All MahaRERA projects
23,645 registered projects with disclosed construction progress or complaint records. Page 43 of 48.
Ratnagiri
- SHRAVANDHARA ANNEX · CHIPLUNSuyog Nirman · P52800021445 · possession Mar 2025 · 58.5% built
- BLUE STAR RESIDENCY · SAWARDETAMANNA BUILDERS & DEVELOPERS · P52800021449 · possession Dec 2024 · 37.3% built
- Amantara · NEAR HINDU COLONYSuresh Tarachand Gundecha · P52800021640 · possession Dec 2025 · 100% built
- VITHAI BUILDING A · PALPENESARITA CORPORATION · P52800021724 · possession Jul 2026 · 81.8% built
- Varadvinayak Residency · Brahman AliGandhi Developers · P52800021877 · possession May 2022 · 100% built
- SAROJINI PLAZA · BURUMTALI CHIPLUNSantosh Ramchandra Tadsare · P52800021920 · possession Dec 2027 · 46.4% built
- NARAYAN SAI · NACHANENIKHIL ENTERSISES · P52800022616 · possession Feb 2027 · 81.8% built
- KOHINOOR VALLEY VIEW · NACHANE ROADJAINAM CONSTRUCTIONS PVT LTD · P52800022728 · possession Sept 2028 · 30.3% built
- KOHINOOR BLOSSOM · BUNDAR ROAD NEAR PHADKE UDYANJAIN AND JAIN CONSTRUCTION COMPANY · P52800022809 · possession Sept 2024 · 100% built
- OCEAN INFINITY · FISHRISE COLLEGEDEEPAK YASHWANT SALVI · P52800023055 · possession Dec 2030 · 54% built
- MADHUMANGAL RESIDENCY · KHED BAZAR PETHRAJAN MADHUKAR DESAI · P52800023309 · possession Dec 2022 · 100% built
- OMKAR RIDDHI APARTMENT · JAYSTAMBHPRAMOD GANPAT NALAWADE · P52800023781 · possession Dec 2026 · 55.5% built
- Mukadam Landmark 3 · KhedMukadam Estate · P52800025083 · possession Dec 2026 · 90.9% built
- SWAPNAPURTI RESIDENCY · JALGAONIDATE BUILDERS AND DEVELOPERS · P52800025425 · possession Jun 2027 · 5.5% built
- Kalpavriksha Heritage · RatnagiriKalpavriksha Builders & Developers · P52800025440 · possession Jun 2027 · 52.4% built
- VARUN EMPIRE · POST LANEVARUN DILIP WALAWALKAR · P52800025814 · possession Dec 2026 · 78.5% built
- NALINI VASANT VIHAR · NIVKHOLDinesh Mohanlal Jain · P52800026079 · possession Jul 2024 · 90.9% built
- Tatkare Mall · BazarpethAshraf Karim Fakir · P52800026098 · possession Jun 2026 · 81.8% built
- Amod Residency · RatnagiriMANOJ SHAM GHUDE · P52800027117 · possession May 2023 · 100% built
- RK SHOPPING CENTER · LanjaRamchandra Balkrishna Katgalkar · P52800027313 · possession Jun 2027 · 2.7% built
- Lakshminarayan Residency · DattanagarM/s Phatak Developers · P52800027427 · possession Jun 2022 · 100% built
- BELLE VUE · DapoliCranfield Construction · P52800027800 · possession Dec 2026 · 78.8% built
- RAJYOG RESIDENCY · MarutimandirRajyog Developers · P52800029325 · possession Apr 2024 · 90.9% built
- UNITY IRIS · MARUTI MANDIRUNITY VENTURES · P52800029463 · possession Mar 2025 · 27.3% built
- MAYURESH RESIDENCY · ZadgaonM/s Pavan and GJ construction co · P52800029697 · possession Dec 2025 · 66.4% built
- CITY LANDMARK · CHIPLUNC M ASSOCITES · P52800029774 · possession Jun 2027 · 45.6% built
- AMBIKA RESIDENCY · BHARNE NAKAVIVEK VILAS KADAM · P52800029789 · possession May 2023 · 90.9% built
- KOHINOOR V R PLAZA · NEAR MARUTI MANDIRJAIN AND JAIN CONSTRUCTION COMPANY · P52800030061 · possession Dec 2025 · 100% built
- ARIHANT THE PARK PHASE - I · NEAR MIDCRATNAGIRI DREAM HOMES PVT. LTD. · P52800030601 · possession Dec 2027 · 38.4% built
- CITY PRIDE · MandangadMahammad Salim Sayyad · P52800031330 · possession Dec 2028 · 15.5% built
- SHABAB AND RUBAB COMPLEX · CHIPLUNS R CONSTRUCTION PROP RIHAN KADIR MAHALDAR · P52800031491 · possession Dec 2027 · 100% built
- PADMAVATEE VATIKA · NEAR MSEB POWER STATION 80FT MANDVI HIGHWAY RATANGIRIABHAY MAHENDRA JAIN · P52800031497 · possession Dec 2024 · 75.9% built
- Gold Tower · Bazaar pethSalim Haji yusuf Memon · P52800031614 · possession Dec 2026 · 90.9% built
- AARAMBH HOMES · SUPALWADI STOPYASHRAJ ENTERPRISES · P52800031948 · possession Dec 2027 · 71.1% built
- Shrivishwa · Behind Ebrahim & Sons Nachane Raod, Near MSEBE Office Maruti Mandir RatnagiriGowardhan Builders & Developers · P52800032376 · possession Dec 2024 · 90.9% built
- SOHAM PRAKASH · ABHUDAY NAGARSOHAM PROMOTERS AND BUILDERS · P52800032587 · possession Dec 2025 · 88.6% built
- PATHAN COMPLEX · ChiplunAsif Gulab Pathan · P52800032898 · possession Dec 2026 · 90.9% built
- AMRUT DHAM · KUWARBAVGAJANAN CONSTRUCTION · P52800032934 · possession Dec 2026 · 81.8% built
- ADWAIT RESIDENCY · BHARNE NAKASHAILESH SUDHAKAR PAWAR · P52800032941 · possession May 2024 · 100% built
- Agastya sea view apartments · HarneM/s Phatak Developers · P52800033048 · possession Jan 2025 · 61.4% built
- SHREE SAI RESIDENCY · MirjoliRamesh Mahadev Khale · P52800033120 · possession Dec 2026 · 44.9% built
- KONKAN PARK · Behind Shainay HallMAHESH RAJARAM MESTRY · P52800033317 · possession Dec 2026 · 56% built
- S R City Phase I · ShirshingeRoshan Rohidas More · P52800034260 · possession Dec 2027 · 78.2% built
- Saffron · Opp of atharav banglows, markandiMohsin Salim Memon · P52800034516 · possession Dec 2026 · 90.9% built
- AKAR RAJASHRI SANKUL · NACHANE MUN.INAKAR INFRASTRUCTURE · P52800034762 · possession Sept 2028 · 90.9% built
- AKAR-ANAND VIHAR · OPPOSITE GST OFFICEAKAR INFRASTRUCTURE · P52800035144 · possession Apr 2030 · 80.9% built
- PHATAK SOLITAIRE · JalgaonM/s Phatak Developers · P52800046383 · possession Dec 2025 · 81.8% built
- NANDARAJ · RATNAGIRIRUCHA RAJESH MAPUSKAR · P52800047100 · possession Mar 2025 · 32.7% built
- ARYAN PLAZA · Bharne Naka, KhedMANGESH MOHAN GOVALKAR · P52800047441 · possession Mar 2025 · 100% built
- SHREE COMPLEX · Mauje KhedYogesh Shashikant Kudalkar · P52800047959 · possession Dec 2026 · 90.6% built
- Khedekars Enclave · State Bank ColonyHarsh Dinesh Jain · P52800048181 · possession May 2027 · 52.7% built
- SIDDHIVINAYAK PARK · KasarwadiPRUTHVI DEVELOPERS · P52800048798 · possession Dec 2030 · 44.1% built
- SHREE SADGURUKRIPA GRUHASANKUL PRAKALP · Near CollegeRishikesh Ramchandra Tavasalkar · P52800048882 · possession Dec 2031 · 29.7% built
- KOHINOOR TULIP · ATHAWADA BAZAARJAIN AND JAIN CONSTRUCTION COMPANY · P52800048970 · possession Dec 2025 · 100% built
- PARAS ENCLAVE · LOTEParas Infrastructure · P52800049063 · possession Jun 2026 · 67.7% built
- AYODHYA PARK · LASHKARWADIPRAMAY ENTERPRISES · P52800049259 · possession Dec 2026 · 52% built
- SWAPNASHILP · JALGAONAKSHAY SHRIDHAR PHATAK · P52800049318 · possession Dec 2025 · 90.9% built
- ATRIA · MirjoliSushant Suresh Chiplunkar · P52800050180 · possession Dec 2028 · 13.7% built
- TomorrowView · District RatnagiriHouse of Abhinandan Lodha Estate Holdings Private Limited · P52800050210 · possession Dec 2025 · 1 complaint
- A K CROWN · KherdiAbdul Hai Liyaqat Qazi · P52800050649 · possession Dec 2025 · 57.3% built
- Fortune Heights · Markandi, ChiplunYaseen Salim Memon · P52800050881 · possession Dec 2027 · 42.7% built
- SHUBHANKAR PRARAMBH · RatnagiriSHUBHANKAR BUILDSOL LLP · P52800050920 · possession Dec 2027 · 49.1% built
- BLUE MONT · JaystambhaDeepak Yashwant Salvi · P52800051050 · possession Apr 2027 · 24.7% built
