Delayed projects in Pune
3,375 MahaRERA-registered projects in Pune are past the possession date on file and still under 100% built. Where the promoter has formally revised the date, the original is shown alongside so you can see what changed.
Page 6 of 17
- MAHADKAR RESIDENCY7.1 yr overdueP.V,Mahadkar and Associates · Kothrud, PuneP52100006972· 99.9% built
- Nakshatra I-Land - 27.1 yr overdueEllora Homemakers Pvt. Ltd. · Moshi, PuneP52100007078· 90.9% built
- krishna kamal7.1 yr overdueS KBUILDERS & DEVELOPERS · Baner, PuneP52100011520· filed Jul 2018 → now Jul 2019· 71.8% built
- G K MALL7.1 yr overdueVINOD PREMCHAND CHANDWANI · Pimpale Saudagar, PuneP52100001188· 90.9% built
- Madhusudan Apartments7.1 yr overdueVastupurti Constructions · Bhor (M Cl), PuneP52100010907· 12.3% built
- Whispering Glades7.1 yr overdueKakade Associates Undri · MOHAMMADWADI, PuneP52100001890· filed Jul 2018 → now Jul 2019· 51.5% built
- KASTURI PRIDE7.1 yr overdueGOVIND VASANT SANGALGIKAR · Near Varad Vinayak Apartment, PuneP52100002948· 90.9% built
- SHREE JAYGANESH DARPAN7.1 yr overdueKhed, PuneP52100010521· 51.1% built
- KALASH PHASE 2 WING A AND B7.1 yr overdueKalyanee Fortune Properties · Kasar Amboli, PuneP52100002296· 33.6% built
- ANIKA LAXMI NIWAS7.1 yr overdueArun Pitamber Sheth · Mukundnagar, PuneP52100014468· 83.6% built
- KAMALSANDHYA7.1 yr overdueSANTOSH BABAN MORE · Shirur, PuneP52100008308· 40% built
- Meghsparsh Building C7.1 yr overdueShri Venkatesh Sharada Alliance · AMBEGAON KH, PuneP52100002043· 90.9% built
- Wonderwall7.1 yr overdueAshwin Ulhas Trimal · Balewadi, PuneP52100015766· 64.5% built
- Hubtown Countrywoods Building 17.1 yr overdueAkruti Jay Developers · Tilekar Nagar, Kondhwa Budruk, PuneP52100003342· 90.4% built· 2 complaints
- TANISHQ7.1 yr overdueSAHYADRI PROPERTIES · Pune City, PuneP52100001450· filed Jul 2018 → now Jul 2019· 54.5% built
- Orchard Park, Building-A, Wing-A7.1 yr overduePRAKASH GIRIDHAR PATIL · Pune (M Corp.), PuneP52100003670· 16.4% built
- Shubhankar Heights7.1 yr overdueSurekha Landmarks Private Limited · Haveli, PuneP52100003406· 31.8% built
- Aster7.1 yr overdueSUNFLOWER REALTY · Baner, PuneP52100005614· 70.9% built
- MOUNTAIN RAGA7.1 yr overdueALACRITY DEVELOPERS PROMOTERS AND BUILDERS · Haveli, PuneP52100002239· filed Jul 2018 → now Jul 2019· 90.9% built
- Hubtown Countrywoods Building 27.1 yr overdueAckruti Jay Developers · Tilekar Nagar Kondhwa Budruk, PuneP52100002575· 86.3% built· 1 complaint
- Vitthal Empire Phase-II7.1 yr overdueM/S A V Corporation · Pimpri Chinchawad (M Corp.), PuneP52100001548· 39.1% built· 1 complaint
- SHIVAI COMPLEX7.1 yr overdueSameer Devram Dudhane · Haveli, PuneP52100015318· 29.1% built
- Mauli Heights7.1 yr overdueShree Ganesh · Pimpale Saudagar, PuneP52100005328· 78.8% built
