All MahaRERA projects
23,645 registered projects with disclosed construction progress or complaint records. Page 29 of 48.
Pune
- The One · BhugaonShamkant Jagannath Shende · P52100001943 · possession Dec 2020 · 81.8% built · 4 complaints
- Playtor Paud B · MulshiPLAYTOR PAUD HOMES PRIVATE LIMITED · P52100001949 · possession Mar 2023 · 60.2% built · 1 complaint
- Playtor Ranjangaon- Phase 1 · KaregaonPLAYTOR LIFESPACES PRIVATE LIMITED · P52100001953 · possession Dec 2017 · 74.7% built · 2 complaints
- Shubhankar Classic · ThergaonShiv Properties · P52100001956 · possession Jan 2021 · 32.7% built
- HILLVIEW RESIDENCY PHASE I · KOTHRUDKUMAR BEHARAY PROPERTIES LLP · P52100001962 · possession May 2019 · 93.2% built · 1 complaint
- TRIMURTI · Pune (M Corp.)Gruha Navnirman Developers · P52100001969 · possession Feb 2021 · 32.9% built
- Mont Vert Velocity · PashanNiraj Kumar Associates Pvt Ltd · P52100001973 · possession Dec 2019 · 90.7% built
- Xotech Phase 1 · HinjavadiPhoenix Ventures · P52100001988 · possession Mar 2019 · 100% built · 1 complaint
- KINGSBURY PHASE I · CHARHOLIJaikul Associates · P52100001994 · possession Dec 2022 · 96.8% built · 2 complaints
- PADMANABH GOLDEN VALLEY PHASE-I BUILDING B AND C · DHAYARIOM BALAJI PLAZA · P52100001995 · possession Oct 2020 · 44.5% built · 1 complaint
- Quadream Residences Phase 1 Bldg C D and Common Amenities · UndriGAGAN SHARDA DEVELOPERS · P52100001996 · possession Dec 2018 · 81.8% built
- POWER BOULEVARD · GANESH BAUGSAPRA PROPERTIES & INVESTMENTS · P52100002004 · possession Dec 2021 · 81.8% built
- MONTECITO Phase II - E Building · ParvatiAmit Vastu Ventures LLP · P52100002014 · possession Dec 2021 · 93.2% built · 1 complaint
- PGD Pinnacle · KeshavnagarPGD Land LLP · P52100002015 · possession Oct 2021 · 90.9% built
- Runal Gateway Phase 1 · KiwaleRajendra Suresh Jain · P52100002021 · possession Dec 2021 · 90.3% built · 2 complaints
- NYATI ETHOS I - B3 · undriNYATI BUILDERS PRIVATE LIMITED · P52100002024 · possession Jul 2022 · 37.5% built
- NISARG PALMS · Bavadhan BKADITYA SHAGUN DEVELOPERS · P52100002025 · possession Jun 2018 · 81.8% built
- Dwarika Nagari · Tilekar NagarYashodhan Associates · P52100002029 · possession Dec 2019 · 90.9% built · 1 complaint
- ARUN APARTMENT · Pune (M Corp.)ZINNIA SPACES PVT LTD · P52100002034 · possession Dec 2018 · 65.6% built · 2 complaints
- BROOKEFIELD WILLOWS · PisoliNirman Trimurti Developers · P52100002035 · possession Dec 2019 · 90.9% built · 1 complaint
- WATERS EDGE PHASE V · PIMPLE NILAKHOM SAGAR DEVELOPERS · P52100002038 · possession Mar 2022 · 90.9% built
- GANGA ISHANYA C · DhankawadiMAHANAGAR REALTY · P52100002039 · possession Dec 2021 · 100% built · 4 complaints
- GULAB KUNJ · SHANIWAR PETHButtepatil-Sabale Properties · P52100002040 · possession Dec 2019 · 41.4% built
- Meghsparsh Building C · AMBEGAON KHShri Venkatesh Sharada Alliance · P52100002043 · possession Jul 2019 · 90.9% built
- SOBHA ORION BLOCK 03 · kondhwa BKSOBHA LTD. · P52100002044 · possession Apr 2018 · 100% built
- GRANDBAY A5 A6 B3 · PUNEPRAKASH HARAKCHAND PARAKH · P52100002050 · possession Sept 2018 · 90.9% built · 2 complaints
- CRYSTAL HOMES · Pimpri Chinchawad (M Corp.)CRYSTAL CREATIONS · P52100002053 · possession Dec 2023 · 90.9% built
- GIRIPUSHP · Pune (M Corp.)AJIT GIRDHARILAL NAHAR · P52100002063 · possession Dec 2021 · 100% built
- Marvel Ganga Sangria D,E Building · MOHAMMADWADIMARVEL LANDMARKS PVT LTD · P52100002064 · possession Mar 2018 · 99.4% built · 8 complaints
- LAXMI VINAYAK · Dhayari (Part)LAXMI VINAYAK · P52100002074 · possession Oct 2019 · 90% built
- KUTUMB PRIME · MawalNAIKNAVARE BUILDCON PVT LTD · P52100002090 · possession Jun 2023 · 58.2% built · 4 complaints
- AKSHAY HEIGHTS · WakadR R LUNKAD BUILDERS AND PROMOTERS · P52100002094 · possession Nov 2022 · 81.8% built
- Raajlaxmi Greens a and b · RAVETShree Dharamaraj Developers · P52100002102 · possession Oct 2019 · 100% built
- Shubham Srushti-Vasundhara · JunnarShubham Housing Developers Private Limited · P52100002106 · possession Jun 2022 · 100% built
- FORTUNE SIDDHIPRIYA · PUNEFORTUNE GROUP · P52100002108 · possession Jul 2018 · 90.9% built
- anantvenktesh · Pune (M Corp.)ANANTVENKATESH CONSTRUCTION LLP · P52100002109 · possession Dec 2019 · 100% built · 1 complaint
- PLOT NO 8, VIVA, PIRANGUT · MulshiPACT REAL ESTATE PRIVATE LIMITED · P52100002113 · possession Nov 2024 · 78.2% built
- Elina Phase 1 · SusTrimurti Development Company · P52100002115 · possession Jun 2018 · 90.9% built
- AXIS CENTRA · BANERAxis Landmarks · P52100002121 · possession Dec 2020 · 41.8% built
- SAI SHIVAM · RAHATANIMANGAL MURTI DEVELOPERS PROP NARESH THAKURDAS WADHWANI · P52100002125 · possession Sept 2018 · 77.3% built
- SOLITAIRE PALMS C · Borhadewadi, MoshiRAJKUMARI GULAB CHOITHRAMANI · P52100002126 · possession Feb 2021 · 27.3% built
- RADHEYA · kondhwa BKB G PROMOTERS AND BUILDERS · P52100002128 · possession Sept 2020 · 100% built
- Mayuri Optimum · UNDRIVinesh Naresh Kumar Oswal · P52100002131 · possession Jan 2021 · 54.5% built
- Sayama Phase 3 · Lonavala (M Cl)Puranik Builders Limited · P52100002137 · possession Dec 2023 · 81.8% built
- Bhalchandra Puram · RAVETPolite Buildwell · P52100002143 · possession Dec 2020 · 90.9% built
- SOLITAIRE PALMS D · BORHADEWADIRAJKUMARI GULAB CHOITHRAMANI · P52100002144 · possession Sept 2022 · 63.6% built · 2 complaints
- Nilay · HaveliSiddhivinayak Developers · P52100002147 · possession Dec 2022 · 78.8% built · 1 complaint
- Atlantis · Pune (M Corp.)Manoj Yeole Ramdas Yeole · P52100002148 · possession Sept 2020 · 49.5% built
- Sunrise Enclave · Pimpri Chinchawad (M Corp.)Sunrise Realtors · P52100002153 · possession Dec 2019 · 65.9% built
- SUNWINDS COMMERCIAL · Bavdhan Kh.SANIKET INFRASTRUCTURES · P52100002154 · possession Dec 2018 · 90.9% built
- Tanishq Vlasta · Alandi RuralTanishq Realities · P52100002155 · possession Dec 2026 · 78.8% built · 24 complaints
- BHAKTI GENESIS D WING · SHEDGE WASTIMAHAVIR CONSTRUCTIONS AND DEVELOPERS · P52100002159 · possession Sept 2018 · 81.8% built
- IRA C BUILDING PHASE 2 · UNDRIM/S MAJESTIQUE MANTRA INCORPORATION · P52100002163 · possession Dec 2017 · 90.9% built
- Aundh Riviera · HaveliSujay Shirish Bhansali · P52100002165 · possession Sept 2020 · 90.9% built
- B WING · HaveliDHANOTTAM VASANT LONKAR · P52100002168 · possession Dec 2017 · 100% built
- Sapphire Greens · WaksaiShreem Corporation · P52100002171 · possession Jun 2019 · 78.2% built
- Sara Metroville A phase II · PunawaleSara Infrastructures · P52100002174 · possession Jun 2022 · 81.8% built
