Delayed projects in Pune
3,375 MahaRERA-registered projects in Pune are past the possession date on file and still under 100% built. Where the promoter has formally revised the date, the original is shown alongside so you can see what changed.
Page 8 of 17
- MAHI ANAND RESIDENCY5.9 yr overdueBHAGWAN MACHINDRA MAHADIK · BABRAS MALA, PuneP52100016298· 72.7% built
- GIRNAR5.9 yr overdueABHAY CHANDRAMOHAN SAWANT · Daund (M Cl), PuneP52100007331· filed Mar 2019 → now Sept 2020· 81.8% built
- COZY LIFE5.9 yr overdueCOZY LIFE · PUNE, PuneP52100011208· 28.6% built· 2 complaints
- METRO JAZZ5.9 yr overdueBALAJI REALTY · Baner, PuneP52100004597· filed Mar 2019 → now Sept 2020· 76.4% built· 1 complaint
- SWASTIK DREAMS5.9 yr overdueDHANANJAY DAMODHAR DAREKAR · Pimpri Chinchawad (M Corp.), PuneP52100005665· 45.5% built
- Swaraj Capital - Phase I5.9 yr overdueSim Realty · Borhadewadi,Moshi, PuneP52100003900· filed Mar 2019 → now Sept 2020· 71.8% built
- Dreams Lynnea A B wings5.9 yr overdueDreams Construction ( Pune) Pvt. Ltd. · WAGHOLI, PuneP52100000237· filed Mar 2019 → now Sept 2020· 68.8% built· 12 complaints
- Godrej Prana5.9 yr overdueDREAM WORLD LANDMARKS LLP · UNDRI, PuneP52100001372· 89.1% built· 5 complaints
- Akash Towers C-D5.9 yr overdueLunkad Builders LLP · Pimple Nilakh, PuneP52100000402· 81.8% built
- SHRIRAM REALITY5.9 yr overdueSHRIRAM REALITY · Chakan (CT), PuneP52100006883· 81.8% built
- SHIVLEELA5.9 yr overdueEkdant Developers · Jejuri (M Cl), PuneP52100001802· 73.2% built
- Nirmiti Royal5.9 yr overdueNirmiti Homes · Baramati (M Cl), PuneP52100006518· filed Mar 2019 → now Sept 2020· 82.5% built
- VARDHAMAN HEIGHT5.9 yr overdueCHRISHH OMKARA CONSTRUCTIONS · Varale, PuneP52100005792· 90.9% built
- Atlantis5.9 yr overdueManoj Yeole Ramdas Yeole · Pune (M Corp.), PuneP52100002148· 49.5% built
- Saarrthi Shivalik5.9 yr overdueSiddharth Real Ventures Limited Liability Partnership · Kothrud, PuneP52100014200· 90.9% built
- SAI AURA5.9 yr overdueSHREE SAI CREATIONS · Kiwale, PuneP52100003031· 78.8% built
- NIVRUTTI HEIGHTS5.9 yr overdueKALKI DEVELOPERS · Pimpri Chinchawad (M Corp.), PuneP52100011757· filed Mar 2019 → now Sept 2020· 90.9% built· 8 complaints
- Memories5.9 yr overdueM/s NAMO DEVELOPERS · MOHAMMADWADI, PuneP52100001168· filed Mar 2019 → now Sept 2020· 51.8% built· 1 complaint
- KAPIL SANKALP5.9 yr overdueAVADHOOT CONSTRUCTIONS · Near Perugate Police Chauki, PuneP52100006505· filed Mar 2019 → now Sept 2020· 89.1% built
- ROYAL CATALEYA5.9 yr overdueROYAL GROUP OF DEVELOPERS · Haveli, PuneP52100005226· filed Mar 2019 → now Sept 2020· 89.1% built
- Antheia B35.9 yr overdueMahindra Lifespace Developers limited · Haveli, PuneP52100016677· 90.9% built· 1 complaint
- Atlantis5.9 yr overdueManoj Yeole Ramdas Yeole · Pune (M Corp.), PuneP52100014390· 1.4% built· 1 complaint
- Pansare Paradise Phase 15.9 yr overdueHari Om Builders & Developers · Shirur, PuneP52100015622· 90.9% built
