Delayed projects in Pune
3,402 MahaRERA-registered projects in Pune are past the possession date on file and still under 100% built. Where the promoter has formally revised the date, the original is shown alongside so you can see what changed.
Page 7 of 18
- NIRMAL BUILDING A6.8 yr overdueM/s. Prathamesh Promoters Company · Pune (M Corp.), PuneP52100005656· 81.8% built
- Optimus6.8 yr overdueSiddhesh properties · Lahagaon, PuneP52100000803· filed Dec 2018 → now Dec 2019· 38.2% built· 2 complaints
- Sairaj Heights6.8 yr overdueSAIBABA SALES PRIVATE LIMITED · Pimpri Chinchawad (M Corp.), PuneP52100001542· filed Dec 2018 → now Dec 2019· 81.8% built· 2 complaints
- NYATI ETERNITY COMMERCIAL II6.8 yr overdueNITIN DWARKADAS NYATI · AXIS BANK UNDRI, PuneP52100021443· 45.2% built
- RAVI KARAN HEIGHTS6.8 yr overdueRAMKRISHNA DEVELOPERS · Haveli, PuneP52100013812· 22.7% built
- DOLPHIN PLATINA6.8 yr overdueDOLHIN HOME DEVELOPERS · Haveli, PuneP52100014580· 90.9% built
- Marvel Ganga Sangria A,B,C Building6.8 yr overdueMARVEL LANDMARKS PVT LTD · MOHAMMADWADI, PuneP52100001815· 76.8% built· 5 complaints
- Happy Homes6.8 yr overdueHappy Homes Realty · WAGHOLI, PuneP52100010270· filed Dec 2018 → now Dec 2019· 90.9% built
- Swara Sparsh6.8 yr overdueM/S Chinchwade Avhale Associates · Wakad, PuneP52100008838· 42.3% built
- Mont Vert Velocity6.8 yr overdueNiraj Kumar Associates Pvt Ltd · Pashan, PuneP52100001973· filed Dec 2018 → now Dec 2019· 90.7% built
- KAPILASHRAM6.8 yr overdueRAMRAI Buildcon LLP · Navi Sadashiv Peth, PuneP52100018672· 70.5% built
- SILVANA COUNTY6.8 yr overdueDIAMOND PROPERTIES · CHAROLI PHATA, PuneP52100018403· 90.9% built
- Megapolis Mystic - C6.8 yr overduePegasus Properties Pvt. Ltd. · Rajiv Gandhi Infotech Park, Phase 3, PuneP52100019959· 90.9% built
- Shankeshwar Crimson6.8 yr overdueNitin Chhaganlal Jain · Haveli, PuneP52100000087· 90.9% built
- Sai Hills6.8 yr overdueVighnaharta Promoters · Sai Hills, PuneP52100000061· filed Dec 2018 → now Dec 2019· 77.3% built
- LODHA BELMONDO ST. ANDREWS E6.8 yr overdueLodha Developers Limited · Gahunje, PuneP52100000182· 90.9% built· 1 complaint
- AKSHAY RESIDENCY6.8 yr overdueRAJENDRA RAMANLAL LUNAKD · Wakad, PuneP52100005552· 40.9% built
- ELITE GREEN ACRES - I AND J6.8 yr overdueSUNITA GAJENDRA PATIL · Mawal, PuneP52100003819· 81.8% built
- Sunrise Enclave6.8 yr overdueSunrise Realtors · Pimpri Chinchawad (M Corp.), PuneP52100002153· 65.9% built
- DURVA RESIDENCE6.8 yr overduePRADEEP MANIK BHISE · Thergaon, PuneP52100008001· 9.1% built
- Arihant Heights6.8 yr overdueSamruddhi Developers · Haveli, PuneP52100015353· 77.3% built
- Teerth Technospace 76.8 yr overdueTEERTH DEVELOPERS AND TEERTH REALTIES JV · Baner, PuneP52100006190· filed Dec 2018 → now Dec 2019· 90.9% built
- KINGSTONE AVENUE PH 16.8 yr overdueSupreme Developers · Pimpale Saudagar, PuneP52100001909· filed Dec 2018 → now Dec 2019· 70.8% built· 2 complaints
