3,375 MahaRERA-registered projects in Pune are past the possession date on file and still under 100% built. Where the promoter has formally revised the date, the original is shown alongside so you can see what changed.
Page 7 of 17
- Teerth Technospace 46.6 yr overdueTEERTH DEVELOPERS AND TEERTH REALTIES JV · Baner, PuneP52100011403· filed Dec 2018 → now Dec 2019· 90.9% built
- Teerth Technospace 126.6 yr overdueTEERTH DEVELOPERS AND TEERTH REALTIES JV · Baner, PuneP52100006740· filed Dec 2018 → now Dec 2019· 90.9% built
- GOLDEN WINDS Building B Phase 36.6 yr overdueGOLDEN BRICKS DEVELOPERS · Pune City, PuneP52100007347· 86.4% built
- Amber6.6 yr overdueAchalare Realtors Private Limited · Baner, PuneP52100015730· 90.9% built
- DOLPHIN SQUARE6.6 yr overdueDOLPHIN INDUSTRIAL ESTATE · Haveli, PuneP52100014980· 81.8% built
- SILVANA COUNTY6.6 yr overdueDIAMOND PROPERTIES · CHAROLI PHATA, PuneP52100018403· 90.9% built
- Teerth Technospace 116.6 yr overdueTEERTH DEVELOPERS AND TEERTH REALTIES JV · Baner, PuneP52100005717· filed Dec 2018 → now Dec 2019· 90.9% built
- Saheels Fortune Park II6.6 yr overdueNeev Sai Associates · PUNE, PuneP52100002349· 90.9% built
- SWAPNASHILP RESIDENCY6.6 yr overdueM/S NIRMITI BUILDERS & DEVELOPERS · Junnar, PuneP52100011894· 29.5% built
- Sai Tirupati Greens Phase- I6.6 yr overdueSai Tirupati Properties · Wadmukhwadi, PuneP52100010061· 81.8% built· 1 complaint
- PARK PLAZA WING A6.6 yr overduePPR CONSTRUCTION LLP · HOHGAON, PuneP52100002914· 55.7% built
- Teerth Technospace 76.6 yr overdueTEERTH DEVELOPERS AND TEERTH REALTIES JV · Baner, PuneP52100006190· filed Dec 2018 → now Dec 2019· 90.9% built
- ZIGGURAT G Building6.6 yr overdueM/S BUILT UP · Ambegaon, PuneP52100003097· 77.6% built
- JARDIN6.6 yr overduesanskruti life spaces · Mahalunge, PuneP52100003366· 79% built
- RAJYOG RESIDENCY6.6 yr overdueBALAJI VIKRAM AWARE · Haveli, PuneP52100014835· 18.2% built
- Portia6.6 yr overdueVilas Javdekar Lifestyle Developers Pvt. Ltd. · Haveli, PuneP52100000301· filed Dec 2018 → now Dec 2019· 68.2% built
- Empier Estate6.6 yr overdueRohit Builders · Daund, PuneP52100003125· 59.5% built
- KRISH AVENUE6.6 yr overdueM AND K DEVELOPERS · kala khadak, PuneP52100012641· filed Dec 2018 → now Dec 2019· 63.6% built
- LAXMI EMERALD PHASE-I6.6 yr overdueLAXMI DEVELOPMENTS · LOHGAON, PuneP52100004583· 77.4% built
- ARMADAPHASEI6.6 yr overdueG K WONDERS · WAKAD, PuneP52100001684· 59.1% built
- Teerth Technospace 96.6 yr overdueTEERTH DEVELOPERS AND TEERTH REALTIES JV · Baner, PuneP52100004297· filed Dec 2018 → now Dec 2019· 90.9% built
- PARTH CLASSIC6.6 yr overduePARTH DEVELOPERS · Pimpri Chinchawad (M Corp.), PuneP52100013837· filed Dec 2018 → now Dec 2019· 58.6% built
- Mont Vert Velocity6.6 yr overdueNiraj Kumar Associates Pvt Ltd · Pashan, PuneP52100001973· filed Dec 2018 → now Dec 2019· 90.7% built
- ALANKAR F BUILDING6.6 yr overdueR K LUNKAD HOUSING COMPANY · CHARHOLI, PuneP52100016029· 81.8% built
