E3.4 yr overdueKapstone Constructions Private Limited · Thane, ThaneP51700015260· 90% built· 1 complaint
- VBHC Greenglade3.4 yr overdueVBHC MUMBAI VALUE HOMES PRIVATE LIMITED · Palghar, PalgharP99000000542· filed Feb 2020 → now Feb 2023· 81.8% built
- LIFE MAXIMA PHASE 23.4 yr overduePate Future Constructions LLP · Haveli, PuneP52100002233· filed Dec 2019 → now Feb 2023· 69% built· 1 complaint
- WHITECITY PHASE 1 WING A3.4 yr overdueRajesh Real Estate Developers Private Limited · Borivali, Mumbai SuburbanP51800007798· filed Jun 2019 → now Feb 2023· 90.9% built· 33 complaints
- WHITE CITY PHASE 2 WING B3.4 yr overdueRAJESH REAL ESTATE DEVELOPERS PRIVATE LIMITED · Borivali, Mumbai SuburbanP51800008324· filed Jun 2019 → now Feb 2023· 90.9% built· 43 complaints
- Om Sai Sankul3.4 yr overdueOm Sai Constructions · Kalyan, ThaneP51700013210· filed Feb 2022 → now Feb 2023· 90.9% built
- SUNRISE RESIDENCY3.4 yr overdueSUNRISE GROUP · KAMAL NAGAR, NashikP51600011993· 90.9% built
- SHREE LAMBODAR HEIGHTS3.4 yr overdueshree sadguru enterprises · Vasai, PalgharP99000007786· 90.9% built
- RAGHAV ONE453.4 yr overdueRAGHAV RAJ BUILDERS & DEVELOPERS LLP · Kurla, Mumbai SuburbanP51800026775· 90.9% built
- Heramb Heritage3.4 yr overdueHeramb Reality and Infrastructures · Kalamba A Ward, KolhapurP53000016152· 90.9% built
- RADHE RESIDENCY3.4 yr overdueRADHE BUILDERS · Amravati (M Corp.), AmravatiP50300013532· filed Dec 2018 → now Mar 2023· 45% built
- UNIQUE ESTATE3.4 yr overdueUNIQUE SHANTI REALTORS · MIRA ROAD EAST, ThaneP51700006459· filed Dec 2020 → now Mar 2023· 54.5% built
- Sejal Glory Apartment3.4 yr overdueSejal Buildcon Pvt Ltd · Shinde Nagar, NashikP51600015796· 90.9% built
- VERDURA3.4 yr overdueSHUBHASHREE DEVELOPERS · DUDULGAON, PuneP52100024065· 81.8% built· 1 complaint
- GOBIND SAMARTH3.4 yr overdueSUKHMANI CONSTRUCTIONS · Sawantwadi (M Cl), SindhudurgP52900013448· 44.5% built· 1 complaint
- Konnark Heavens3.4 yr overdueNinath Bhausaheb Shingade · Panvel, RaigarhP52000003634· filed May 2022 → now Mar 2023· 89.1% built· 3 complaints
- Lotus Royale3.4 yr overdueArvind Danabhai Desai · Juhu, Mumbai SuburbanP51800020315· filed Sept 2022 → now Mar 2023· 90.9% built
- NIRMITI RESIDENCY3.4 yr overdueNIRMALA SHITAL PATIL · CHINTAMANINAGAR, SangliP53100014823· 14.5% built
- MILESTONE3.4 yr overdueLAGAD PROPERTIES LLP · BUDRUK, PuneP52100022853· 81.8% built
- Neelyog Aashiyana3.4 yr overdueNeelyog Construction Pvt Ltd · Borivali, Mumbai SuburbanP51800001136· 90.9% built
- Silver sand3.4 yr overdueNeelkanth Developers · Borawake Nagar, AhmednagarP52200020328· 90.9% built