- SHREE PRATHAMESH PARK7.1 yr overdueSHREE CONSTRUCTION · Pimpri Chinchawad (M Corp.), PuneP52100001644· 90.9% built
- SAIEESH HOMES7.1 yr overdueSAIEESH DEVELOPERS · Haveli, PuneP52100005700· filed Jul 2018 → now Jul 2019· 69.5% built· 1 complaint
- SAVALI HOMES - E BUILDING7.1 yr overdueSAPTSIDDHI ASSOCIATES · Pune (M Corp.), PuneP52100008425· filed Aug 2018 → now Aug 2019· 90.9% built
- Seetai Villa7.0 yr overdueRaju Baburao Jori · Man, PuneP52100007605· 99.1% built· 1 complaint
- NEHA PARK7.0 yr overduePRAPTI HOMES · Pimpri Chinchawad (M Corp.), PuneP52100013255· 73.2% built
- sudarshan heights7.0 yr overduesudarshan properties · Balkrushna nagar, PuneP52100011107· filed Aug 2018 → now Aug 2019· 55% built
- SHREE NIDHI PHASE -17.0 yr overdueSHREE INFRACON · LOHGAON, PuneP52100007979· 90.9% built
- JAI GANESH HERITAGE7.0 yr overdueJAI GANESH DEVELOPERS · Pimpri Chinchawad (M Corp.), PuneP52100009693· 86.4% built
- VANASHREE E7.0 yr overdueOMKAR PROPERTIES · HADAPSAR, PuneP52100006431· 52.7% built· 1 complaint
- TANUSHREE7.0 yr overdueTANUSHREE DEVELOPERS · Pune City, PuneP52100011903· 90.9% built
- PALMARIUS7.0 yr overdueSAINATH BUILDCON · Baner, PuneP52100003132· 36.4% built
- THE RIDGES PHASE I7.0 yr overdueVENKATESHWARA ASSOCIATES · Bhugaon, PuneP52100003060· 41.8% built· 7 complaints
- MOHAR RESIDENCY7.0 yr overdueSANDEEP CHANDRAKANT KAKADE · TALEGAON STATION, PuneP52100015458· 90.9% built
- Suyash Mart7.0 yr overdueSuyash Developers · Hadapsar, PuneP52100012324· 9.1% built
- Skyi Star Towers Phase I7.0 yr overdueEnerrgia Skyi Ventures · Bhukum, PuneP52100000421· 90.9% built· 3 complaints
- OLYMPIA7.0 yr overdueAchalare Realtors Private Limited · Near Tierra-Viva Soc., PuneP52100001491· 90.9% built
- KRISHNAS BLESSING A, B, C BUILDING7.0 yr overdueVISHAL INFRACON · NEAR KUMAR MEADOWS, PuneP52100009717· 97% built
- Hirabaug Business center7.0 yr overduesanjivani shelters · Pune City, PuneP52100000415· 81.8% built
- GULAB VISHWA7.0 yr overdueBUTTEPATIL PROPERTIES · NARAYAN PETH, PuneP52100003459· filed Aug 2018 → now Aug 2019· 63.6% built
- Prabodhan Apartments7.0 yr overduePinnac Housing Private Limited · Prabhat Road, PuneP52100004585· filed Aug 2018 → now Aug 2019· 59.2% built
- ICHHAPURTI RESIDENCY7.0 yr overdueSHREYASH ENGINEERS AND DEVELOPERS · Talegaon Dabhade (M Cl), PuneP52100006673· 9.1% built
- Vishwakarma Business centre7.0 yr overdueWhite Castle Realty · Pune City, PuneP52100003114· 70.5% built
- Janaranjani A at Nanded City7.0 yr overdueNanded City Development & Construction Co. Ltd. · Nanded City, PuneP52100015719· 77.8% built
- Nirmitee Shubhyog Phase 17.0 yr overduePankaj Lakhamshi Patel · Borhadewadi Moshi, PuneP52100011474· filed Aug 2018 → now Aug 2019· 83% built
- AIKONIC7.0 yr overdueNAMRATA DEVELOPERS · Talegaon Dabhade (R), PuneP52100004720· 89.1% built