- Teerth Technospace 86.6 yr overdueTEERTH DEVELOPERS AND TEERTH REALTIES JV · Baner, PuneP52100005429· filed Dec 2018 → now Dec 2019· 90.9% built
- NISARG PALMS6.6 yr overdueADITYA SHAGUN DEVELOPERS · BAVDHAN BK, PuneP52100015113· 72.7% built
- GOLDEN WINDS Building E Phase 26.6 yr overdueGOLDEN BRICKS DEVELOPERS · Pune City, PuneP52100005025· 90.9% built
- AG ICON6.6 yr overdueAJIT SUBHASH GAIKWAD · Haveli, PuneP52100005698· filed Dec 2018 → now Dec 2019· 45.5% built
- AKSHAY RESIDENCY6.6 yr overdueRAJENDRA RAMANLAL LUNAKD · Wakad, PuneP52100005552· 40.9% built
- GANGA NEWTOWN PHASE I6.6 yr overdueSHREE BALAJI ASSOCIATES PUNE LLP · Haveli, PuneP52100001431· 87.4% built· 1 complaint
- Platinum Park Phase I6.6 yr overdueRanjeet Property Developers India Pvt. Ltd. · UNDRI, PuneP52100007249· filed Dec 2018 → now Dec 2019· 98.5% built· 5 complaints
- Abhilasha Park6.6 yr overdueSarovar Associates · Haveli, PuneP52100009755· 19.2% built
- Celestine6.6 yr overdueLotus Construction · Pune City, PuneP52100002736· 39.4% built
- ATRIA GRANDE PROJECT A6.6 yr overdueAtria Constructions · Undri, PuneP52100000580· 72.7% built
- PRIDE REGENCY6.6 yr overdueSHAILESH CONSTRUCTION CO · Daund (CT), PuneP52100000716· 81.6% built
- NEELAYA6.6 yr overdueNAIKNAVARE BUILDCON PVT LTD · TALEGAON, PuneP52100000013· 95.5% built
- ASHTAVINAYAK CITY PHASE 16.6 yr overdueASHTAVINAYAK CITY PUNE LLP · Fursungi, PuneP52100003514· filed Dec 2018 → now Dec 2019· 90.9% built
- SAVITRI COMPLEX6.6 yr overdueM/S TRIMURTI DEVELOPERS · Otur, PuneP52100012055· 90.9% built
- VIJAY RESIDENCY6.6 yr overdueVEDANT PROPERTIES · Pune (M Corp.), PuneP52100013999· 78.2% built
- Mont Vert Vesta6.6 yr overdueMont Vert Estates · Mulshi, PuneP52100003950· filed Dec 2018 → now Dec 2019· 89.1% built
- Indraprastha Paradise6.6 yr overdueS. S. Developers · Borhadewadi, PuneP52100014739· 81.8% built· 1 complaint
- GURUDEV APARTMENT6.6 yr overdueGurudev Associates · Haveli, PuneP52100010499· 53.6% built
- RAJYOG RESIDENCY6.6 yr overdueNISARG DEVELOPERS · Rajuri, PuneP52100011521· filed Dec 2018 → now Dec 2019· 48.5% built· 1 complaint
- Marvel Ganga Sangria G,H,J Building6.6 yr overdueMARVEL LANDMARKS PVT LTD · MOHAMMADWADI, PuneP52100002371· filed Dec 2018 → now Dec 2019· 95.2% built· 15 complaints
- Teerth Technospace 56.6 yr overdueTEERTH DEVELOPERS AND TEERTH REALTIES JV · Baner, PuneP52100011316· filed Dec 2018 → now Dec 2019· 90.9% built· 1 complaint
- Teerth Technospace 36.6 yr overdueTEERTH DEVELOPERS AND TEERTH REALTIES JV · Baner, PuneP52100004739· filed Dec 2018 → now Dec 2019· 90.9% built
- Sai Krupa Residency Wing B6.6 yr overdueSai Krupa Ventures · LOHGAON, PuneP52100007343· 90.9% built
- Sangam Solitaire A wing6.6 yr overdueSangam Press Pvt Ltd · Pune (M Corp.), PuneP52100000438· 82.5% built
- Shree Apartment Phase 26.6 yr overdueNandini Mangaldeep Vishnu Associates · Rahatani, PuneP52100017227· 81.8% built