- SAI PRABHAT · RavtaleSAI TAPASWI BUILDERS · P52800051068 · possession Dec 2026 · 85.5% built
- DILIPKUMAR PYARELAL JAIN · chiplunDilipkumar Pyarelal Jain · P52800051260 · possession Mar 2027 · 49.1% built
- BUSHRA RESIDENCY · Patwardhan WadiDILSHAD MOAZAM DHALAK · P52800051883 · possession May 2027 · 90.9% built
- Anand Park · KarvanchiwadiSD Associates · P52800052056 · possession May 2028 · 36.6% built
- THE WOODLAND · CH. SHIVAJI MAHARAJ NAGARSiddhivinayak Realty · P52800052311 · possession Dec 2028 · 47.4% built
- Cape of Bliss Phase 1A · RatnagiriHOABL Management Private Limited · P52800052438 · possession Dec 2025 · 2 complaints
- DREAMS TOWER · BAZARPETH CHIPLUNASHRAF KARIM FAKIR · P52800052729 · possession Dec 2026 · 90.9% built
- REEMZ TWIN TOWERS · Bahadur Shaikh NakaSOFITEL REALTY LLP · P52800052976 · possession Dec 2031 · 49.1% built
- Vasant Varsha · Dapoli CampJayant Yeshwant Kolhatkar · P52800053203 · possession Dec 2026 · 25.5% built
- APARANT PRIME · CHINCH NAKA CHIPLUN, DIST RATNAGIRIAPARANT DEVELOPERS · P52800053778 · possession Nov 2026 · 100% built
- KESHAVRAJ · RATNAGIRIAnil Bajarang Channe · P52800053963 · possession Dec 2027 · 53.6% built
- RATNASAGAR RESIDENCY · Near Govt PolytechnicBARSANA GROUP · P52800054081 · possession Dec 2026 · 82.7% built
- DREAM HORIZON · NEAR SWAMI SAMARTH MANDIRDELIGHT DEVELOPERS · P52800054286 · possession Dec 2026 · 31.4% built
- RUSHANG RESIDENCY · Sati ChinchghariRakesh Rajaram Chalke · P52800054777 · possession Dec 2028 · 48.2% built
- Mango Lakeview Guhagar · GuhagarSamir Shrinivas Kale · P52800054932 · possession Sept 2029 · 25.6% built
- SIDDHI A SQUARE · KhedJOGESH MADHUKAR SADVILKAR · P52800055144 · possession Dec 2026 · 100% built
- SEA VIEW APARTMENT · RAHATGHARSHREE DATTA CONSTRUCTION · P52800055367 · possession Jan 2027 · 39.2% built
- MAHADEV COMPLEX · Near Reliance MallMANGALMURTI DEVELOPERS AND BUILDERS · P52800055368 · possession Dec 2029 · 40.9% built
- AROHI · DabholPRADIP CHANDRAKANT RAUT · P52800055425 · possession Mar 2028 · 72.7% built
- GADRE EMPIRE · SakharpaSAWAKAR AND COMPANY · P52800055538 · possession Dec 2028 · 14.8% built
- MAULI RESIDENCY · SawardeIRA DEVELOPERS · P52800055629 · possession Dec 2028 · 90.9% built
- GOVINDA HEIGHTS · CHIKHALIRAHUL MANGESH SHETYE · P52800055772 · possession Feb 2029 · 38.8% built
- SWAMI COMPLEX · KasbaAMEY DEVELOPERS · P52800055824 · possession Dec 2028 · 77.3% built
- RAJASVI ENCLAVE · RatnagiriVIVEK PRABHAKAR BAPAT · P52800056236 · possession May 2029 · 51.4% built
- UNITY ASTER · SHIVAJI NAGARUNITYMEGACORPPVTLTD · P52800056244 · possession Dec 2028 · 41.4% built
- DHANWANTARI ENCLAVE · MARKANDIMEDHA VINAY KALI · P52800056432 · possession Dec 2028 · 30.3% built
- Mango Holiday Village Guhagar Bungalow No 109 · KirtanwadiSamir Shrinivas Kale · P52800066569 · possession Oct 2026 · 63.6% built
- The Ridley · PadaleHouse of Abhinandan Lodha Estate Holdings Private Limited · P52800076609 · possession Dec 2025 · 1 complaint
- Shree Sadguru Krupa · near Golden BakeryPRAMAY ENTERPRISES · P52800076818 · possession Dec 2027 · 43.6% built
- AKAR SHERE PLAZA · JOSHI PALAND NAKAAKAR INFRASTRUCTURE · P52800076898 · possession Nov 2028 · 59.1% built
- SHREE SAMARTH ANGAN CTS no.2915 · Bhairibhawani Templeshreeram samarth developers · P52800077013 · possession Dec 2028 · 25.6% built
- SAI SADAN · CAMP DAPOLIADITH BUILDERS AND DEVELOPERS · P52800077065 · possession Jan 2028 · 37.1% built
- PASHCHIMA · GuhagarMAKARAND GAJANAN KHARE · P52800077099 · possession Oct 2026 · 46.8% built
- Mango Lakefront Paradise Guhagar Bungalow No 38 · KondwadiSamir Shrinivas Kale · P52800077206 · possession Nov 2026 · 49.1% built
- THE BUTALA AVENUE · KHEDPRAMOD PARSHARAM BUTALA · P52800077208 · possession Dec 2026 · 79.5% built
- MALIK HILLS WING A AND B · UKTADSHARIF HASAN JAHANGIR DALWAI · P52800077482 · possession May 2029 · 37.5% built
- SUKHSAGAR · TILAK ALIPRASHANT MANOHAR DINGANKAR · P52800077534 · possession Dec 2030 · 19.7% built
- GAURI GANESH HEIGHTS · KuwarbavOmkar Dattaram Joshi · P52800077547 · possession Dec 2027 · 40% built
- DATTA ARCADE · Suyog Sweets and FarsanNIKET RAMESH MEHTA · P52800077925 · possession May 2027 · 2.6% built
- SHREEJI SPARSH · UDAY NAGAR, DAPOLI CAMPSHREE KRISHNA BUILDCON · P52800077960 · possession Aug 2031 · 56.4% built
- MADHUBAN HEIGHTS · PAG NAKARajesh M Vaje · P52800078386 · possession Sept 2029 · 20% built
- AKAR VANAJU ESTATE · RATNAGIRIAKAR INFRASTRUCTURE · P52800078696 · possession Dec 2040 · 8.1% built
- Sun City Phase - I · KhedNitin Talathi & Co · P52800078725 · possession Dec 2028 · 40.9% built
- BAIG RESIDENCY · DAPOLISHAHID ABDULLA RAKHANGE · P52800078865 · possession Dec 2028 · 34.1% built
- VASANT RESIDENCY · Anandvan JalgaonIDATE BUILDERS AND DEVELOPERS · P52800078966 · possession Dec 2026 · 22.9% built
- ABDUL GAFOOR RESIDENCY · JogeleFaraz Anwar Rakhange · P52800079228 · possession Dec 2027 · 32.7% built
- EKTA HEIGHTS · DhamanvaneEkta Developers · P52800079383 · possession Dec 2027 · 43.6% built
- UNIQUE RESIDENCY · Taluka KhedRED BRICKS DEVELOPERS · P52800079595 · possession Dec 2027 · 25.9% built
- MHVG Bungalow No 105 · KirtanwadiSamir Shrinivas Kale · P52800079596 · possession Aug 2027 · 41.8% built
- MHVG Bungalow No 91 · KirtanwadiSamir Shrinivas Kale · P52800079665 · possession Jun 2027 · 54.5% built
- SHREERAM RESIDENCY · Pimpli KhurdRupesh Shriram Bamane · P52800079689 · possession Dec 2027 · 40.5% built
- MHVG Bungalow No 86 · KirtanwadiSamir Shrinivas Kale · P52800079696 · possession Sept 2027 · 54.5% built
- DARUSSALAM RESIDENCY · KHEDFAKIABDULLA FAKIUMAR MULLAJI · P52800079710 · possession Dec 2029 · 55.5% built
- KHAN RESIDENCY · Survey No.268, Hissa No.1/2/C/2 and CTS No.700/2MMM BUILDCON · P52800079742 · possession Sept 2026 · 80.8% built
- SHREE MAHAKAL HEIGHTS · GuhagarSunil Shivpoojan Gupta · P52800079957 · possession Dec 2027 · 33.6% built
- SHREENIWAS RESIDENCY PHASE II · GimhavaneSachin Manohar Shinde · P52800080298 · possession Dec 2028 · 38.2% built
- Business Bay For Dapoli · DapoliGreencity Realty · P52800080377 · possession Mar 2028 · 18.2% built
- SAGAR SPARSH · MANDVIABHAY MAHENDRA JAIN · P52800080896 · possession Dec 2030 · 28.6% built
- HAJI UMAR COMPLEX · RatnagiriSIRAJ KARIM PATHAN · P52800080997 · possession Dec 2028 · 58.6% built
Sindhudurg
- ASHWA LUXORA · Near Kankavali DepotASHWAMEDH PRODUCTION · P52900000637 · possession Sept 2024 · 90.9% built
- COCONUT COUNTY PHASE 2 · KshetrafalDSQUARE DEVELOPERS AND DEVELOPERS · P52900000962 · possession Aug 2026 · 6.1% built
- PATESHWAR COMPLEX · SAWANTWADIRAJ CONSTRUCTION · P52900001049 · possession Nov 2022 · 81.8% built
- SANSKRUTI PARK · Malwan (M Cl)SANSKRUTI INFRASTRUCTURE · P52900001092 · possession Dec 2021 · 62.7% built
- ANANDVAN DABHOLKAR SANKUL PHASE 2 · PinguliCONSORTEXE PROPERTIES PVT LTD · P52900001575 · possession Dec 2018 · 72.7% built