- Ved - Ashritha Phase I · KatrajYogvinda Promoters & Developers Pvt. Ltd. · P52100002175 · possession Oct 2023 · 40.9% built
- ZIGGURAT H Building · AmbegaonM/S BUILT UP · P52100002178 · possession Mar 2019 · 86.6% built
- Sarthak Belva · PISOLISarthak Ventures · P52100002181 · possession Sept 2022 · 100% built
- Aarambh · Pimpri Chinchawad (M Corp.)YASHADA NIVASA ASSOCIATES · P52100002191 · possession Dec 2019 · 81.8% built
- SAI PARADISE · PunavaleSHIV CONSTRUCTIONS · P52100002193 · possession Dec 2021 · 94.5% built · 4 complaints
- SARA A BUILDING · BanerAnshul Megaprojects LLP · P52100002199 · possession Apr 2019 · 90.9% built
- Swapna Yog · Daund (CT)Jadhav engg. & Associate · P52100002202 · possession Dec 2017 · 90.9% built
- ANAND AASHRAY · Pimpri Chinchawad (M Corp.)ANAND ENTERPRISES · P52100002204 · possession Dec 2019 · 90.9% built · 3 complaints
- VIVANTA LIFE VERONIKA · Pimpale SaudagarVIVANTA REALTY · P52100002206 · possession Nov 2021 · 90.9% built
- Belcastel Phase II · MundhwaSancheti Properties · P52100002211 · possession Dec 2018 · 100% built
- WINSPIRE · kondhwa khurdK & S Associates · P52100002214 · possession Jun 2018 · 90.9% built
- SOMANI RESIDENCY · PunawaleNITIN PRABHUDAS SOMANI · P52100002216 · possession Mar 2018 · 65% built
- ECO PARK · CHARHOLIDELIGHT DEVELOPERS · P52100002220 · possession Dec 2021 · 90.9% built · 2 complaints
- SILVANACOUNTY · CHARHOLIDIAMOND PROPERTIES · P52100002224 · possession Dec 2019 · 85.9% built
- LOVE NEST · chikhaliARROW REALTY · P52100002225 · possession Dec 2021 · 100% built
- BELLEZZA · Pimpri Chinchawad (M Corp.)SIDDHISHREE BUILDCON · P52100002229 · possession Dec 2018 · 81.8% built
- LIFE MAXIMA PHASE 2 · HaveliPate Future Constructions LLP · P52100002233 · possession Feb 2023 · 69% built · 1 complaint
- MOUNTAIN RAGA · HaveliALACRITY DEVELOPERS PROMOTERS AND BUILDERS · P52100002239 · possession Jul 2019 · 90.9% built
- Marvel Aurum · Pune CityMARVEL REALTORS AND DEVELOPERS LTD · P52100002240 · possession Jun 2018 · 78.9% built
- SWASTIK SHRUSHTI · Pimpri Chinchawad (M Corp.)SWASTIK ASSOCIATES · P52100002248 · possession Dec 2021 · 14.7% built · 1 complaint
- Shreemanyogi · Pimpri Chinchawad (M Corp.)MORNING STAR REALITIES · P52100002250 · possession Dec 2019 · 86.4% built
- LOTUS BUILDING A3 · YAWALEWADIORIENT SHIVAM DEVELOPERS · P52100002253 · possession Oct 2020 · 90.9% built · 1 complaint
- Bramha Vantage C · BavadhanBramhacorp Limited · P52100002254 · possession Dec 2022 · 85.5% built · 1 complaint
- Runal Elanza · Pimpri Chinchawad (M Corp.)Rajendra Suresh Jain · P52100002255 · possession Jun 2019 · 100% built
- ARTEMIS · Wadgaon BkCALYX ESTATES · P52100002256 · possession Jun 2019 · 90.9% built · 3 complaints
- ANANDBAN · ravetM/s. Govardhan Developers · P52100002259 · possession Aug 2018 · 90.9% built
- GIRNAR 108 · HaveliPADMAVATI BUILDERS · P52100002263 · possession Oct 2019 · 90.9% built
- Dreamcastle · WakadSancheti Space · P52100002264 · possession Jun 2019 · 84.8% built
- EVEREST PLAZA · JADHAVWADICHOICE DEVELOPERS · P52100002269 · possession Dec 2022 · 90.9% built · 1 complaint
- SOMANI DREAM HOME PHASE - 1 · PunawaleFAST REALTY PVT LTD · P52100002272 · possession Dec 2021 · 32.5% built
- Ivory Tathastu · KhedIvory Lifespace LLP · P52100002274 · possession Dec 2026 · 67.3% built
- Clover Casablanca Phase II · MawalWorthwhile Properties Pvt. Ltd. · P52100002277 · possession Dec 2019 · 90.9% built
- LAKE TOWER · HaveliTUSHAR PRAMOD NAGARKAR · P52100002281 · possession Apr 2026 · 100% built
- MAINLAND VALENCIA · WAGHOLIMainland Builders LLP · P52100002282 · possession Dec 2018 · 100% built
- Piyusha · Pune (M Corp.)Amol Ajit Ravetkar · P52100002284 · possession Mar 2019 · 60% built
- GAJSHEELA · Talegaon Dabhade (M Cl)SHASHIKANT LAXMAN BHAGAT · P52100002285 · possession Mar 2019 · 38.6% built
- Ashirwad The Living B Wing · Pimpri Chinchawad (M Corp.)Ashirwad Associates · P52100002288 · possession Jul 2018 · 100% built · 1 complaint
- NYATI EMBRACE I · UNDRINITIN DWARKADAS NYATI · P52100002290 · possession Jul 2024 · 39.4% built
- AMBIENCE GREENDALE WING D · Pune CityAmbience Developments · P52100002295 · possession Sept 2023 · 100% built
- KALASH PHASE 2 WING A AND B · Kasar AmboliKalyanee Fortune Properties · P52100002296 · possession Jul 2019 · 33.6% built
- ROHAN MADHUBAN II WINGS A B C · Pune CityRohan Promoters & Developers · P52100002297 · possession Dec 2021 · 90.9% built
- Venkatesh Imperia Phase II · PunawaleRajHeramb Properties · P52100002301 · possession Jun 2022 · 90.9% built
- DISCOVERY PHASE - II · KUNENAMA, KUNEGAONS2 REALTY AND DEVELOPERS PRIVATE LIMITED · P52100002302 · possession Mar 2023 · 81.8% built · 1 complaint
- RIDDHI SIDDHI TOWER A BUILDING · CHARHOLIR R LUNKAD BUILDERS AND PROMOTERS · P52100002304 · possession Apr 2018 · 90.9% built
- ROHAN MADHUBAN II WINGS D E · Pune CityRohan Promoters & Developers · P52100002307 · possession Dec 2022 · 90.9% built · 1 complaint
- Nisarg Serene · WakadAkruti Buildcon · P52100002312 · possession Jun 2018 · 100% built
- S3 PRIME · SusS-3 PROPERTIES · P52100002314 · possession Jun 2019 · 60% built
- Prathamesh Residency · CHARHOLISiddhivinayak Developers · P52100002315 · possession Feb 2018 · 85.5% built
- PRISTINE VIVA · MOHAMMADWADISACHIN ISHWARCHAND GOYAL · P52100002319 · possession Mar 2019 · 90.9% built
- SUNWINDS RESIDENTIAL · BAVDHAN KHURDSANIKET INFRASTRUCTURES · P52100002322 · possession Dec 2019 · 81.8% built
- CLOVER HILLS PLAZA · NIBM roadClover Buildcorp · P52100002324 · possession Dec 2022 · 50% built
- SNEHAVISHWA APARTMENTS · Pune (M Corp.)SNEHAVISHWA ASSOCIATES · P52100002326 · possession Jun 2018 · 100% built
- Kiarah Terrazo · HaveliWellwisher Apartment · P52100002327 · possession Dec 2021 · 57.7% built · 4 complaints
- Kalp Residency C Wing · ChakanKalp Buildtech · P52100002332 · possession Dec 2019 · 81.8% built
- ARJUN HEIGHTS · HaveliSHRIRANG DNYANOBA DHODADE · P52100002334 · possession Dec 2024 · 81.8% built · 1 complaint
- KAMAL RESIDENCY · Talegaon Dabhade (R)ADITYA ASSOCIATES · P52100002337 · possession Mar 2019 · 60.9% built
- Jaymala Business Court · mANJRISatyam Constructions · P52100002339 · possession Apr 2019 · 81.8% built
- Bzone · HaveliVineet Krishnakumar Goyal · P52100002340 · possession Sept 2019 · 100% built · 1 complaint
- JEWELS ROYALE · GANESH BAUGJEWEL DEVELOPMENT CORP · P52100002343 · possession Dec 2021 · 90.9% built
- KUTUMB PRIME · MawalNAIKNAVARE BUILDCON PVT LTD · P52100002348 · possession Jun 2024 · 60.5% built
- Saheels Fortune Park II · PUNENeev Sai Associates · P52100002349 · possession Dec 2019 · 90.9% built