- SANSKRUTI HOMES6.8 yr overduePAVAN BUILDER · LOHEGAON, PuneP52100012935· 81.8% built
- Samrudhee Malhar6.8 yr overdueSAMRUDHEE HOMES · Sasvad (M Cl), PuneP52100002866· filed Dec 2018 → now Dec 2019· 77.3% built
- Central Park6.8 yr overdueOpulent Properties · Manjari Bk, PuneP52100000909· 90.9% built
- OAK VIEW6.8 yr overduePM Construction · Thergaon Near PCMC Zonal Office, PuneP52100006090· 94.1% built· 4 complaints
- Uttam Townscapes6.8 yr overdueFORTUNE DEVELOPERS AND INFRASTRUCTURES · Vishrantwadi, PuneP52100014002· 90.9% built
- AARAMBH6.8 yr overdueSAPTARSHI DEVELOPERS · Shirur, PuneP52100004850· 60.6% built
- Nilaya Wing A6.8 yr overdueGood Earth Shelters · Pune (M Corp.), PuneP52100007699· filed Dec 2018 → now Dec 2019· 91.9% built
- PAVILION 796.8 yr overdueWAKADKAR ASSOCIATE · Wakad, PuneP52100004489· 23.6% built
- MSPACE6.8 yr overdueMahindra Lifespace Developers limited · Haveli, PuneP52100015480· 81.8% built
- JARDIN6.8 yr overdueSanskruti Life Spaces · Mahalunge, PuneP52100003366· 79% built
- Ronch Viveza6.8 yr overdueRonch Realty Pvt. Ltd · Valvan, PuneP52100010441· 43.6% built
- Indraprastha Paradise6.8 yr overdueS. S. Developers · Borhadewadi, PuneP52100014739· 81.8% built· 1 complaint
- THE SPIRES6.8 yr overdueNAIKNAVARE PRIDE AOP · Pune City, PuneP52100000485· filed Dec 2018 → now Dec 2019· 87.9% built
- ANAND AASHRAY6.8 yr overdueANAND ENTERPRISES · Pimpri Chinchawad (M Corp.), PuneP52100002204· filed Dec 2018 → now Dec 2019· 90.9% built· 3 complaints
- SAMARTH CARINA COMMERCIA6.8 yr overdueMAHESH ZUMBARLAL KHINVASARA · NEAR ADITYA BIRLA HOSPITAL, PuneP52100015662· 9.1% built
- Hubtown Countrywoods Building 36.8 yr overdueHubtown Limited · Tilekar Nagar Kondhwa Budruk, PuneP52100002733· 82% built
- Pristine Greens Phase 16.8 yr overduePRISTINE PROPERTIES · BORHADEWADI, PuneP52100009406· 90.9% built· 9 complaints
- Pranjal Residency6.8 yr overdueBalasaheb Sadashiv Murkute · Baner, PuneP52100005273· 81.8% built· 1 complaint
- PHASE III VISION SHREE6.8 yr overdueSHUBBAN PROPERTIES VISION SHREE · jambhul, PuneP52100011706· filed Dec 2018 → now Dec 2019· 78.2% built
- DOLPHIN SQUARE6.8 yr overdueDOLPHIN INDUSTRIAL ESTATE · Haveli, PuneP52100014980· 81.8% built
- ORION6.8 yr overdueSUDARSHAN DEVELOPERS · Haveli, PuneP52100007244· 42.4% built
- Pratham Yash Residency6.8 yr overduePRATHAM YASH ASSOCIATES · LOHGAON, PuneP52100000071· filed Dec 2018 → now Dec 2019· 66.1% built· 1 complaint
- Abhilasha Park6.8 yr overdueSarovar Associates · Haveli, PuneP52100009755· 19.2% built
- Shine Square6.8 yr overdueNamoh Builders & Developers · Pimpri Chinchawad (M Corp.), PuneP52100003130· filed Dec 2018 → now Dec 2019· 75.9% built· 1 complaint
- GURUDEV APARTMENT6.8 yr overdueGurudev Associates · Haveli, PuneP52100010499· 53.6% built
- Metropolis6.8 yr overdueSharada Alliance Corporate House · Balewadi, PuneP52100005569· 55.9% built