- Silver Brooke Wing B7.0 yr overdueBehede Properties LLP · Bavdhan Kh., PuneP52100002677· 86.4% built
- Gandharva Excellence Project II7.0 yr overdueVinayak Pandharinath Bhongale · Near Modern Collage of Pharmacy, PuneP52100007967· 67.1% built· 1 complaint
- VENKATESH JOYNEST PHASE 36.9 yr overdueSHREE VENKATESH GROUP · Haveli, PuneP52100013900· 90.9% built
- Shanti Elixir6.9 yr overdueDivyanand Properties LLP · Mundhawa, PuneP52100004234· filed Sept 2018 → now Sept 2019· 46.4% built
- SPLENDOR RESIDENCY PHASE 16.9 yr overdueADITI PROMOTERS AND DEVELOPERS · AMBEGAON Bk, PuneP52100006184· 57.7% built
- MANTRI MYSTICA A PART6.9 yr overdueOMEGA PREMISES PVT LTD · RAHATNI, PuneP52100005136· filed Sept 2018 → now Sept 2019· 81.7% built· 5 complaints
- POOJA RAJAS6.9 yr overdueGokhale Constructions · Kothrud, PuneP52100013970· 81.8% built
- Sukhwani Boulevard Commerz6.9 yr overdueVicky G Sukhwani · Next to HP Petrol Pump, Sus, PuneP52100021251· 55.5% built
- Nisarg Vatika6.9 yr overdueNisarg Ventures · Pimpri Chinchawad (M Corp.), PuneP52100006131· 72.7% built
- NISARG RESIDENCY WING A6.9 yr overdueSHREE DATTAKRUPABUILDERS AND DEVELOPERS · Baramati (M Cl), PuneP52100002548· 78.2% built
- SAI DWARKA PHASE 46.9 yr overdueMAA SANKALP BUILDCON · YAWALEWADI, PuneP52100003592· filed Sept 2018 → now Sept 2019· 90.9% built· 3 complaints
- Citrine6.9 yr overdueAchalare Welworth Associates · Marunji, PuneP52100002515· 90.9% built· 4 complaints
- CHRISHH SPRINGS6.9 yr overdueCHRISHH HOLDINGS · NEAR SAHYADRI SCHOOL, PuneP52100008928· 72.7% built
- Sara Metroville B6.9 yr overdueSara Infrastructures · Punawale, PuneP52100001689· 90.9% built
- SHUBHARAMBHA RESIDENCY6.9 yr overdueSANDEEP CHANDRAKANT KAKADE · Talegaon Dabhade (M Cl), PuneP52100007790· 52.7% built
- CHRISHH HARMONY6.9 yr overdueCHRISHH HOLDINGS · Talegaon Dabhade (M Cl), PuneP52100009128· 61.4% built
- NYATI ELAN WEST II6.9 yr overduePSQUARE BUILDERS LLP · WAGHOLI, PuneP52100015826· 81.4% built
- PANORAMA PAHSE 46.9 yr overdueJEWEL HOUSING · Pune City, PuneP52100005793· filed Sept 2018 → now Sept 2019· 86.4% built
- SWARAJ ICON6.9 yr overdueSWARAJ DEVELOPERS · Pimpri Chinchawad (M Corp.), PuneP52100012944· 81.8% built· 1 complaint
- LAXMI VINAYAK6.9 yr overdueLAXMI VINAYAK · Dhayari (Part), PuneP52100002074· 90% built
- Shree Vitthal Annex6.9 yr overdueYuvraj Madolappa Chidre · CHOVISWADI, PuneP52100014925· 81.8% built
- SERA BELLA6.8 yr overdueSURESH FAGUNMAL CHETWANI · Tathawade, PuneP52100009897· 45.9% built
- DISHA PRIMO6.8 yr overdueJAY GANESH CORPORATE · Shirur, PuneP52100002486· 45.6% built
- SWATISH6.8 yr overdueAna Developers · Kothrud, PuneP52100007676· 54.5% built
- LAXMI SHANTIBAN6.8 yr overdueLAXMI ROPERTIES · Haveli, PuneP52100009542· 90.9% built
- SANTOSHI SRUSHTI6.8 yr overdueSHREE SANTOSHI DEVELOPERS · Haveli, PuneP52100011828· filed Oct 2018 → now Oct 2019· 90.9% built