- AKSHAY CITY A AND B BUILDING · MawalRAJENDRA RAMANLAL LUNAKD · P52100002357 · possession Nov 2020 · 86.4% built
- SAVANNA HILLS · MulshiBHALERAO BROTHERS AND ASSOCIATES · P52100002361 · possession Dec 2027 · 64.5% built
- GAGAN CEFIRO PHASE 2 · UndriGAGAN UNNATI PROMOTERS · P52100002365 · possession Mar 2019 · 90.9% built
- Windermere Phase 2 · HaveliVascon Engineers Ltd · P52100002368 · possession Mar 2019 · 80% built · 2 complaints
- Marvel Ganga Sangria G,H,J Building · MOHAMMADWADIMARVEL LANDMARKS PVT LTD · P52100002371 · possession Dec 2019 · 95.2% built · 15 complaints
- GREEN GLORY B WING · MawalShree Mahalaxmi Group · P52100002374 · possession Sept 2021 · 73.5% built
- Shankeshwar Dang Ikon Phase 2 · Pimpri Chinchawad (M Corp.)Shree Shankeshwar Atharva Properties · P52100002375 · possession Dec 2021 · 72.7% built
- SWAPNASHILP · KALAJEWADIKALAJE ASSOCIATES · P52100002380 · possession Feb 2021 · 72.7% built
- PARVATARA PHASE 1 · HaveliSaakshi Constructions · P52100002385 · possession Dec 2021 · 92.7% built
- Goodwill Palette · RavetIra Ventures · P52100002390 · possession Oct 2019 · 76.4% built
- SUBURBIA ESTATE PHASE 1 · HaveliSSG REALTY AND INFRA LLP · P52100002391 · possession Feb 2027 · 71.8% built · 128 complaints
- Shriram Vihar · Pimpri Chinchawad (M Corp.)Shau Associates · P52100002393 · possession Jan 2020 · 79.5% built
- Leisure Town Phase 1 · HaveliSai Proviso Homes · P52100002395 · possession Dec 2026 · 84.5% built · 59 complaints
- AISHWARYAM HAMARA PHASE I · HaveliSAI ESSEN DEVELOPERS · P52100002396 · possession Jun 2022 · 100% built
- ONE MALL · Pimpri Chinchawad (M Corp.)NIRMAN PROPERTIES · P52100002399 · possession Dec 2019 · 42.7% built
- ONENESS · -NIRVAAN COS ASSOCIATES · P52100002401 · possession Oct 2020 · 100% built
- Allure · WagholiDreamland Venture · P52100002402 · possession Jun 2022 · 86.4% built
- ADORN BUSINESS CENTRE · Pune CityHASIB AHMED SHAIKH · P52100002403 · possession Sept 2018 · 81.8% built
- ATULYA RACHANA · KRANTINAGARRAJNANDINI DEVELOPERS · P52100002404 · possession Dec 2019 · 90.9% built
- Sanjeewani · ThergaonJ J SHELTERS · P52100002408 · possession Dec 2017 · 81.8% built
- Devayani Residency · BibwewadiYashodhan Associates · P52100002412 · possession Dec 2021 · 90.9% built · 13 complaints
- ARV Imperia C, D and E Building · PisoliVEDANT BUILDCON · P52100002415 · possession Dec 2018 · 100% built · 28 complaints
- Green City · HaveliAJIT GIRDHARILAL NAHAR · P52100002420 · possession Dec 2021 · 100% built
- TRANQUIL PARK · LOHGAONLEGACY LANDMARKS PVT LTD · P52100002421 · possession Jun 2022 · 75.9% built · 1 complaint
- Nirman Ajinkyatara · Ambegaon BudrukNIRMAN DEVELOPERS · P52100002423 · possession Dec 2018 · 72% built · 1 complaint
- SNEH SHRADDHA · Dhayari (Part)M/S. K K CONSTRUCTION · P52100002426 · possession Jul 2018 · 56.8% built
- KUSUM KUNJ · MANJARI BkKUSUM ASSOCIATES · P52100002431 · possession Jul 2019 · 100% built
- Marvel Castella A And B Building · BalewadiMARVEL SIGMA HOMES PRIVATE LIMITED · P52100002438 · possession Jun 2022 · 0% built · 6 complaints
- Gagan Ela · MohammadwadiGagan Landmarks LLP · P52100002439 · possession Jun 2025 · 76.2% built · 6 complaints
- Sonigara Neelangan · CHIKHALIKIRANRAJ KESARIMAL SONIGARA · P52100002447 · possession Mar 2023 · 100% built
- Mont Vert Avion · PashanNiraj Kumar Associates Pvt Ltd · P52100002448 · possession Jul 2018 · 90.9% built
- Mont Vert Belbrook · MulshiMont Vert Elegance · P52100002449 · possession Jun 2022 · 93.9% built
- GREEN HIVE B1 · HaveliRAM INDIA SHELTERS · P52100002453 · possession Dec 2018 · 81.8% built
- PRAJOL ICON · HaveliRAJESH MARUTI KADAM · P52100002454 · possession Dec 2018 · 16.4% built
- AISHWARYA RESIDENCY · BanerVYAS BUILDCON PVT. LTD. · P52100002455 · possession Dec 2018 · 72.4% built
- AARAMBH · HaveliPANDHARINATH VITTHAL JAMBHALKAR · P52100002457 · possession Dec 2019 · 76.4% built
- WHITEFIELD PHASE 1 · SusBALAJI ALLIANCE DEVELOPERS LLP · P52100002460 · possession Dec 2019 · 61.2% built
- Vistaar Shubharambh · BalewadiMarathwada Developers · P52100002463 · possession Dec 2018 · 81.8% built
- FAVOLOSA · Pune (M Corp.)ABHILASHA DEVELOPERS · P52100002469 · possession Mar 2019 · 66.6% built
- DREAMS ROYALE · pimpriDREAM HOMES · P52100002470 · possession Dec 2019 · 81.8% built
- Engracia · HaveliJagtap Patil Promoters & Builders · P52100002471 · possession Dec 2019 · 81.8% built
- VISION ETERNITY · MarunjiVISION DEVELOPERS · P52100002472 · possession Feb 2021 · 90.9% built
- PEARL REALTY · LonavalaAMIR VEERJI BHANWADIA · P52100002473 · possession Dec 2028 · 47.3% built
- SHUBHKALASH B WING · ChikhaliTulip Developers · P52100002475 · possession Jun 2022 · 90.9% built
- REFLECTIONS BUILDING B · ThergaonSIDDHARTH KANTILAL KHINVASARA · P52100002479 · possession Dec 2023 · 100% built
- Rohit Palms · Pimpri Chinchawad (M Corp.)Rohit Infra · P52100002481 · possession Mar 2018 · 90.9% built
- DISHA PRIMO · ShirurJAY GANESH CORPORATE · P52100002486 · possession Oct 2019 · 45.6% built
- SAI MAJESTIC · WakadS S DEVELOPERS · P52100002487 · possession Dec 2017 · 55% built
- RIDDHI SIDDHI HEIGHTS · WakadR R LUNKAD BUILDCON · P52100002501 · possession Jul 2018 · 97.7% built
- Tulsai Heights · BhosariSachin Kishanrao Padwal · P52100002513 · possession Dec 2017 · 90.9% built
- Marvel Ganga Sangria K,L,M Building · MOHAMMADWADIMARVEL LANDMARKS PVT LTD · P52100002514 · possession Dec 2020 · 72.4% built · 14 complaints
- Citrine · MarunjiAchalare Welworth Associates · P52100002515 · possession Sept 2019 · 90.9% built · 4 complaints
- Lotus Pearls · MamurdiSwayambhu Properties · P52100002516 · possession Dec 2023 · 14.5% built
- 1 Nere Residency · NERERajHeramb Landmarks · P52100002517 · possession Jun 2022 · 88.2% built · 2 complaints
- YASH SQUARE · Pune (M Corp.)S.K.DEVELOPERS · P52100002520 · possession Oct 2018 · 100% built
- PALAASH RHYTHM · chinchwadSPBDEVELOPER · P52100002524 · possession Dec 2021 · 9.1% built
- Panchshil Towers · WagholiPanchshil Infrastructure Holdings Pvt. Ltd. · P52100002528 · possession Dec 2026 · 87.6% built · 5 complaints
- ORIANA · BanerM/S.Kishor Builders Promoters And Developers · P52100002537 · possession Mar 2018 · 81.8% built
- Sanghvi Shells · BanerMukesh Shantilal Sanghvi · P52100002539 · possession Feb 2018 · 72.7% built
- Kunal Aspiree Phase III · balewadiKunal Spaces Pvt Ltd · P52100002540 · possession Jun 2022 · 100% built
- NISARG RESIDENCY WING A · Baramati (M Cl)SHREE DATTAKRUPABUILDERS AND DEVELOPERS · P52100002548 · possession Sept 2019 · 78.2% built
- SAHARA PEARL · Sasvad (M Cl)SAHARA BUILDCON · P52100002551 · possession Dec 2019 · 90.9% built