- VARAD VINAYAK APARTMENTS · behind Gogate high schoolHARISHCHANDRA REALTY SOLUTIONS LLP · P52900001578 · possession Mar 2019 · 49.1% built
- SHREE CHINTAMANI · PinguliSHUBHANGI MAHENDRA GAWAS · P52900002891 · possession Dec 2018 · 52.3% built
- Aaradhya residency · Kudal (CT)Shrilaxmi Ventures Private Limited · P52900003293 · possession Sept 2018 · 81.8% built
- PUSHP RESIDENCY · BhomSUKHAKARTA REAALTY AND DEVELOPER · P52900003398 · possession Oct 2020 · 90.9% built
- Coral Residency B · Malwan (M Cl)Saanvi Landmarks Pvt.Ltd · P52900003719 · possession Oct 2019 · 90.9% built
- JAITAPKARWADI PHASE II · OrosPRAKASH RAJARAM JAITAPKAR · P52900003896 · possession May 2019 · 43.2% built
- SIDDHIVIINAYAK APARTMENT · Sawantwadi (M Cl)VARUN ENTERPRISES · P52900003899 · possession Oct 2018 · 58.2% built
- CRYSTAL RESIDENCY · KankavaliSNG HOUSING SCHEME PVT LTD · P52900003949 · possession Dec 2018 · 42.4% built
- Krishna Kunj · KasaiRajendra Dinkar Phatarpekar · P52900004075 · possession Jul 2019 · 24.5% built
- VIJAYADURGA APARTMENT · KolgaonVIJAYDURGA DEVELOPERS · P52900004162 · possession Sept 2018 · 80.9% built
- Laxmi Eva · Kudal (CT)Weaver Developers · P52900004169 · possession Jun 2018 · 56.5% built
- SAMRUDDHI APARTMENT · DeulwadiChirayu Properties LLP · P52900004545 · possession Oct 2018 · 53.9% built
- DHAIRYASHEEL PRIDE · padatewadiPANDURANG VINAYAK KANDALGAONKAR · P52900004575 · possession Dec 2019 · 81.8% built
- Govind Plaza · Vengurla (M Cl)Shrinivas Ramchandra Gaikwad · P52900004773 · possession Jan 2020 · 90.9% built
- Siddhipriya Park · OrosPRAKASH RAJARAM JAITAPKAR · P52900004787 · possession May 2023 · 39.5% built
- MOHAN RESIDENCY · Kudal (CT)ABHAY SHARAD WALAWALKAR · P52900005042 · possession Nov 2020 · 88.5% built
- SANJUCHIWADI PHASE- 1 · Kudal (CT)SHANTNU DEVELOPERS · P52900005097 · possession Dec 2018 · 86.4% built
- SHUBHARAMBHA PLAZA · Kudal (CT)R K INFRACONSTRUCT · P52900005183 · possession Oct 2022 · 54.5% built
- Silver Leaf Residency · PANZARWADAM/s Inspire Group · P52900005266 · possession May 2019 · 87.1% built
- SHREE BILWADAL · KankavaliSANKET SHRIDHAR NAIK · P52900005500 · possession Dec 2017 · 100% built
- PRIDE SQUARE · Malwan (M Cl)PRIDELAND PROPERTIES · P52900005509 · possession Jun 2018 · 89.1% built
- DWARKANATH COMPLEX · Sawantwadi (M Cl)GHARKUL CONSTRUCTION · P52900005596 · possession Dec 2022 · 90.9% built
- ASHWAMEDH · Sawantwadi (M Cl)Aryak Associates · P52900005744 · possession Dec 2026 · 76.5% built
- AIREZO DEVELOPERS · Majgaon (CT)RAMCHANDRA VITTHAL SATRE · P52900005936 · possession Aug 2018 · 90.9% built
- Valley of Grace · Sawantwadi (M Cl)Anil Bajarang Channe · P52900006039 · possession Dec 2021 · 59.1% built
- Shree Samarth Residency · Malwan (M Cl)Samarth Developers · P52900006080 · possession Oct 2020 · 51.4% built · 1 complaint
- NANDANVAN · OsargaonKALPAK DEVELOPERS · P52900006148 · possession Dec 2028 · 59.3% built
- RUTURAJ EMPIRE · Malwan (M Cl)CHAITANYA SURESH KAMBLI · P52900006409 · possession Nov 2020 · 18.2% built
- SHRINIVAS HEIGHTS · SAWANTWADIVYANKTESH VASANT DESHPANDE · P52900006630 · possession Mar 2018 · 30.3% built
- MANORAMA COMPLEX · Sawantwadi (M Cl)KEDAR CONSTRUCTION · P52900006912 · possession Dec 2021 · 90.9% built
- LAXMAN GOPAL RESIDENCY · KasalTATHASTU ENTERPRISES PRIVATE LIMITED · P52900006978 · possession Jun 2018 · 90.9% built
- AASHIRWAD AVENUE · KudalRACHANA BUILDERS AND DEVELOPERS KUDAL · P52900007098 · possession Jul 2023 · 72.3% built
- LATA APARTMENT · VengurlaBabasaheb Pandurang Patil · P52900007169 · possession Dec 2022 · 68.2% built
- Dattatray Residency · KumbharmathSana Homes Private Limited · P52900007388 · possession May 2028 · 58.2% built · 1 complaint
- Sadanand Residency · Oras Bk.Bhavani Builders · P52900007520 · possession Mar 2024 · 89.5% built
- GURU KRUPA · Majgaon (CT)SHREE SAMARTH SATAM MAHARAJ ENTERPRISES · P52900007558 · possession Jul 2018 · 81.8% built
- durvankur · Sawantwadi (M Cl)Darpan Construction · P52900007625 · possession Apr 2019 · 90.9% built
- SONBAHAVA - PHASE 2 · Majgaon (CT)Mega Realtors · P52900007661 · possession Sept 2018 · 55.2% built
- NIRMITEE LAXMINARAYAN · KudalNIRMITEE BUILDERS & DEVELOPERS · P52900007673 · possession Sept 2019 · 77.3% built
- Arvind Vaastu · AshiyeNilesh Arvind Manjarekar · P52900007739 · possession Jan 2019 · 90.9% built
- TULJA NEST · Sawantwadi (M Cl)TULJA BUILDERS · P52900007799 · possession Apr 2022 · 61.6% built
- SHANTADURGA APARTMENT · Sawantwadi (M Cl)SHANTADURGA DEVELOPERS · P52900007815 · possession Aug 2018 · 75% built
- ADIRAJ RESIDENCY · Sawantwadi (M Cl)KHORJUVEKAR BUILDERS & DEVELOPERS · P52900007870 · possession Jul 2019 · 77.3% built
- NILKANTH · kalmathKALPAK DEVELOPERS · P52900007897 · possession May 2018 · 81.8% built
- Vainta Residency · KankavaliSthapatya Realtors · P52900007947 · possession May 2022 · 90.9% built
- SRISHTI AANGAN · SALAIWADANEERAJ MOHAN DESAI HUF · P52900007953 · possession Jul 2023 · 45.5% built
- ANANDI ARPAN PHASE II · Vengurla (M Cl)ANANDI CONSTRUCTIONS · P52900007995 · possession Dec 2019 · 81.8% built
- SAI SAMARTH SANKUL · Kudal (CT)SAI SAMARTH ENTERPRISES · P52900008286 · possession Dec 2019 · 45.5% built
- SAIVED APPARTMENTS · KankavaliVIJAY ANAND RANE · P52900008461 · possession Oct 2018 · 59.5% built
- RAVIRAJ CORAL · KankavaliRAVINDRA SHANKAR SAWANT · P52900008639 · possession Dec 2022 · 63.9% built
- Sai Sahavas Phase II · HalvalSai Sampada Lifespaces Private Limited · P52900008783 · possession Jun 2018 · 77.3% built
- PALKAR RESIDANCY · KankavaliSandeep Balkrishna Walavalkar · P52900008832 · possession Dec 2021 · 81.8% built
- SKYLINE PRIDE · CharatheSKYLINE DEVELOPERS · P52900009098 · possession Jun 2022 · 85% built
- Patil Chembers · VengurlaBabasaheb Pandurang Patil · P52900009272 · possession Dec 2023 · 81.8% built
- NAKSHATRA ENCLAVE · Vengurla (M Cl)PANCHARATNA ASSOCIATES · P52900009370 · possession Dec 2022 · 45.5% built
- ASHTVINAYAK GRUHSANKUL · NEAR KHAMDEV NAKAMR PANKAJ ROHIDAS NARVEKAR AND VIVEKANAND ROHIDAS NARVEKAR · P52900009547 · possession Jun 2027 · 16.5% built
- MANE G CREATION · Kudal (CT)PRADEEP GAJANAN MANE · P52900009747 · possession Dec 2021 · 43.2% built
- MAHALAXMI ACRAD · sawantwadiMAHALAXMI REALTORS · P52900009862 · possession Aug 2026 · 90.9% built · 1 complaint
- PRATHAM RESIDENCY · Kudal (CT)Dalvi Brothers Builders and Developers Pvt. Ltd. · P52900009895 · possession Jun 2022 · 41.1% built
- PRIDE SIGNATURE · Malwan (M Cl)PRIDELAND PROPERTY · P52900009932 · possession Dec 2022 · 78.4% built
- SHREE OM APARTMENT · SAWANTWADISHREE OM PROPERTIES · P52900009948 · possession Feb 2021 · 81.8% built
- SHRI DWARAKA MAI COMPLEX · Sawantwadi (M Cl)SUNIL KRISHNA NIRAVDEKAR · P52900010099 · possession Aug 2026 · 80.7% built
- Vanashree Apartment · BhatwadiGoldCoast Infra · P52900010169 · possession Dec 2019 · 90.9% built