- Sun Planet Phase III6.8 yr overdueJindal Mittal Graha Nirman Pvt. Ltd. · Haveli, PuneP52100018258· 81.8% built
- RAJYOG RESIDENCY6.8 yr overdueNISARG DEVELOPERS · Rajuri, PuneP52100011521· filed Dec 2018 → now Dec 2019· 48.5% built· 1 complaint
- UNITED ARISE6.8 yr overdueUNITED REALINFRA LLP · Pune (M Corp.), PuneP52100001312· filed Dec 2018 → now Dec 2019· 69.1% built
- Sai Krupa Residency Wing B6.8 yr overdueSai Krupa Ventures · LOHGAON, PuneP52100007343· 90.9% built
- AAYAN- BUILDING 26.8 yr overdueGANDHI BAFNA CONSTRUCTION PVT LTD · WAGHOLI, PuneP52100007092· filed Dec 2018 → now Dec 2019· 65.9% built
- GOLDEN WINDS Building E Phase 26.8 yr overdueGOLDEN BRICKS DEVELOPERS · Pune City, PuneP52100005025· 90.9% built
- SURAJ SURABHI6.8 yr overdueSURAJ BUILDERS · KONDHWA KHURD, PuneP52100014807· 71.8% built
- Teerth Technospace 96.8 yr overdueTEERTH DEVELOPERS AND TEERTH REALTIES JV · Baner, PuneP52100004297· filed Dec 2018 → now Dec 2019· 90.9% built
- DNYANESHWARI COMPLEX6.8 yr overdueShree Raghunath Maharaj Developers · CHOVISWADI, PuneP52100016255· 47.7% built
- Teerth Technospace 16.8 yr overdueTEERTH DEVELOPERS AND TEERTH REALTIES JV · Baner, PuneP52100011100· filed Dec 2018 → now Dec 2019· 81.8% built
- DREAMS ROYALE6.8 yr overdueDREAM HOMES · pimpri, PuneP52100002470· 81.8% built
- Platinum Square Phase 26.8 yr overdueVascon Engineers Ltd · Vimannagar, PuneP52100012916· 0% built
- ARV Royale6.8 yr overdueVedant Properties · Hadapsar, PuneP52100001161· 66.5% built
- Teerth Technospace 26.8 yr overdueTEERTH DEVELOPERS AND TEERTH REALTIES JV · Baner, PuneP52100012046· filed Dec 2018 → now Dec 2019· 90.9% built
- Teerth Technospace 156.8 yr overdueTEERTH DEVELOPERS AND TEERTH REALTIES JV · Baner, PuneP52100007204· filed Dec 2018 → now Dec 2019· 90.9% built
- LAXMI EMERALD PHASE-I6.8 yr overdueLAXMI DEVELOPMENTS · LOHGAON, PuneP52100004583· 77.4% built
- Sai Tirupati Greens Phase- I6.8 yr overdueSai Tirupati Properties · Wadmukhwadi, PuneP52100010061· 81.8% built· 1 complaint
- ROHAN ABHILASHA BUILDING F6.8 yr overdueROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED · WAGHOLI, PuneP52100000490· 83% built
- VENKATESH GRAFFITI PHASE 36.8 yr overdueSHREE VENKATESH BUILDCON PVT LTD · KESHAVNAGAR MUNDHWA, PuneP52100001000· 90.9% built· 1 complaint
- NeaPlus6.8 yr overdueSkylark Promoters Pvt. Ltd. · Baner Annexure, PuneP52100000823· filed Dec 2018 → now Dec 2019· 74.5% built
- Teerth Technospace 36.8 yr overdueTEERTH DEVELOPERS AND TEERTH REALTIES JV · Baner, PuneP52100004739· filed Dec 2018 → now Dec 2019· 90.9% built
- Engracia6.8 yr overdueJagtap Patil Promoters & Builders · Haveli, PuneP52100002471· 81.8% built
- Elite Abodeh6.8 yr overdueGanesh Dashrath Dale · LOHGAON, PuneP52100009181· filed Dec 2018 → now Dec 2019· 97.3% built
- ALANKAR F BUILDING6.8 yr overdueR K LUNKAD HOUSING COMPANY · CHARHOLI, PuneP52100016029· 81.8% built