- Vedant Residency6.8 yr overdueVaishnavi Builders · Talegaon Dabhade (R), PuneP52100004823· 53.2% built
- The Nook Phase 16.8 yr overduePyramid Developers · Tathwade, PuneP52100004015· filed Oct 2018 → now Oct 2019· 77% built· 28 complaints
- Dharamshi Milestone6.8 yr overdueSanjay Navinchandra Dharamshi · Bavadhan BK, PuneP52100006908· 37.6% built
- Rainbow6.8 yr overdueSG VENTURES · Haveli, PuneP52100007423· filed Jun 2018 → now Oct 2019· 67.7% built
- Pancham Phase I at Nanded City6.8 yr overdueNanded City Development & Construction Co. Ltd. · Nanded City, PuneP52100000385· 91.4% built
- GIRNAR 1086.8 yr overduePADMAVATI BUILDERS · Haveli, PuneP52100002263· 90.9% built
- VISHNU VIHAR6.8 yr overdueNOBLE PROMETERS &BULIDERS · Pimpri Chinchawad (M Corp.), PuneP52100009834· 90.9% built· 2 complaints
- TROPICAL PALMS BUILDING H6.8 yr overdueOm Developers Project Green · Pimpri Chinchawad (M Corp.), PuneP52100005869· filed Oct 2018 → now Oct 2019· 59.5% built· 14 complaints
- Skyi First Bhukum Phase I6.8 yr overdueEnerrgia Skyi Realty · Bhukum, PuneP52100000462· 86.4% built· 1 complaint
- ANVI PARK6.8 yr overdueDALVIADHAVPROPERTIES · Shirur, PuneP52100005557· 90.9% built
- Goodwill Palette6.8 yr overdueIra Ventures · Ravet, PuneP52100002390· 76.4% built
- Tejas Ela6.8 yr overdueVijay Harinarayan Sarda · Prathamesh Park, Baner, PuneP52100016518· 68.2% built
- BALAJI NIWAS6.8 yr overdueSANTOSH DINKAR NARVEKAR · PUNE, PuneP52100014262· 73.1% built
- Kate city6.8 yr overdueSagar Mahadev Kate · Rui, PuneP52100013834· 75% built
- RAMAA HERITAIGE - PHASE I6.8 yr overdueWADHWA BUILDERS & DEVELOPERS · UNDRI, PuneP52100021140· 64.1% built
- SMITA GLORY A WING6.8 yr overdueMAHESH DASHRATH MHASKE · Haveli, PuneP52100014274· 29.5% built
- 93 Avenue Phase- III6.8 yr overdueRAVIRAJ BOKADIA CREATIVE · Pune City, PuneP52100019662· 54.5% built
- THE SECRET GARDEN6.8 yr overdueRAVIRAJ ABHINANDAN ASSOCIATES LLP · EMPRESS TOWER SOPAN BAUGH, PuneP52100016302· 72.7% built
- Shinde Darade Complex6.7 yr overdueSHINDE DARADE ASSOCIATES · Jalochi, PuneP52100008723· 32.3% built
- Sulabh Monali6.7 yr overdueGokhale Constructions · Pune (M Corp.), PuneP52100014571· 90.9% built· 1 complaint
- Rituparna Residence6.7 yr overdueMITAALI GROOP · Katraj, PuneP52100010236· 83.8% built
- BAGESHREE6.7 yr overdueSES ENTERPRISES · Dhayari (Part), PuneP52100006462· 41.8% built
- Diamond Crest Wing B6.7 yr overdueOm Mahavir Reality · Wagholi, PuneP52100014731· filed Dec 2021 → now Nov 2019· 90.9% built· 1 complaint
- SAYALI COMPLEX6.7 yr overduePANDIT NANABHAU MOLAK · DEHU, PuneP52100008283· filed Sept 2020 → now Nov 2019· 72.3% built
- KRISHNA CLASSIC6.7 yr overduePANDURANG MARUTI KALOKHE · Haveli, PuneP52100005965· 90.9% built
