Delayed projects in Mumbai Suburban
1,533 MahaRERA-registered projects in Mumbai Suburban are past the possession date on file and still under 100% built. Where the promoter has formally revised the date, the original is shown alongside so you can see what changed.
Page 3 of 8
- Anmol Fortune - II6.6 yr overdueWadhwa Realty Pvt Ltd. · Borivali, Mumbai SuburbanP51800001089· 99.1% built· 5 complaints
- RAJSHREE CLOVER6.6 yr overdueRajshree Creations · Kurla, Mumbai SuburbanP51800004812· 90.9% built
- 11 West6.6 yr overduePARINEE REALTY PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800003709· 90.9% built· 2 complaints
- SHALIMAR SHELTERS6.6 yr overdueSADGURU ENTERPRISES · Borivali, Mumbai SuburbanP51800004740· 90.9% built
- ND Enclave6.6 yr overdueN & D Constructions LLP · Andheri, Mumbai SuburbanP51800010411· filed Dec 2018 → now Dec 2019· 90.5% built
- ADCON MERIDIAN6.6 yr overdueHI SKY REALTY · Andheri, Mumbai SuburbanP51800010498· filed Dec 2018 → now Dec 2019· 90.9% built
- Spring Dale6.6 yr overdueAmbrosial Developers Private Limited · Andheri, Mumbai SuburbanP51800002536· 90.9% built
- Sunrise Orlem Building 46.6 yr overdueDhaval Housing AOP · Borivali, Mumbai SuburbanP51800007714· filed Dec 2018 → now Dec 2019· 81.8% built
- Grow More Bliss B Wing6.6 yr overdueGrowmore Space Solutions Pvt. Ltd. · Borivali, Mumbai SuburbanP51800005958· 81.8% built
- BELLA VISTA6.6 yr overdueARMAND CORPORATION · CHEMBUR, Mumbai SuburbanP51800007308· filed Dec 2018 → now Dec 2019· 63.6% built
- NEMINATH APARTMENT SRA CHS AND SHREE SIDDHAGIRI SRA CHS6.6 yr overdueSUBHASH VELJI CHAWDA · Borivali, Mumbai SuburbanP51800011251· 41.9% built
- LODHA ETERNIS SERENA A6.6 yr overdueLODHA DEVELOPERS LIMITED · Andheri, Mumbai SuburbanP51800000294· 90.9% built· 1 complaint
- Rajshree Orchid6.6 yr overdueLAXMIECHAND DEVJI DEDHIA · Kurla, Mumbai SuburbanP51800001097· 90.9% built
- LEGRANZ6.6 yr overdueEKTA SHUBHAM VENTURE · Kurla, Mumbai SuburbanP51800000141· filed Dec 2018 → now Dec 2019· 90.9% built· 2 complaints
- CRESENZO RESIDENCES6.6 yr overduePARESH PUJARA AND ABHIRAJ PUJARA (AOP) · Andheri, Mumbai SuburbanP51800005898· 90.9% built· 1 complaint
- KAILASH HEIGHTS6.6 yr overdueRANJANA CONSTRUCTION PVT LTD · Borivali, Mumbai SuburbanP51800011192· 72.7% built
- Universal Cubical6.6 yr overduePAGARANI UNIVERSAL INFRASTRUCTURE PVT. LTD. · Andheri, Mumbai SuburbanP51800002157· filed Dec 2018 → now Dec 2019· 48.4% built· 4 complaints
- Dahisar Sunderbaug co-op housing society ltd.6.6 yr overdueRISHABRAJ ESTATE DEVELOPERS PVT LTD · Borivali, Mumbai SuburbanP51800002464· filed Dec 2018 → now Dec 2019· 81.1% built
- REDEVLOPMENT OF RAJENDRA NAGAR - SHREE GANESH CHS LTD.6.6 yr overdueKaustubh Construction Private Limited · Borivali, Mumbai SuburbanP51800006765· filed Dec 2018 → now Dec 2019· 81.8% built
- Hubtown Sunmist A 6th to Above Floor6.6 yr overdueHubtown Limited · Andheri, Mumbai SuburbanP51800001202· 81.2% built· 8 complaints
- Arihant Enclave6.6 yr overdueKDS Developers Pvt. Ltd. · Borivali, Mumbai SuburbanP51800010229· filed Dec 2018 → now Dec 2019· 95.9% built
- Evergreen Woods6.6 yr overdueANKUR MAYFLOWER ASSOCIATES · Andheri, Mumbai SuburbanP51800008167· filed Jun 2020 → now Dec 2019· 45.5% built· 11 complaints
- NEELREKHA6.6 yr overdueTASMAI SPACES · Borivali, Mumbai SuburbanP51800008659· filed Dec 2018 → now Dec 2019· 36.4% built· 1 complaint
- Swastik Sapphire6.6 yr overdueSwastik Realtors · Kurla, Mumbai SuburbanP51800000239· 63.6% built
