Delayed projects in Pune
3,402 MahaRERA-registered projects in Pune are past the possession date on file and still under 100% built. Where the promoter has formally revised the date, the original is shown alongside so you can see what changed.
Page 6 of 18
- WATER EDGE7.2 yr overdueRAYKAR MARATHE DEVELOPERS · PUNE, PuneP52100008074· 11.8% built
- MAHADKAR RESIDENCY7.2 yr overdueP.V,Mahadkar and Associates · Kothrud, PuneP52100006972· 99.9% built
- Nakshatra I-Land - 27.2 yr overdueEllora Homemakers Pvt. Ltd. · Moshi, PuneP52100007078· 90.9% built
- SHIVAI COMPLEX7.2 yr overdueSameer Devram Dudhane · Haveli, PuneP52100015318· 29.1% built
- MOUNTAIN RAGA7.2 yr overdueALACRITY DEVELOPERS PROMOTERS AND BUILDERS · Haveli, PuneP52100002239· filed Jul 2018 → now Jul 2019· 90.9% built
- Hubtown Countrywoods Building 27.2 yr overdueAckruti Jay Developers · Tilekar Nagar Kondhwa Budruk, PuneP52100002575· 86.3% built· 1 complaint
- Whispering Glades7.2 yr overdueKakade Associates Undri · MOHAMMADWADI, PuneP52100001890· filed Jul 2018 → now Jul 2019· 51.5% built
- SAIEESH HOMES7.2 yr overdueSAIEESH DEVELOPERS · Haveli, PuneP52100005700· filed Jul 2018 → now Jul 2019· 69.5% built· 1 complaint
- Shubhankar Heights7.2 yr overdueSurekha Landmarks Private Limited · Haveli, PuneP52100003406· 31.8% built
- TANISHQ7.2 yr overdueSAHYADRI PROPERTIES · Pune City, PuneP52100001450· filed Jul 2018 → now Jul 2019· 54.5% built
- ANIKA LAXMI NIWAS7.2 yr overdueArun Pitamber Sheth · Mukundnagar, PuneP52100014468· 83.6% built
- SHREE JAYGANESH DARPAN7.2 yr overdueKhed, PuneP52100010521· 51.1% built
- KALASH PHASE 2 WING A AND B7.2 yr overdueKalyanee Fortune Properties · Kasar Amboli, PuneP52100002296· 33.6% built
- KAMALSANDHYA7.2 yr overdueSANTOSH BABAN MORE · Shirur, PuneP52100008308· 40% built
- Krishna Kamal7.2 yr overdueS KBUILDERS & DEVELOPERS · Baner, PuneP52100011520· filed Jul 2018 → now Jul 2019· 71.8% built
- Aster7.2 yr overdueSUNFLOWER REALTY · Baner, PuneP52100005614· 70.9% built
- KASTURI PRIDE7.2 yr overdueGOVIND VASANT SANGALGIKAR · Near Varad Vinayak Apartment, PuneP52100002948· 90.9% built
- Wonderwall7.2 yr overdueAshwin Ulhas Trimal · Balewadi, PuneP52100015766· 64.5% built
- Mauli Heights7.2 yr overdueShree Ganesh · Pimpale Saudagar, PuneP52100005328· 78.8% built
- Meghsparsh Building C7.2 yr overdueShri Venkatesh Sharada Alliance · AMBEGAON KH, PuneP52100002043· 90.9% built
- SHREE PRATHAMESH PARK7.2 yr overdueSHREE CONSTRUCTION · Pimpri Chinchawad (M Corp.), PuneP52100001644· 90.9% built
- Hubtown Countrywoods Building 17.2 yr overdueAkruti Jay Developers · Tilekar Nagar, Kondhwa Budruk, PuneP52100003342· 90.4% built· 2 complaints
- G K MALL7.2 yr overdueVINOD PREMCHAND CHANDWANI · Pimpale Saudagar, PuneP52100001188· 90.9% built
- Vitthal Empire Phase-II7.2 yr overdueM/S A V Corporation · Pimpri Chinchawad (M Corp.), PuneP52100001548· 39.1% built· 1 complaint