- GAGNESH NILAYA · KankavaliTATHASTU ENTERPRISES PRIVATE LIMITED · P52900010253 · possession Aug 2019 · 56.4% built
- SEAWOOD Phase I · Vengurla (M Cl)Shreeram Builders & Developers · P52900010496 · possession Jan 2019 · 81.8% built
- Kshitij Market City Phase I · Kudal (CT)KSHITIJ DEVELOPERS · P52900010519 · possession Jan 2021 · 23.6% built
- SHREE TULJABHAVANI RESEDENCY · WayariMANGESH RAJARAM MANKAR · P52900010546 · possession Nov 2018 · 90.9% built
- Shivaji Park · Kudal (CT)AAradhya Landmarks & Infra Pvt. Ltd. · P52900010548 · possession Dec 2021 · 79.6% built · 1 complaint
- Tarangan · KankavaliAsif Abdul Naik · P52900010623 · possession Jul 2019 · 81.8% built
- Siddhidata Park · OrosABHIJIT PRAKASH JAITAPKAR · P52900010635 · possession Mar 2022 · 81.8% built
- SAMARTH ANGAN · Malwan (M Cl)SAMARTH KRUPA DEVELOPERS · P52900010854 · possession Jun 2019 · 90.9% built
- GOBIND PLAZA · Sawantwadi (M Cl)SUKHMANI CONSTRUCTIONS · P52900010881 · possession Mar 2018 · 81.8% built
- DWARKANAGARI · CharatheSwastik Enterprises · P52900010891 · possession Apr 2031 · 57.6% built · 1 complaint
- HAPUS HOMES - PHASE 1 · JamsandeMEGA SPACES · P52900010951 · possession Dec 2017 · 84.5% built · 1 complaint
- Siddhivinayak Complex · AjgaonPrasad Pramod Khot · P52900011092 · possession Jul 2022 · 81.8% built
- PRITESH CHAMBERS · KumbharliPRALHAD LADU ARONDEKAR · P52900011467 · possession Dec 2024 · 90.9% built
- HERAMB SANKUL · Vengurla (M Cl)M/S HERAMB CONSTRUCTIONS · P52900011588 · possession Dec 2019 · 90.9% built
- SIDDHIVINAYAK APPARTMENT II · kudalSHREYASH BUILDERS & DEVELOPERS · P52900011808 · possession Dec 2019 · 43.2% built
- Ratnesh Plaza · Sawantwadi (M Cl)Babasaheb Pandurang Patil · P52900011813 · possession Dec 2019 · 90.9% built
- Dattakrupa Apartment · KankavaliVaibhav Vijay Naik HUF · P52900011920 · possession Dec 2018 · 90.9% built
- SWAYAMBHU PLAZA · JanvaliSHREE SAMARTHA ENTERPRISES · P52900012193 · possession Jan 2022 · 90.9% built
- Devi Darshan Phase I · Vengurla (M Cl)Shreeram Builders & Developers · P52900012306 · possession Nov 2018 · 86.4% built
- Swami Samarth Nagar · MalgaonRanco Realty Pvt Ltd · P52900012388 · possession Feb 2018 · 100% built
- Yashoday Phase One · near sawantwadi railway stationRanco Realty Pvt Ltd · P52900012395 · possession Sept 2019 · 100% built
- Shubham Shanti Residency · KudalSiddhivinayak Developers · P52900012484 · possession Sept 2019 · 90.9% built
- Maitri Residancy · kalmathDIgambar Shantaram Bhosale · P52900012571 · possession Aug 2018 · 54.5% built
- Samarth Krupa · Kudal (CT)Shailendra Ramesh Vajaratkar · P52900012636 · possession Jun 2022 · 65.8% built
- 54 Anandwan Sankul · ArawaliRajesh Raghuvir Mantri · P52900012680 · possession Jun 2018 · 74.2% built
- Datta-Anagha Park · KolgaonDattaraj Constructions · P52900012863 · possession Jun 2018 · 40.9% built
- SHRI SIDHESHWAR COMPLEX · KolgaonRADHEY ENTERPRISES · P52900012882 · possession Nov 2026 · 55.5% built
- GOLDEN SQUARE · Sawantwadi (M Cl)AJAY VASANT GONDAVALE · P52900012890 · possession Mar 2018 · 60% built
- Adityasagar Complex · VabhaveSiddhesh Mahadeo Kanade · P52900012910 · possession Dec 2019 · 69.5% built
- Yashoday Nagar Phase III · NiravadeRanco Realty Pvt Ltd · P52900012930 · possession Mar 2021 · 100% built
- SUWARNA KALASH · Oras Bk.MAHESH VASUDEV KANDALGAONKAR · P52900013174 · possession Jun 2019 · 36.8% built
- Yashoday Nagar Phase II · NiravadeRanco Realty Pvt Ltd · P52900013346 · possession Mar 2021 · 100% built
- LOTUS PLAZA · Vengurla (M Cl)CHOICE REALTY PRIVATE LIMITED · P52900013372 · possession Nov 2020 · 50% built
- MANERI RESIDENCY · ManeriNatasha Dcosta · P52900013413 · possession Jun 2024 · 81.8% built
- GOBIND SAMARTH · Sawantwadi (M Cl)SUKHMANI CONSTRUCTIONS · P52900013448 · possession Mar 2023 · 44.5% built · 1 complaint
- Shree Sadan · KankavliShreeyash Builders and Developers proprietor Shriram Nivruti Thormote · P52900013755 · possession Mar 2027 · 47.7% built
- Mahalaxmi Plaza · Vengurla (M Cl)Meraj Majesty Builders and Developers · P52900013898 · possession Jun 2021 · 100% built
- AVIGHNA · MajgaonAARADHYA PROMOTERS & BUILDERS LLP · P52900014032 · possession Jun 2019 · 90.9% built
- SHREE GANESH RESIDENCY · Sawantwadi (M Cl)ARCHANA SANDEEP GHARE · P52900014070 · possession Sept 2018 · 74.5% built
- DURVESH APARTMENT · Sawantwadi (M Cl)UNITED BUILDERS AND DEVELOPERS · P52900014380 · possession Mar 2018 · 90.9% built
- SHRI PLAZA · KolgaonR G DEVELOPERS · P52900014387 · possession Dec 2019 · 74.1% built
- ANANDVAN DABHOLKAR SANKUL PHASE 3 · MHAPSEKAR TITHACONSORTEXE PROPERTIES PVT LTD · P52900014584 · possession Nov 2019 · 51.5% built
- OWAIS TOWER · VAISHYAWADAKUTUBUDDIN JAMAL SHAIKH · P52900014691 · possession Sept 2020 · 98.6% built
- WAMAN-DATTA APARTMENT · BANDASAWANT AND SAWANT DEVELOPERS · P52900014726 · possession Jan 2023 · 34.1% built
- MEENA PARK - 5 · RAWOOLWADABENJAMIN MANWEL DSOUZA · P52900014825 · possession Mar 2018 · 90.9% built
- MEENA PARK PLOT 2-4 · RAWOOLWADABENJAMIN MANWEL DSOUZA · P52900014880 · possession Dec 2023 · 90.9% built
- COSMOS BUILDING C · VENGURLABENJAMIN MANWEL DSOUZA · P52900014898 · possession Feb 2019 · 90.9% built
- AJINKYA ROYAL · SABNISWADAAJINKYA CONSTRUCTION · P52900015368 · possession Feb 2022 · 90.9% built
- RAHMAT ARCADE · CHARATHEUNITED CONSTRUCTION CO · P52900015496 · possession Oct 2023 · 90.9% built
- OTRA PRESTIGE · RAWALNATH NAGAROTRA REALTY LLP · P52900015540 · possession Jan 2029 · 32% built
- MAITRI GARDEN · KANAK NAGARMAITRI DEVELOPERS · P52900015714 · possession Jun 2028 · 49.1% built
- AANGAN · VAZRE VILLAGEGULSHAN HOMEZ AND DEVELOPERS · P52900015873 · possession Aug 2022 · 81.7% built · 2 complaints
- NIRMITEE NANDAN · KUDAL BAZARPETHNIRMITEE BUILDERS & DEVELOPERS · P52900016322 · possession Sept 2020 · 81.8% built
- Dwarkamai · Near Forest OfficeDarpan Construction · P52900016701 · possession Apr 2028 · 50% built
- DREAMZ GOA · NABARWADALEVEL UP CONSTRUCTIONS · P52900017742 · possession Jul 2026 · 90.9% built
- OMKAR COMPLEX - PHASE 1 · SHRIRAM GOGATE HIGH SCHOOLShree Omkar developers · P52900018151 · possession Jun 2023 · 27.3% built
- Diksha Park Phase 4 · JanavliSudhir Dashrath Jadhav · P52900019394 · possession Mar 2022 · 90.9% built
- Dwarkanagri phase -1 · MITHBAONKRISHNA GAJANAN KESARKAR · P52900020632 · possession Dec 2026 · 43% built
- GOURI NANDAN APARTMENT · BANDAGOURINANDAN BUILDERS AND DEVELOPERS · P52900020980 · possession Nov 2031 · 25.7% built
- SHERA GREEN RESIDENCY · MASTAN MARG ZIRANGM/S GS BUILDCON · P52900021009 · possession Dec 2028 · 18.4% built
- KRUPASINDHU · PADELKRUPASINDHU CONSTRUCTIONS LLP · P52900021369 · possession Dec 2027 · 3.6% built
- AXIS BLUES · Yog ResortEEJAK HOLDINGS PRIVATE LIMITED · P52900021725 · possession Dec 2027 · 59% built · 10 complaints
- SHREE SAIDHAM APARTMENT · KANKAVLIHARISHCHANDRA REALTY SOLUTIONS LLP · P52900021797 · possession Jun 2023 · 88.2% built