- PARK SOLITAIRE6.6 yr overdueAMAZON MANA & ASSOCIATES AOP · Andheri, Mumbai SuburbanP51800006074· filed Dec 2018 → now Dec 2019· 87.7% built· 4 complaints
- KABRA AURUM WING A B C AND D Redevelopment of Goregaon Unnat Nagar II Plot No 51 to 55 CHSL6.6 yr overdueKABRA AND ASSOCIATES · Andheri, Mumbai SuburbanP51800005550· 81.8% built· 1 complaint
- TRISHABH SIGNET6.6 yr overdueDimension Housing Realty LLP · Kurla, Mumbai SuburbanP51800001222· 90% built· 1 complaint
- TRIBECA6.6 yr overdueNESTOR BUILDERS & DEVELOPERS PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800009815· filed Dec 2018 → now Dec 2019· 90.9% built· 2 complaints
- Sanskriti Signature6.6 yr overdueDivisha Developers LLP · Borivali, Mumbai SuburbanP51800006240· 90.9% built
- JMDVARDHAM6.6 yr overdueCOSTAL VINCOM PVT LTD · Borivali, Mumbai SuburbanP51800005339· 86.4% built
- LANDMARK6.6 yr overdueCRESCENT REALTORS INDIA PVT LTD · Andheri, Mumbai SuburbanP51800003163· 90.9% built
- DANVIJAY C.H.S. LTD6.6 yr overdueANKURDEV BUILDCON · Borivali, Mumbai SuburbanP51800005272· 49.1% built
- Stella Sapphire A Wing6.6 yr overdueVaibhavLaxmi Builders and Developers · Kurla, Mumbai SuburbanP51800007545· 64.3% built
- N.V. Deshmukh - NEPTUNE GULMOHAR6.6 yr overdueVEDANT REALTORS LLP · Kurla, Mumbai SuburbanP51800005834· filed Dec 2018 → now Dec 2019· 77.7% built
- Neptune Flying Kites B Wing- Left Wing6.6 yr overdueNEPTUNE VENTURES AND DEVELOPERS PRIVATE LIMITED · Kurla, Mumbai SuburbanP51800009307· filed Dec 2018 → now Dec 2019· 90.9% built· 7 complaints
- Kisna6.6 yr overdueShreeji Realties Private Limited · Andheri, Mumbai SuburbanP51800003802· 90.9% built
- ASHARA6.6 yr overdueDevleela Developers · Borivali, Mumbai SuburbanP51800005938· 98.2% built
- Joy Legend Wing A6.6 yr overdueJAYANT SONI · Andheri, Mumbai SuburbanP51800005022· filed Dec 2018 → now Dec 2019· 70% built· 7 complaints
- JASWANTI WOODS6.6 yr overdueASHRAY REALTORS · Kurla, Mumbai SuburbanP51800002192· 90.9% built
- ASMI6.6 yr overdueSia Developers LLP · Borivali, Mumbai SuburbanP51800002325· 82.5% built· 1 complaint
- Shanti Niwas6.6 yr overdueD.G. Patel & Co. · Kurla, Mumbai SuburbanP51800007402· filed Dec 2018 → now Dec 2019· 90.9% built
- Integrated Kamal6.6 yr overdueIntegrated Spaces Limited · Kurla, Mumbai SuburbanP51800002437· filed Dec 2018 → now Dec 2019· 99.1% built
- Stadium View6.6 yr overdueAcme Avenue Infrastructure Pvt. Ltd. · Andheri, Mumbai SuburbanP51800000777· 52.7% built· 2 complaints
- MOHINI TOWER6.6 yr overdueMOHINI SHELTORS PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800006731· 98.2% built· 1 complaint
- 16 MOUNT BLANC6.6 yr overdue16 MOUNT BLANC · Kurla, Mumbai SuburbanP51800005179· filed Jun 2018 → now Dec 2019· 60% built· 2 complaints
- Gundecha Desire6.6 yr overdueRockline Developers Pvt. Ltd. · Andheri, Mumbai SuburbanP51800001166· filed Dec 2018 → now Dec 2019· 90.9% built· 4 complaints
- ROYAL OASIS PHASE 16.6 yr overdueRIKKI RONIE DEVELOPERS · Borivali, Mumbai SuburbanP51800002382· filed Dec 2018 → now Dec 2019· 94.5% built· 2 complaints
- MAHAVIR ASHISH6.6 yr overdueSarvoday Enterprises · Kurla, Mumbai SuburbanP51800003457· 90.9% built
- SANKALP HERITAGE6.6 yr overdueSHYAM BIHARILAL GEHANI · Borivali, Mumbai SuburbanP51800003309· 90.9% built
- KANAKIA WALLSTREET WING A6.6 yr overdueKANAKIA SPACES REALTY PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800000121· 90.7% built· 2 complaints