- Dreams Rakshak G H wings5.9 yr overdueDreams Landmark · Wagholi, PuneP52100000401· filed Mar 2018 → now Sept 2020· 83.2% built· 1 complaint
- SARITA VAIBHAV B5 AND B65.9 yr overdueBELVALKAR HOUSING COMPANY · PARAVTI, PuneP52100000336· filed Mar 2019 → now Sept 2020· 90.9% built
- NYATI EVARA II5.9 yr overdueNYATI BUILDERS PRIVATE LIMITED · Undri, PuneP52100021346· 78.6% built
- SPACE ELENA5.9 yr overdueSPACE VENTURES · Bavdhan, PuneP52100008019· 45.5% built
- HEUU INDUSTRIAL SPACES5.9 yr overdueSONIGARA JEWELLERS PRIVATE LIMITED · AKURDI MIDC, PuneP52100007159· 41.8% built
- Vasudevsmruti5.9 yr overdueLAGOO APTE · Pune City, PuneP52100014160· 81.8% built
- VANALIKA5.9 yr overdueM/S. AVIOR MAJESTIQUE PROPERTIES · Mulshi, PuneP52100001569· filed Mar 2019 → now Sept 2020· 90.1% built
- MAULI SHANKAR KRUPA5.9 yr overdueBadri Construction · Baramati (M Cl), PuneP52100013080· 34.5% built
- VARADVINAYAK5.9 yr overduePANDHARI CONSTRUCTION · Haveli, PuneP52100010384· 23.6% built
- VENKATESH CLASSIC5.9 yr overdueOMSHRINIWAS DEVELOPERS · Hadapsar, PuneP52100001014· filed Mar 2019 → now Sept 2020· 84.2% built
- Aundh Riviera5.9 yr overdueSujay Shirish Bhansali · Haveli, PuneP52100002165· filed Mar 2019 → now Sept 2020· 90.9% built
- SHUBHARAMBH5.9 yr overdueI BUILD SUPREME UNION JV · Haveli, PuneP52100001406· filed Mar 2018 → now Sept 2020· 90.9% built· 2 complaints
- Vidyadhan Wing D5.9 yr overdueKale Promoters and Developers · Haveli, PuneP52100001543· 72.7% built
- FEEL BLISS PHASE-I5.9 yr overdueMaple Ravima Realtors · Bavdhan, PuneP52100003782· filed Mar 2019 → now Sept 2020· 90.9% built
- VARSHA Phase II5.9 yr overdueSADGURU Developers · Baner, PuneP52100019844· 89.1% built
- RAJ TEJ COMMERCIAL COMPLEX5.9 yr overdueSANGRAM ANANTRAO THOPTE · Bhor, PuneP52100010209· filed Mar 2019 → now Sept 2020· 90.9% built
- Godrej Infinity5.9 yr overdueOXFORD REALTY LLP · MUNDWA, PuneP52100003129· 89.1% built· 31 complaints
- THE BLUE RIDGE5.9 yr overdueBLUEBERRY DEVELOPERS · CHOWRAI NAGAR, PuneP52100015515· 57.3% built
- KAMAL VILLA II5.9 yr overdueRAJ HOUSING CORPORATION · Gokulnagar, PuneP52100001209· filed Mar 2019 → now Sept 2020· 87.3% built
- FLORISTA COUNTY5.9 yr overdueI BUILD SUPREME UNION JV · Hadapsar, PuneP52100001416· filed Mar 2018 → now Sept 2020· 90.9% built· 6 complaints
- VAASTU DREAMS5.9 yr overdueSai Essen Vaastu Developers LLP · CHIKHALI, PuneP52100007364· 64.8% built
- BAPPA RESIDENCY5.9 yr overdueSTONE SHELTERS LLP · Hinjavadi (CT), PuneP52100003451· filed Apr 2019 → now Oct 2020· 72.7% built
- Silver Satyam5.9 yr overdueSilver Satyam · Haveli, PuneP52100000036· 62.1% built
- EQUILIFE HOMES PHASE I5.8 yr overdueYELLOWSTONE NIRMITI LLP · Mhalunge, PuneP52100000767· 90.9% built
- ADORA-PHASE 25.8 yr overdueNEST KRISALA ASSOCIATES · RAVET, PuneP52100016201· 39.1% built
- Kul Utsav Ph 1 C building5.8 yr overdueKumar Builders · Pune, PuneP52100007155· 81.8% built· 2 complaints
- SHREE RESIDENCY PHASE A5.8 yr overdueUK CONSTRUCTION · Haveli, PuneP52100004908· filed Apr 2019 → now Oct 2020· 80% built