- MAJESTIQUE CITY6.6 yr overdueMANISH DWARKADAS MAHESHWARI · Wagholi, PuneP52100000113· 90.9% built
- Platinum Square Phase 26.6 yr overdueVascon Engineers Ltd · Vimannagar, PuneP52100012916· 0% built
- Tiara6.6 yr overdueSHETH AND POPAT ENTERPRISE · Wakad, PuneP52100007260· 26.8% built· 1 complaint
- Royal Entrada Phase II6.6 yr overdueFive Star Construction Company · Mulshi, PuneP52100000526· 78.8% built· 1 complaint
- SUNWINDS RESIDENTIAL6.6 yr overdueSANIKET INFRASTRUCTURES · BAVDHAN KHURD, PuneP52100002322· 81.8% built
- NISARG VISHWA6.6 yr overdueNISARG BUILDCON · Wakad, PuneP52100005116· 72.7% built
- NeaPlus6.6 yr overdueSkylark Promoters Pvt. Ltd. · Baner Annexure, PuneP52100000823· filed Dec 2018 → now Dec 2019· 74.5% built
- Sukhwani Scarlet6.6 yr overdueRavi Ghanshyam Sukhwani · WAGHOLI, PuneP52100000894· 90.2% built
- Teerth Technospace 136.6 yr overdueTEERTH DEVELOPERS AND TEERTH REALTIES JV · Baner, PuneP52100005488· filed Dec 2018 → now Dec 2019· 90.9% built
- Shine Square6.6 yr overdueNamoh Builders & Developers · Pimpri Chinchawad (M Corp.), PuneP52100003130· filed Dec 2018 → now Dec 2019· 75.9% built· 1 complaint
- NIRMAL BUILDING A6.6 yr overdueM/s. Prathamesh Promoters Company · Pune (M Corp.), PuneP52100005656· 81.8% built
- VENKATESH GRAFFITI PHASE 36.6 yr overdueSHREE VENKATESH BUILDCON PVT LTD · KESHAVNAGAR MUNDHWA, PuneP52100001000· 90.9% built· 1 complaint
- Uttam Townscapes6.6 yr overdueFORTUNE DEVELOPERS AND INFRASTRUCTURES · Vishrantwadi, PuneP52100014002· 90.9% built
- Unnati6.6 yr overdueSigma Realty · Mulshi, PuneP52100000976· filed Dec 2018 → now Dec 2019· 90.9% built
- Teerth Technospace 146.6 yr overdueTEERTH DEVELOPERS AND TEERTH REALTIES JV · Baner, PuneP52100007620· filed Dec 2018 → now Dec 2019· 90.9% built
- 15 PREMLOK6.6 yr overdueHANSRAJ ORANGE DEVELOPERS · Pimpri Chinchawad (M Corp.), PuneP52100007314· 90% built
- BROOKEFIELD WILLOWS6.6 yr overdueNirman Trimurti Developers · Pisoli, PuneP52100002035· 90.9% built· 1 complaint
- Life Republic Sector R3 - 3rd Avenue6.6 yr overdueKOLTE-PATIL INTEGRATED TOWNSHIPS LIMITED · Jambe, PuneP52100007511· 90.9% built· 5 complaints
- AMIT DEVELOPERS AND BUILDER6.6 yr overdueAMIT DEVELOPERS & BUILDER · Pune City, PuneP52100014355· 86.4% built
- DNYANESHWARI COMPLEX6.6 yr overdueShree Raghunath Maharaj Developers · CHOVISWADI, PuneP52100016255· 47.7% built
- SAPTARSHI RESIDENCY C WING6.6 yr overdueSUBHAGYA PROMOTERS & BUILDERS PRIVATE LIMITED · AHER NAGAR , NEAR AHER GARDEN, PuneP52100010341· filed Dec 2018 → now Dec 2019· 45.5% built
- SURAJ SURABHI6.6 yr overdueSURAJ BUILDERS · KONDHWA KHURD, PuneP52100014807· 71.8% built
- Shri Sukhshanti6.6 yr overdueGokhale Homes LLP · Kothrud, PuneP52100003601· filed Jun 2017 → now Dec 2019· 81.8% built
- DOLPHIN PLATINA6.6 yr overdueDOLHIN HOME DEVELOPERS · Haveli, PuneP52100014580· 90.9% built
- Skylight6.6 yr overdueKrushnarang Associates · Haveli, PuneP52100014803· 35.9% built