- Amber6.8 yr overdueAchalare Realtors Private Limited · Baner, PuneP52100015730· 90.9% built
- Unnati6.8 yr overdueSigma Realty · Mulshi, PuneP52100000976· filed Dec 2018 → now Dec 2019· 90.9% built
- SHREERAM MAREEGOLD6.8 yr overdueR.G.DEVELOPERS · LOHGAON, PuneP52100003038· 27.3% built
- WEST ONE6.8 yr overdueDEU ASSOCIATES · Wakad, PuneP52100011779· 39.1% built
- Teerth Technospace 56.8 yr overdueTEERTH DEVELOPERS AND TEERTH REALTIES JV · Baner, PuneP52100011316· filed Dec 2018 → now Dec 2019· 90.9% built· 1 complaint
- OXY EVOLVE6.8 yr overdueVENKATESH ASSOCIATES · WAGHOLI, PuneP52100000772· 90.9% built
- Kalp Residency C Wing6.8 yr overdueKalp Buildtech · Chakan, PuneP52100002332· filed Dec 2018 → now Dec 2019· 81.8% built
- ABHIMAAN HOMES PHASE I6.8 yr overdueRISING PROPCON LLP · Shirgaon, PuneP52100000339· 83% built· 1 complaint
- COURTYARD6.8 yr overdueYOGESH & YOGESH DEVELOPERS · PASHAN, PuneP52100007218· filed Dec 2018 → now Dec 2019· 51.8% built
- ARIHANT RESIDENCY6.8 yr overdueNIRWANA ASSOCIATES · Baner, PuneP52100011552· 69.5% built· 1 complaint
- Xrbia Hinjewadi Road / Riverfront - Ph - 26.8 yr overdueXrbia North Hinjewadi Developers Private Limited · Bebad Ohol, PuneP52100000379· filed Dec 2018 → now Dec 2019· 90.9% built· 7 complaints
- ARISTOLIA6.8 yr overdueFORTUNE ASSOCIATES · Hadapsar, PuneP52100001480· 38.2% built
- EELA Phase-I6.8 yr overdueM/s. Siddhashila Developers · Punawale, PuneP52100012382· filed Dec 2018 → now Dec 2019· 89.1% built
- VIJAY RESIDENCY6.8 yr overdueVEDANT PROPERTIES · Pune (M Corp.), PuneP52100013999· 78.2% built
- SUNWINDS RESIDENTIAL6.8 yr overdueSANIKET INFRASTRUCTURES · BAVDHAN KHURD, PuneP52100002322· 81.8% built
- Aaradhyam6.8 yr overdueDHANESHWAR VISION DEVELOPERS · Pimpri Chinchawad (M Corp.), PuneP52100008419· 86.4% built
- SHIVPURAM A PLOT A6.8 yr overdueLUNKAD VISHWA DEVELOPERS · Haveli, PuneP52100002861· 81.8% built
- GANGA NEWTOWN PHASE I6.8 yr overdueSHREE BALAJI ASSOCIATES PUNE LLP · Haveli, PuneP52100001431· 87.4% built· 1 complaint
- REELICON KIAN6.8 yr overdueJKDEVELOPERS · AMBEGAON BK, PuneP52100003028· filed Dec 2018 → now Dec 2019· 54.5% built
- Dwarika Nagari6.8 yr overdueYashodhan Associates · Tilekar Nagar, PuneP52100002029· 90.9% built· 1 complaint
- RAJYOG RESIDENCY6.8 yr overdueBALAJI VIKRAM AWARE · Haveli, PuneP52100014835· 18.2% built
- Legacy Aura6.8 yr overdueLegacy Lifespaces LLP · Haveli, PuneP52100000710· 90.9% built
- ASHTAVINAYAK CITY PHASE 16.8 yr overdueASHTAVINAYAK CITY PUNE LLP · Fursungi, PuneP52100003514· filed Dec 2018 → now Dec 2019· 90.9% built
- Sangam Solitaire A wing6.8 yr overdueSangam Press Pvt Ltd · Pune (M Corp.), PuneP52100000438· 82.5% built
- Teerth Technospace 46.8 yr overdueTEERTH DEVELOPERS AND TEERTH REALTIES JV · Baner, PuneP52100011403· filed Dec 2018 → now Dec 2019· 90.9% built