- AARAMBH · KANKAVLIROVER ESTATE DEVELOPER PRIVATE LIMITED · P52900021990 · possession Feb 2024 · 100% built
- SULOCHANA PARADISE · JALKEWADIRIDDHI SIDDHI DEVELOPERS · P52900023285 · possession Oct 2024 · 44.5% built
- Galaxy Residency · Bidayewadi, KalmathMaitri Developers · P52900024798 · possession Jan 2027 · 84.5% built
- AARADHYA RESIDENCY · KOLGAONAARAMBHA INFOTECH PVT LTD · P52900025070 · possession Dec 2027 · 43.3% built
- ATHANG HOMES Project By Morvekar Realtors · KandalgaonCHANDRASHEKHAR SURYAKANT MORVEKAR · P52900026109 · possession Sept 2025 · 85.5% built
- JAITAPKARWADI PHASE III · OROSPRAKASH RAJARAM JAITAPKAR · P52900026560 · possession Jun 2029 · 52.5% built
- Ekdantpark · laxmiwadiSHREE MAHALAKSHMI BUILDCON LLP · P52900026752 · possession Jun 2029 · 8.6% built
- RAMESHWAR COMPLEX · BEHIND NIKHIL LUNCH HOMEPukar · P52900027238 · possession Dec 2026 · 41.1% built · 3 complaints
- ANANDVAN DABHOLKAR SANKUL- PHASE 4 · MHAPSEKAR TITHACONSORTEXE PROPERTIES PVT LTD · P52900027528 · possession Mar 2023 · 63.6% built
- perto de goa phase R 1 · niravde village, sawantwadiANKIT VASTU CREATIONS PRIVATE LIMITED · P52900027782 · possession Jun 2027 · 9.1% built
- VRINDAVAN · VAGADEKALPAK DEVELOPERS · P52900028417 · possession Jun 2029 · 14.2% built
- Siddhivinayak Developers · KudalSiddhivinayak Developers · P52900028637 · possession Aug 2027 · 58.2% built
- Krushanadarshan · BandhakarwadiVISHAVAJIT · P52900028902 · possession Sept 2025 · 90.9% built
- HARIDRA DEVAVRAT ENCLAVE · Near M.I.D.C. cornerShrilaxmi Ventures Private Limited · P52900029101 · possession May 2027 · 60.6% built
- Shri Bhawani Complex - Phase I · MirashiwadiShridhar Ramchandra Mirashi · P52900029269 · possession May 2027 · 67.9% built
- Aradhana Samarpan · VENGURLA BANDAR ROADAARWANA DEVELOPERS · P52900029515 · possession Mar 2030 · 47% built
- ADITYASAGAR COMPLEX PHASE II · Sambhaji ChowkSiddhesh Mahadeo Kanade · P52900029896 · possession Dec 2026 · 79% built
- Kamat Gurukul · KankavaliPranav Prakash Kamat · P52900030129 · possession Mar 2023 · 89.1% built
- PMAY EWS 240 tenement at Devgad jamsande · JamsandeSamarath Multi biz JV · P52900030789 · possession Dec 2029 · 13.8% built
- ATHARVA PARADISE · JAMSANDEATHARVA LIFESPACES LLP · P52900032699 · possession Oct 2025 · 100% built
- SHAMIM RESIDENCY · BANDAKUTUBUDDIN JAMAL SHAIKH · P52900032950 · possession Dec 2027 · 34.5% built
- HARISHCHANDRA RESIDENCY · JAMSANDEHARISHCHANDRA REALTY SOLUTIONS LLP · P52900033010 · possession Oct 2028 · 61.8% built
- SAI DARBAR · PILANKAR WADIKAILAS SURESH SATELKAR · P52900033068 · possession Oct 2023 · 72.7% built
- SAIGANDH PHASE 3 · KUDALSHRI SAI BUILDERS AND DEVELOPERS · P52900033268 · possession Nov 2027 · 55.5% built
- SHRI SAMARTH PLAZA · NEAR KANKAVLI RAILWAY STATIONKISHOR SHAHU PANGAM · P52900033456 · possession Dec 2026 · 27.3% built
- Devgiri Heights · MathewadaDarpan Construction · P52900034016 · possession Mar 2027 · 90.5% built
- VAASTU TATHASTU · REVTALE-MALVANNilesh Arvind Manjarekar · P52900034388 · possession Nov 2024 · 90.9% built
- Shri Shri Enclaves · PandurBalkrishna Bhaskar Sawant · P52900034558 · possession Mar 2027 · 34.7% built
- Shree sai Balaji Builders · JamsandeShree Sai Balaji Builders · P52900034866 · possession Mar 2027 · 70% built
- Dattaguru Niwas · majgaonD.S.S Group · P52900034870 · possession Mar 2029 · 50% built
- SAIRA APARTMENT · MUSLIMWADIJAVED HUSSAIN KHATIB · P52900045199 · possession Mar 2025 · 29.1% built
- ECO VILLAGE ANNEX · ECO VILLAGEmanuraj enterprises · P52900046155 · possession Dec 2027 · 17.3% built
- SHREES URBAN LIFE · VAGADESANKET SHRIDHAR NAIK · P52900046385 · possession May 2034 · 62.3% built
- ANANDVAN SAIRAJ SANKUL PHASE 1 · GONDHALPURCONSORTEXE PROPERTIES PVT LTD · P52900046802 · possession Dec 2028 · 47.3% built
- VRUKSHAVALLI B-4 · SAWANTWADIVIJAY GANGARAM NAIK · P52900046973 · possession Dec 2026 · 48.2% built
- Srishti Imperia · BajarPethNeeraj Mohan Desai · P52900047188 · possession Jul 2027 · 81.8% built
- Panchami Heights · SawantwadiGovind Janardan Khorjuvekar · P52900048001 · possession Oct 2027 · 45.5% built
- DYANESHWARI · Kelbaiwadi KudalDDS BUILDCON · P52900048563 · possession Dec 2026 · 41.6% built
- SHREYANS RESIDENCY · Wakad WadiPradeep Balu Jaitapkar · P52900049373 · possession Dec 2026 · 61.4% built
- Nirmitee Avighna · Near Topiwala VachanalayNIRMITEE BUILDERS & DEVELOPERS · P52900049381 · possession Dec 2028 · 74.5% built
- Ashapuri Residency · Jamsande, DevgadShirish Suryakant Shirsathe · P52900049516 · possession Dec 2028 · 40.6% built
- Swami Samarth Nagar Survey No. 133 Hissa No. 3 · Sawantwadi railway stationRanco Realty Pvt Ltd · P52900049565 · possession Mar 2028 · 25.8% built
- ATHANG SAI HOMES on S No 32/8/2 and 34/1B of Village Kolamb Malvan 416606 · KolambChandrashekhar Suryakant Morvekar · P52900049692 · possession Mar 2029 · 44.2% built
- SHRAAVAN NIVAS · Village TalereGAJANAN GOPAL BANDIVADEKAR · P52900049804 · possession Dec 2027 · 45.5% built
- Kshitij Market City Phase II · KudalKSHITIJ DEVELOPERS · P52900050301 · possession Aug 2027 · 53.6% built
- KRUPASINDHU APARTMENT · KUDALPRAWAL CONSTRUCTION · P52900050947 · possession Dec 2026 · 62.3% built
- Royal Enclave · Teli AliELITE DEVELOPERS · P52900051421 · possession Jun 2027 · 45.8% built
- SHREE TULJABHAVANI COMPLEX · -SHREE TULJABHAVANI DEVELOPERS · P52900051571 · possession Dec 2030 · 40.4% built
- SAHIL PLAZA B-WING · SATPAYARINAFEES ASHRAF KHAN · P52900051980 · possession Jun 2026 · 140.9% built
- MANOMAY RESIDENCY · KUDALSUMUKH DEVELOPERS · P52900052174 · possession Dec 2026 · 63.6% built
- KAMAT VISHWA - 2 · Near Kankavli CollegePranav Prakash Kamat · P52900052902 · possession Dec 2026 · 78.6% built
- APNA GHAR · KOLGAON WITHIN THE MUNICIPAL LIMITS OF SAWANTWADIVYANKATESH VASANT DESHPANDE · P52900053000 · possession May 2028 · 49.5% built
- MAHALAXMI RESIDENCY · NEAR BHAIRAV MANDIR KUDALPRAKASH RAJARAM JAITAPKAR · P52900053039 · possession Dec 2030 · 40.9% built
- AMRUTA HEIGHTS · KOLGAON MUN CL.ANISH AJAY SWAR · P52900053262 · possession May 2028 · 21.4% built
- Dipali Residency · SalaiwadaDattatray Construction · P52900053530 · possession Dec 2026 · 81.8% built
- RAM RAJYA RESIDENCY · KUDALADITYA NIKUNJ SHAH · P52900053662 · possession Dec 2028 · 46.8% built
- Nirman Heights · Maruti AaliRohan Shashikant Ragaji · P52900053822 · possession Dec 2026 · 43.6% built
- GARDEN VIEW · AT SAWANTWADI, TAL.SAWANTWADIS S CONSTRUCTION · P52900054210 · possession Dec 2027 · 28.2% built
- Prime Vista · KudalUmesh Sudhakar Sukhi · P52900054487 · possession Dec 2027 · 8.2% built
- SEA PEARL · MALWAN CITYHIRAYA CONSTRUCTIONS LLP · P52900054529 · possession Apr 2029 · 30.5% built
- Dattaprasad Niwas · MajgaonDattatray Construction · P52900054665 · possession Dec 2027 · 73.9% built
- YOG ANAND · YOG CITY MANERIDOMILIS ESTATE LLP · P52900054767 · possession Dec 2031 · 1 complaint