- ANSHUL KANVAS A AND E BUILDING5.8 yr overdueM/S ANSHUL BHOSALE REALTY · WAGHOLI, PuneP52100001023· filed Apr 2019 → now Oct 2020· 90.9% built· 1 complaint
- CRYSTAL CORNER5.8 yr overdueSAPTGIRI DEVELOPERS · Haveli, PuneP52100004065· filed Mar 2018 → now Oct 2020· 71.8% built
- SHOBHA VIHAR5.8 yr overdueANUP SATYANARAYAN SRIVASTAV · Mulshi, PuneP52100010551· filed Dec 2018 → now Oct 2020· 42.7% built
- Sun Radiant5.8 yr overdueMittal Vastu Rachana LLP · -, PuneP52100001797· filed Dec 2018 → now Oct 2020· 88.6% built
- PEBBLE PARK D15.8 yr overdueKumar Construction and Properties Pvt Ltd · Hadapsar, PuneP52100000073· 90.9% built
- Kul Utsav Phase I - Building D5.8 yr overdueKumar Builders · pune, PuneP52100007160· filed May 2019 → now Oct 2020· 90.9% built· 1 complaint
- Eden Spaces5.8 yr overdueElysian Realty · Kivale, PuneP52100006898· filed Oct 2019 → now Oct 2020· 66.4% built
- UDYAM BIZHUB5.8 yr overdueKADU REALTY LLP · SASWAD, PuneP52100016421· 81.8% built
- NAMRATA MAGIC5.8 yr overdueNAMRATA DEVELOPERS · Kokane Chowk, PuneP52100018637· 90.9% built· 1 complaint
- SWARGANDH5.8 yr overduePRIDE PROPERTIES & INFRASTRUCTURE · Gujrat colony, PuneP52100009418· filed Nov 2018 → now Oct 2020· 81.8% built
- LOTUS BUILDING A35.8 yr overdueORIENT SHIVAM DEVELOPERS · YAWALEWADI, PuneP52100002253· filed Jun 2018 → now Oct 2020· 90.9% built· 1 complaint
- TULIP SWAPNALOK5.8 yr overdueTulip Properties · Pimpri Chinchawad (M Corp.), PuneP52100011375· filed Dec 2017 → now Oct 2020· 90.9% built· 2 complaints
- Avneesh5.8 yr overdueSai Nirmiti Promoters & Builders · Pimpri Waghere, PuneP52100011082· 81.8% built· 1 complaint
- Vitthal Residency5.8 yr overdueSandeep Tukaram Raut · Pimpri Chinchawad (M Corp.), PuneP52100002758· filed Apr 2019 → now Oct 2020· 90.9% built
- BABAR POTE RECIDENCY5.8 yr overdueBABAR POTE ASSOCIATES · Pimpri Chinchawad (M Corp.), PuneP52100009503· filed Nov 2018 → now Oct 2020· 70.9% built
- SWASTIK MANAS5.8 yr overdueSWASTIK INFRA · Mahalunge, PuneP52100008050· filed Jul 2018 → now Oct 2020· 27.3% built· 1 complaint
- NANDAN ASPIRA5.8 yr overdueSHAMKANT KESHAV KOTKAR · Pune City, PuneP52100000971· filed Mar 2019 → now Oct 2020· 90.9% built· 1 complaint
- MORYA HILLS5.8 yr overdueRAMESH BABANRAO GAVHANE · Alandi (M Cl), PuneP52100012723· filed May 2019 → now Oct 2020· 54.5% built
- RISHABH AVENUE PHASE I5.8 yr overdueVISHWAMITRA AND RATHI · LAXMI ROAD NEAR VIJAY TALKIES, PuneP52100006466· filed Mar 2018 → now Oct 2020· 75.5% built
- BHALCHANDRA VATIKA5.8 yr overdueSAMARTH CHINTAMANI PROPERTIES · NEAR BALAJI TEMPLE, PuneP52100021798· 90.9% built
- GURUDATTA RESIDENCY5.8 yr overdueGURUDATTA DEVELOPERS · Pune (M Corp.), PuneP52100014253· filed Dec 2018 → now Oct 2020· 66.4% built
- Palazzo Greens5.8 yr overdueUnique Multicon India Pvt. Ltd. · Mawal, PuneP52100000948· filed Dec 2018 → now Oct 2020· 53.6% built· 7 complaints