- Pristine Pacific H , I6.8 yr overdueMELANGE DEVELOPERS · Pune (M Corp.), PuneP52100001211· 90.9% built
- SERENE HOMES6.8 yr overdueMANAS PROMOTERS & DEVELOPERS · Bhosari, PuneP52100012409· 73.1% built
- Sukhwani Scarlet6.8 yr overdueRavi Ghanshyam Sukhwani · WAGHOLI, PuneP52100000894· 90.2% built
- VENKATESH JOYNEST PHASE 46.8 yr overdueSHREE VENKATESH GROUP · Haveli, PuneP52100017998· 90.9% built
- Samarth Siddhi6.8 yr overdueShree Samarth Developers · Haveli, PuneP52100000711· 81.8% built
- Sunshine Joy Phase 26.8 yr overdueGreenlife Associates · Mulshi, PuneP52100004441· filed Dec 2018 → now Dec 2019· 86.4% built
- Tiara6.8 yr overdueSHETH AND POPAT ENTERPRISE · Wakad, PuneP52100007260· 26.8% built· 1 complaint
- T12 NAMED MAGNA BEING PHASE 2 OF THE PROJECT COMPRISING BUILDINGS T12 AND T136.8 yr overdueCavalcade Properties Private Limited · MOHAMMADWADI, PuneP52100015996· 72.7% built
- APS GRAND6.8 yr overdueAPS DEVELOPERS · Near Mokashi Bunglow, PuneP52100006373· filed Dec 2018 → now Dec 2019· 90.9% built
- Marvel Ganga Sangria G,H,J Building6.8 yr overdueMARVEL LANDMARKS PVT LTD · MOHAMMADWADI, PuneP52100002371· filed Dec 2018 → now Dec 2019· 95.2% built· 15 complaints
- Bliss county A and B Wing6.8 yr overdueVISION DEVELOPERS AND BUILDERS · RAHATNI, PuneP52100003752· 29.5% built
- SAVITRI COMPLEX6.8 yr overdueM/S TRIMURTI DEVELOPERS · Otur, PuneP52100012055· 90.9% built
- AMIT DEVELOPERS AND BUILDER6.8 yr overdueAMIT DEVELOPERS & BUILDER · Pune City, PuneP52100014355· 86.4% built
- Empier Estate6.8 yr overdueRohit Builders · Daund, PuneP52100003125· 59.5% built
- ATRIA GRANDE PROJECT A6.8 yr overdueAtria Constructions · Undri, PuneP52100000580· 72.7% built
- MAJESTIQUE CITY6.8 yr overdueMANISH DWARKADAS MAHESHWARI · Wagholi, PuneP52100000113· 90.9% built
- PRIDE REGENCY6.8 yr overdueSHAILESH CONSTRUCTION CO · Daund (CT), PuneP52100000716· 81.6% built
- Teerth Technospace 136.8 yr overdueTEERTH DEVELOPERS AND TEERTH REALTIES JV · Baner, PuneP52100005488· filed Dec 2018 → now Dec 2019· 90.9% built
- Life Republic Sector R3 - 3rd Avenue6.8 yr overdueKOLTE-PATIL INTEGRATED TOWNSHIPS LIMITED · Jambe, PuneP52100007511· 90.9% built· 5 complaints
- BROOKEFIELD WILLOWS6.8 yr overdueNirman Trimurti Developers · Pisoli, PuneP52100002035· 90.9% built· 1 complaint
- FOUR AVENUES6.8 yr overdueIKON CONSTRUCTIONS · Haveli, PuneP52100006853· filed Dec 2018 → now Dec 2019· 90.9% built
- ARMADAPHASEI6.8 yr overdueG K WONDERS · WAKAD, PuneP52100001684· 59.1% built
- Celestine6.8 yr overdueLotus Construction · Pune City, PuneP52100002736· 39.4% built
- LOTUS PARK6.8 yr overdueMATRUKRUPA DEVELOPERS · Ambegaon Bk, PuneP52100016278· 62.7% built
- PEACE VALLEY6.8 yr overdueR J DEVELOPERS · Ravet, PuneP52100012347· filed Dec 2018 → now Dec 2019· 81.4% built
- Mont Vert Cresta6.8 yr overdueMont Vert Constructions · Old Mumbai Pune Highway, PuneP52100004636· 73% built
- OM SHILP6.8 yr overdueOM SHILP · Haveli, PuneP52100013506· 81.8% built