- Skyways Sereno · LOHGAONPranam Associates · P52100002552 · possession Dec 2018 · 85.8% built
- SOHAM PURANDAR HEIGHTS · HadapsarSOHAM PROPERTIES · P52100002553 · possession Sept 2018 · 37.3% built
- Swarnavilas Phase 1 · PashanSachin vitthal Nimhan · P52100002565 · possession Dec 2017 · 90.9% built
- Stanza · PunawaleSaarrthi Blue Ventures LLP · P52100002571 · possession Jan 2021 · 90.9% built
- Hubtown Countrywoods Building 2 · Tilekar Nagar Kondhwa BudrukAckruti Jay Developers · P52100002575 · possession Jul 2019 · 86.3% built · 1 complaint
- SILVER HEIGHTS · MawalTITANIC PROMOTERS AND DEVELOPERS · P52100002577 · possession Dec 2018 · 36.4% built · 1 complaint
- MANTRA CITY 360 PHASE05 · TALEGAONMANTRA ISLAND HOMES TALEGAON LLP · P52100002595 · possession Oct 2019 · 100% built
- Tinsel County Phase I · PUNEGrow India Realcon LLP · P52100002596 · possession Feb 2021 · 100% built · 1 complaint
- ESTONIA · Pune CityS.S. PROPERTIES · P52100002601 · possession Dec 2026 · 90.9% built
- EMEZEKA PARK · JadhavwadiINDRA PROPERTIES · P52100002604 · possession Dec 2021 · 90.9% built · 1 complaint
- Yashada Residency · DaundAgresar Construction · P52100002610 · possession Dec 2018 · 37.2% built
- Uttam Townscapes · HaveliFORTUNE DEVELOPERS AND INFRASTRUCTURES · P52100002613 · possession Aug 2018 · 89.3% built
- DURVANKUR RESIDENCY PHASE-2 · WAGHOLIRAJESH SADHURAM GURNANI · P52100002617 · possession Jun 2018 · 59.1% built
- GANGA AMBER PH I · TathawadeSHRI SIDDHIVINAYAK DEVELOPERS · P52100002620 · possession Apr 2023 · 90.9% built · 22 complaints
- PRATIBHA SADAN CO. OP. HSG. SOC. · KothrudVYAS BUILDCON PVT. LTD. · P52100002624 · possession Mar 2019 · 85.5% built
- Ekunj Residency · Pune (CB)Madhuban Infracon and Developers · P52100002630 · possession Dec 2018 · 81.8% built
- Avenue Imperia · BanerAvenue Buildcon · P52100002633 · possession Oct 2020 · 35% built
- Anika Mangalam · Pune CityArun Sheth Properties · P52100002636 · possession Dec 2018 · 90.9% built
- MANTRA 24WEST PHASE 2 · GahunjeMANTRA ERECTORS AND BUILDERS LLP · P52100002639 · possession Dec 2022 · 100% built · 2 complaints
- GAYATRI SQUARE · HaveliSWASTIK BUILDCON · P52100002643 · possession Sept 2020 · 100% built
- Renuka Tulsi Phase II · CHINCHWADRenuka Constructions · P52100002644 · possession Dec 2019 · 90.9% built
- Life Republic Sector R1 - 1st Avenue · MulshiKOLTE-PATIL DEVELOPERS LIMITED · P52100002646 · possession Dec 2027 · 86.2% built
- MEGHMANAS · Pune CityRANJEKAR REALTY · P52100002654 · possession Dec 2017 · 96.8% built
- SAI PARADISE · BanerHaresh Premchand Chandwani · P52100002660 · possession Dec 2021 · 72.6% built
- Basil Park A and B Wing · HaveliM/s Yogesh Enterprises · P52100002663 · possession Dec 2018 · 81.8% built
- Aldea Annexo - C2 · Near Puraniks Aldea EspanolaPuranik Builders Limited · P52100002665 · possession Dec 2026 · 90.9% built · 1 complaint
- ATHASHRI BANER COMMERCIAL · BanerPARANJAPE SCHEMES (CONSTRUCTION) LTD · P52100002667 · possession Dec 2018 · 81.8% built
- Silver Brooke Wing B · Bavdhan Kh.Behede Properties LLP · P52100002677 · possession Sept 2019 · 86.4% built
- ALLIANCE MANAS · Pune (M Corp.)ALLIANCE BUILDERS and DEVELOPERS · P52100002679 · possession Dec 2018 · 58.2% built · 1 complaint
- INFINITY TOWER A WING · PunawalePURPLE BUILDCON · P52100002680 · possession Jun 2019 · 75.7% built
- PLOT NO.7, VIVA, PIRANGUT · PirangutPACT REAL ESTATE PRIVATE LIMITED · P52100002681 · possession Dec 2023 · 56.4% built
- Life Republic Sector R2 - 2nd Avenue · MarunjiKOLTE-PATIL INTEGRATED TOWNSHIPS LIMITED · P52100002682 · possession Sept 2020 · 78.2% built
- Goodwill Nirmiti A Building · LOHGAONUnique Choice Ventures · P52100002683 · possession Oct 2018 · 90.9% built
- Ohaana Homes · Pimpri Chinchawad (M Corp.)Kamesh Builders · P52100002688 · possession May 2018 · 100% built
- Hubtown Countrywoods Building 5 · Tilekar Nagar Kondhwa BudrukHubtown Limited · P52100002695 · possession Jul 2023 · 51.5% built
- Undri City Centre · UndriUKT Constructions · P52100002700 · possession Oct 2020 · 100% built
- PLOT NO. 10, VIVA,PIRANGUT,PUNE · PirangutPACT REAL ESTATE PRIVATE LIMITED · P52100002702 · possession Oct 2024 · 72.1% built
- COLLINA · KanheBHARUCHA & SONS REALTORS & DEVELOPERS PVT LTD · P52100002704 · possession Mar 2022 · 89.1% built · 2 complaints
- Playtor Paud D- Phase 1 · Next to Tehsil OfficeSANGAM REALTY · P52100002705 · possession Jun 2023 · 25.4% built · 3 complaints
- PARVATARA PHASE 2 · HaveliSaakshi Constructions · P52100002707 · possession Dec 2027 · 71.5% built
- Eklavya Skylark · HaveliEklavya Builders Private Limited · P52100002715 · possession Dec 2027 · 95% built · 1 complaint
- SPRING VALLEY PHASE I · CHARHOLISHUBH GANESH PROPERTIES · P52100002725 · possession Dec 2019 · 100% built
- Westernhills V1 - V9 · SusHigh Seas Properties Private Limited · P52100002728 · possession Dec 2021 · 89.1% built
- Hubtown Countrywoods Building 3 · Tilekar Nagar Kondhwa BudrukHubtown Limited · P52100002733 · possession Dec 2019 · 82% built
- Celestine · Pune CityLotus Construction · P52100002736 · possession Dec 2019 · 39.4% built
- ARV Newtown · PisoliVedant Infracon · P52100002738 · possession Dec 2021 · 90.9% built
- LINEA · HadapsarRajeev Shivnath Sonkar · P52100002743 · possession Jun 2023 · 45.8% built · 1 complaint
- OM PARADISE B AND C WING · KIWALES K BUILDCON · P52100002744 · possession Dec 2017 · 72.7% built
- STELLA · MOSHIDMK INFRASTRUCTURE PVT LTD · P52100002747 · possession Feb 2019 · 100% built · 2 complaints
- ESTIQUE PHASE I · BanerKHANDVE PATIL CONSTRUCTIONS · P52100002751 · possession Dec 2019 · 100% built
- Mont Vert Belair · MulshiMont Vert Elegance · P52100002756 · possession Dec 2021 · 100% built
- Vitthal Residency · Pimpri Chinchawad (M Corp.)Sandeep Tukaram Raut · P52100002758 · possession Oct 2020 · 90.9% built
- 1 Hallmark Avenue Phase I · RavetRajHeramb Properties · P52100002760 · possession Jun 2019 · 89.1% built
- SHILOH · Pune CityVIRAJ PROPERTIES · P52100002763 · possession Dec 2018 · 55.8% built
- Pari Towers · NarheUrban Homes Realty · P52100002767 · possession Dec 2022 · 90.9% built · 2 complaints
- NISARG · chakanKULSWAMINI ASSOCIATES PROMOTOERS AND BUILDERS · P52100002785 · possession Dec 2022 · 90.9% built
- Bella Casa · HaveliVEER REALITY · P52100002786 · possession Dec 2021 · 90.9% built
- Swapnanagari Phase 1 · Sasvad (M Cl)SANJAY DNYANOBA JAGTAP · P52100002791 · possession Dec 2018 · 87.3% built
- MANTRA 7 HILLS PHASE I · HaveliMANTRA BUILDCRAFTS PRIVATE LIMITED · P52100002795 · possession Dec 2022 · 100% built