- Orchard Park, Building-A, Wing-A7.2 yr overduePRAKASH GIRIDHAR PATIL · Pune (M Corp.), PuneP52100003670· 16.4% built
- Madhusudan Apartments7.2 yr overdueVastupurti Constructions · Bhor (M Cl), PuneP52100010907· 12.3% built
- SAVALI HOMES - E BUILDING7.2 yr overdueSAPTSIDDHI ASSOCIATES · Pune (M Corp.), PuneP52100008425· filed Aug 2018 → now Aug 2019· 90.9% built
- Seetai Villa7.2 yr overdueRaju Baburao Jori · Man, PuneP52100007605· 99.1% built· 1 complaint
- Sudarshan Heights7.2 yr overdueSudarshan Properties · Balkrushna nagar, PuneP52100011107· filed Aug 2018 → now Aug 2019· 55% built
- NEHA PARK7.2 yr overduePRAPTI HOMES · Pimpri Chinchawad (M Corp.), PuneP52100013255· 73.2% built
- SHREE NIDHI PHASE -17.2 yr overdueSHREE INFRACON · LOHGAON, PuneP52100007979· 90.9% built
- JAI GANESH HERITAGE7.2 yr overdueJAI GANESH DEVELOPERS · Pimpri Chinchawad (M Corp.), PuneP52100009693· 86.4% built
- TANUSHREE7.2 yr overdueTANUSHREE DEVELOPERS · Pune City, PuneP52100011903· 90.9% built
- THE RIDGES PHASE I7.2 yr overdueVENKATESHWARA ASSOCIATES · Bhugaon, PuneP52100003060· 41.8% built· 8 complaints
- VANASHREE E7.2 yr overdueOMKAR PROPERTIES · HADAPSAR, PuneP52100006431· 52.7% built· 1 complaint
- PALMARIUS7.2 yr overdueSAINATH BUILDCON · Baner, PuneP52100003132· 36.4% built
- MOHAR RESIDENCY7.1 yr overdueSANDEEP CHANDRAKANT KAKADE · TALEGAON STATION, PuneP52100015458· 90.9% built
- Nirmitee Shubhyog Phase 17.1 yr overduePankaj Lakhamshi Patel · Borhadewadi Moshi, PuneP52100011474· filed Aug 2018 → now Aug 2019· 83% built
- Suyash Mart7.1 yr overdueSuyash Developers · Hadapsar, PuneP52100012324· 9.1% built
- Hirabaug Business center7.1 yr overdueSanjivani Shelters · Pune City, PuneP52100000415· 81.8% built
- GULAB VISHWA7.1 yr overdueBUTTEPATIL PROPERTIES · NARAYAN PETH, PuneP52100003459· filed Aug 2018 → now Aug 2019· 63.6% built
- Skyi Star Towers Phase I7.1 yr overdueEnerrgia Skyi Ventures · Bhukum, PuneP52100000421· 90.9% built· 4 complaints
- ICHHAPURTI RESIDENCY7.1 yr overdueSHREYASH ENGINEERS AND DEVELOPERS · Talegaon Dabhade (M Cl), PuneP52100006673· 9.1% built
- Janaranjani A at Nanded City7.1 yr overdueNanded City Development & Construction Co. Ltd. · Nanded City, PuneP52100015719· 77.8% built
- OLYMPIA7.1 yr overdueAchalare Realtors Private Limited · Near Tierra-Viva Soc., PuneP52100001491· 90.9% built
- Vishwakarma Business centre7.1 yr overdueWhite Castle Realty · Pune City, PuneP52100003114· 70.5% built
- KRISHNAS BLESSING A, B, C BUILDING7.1 yr overdueVISHAL INFRACON · NEAR KUMAR MEADOWS, PuneP52100009717· 97% built
- Prabodhan Apartments7.1 yr overduePinnac Housing Private Limited · Prabhat Road, PuneP52100004585· filed Aug 2018 → now Aug 2019· 59.2% built
- Silver Brooke Wing B7.1 yr overdueBehede Properties LLP · Bavdhan Kh., PuneP52100002677· 86.4% built