- Playtor Paud C- Phase 13.4 yr overdueSANGAM REALTY · Mulshi, PuneP52100004088· filed Mar 2019 → now Mar 2023· 54.5% built
- ADIRAJ BLISS3.4 yr overdueS K DEVELOPERS · BHUGAON, PuneP52100015487· filed Mar 2022 → now Mar 2023· 66.4% built
- KAMAL GLORY3.4 yr overdueKAMAL REALTY · KONDHWA BK, PuneP52100007792· filed Mar 2022 → now Mar 2023· 37.3% built
- Palace Orchids Phase II3.4 yr overdueSiddhant Infrastructure · Kasaba Bawada, Raman Mala,, KolhapurP53000016965· 95.5% built
- SAUBHAGYA APARTMENT3.4 yr overdueMANDA PRAKASH PATIL · DEAF & DUMB SCHOOL, PalgharP99000014504· 27.3% built
- LIGHTHALL E WING3.4 yr overdueGamma Constructions Pvt Ltd · Kurla, Mumbai SuburbanP51800019614· 88.5% built
- 1 OSR3.4 yr overdueShagun Builders · Ward GNorth, Mumbai CityP51900014754· 90.9% built· 2 complaints
- SHREE GANESH SANIDHYA3.4 yr overdueSACHANI DEVELOPERS LLP · KORADI ROAD, BOKHARA, NagpurP50500024420· 69.1% built
- RAINBOW GRACE3.4 yr overdueRAINBOW REALTY · WAGHOLI, PuneP52100008364· filed Mar 2020 → now Mar 2023· 90.9% built
- PALVA MILANO D, G3.4 yr overduePalava Dwellers Private Limited · Kalyan, ThaneP51700010109· 72.7% built· 3 complaints
- ANDHERI EKTA3.4 yr overdueMumbai Shelter Combines LLP · Andheri, Mumbai SuburbanP51800004843· filed Sept 2018 → now Mar 2023· 41.8% built
- GODAI APARTMENT3.4 yr overdueBALWANT ATMARAM PATIL · PALGHAR, PalgharP99000014419· 90.9% built
- Jasmine A, B, C, G, H and I3.4 yr overduePalava Dwellers Pvt Ltd · ., ThaneP51700020381· 78.2% built· 1 complaint
- RUDRAKSH HERITAGE WING A AND WING B3.4 yr overdueS SQUARE DEVELOPERS · Mulund West, Mumbai SuburbanP51800009023· 79.1% built
- Princetown Royal - B23.4 yr overdueManikchand Kumar Properties · Undri, PuneP52100018309· 90.9% built
- JAIRAM HEIGHTS3.4 yr overdueSHILP CONSTRUCTION · Mehrun, JalgaonP49900013090· 90.9% built
- PADMAVISHWA OXYFLOW APARTMENT3.4 yr overdueSIDDHI CONSTRUCTION · RAMESHWAR NAGAR, NashikP51600020387· 90.9% built
- ADIJON3.4 yr overdueJ. ALVARES & OTHERS · Thane, ThaneP51700008646· filed Mar 2022 → now Mar 2023· 90.9% built
- OMKAR SHILP3.4 yr overduePrasad Prabhakar Waghdhare · Sai Mandir, RatnagiriP52800021166· 90.9% built
- Sadguru Aarambh3.4 yr overdueVisharia Sadguru Bhoomi LLP · Palghar, PalgharP99000021488· 90.9% built
- ROSEWOOD BUILDING NO. 13.4 yr overdueSVS GROUPS · Karjat, RaigarhP52000011741· filed Mar 2022 → now Mar 2023· 73.1% built
- ABH CAPITAL PHASE II3.4 yr overdueTANU REALITY LLP · TILAKWADI, NashikP51600028514· 59.5% built
- SHREE LAXMI ESTATE-13.4 yr overdueSHREE LAXMI VENTURE PVT LTD · PIPLA BESA, NagpurP50500021396· 72.1% built