- Sai Exotique B Wing6.6 yr overdueSAIBABA SALES PRIVATE LIMITED · Pimpri Chinchawad (M Corp.), PuneP52100009721· filed Dec 2018 → now Dec 2019· 81.8% built
- Sundaram residency6.6 yr overdueJadhav Enterprises · Tathwade, PuneP52100000907· filed Dec 2018 → now Dec 2019· 81.8% built· 2 complaints
- FOUR AVENUES6.6 yr overdueIKON CONSTRUCTIONS · Haveli, PuneP52100006853· filed Dec 2018 → now Dec 2019· 90.9% built
- Engracia6.6 yr overdueJagtap Patil Promoters & Builders · Haveli, PuneP52100002471· 81.8% built
- Sunshine Joy Phase 26.6 yr overdueGreenlife Associates · Mulshi, PuneP52100004441· filed Dec 2018 → now Dec 2019· 86.4% built
- RAVI KARAN HEIGHTS6.6 yr overdueRAMKRISHNA DEVELOPERS · Haveli, PuneP52100013812· 22.7% built
- Legacy Aura6.6 yr overdueLegacy Lifespaces LLP · Haveli, PuneP52100000710· 90.9% built
- Pristine Pacific H , I6.6 yr overdueMELANGE DEVELOPERS · Pune (M Corp.), PuneP52100001211· 90.9% built
- WHITEFIELD PHASE 16.6 yr overdueBALAJI ALLIANCE DEVELOPERS LLP · Sus, PuneP52100002460· 61.2% built
- GRACE HEIGHTS6.6 yr overdueGRACE VENTURES · Pune City, PuneP52100009946· 68.6% built
- LODHA BELMONDO ST. ANDREWS E6.6 yr overdueLodha Developers Limited · Gahunje, PuneP52100000182· 90.9% built· 1 complaint
- Giri Darshan Apartment6.6 yr overdueConcept Townships & Estate Developers Pvt Ltd · Talegaon Dabhade (M Cl), PuneP52100011639· 54.5% built
- Samrudhee Malhar6.6 yr overdueSAMRUDHEE HOMES · Sasvad (M Cl), PuneP52100002866· filed Dec 2018 → now Dec 2019· 77.3% built
- REELICON KIAN6.6 yr overdueJKDEVELOPERS · AMBEGAON BK, PuneP52100003028· filed Dec 2018 → now Dec 2019· 54.5% built
- PRAYEJA CITY PHASE II6.6 yr overduePRAYEJA CITY · Wadgaon Budruk, PuneP52100011611· filed Dec 2018 → now Dec 2019· 90.5% built· 1 complaint
- Aarambh6.6 yr overdueYASHADA NIVASA ASSOCIATES · Pimpri Chinchawad (M Corp.), PuneP52100002191· 81.8% built
- Sai Hills6.6 yr overdueVighnaharta Promoters · Sai Hills, PuneP52100000061· filed Dec 2018 → now Dec 2019· 77.3% built
- KAPILASHRAM6.6 yr overdueRAMRAI Buildcon LLP · Navi Sadashiv Peth, PuneP52100018672· 70.5% built
- ARMONIA RESIDENCY6.6 yr overdueM2 DEVELOPERS · Somatane, PuneP52100013738· 81.8% built
- SOLITAIRE6.6 yr overdueVarsha Ritu Constructions Pvt Ltd · Hadapsar, PuneP52100004759· filed Dec 2018 → now Dec 2019· 90.9% built
- UNITED ARISE6.6 yr overdueUNITED REALINFRA LLP · Pune (M Corp.), PuneP52100001312· filed Dec 2018 → now Dec 2019· 69.1% built
- ATULYA RACHANA6.6 yr overdueRAJNANDINI DEVELOPERS · KRANTINAGAR, PuneP52100002404· 90.9% built
- VARDHAMAN DREAMS PHASE II6.6 yr overdueVARDHMAN PROPERTISE · Wakad, PuneP52100001649· 90.2% built
- ELITE GREEN ACRES - A6.6 yr overdueSUNITA GAJENDRA PATIL · Mawal, PuneP52100004215· 81.8% built· 1 complaint
- VARAD VIHAR6.6 yr overdueSHREE DEVELOPERS · Haveli, PuneP52100012703· filed Aug 2018 → now Dec 2019· 52.7% built