- AIKONIC7.1 yr overdueNAMRATA DEVELOPERS · Talegaon Dabhade (R), PuneP52100004720· 89.1% built
- Gandharva Excellence Project II7.1 yr overdueVinayak Pandharinath Bhongale · Near Modern Collage of Pharmacy, PuneP52100007967· 67.1% built· 1 complaint
- MANTRI MYSTICA A PART7.0 yr overdueOMEGA PREMISES PVT LTD · RAHATNI, PuneP52100005136· filed Sept 2018 → now Sept 2019· 81.7% built· 5 complaints
- VENKATESH JOYNEST PHASE 37.0 yr overdueSHREE VENKATESH GROUP · Haveli, PuneP52100013900· 90.9% built
- Sukhwani Boulevard Commerz7.0 yr overdueVicky G Sukhwani · Next to HP Petrol Pump, Sus, PuneP52100021251· 55.5% built
- SWARAJ ICON7.0 yr overdueSWARAJ DEVELOPERS · Pimpri Chinchawad (M Corp.), PuneP52100012944· 81.8% built· 1 complaint
- Nisarg Vatika7.0 yr overdueNisarg Ventures · Pimpri Chinchawad (M Corp.), PuneP52100006131· 72.7% built
- NISARG RESIDENCY WING A7.0 yr overdueSHREE DATTAKRUPABUILDERS AND DEVELOPERS · Baramati (M Cl), PuneP52100002548· 78.2% built
- POOJA RAJAS7.0 yr overdueGokhale Constructions · Kothrud, PuneP52100013970· 81.8% built
- Citrine7.0 yr overdueAchalare Welworth Associates · Marunji, PuneP52100002515· 90.9% built· 4 complaints
- SHUBHARAMBHA RESIDENCY7.0 yr overdueSANDEEP CHANDRAKANT KAKADE · Talegaon Dabhade (M Cl), PuneP52100007790· 52.7% built
- CHRISHH HARMONY7.0 yr overdueCHRISHH HOLDINGS · Talegaon Dabhade (M Cl), PuneP52100009128· 61.4% built
- CHRISHH SPRINGS7.0 yr overdueCHRISHH HOLDINGS · NEAR SAHYADRI SCHOOL, PuneP52100008928· 72.7% built
- SAI DWARKA PHASE 47.0 yr overdueMAA SANKALP BUILDCON · YAWALEWADI, PuneP52100003592· filed Sept 2018 → now Sept 2019· 90.9% built· 3 complaints
- Shanti Elixir7.0 yr overdueDivyanand Properties LLP · Mundhawa, PuneP52100004234· filed Sept 2018 → now Sept 2019· 46.4% built
- NYATI ELAN WEST II7.0 yr overduePSQUARE BUILDERS LLP · WAGHOLI, PuneP52100015826· 81.4% built
- PANORAMA PAHSE 47.0 yr overdueJEWEL HOUSING · Pune City, PuneP52100005793· filed Sept 2018 → now Sept 2019· 86.4% built
- SPLENDOR RESIDENCY PHASE 17.0 yr overdueADITI PROMOTERS AND DEVELOPERS · AMBEGAON Bk, PuneP52100006184· 57.7% built
- Sara Metroville B7.0 yr overdueSara Infrastructures · Punawale, PuneP52100001689· 90.9% built
- LAXMI VINAYAK7.0 yr overdueLAXMI VINAYAK · Dhayari (Part), PuneP52100002074· 90% built
- Shree Vitthal Annex7.0 yr overdueYuvraj Madolappa Chidre · CHOVISWADI, PuneP52100014925· 81.8% built
- SERA BELLA7.0 yr overdueSURESH FAGUNMAL CHETWANI · Tathawade, PuneP52100009897· 45.9% built
- Vedant Residency7.0 yr overdueVaishnavi Builders · Talegaon Dabhade (R), PuneP52100004823· 53.2% built
- LAXMI SHANTIBAN7.0 yr overdueLAXMI ROPERTIES · Haveli, PuneP52100009542· 90.9% built
- SWATISH7.0 yr overdueAna Developers · Kothrud, PuneP52100007676· 54.5% built