- PADMANABH GOLDEN VALLEY PHASE-I BUILDING B AND C5.8 yr overdueOM BALAJI PLAZA · DHAYARI, PuneP52100001995· filed Dec 2018 → now Oct 2020· 44.5% built· 1 complaint
- Avenue Imperia5.8 yr overdueAvenue Buildcon · Baner, PuneP52100002633· filed Dec 2018 → now Oct 2020· 35% built
- NOTTING HILL PHASE II5.8 yr overduePARADISE REALTY · KONDHWA BUDRUK, PuneP52100018617· 72.7% built
- MARIYAH HEIGHTS5.8 yr overdueSAYED NAVEED AHEMD · Junnar, PuneP52100016027· 45.5% built
- Kul Utsav Ph I E Building5.8 yr overdueKumar Builders · Pune, PuneP52100007157· filed May 2019 → now Nov 2020· 90.9% built
- AKSHAY CITY A AND B BUILDING5.7 yr overdueRAJENDRA RAMANLAL LUNAKD · Mawal, PuneP52100002357· filed May 2019 → now Nov 2020· 86.4% built
- SILVER WOODS5.7 yr overdueHARIKRISHNA BUILDCON · mascernhes colony, PuneP52100011298· 50.9% built
- HAZEL VIEW5.7 yr overdueSHIV ASSOCIATES · HINJEWADI, PuneP52100001732· filed Jun 2019 → now Nov 2020· 69.7% built
- Solitaire Nine5.7 yr overdueAtul Builders · BANER, PuneP52100009238· filed May 2019 → now Nov 2020· 72.7% built
- DESTINATION ANKUR C BUILDING5.7 yr overdueKIRTI LANDMARKS · CHOVISAWADI, PuneP52100008620· 31.3% built
- Courtyard One Phase 15.7 yr overdueSIGMA ONE DHOOT VENTURES Previously Sigmaone Remonesa Ventures · WAKAD, PuneP52100005050· filed May 2019 → now Nov 2020· 89.1% built· 2 complaints
- Saarrthi Skybay5.7 yr overdueSiddharth Properties · Mahalunge, PuneP52100004803· filed May 2019 → now Nov 2020· 90.9% built· 19 complaints
- 39 AVENUE5.7 yr overdueR R LUNKAD VENTURES LLP · Wakad, PuneP52100001410· 90.9% built
- HARSHAD HARMONY5.7 yr overdueANAND ASHOK GANDHI · Dhayari (Part), PuneP52100014463· 81.8% built
- Eternia Phase 15.7 yr overdueVENTURESPRO PROJECTS LLP · Haveli, PuneP52100003139· filed May 2019 → now Nov 2020· 66.7% built· 4 complaints
- Janaranjani B at Nanded City5.7 yr overdueNanded City Development & Construction Co. Ltd. · Nanded City, PuneP52100015725· 73.4% built
- BHONDVE RESIDENCY5.7 yr overdueBHONDVE TEMGIRE ASSOCIATES · Pimpri Chinchawad (M Corp.), PuneP52100009836· filed Jun 2019 → now Nov 2020· 31.8% built
- Sterling Towers5.7 yr overdueICON DEVELOPERS · Haveli, PuneP52100016114· 56.7% built
- 5 AUDUMBER5.7 yr overdueLALITA DHARAMCHAND FULFAGAR · Shirur, PuneP52100015030· 72.4% built
- AUSTIN PARK D BUILDING5.7 yr overdueDIVYA SHRAVANI DEVELOPERS · Tathwade, PuneP52100009291· 90.9% built
- Regal Residency5.7 yr overdueShamshuddin Abdul Samad Choudhary · Chikahli, PuneP52100009843· 49.1% built
- SILVER SPACE A WING5.7 yr overdueDAMJI VASTA MAKWANA · PIMPLE NILAKH, PuneP52100025541· 81.8% built
- LIFE MONTAGE PHASE 25.7 yr overdueGHODAWAT INFRA LLP · SUS, PuneP53000006727· filed Jun 2019 → now Dec 2020· 48.2% built
- SAFFRON5.7 yr overdueSOBA ASSOCIATES · Kothrud, PuneP52100013262· 81.8% built
- SAFFRON -PHASE-II5.7 yr overdueM/S SOBA ASSOCIATES · KOTHRUD, PuneP52100014668· 81.8% built
- Rajgruhi Business Hub5.6 yr overdueRajgruhi Business Hub · Pune (M Corp.), PuneP52100010332· filed Jun 2018 → now Dec 2020· 9.7% built