- SWAYAMBHU HEIGHTS6.7 yr overdueDHANALAXMI BUILDERS · MANJRI KHURDA, PuneP52100015250· 81.8% built
- BLOSSOMCITY6.7 yr overdueDATTATRAY HANUMANT BORADE · Baramati (M Cl), PuneP52100004332· 26.6% built
- WEST END VILLAGE PHASE-II BUILDING - H6.7 yr overdueTHE CONSTRUCTION AND DEVELOPMENT COMPANY · Haveli, PuneP52100024034· 90.9% built
- REVELL ORCHID PHASE II BUILDING D6.7 yr overdueABHAY INDRABHAN FULFAGAR · LOHGAON, PuneP52100001922· 64.1% built
- LAXMI VISHNUPURAM6.7 yr overdueLAXMI DEVELOPERS · Haveli, PuneP52100007068· 83.9% built
- AARAV BLISS6.7 yr overdueDIKSHIT RAJAN AGARWAL · WAGHOLI, PuneP52100013258· 85.8% built
- BELLISIMO APARTMENTS6.7 yr overdueSARKAR CONSTRUCTIONS · kondhwa BK, PuneP52100004290· filed Jul 2019 → now Dec 2019· 90.9% built
- SANTOSH APARTMENTS6.7 yr overdueM/S NAMJOSHI AND DESAI ASSOCIATES · Talegaon Dabhade (M Cl), PuneP52100014235· 54.5% built
- Vasant Vihar Co-operative Housing Society6.7 yr overdueKotibhaskar Infrastructures &Developers Pvt.Ltd. · Kothrud, PuneP52100004322· 90.5% built
- GULAB KUNJ6.7 yr overdueButtepatil-Sabale Properties · SHANIWAR PETH, PuneP52100002040· 41.4% built
- Shreemanyogi6.7 yr overdueMORNING STAR REALITIES · Pimpri Chinchawad (M Corp.), PuneP52100002250· filed Dec 2018 → now Dec 2019· 86.4% built
- OM SAI HEIGHTS6.7 yr overdueOM SAI DEVELOPERS · Junnar, PuneP52100003063· 49.1% built
- AARIV EXOTICA6.7 yr overdueIK ONKAR CONSTRUCTIONS · BALEWADI, PuneP52100009605· 84.5% built
- SAVALI TOWER6.7 yr overduesavali developers · OPP RELIANCE PETROL PUMP SASVAD, PuneP52100015927· 49.1% built
- Morphic Arham6.7 yr overdueMorphic Developers · Mukundnagar, PuneP52100003108· filed Jun 2018 → now Dec 2019· 90.9% built
- KUL Utsav Phase I -Building F6.7 yr overdueKumar Builders · Pune, PuneP52100009849· 90.9% built
- SAHARA PEARL6.7 yr overdueSAHARA BUILDCON · Sasvad (M Cl), PuneP52100002551· 90.9% built
- The Back Water Residency phase I - D Building6.7 yr overdueLNK PROJECTS Through Proprietor Mr Narayan Baburao Khasnis · Haveli, PuneP52100019828· 90.9% built
- ARCHWAY6.7 yr overdueAAB ASSOCIATES · Pune (M Corp.), PuneP52100009345· filed Dec 2018 → now Dec 2019· 90.9% built
- Gulmohar Park A phase 16.6 yr overdueMercury Artharaj Landmarks AOP · Haveli, PuneP52100007126· 42.7% built
- NISARGA SPARSH6.6 yr overdueARYA NISARGA PROPERTIES · Mawal, PuneP52100004715· 35.5% built
- SHIV SAMRUDHI - A WING6.6 yr overdueSHIV DEVELOPERS · Wakad, PuneP52100014369· 81.8% built
- Rivaah Regency6.6 yr overdueAjay Nanasaheb Jadhavrao · WAGHOLI, PuneP52100009655· filed Dec 2018 → now Dec 2019· 90.9% built
- SWAPNASHILP6.6 yr overdueFUTURISTIC HOMES · Wakad, PuneP52100003880· 73.2% built
- PAYAL CO OP HSG SOC6.6 yr overdueSUFAL ASSOCIATES · PRABHAT ROAD, PuneP52100009888· filed Dec 2018 → now Dec 2019· 81.8% built