- SANTOSHI SRUSHTI7.0 yr overdueSHREE SANTOSHI DEVELOPERS · Haveli, PuneP52100011828· filed Oct 2018 → now Oct 2019· 90.9% built
- DISHA PRIMO7.0 yr overdueJAY GANESH CORPORATE · Shirur, PuneP52100002486· 45.6% built
- Skyi First Bhukum Phase I7.0 yr overdueEnerrgia Skyi Realty · Bhukum, PuneP52100000462· 86.4% built· 1 complaint
- Pancham Phase I at Nanded City7.0 yr overdueNanded City Development & Construction Co. Ltd. · Nanded City, PuneP52100000385· 91.4% built
- GIRNAR 1087.0 yr overduePADMAVATI BUILDERS · Haveli, PuneP52100002263· 90.9% built
- BALAJI NIWAS7.0 yr overdueSANTOSH DINKAR NARVEKAR · PUNE, PuneP52100014262· 73.1% built
- TROPICAL PALMS BUILDING H7.0 yr overdueOm Developers Project Green · Pimpri Chinchawad (M Corp.), PuneP52100005869· filed Oct 2018 → now Oct 2019· 59.5% built· 14 complaints
- The Nook Phase 17.0 yr overduePyramid Developers · Tathwade, PuneP52100004015· filed Oct 2018 → now Oct 2019· 77% built· 28 complaints
- Tejas Ela7.0 yr overdueVijay Harinarayan Sarda · Prathamesh Park, Baner, PuneP52100016518· 68.2% built
- Dharamshi Milestone7.0 yr overdueSanjay Navinchandra Dharamshi · Bavadhan BK, PuneP52100006908· 37.6% built
- Rainbow7.0 yr overdueSG VENTURES · Haveli, PuneP52100007423· filed Jun 2018 → now Oct 2019· 67.7% built
- Goodwill Palette7.0 yr overdueIra Ventures · Ravet, PuneP52100002390· 76.4% built
- ANVI PARK7.0 yr overdueDALVIADHAVPROPERTIES · Shirur, PuneP52100005557· 90.9% built
- VISHNU VIHAR7.0 yr overdueNOBLE PROMETERS &BULIDERS · Pimpri Chinchawad (M Corp.), PuneP52100009834· 90.9% built· 2 complaints
- Kate city7.0 yr overdueSagar Mahadev Kate · Rui, PuneP52100013834· 75% built
- RAMAA HERITAIGE - PHASE I6.9 yr overdueWADHWA BUILDERS & DEVELOPERS · UNDRI, PuneP52100021140· 64.1% built
- SMITA GLORY A WING6.9 yr overdueMAHESH DASHRATH MHASKE · Haveli, PuneP52100014274· 29.5% built
- THE SECRET GARDEN6.9 yr overdueRAVIRAJ ABHINANDAN ASSOCIATES LLP · EMPRESS TOWER SOPAN BAUGH, PuneP52100016302· 72.7% built
- 93 Avenue Phase- III6.9 yr overdueRAVIRAJ BOKADIA CREATIVE · Pune City, PuneP52100019662· 54.5% built
- Shinde Darade Complex6.9 yr overdueSHINDE DARADE ASSOCIATES · Jalochi, PuneP52100008723· 32.3% built
- Rituparna Residence6.9 yr overdueMITAALI GROOP · Katraj, PuneP52100010236· 83.8% built
- Sulabh Monali6.9 yr overdueGokhale Constructions · Pune (M Corp.), PuneP52100014571· 90.9% built· 1 complaint
- Diamond Crest Wing B6.9 yr overdueOm Mahavir Reality · Wagholi, PuneP52100014731· filed Dec 2021 → now Nov 2019· 90.9% built· 1 complaint
- BAGESHREE6.9 yr overdueSES ENTERPRISES · Dhayari (Part), PuneP52100006462· 41.8% built
- SAYALI COMPLEX6.9 yr overduePANDIT NANABHAU MOLAK · DEHU, PuneP52100008283· filed Sept 2020 → now Nov 2019· 72.3% built
- BLOSSOMCITY6.9 yr overdueDATTATRAY HANUMANT BORADE · Baramati (M Cl), PuneP52100004332· 26.6% built
- SWAYAMBHU HEIGHTS6.9 yr overdueDHANALAXMI BUILDERS · MANJRI KHURDA, PuneP52100015250· 81.8% built