- The One5.6 yr overdueShamkant Jagannath Shende · Bhugaon, PuneP52100001943· filed Jun 2019 → now Dec 2020· 81.8% built· 4 complaints
- ANANDTARA WHITEFIELD RESIDENCES PHASE - I5.6 yr overdueANANDTARA INFRASTRUCTURE · LONKAR VASTI, PuneP52100007529· filed Jun 2019 → now Dec 2020· 85.4% built
- POLITE PRECISA5.6 yr overduePOLITE ASSOCIATES · RAVET, PuneP52100001580· filed Jun 2019 → now Dec 2020· 90.9% built
- CONSTRUCTION OF 648 NOS EWS TS, 620 LIG TS UNDER PH2 AT MAHALUNGE TAL KHED DIST PUNE5.6 yr overduePune Housing & Area Development Board · Mahalunge, PuneP52100005293· filed Jun 2019 → now Dec 2020· 24.5% built
- ROSE E MEHAR5.6 yr overdueVINOD PREMCHAND CHANDWANI · Haveli, PuneP52100000330· filed Jun 2019 → now Dec 2020· 58% built
- Rajgruhi Residency Tower A5.6 yr overdueWellbuild Merchants Private Limited · Kondhwa, PuneP52100006776· filed Jun 2019 → now Dec 2020· 88.3% built
- Vermont5.6 yr overdueSIA Developers · Moze Engineering College, PuneP52100001456· filed Jun 2019 → now Dec 2020· 81.7% built· 3 complaints
- ZINNIA ELEGANS5.6 yr overdueVINODE WAKADKAR ASSOCIATES · Wakad, PuneP52100008023· filed Jun 2019 → now Dec 2020· 45.5% built
- Marvel Ganga Sangria K,L,M Building5.6 yr overdueMARVEL LANDMARKS PVT LTD · MOHAMMADWADI, PuneP52100002514· filed Jun 2019 → now Dec 2020· 72.4% built· 14 complaints
- MY HOME TALEGAON5.6 yr overdueGoyal Developers · Talegaon Dabhade (R), PuneP52100000758· filed Jun 2019 → now Dec 2020· 90.9% built· 1 complaint
- POLITE HARMONY - B WING5.6 yr overduePOLITE PROMOTERS & BUILDERS · Haveli, PuneP52100001805· filed Jun 2019 → now Dec 2020· 90.9% built
- Nexus Glorious5.6 yr overdueNEXUS ASSOCIATES · Nexus Glorious, PuneP52100000875· filed Jun 2019 → now Dec 2020· 81.8% built
- IMPERIAL COMMERCIAL SPACES5.6 yr overdueMERIDIAN · Pune City, PuneP52100007362· filed Jun 2019 → now Dec 2020· 66.4% built· 1 complaint
- Woodsville Phase 1 D1 and D3 Buildings5.6 yr overduePharande Promoters and Builders · Pimpri Chinchawad (M Corp.), PuneP52100001127· filed Jun 2019 → now Dec 2020· 90.9% built
- Runwal Arcade5.6 yr overdueRunwal Developers · Haveli, PuneP52100001264· 90.9% built
- ELITE COLOSSAL - I5.6 yr overduePREMIER DEVELOPERS · Pune City, PuneP52100004606· 81.8% built
- VISHAKHA REGENCCY5.6 yr overdueVISHAKHA DEVELOPER · WADGAON BK, PuneP52100008301· filed Jul 2019 → now Dec 2020· 81.8% built
- RAHULKUNJ5.6 yr overdueGokhale Shelters LLP · Rambaug Colony, PuneP52100014157· 90.9% built
- KAPILASHRAM PHASE II5.6 yr overdueRAMRAI Buildcon LLP · Ganjave Chowk, PuneP52100022227· 67.3% built
- Sai Tirupati Greens Phase-25.6 yr overdueSai Tirupati Properties · Wadmukhwadi, PuneP52100007106· 81.8% built
- Namrata Eco City 2.05.6 yr overdueNAMRATA DEVELOPERS PVT. LTD · s, PuneP52100000227· 89.1% built· 2 complaints
- AMAR SADANAND TECH PARK5.6 yr overdueAMAR BUILDERS AND DEVELOPERS · BANER, PuneP52100014439· 90.9% built