- Ruturaj Aatmshree · MalvanCHAITANYA SURESH KAMBLI · P52900055057 · possession Feb 2030 · 29.5% built
- MAHADIK PLAZA · TALEREMANOJ VASANT MAHADIK · P52900055325 · possession Dec 2026 · 53.2% built
- ALTURA · Kasai DodamargM/s. Block Buildtech LLP · P52900055534 · possession Dec 2027 · 18.6% built
- YOG ANAND · YOG CITYAbome Real Estate Private Limited · P52900055557 · possession Dec 2031 · 2 complaints
- SHIV RESIDENCY · NEW KHASKILWADASHIV REAL ESTATE DEVELOPERS AND BUILDERS · P52900055639 · possession Mar 2028 · 100% built
- VAIBHAVLAKSHMI APARTMENT · MAJGAONRAJENDRA SHASHIKANT MORYE · P52900056235 · possession Mar 2029 · 18.4% built
- Vighnaraj Apartment · KudalDhananjay Manohar Kalsekar · P52900056257 · possession Dec 2030 · 78.2% built
- Krishiv Tower · KudalSanjiv Sahadev Parab · P52900056360 · possession Mar 2028 · 40.9% built
- TARANGAN B WING · SANGIRDE KUDALCONSORTEXE PROPERTIES PVT LTD · P52900076691 · possession Dec 2026 · 60.9% built
- LOTUS ARCADE · KHASKILWADA SAWANTWADILOTUS ARCADE · P52900076769 · possession Mar 2028 · 35.9% built
- NARAYAN PLAZA · HINDU COLONY, OPP BHARAT PETROLIUM FUEL STATIONRACHANA BUILDERS AND DEVELOPERS KUDAL · P52900077084 · possession Mar 2029 · 51.4% built
- DATTA SRISHTI · NEW SABNISWADANeeraj Mohan Desai · P52900077107 · possession May 2029 · 20.6% built
- ATRINANDAN · KATTAGAONSHREE DATT ENTERPRISES · P52900077378 · possession May 2031 · 13.8% built
- ROSHAN SAIRA COMPLEX · DONGARALISAIRA BUILDERS AND DEVELOPERS · P52900077502 · possession Dec 2026 · 163.6% built
- Vasudha Heights · KalmathRhishikesh Prakash Kalage · P52900077928 · possession Mar 2027 · 0.5% built
- Alve Nirmiti · Kanak NagarP52900077938 · possession Dec 2027 · 43.2% built
- SAMARTH SAI RESIDENCY · Kanak NagarKailas Suresh Satelkar · P52900078236 · possession May 2028 · 58.6% built
- SWAYAMBHU KIRTI · KalmathRAKESH B RANE · P52900078400 · possession Jul 2027 · 32.7% built
- AAKAR ANANT · VENGURLA ROADAAKAR BUILDERS AND DEVELOPERS · P52900078734 · possession Mar 2028 · 50.7% built
- MHALSA HEIGHTS · GAWANDIWADANILESH ARAVIND MANJAREKAR · P52900078948 · possession Dec 2029 · 54.5% built
- GHD SAMAYA RETREAT · DODAMARGGHD INFRA DEVELOPERS PVT LTD · P52900078952 · possession Dec 2027 · 1 complaint
- Vrindavan Vas · Oras BkSHRIKANT PANDURANG VADGAONKAR · P52900078988 · possession Dec 2028 · 35.9% built
- Siddhivinayak Residency · KolambVastu Builder & Land Developer · P52900079034 · possession Dec 2029 · 0.5% built
- ALAUKIK · Hindu ColonyABHAY SHARAD WALAWALKAR · P52900079082 · possession May 2029 · 35.5% built
- Nirmitee S S Royal Plaza · KudalNIRMITEE BUILDERS & DEVELOPERS · P52900079764 · possession May 2030 · 30% built
- Avdhoot Manthan · PinguliShashikant Shamrao Jadhav · P52900079805 · possession Dec 2027 · 60.4% built
- Nishigandha Apartments · KudalBrahma Constructions · P52900080583 · possession Apr 2030 · 37.3% built
- Kudaleshwar Krupa Phase I · KudaleshwarwadiWeaver Constro · P52900080865 · possession Mar 2028 · 53.2% built
- Sadanand Residency Phase III · Oros Budruk, KudalBhavani Builders · P52900080992 · possession Mar 2030 · 27.9% built
Vengurla
Kolhapur
- SWAPNANAGARI · Near Rajendra NagarSwapnashilpa Housing LLP · P53000000097 · possession Dec 2021 · 90.9% built
- Palace Orchids Phase-I · Raman Mala,Siddhant Infrastructure · P53000000108 · possession Dec 2018 · 90.9% built
- IDEAL EMBARK · SANEGURUJI KOLHAPURTHE IDEAL CONSTRUCTION · P53000000132 · possession Jun 2018 · 90.9% built
- Runwal Tower · Daate MalaVision Infra Developers · P53000000151 · possession Dec 2023 · 81.8% built · 3 complaints
- VASANT NIWARA · Kasaba BawadaM/s Niwara Builders & Developers · P53000000207 · possession Apr 2022 · 90.9% built
- Indraprastha Prestige · Arun Sarnaik NagarSomraj Vithalrao Deshmukh · P53000000209 · possession Jul 2025 · 90.9% built
- Kwality Plaza · Jaysingpur (M Cl)Ghodawat Developers LLP · P53000000233 · possession Dec 2021 · 47.3% built
- REKHA SKY GARDEN · NEAR RAM MANGAL KARYALAYABhima builders & developers · P53000000341 · possession May 2019 · 81.8% built
- VARUN FLORA TOWNSHIP · UjalaiwadiVertex Developers · P53000000346 · possession Jan 2019 · 90.9% built
- CLYDE HOMES · TARABAI PARKVARAD DEVELOPERS · P53000000356 · possession Jan 2021 · 81.8% built · 3 complaints
- Anand Prospera C wing · Kolhapur (M Corp.)VIHANG ASHOK SHAH · P53000000357 · possession Nov 2018 · 90.9% built
- Ace Residency · Kolhapur (M Corp.)Ace Infra · P53000000422 · possession Dec 2021 · 59.5% built
- Mahalaxmi Residency · Kolhapur (M Corp.)shree mahalaxmi homes · P53000000426 · possession Dec 2021 · 61.8% built
- JUNCTION 176 · Kolhapur (M Corp.)Bhima builders & developers · P53000000545 · possession Dec 2021 · 66.4% built
- Dattawad Renaissance · Kolhapur (M Corp.)Karnasingh Daulatrao Ghorpade · P53000000560 · possession Dec 2018 · 79.5% built
- Sapphire Park · Kolhapur (M Corp.)S.S.Builders and Developers · P53000000649 · possession Sept 2020 · 90.9% built
- THE PALMGROVE PHASE II · Kolhapur (M Corp.)BEDEKAR BUILDERS AND DEVELOPERS · P53000000720 · possession Dec 2021 · 90.9% built
- YASH OMKAR RESIDENCY · Kolhapur (M Corp.)Yash Omkar Devepopers · P53000000836 · possession Sept 2020 · 100% built
- MEERA BHAKTI RESIDENCY · A WARDSHP Properties Private Limited · P53000000915 · possession Oct 2018 · 66.7% built
- VIHANG APPARTMENT · Kolhapur (M Corp.)SUDHAKAR DEVELOPERS PVT. LTD. · P53000000963 · possession Dec 2018 · 81.8% built
- ATHARVA OMKAR · Kolhapur (M Corp.)Yash Omkar Devepopers · P53000001056 · possession Dec 2020 · 100% built
- SHIVDATTA RESIDENCY · SHIVAJI UDAYAMNAGARShivdatta Builders · P53000001077 · possession Dec 2019 · 100% built
- KEYSTONE DEVELOPERS-GRUHYOG · Kolhapur (M Corp.)VIRENDRASINH PRAVINSINH GHATGE · P53000001104 · possession Mar 2022 · 90.9% built
- Shree Residency · Kolhapur (M Corp.)SHREE DEVELOPERS · P53000001228 · possession Mar 2022 · 61.8% built
- Mallhar Terraces · Kolhapur (M Corp.)Shendre and Associates · P53000001244 · possession Dec 2019 · 77.7% built
- GRUHYOG · Kolhapur (M Corp.)PRAVINSINH JAYSINGRAO GHATGE · P53000001246 · possession Dec 2024 · 90.9% built · 1 complaint
- SILVER OAK PHASE 1 · GadhinglajBHASKAR RAMGONDA PATIL · P53000001256 · possession Jun 2023 · 84.8% built
- JAGAJJIVAN HEIGHTS · Kolhapur (M Corp.)Aavishkar Realtors · P53000001291 · possession Jun 2023 · 81.8% built
- Shree Yash Varad · Kolhapur (M Corp.)Powar Associates · P53000001365 · possession Mar 2019 · 90.9% built
- Mallhar Estate · Kolhapur (M Corp.)Shendre and Associates · P53000001367 · possession Dec 2019 · 90.9% built
- Mallhar Enclave · Kolhapur (M Corp.)Shendre and Associates · P53000001423 · possession Dec 2019 · 88.6% built
- THE CUBE · Kolhapur (M Corp.)AIM KAPADE CREATORS · P53000001448 · possession Jan 2018 · 90.9% built
- JYOTI MONTERIO PHASE 1 · JaphaleJeevan Jyoti Builders and Developers · P53000001496 · possession Dec 2018 · 53.6% built