- LITTLE HEARTS PHASE 26.6 yr overdueSHREEMANGAL VISHHRAM DEVELOPERS · UNDRI, PuneP52100009230· 90.9% built
- KAKADE PLAZA PHASE 16.6 yr overdueSuryakant Kakade · Kopare, PuneP52100012132· 93.9% built
- Clover Casablanca Phase II6.6 yr overdueWorthwhile Properties Pvt. Ltd. · Mawal, PuneP52100002277· filed Dec 2018 → now Dec 2019· 90.9% built
- Pratham Yash Residency6.6 yr overduePRATHAM YASH ASSOCIATES · LOHGAON, PuneP52100000071· filed Dec 2018 → now Dec 2019· 66.1% built· 1 complaint
- SOLITAIRE6.6 yr overdueVarsha Ritu Constructions Pvt Ltd · Hadapsar, PuneP52100004759· filed Dec 2018 → now Dec 2019· 90.9% built
- ORION6.6 yr overdueSUDARSHAN DEVELOPERS · Haveli, PuneP52100007244· 42.4% built
- Arihant Heights6.6 yr overdueSamruddhi Developers · Haveli, PuneP52100015353· 77.3% built
- THE SPIRES6.6 yr overdueNAIKNAVARE PRIDE AOP · Pune City, PuneP52100000485· filed Dec 2018 → now Dec 2019· 87.9% built
- ARISTOLIA6.6 yr overdueFORTUNE ASSOCIATES · Hadapsar, PuneP52100001480· 38.2% built
- EELA Phase-I6.6 yr overdueM/s. Siddhashila Developers · Punawale, PuneP52100012382· filed Dec 2018 → now Dec 2019· 89.1% built
- PRAYEJA CITY PHASE II6.6 yr overduePRAYEJA CITY · Wadgaon Budruk, PuneP52100011611· filed Dec 2018 → now Dec 2019· 90.5% built· 1 complaint
- LAXMI EMERALD PHASE-I6.6 yr overdueLAXMI DEVELOPMENTS · LOHGAON, PuneP52100004583· 77.4% built
- DNYANESHWARI COMPLEX6.6 yr overdueShree Raghunath Maharaj Developers · CHOVISWADI, PuneP52100016255· 47.7% built
- Metropolis6.6 yr overdueSharada Alliance Corporate House · Balewadi, PuneP52100005569· 55.9% built
- AMIT DEVELOPERS AND BUILDER6.6 yr overdueAMIT DEVELOPERS & BUILDER · Pune City, PuneP52100014355· 86.4% built
- SOLITAIRE SEVEN6.6 yr overdueAtul Builders · BANER, PuneP52100006186· filed Dec 2018 → now Dec 2019· 90.9% built
- Airiana6.6 yr overdueMitesh Lakhamshi Patel · LOHGAON, PuneP52100007161· filed Sept 2018 → now Dec 2019· 25.9% built
- Twin Arcs6.6 yr overdueWhite Properties and Ventures · Punawale, PuneP52100001145· 90.9% built
- SANSKRUTI HOMES6.6 yr overduePAVAN BUILDER · LOHEGAON, PuneP52100012935· 81.8% built
- DURVA RESIDENCE6.6 yr overduePRADEEP MANIK BHISE · Thergaon, PuneP52100008001· 9.1% built
- Akashvedh Phase 16.6 yr overdueRaghvendra Buildcon · Pimpri Chinchawad (M Corp.), PuneP52100006065· filed Dec 2018 → now Dec 2019· 90.9% built
- Celestine6.6 yr overdueLotus Construction · Pune City, PuneP52100002736· 39.4% built
- Samarth Siddhi6.6 yr overdueShree Samarth Developers · Haveli, PuneP52100000711· 81.8% built
- Happy Homes6.6 yr overdueHappy Homes Realty · WAGHOLI, PuneP52100010270· filed Dec 2018 → now Dec 2019· 90.9% built
- 15 PREMLOK6.6 yr overdueHANSRAJ ORANGE DEVELOPERS · Pimpri Chinchawad (M Corp.), PuneP52100007314· 90% built
- ARYAN HEIGHTS6.6 yr overdueAryan Construction · Haveli, PuneP52100010649· 39.5% built