- Venkatesh Imperia Phase I · PCMCRajHeramb Properties · P52100002796 · possession Jun 2019 · 90.9% built
- Aapla Ghar Paud 2 Phase I · PaudPhoenix Ventures · P52100002798 · possession Dec 2023 · 12.7% built · 1 complaint
- Mukti Nakshtra E and H bldg · Baramati (M Cl)Mukti Township Development & Construction Co. Pvt. Ltd. · P52100002811 · possession Dec 2017 · 81.8% built
- Greens - Beech - GH · ChinchwadAMJ Land Developers · P52100002813 · possession Oct 2018 · 72.7% built
- SAI ESHANYA · BANERMANIKCHAND VASUDHA DEVELOPERS · P52100002815 · possession Mar 2019 · 90.9% built · 1 complaint
- Silver Mist C, D Building · LOHGAONNIRMAN BUILDCON · P52100002817 · possession Jun 2018 · 90.9% built
- 9 Sadashiv C building · Pune CityPinnacle Neostar Corporation Pvt. Ltd. · P52100002820 · possession Dec 2026 · 78.6% built
- NEETI HERITAGE · Pune (M Corp.)NEETI CONSTRUCTION · P52100002822 · possession Dec 2020 · 67.3% built
- AKASH RAJ PHASE ONE · Pimpri Chinchawad (M Corp.)NIRMAN PROPERTIES · P52100002839 · possession Aug 2018 · 79.1% built
- ICONIA Phase II · Pimpri Chinchawad (M Corp.)Kunal Sulakshan Associates · P52100002850 · possession Jun 2018 · 90.9% built
- Vastu Nirvana · Pune CityNirvana Builders · P52100002857 · possession May 2019 · 65.5% built
- SHIVPURAM A PLOT A · HaveliLUNKAD VISHWA DEVELOPERS · P52100002861 · possession Dec 2019 · 81.8% built
- Samrudhee Malhar · Sasvad (M Cl)SAMRUDHEE HOMES · P52100002866 · possession Dec 2019 · 77.3% built
- MELANGE RESIDENCES - PHASE I · Hinjawadi Phase IIIRAMA SYNERGY SPACES · P52100002877 · possession Dec 2018 · 91.8% built · 1 complaint
- Bellacasa · SusRachana Lifespaces · P52100002878 · possession Dec 2021 · 100% built
- MANTRA CITY 360 PHASE03 · TALEGAONMANTRA ISLAND HOMES TALEGAON LLP · P52100002880 · possession Oct 2021 · 88.2% built
- FLORENCIA PHASE 1 · WakadSHUBHAM ASSOCIATES · P52100002881 · possession Jun 2022 · 72.7% built
- Lakshmi Plaza Building D · HaveliIndus Realty · P52100002883 · possession Jan 2019 · 58.2% built
- ELEMENTA · TathwadeAKSHAR LAND DEVELOPERS PRIVATE LIMITED · P52100002903 · possession Dec 2018 · 89.1% built
- PARK PLAZA WING A · HOHGAONPPR CONSTRUCTION LLP · P52100002914 · possession Dec 2019 · 55.7% built
- Atrium Skyward · Hole VastiATRIUM HOMES LLP · P52100002923 · possession Dec 2021 · 90.9% built · 1 complaint
- SHRAVANDHARA · KothrudKIRTIVARDHAN DEVELOPERS AND BUILDERS · P52100002928 · possession Feb 2021 · 72.7% built
- IMPERIO · Pimpri Chinchawad (M Corp.)BLUESTONE PROPERTIES · P52100002929 · possession Dec 2018 · 52.7% built
- GAGAN NULIFE PHASE 2 · KamshetGAGAN LIFESPACE · P52100002941 · possession Jun 2027 · 74.1% built · 41 complaints
- Park Land - 1 - i · Pune CityYashvastu Developers · P52100002945 · possession Dec 2021 · 74.4% built
- KASTURI PRIDE · Near Varad Vinayak ApartmentGOVIND VASANT SANGALGIKAR · P52100002948 · possession Jul 2019 · 90.9% built
- NANDINI BELLUS · MANJARI BkVENUS INFRA · P52100002950 · possession Dec 2021 · 52.3% built · 1 complaint
- SAI SNEH PHASE-II · Pimpri Chinchawad (M Corp.)GS DEVELOPERS · P52100002952 · possession Aug 2018 · 63.6% built
- KESHAV CAPITAL · MundhawaSAMARTHSHREE PROMOTERS AND DEVELOPERS · P52100002968 · possession Mar 2018 · 51.9% built · 1 complaint
- Kamalraj Datta Vihar A Bldng · MOSHIKAMALRAJ ESTATE · P52100002971 · possession Dec 2021 · 90.9% built
- BHAKTI GULMOHAR · Talegaon Dabhade (M Cl)MEGHASWANA INFRA · P52100002983 · possession Dec 2018 · 45.5% built
- ADITYA VIHAR · Talegaon Dabhade (R)ADITYA ASSOCIATES · P52100002988 · possession Sept 2018 · 82.7% built
- SHREE JALARAM PARK · PuneMEHTA KISHOR ASSOCIATES · P52100002995 · possession Dec 2021 · 100% built
- Aapla Ghar Moshi Annex Phase I · KhedMaple Shelters Pvt. Ltd. · P52100002998 · possession Dec 2027 · 65% built · 6 complaints
- CASA FELIZ - PHASE I · Pune (M Corp.)SHUBH CORPORATION · P52100003013 · possession Jul 2018 · 100% built · 10 complaints
- Fortune Spaces · Pimpri Chinchawad (M Corp.)Fortunespaces · P52100003020 · possession Dec 2017 · 90.5% built
- REELICON KIAN · AMBEGAON BKJKDEVELOPERS · P52100003028 · possession Dec 2019 · 54.5% built
- SHREERAM TRADECON · ChakanSHREERAMTRADECON · P52100003029 · possession Dec 2018 · 65% built
- Ganesh Park · AMBEGAON BkGanesh Developers & Company · P52100003030 · possession May 2018 · 44% built
- SAI AURA · KiwaleSHREE SAI CREATIONS · P52100003031 · possession Sept 2020 · 78.8% built
- SHREERAM MAREEGOLD · LOHGAONR.G.DEVELOPERS · P52100003038 · possession Dec 2019 · 27.3% built
- MELANGE RESIDENCES - PHASE II · Hinjawadi Phase IIIRAMA SYNERGY SPACES · P52100003047 · possession Dec 2020 · 87.7% built
- Aura City D11,D12 · ShirurBhagvati infra · P52100003048 · possession Aug 2018 · 76.4% built · 2 complaints
- Goodwill Nirmiti B Building · LOHGAONUnique Choice Ventures · P52100003051 · possession May 2019 · 58.2% built
- MANTRA INSIGNIA COMMERCIAL PHASE 2 · KESHAVNAGARMANTRA INSIGNIA LLP · P52100003056 · possession Dec 2021 · 100% built
- XRBIA EIFFEL CITY CHAKAN PH2 · ChakanXRBIA CHAKAN DEVELOPERS PRIVATE LIMITED · P52100003059 · possession Mar 2022 · 86.8% built · 46 complaints
- THE RIDGES PHASE I · BhugaonVENKATESHWARA ASSOCIATES · P52100003060 · possession Aug 2019 · 41.8% built · 7 complaints
- Mount Castel · WAGHOLISancheti Space · P52100003062 · possession Dec 2021 · 90.9% built
- OM SAI HEIGHTS · JunnarOM SAI DEVELOPERS · P52100003063 · possession Dec 2019 · 49.1% built
- Aura City D1,D2 · ShirurBhagvati infra · P52100003069 · possession Aug 2018 · 76.4% built
- EVA C BUILDING · Bavadhan BKM/S KARAN SANRAN ASSOCIATES · P52100003070 · possession Apr 2019 · 100% built
- Saloni · ErandwaneGokhale Constructions · P52100003071 · possession Dec 2019 · 100% built
- HILL VIEW · WAGHOLISAI BUILDERS · P52100003073 · possession Mar 2018 · 90.9% built
- PRATHAMESH SYLVATICA · BanerPrathamesh constructions · P52100003074 · possession Dec 2019 · 100% built
- RUTURANG SHRAVAN BUILDING G · PARVATIA.K.SURANA DEVELOPERS-G · P52100003075 · possession Dec 2021 · 99.9% built
- Amoda Reserve - South Park · Kune N.m.Kalpataru Properties (Thane) Private Limited · P52100003084 · possession Dec 2026 · 50% built · 1 complaint
- ZIGGURAT G Building · AmbegaonM/S BUILT UP · P52100003097 · possession Dec 2019 · 77.6% built
- SAPTASUR · KothrudBHAGIRATHI GROUP · P52100003100 · possession Dec 2019 · 90.9% built
- AVALON CITY C-3 · HaveliClassic Promoters and Builders Private Limited · P52100003105 · possession Dec 2021 · 81.8% built · 1 complaint
- Morphic Arham · MukundnagarMorphic Developers · P52100003108 · possession Dec 2019 · 90.9% built