- KRISHNA CLASSIC6.9 yr overduePANDURANG MARUTI KALOKHE · Haveli, PuneP52100005965· 90.9% built
- WEST END VILLAGE PHASE-II BUILDING - H6.9 yr overdueTHE CONSTRUCTION AND DEVELOPMENT COMPANY · Haveli, PuneP52100024034· 90.9% built
- REVELL ORCHID PHASE II BUILDING D6.9 yr overdueABHAY INDRABHAN FULFAGAR · LOHGAON, PuneP52100001922· 64.1% built
- LAXMI VISHNUPURAM6.8 yr overdueLAXMI DEVELOPERS · Haveli, PuneP52100007068· 83.9% built
- AARAV BLISS6.8 yr overdueDIKSHIT RAJAN AGARWAL · WAGHOLI, PuneP52100013258· 85.8% built
- BELLISIMO APARTMENTS6.8 yr overdueSARKAR CONSTRUCTIONS · kondhwa BK, PuneP52100004290· filed Jul 2019 → now Dec 2019· 90.9% built
- SANTOSH APARTMENTS6.8 yr overdueM/S NAMJOSHI AND DESAI ASSOCIATES · Talegaon Dabhade (M Cl), PuneP52100014235· 54.5% built
- GULAB KUNJ6.8 yr overdueButtepatil-Sabale Properties · SHANIWAR PETH, PuneP52100002040· 41.4% built
- Vasant Vihar Co-operative Housing Society6.8 yr overdueKotibhaskar Infrastructures &Developers Pvt.Ltd. · Kothrud, PuneP52100004322· 90.5% built
- AARIV EXOTICA6.8 yr overdueIK ONKAR CONSTRUCTIONS · BALEWADI, PuneP52100009605· 84.5% built
- OM SAI HEIGHTS6.8 yr overdueOM SAI DEVELOPERS · Junnar, PuneP52100003063· 49.1% built
- SAVALI TOWER6.8 yr overdueSavali Developers · OPP RELIANCE PETROL PUMP SASVAD, PuneP52100015927· 49.1% built
- Shreemanyogi6.8 yr overdueMORNING STAR REALITIES · Pimpri Chinchawad (M Corp.), PuneP52100002250· filed Dec 2018 → now Dec 2019· 86.4% built
- Morphic Arham6.8 yr overdueMorphic Developers · Mukundnagar, PuneP52100003108· filed Jun 2018 → now Dec 2019· 90.9% built
- KUL Utsav Phase I -Building F6.8 yr overdueKumar Builders · Pune, PuneP52100009849· 90.9% built
- SAHARA PEARL6.8 yr overdueSAHARA BUILDCON · Sasvad (M Cl), PuneP52100002551· 90.9% built
- The Back Water Residency phase I - D Building6.8 yr overdueLNK PROJECTS Through Proprietor Mr Narayan Baburao Khasnis · Haveli, PuneP52100019828· 90.9% built
- ARCHWAY6.8 yr overdueAAB ASSOCIATES · Pune (M Corp.), PuneP52100009345· filed Dec 2018 → now Dec 2019· 90.9% built
- Rivaah Regency6.8 yr overdueAjay Nanasaheb Jadhavrao · WAGHOLI, PuneP52100009655· filed Dec 2018 → now Dec 2019· 90.9% built
- LITTLE HEARTS PHASE 26.8 yr overdueSHREEMANGAL VISHHRAM DEVELOPERS · UNDRI, PuneP52100009230· 90.9% built
- NISARGA SPARSH6.8 yr overdueARYA NISARGA PROPERTIES · Mawal, PuneP52100004715· 35.5% built
- SHIV SAMRUDHI - A WING6.8 yr overdueSHIV DEVELOPERS · Wakad, PuneP52100014369· 81.8% built
- KAKADE PLAZA PHASE 16.8 yr overdueSuryakant Kakade · Kopare, PuneP52100012132· 93.9% built
- Gulmohar Park A phase 16.8 yr overdueMercury Artharaj Landmarks AOP · Haveli, PuneP52100007126· 42.7% built
- SWAPNASHILP6.8 yr overdueFUTURISTIC HOMES · Wakad, PuneP52100003880· 73.2% built