- COURTYARD6.6 yr overdueYOGESH & YOGESH DEVELOPERS · PASHAN, PuneP52100007218· filed Dec 2018 → now Dec 2019· 51.8% built
- SURAJ SURABHI6.6 yr overdueSURAJ BUILDERS · KONDHWA KHURD, PuneP52100014807· 71.8% built
- SETPAL PALAZZO6.6 yr overdueSETPAL PROPERTIES PVT. LTD. · Mawal, PuneP52100001337· 88.6% built
- Pankaj Aasmaan Phase I6.6 yr overduePankaj Developers · Lahagaon, PuneP52100009665· 81.8% built
- ABHIMAAN HOMES PHASE I6.6 yr overdueRISING PROPCON LLP · Shirgaon, PuneP52100000339· 83% built· 1 complaint
- SHREERAM MAREEGOLD6.6 yr overdueR.G.DEVELOPERS · LOHGAON, PuneP52100003038· 27.3% built
- NEELAMBARI6.6 yr overdueNAMRATA CONSTRUCTION · WAKAD, PuneP52100014695· 63.6% built
- DATTA VIHAR6.6 yr overdueSHREE UMIYA BUILDCON · Ambegaon, PuneP52100016362· 90.9% built
- Pratham Residency6.6 yr overduePratham realtors · Talegaon Dabhade (M Cl), PuneP52100008144· 90.9% built
- ROHAN ABHILASHA BUILDING F6.6 yr overdueROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED · WAGHOLI, PuneP52100000490· 83% built
- KOHINOOR IRIS PARK6.6 yr overdueKohinoor Properties · kalepadal, PuneP52100001617· 81.8% built
- EDEN SOLITIARE6.6 yr overdueELEMENT INFRACON PVT LTD · Mulshi, PuneP52100005489· filed Dec 2018 → now Dec 2019· 87.7% built
- Marvel Bounty K Building6.6 yr overdueMARVEL SIGMA HOMES PRIVATE LIMITED · Haveli, PuneP52100007453· 90.9% built
- GANDHARV SERENITY6.6 yr overdueGandharv Developers · HADAPSAR, PuneP52100005405· filed Jun 2019 → now Dec 2019· 35% built
- ELITE GREEN ACRES - I AND J6.6 yr overdueSUNITA GAJENDRA PATIL · Mawal, PuneP52100003819· 81.8% built
- VENKATESH JOYNEST PHASE 46.6 yr overdueSHREE VENKATESH GROUP · Haveli, PuneP52100017998· 90.9% built
- The Sacred Basil Phase II6.6 yr overdueAshapuri Realtors · Pirangut, PuneP52100001486· 81.8% built
- AARAMBH6.6 yr overduePANDHARINATH VITTHAL JAMBHALKAR · Haveli, PuneP52100002457· filed Dec 2018 → now Dec 2019· 76.4% built
- Central Park6.6 yr overdueOpulent Properties · Manjari Bk, PuneP52100000909· 90.9% built
- SUNWINDS RESIDENTIAL6.6 yr overdueSANIKET INFRASTRUCTURES · BAVDHAN KHURD, PuneP52100002322· 81.8% built
- Shri Sukhshanti6.6 yr overdueGokhale Homes LLP · Kothrud, PuneP52100003601· filed Jun 2017 → now Dec 2019· 81.8% built
- Teerth Technospace 56.6 yr overdueTEERTH DEVELOPERS AND TEERTH REALTIES JV · Baner, PuneP52100011316· filed Dec 2018 → now Dec 2019· 90.9% built· 1 complaint
- Tiara6.6 yr overdueSHETH AND POPAT ENTERPRISE · Wakad, PuneP52100007260· 26.8% built· 1 complaint
- PARTH CLASSIC6.6 yr overduePARTH DEVELOPERS · Pimpri Chinchawad (M Corp.), PuneP52100013837· filed Dec 2018 → now Dec 2019· 58.6% built
- Platinum Square Phase 26.6 yr overdueVascon Engineers Ltd · Vimannagar, PuneP52100012916· 0% built
- Fortune6.6 yr overdueWonder Spaces · Talegaon Dabhade (M Cl), PuneP52100001687· 90.9% built