- Vishwakarma Business centre · Pune CityWhite Castle Realty · P52100003114 · possession Aug 2019 · 70.5% built
- 11 PARK STREET A WING · PisoliTRIMURTI HOUSING · P52100003117 · possession Jun 2022 · 90.9% built
- VANTAGE · BanerRUCHA PROMOTERS & DEVELOPERS PVT.LTD · P52100003119 · possession Dec 2018 · 100% built
- Empier Estate · DaundRohit Builders · P52100003125 · possession Dec 2019 · 59.5% built
- Presidia · Mohammed WadiKundan Buildcon · P52100003128 · possession Dec 2025 · 100% built · 6 complaints
- Godrej Infinity · MUNDWAOXFORD REALTY LLP · P52100003129 · possession Sept 2020 · 89.1% built · 31 complaints
- Shine Square · Pimpri Chinchawad (M Corp.)Namoh Builders & Developers · P52100003130 · possession Dec 2019 · 75.9% built · 1 complaint
- GRANDEZA · HaveliKARMA PROPERTIES · P52100003131 · possession Dec 2018 · 100% built · 2 complaints
- PALMARIUS · BanerSAINATH BUILDCON · P52100003132 · possession Aug 2019 · 36.4% built
- Aloha Towers · BanerThe Bafana Group · P52100003134 · possession Dec 2020 · 100% built
- Eternia Phase 1 · HaveliVENTURESPRO PROJECTS LLP · P52100003139 · possession Nov 2020 · 66.7% built · 4 complaints
- ADORA · Pimpri Chinchawad (M Corp.)NEST KRISALA ASSOCIATES · P52100003141 · possession Mar 2019 · 81.8% built
- SUVIDHA DNYANGANGA PHASE-II · Wadgaon BudrukSUVIDHA PROJECTS · P52100003146 · possession Sept 2018 · 81.8% built
- STERLING BLOOMS · Pimpri Chinchawad (M Corp.)YASHADA GOVIND CITY CORPORATION · P52100003148 · possession Jun 2023 · 97% built
- BHONGADE PARK III · VaraleSHARAD BABANRAO BHONGADE · P52100003152 · possession Dec 2017 · 99.1% built
- Axisa · Pimpri Chinchawad (M Corp.)Maheshwari Developers · P52100003153 · possession Jun 2023 · 90.9% built
- Guardian Eastern Meadows - Phase 2 · HaveliGuardian Promoters & Developers Private Limited · P52100003157 · possession Dec 2026 · 62.3% built · 5 complaints
- SAIDHAM · Baramati (M Cl)Rajmata Construction · P52100003158 · possession Oct 2021 · 90.9% built
- AXIS VERTIGA · PUNEAXIS LIFESPACES LLP · P52100003159 · possession Nov 2021 · 90.9% built
- SAI VISHWA · RajuriEKNATH BHAU SHINDE · P52100003169 · possession Apr 2018 · 90.5% built
- ELLANZA PHASE-A · WADGAON BUDRUKMAHESH VITTHAL · P52100003171 · possession Jun 2019 · 74.4% built
- WESTBROOK · AMBEGAONTara Constructions · P52100003178 · possession May 2024 · 68% built · 14 complaints
- EMPPIRE ETERNITY · Pune (M Corp.)EMPPIRE PROPERTIES · P52100003185 · possession Mar 2019 · 41.8% built
- JAYHIND ICON · HaveliJAYHIND BUILDERS AND DEVELOPERS · P52100003193 · possession Jan 2020 · 89.3% built
- AMRUTVEL · Medankarwadi, KhedSHIVMUDRA ENTERPRISES · P52100003198 · possession Mar 2027 · 90.9% built · 1 complaint
- VANTAGE-9 · BanerSOHANLAL SHANKARLAL VISHNOI · P52100003199 · possession Jan 2021 · 90.9% built
- KUTUMB PRIME · MawalNAIKNAVARE BUILDCON PVT LTD · P52100003209 · possession Jun 2023 · 53.4% built
- Nav Nirmal · KothrudDigamber Parulekar · P52100003211 · possession Dec 2017 · 81.8% built
- Guardian Cityscapes Phase 1 · DattawadiGuardian Homes Private Limited · P52100003214 · possession Jun 2024 · 75.2% built · 4 complaints
- Cosmos Greens · DaundCosmos Realities · P52100003223 · possession Dec 2017 · 64.1% built
- PALAASH SADAPHULI · VaraleGS ASSOCIATES · P52100003228 · possession Jun 2024 · 90.9% built · 21 complaints
- GOLDEN BELLS PHASE II · HaveliPIONEER CONSTRUCTIONS · P52100003229 · possession Dec 2018 · 90.9% built
- Suyog Aura Phase II · HaveliShivram Developers · P52100003242 · possession Dec 2021 · 81.8% built
- MAGIA AVENUE · SAI-NAGAROM TIRUPATI DEVELOPERS · P52100003261 · possession Apr 2023 · 81.8% built
- ANURADDHA AT 168/27 · AmbegaonSUNGRACE INFRA PROJECTS · P52100003277 · possession Dec 2018 · 90.9% built
- Waves · WakadGokhale Constructions · P52100003292 · possession Dec 2021 · 60.6% built
- The Kings Way - A1, A2 and A3 · ghorpadiThe Kings Way AOP · P52100003300 · possession Dec 2024 · 96.8% built · 1 complaint
- SPRING HEIGHTS · AMBEGAON BkSHRI GANESH DEVELOPERS · P52100003315 · possession Dec 2018 · 75% built
- SAI PLANET · PunawaleM K ASSOCIATES · P52100003320 · possession May 2018 · 90.9% built
- KINJAL PRISTINE · KiwaleS N POTE CONSTRUCTION CO · P52100003327 · possession Nov 2022 · 100% built · 1 complaint
- MONARCH REGAL AND MAJESTIC · HaveliMONARCH BUILDERS AND DEVELOPERS · P52100003332 · possession Dec 2028 · 8.6% built · 11 complaints
- Hubtown Countrywoods Building 1 · Tilekar Nagar, Kondhwa BudrukAkruti Jay Developers · P52100003342 · possession Jul 2019 · 90.4% built · 2 complaints
- Orbit Bonneville · MOSHIB-Orbit Amparo Constructions PVT Ltd · P52100003348 · possession Dec 2019 · 90.9% built
- 33 keshav kunj · MundhawaCRYSTAL PROPERTIES · P52100003364 · possession Dec 2025 · 95.4% built
- JARDIN · Mahalungesanskruti life spaces · P52100003366 · possession Dec 2019 · 79% built
- FLORIA BUILDING A · Pune (M Corp.)AKSHAY CHINTAN BUILDERS · P52100003367 · possession Mar 2024 · 46.4% built
- VARDHAMAN VILLA · Pune CityVINOD PREMCHAND JAIN · P52100003372 · possession Dec 2018 · 63.5% built
- Apple Tree Cottage · puneSaraswati Constructions · P52100003385 · possession Jun 2019 · 72.6% built
- Avenue Daffodil · BanerAVENUE REALTY · P52100003389 · possession Dec 2025 · 81.7% built
- RUDRAKSHAM PH 1 · HaveliONKAR CONSTRUCTIONS · P52100003403 · possession Dec 2023 · 90.9% built
- Shubhankar Heights · HaveliSurekha Landmarks Private Limited · P52100003406 · possession Jul 2019 · 31.8% built
- GATHA AARAMBH · HaveliSAFFRON PROPERTIES · P52100003408 · possession Dec 2022 · 90.9% built
- SAI VELOCITY II · MulshiPRAKASH PANDURANG CHAVAN · P52100003410 · possession Dec 2027 · 73.6% built · 104 complaints
- AMBER ELITE · AMBEGAON BkADHAR LAND DEVELOPERS PVT. LTD. · P52100003416 · possession Dec 2017 · 90.9% built
- THE REGENT PARK · PUNEKAMDHENU INFRASTRUCTURE · P52100003421 · possession Apr 2018 · 92.9% built
- SHYAMNATH PALACE · WAGHOLISUNIL JANARDAN CHAVRE · P52100003425 · possession Dec 2017 · 25.9% built
- Guardian Cityscapes Phase 2 · DattawadiGuardian Homes Private Limited · P52100003427 · possession Jun 2025 · 81.8% built
- SHREEJI DREAMS · BhosariSHREEJI DEVELOPERS · P52100003437 · possession Jun 2019 · 43.6% built
- SURYASHRUSHTI · JunnarSURYAPUTRA DEVELOPERS · P52100003450 · possession Mar 2019 · 90.9% built
- BAPPA RESIDENCY · Hinjavadi (CT)STONE SHELTERS LLP · P52100003451 · possession Oct 2020 · 72.7% built
- DB Commercial Phase II · YerawadaPune Buildtech Private Limited · P52100003455 · possession Dec 2021 · 60.9% built · 2 complaints
- GULAB VISHWA · NARAYAN PETHBUTTEPATIL PROPERTIES · P52100003459 · possession Aug 2019 · 63.6% built