- Star City6.6 yr overdueRajmata Constructions · Pimpri Chinchawad (M Corp.), PuneP52100001163· 86.4% built
- Nilaya Wing A6.6 yr overdueGood Earth Shelters · Pune (M Corp.), PuneP52100007699· filed Dec 2018 → now Dec 2019· 91.9% built
- STKANWARRAMPALACIOPHASE16.6 yr overdueVINOD PREMCHAND CHANDWANI · Chikhali Bk., PuneP52100000276· 90.9% built
- GANESH AURA6.6 yr overdueVEDDANT REALTY · Haveli, PuneP52100005169· 72.7% built
- Marvel Bounty K Building6.6 yr overdueMARVEL SIGMA HOMES PRIVATE LIMITED · Haveli, PuneP52100007453· 90.9% built
- POPULAR COLONY6.6 yr overdueBALAJI CONSTRUCTION COMPANY · Haveli, PuneP52100015233· 72.7% built
- Optimus6.6 yr overdueSiddhesh properties · Lahagaon, PuneP52100000803· filed Dec 2018 → now Dec 2019· 38.2% built· 2 complaints
- Aaradhyam6.6 yr overdueDHANESHWAR VISION DEVELOPERS · Pimpri Chinchawad (M Corp.), PuneP52100008419· 86.4% built
- Shankeshwar Crimson6.6 yr overdueNitin Chhaganlal Jain · Haveli, PuneP52100000087· 90.9% built
- OAK VIEW6.6 yr overduePM Construction · Thergaon Near PCMC Zonal Office, PuneP52100006090· 94.1% built· 4 complaints
- NIVASA UDAAN - PHASE II6.6 yr overdueNIVASA REALTY · LOHEGAON, PuneP52100017799· 37.7% built
- HIGHWAY HEIGHTS6.6 yr overdueBHELKE AND DHONE PROMOTERS AND BUILDERS · Haveli, PuneP52100010723· 43.2% built
- OXY EVOLVE6.6 yr overdueVENKATESH ASSOCIATES · WAGHOLI, PuneP52100000772· 90.9% built
- ONE MALL6.6 yr overdueNIRMAN PROPERTIES · Pimpri Chinchawad (M Corp.), PuneP52100002399· filed Dec 2018 → now Dec 2019· 42.7% built
- Swara Sparsh6.6 yr overdueM/S Chinchwade Avhale Associates · Wakad, PuneP52100008838· 42.3% built
- Dwarika Nagari6.6 yr overdueYashodhan Associates · Tilekar Nagar, PuneP52100002029· 90.9% built· 1 complaint
- GAGAN AKANKSHA PHASE 16.6 yr overdueGAGAN HORIZON VENTURES · Koregaon mul, PuneP52100001285· filed Dec 2018 → now Dec 2019· 90.3% built· 26 complaints
- Teerth Technospace 66.6 yr overdueTEERTH DEVELOPERS AND TEERTH REALTIES JV · Baner, PuneP52100004940· filed Dec 2018 → now Dec 2019· 90.9% built
- Ronch Viveza6.6 yr overdueRonch Realty Pvt. Ltd · Valvan, PuneP52100010441· 43.6% built
- AAYAN- BUILDING 26.6 yr overdueGANDHI BAFNA CONSTRUCTION PVT LTD · WAGHOLI, PuneP52100007092· filed Dec 2018 → now Dec 2019· 65.9% built
- SOLITAIRE SEVEN6.6 yr overdueAtul Builders · BANER, PuneP52100006186· filed Dec 2018 → now Dec 2019· 90.9% built
- Teerth Technospace 26.6 yr overdueTEERTH DEVELOPERS AND TEERTH REALTIES JV · Baner, PuneP52100012046· filed Dec 2018 → now Dec 2019· 90.9% built
- Megapolis Mystic - C6.6 yr overduePegasus Properties Pvt. Ltd. · Rajiv Gandhi Infotech Park, Phase 3, PuneP52100019959· 90.9% built
- Bliss county A and B Wing6.6 yr overdueVISION DEVELOPERS AND BUILDERS · RAHATNI, PuneP52100003752· 29.5% built
- Venkateshwara Heights B6.6 yr overdueOhana Builders& Developers · Baner, PuneP52100010633· 90.9% built
- Shaankeshwar Pride6.6 yr overdueSri Shaankeshwar Developers · Pimpri Chinchawad (M Corp.), PuneP52100013140· 81.8% built