- Orbit Bonneville6.8 yr overdueB-Orbit Amparo Constructions PVT Ltd · MOSHI, PuneP52100003348· filed Dec 2018 → now Dec 2019· 90.9% built
- Teerth Technospace 116.8 yr overdueTEERTH DEVELOPERS AND TEERTH REALTIES JV · Baner, PuneP52100005717· filed Dec 2018 → now Dec 2019· 90.9% built
- KOHINOOR IRIS PARK6.8 yr overdueKohinoor Properties · kalepadal, PuneP52100001617· 81.8% built
- NIVASA UDAAN - PHASE II6.8 yr overdueNIVASA REALTY · LOHEGAON, PuneP52100017799· 37.7% built
- Fortune6.8 yr overdueWonder Spaces · Talegaon Dabhade (M Cl), PuneP52100001687· 90.9% built
- SOLITAIRE6.8 yr overdueVarsha Ritu Constructions Pvt Ltd · Hadapsar, PuneP52100004759· filed Dec 2018 → now Dec 2019· 90.9% built
- DATTA VIHAR6.8 yr overdueSHREE UMIYA BUILDCON · Ambegaon, PuneP52100016362· 90.9% built
- PARTH CLASSIC6.8 yr overduePARTH DEVELOPERS · Pimpri Chinchawad (M Corp.), PuneP52100013837· filed Dec 2018 → now Dec 2019· 58.6% built
- HIGHWAY HEIGHTS6.8 yr overdueBHELKE AND DHONE PROMOTERS AND BUILDERS · Haveli, PuneP52100010723· 43.2% built
- AARAMBH6.8 yr overduePANDHARINATH VITTHAL JAMBHALKAR · Haveli, PuneP52100002457· filed Dec 2018 → now Dec 2019· 76.4% built
- NEELAMBARI6.8 yr overdueNAMRATA CONSTRUCTION · WAKAD, PuneP52100014695· 63.6% built
- Shree Apartment Phase 26.8 yr overdueNandini Mangaldeep Vishnu Associates · Rahatani, PuneP52100017227· 81.8% built
- Aarambh6.8 yr overdueYASHADA NIVASA ASSOCIATES · Pimpri Chinchawad (M Corp.), PuneP52100002191· 81.8% built
- Giri Darshan Apartment6.8 yr overdueConcept Townships & Estate Developers Pvt Ltd · Talegaon Dabhade (M Cl), PuneP52100011639· 54.5% built
- Portia6.8 yr overdueVilas Javdekar Lifestyle Developers Pvt. Ltd. · Haveli, PuneP52100000301· filed Dec 2018 → now Dec 2019· 68.2% built
- GRACE HEIGHTS6.8 yr overdueGRACE VENTURES · Pune City, PuneP52100009946· 68.6% built
- Mont Vert Vesta6.8 yr overdueMont Vert Estates · Mulshi, PuneP52100003950· filed Dec 2018 → now Dec 2019· 89.1% built
- GANESH AURA6.8 yr overdueVEDDANT REALTY · Haveli, PuneP52100005169· 72.7% built
- ELITE DREAMS6.8 yr overdueAJINKYA DEVELOPERS · Haveli, PuneP52100007217· 44.1% built
- Clover Casablanca Phase II6.8 yr overdueWorthwhile Properties Pvt. Ltd. · Mawal, PuneP52100002277· filed Dec 2018 → now Dec 2019· 90.9% built
- GANDHARV SERENITY6.8 yr overdueGandharv Developers · HADAPSAR, PuneP52100005405· filed Jun 2019 → now Dec 2019· 35% built
- VARAD VIHAR6.8 yr overdueSHREE DEVELOPERS · Haveli, PuneP52100012703· filed Aug 2018 → now Dec 2019· 52.7% built
- SAPTARSHI RESIDENCY C WING6.8 yr overdueSUBHAGYA PROMOTERS & BUILDERS PRIVATE LIMITED · AHER NAGAR , NEAR AHER GARDEN, PuneP52100010341· filed Dec 2018 → now Dec 2019· 45.5% built
- MUGDHALI APARTMENT CONDOMINIUM6.8 yr overdueKotibhaskar Infrastructures &Developers Pvt.Ltd. · Erandwana, PuneP52100015051· 90.9% built