- Galaxy Orchid6.6 yr overdueGalaxy Constructions · Pune City, PuneP52100008975· 10.8% built
- PAVILION 796.6 yr overdueWAKADKAR ASSOCIATE · Wakad, PuneP52100004489· 23.6% built
- SILVANACOUNTY6.6 yr overdueDIAMOND PROPERTIES · CHARHOLI, PuneP52100002224· 85.9% built
- Shree Apartment Phase16.6 yr overdueNandini Mangaldeep Vishnu Associates · Rahatani, PuneP52100014877· 81.8% built
- Teerth Technospace 126.6 yr overdueTEERTH DEVELOPERS AND TEERTH REALTIES JV · Baner, PuneP52100006740· filed Dec 2018 → now Dec 2019· 90.9% built
- KAPILASHRAM6.6 yr overdueRAMRAI Buildcon LLP · Navi Sadashiv Peth, PuneP52100018672· 70.5% built
- Sai Tirupati Greens Phase- I6.6 yr overdueSai Tirupati Properties · Wadmukhwadi, PuneP52100010061· 81.8% built· 1 complaint
- Hubtown Countrywoods Building 36.6 yr overdueHubtown Limited · Tilekar Nagar Kondhwa Budruk, PuneP52100002733· 82% built
- SAPTASUR6.6 yr overdueBHAGIRATHI GROUP · Kothrud, PuneP52100003100· 90.9% built
- ARMADAPHASEI6.6 yr overdueG K WONDERS · WAKAD, PuneP52100001684· 59.1% built
- Renuka Tulsi Phase II6.6 yr overdueRenuka Constructions · CHINCHWAD, PuneP52100002644· 90.9% built
- Sai Saroj6.6 yr overdueM/S Vighnaharta Developers · Ravet, PuneP52100000008· filed Mar 2019 → now Dec 2019· 58.8% built
- Portia6.6 yr overdueVilas Javdekar Lifestyle Developers Pvt. Ltd. · Haveli, PuneP52100000301· filed Dec 2018 → now Dec 2019· 68.2% built
- PHASE III VISION WOODS6.6 yr overdueSHUBBAN PROPERTIES VISION WOODS · pune, PuneP52100004840· filed Dec 2018 → now Dec 2019· 78.2% built
- Marvel Ganga Sangria A,B,C Building6.6 yr overdueMARVEL LANDMARKS PVT LTD · MOHAMMADWADI, PuneP52100001815· 76.8% built· 5 complaints
- Sai Hira6.6 yr overdueMRUNALI REALTY LLP · MOSHI, PuneP52100000634· 90.9% built
- Omega Paradise Wing L Phase 16.6 yr overdueOmega Promoters Private Ltd · wakad, PuneP52100011411· filed Dec 2018 → now Dec 2019· 58.5% built· 1 complaint
- Pristine Greens Phase 16.6 yr overduePRISTINE PROPERTIES · BORHADEWADI, PuneP52100009406· 90.9% built· 9 complaints
- Pristine Pacific H , I6.6 yr overdueMELANGE DEVELOPERS · Pune (M Corp.), PuneP52100001211· 90.9% built
- Orbit Bonneville6.6 yr overdueB-Orbit Amparo Constructions PVT Ltd · MOSHI, PuneP52100003348· filed Dec 2018 → now Dec 2019· 90.9% built
- KRISH AVENUE6.6 yr overdueM AND K DEVELOPERS · kala khadak, PuneP52100012641· filed Dec 2018 → now Dec 2019· 63.6% built
- POPULAR COLONY6.6 yr overdueBALAJI CONSTRUCTION COMPANY · Haveli, PuneP52100015233· 72.7% built
- Kalp Residency C Wing6.6 yr overdueKalp Buildtech · Chakan, PuneP52100002332· filed Dec 2018 → now Dec 2019· 81.8% built
- Teerth Technospace 46.6 yr overdueTEERTH DEVELOPERS AND TEERTH REALTIES JV · Baner, PuneP52100011403· filed Dec 2018 → now Dec 2019· 90.9% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.