- Sunrise Enclave6.6 yr overdueSunrise Realtors · Pimpri Chinchawad (M Corp.), PuneP52100002153· 65.9% built
- Jeevan Aashiana6.6 yr overdueBrahmani Constructions · Talegaon Dabhade (M Cl), PuneP52100014493· 46.4% built
- T12 NAMED MAGNA BEING PHASE 2 OF THE PROJECT COMPRISING BUILDINGS T12 AND T136.6 yr overdueCavalcade Properties Private Limited · MOHAMMADWADI, PuneP52100015996· 72.7% built
- CALIFORNIA HEIGHTS6.6 yr overdueSUDHIR ASHOK MANDALE · Khed, PuneP52100005103· 65.7% built
- MSPACE6.6 yr overdueMahindra Lifespace Developers limited · Haveli, PuneP52100015480· 81.8% built
- KalpaVruksha B6.6 yr overdueVaichal Constructions Pvt Ltd · Mulshi, PuneP52100004001· filed Dec 2018 → now Dec 2019· 90.9% built
- ANAND AASHRAY6.6 yr overdueANAND ENTERPRISES · Pimpri Chinchawad (M Corp.), PuneP52100002204· filed Dec 2018 → now Dec 2019· 90.9% built· 3 complaints
- KRISHNA AAKAR6.6 yr overdueKRISHNA AAKAR · Talegaon Dabhade (M Cl), PuneP52100000621· filed Dec 2018 → now Dec 2019· 86.4% built
- SAIS LEELA6.6 yr overdueSAIBABA SALES PRIVATE LIMITED · Haveli, PuneP52100001705· filed Dec 2018 → now Dec 2019· 81.8% built
- KINGSTONE AVENUE PH 16.6 yr overdueSupreme Developers · Pimpale Saudagar, PuneP52100001909· filed Dec 2018 → now Dec 2019· 70.8% built· 2 complaints
- Sun Planet Phase III6.6 yr overdueJindal Mittal Graha Nirman Pvt. Ltd. · Haveli, PuneP52100018258· 81.8% built
- DWARKA PROJECT 46.6 yr overdueNAIKNAVAREHOUSINGDEVELOPERSPVTLTD · CHAKAN, PuneP52100000240· 0% built· 1 complaint
- ORION6.6 yr overdueSUDARSHAN DEVELOPERS · Haveli, PuneP52100007244· 42.4% built
- Pranjal Residency6.6 yr overdueBalasaheb Sadashiv Murkute · Baner, PuneP52100005273· 81.8% built· 1 complaint
- WEST ONE6.6 yr overdueDEU ASSOCIATES · Wakad, PuneP52100011779· 39.1% built
- Sairaj Heights6.6 yr overdueSAIBABA SALES PRIVATE LIMITED · Pimpri Chinchawad (M Corp.), PuneP52100001542· filed Dec 2018 → now Dec 2019· 81.8% built· 2 complaints
- ADITIS RIBERA6.6 yr overdueADITI REALTORS · Baner, PuneP52100013429· filed Dec 2018 → now Dec 2019· 50% built
- Metropolis6.6 yr overdueSharada Alliance Corporate House · Balewadi, PuneP52100005569· 55.9% built
- Parijat6.6 yr overdueNavketan Associates · Wadgaon Bk, PuneP52100005857· filed Dec 2018 → now Dec 2019· 90.9% built
- ATULYA NIRMAN6.6 yr overdueD S ASSOCIATES · Punawale, PuneP52100003976· 81.8% built· 2 complaints
- ANANDTARAS HARITARA6.6 yr overdueANANDTARA PROPERTIES · Haveli, PuneP52100004122· filed Dec 2018 → now Dec 2019· 90.9% built· 1 complaint
- SKY MAX6.6 yr overdueHARBANSLAL TULSIRAM WADHWA · Haveli, PuneP52100001534· filed Dec 2018 → now Dec 2019· 80% built
- MUGDHALI APARTMENT CONDOMINIUM6.6 yr overdueKotibhaskar Infrastructures &Developers Pvt.Ltd. · Erandwana, PuneP52100015051· 90.9% built
- LAXMI PUJAN RESIDENCY6.6 yr overdueLAXMI PUJAN DEVELOPERS · Ambegaon, PuneP52100006418· filed Dec 2018 → now Jan 2020· 90.9% built