- Aayush Business Square5.6 yr overdueEarnest and Shah Ventures · Near D Y Patil Engineering College - Varale, PuneP52100019102· 77.3% built
- ELITE COLOSSAL-II5.6 yr overduePREMIER DEVELOPERS · Pune (M Corp.), PuneP52100009643· 81.8% built
- YASH TWIN TOWER5.6 yr overdueYASH INFRA CITY REALTY PRIVATE LIMITED · Baner, PuneP52100008049· filed Jul 2019 → now Dec 2020· 71% built· 14 complaints
- Bhalchandra Puram5.6 yr overduePolite Buildwell · RAVET, PuneP52100002143· filed Jun 2019 → now Dec 2020· 90.9% built
- DWARKA SAI WONDERS PHASE 25.6 yr overdueG K DEVELOPERS · PIMPLE SAUDAGAR, PuneP52100000609· 81.8% built
- Woodsville Phase 3 Cluster B5.6 yr overduePharande Promoters and Builders · Boradewadi, PuneP52100000246· 90.9% built
- Konark Riva5.6 yr overdueKonark and Leeshaa · Keshavnagar, PuneP52100000825· 90.9% built
- Gandharva Nagari Phase II, Project II, G-125.6 yr overdueVinayak Pandharinath Bhongale · Opp Kendriya Vihar, PuneP52100007134· 29.1% built
- Vistaar Icon5.6 yr overdueVistaar Realty · Balewadi, PuneP52100000866· filed Jun 2019 → now Dec 2020· 80.9% built
- SHERKAR-BANKAR RESIDENCY5.6 yr overdueSACHIN SAYAJI BANKAR · SURAYANAGARI, PuneP52100023248· 90.9% built
- MELANGE RESIDENCES - PHASE II5.6 yr overdueRAMA SYNERGY SPACES · Hinjawadi Phase III, PuneP52100003047· filed Jun 2019 → now Dec 2020· 87.7% built
- YashONE Phase - I5.6 yr overdueVilas Javdekar Eco Homes · Mulshi, PuneP52100014585· 78.8% built· 1 complaint
- GOKHALE BLOSSOM5.6 yr overdueSUDHIR MAHADEV GOKHALE · KIRKATWADI, PuneP52100016483· 81.8% built
- SAIRATNA HEIGHTS5.6 yr overdueMALHAR BUILDERS AND DEVELOPERS · Alefata (N.V.), PuneP52100012748· 82.2% built· 1 complaint
- BLOSSOM5.6 yr overdueNG RATHI ASSOCIATES · WAGHOLI, PuneP52100007572· 51.8% built· 4 complaints
- INSIGNIA5.6 yr overdueATHARVA REALTORS · BANER,, PuneP52100022043· 54.5% built
- GULAB HEIGHTS5.6 yr overdueBUTTEPATIL ENTERPRISES · SHIVAJINAGAR, PuneP52100015219· 60% built
- SPLENDID COUNTY PHASE II5.6 yr overdueYASHADA BUILDERS · LOHGAON, PuneP52100004533· 90.9% built
- VISION INDRAMEGH5.6 yr overdueVISION INFRA · Koyate Wasti, PuneP52100005558· 90.9% built
- GYANGANGA E5.6 yr overdueGANGA GALAXY PROMOTERS · RAHATANI, PuneP52100024597· 99.1% built
- Kalpataru5.6 yr overdueShree Maruti Buildcon · Chakan, PuneP52100012215· filed Dec 2019 → now Dec 2020· 81.8% built
- CITY AVENUE5.6 yr overdueCARNATION LANDMARKS LLP · Near Bhumkar Chauk, PuneP52100003760· 90.9% built· 2 complaints
- NEETI HERITAGE5.6 yr overdueNEETI CONSTRUCTION · Pune (M Corp.), PuneP52100002822· 67.3% built
- Antheia A35.6 yr overdueMahindra Lifespace Developers limited · Haveli, PuneP52100000171· 90.9% built
- SAHYADRI VISHWA A5.6 yr overdueSAHYADRI VISHWA ASSOCIATES · Haveli, PuneP52100010857· filed Jul 2019 → now Dec 2020· 90.9% built
- GLORIA5.6 yr overdueDRUSHTI DEVELOPERS · Katraj, PuneP52100012808· filed Dec 2018 → now Dec 2020· 90.9% built· 12 complaints
- Dnyanai Residency5.6 yr overdueBharat Badshah Satpute · Rase, PuneP52100014606· 72.7% built