- Mandke Armaan 4th to 7th floor · VIMANNAGARM/s. Sudhir Mandke and Company · P52100003465 · possession Sept 2018 · 100% built
- SINHGAD PLANET B WING · NARHEANANT NARAYAN GANDALE · P52100003473 · possession Apr 2021 · 27.3% built
- DNV ARCELIA PH 2 · Pimpri Chinchawad (M Corp.)DNV REALTY · P52100003478 · possession Dec 2018 · 67.4% built
- Gopalkrupa · HaveliLAGOO APTE · P52100003479 · possession Dec 2018 · 81.8% built
- Suyog Nisarg Phase III · WAGHOLISuyog Nisarg JV · P52100003483 · possession Mar 2019 · 84.5% built · 4 complaints
- KUL Utsav Phase I -Building G · kondhwa BKKumar Builders · P52100003489 · possession Jun 2023 · 49.3% built
- Tathastu Paradise · HaveliROYAL DEVELOPERS · P52100003490 · possession Mar 2019 · 69.3% built
- BHAKTI MEERA · VaraleMEGHASWANA BHONGADE ASSOCIATES · P52100003491 · possession Dec 2021 · 9.3% built
- VARAD SUKRITI · Mukund NagarNEHA DREAM HOMES LLP · P52100003495 · possession Apr 2019 · 58.2% built
- SIGMA CENTURIA · HaveliSigma Realtors · P52100003501 · possession Jun 2025 · 45.5% built
- Alpha Center · Pune (CB)Hrudev Realty Projects L.L.P · P52100003505 · possession Dec 2023 · 100% built
- Bhagyam Residency · kondhwa BKZende Reality · P52100003512 · possession Apr 2019 · 52.7% built
- ASHTAVINAYAK CITY PHASE 1 · FursungiASHTAVINAYAK CITY PUNE LLP · P52100003514 · possession Dec 2019 · 90.9% built
- LAKE HOMES WING B · AMBEGAON KHRAYS INFRA · P52100003515 · possession Mar 2018 · 57.3% built
- MAYUR GEMINUS - B · HadapsarBUNTY PROPERTIES UNIT NO. XI · P52100003518 · possession Dec 2017 · 90.9% built
- Panchtirth · Hagawane NagarShree Siddhagiri Developers · P52100003520 · possession Sept 2018 · 90.9% built
- Vidnyan Vishwa · Pune CityGokhale Homes LLP · P52100003523 · possession Oct 2019 · 100% built
- SARSAN PLAZA · Pune (M Corp.)SARSAN DEVELOPERS · P52100003526 · possession Dec 2018 · 90.9% built
- Prathamesh Exotica Phase-II · HaveliAtharva Associates · P52100003533 · possession Dec 2017 · 81.8% built
- PAVILION 2 · HaveliKRISH DEVELOPERS · P52100003546 · possession Mar 2028 · 56.8% built
- RIDDHI SIDDHI · BanerDurga Associates · P52100003550 · possession Dec 2017 · 81.8% built
- SHIVAI 2 COOPERATIVE HOUSING SOCIETY · ParvatiVISHWATAMAK ASSOCIATES · P52100003552 · possession Feb 2021 · 51.8% built
- Sai Sparsh-A1, A2 · BhorJalan Associates · P52100003561 · possession Jun 2024 · 99.1% built
- Padmavati Hills - E, F, G · Mokai VastiSuyog City Developers · P52100003566 · possession Sept 2023 · 100% built
- 41 ESTERA · PUNAWALESAMARTTHA TRIMURTI PROPERTIES · P52100003574 · possession Apr 2019 · 81.8% built · 2 complaints
- Aura City D5,D6 · ShirurBhagvati infra · P52100003585 · possession Oct 2018 · 76.4% built
- KALAAPI CIRA · PirangutSHILP PROPERTIES · P52100003588 · possession Jun 2018 · 86.4% built
- Honeydew Wing A 12th Floor · MulshiRajendra Jindatt Achalare · P52100003589 · possession Mar 2018 · 100% built
- SAI DWARKA PHASE 4 · YAWALEWADIMAA SANKALP BUILDCON · P52100003592 · possession Sept 2019 · 90.9% built · 3 complaints
- DISHA PARADISE · ShirurJAY GANESH EMPIRE · P52100003596 · possession Mar 2019 · 42.7% built
- Sai City · DaundRaju Dnyandev Gaikwad · P52100003598 · possession Dec 2024 · 90.9% built
- SHANTAI RESIDENCY · HaveliJSJ BUILDERS AND DEVELOPERS · P52100003599 · possession Dec 2018 · 36.8% built
- Shri Sukhshanti · KothrudGokhale Homes LLP · P52100003601 · possession Dec 2019 · 81.8% built
- SAIRAJ COMPLEX · Baramati (M Cl)SHOBHA ATUL BALGUDE · P52100003625 · possession Dec 2018 · 33.3% built
- PARTH ESTATE · Pune (M Corp.)SANDEEP CONSTRUCTION COMPANY · P52100003629 · possession Jan 2021 · 67.3% built
- DIVINE MIST · Kalewadi RahataniV & T Properties · P52100003638 · possession Sept 2022 · 73.5% built
- Tanai B · JalochiSurekha vishnu Kumbhar · P52100003644 · possession Jan 2021 · 72.7% built
- SKYLIGHTS · HaveliRAVINANDA LANDMARKS · P52100003645 · possession Feb 2027 · 60.2% built · 82 complaints
- Marvel Selva Ridge A,B Building · Bavdhan Kh.MARVEL OMEGA BUILDERS PVT LTD · P52100003648 · possession Dec 2018 · 90.9% built · 11 complaints
- Marvel Piazza phase -01 · LOHGAONMARVEL ZETA DEVELOPERS PVT LTD · P52100003653 · possession Dec 2022 · 61.1% built · 27 complaints
- ARCHANA KOHINOOR GLORY · MOHAMMADWADIKOHINOOR GLORY · P52100003656 · possession Mar 2019 · 76.8% built
- ZELAM · Pune (M Corp.)DARODE JOG BUILDERS Pvt Ltd · P52100003665 · possession Dec 2018 · 53.6% built
- Orchard Park, Building-A, Wing-A · Pune (M Corp.)PRAKASH GIRIDHAR PATIL · P52100003670 · possession Jul 2019 · 16.4% built
- Shubhshree Residency · Pune CityShree Developers · P52100003686 · possession Jul 2018 · 31.8% built
- NAMRATA GLORIA · RAVET PUNENAMRATA CONSTRUCTION · P52100003691 · possession Dec 2023 · 72.7% built
- AUSTIN PLAZA · MAHATHOBA CHOWKAUSTIN REAL INFRA LLP · P52100003698 · possession Dec 2021 · 78.6% built
- Vertical Oriana Phase II · MundhwaVertical Infra · P52100003699 · possession Jun 2019 · 33.9% built
- Vertical Oriana Phase I · MundhwaVertical Infra · P52100003700 · possession Dec 2018 · 51.5% built · 1 complaint
- Prathamesh Novellus building of chaya heights CHS · dahnukar colonyPrathamesh Constructions · P52100003707 · possession Jul 2018 · 90.9% built
- SALISBURY TOWERS · GultekadiATUR INDIA PRIVATE LIMITED · P52100003712 · possession Dec 2025 · 99.8% built
- MUDRA · BIBWEWADIClassic Promoters and Builders Private Limited · P52100003715 · possession Dec 2022 · 90.9% built · 1 complaint
- Priyadarshan · KothrudGangotree Greenbuild · P52100003716 · possession Apr 2018 · 90.9% built
- 55 SUKHNIWAS · Pune CityTara Constructions · P52100003717 · possession Dec 2020 · 100% built · 5 complaints
- EURISKA BUILDING B · MOHAMMADWADIEISHA ASSET DEVELOPERS PHASE II · P52100003735 · possession Dec 2018 · 100% built
- Prachi Residency Phase II · BanerSancheti Associates · P52100003737 · possession Dec 2017 · 90.9% built
- Swapneel Phase 2 · Pimpri Chinchawad (M Corp.)M/S Waman Constructions · P52100003744 · possession Dec 2017 · 90.9% built
- GANGA ELIKA · HaveliGOEL AVISHKAR PROMOTERS · P52100003750 · possession Dec 2017 · 90% built
- Bliss county A and B Wing · RAHATNIVISION DEVELOPERS AND BUILDERS · P52100003752 · possession Dec 2019 · 29.5% built
- srishtee spaces Phase I · Pimpale SaudagarSRISHTEES Preet Homes · P52100003753 · possession Mar 2018 · 72.7% built
- SWASTIK SPIRA · Pimpri Chinchawad (M Corp.)SWASTIK ASSOCIATES · P52100003757 · possession Mar 2018 · 100% built
- CITY AVENUE · Near Bhumkar ChaukCARNATION LANDMARKS LLP · P52100003760 · possession Dec 2020 · 90.9% built · 2 complaints