- SHREE CHINTAMANI NAGAR3.4 yr overdueS R CONSTRUCTIONS · PANCHWATI, NashikP51600016506· 72.7% built
- VASTU SIDDHI , PHASE II3.4 yr overdueSIDDHIVINAYAK GROUP · CHIKHLOLI, ThaneP51700016349· 81.8% built
- MAMTA3.4 yr overdueSHIVAM DEV INFRACON PVT LTD · ANDHERI WEST, Mumbai SuburbanP51800016215· 85.5% built
- Meera Heights3.4 yr overdueMoraya Realty · Chikhali, PuneP52100015269· 72.7% built
- The Bzone3.4 yr overdueOxford Properties ( Kondhwa Project) · KONDVA, PuneP52100013641· 79.5% built· 1 complaint
- RUTURAJ VASTUSHILP PHASE II D E F WINGS3.4 yr overdueRUTURAJ VASTUSHILP · Vasai, PalgharP99000010069· 90.9% built
- AKSHAR EMPIRE3.4 yr overdueASHWINBHAI BAVANJIBHAI BOKARWADIA · PATHARDI, NashikP51600016216· 81.8% built
- BELLEZA C WING3.4 yr overdueVISHAL ASSOCIATES · MALWADI, PuneP52100022719· 90.9% built
- RUSHI PRASAD3.4 yr overdueMAHESHKUMAR BHAVCHANDBHAI RAKHOLIYA · CHANDSHI, NashikP51600015643· 81.8% built
- GURU SAI COMPLEX3.4 yr overdueANIL MADHAVRAO AGRAHARKAR · Aurangabad (M Corp.), AurangabadP51500004148· 90.9% built
- KANKESHWAR VRINDAVAN3.4 yr overdueKANKESHWARA BUILDCON PRIVATE LIMITED · ALIBAG, RaigarhP52000000991· filed Mar 2020 → now Mar 2023· 90.9% built
- Adarsh Nagar SRA CHS Ltd.3.4 yr overdueBombay Slum Redevelopment Corporation Pvt. Ltd. · Kandivali West, Mumbai SuburbanP51800028687· 81.8% built
- KUMAR PRATIK B BUILDING3.4 yr overdueKumar Construction and Properties Pvt Ltd · SINHGAD ROAD, PuneP52100020450· 0% built· 1 complaint
- ROONGTA OPTIMUS APARTMENT3.4 yr overdueROONGTA HOMES LLP · NASHIK, NashikP51600027608· 81.8% built
- Fatima Palace3.4 yr overdueMujib Umar Sange · Gowalkot Road, RatnagiriP52800004269· 90.9% built
- Ishwar Pratishta3.4 yr overdueParam Developers · Wadala, NashikP51600018551· 81.8% built
- Jasmine T3.4 yr overduePalava Dwellers Pvt Ltd · PALAVA, ThaneP51700020373· 0% built· 1 complaint
- PALAVA MILANO E, F3.4 yr overduePalava Dwellers Private Limited · -, ThaneP51700011629· 72.7% built· 1 complaint
- Palava - Trinity A to C3.4 yr overduePalava Dwellers Private Limited · Kalyan, ThaneP51700014396· 81.8% built· 2 complaints
- ALIVE SKYPARK3.4 yr overdueNIMANI CONSTRUCTIONS · BANER, PuneP52100020379· 81.8% built
- Swaroop Enclave3.4 yr overdueAMS LANDMARKS CO. · Mitramandal Co Op Hsg Society, PuneP52100019957· 90.9% built
- N B PEARL PHASE III3.4 yr overdueGanesh developers & co · NAVLE BRIDGE, PuneP52100015948· 95.5% built
- Mukti Nakshatra D and F type Building3.4 yr overdueMukti Township Development & Construction Co. Pvt. Ltd. · Near Nakshatra Garden, PuneP52100022494· filed Mar 2022 → now Mar 2023· 95.5% built