- KESAR TREE TOWN5.6 yr overdueKESAR VIGHNAHARTA GROUP · MOSHI, PuneP52100006616· 90.6% built
- Sai Tirupati Greens Phase 35.6 yr overdueSai Tirupati Properties · Wadmukhwadi, PuneP52100007487· 90.9% built· 1 complaint
- COURTYARD 155.6 yr overdueUNICON DEVELOPMENTS · Haveli, PuneP52100001345· filed Dec 2019 → now Dec 2020· 58.7% built
- AUSTIN PARK A BUILDING5.6 yr overdueYASHADA SHRAVNI GROUP · Tathwade, PuneP52100007500· 90.9% built
- SIGNATURE 285.6 yr overdueJagrutsara Structures LLP · CHAKAN, PuneP52100015061· 89.1% built
- SKY Pavilion Phase I5.6 yr overdueSKP Corp Private Limited · Undri, PuneP52100013569· 81.8% built
- SHRUTI APARTMENT A WING PHASE 15.6 yr overdueRADHIKA SHRIKRISHNA HAVAL · BANER, PuneP52100018846· 30% built
- Green Florencia5.6 yr overdueGreen Buildcon · Sus, PuneP52100004175· filed Dec 2019 → now Dec 2020· 90.9% built
- APPLE GLORY5.6 yr overdueAPPLE BUILDERS AND DEVELOPERS · MARUNJI, PuneP52100016004· 7.3% built
- GREEN LEAF5.6 yr overdueM/S KWALITY DEVELOPERS · BHAVANI PETH, PuneP52100014561· filed Dec 2018 → now Dec 2020· 59.1% built
- MANOHAR BLISS5.6 yr overdueBHAGYASHREE BHARAT SHASTRI · Baner, PuneP52100004676· filed Jun 2019 → now Dec 2020· 90.9% built
- Voyage to the Stars - Phase I5.6 yr overdueAcropolis Purple Developers · PUNE, PuneP52100004160· filed Jun 2021 → now Dec 2020· 98.9% built· 12 complaints
- Prasun Morya5.6 yr overduePrasun Associates · Thergaon, PuneP52100025761· 90.9% built
- AXIS CENTRA5.6 yr overdueAxis Landmarks · BANER, PuneP52100002121· filed Dec 2019 → now Dec 2020· 41.8% built
- Sonigara Excluzee5.6 yr overdueDHANRAJ KESARIMAL SONIGARA · Hinjavadi (CT), PuneP52100008799· filed Feb 2020 → now Dec 2020· 93% built
- enliven homes5.6 yr overduesiddhivinayak properties · Hadapsar, PuneP52100013363· 45.5% built
- OMKAR NANDAN5.6 yr overduePHOENIX ENTERPRISES · NARHE, PuneP52100004426· 72.7% built
- Vantagio5.6 yr overdueHarmony Shubham Associates · Wakad, PuneP52100003876· 90.9% built
- 24 K DREAMS5.6 yr overdueGS 24 BUILDCON · Pimpri Chinchawad (M Corp.), PuneP52100006385· 90.9% built
- RUDRA DHAM Phase 15.6 yr overdueRudra Construction & Developers · Lingali, PuneP52100007588· 30.9% built
- Urban Village5.6 yr overdueGirijapati Developers · Tambe Wasti, PuneP52100004861· filed Jul 2019 → now Jan 2021· 51.5% built· 1 complaint
- PARTH ESTATE5.6 yr overdueSANDEEP CONSTRUCTION COMPANY · Pune (M Corp.), PuneP52100003629· 67.3% built
- SHREYA5.6 yr overdueSAI SAMARTTHA PROPERTIES · Punavale, PuneP52100005125· filed Jul 2019 → now Jan 2021· 77.2% built
- SHREEPAD5.6 yr overdueSACHN ASHOK HARNASKAR · Bhor, PuneP52100012094· 90.9% built
- spurti pride5.6 yr overduesunil kamlakar thokale · Pimpri Chinchawad (M Corp.), PuneP52100003803· 81.8% built
- Nakshatra I-Land - 15.6 yr overdueEllora Buildwell Pvt Ltd · Moshi, PuneP52100003804· filed Jul 2019 → now Jan 2021· 90.9% built
- Ashritha Phase I5.6 yr overdueYogvinda Promoters & Developers Pvt. Ltd. · Haveli, PuneP52100001485· filed Dec 2018 → now Jan 2021· 33.3% built