- Sai Nisarg · HaveliHemant Audumber Padule · P52100003763 · possession Dec 2018 · 34.1% built
- Royal Orange County C Wing · Pimpri Chinchawad (M Corp.)Navras Sthapatya LLP · P52100003764 · possession Jun 2022 · 90.9% built
- TROPICA PHASE I · Pimpri Chinchawad (M Corp.)Om Developers Project Ravet · P52100003765 · possession Dec 2017 · 90% built
- NYATI ESTEBAN I · MohammaswadiNYATI REALTORS LLP · P52100003767 · possession Mar 2022 · 79% built · 14 complaints
- FEEL BLISS PHASE-I · BavdhanMaple Ravima Realtors · P52100003782 · possession Sept 2020 · 90.9% built
- SHIVSAGAR PLATINUM · HaveliSABLE ASSOCIATES · P52100003789 · possession Nov 2021 · 89.5% built
- K-SQUARE-BALEWADI · HaveliANKIT CONSTRUCTION · P52100003794 · possession May 2023 · 90.8% built · 3 complaints
- TANVI RESIDENCY · ShirurARM ENGINEERS · P52100003796 · possession Jun 2019 · 90.9% built
- Aeropolis Phase II · LOHGAONKrishna developers · P52100003798 · possession May 2019 · 90.9% built
- Shubharambh · Pimpri Chinchawad (M Corp.)Five Elements Erectors and landmarks LLP · P52100003800 · possession Dec 2018 · 90.9% built
- ATUR VALLY VISTA WING B · PisoliATUR INDIA PRIVATE LIMITED · P52100003801 · possession Dec 2017 · 95% built
- spurti pride · Pimpri Chinchawad (M Corp.)sunil kamlakar thokale · P52100003803 · possession Jan 2021 · 81.8% built
- Nakshatra I-Land - 1 · MoshiEllora Buildwell Pvt Ltd · P52100003804 · possession Jan 2021 · 90.9% built
- Lilium Phase II · ShirurAmol Shirish Jakate · P52100003808 · possession Dec 2028 · 33% built
- MALHAR RESIDENCY · MawalRANJEET DEVELOPERS · P52100003817 · possession Jan 2021 · 90.9% built
- ELITE GREEN ACRES - I AND J · MawalSUNITA GAJENDRA PATIL · P52100003819 · possession Dec 2019 · 81.8% built
- Kushal Vatika Phase II · HaveliKushal Constructions · P52100003826 · possession Jul 2018 · 65.5% built
- Akashparv A, B · BavdhanSHARADA SHRIKALP PROMOTERS & BUILDERS · P52100003836 · possession Dec 2022 · 90.9% built
- GOLDEN WINDS Building A Phase 4 · LohegaonGOLDEN BRICKS DEVELOPERS · P52100003838 · possession Dec 2021 · 76.8% built
- SAMARTH KRISHNA · kondhwa BKSAMARTH DEVELOPERS · P52100003841 · possession Mar 2018 · 58.2% built
- THE RESIDENCES · LavaleOXFORD GOLF AND RESORTS PRIVATE LIMITED · P52100003843 · possession Dec 2018 · 56.4% built · 1 complaint
- SOLITAIRE · Pune (M Corp.)VENUS SASCON DEVELOPERS · P52100003846 · possession Dec 2017 · 72.7% built
- Saarrthi Swadesh · MawalSiddharth Properties · P52100003849 · possession Jul 2024 · 90.9% built · 3 complaints
- PICCADILLY · WakadKumar Construction and Properties Pvt Ltd · P52100003854 · possession Dec 2018 · 99.1% built
- HARIT DEVELOPERS · RAHATNIHARIT DEVELOPERS · P52100003855 · possession Dec 2018 · 90.9% built · 2 complaints
- GOLDEN NEST · OUATADE HANDEWADIBHAGWAT PARDESHI REALTY · P52100003863 · possession Mar 2018 · 100% built · 1 complaint
- Windsor County phase-2 · Taware ColonyWindsor Shelters · P52100003871 · possession Mar 2019 · 100% built
- TWIN TOWER · WakadShraddha Spaces · P52100003875 · possession Dec 2021 · 90.9% built
- Vantagio · WakadHarmony Shubham Associates · P52100003876 · possession Jan 2021 · 90.9% built
- LIFE VILLE · Pimpale SaudagarBHARAT SITARAM KATE · P52100003879 · possession Mar 2019 · 30.2% built
- SWAPNASHILP · WakadFUTURISTIC HOMES · P52100003880 · possession Dec 2019 · 73.2% built
- Eisha Erica D Bldg · Dhayari (Part)EISHA VASTU CONSTRUCTION · P52100003882 · possession Mar 2018 · 84.6% built · 1 complaint
- Riddhi Residency · Talegaon Dabhade (M Cl)ATMIYA ENTERPRISES · P52100003883 · possession Sept 2018 · 82.7% built
- SAFFRON HILLSCAPES · MOHAMMADWADISHREE KESHRIYA DEVELOPERS · P52100003894 · possession Dec 2026 · 94.2% built
- Swaraj Capital - Phase I · Borhadewadi,MoshiSim Realty · P52100003900 · possession Sept 2020 · 71.8% built
- Chaitanya Srusti · DaundCHAITANYA DEVELOPERS · P52100003910 · possession Dec 2024 · 63.6% built
- 40 Hyde Park · Pune (M Corp.)Viraj Properties · P52100003914 · possession Dec 2018 · 90.9% built
- MANGAL UPVAN · HaveliPankaj Constructions · P52100003918 · possession Dec 2019 · 100% built
- Sambhaji Park · GopalwadiSambhaji Shivaji Pawar · P52100003923 · possession Jul 2022 · 22.7% built
- Rohan Heights · HaveliRohan Engineering Construction · P52100003926 · possession Mar 2018 · 78.2% built
- Kanakshree Apartments · undriKanak Developments · P52100003928 · possession Jun 2023 · 90.9% built
- LAXMI VISHWA · KhedTULSI BUILDTECH · P52100003933 · possession Dec 2026 · 42.3% built
- DEVI CREST · MawalDEVI CONSTRUCTION LLP · P52100003935 · possession Dec 2019 · 100% built
- Suyash Greens · MawalSuyash Promotors & Developers · P52100003942 · possession Jun 2026 · 85% built · 1 complaint
- Dharmaganga · Pimpri Chinchawad (M Corp.)Anagha Associate · P52100003945 · possession Dec 2017 · 90.9% built
- Mont Vert Vesta · MulshiMont Vert Estates · P52100003950 · possession Dec 2019 · 89.1% built
- EL PREMIERO · Pune (M Corp.)M/S BAFANA BROTHERS · P52100003958 · possession Jul 2019 · 100% built
- REGENT HILLS · GHOTAWADE PHATARadheshyam Promoters and Builders · P52100003965 · possession Feb 2021 · 90.9% built · 1 complaint
- DAMODAR HERITAGE · Pune (M Corp.)ROHIT RAJIV SHETH · P52100003968 · possession Dec 2018 · 81.8% built
- ATULYA NIRMAN · PunawaleD S ASSOCIATES · P52100003976 · possession Dec 2019 · 81.8% built · 1 complaint
Kharadi
Kamal Park
DHANORI
Vadgaonsheri
Other
- PRIME ROASEPRIMEROSE · P52100002180 · possession Dec 2019 · 9.1% built
- SHREY PARADISEPRAVIN MOTILAL SONIGARA · P52100002273 · possession Nov 2018 · 76.4% built
- Satyam RajyogSatyam Constructions · P52100002338 · possession Dec 2019 · 90.9% built
- MARVEL CERISE BLDG B, C, DMARVEL REALTORS AND DEVELOPERS LTD · P52100002648 · possession Sept 2019 · 95.2% built · 22 complaints
- NAVALAKHA RITZNAVALAKHA CHORADIYA ASSOCIATES · P52100002664 · possession Dec 2018 · 95.5% built
- VIVANTA LIFE VISHAKHA PHASE IIVIVANTA REALTY · P52100002690 · possession Nov 2021 · 90.9% built
- PARAISO-1SARTHAK BUILDTECH · P52100003064 · possession Dec 2019 · 81.8% built
- MANGALMURTI RESIDENCYSHREE GANESH DEVELOPERS · P52100003225 · possession Dec 2024 · 99.1% built
- Erande HillsSairam Associates · P52100003271 · possession Apr 2019 · 46.5% built
- CHESTERFIELD WING A AND WING BKALYANEE FORTUNE PROPERTIES · P52100003511 · possession Dec 2022 · 63.6% built · 1 complaint
- GANGA ARIA B1 B2GOEL GANGA SPACE LLP · P52100003739 · possession Dec 2020 · 100% built
- Ganga Platino Building PQRGOEL EISHA CAPITAL · P52100003874 · possession Dec 2018 · 100% built · 6 complaints
- VEDAParshwa Developers · P52100003939 · possession Jul 2018 · 80% built