- AMEY HI LIFE · nana patil nagarAMEY ESTATES · P53000001507 · possession Dec 2026 · 81% built
- Bhosales Mallhar Heritage · Kolhapur (M Corp.)Shendre and Associates · P53000001531 · possession Dec 2019 · 90.9% built
- Advitiya-A · Ambai Tank AreaSilver Landmarks · P53000001556 · possession Dec 2018 · 90.9% built
- Mansing Residency · Kolhapur (M Corp.)Shilpaja Pramod Kangutkar · P53000001602 · possession Feb 2020 · 72.3% built
- Korgaonkar Park · GadhinglajASHISH ANIL KORGAONKAR · P53000001698 · possession Dec 2019 · 90.9% built
- Vishwa Prestige · Kolhapur (M Corp.)Patki-Joshi Engineers and Contractors Pvt. Ltd. · P53000001706 · possession Dec 2017 · 81.8% built
- ELIXA PARK · ‘E’ WardAJAYSINH V DESAI BUILDERS & DEVELOPERS · P53000001735 · possession Jun 2025 · 86.2% built
- Navrang Co-Op Housing Society Ltd · Kolhapur (M Corp.)SHREE MAHALAXMI CONSTRUCTION · P53000001850 · possession Jul 2019 · 81.5% built
- TREEKAYA · Kolhapur (M Corp.)SHREE PADMAMBA ASSOCIATE · P53000001913 · possession Mar 2022 · 80.9% built
- Mallhar Towers · Kolhapur (M Corp.)Shendre and Associates · P53000001951 · possession Dec 2019 · 81.4% built
- ABHISHEK PLAZA · Sykes ExtensionAJAYSINH VITTHALRAO DESAI PROMOTERS AND DEVELOPER · P53000001964 · possession Mar 2018 · 81.8% built
- OMKAR RESIDENCY · Kolhapur (M Corp.)SHREE PADMAMBA CONSTRUCTIONS · P53000001983 · possession Jul 2019 · 72.7% built
- Anant Pride Wing II · Kolhapur (M Corp.)ANANT ESTATE DEVELOPER AND BUILDER PRIVATE LIMITED · P53000002082 · possession Dec 2021 · 86.1% built
- ROYAL MIRAJ ARCADE · Opp. Railway StationVishwas Bajirao Patil · P53000002279 · possession Jun 2024 · 75.9% built
- Rudraksha · Kolhapur (M Corp.)Mahesh Manohar Panhalkar · P53000002311 · possession Dec 2019 · 90.9% built
- Paarijaat Blossoms · Kolhapur (M Corp.)M/s. Bedekar Developers limited Liability Partnership · P53000002381 · possession Dec 2021 · 90.9% built
- Karveer Nivasini Residency · Satyai NagarS R Real Estate Developers · P53000002511 · possession Nov 2026 · 17.1% built
- Karveer Nivasini Complex · Kolhapur (M Corp.)S R Real Estate Developers · P53000002597 · possession Jan 2021 · 82.4% built
- SHRI RAM PLAZA · GadhinglajOMKAR CONSTRUCTION · P53000002629 · possession Oct 2020 · 90.9% built
- Vishwakrupa Sankul · Kolhapur (M Corp.)VISHWAKRUPA DEVELOPERS · P53000002686 · possession Dec 2021 · 65.7% built
- SHRI LAXMI KUNJ · Kolhapur (M Corp.)V S BUILDERS & DEVELOPERS · P53000002755 · possession Dec 2024 · 85% built
- LAXMINARAYAN APARTMENT · Ichalkaranji (M Cl)MAYUR VILAS SHAH HUF · P53000002792 · possession Oct 2018 · 54.5% built
- PUNYA PRAVAH · MAHAVEER COLLEGE PREMISE NAGALA PARKPRARTHANA INFRA · P53000002843 · possession Dec 2020 · 90.9% built
- CENTURY PLAZA · Ichalkaranji (M Cl)SURABHI DEVELOPERS · P53000002854 · possession Jul 2019 · 90.9% built
- GANGADHAM · Kolhapur (M Corp.)SUMEDHA CONSTRUCTIONS · P53000002898 · possession Apr 2018 · 100% built
- THE EMPIRE · TARABAI PARKWESTIN INFRA · P53000002901 · possession Jun 2022 · 81.8% built
- RIDDHI SIDDHI · Kolhapur (M Corp.)motilal laxminarayan construction pvt. ltd. · P53000003011 · possession May 2018 · 98.8% built
- Patson Orchid · Kolhapur (M Corp.)Patson Builders · P53000003032 · possession Dec 2022 · 90.9% built
- Bhushan residency · Kolhapur (M Corp.)vilas bhupal awati · P53000003035 · possession Jan 2022 · 64.5% built
- Pinnac Shivalaya · -Suresh Rajaram Dharmadhikari · P53000003090 · possession Jun 2027 · 81.3% built
- Pratiraj Towers · Kolhapur (M Corp.)PRATIK TOWNSHIP & INFRA PROJECTS PVT LTD · P53000003111 · possession Jul 2018 · 55.5% built
- Grandeur Residency · Kolhapur (M Corp.)Jadhav-Kasbekar Brothers Builders and Developers · P53000003115 · possession Dec 2020 · 81.8% built
- AMOGH METIL RESIDENCY · Kolhapur (M Corp.)Ranjit Rangrao Patil · P53000003116 · possession Sept 2018 · 53.2% built
- ATHARVA ICON · Kolhapur (M Corp.)Atharva Estate Developers · P53000003267 · possession Jul 2019 · 90.9% built
- SP AADI ARCADE · 8TH LANES P DEVELOPERS AND BUILDERS · P53000003322 · possession Jul 2022 · 81.8% built
- Mahabhadra Residency · Kolhapur (M Corp.)SHRIGANESH DEVELOPERS · P53000003371 · possession Jun 2019 · 90.9% built
- KEDAR APARTMENT · Kolhapur (M Corp.)NIWARA NIRMAN DEVELOPERS · P53000003383 · possession Mar 2019 · 100% built
- VasantRekha Heights · Ichalkaranji (M Cl)SURABHI DEVELOPERS · P53000003458 · possession Nov 2020 · 90.9% built
- Dwarka Adreno · Kolhapur (M Corp.)M/S Randive Builders and Developers · P53000003557 · possession Aug 2026 · 90.4% built
- Shalini Vilas Terraces · Kolhapur (M Corp.)SHRI SAGAR BUILDERS AND DEVELOPERS · P53000003571 · possession Feb 2018 · 90.9% built
- Shri Gajanan Maharaj Villas · Kolhapur (M Corp.)Vishal Developers · P53000003725 · possession Mar 2018 · 60% built
- Nakshtra Bungalows · Vadgaon Kasba (M Cl)Shree Construction & Developers · P53000003726 · possession Aug 2018 · 72.7% built
- SOLITARE 1 · Kolhapur (M Corp.)ARIHANT BUILDCON · P53000003856 · possession May 2019 · 100% built
- KEDAR RESIDENCY · GijavaneGOURAV CONSTRUCTION · P53000003979 · possession Jun 2022 · 79.1% built
- vishwakarma vasant plaza · Kolhapur (M Corp.)vishwakarma developers · P53000004076 · possession Nov 2022 · 81.5% built
- KAPIL HEIGHTS · Kolhapur (M Corp.)Arun Balasaheb Chougule HUF · P53000004217 · possession Jul 2019 · 80% built
- Silver plaza II · Kolhapur (M Corp.)Kantilal Ratilal Javiya · P53000004286 · possession Dec 2019 · 100% built
- Viraj City Phase II · Kagal (M Cl)Bhuyekar Patil Construction Company · P53000004289 · possession Dec 2021 · 90.9% built
- STAR ASHIYANA HR 4 · Kolhapur (M Corp.)STARTECH INFRA · P53000004305 · possession Mar 2018 · 72.7% built
- SHARVAN PRIDE · E WARDS R BUILDERS AND DEVELOPERS · P53000004352 · possession Dec 2017 · 90.9% built
- PRAVINKUMAR KHAMKAR INFRA DEVELOPERS AND CONSTRUCTION · Ichalkaranji (M Cl)Pravinkumar Maruti Khamkar · P53000004382 · possession Dec 2023 · 27.3% built
- Omkar Complex · Kagal (M Cl)BALARAM PIRAJI SHINGTE · P53000004415 · possession Aug 2019 · 18.9% built
- Shrisathi Tower · Kolhapur (M Corp.)STS Associates · P53000004456 · possession Sept 2019 · 54.5% built
- SAKSHI HEIGHTS · Kolhapur (M Corp.)SAKSHI DEVELOPERS · P53000004513 · possession Dec 2018 · 100% built
- Sankalp Siddhi Wing E · Kalambe T. Thane (CT)Garve Patil Associates · P53000004632 · possession Dec 2023 · 30.5% built
- Shreenivas Park Phase I · Vadgaon Kasba (M Cl)Mangal Ramchandra Randive · P53000004694 · possession Aug 2018 · 84.1% built
- PRIDE · Kolhapur (M Corp.)UNITY BUILDERS & DEVELOPERS · P53000004705 · possession Dec 2018 · 55.5% built
- FORTUNE WORLD ONE · 6 TH LANEFORTUNE DEVELOPERS · P53000004848 · possession Mar 2019 · 47.7% built
- EMRALD CORNER · Kolhapur (M Corp.)SHREE MADHUPURI CONSTRUCTION · P53000004863 · possession Jun 2018 · 100% built
- WINDFLOWER · Morewadi (CT)Life Style Developers · P53000004913 · possession Dec 2019 · 80.6% built