- Kohinoor3.4 yr overdueOxford Properties ( Kondhwa Project) · KONDHWA, PuneP52100013890· 67.3% built
- DONDE HEIGHTS3.4 yr overdueGURUPRABHU REALTORS · Vasai, PalgharP99000021303· 90.9% built
- SHIV PLAZA3.4 yr overdueARVINDBHAI BHAVCHANDBHAI RAKHOLIYA · CHANDSHI, NashikP51600015770· 81.8% built
- SHREERAM GALAXY3.4 yr overdueSHREE RAM BUILDERS · SHIVAJI UDYOG NAGAR, ThaneP51700009544· 25.5% built
- Playtor Rajgurunagar- Phase 23.4 yr overduePLAYTOR RAJGURUNAGAR DEVELOPERS PRIVATE LIMITED · Khed, PuneP52100006327· filed Sept 2018 → now Mar 2023· 60% built· 2 complaints
- Mandor Heights Phase-II3.4 yr overdueA S K Construction Co · Borivali, Mumbai SuburbanP51800017804· 81.8% built· 2 complaints
- SAI AASTHA3.4 yr overdueYASH RAJ DEVELOPERS · SECTOR 4, RaigarhP52000015632· 90.9% built
- KANAK RESIDENCY3.4 yr overdueKRISKAN INFRAVENTURE LLP · KAMATGHAR, ThaneP51700016074· 45.6% built
- SHREE AMBA BUSINESS PARK WING C3.4 yr overdueSHREE AMBA BUSINESS PARK · RAHATGAON, AmravatiP50300023525· 72.7% built
- Sai Srushti Residency3.4 yr overduePradeep Shridhar Phadke · Government Colony, SangliP53100020769· 90.9% built
- AMARS WONDERLAND3.4 yr overdueM/s PRAGATI REALTY · Tembhurni, SolapurP52600005524· filed Mar 2019 → now Mar 2023· 81.8% built
- VICTORY ARCH3.4 yr overdueTHAKKAR BUILDERS AND DEVELOPERS · HARIDAS NAGAR, Mumbai SuburbanP51800013975· filed Mar 2022 → now Mar 2023· 93.6% built
- VAISHNAVI HIGHLIFE3.4 yr overdueMAA JIVDANI CONSTRUCTION COMPANY · Kalyan, ThaneP51700008333· 95.5% built
- Celestial City Phase II Building A, E, H3.4 yr overdueRAMA SYNERGY SPACES · S No 78 P and 86/2 P, Ravet Aundh Road, Near Expressway, Ravet, Pimpri Chichwad, Pune, MH, PuneP52100022487· 97% built
- SHUBHAM APARTMENT3.4 yr overdueVASANT SHIVAJI VASANI · TAMBOLI NAGAR HIRAWADI ROAD PANCHAVATI, NashikP51600021407· 66.8% built
- ABH CAPITAL PHASE I3.4 yr overdueTANU REALITY LLP · TILAKWADI, NashikP51600027827· 90.9% built
- Rajyog Residency3.4 yr overdueRajyog Properties · Junnar, PuneP52100012213· filed Sept 2018 → now Mar 2023· 69.5% built· 1 complaint
- SHIVTEERTH LEGACY A WING3.4 yr overdueSHIVTEERTH PROPERTIES · DUDALGAON, PuneP52100020486· 9.1% built
- KANAKIA ZENWORLD PHASE I3.4 yr overdueKANAKIA SPACES REALTY PRIVATE LIMITED · Kurla, Mumbai SuburbanP51800008343· 82.7% built· 15 complaints
- DREAM SHELTER PHASE 23.4 yr overdueDREAMSHELTER DEVELOPERS LLP (Formerly known as Dreamshelter Developers Pvt Ltd) · CHUNCHALE SHIWAR, NashikP51600014758· 43.6% built
- SAHARE TRADE CENTRE3.4 yr overduePUSHPA NANDKISHOR SAHARE · Sillod, AurangabadP51500009964· 80% built