- PAYAL CO OP HSG SOC6.8 yr overdueSUFAL ASSOCIATES · PRABHAT ROAD, PuneP52100009888· filed Dec 2018 → now Dec 2019· 81.8% built
- NEELAYA6.8 yr overdueNAIKNAVARE BUILDCON PVT LTD · TALEGAON, PuneP52100000013· 95.5% built
- SETPAL PALAZZO6.8 yr overdueSETPAL PROPERTIES PVT. LTD. · Mawal, PuneP52100001337· 88.6% built
- VARDHAMAN DREAMS PHASE II6.8 yr overdueVARDHMAN PROPERTISE · Wakad, PuneP52100001649· 90.2% built
- SAMARTH CARINA COMMERCIA6.8 yr overdueMAHESH ZUMBARLAL KHINVASARA · NEAR ADITYA BIRLA HOSPITAL, PuneP52100015662· 9.1% built
- Teerth Technospace 96.8 yr overdueTEERTH DEVELOPERS AND TEERTH REALTIES JV · Baner, PuneP52100004297· filed Dec 2018 → now Dec 2019· 90.9% built
- ABHIMAAN HOMES PHASE I6.8 yr overdueRISING PROPCON LLP · Shirgaon, PuneP52100000339· 83% built· 1 complaint
- GOLDEN WINDS Building B Phase 36.8 yr overdueGOLDEN BRICKS DEVELOPERS · Pune City, PuneP52100007347· 86.4% built
- COURTYARD6.8 yr overdueYOGESH & YOGESH DEVELOPERS · PASHAN, PuneP52100007218· filed Dec 2018 → now Dec 2019· 51.8% built
- Shaankeshwar Pride6.8 yr overdueSri Shaankeshwar Developers · Pimpri Chinchawad (M Corp.), PuneP52100013140· 81.8% built
- ATRIA GRANDE PROJECT A6.8 yr overdueAtria Constructions · Undri, PuneP52100000580· 72.7% built
- Flora6.8 yr overdueSiddhidata Construction and Siddhesh Landge Developers · Pimple Nilakh, PuneP52100016341· 81.8% built
- Parijat6.8 yr overdueNavketan Associates · Wadgaon Bk, PuneP52100005857· filed Dec 2018 → now Dec 2019· 90.9% built
- DNYANESHWARI COMPLEX6.8 yr overdueShree Raghunath Maharaj Developers · CHOVISWADI, PuneP52100016255· 47.7% built
- Akashvedh Phase 16.8 yr overdueRaghvendra Buildcon · Pimpri Chinchawad (M Corp.), PuneP52100006065· filed Dec 2018 → now Dec 2019· 90.9% built
- SKY MAX6.8 yr overdueHARBANSLAL TULSIRAM WADHWA · Haveli, PuneP52100001534· filed Dec 2018 → now Dec 2019· 80% built
- Pratham Residency6.8 yr overduePratham realtors · Talegaon Dabhade (M Cl), PuneP52100008144· 90.9% built
- Teerth Technospac 106.8 yr overdueTEERTH DEVELOPERS AND TEERTH REALTIES JV · Baner, PuneP52100004312· filed Dec 2018 → now Dec 2019· 90.9% built
- Sunshine Joy Phase 26.8 yr overdueGreenlife Associates · Mulshi, PuneP52100004441· filed Dec 2018 → now Dec 2019· 86.4% built
- KRISH AVENUE6.8 yr overdueM AND K DEVELOPERS · kala khadak, PuneP52100012641· filed Dec 2018 → now Dec 2019· 63.6% built
- Nilaya Wing A6.8 yr overdueGood Earth Shelters · Pune (M Corp.), PuneP52100007699· filed Dec 2018 → now Dec 2019· 91.9% built
- Samarth Siddhi6.8 yr overdueShree Samarth Developers · Haveli, PuneP52100000711· 81.8% built
- SWAPNASHILP RESIDENCY6.8 yr overdueM/S NIRMITI BUILDERS & DEVELOPERS · Junnar, PuneP52100011894· 29.5% built
- Omega Paradise Wing L Phase 16.8 yr overdueOmega Promoters Private Ltd · wakad, PuneP52100011411· filed Dec 2018 → now Dec 2019· 58.5% built· 1 complaint