- Acropolis6.6 yr overdueMillennium Developers · NEAR BHUMKAR CHOWK, PuneP52100000088· 75.8% built
- VISION 16.6 yr overdueVISION PROPERTIES · CHIKHALI, PuneP52100014791· 81.8% built
- JAYHIND ICON6.6 yr overdueJAYHIND BUILDERS AND DEVELOPERS · Haveli, PuneP52100003193· 89.3% built
- Krupasindhu Corner6.6 yr overdueDhanlaxmi Builders And Developers · Haveli, PuneP52100011889· filed Jan 2019 → now Jan 2020· 90.9% built
- Shriram Vihar6.6 yr overdueShau Associates · Pimpri Chinchawad (M Corp.), PuneP52100002393· 79.5% built
- Ganeshree6.6 yr overdueGokhale Homes LLP · Pune (M Corp.), PuneP52100004527· filed Dec 2017 → now Jan 2020· 90.5% built
- KRUSHNAI IMPIRIO6.6 yr overdueKRUSHNAI BUILDCON · Pimpri Chinchawad (M Corp.), PuneP52100004229· 43% built
- SOHAM RESIDENCY6.6 yr overdueKHUSHBU REALTIES PVT. LTD · Haveli, PuneP52100007025· 81.8% built
- LAXMINARAYAN APARTMENT6.6 yr overdueKAPIL VILASRAO BARGE · MALEGAON B.K. TAL BARAMATI, PuneP52100017726· 10.9% built
- GOKULDHAM RESIDENCY6.6 yr overdueS K BUILDERS AND DEVELOPERS · CHARHOLI, PuneP52100014496· 89.1% built
- PRIVIA SQUARE6.5 yr overdueELLORA ASIAN REALTY PRIVATE LIMITED · MOSHI, PuneP52100009271· 81.8% built· 1 complaint
- Basileo Phase 26.5 yr overdueKate Jagtap Associates · Haveli, PuneP52100005652· 82.8% built
- MANTRI ETERNITY PLUS6.5 yr overdueOMEGA PREMISES PVT LTD · Haveli, PuneP52100007791· filed Feb 2019 → now Feb 2020· 54.5% built· 2 complaints
- Celina B2 Wing6.5 yr overdueWelworth Associates · NA, PuneP52100015172· 81.8% built· 1 complaint
- MALHAR COMPLEX6.5 yr overdueVINAYAK MHALSAKNT KHADE · TAL PURANDAR, PuneP52100015650· 19.1% built
- PRISTINE CITY BEF6.5 yr overduePRISTINE DEVELOPERS · Adjucent to Bakori Village, PuneP52100000913· filed Aug 2019 → now Feb 2020· 90.9% built· 2 complaints
- Megapolis Mystic Phase 26.5 yr overduePegasus Properties Pvt. Ltd. · Hinjewadi, PuneP52100001391· 90.9% built
- Swami Samarth6.5 yr overduePRIDE PROPERTIES & INFRASTRUCTURE · Erandwana, PuneP52100015849· 81.8% built
- Shantiniketan Phase II A36.5 yr overdueKumar Builders Consortium · Pune, PuneP52100005467· filed Mar 2019 → now Mar 2020· 90.9% built· 2 complaints
- Simar elegance6.5 yr overdueManmohan Singh Alagh · Pimpri Chinchawad (M Corp.), PuneP52100004329· 52.7% built
- Anushree6.4 yr overduePrasad Rajan Sable · Pimpri Chinchawad (M Corp.), PuneP52100013940· 15.1% built
- RENUKA HEIGHTS6.4 yr overdueR. H. ASSOCIATES · Baramati, PuneP52100011243· 20.5% built
- SHIVPADMA RESIDENCY6.4 yr overdueN B PROPERTIES · CHARHOLI, PuneP52100015571· 9.1% built
- SHIVOM REGENCY6.4 yr overdueSPACE BUILDERS & DEVELOPERS · Baner Village, PuneP52100014878· 78.6% built
- SILVER ROCKS6.3 yr overdueSILVER DEVELOPERS · Haveli, PuneP52100013495· filed Dec 2018 → now Apr 2020· 19.5% built
- LITTLE EARTH MASULKAR CITY PHASE 36.1 yr overdueKolte-Patil Developers Limited · KIWALE, PuneP52100014875· 88.6% built· 5 complaints