- LAXMI PUJAN RESIDENCY6.8 yr overdueLAXMI PUJAN DEVELOPERS · Ambegaon, PuneP52100006418· filed Dec 2018 → now Jan 2020· 90.9% built
- SRUSHTI APARTMENT6.8 yr overdueRACHANA CREATERS · -, PuneP52100014366· filed Oct 2019 → now Jan 2020· 61.8% built
- VISION 16.7 yr overdueVISION PROPERTIES · CHIKHALI, PuneP52100014791· 81.8% built
- Acropolis6.7 yr overdueMillennium Developers · NEAR BHUMKAR CHOWK, PuneP52100000088· 75.8% built
- JAYHIND ICON6.7 yr overdueJAYHIND BUILDERS AND DEVELOPERS · Haveli, PuneP52100003193· 89.3% built
- Krupasindhu Corner6.7 yr overdueDhanlaxmi Builders And Developers · Haveli, PuneP52100011889· filed Jan 2019 → now Jan 2020· 90.9% built
- Shriram Vihar6.7 yr overdueShau Associates · Pimpri Chinchawad (M Corp.), PuneP52100002393· 79.5% built
- GOKULDHAM RESIDENCY6.7 yr overdueS K BUILDERS AND DEVELOPERS · CHARHOLI, PuneP52100014496· 89.1% built
- Ganeshree6.7 yr overdueGokhale Homes LLP · Pune (M Corp.), PuneP52100004527· filed Dec 2017 → now Jan 2020· 90.5% built
- SOHAM RESIDENCY6.7 yr overdueKHUSHBU REALTIES PVT. LTD · Haveli, PuneP52100007025· 81.8% built
- KRUSHNAI IMPIRIO6.7 yr overdueKRUSHNAI BUILDCON · Pimpri Chinchawad (M Corp.), PuneP52100004229· 43% built
- LAXMINARAYAN APARTMENT6.7 yr overdueKAPIL VILASRAO BARGE · MALEGAON B.K. TAL BARAMATI, PuneP52100017726· 10.9% built
- PRIVIA SQUARE6.7 yr overdueELLORA ASIAN REALTY PRIVATE LIMITED · MOSHI, PuneP52100009271· 81.8% built· 1 complaint
- Basileo Phase 26.7 yr overdueKate Jagtap Associates · Haveli, PuneP52100005652· 82.8% built
- MANTRI ETERNITY PLUS6.6 yr overdueOMEGA PREMISES PVT LTD · Haveli, PuneP52100007791· filed Feb 2019 → now Feb 2020· 54.5% built· 2 complaints
- Celina B2 Wing6.6 yr overdueWelworth Associates · NA, PuneP52100015172· 81.8% built· 1 complaint
- PRISTINE CITY BEF6.6 yr overduePRISTINE DEVELOPERS · Adjucent to Bakori Village, PuneP52100000913· filed Aug 2019 → now Feb 2020· 90.9% built· 2 complaints
- MALHAR COMPLEX6.6 yr overdueVINAYAK MHALSAKNT KHADE · TAL PURANDAR, PuneP52100015650· 19.1% built
- Swami Samarth6.6 yr overduePRIDE PROPERTIES & INFRASTRUCTURE · Erandwana, PuneP52100015849· 81.8% built
- Megapolis Mystic Phase 26.6 yr overduePegasus Properties Pvt. Ltd. · Hinjewadi, PuneP52100001391· 90.9% built
- Shantiniketan Phase II A36.6 yr overdueKumar Builders Consortium · Pune, PuneP52100005467· filed Mar 2019 → now Mar 2020· 90.9% built· 2 complaints
- Simar elegance6.6 yr overdueManmohan Singh Alagh · Pimpri Chinchawad (M Corp.), PuneP52100004329· 52.7% built
- Anushree6.6 yr overduePrasad Rajan Sable · Pimpri Chinchawad (M Corp.), PuneP52100013940· 15.1% built
- RENUKA HEIGHTS6.6 yr overdueR. H. ASSOCIATES · Baramati, PuneP52100011243· 20.5% built
- SHIVPADMA RESIDENCY6.5 yr overdueN B PROPERTIES · CHARHOLI, PuneP52100015571· 9.1% built
- SHIVOM REGENCY6.5 yr overdueSPACE BUILDERS & DEVELOPERS · Baner Village, PuneP52100014878· 78.6% built