- RADHE KRISHNA APARTMENT3.4 yr overdueHITESH MANSUKHBHAI VIRPARA · MAKHAMALABAD, NashikP51600021952· 60.9% built
- PALAVA AURORA B, C3.4 yr overduePalava Dwellers Private Limited · Kalyan, ThaneP51700010960· 72.7% built
- SIDDHESHWAR HEIGHTS3.4 yr overdueSHREE JAI MALHAR ENTERPRISES · TITWALA, ThaneP51700008224· 34.8% built
- Urban Residency3.4 yr overdueAshwamedh Developers · Urban Colony, KolhapurP53000020796· 54.3% built
- Samruddhi Appartment3.4 yr overdueSujeet Manikrao Jagdhane · Pirwadi, SataraP52700001674· filed Mar 2022 → now Mar 2023· 21.4% built· 1 complaint
- CHINTAMANI PARK3.4 yr overdueS. B. HOMES BUILDERS AND DEVELOPERS · KAPSAL, RatnagiriP52800020358· 33.2% built
- NANDLAL PLAZA3.4 yr overdueRISHIKESH BUILDERS & DEVELOPERS · SECURITY PRESS, NashikP51600023461· 90.9% built
- AARADHYA PRIMUS3.4 yr overdueMAN VASTUCON LLP · NEAR SINGAPORE INTERNATIONAL SCHOOL, ThaneP51700023844· 81.8% built
- PALAVA - ESTELA D to G3.4 yr overduePalava Dwellers Private Limited · Kalyan, ThaneP51700011068· 81.8% built· 6 complaints
- SILVER BROOK WING A3.4 yr overdueBehede Properties LLP · BAVDHAN KR, PuneP52100024383· 48.6% built
- ANANDVAN DABHOLKAR SANKUL- PHASE 43.4 yr overdueCONSORTEXE PROPERTIES PVT LTD · MHAPSEKAR TITHA, SindhudurgP52900027528· 63.6% built
- SHREE GANESH ACE ARCADE3.4 yr overdueGOBIND BUILDERS & DEVELOPERS · RAHATNI, PuneP52100015738· 81.7% built
- Playtor Paud B3.4 yr overduePLAYTOR PAUD HOMES PRIVATE LIMITED · Mulshi, PuneP52100001949· filed Sept 2018 → now Mar 2023· 60.2% built· 1 complaint
- SHREE KAMAKHYA CHAMBERS3.4 yr overdueSHRIPRAKASH VIJAYNATH RAI · Thane, ThaneP51700011960· filed Mar 2022 → now Mar 2023· 90.9% built
- ASHIRWAD HOMES3.4 yr overdueBHARAT PREMCHAND KOTHARI · SR NO 275/1B, PLOT NO 05,DHORE WADA,NEAR RAILWY-STATION WADGAON MAWAL, PuneP52100025081· 90.9% built
- NEWA BHAKTI KNOWLEDGE CITY COMMERCIAL BUILDING PHASE 13.4 yr overdueNEWA TECHNOCITY (I) PRIVATE LIMITED · Thane, ThaneP51700010310· filed Sept 2021 → now Mar 2023· 90.9% built
- PRIDE CENTURY THE LORDS3.4 yr overdueABAD ESTATE AOP · Pannalal Nagar, AurangabadP51500013248· 90.9% built
- B AND W TOWER3.4 yr overdueBANKAR AND WAGHMODE ASSOCIATES · COLLEGE CORNER, SangliP53100023281· 81.8% built
- KRISHNAS BLESSING D BUILDING3.4 yr overdueVISHAL INFRACON · MANJRI BK, PuneP52100022987· 1.8% built
- ANP - LANDMARK3.4 yr overdueFive Star Construction Company · Near Bhumkar Chowk, PuneP52100023061· 81.8% built
- SHRADDHA CHHAYA3.4 yr overdueSHRADDHA CHHAYA DEVELOPERS LLP · BORIVALI (WEST), Mumbai SuburbanP51800026301· 63.6% built