- grand uno · Kolhapur (M Corp.)grandeur infra · P53000004969 · possession Dec 2017 · 90.9% built
- ORCHID · Kolhapur (M Corp.)LOHIA DEVELOPERS · P53000004970 · possession Dec 2017 · 90.9% built
- ONE CORNER · Kolhapur (M Corp.)ONE PROPERTIES · P53000004976 · possession Dec 2018 · 77.3% built
- IRIS · Kolhapur (M Corp.)LOHIA DEVELOPERS · P53000005313 · possession Mar 2018 · 100% built
- Constructing 45 T/s EWS on S.No.42-B at Ujalaiwadi, Kolhapur · Ujalaiwadi (CT)Pune Housing and Area Development Board Pune · P53000005353 · possession Dec 2018 · 6.1% built
- Palm Glory · Kolhapur (M Corp.)Sachin Gopalrao Sabale · P53000005449 · possession Dec 2018 · 90.9% built
- Dwarka Ravaji · Kolhapur (M Corp.)M/S Randive Builders and Developers · P53000005706 · possession Feb 2023 · 75.6% built
- RAJARSHI SHAHU ENCLAVE · Kolhapur (M Corp.)RANANAVARE BUILDERS AND DEVELOPERS · P53000005716 · possession Dec 2025 · 163.6% built
- Deccan Hills Bungalow Scheme · DanewadiC.K. Constructions · P53000006061 · possession Mar 2018 · 85.4% built
- PALM GREENS · Kolhapur (M Corp.)APEX DEVEPOERS · P53000006108 · possession Dec 2017 · 100% built
- Shree Siddhi Properties · Kolhapur (M Corp.)Shree SiddhProperties · P53000006146 · possession Dec 2018 · 74.1% built
- HIRANYAKESHI COMPLEX · GijavaneVijay Ramchandra Godse · P53000006212 · possession Oct 2020 · 67.7% built
- RR HEIGHTS · Kolhapur (M Corp.)RAVIRAM BUILDERS AND DEVELOPERS · P53000006470 · possession Oct 2018 · 76.8% built
- WHITE BOX · Kolhapur (M Corp.)ONE PROPERTIES · P53000006511 · possession Dec 2018 · 71.8% built
- Nimbalkar Residency · Kolhapur (M Corp.)Balaji Houses Builders and Developers · P53000006737 · possession Jul 2018 · 90% built
- SHREE YASHAKSHAR APARTMENT · Kolhapur (M Corp.)SHREE YASHAKSHAR DEVELOPERS · P53000006829 · possession Dec 2017 · 69.5% built
- DATTA SAI SANKUL · Kolhapur (M Corp.)SANDEEP SUBHASH MIRAJKAR · P53000006882 · possession Mar 2022 · 90.9% built
- BLOSSOM · Kolhapur (M Corp.)Trinity Builders and Developers · P53000006963 · possession Jun 2018 · 100% built
- Yash Emerald · Kolhapur (M Corp.)Yash Ventures · P53000007198 · possession Nov 2022 · 90.9% built · 1 complaint
- MANOHAR SHRUSTI · Kolhapur (M Corp.)SAI VIDYA CONSTRUCTIONS · P53000007220 · possession Jun 2019 · 92.7% built
- VEDANT HEIGHTS · Ichalkaranji (M Cl)Patil Bhagwat Developers & Builder · P53000007238 · possession Dec 2022 · 90.9% built · 2 complaints
- JAMDAR TOWER · Kolhapur (M Corp.)Vilas Baburao Jamdar · P53000007323 · possession Jul 2018 · 81.8% built · 2 complaints
- MG Market · Shahapur RoadM.G.DEVELOPERS · P53000007444 · possession Dec 2024 · 81.8% built · 1 complaint
- MAHALAXMI HIGHTS · Kolhapur (M Corp.)DP BUILDERS & DEVELOPERS · P53000007919 · possession Aug 2022 · 90.9% built
- Mahadev Plaza · Ichalkaranji (M Cl)M/s Mahadev Builder's & Developers · P53000007970 · possession Nov 2018 · 100% built
- Vidyasagar Residency · Kolhapur (M Corp.)M/S P B Builders and Developers · P53000008070 · possession Dec 2021 · 90.9% built
- Jay Enclave · Kolhapur (M Corp.)Jay Developers · P53000008131 · possession Dec 2018 · 68.2% built
- Gauri Lila · E Ward KolhapurM/S Nashte Associates · P53000008365 · possession Jun 2024 · 49.1% built
- OM PARADISE · GadhinglajPATADE PROPERTIES · P53000008750 · possession Jun 2024 · 90.9% built
- Suvarna Pushpa · ShiyeMohite Shaw Builders And Developers · P53000008881 · possession Aug 2022 · 46.2% built
- SKYLINE TOWER C · KadamwadiSAIBHAGWANT DEVELOPERS · P53000009065 · possession Dec 2026 · 90.7% built · 1 complaint
- Shams Enclave · Morewadi (CT)Zhakirhussain Shamshuddin Bargir · P53000009172 · possession May 2018 · 86.4% built
- Silver Springs · Kolhapur (M Corp.)Mahalaxmi Developers · P53000009173 · possession Dec 2024 · 90.9% built · 6 complaints
- Shri Baba Ramdev Textile and Housing Market- Wing A-1 · Ichalkaranji (M Cl)N. Jaju Malpani Infra Pvt. Ltd. · P53000009180 · possession Dec 2022 · 23.1% built · 1 complaint
- SAMARTH VIHAR · Kolhapur (M Corp.)SANGRAM NANDKUMAR KOTMIRE · P53000009225 · possession May 2019 · 76.4% built
- Vishwa Vimal · Kolhapur (M Corp.)Vikrant Vishwasrao Jadhav · P53000009549 · possession Jun 2022 · 66.8% built
- ETERNITY SQARE · Kolhapur (M Corp.)ATHARVA SWAYAM SIDDHI · P53000009690 · possession Jul 2019 · 74.5% built
- SKYLARK · Kolhapur (M Corp.)GROUP FOUR DEVELOPERS · P53000010097 · possession May 2018 · 87.7% built
- SANKALP RESIDENCY · GijavaneKALPATARU DEVELOPERS · P53000010218 · possession Sept 2020 · 24.1% built
- VASANT VIHAR · Kalambe T. Thane (CT)SULEKH BUILDCON LLP · P53000010322 · possession Dec 2018 · 53.6% built
- EDEN GARDEN APARTMENT · Kolhapur (M Corp.)SHRI CONSTRUCTIONS · P53000010370 · possession Dec 2019 · 84.8% built · 1 complaint
- EMH - 1 · YadravVISTACORE LIFESPACE DEVELOPERS INDIA PVT LTD · P53000010504 · possession Dec 2021 · 59.1% built · 2 complaints
- Krishnakripa Lake View · BalingeKrishnakripa Buildcon LLP · P53000010555 · possession Dec 2018 · 88.6% built
- Shri Siddhivinayak Pride · Kolhapur (M Corp.)Shree Siddhivinayak Builders and Developers · P53000010585 · possession Dec 2024 · 98.1% built
- SAI POOJA · Kolhapur (M Corp.)PARAS BHOMRAJ OSWAL · P53000010700 · possession Dec 2017 · 87.3% built
- Shri Gajanan Maharaj Pushp Sankul · Kolhapur (M Corp.)Vishal Developers · P53000010715 · possession Dec 2018 · 63.6% built
- sAI PLAZA · Kolhapur (M Corp.)sAI CONSTRUCTIONS AND DEVELOPERS · P53000011414 · possession Mar 2018 · 75.5% built
- ARIHANT RESIDENCY · Kolhapur (M Corp.)Atul Vijaykant Moog · P53000011755 · possession May 2019 · 90.9% built
- CENTER-ONE APARTMENT · Vadgaon Kasba (M Cl)RAJAN NEMINATH SHETE · P53000011938 · possession Dec 2018 · 63.6% built
- ANANDI NIWAS · Kolhapur (M Corp.)Suniti Developers · P53000012050 · possession Dec 2018 · 81.8% built
- ICON RESIDENCY · Kolhapur (M Corp.)BHUMI DEVELOPERS · P53000012102 · possession Jun 2018 · 90.9% built
- ATHARVA HEIGHTS · Kolhapur (M Corp.)Atharva Estate Developers · P53000012126 · possession Jan 2021 · 81.8% built
- Goldmine · Kolhapur (M Corp.)Udaysinh vijaysinh Nimbalkar · P53000012274 · possession Dec 2021 · 81.8% built
- TULIP GREEN · Kolhapur (M Corp.)Tushar Mohanrao Khatavkar · P53000012333 · possession Dec 2018 · 90% built
- Padmini Plaza · Jaysingpur (M Cl)Sudarshan Chougule · P53000012462 · possession Dec 2021 · 90.9% built
- NAKSHATRA PLAZA · GadhinglajV S KHOT REAL ESTATE DEVELOPERS · P53000012651 · possession Dec 2019 · 90.9% built
- KRISHNAI · Kolhapur (M Corp.)LOHIA DEVELOPERS · P53000013184 · possession Dec 2017 · 90.9% built
- RAJVEER HEIGHTS C WING · Kolhapur (M Corp.)SHRI DATTASAI DEVELOPERS · P53000013241 · possession Dec 2017 · 81.8% built
- MAYUR VIHAR APARTMENT · GadhinglajHERAMB BUILDERS AND DEVELOPERS · P53000013377 · possession Mar 2018 · 83.6% built
- INDRANAND GREENS · KolhapurSatish Anandrao Ghorpade · P53000013471 · possession Sept 2026 · 71.8% built