- SILVER ROCKS6.5 yr overdueSILVER DEVELOPERS · Haveli, PuneP52100013495· filed Dec 2018 → now Apr 2020· 19.5% built
- LILLIAN6.3 yr overdueKALCON INFRASTRUCTURE · WAKAD, PuneP52100015032· 90.9% built
- LITTLE EARTH MASULKAR CITY PHASE 36.3 yr overdueKolte-Patil Developers Limited · KIWALE, PuneP52100014875· 88.6% built· 5 complaints
- SAPPHIRE6.3 yr overdueVARDHAMAN DEVELOPERS · Shirur, PuneP52100000277· 90.9% built
- PAVILION REGENCY6.2 yr overdueAVISHKAR DEVELOPERS AND BUILDERS · PUNE, PuneP52100014474· filed Jul 2019 → now Jul 2020· 71.8% built
- PRANSHU SQUARE6.0 yr overdueJANANI BUILDERS AND DEVELOPERS · MORE VASTI, PuneP52100011084· filed Jun 2019 → now Sept 2020· 81.8% built
- SHIVLEELA6.0 yr overdueEkdant Developers · Jejuri (M Cl), PuneP52100001802· 73.2% built
- MAHI ANAND RESIDENCY6.0 yr overdueBHAGWAN MACHINDRA MAHADIK · BABRAS MALA, PuneP52100016298· 72.7% built
- 4 Ville6.0 yr overdueTRIMITEE CONSTRUCTIONS · Lonavala (M Cl), PuneP52100014434· 81.8% built
- KAKADE AVISHKAR6.0 yr overdueBMK PROPERTIES · BHISE COLONY, VARALE, PuneP52100016186· 81.8% built
- MADHURANGAN APARTMENT6.0 yr overdueSHRI YOGESH PRABHAKAR DHOLE · MALAD TALUKA BARAMATI, PuneP52100016018· 37.5% built
- Aundh Riviera6.0 yr overdueSujay Shirish Bhansali · Haveli, PuneP52100002165· filed Mar 2019 → now Sept 2020· 90.9% built
- GAGAN UNNATII PHASE 26.0 yr overdueGagan Unnati Ventures · Kondhwa, PuneP52100001818· filed Mar 2019 → now Sept 2020· 96.9% built
- SPACE ELENA6.0 yr overdueSPACE VENTURES · Bavdhan, PuneP52100008019· 45.5% built
- FEEL BLISS PHASE-I6.0 yr overdueMaple Ravima Realtors · Bavdhan, PuneP52100003782· filed Mar 2019 → now Sept 2020· 90.9% built
- VENKATESH CLASSIC6.0 yr overdueOMSHRINIWAS DEVELOPERS · Hadapsar, PuneP52100001014· filed Mar 2019 → now Sept 2020· 84.2% built
- Prakriti -D- Navyangan6.0 yr overdueCALYX MERLIN VENTURES LLP · Mulshi, PuneP52100000312· filed Mar 2019 → now Sept 2020· 83.1% built
- DESTINATION OSTIA BLDG A6.0 yr overdueD R GAVHANE LANDMARKS LLP · Bhosari, PuneP52100007927· 80.9% built
- Godrej Prana6.0 yr overdueDREAM WORLD LANDMARKS LLP · UNDRI, PuneP52100001372· 89.1% built· 5 complaints
- Atlantis6.0 yr overdueManoj Yeole Ramdas Yeole · Pune (M Corp.), PuneP52100014390· 1.4% built· 1 complaint
- Dreams Rakshak G H wings6.0 yr overdueDreams Landmark · Wagholi, PuneP52100000401· filed Mar 2018 → now Sept 2020· 83.2% built· 1 complaint
- SUVARNA6.0 yr overdueRavetkar Realties · Kothrud, PuneP52100013022· 37.3% built· 1 complaint
- VANALIKA6.0 yr overdueM/S. AVIOR MAJESTIQUE PROPERTIES · Mulshi, PuneP52100001569· filed Mar 2019 → now Sept 2020· 90.1% built
- Raj Aangan6.0 yr overdueMorayaRajAssociates · Haveli, PuneP52100000781· 81.8% built
- FLORISTA COUNTY6.0 yr overdueI BUILD SUPREME UNION JV · Hadapsar, PuneP52100001416· filed Mar 2018 → now Sept 2020· 90.9% built· 6 complaints
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.