- SARVESH APARTMENTS5.6 yr overduePrakash Construction Co · Daund, PuneP52100001214· filed Jul 2019 → now Jan 2021· 81.8% built
- Rajyog phase II -B Wing5.6 yr overdueRajadhiraj Developers · AMBEGAON Bk, PuneP52100013599· filed Jul 2019 → now Jan 2021· 57.3% built
- Varad Residency5.6 yr overdueVrushali Vijay Deshmukh · Haveli, PuneP52100004262· 90.9% built
- Prakash Nilay5.6 yr overduePrakash Infracon · Haveli, PuneP52100016061· 81.8% built
- Jai Ganesh Vision Commercial Wing A5.6 yr overdueSIDDHIVINAYAK KOHINOOR ASSOCIATES · pimpri chinchwad, PuneP52100010510· filed Jul 2019 → now Jan 2021· 90.9% built
- Jai Ganesh Vision Commercial WIng B5.6 yr overdueSIDDHIVINAYAK KOHINOOR ASSOCIATES · pimpri chinchwad, PuneP52100011476· filed Jul 2019 → now Jan 2021· 90.9% built
- Shree Ganesha Residency5.6 yr overdueTirupati Developers · Mulshi, PuneP52100005164· filed Jul 2019 → now Jan 2021· 39.5% built
- Atlantis City5.6 yr overdueM/s Surya Housing · Lohgaon, PuneP52100004933· filed Jul 2019 → now Jan 2021· 81.8% built
- Stanza5.6 yr overdueSaarrthi Blue Ventures LLP · Punawale, PuneP52100002571· filed Jul 2019 → now Jan 2021· 90.9% built
- Success Square5.6 yr overdueSiddharth Properties · Pune City, PuneP52100001813· filed Jul 2019 → now Jan 2021· 90.9% built· 3 complaints
- SIDDHI COMPLEX5.6 yr overdueSIDDHI DEVELOPERS · PUNE, PuneP52100004668· 90.9% built
- Divine Dew5.6 yr overdueSHIV ASSOCIATES · RAHATANI, PuneP52100001385· 95.5% built
- NYATI UNITREE II5.6 yr overdueNYATI BUILDERS PRIVATE LIMITED · Pune City, PuneP52100001629· 37.4% built
- GRAND HERITAGE5.6 yr overdueUJJWALA SATISH HAWARE · Wakad, PuneP52100014251· 90.9% built
- VANTAGE-95.6 yr overdueSOHANLAL SHANKARLAL VISHNOI · Baner, PuneP52100003199· 90.9% built
- KRISHNA ICON5.6 yr overdueKRISHNA CONSTRUCTION COMPANY · charholi kh, PuneP52100004486· 85.2% built
- Mayuri Optimum5.6 yr overdueVinesh Naresh Kumar Oswal · UNDRI, PuneP52100002131· filed Aug 2019 → now Jan 2021· 54.5% built
- Green Avenue5.6 yr overdueGreen Concept Builders & Developers · Baner, PuneP52100006788· 38.6% built
- AKSHAY GLORY5.6 yr overdueSHREE DEVELOPMENT CORPORATION · Pune (M Corp.), PuneP52100006319· 81.8% built
- Shubhankar Classic5.6 yr overdueShiv Properties · Thergaon, PuneP52100001956· 32.7% built
- VIGHNESHWAR HOUSE5.6 yr overdueVIVEK CHIMANRAO KATE · JHAVERY COLONY, PuneP52100015901· 90.9% built
- SANSKRUTI RESIDENCY5.6 yr overduePALASH DEVELOPERS · Baramati (M Cl), PuneP52100009432· 90.9% built
- SRI SAI CHAITHANYA5.6 yr overduePerinjelil Madhusoodanan Pillai · Baner, PuneP52100005831· 81.8% built
- MALHAR RESIDENCY5.6 yr overdueRANJEET DEVELOPERS · Mawal, PuneP52100003817· filed Dec 2018 → now Jan 2021· 90.9% built
- Vedant Heights5.6 yr overdueUmesh Shashikant Nanaware · IN FRONT MARKET YARD, PuneP52100007632· 81.8% built
- DWARKA SAI5.6 yr overdueG K FORTUNE · Pimple Saudagar, PuneP52100001761· 81.8% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.