- Arihant Heights6.8 yr overdueSamruddhi Developers · Haveli, PuneP52100015353· 77.3% built
- 15 PREMLOK6.8 yr overdueHANSRAJ ORANGE DEVELOPERS · Pimpri Chinchawad (M Corp.), PuneP52100007314· 90% built
- PAVILION 796.8 yr overdueWAKADKAR ASSOCIATE · Wakad, PuneP52100004489· 23.6% built
- PHASE III VISION WOODS6.8 yr overdueSHUBBAN PROPERTIES VISION WOODS · pune, PuneP52100004840· filed Dec 2018 → now Dec 2019· 78.2% built
- SOLITAIRE SEVEN6.8 yr overdueAtul Builders · BANER, PuneP52100006186· filed Dec 2018 → now Dec 2019· 90.9% built
- KOHINOOR IRIS PARK6.8 yr overdueKohinoor Properties · kalepadal, PuneP52100001617· 81.8% built
- SAIS LEELA6.8 yr overdueSAIBABA SALES PRIVATE LIMITED · Haveli, PuneP52100001705· filed Dec 2018 → now Dec 2019· 81.8% built
- OXY EVOLVE6.8 yr overdueVENKATESH ASSOCIATES · WAGHOLI, PuneP52100000772· 90.9% built
- WHITEFIELD PHASE 16.8 yr overdueBALAJI ALLIANCE DEVELOPERS LLP · Sus, PuneP52100002460· 61.2% built
- SAVITRI COMPLEX6.8 yr overdueM/S TRIMURTI DEVELOPERS · Otur, PuneP52100012055· 90.9% built
- Twin Arcs6.8 yr overdueWhite Properties and Ventures · Punawale, PuneP52100001145· 90.9% built
- NEELAMBARI6.8 yr overdueNAMRATA CONSTRUCTION · WAKAD, PuneP52100014695· 63.6% built
- SURAJ SURABHI6.8 yr overdueSURAJ BUILDERS · KONDHWA KHURD, PuneP52100014807· 71.8% built
- Royal Entrada Phase II6.8 yr overdueFive Star Construction Company · Mulshi, PuneP52100000526· 78.8% built· 1 complaint
- STKANWARRAMPALACIOPHASE16.8 yr overdueVINOD PREMCHAND CHANDWANI · Chikhali Bk., PuneP52100000276· 90.9% built
- Shri Sukhshanti6.8 yr overdueGokhale Homes LLP · Kothrud, PuneP52100003601· filed Jun 2017 → now Dec 2019· 81.8% built
- CALIFORNIA HEIGHTS6.8 yr overdueSUDHIR ASHOK MANDALE · Khed, PuneP52100005103· 65.7% built
- NAVKAR PARK6.8 yr overduePARKONS TRENDZ · Haveli, PuneP52100005084· filed Apr 2019 → now Dec 2019· 81.8% built· 1 complaint
- PARK PLAZA WING A6.8 yr overduePPR CONSTRUCTION LLP · HOHGAON, PuneP52100002914· 55.7% built
- Sunrise Enclave6.8 yr overdueSunrise Realtors · Pimpri Chinchawad (M Corp.), PuneP52100002153· 65.9% built
- Uttam Townscapes6.8 yr overdueFORTUNE DEVELOPERS AND INFRASTRUCTURES · Vishrantwadi, PuneP52100014002· 90.9% built
- Teerth Technospace 76.8 yr overdueTEERTH DEVELOPERS AND TEERTH REALTIES JV · Baner, PuneP52100006190· filed Dec 2018 → now Dec 2019· 90.9% built
- Platinum Square Phase 26.8 yr overdueVascon Engineers Ltd · Vimannagar, PuneP52100012916· 0% built
- Teerth Technospace 116.8 yr overdueTEERTH DEVELOPERS AND TEERTH REALTIES JV · Baner, PuneP52100005717· filed Dec 2018 → now Dec 2019· 90.9% built
- Venkateshwara Heights B6.8 yr overdueOhana Builders& Developers · Baner, PuneP52100010633· 90.9% built
- Star City6.8 yr overdueRajmata Constructions · Pimpri Chinchawad (M Corp.), PuneP52100001163· 86.4% built