- CHESTERTON3.4 yr overdueROMA BUILDERS PRIVATE LIMITED · PATLIPADA, HIRANANDANI ESTATE, OFF GHODBUNDER ROAD, ThaneP51700019400· 90.9% built
- AJAY HEIGHTS3.4 yr overdueSHRINIWAS INFRA · SATARA, AurangabadP51500019612· 72.7% built
- Neelyog Veydaanta3.4 yr overdueRatan Builders · Kurla, Mumbai SuburbanP51800001645· 80.7% built· 1 complaint
- AADINATH RESIDENCY3.4 yr overdueM/S AADINATH PROPERTIES · SHANTIPURA, AurangabadP51500015645· 90.9% built
- BHUVI VISHWABAN3.4 yr overdueBhuvi Landmarks LLP · AURANGABAD, AurangabadP51500020149· 78.2% built
- Apeksha Imperial3.4 yr overdueKOTHARI CREATION · Vasai, PalgharP99000006604· filed Mar 2019 → now Mar 2023· 78% built· 2 complaints
- RUDRA DESIRE3.4 yr overdueRADHAKRUSHANA MADHUKAR KALE · AMBEKAR MALA BABURAO NAGAR, PuneP52100023077· 63.6% built
- AASHEERWAD HOMES3.4 yr overdueM/S. DRUSHTI DEVELOPERS · JYOTINAGAR, AurangabadP51500016220· 81.8% built
- Alhambra3.4 yr overdueHydra Trading Private Limited · Mumbai City, Mumbai CityP51900027257· 99.7% built
- GAURISUTA3.4 yr overdueSAI DEVELOPERS · NEAR KARNALA SPORTS ACADEMY, RaigarhP52000018222· 54.7% built
- SHRINIWAS APARTMENT3.4 yr overdueRAJESH NAMDEO SANGLE · AMRUTDHAM PANCHVATI, NashikP51600026475· 90.9% built
- New Cuffe Parade - Lodha Gardenia3.4 yr overdueLODHA DEVELOPERS LIMITED · Mumbai City, Mumbai CityP51900015715· 71.4% built· 3 complaints
- Sukrut3.4 yr overdueTECHNO PROPERTY DEVELOPERS PRIVATE LIMITED · Ward GNorth, Mumbai CityP51900020341· 89.5% built· 1 complaint
- PENTAGON-GANPATI SAHANIWAS3.4 yr overduePENTAGON INFRASTRUCTURE · NEAR KRUPAMAI HOSPITAL OPP BHOKARE COLLAGE, SangliP53100026204· 90.9% built
- LOTUS CITY3.4 yr overdueSiddharth Sanjaykumar Mehta · Nilgavhan - Kashti Shiv Road, NashikP51600014919· 78.2% built
- AKSHAY SRUSHTI3.4 yr overdueRAJENDRA RAMANLAL LUNAKD · WADMUKHWADI, PuneP52100015477· 81.8% built
- APEX AURA3.4 yr overdueAPEX BUILDCON · DRONAGIRI, RaigarhP52000019129· 90.9% built
- Upper Thane - Sereno D and E3.4 yr overdueLODHA DEVELOPERS LIMITED · Surai, ThaneP51700014770· 81.8% built· 1 complaint
- KT ASPIRE INDUSTRIAL HUB3.4 yr overdueKT 3D SCAPES · GOLANI, PalgharP99000033169· 35.9% built
- GAYATRI CLASSIC3.4 yr overdueTELE BUILD CONSTRUCTION PVT LTD · Bhiwandi, ThaneP51700005592· filed Mar 2020 → now Mar 2023· 65.5% built
- SHRIKRUPA COMPLEX3.4 yr overdueRAJESH RAMESHRAW DAGWAR · SAMUDRAPUR, WardhaP50400033214· 79.1% built
- MAITRI3.4 yr overdueMAITRI ENTERPRISES · DRONAGIRI, RaigarhP52000030192· 90.9% built
- GALAXY PRAYAG3.4 yr overdueSHASHANK PANDE · NAGPUR, NagpurP50500010247· filed Mar 2019 → now Mar 2023· 90% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.