- LILLIAN6.1 yr overdueKALCON INFRASTRUCTURE · WAKAD, PuneP52100015032· 90.9% built
- SAPPHIRE6.1 yr overdueVARDHAMAN DEVELOPERS · Shirur, PuneP52100000277· 90.9% built
- PAVILION REGENCY6.1 yr overdueAVISHKAR DEVELOPERS AND BUILDERS · PUNE, PuneP52100014474· filed Jul 2019 → now Jul 2020· 71.8% built
- PRANSHU SQUARE5.9 yr overdueJANANI BUILDERS AND DEVELOPERS · MORE VASTI, PuneP52100011084· filed Jun 2019 → now Sept 2020· 81.8% built
- Prakriti -D- Navyangan5.9 yr overdueCALYX MERLIN VENTURES LLP · Mulshi, PuneP52100000312· filed Mar 2019 → now Sept 2020· 83.1% built
- NIVRUTTI HEIGHTS5.9 yr overdueKALKI DEVELOPERS · Pimpri Chinchawad (M Corp.), PuneP52100011757· filed Mar 2019 → now Sept 2020· 90.9% built· 8 complaints
- SHUBHARAMBH5.9 yr overdueI BUILD SUPREME UNION JV · Haveli, PuneP52100001406· filed Mar 2018 → now Sept 2020· 90.9% built· 2 complaints
- KIRIK ORIOLE PHASE 1A5.9 yr overdueKIRIK ENTERPRISES · Shankar Kalat Nagar, PuneP52100015859· 72.7% built
- Atlantis5.9 yr overdueManoj Yeole Ramdas Yeole · Pune (M Corp.), PuneP52100002148· 49.5% built
- 4 Ville5.9 yr overdueTRIMITEE CONSTRUCTIONS · Lonavala (M Cl), PuneP52100014434· 81.8% built
- Vidyadhan Wing D5.9 yr overdueKale Promoters and Developers · Haveli, PuneP52100001543· 72.7% built
- KAKADE AVISHKAR5.9 yr overdueBMK PROPERTIES · BHISE COLONY, VARALE, PuneP52100016186· 81.8% built
- VARSHA Phase II5.9 yr overdueSADGURU Developers · Baner, PuneP52100019844· 89.1% built
- DESTINATION OSTIA BLDG A5.9 yr overdueD R GAVHANE LANDMARKS LLP · Bhosari, PuneP52100007927· 80.9% built
- Life Republic Sector R2 - 2nd Avenue5.9 yr overdueKOLTE-PATIL INTEGRATED TOWNSHIPS LIMITED · Marunji, PuneP52100002682· filed Mar 2019 → now Sept 2020· 78.2% built
- SWASTIK DREAMS5.9 yr overdueDHANANJAY DAMODHAR DAREKAR · Pimpri Chinchawad (M Corp.), PuneP52100005665· 45.5% built
- SHREE ELIGANCE5.9 yr overdueABHILASHADEVELOPER · CHIKHALI, PuneP52100007582· filed Mar 2019 → now Sept 2020· 62.3% built
- SARITA VAIBHAV B5 AND B65.9 yr overdueBELVALKAR HOUSING COMPANY · PARAVTI, PuneP52100000336· filed Mar 2019 → now Sept 2020· 90.9% built
- Raj Aangan5.9 yr overdueMorayaRajAssociates · Haveli, PuneP52100000781· 81.8% built
- SHRIRAM REALITY5.9 yr overdueSHRIRAM REALITY · Chakan (CT), PuneP52100006883· 81.8% built
- VARADVINAYAK5.9 yr overduePANDHARI CONSTRUCTION · Haveli, PuneP52100010384· 23.6% built
- VARDHAMAN HEIGHT5.9 yr overdueCHRISHH OMKARA CONSTRUCTIONS · Varale, PuneP52100005792· 90.9% built
- ROYAL CATALEYA5.9 yr overdueROYAL GROUP OF DEVELOPERS · Haveli, PuneP52100005226· filed Mar 2019 → now Sept 2020· 89.1% built
- MADHURANGAN APARTMENT5.9 yr overdueSHRI YOGESH PRABHAKAR DHOLE · MALAD TALUKA BARAMATI, PuneP52100016018· 37.5% built
- GAGAN UNNATII PHASE 25.9 yr overdueGagan Unnati Ventures · Kondhwa, PuneP52100001818· filed Mar 2019 → now Sept 2020· 96.9% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.