- NYATI ETERNITY COMMERCIAL II6.8 yr overdueNITIN DWARKADAS NYATI · AXIS BANK UNDRI, PuneP52100021443· 45.2% built
- NISARG PALMS6.8 yr overdueADITYA SHAGUN DEVELOPERS · BAVDHAN BK, PuneP52100015113· 72.7% built
- GANGA NEWTOWN PHASE I6.8 yr overdueSHREE BALAJI ASSOCIATES PUNE LLP · Haveli, PuneP52100001431· 87.4% built· 1 complaint
- ADITIS RIBERA6.8 yr overdueADITI REALTORS · Baner, PuneP52100013429· filed Dec 2018 → now Dec 2019· 50% built
- FLOWER CITY6.8 yr overdueAARADHYA PROPERTIES · Pimpri Chinchawad (M Corp.), PuneP52100011239· 80% built
- ZIGGURAT G Building6.8 yr overdueM/S BUILT UP · Ambegaon, PuneP52100003097· 77.6% built
- Marvel Ganga Sangria A,B,C Building6.8 yr overdueMARVEL LANDMARKS PVT LTD · MOHAMMADWADI, PuneP52100001815· 76.8% built· 5 complaints
- Sai Exotique B Wing6.8 yr overdueSAIBABA SALES PRIVATE LIMITED · Pimpri Chinchawad (M Corp.), PuneP52100009721· filed Dec 2018 → now Dec 2019· 81.8% built
- ANANDTARAS HARITARA6.8 yr overdueANANDTARA PROPERTIES · Haveli, PuneP52100004122· filed Dec 2018 → now Dec 2019· 90.9% built· 1 complaint
- ROHAN ABHILASHA BUILDING F6.8 yr overdueROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED · WAGHOLI, PuneP52100000490· 83% built
- POPULAR COLONY6.8 yr overdueBALAJI CONSTRUCTION COMPANY · Haveli, PuneP52100015233· 72.7% built
- Teerth Technospace 66.8 yr overdueTEERTH DEVELOPERS AND TEERTH REALTIES JV · Baner, PuneP52100004940· filed Dec 2018 → now Dec 2019· 90.9% built
- Amber6.8 yr overdueAchalare Realtors Private Limited · Baner, PuneP52100015730· 90.9% built
- SAPTASUR6.8 yr overdueBHAGIRATHI GROUP · Kothrud, PuneP52100003100· 90.9% built
- Teerth Technospace 146.8 yr overdueTEERTH DEVELOPERS AND TEERTH REALTIES JV · Baner, PuneP52100007620· filed Dec 2018 → now Dec 2019· 90.9% built
- Saheels Fortune Park II6.8 yr overdueNeev Sai Associates · PUNE, PuneP52100002349· 90.9% built
- PRAYEJA CITY PHASE II6.8 yr overduePRAYEJA CITY · Wadgaon Budruk, PuneP52100011611· filed Dec 2018 → now Dec 2019· 90.5% built· 1 complaint
- Teerth Technospace 16.8 yr overdueTEERTH DEVELOPERS AND TEERTH REALTIES JV · Baner, PuneP52100011100· filed Dec 2018 → now Dec 2019· 81.8% built
- Empier Estate6.8 yr overdueRohit Builders · Daund, PuneP52100003125· 59.5% built
- SILVANACOUNTY6.8 yr overdueDIAMOND PROPERTIES · CHARHOLI, PuneP52100002224· 85.9% built
- Marvel Bounty K Building6.8 yr overdueMARVEL SIGMA HOMES PRIVATE LIMITED · Haveli, PuneP52100007453· 90.9% built
- Teerth Technospace 126.8 yr overdueTEERTH DEVELOPERS AND TEERTH REALTIES JV · Baner, PuneP52100006740· filed Dec 2018 → now Dec 2019· 90.9% built
- UNITED ARISE6.8 yr overdueUNITED REALINFRA LLP · Pune (M Corp.), PuneP52100001312· filed Dec 2018 → now Dec 2019· 69.1% built
- Dwarika Nagari6.8 yr overdueYashodhan Associates · Tilekar Nagar, PuneP52100002029· 90.9% built· 1 complaint
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.