- Tulsi Elanza6.6 yr overdueMETRO CAPITAL · Kurla, Mumbai SuburbanP51800006377· 27.3% built
- SORRENTO6.6 yr overdueSAHAJ ANKUR DEVELOPERS · Andheri, Mumbai SuburbanP51800003022· filed Dec 2018 → now Dec 2019· 95% built· 2 complaints
- PAHHAL AVENUE6.6 yr overdueUmmang Realtors LLP · Borivali, Mumbai SuburbanP51800015919· 45.5% built
- Kalpataru Crest6.6 yr overdueKalpataru Gardens Pvt. Ltd. · Kurla, Mumbai SuburbanP51800000795· 90.9% built
- HARVEST MOON6.6 yr overdueCALVIN PROPERTIES · Kurla, Mumbai SuburbanP51800001141· 90.9% built
- CRESCENT IMPERIA6.6 yr overdueCRESCENT ARK LIFESTYLES PVT LTD · Andheri, Mumbai SuburbanP51800002184· 90.9% built
- Flying Colors6.6 yr overdueNEPTUNE CONSTRUCTIONS · Kurla, Mumbai SuburbanP51800008417· filed Dec 2018 → now Dec 2019· 74.5% built
- Rite Luxuria6.6 yr overdueRite Developers Pvt. Ltd. · Kurla, Mumbai SuburbanP51800006260· filed Dec 2018 → now Dec 2019· 90.9% built· 4 complaints
- PRITHVI RESIDENCY6.6 yr overduePRITHVI BUILD HOMES · Borivali, Mumbai SuburbanP51800009232· filed Dec 2018 → now Dec 2019· 90.9% built
- GAURISHANKAR BUNGALOW REDEVELOPMENT6.6 yr overdueS S REALITY · Shreekrishna Nagar, Mumbai SuburbanP51800015462· 90.9% built
- SHREEJI KRUPA6.6 yr overduePARESH PUJARA AND ABHIRAJ PUJARA (AOP) · Andheri, Mumbai SuburbanP51800003649· 90.9% built
- Shreedham Classic6.6 yr overdueShreedham Construction Private Limited · Andheri, Mumbai SuburbanP51800012234· filed Dec 2018 → now Dec 2019· 89.9% built· 1 complaint
- AUDUMBAR6.6 yr overdueVAS BUILDER & DEVELOPERS · Borivali East, Mumbai SuburbanP51800011943· 41.5% built
- Chetna Kunj CHS6.6 yr overdueK Merchant Construction Ltd · Borivali, Mumbai SuburbanP51800010821· 69.1% built
- MUTUAL BENEFIT CO OP HSG SOC LTD6.6 yr overdueSUNRISE HOUSING · Kurla, Mumbai SuburbanP51800002333· 81.8% built
- ROYAL ORCHID6.6 yr overdueSHRI GANESH DEVELOPERS · Kurla, Mumbai SuburbanP51800010432· 79.5% built
- MANEESHA CHSL6.6 yr overdueSHAH DEVELOPERS · Kurla, Mumbai SuburbanP51800004616· filed Dec 2018 → now Dec 2019· 90.9% built
- Construction of 406 TR TS 442 EWS 258 MIG TS at Gavanpada Mulund east Mumbai6.6 yr overdueMHADA · Kurla, Mumbai SuburbanP51800000024· filed Dec 2018 → now Dec 2019· 90.8% built
- ARPIT6.6 yr overdueTISTA IMPEX PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800004857· 56.8% built
- SHUBH AASHISH6.6 yr overdueA B BUILDER & DEVELOPERS PVT LTD · Mumbai, Mumbai SuburbanP51800009692· filed Dec 2018 → now Dec 2019· 90.9% built
- SHREE RASRAJ TOWER6.6 yr overdueK MEHTA AND COMPANY · Borivali, Mumbai SuburbanP51800000873· 90.9% built
- Park Royale AB Wing6.6 yr overdueSHIVRANJANI PROPERTIES LLP · Andheri, Mumbai SuburbanP51800001315· 96.4% built
- KABRA PRARTHNA6.6 yr overdueKABRA ESTATE AND INVESTMENT CONSULTANTS · Andheri, Mumbai SuburbanP51800000499· filed Dec 2018 → now Dec 2019· 99.5% built
- ROSWALT HEIGHTS6.6 yr overdueURBAN HEIGHTS REALTORS PRIVATE LIMITED · Kurla, Mumbai SuburbanP51800003019· 74.6% built· 1 complaint
- REDEVELOPMENT OF ULKA CHSL6.6 yr overduePRANAV CONSTRUCTIONS LIMITED · Borivali, Mumbai SuburbanP51800004627· 90.9% built
- SANA ARCADE6.6 yr overdueKADRI CONSTRUCTION CO. · Kurla, Mumbai SuburbanP51800012722· filed Jan 2019 → now Dec 2019· 72.7% built
- Gala Amora6.6 yr overdueKarishma Realty · Andheri, Mumbai SuburbanP51800006181· 23.6% built
- ACHARYA ASHRAM SAHAKARI GRIHA RACHANA SANSTHA MARYADIT6.6 yr overduePrarthana Constructions · Borivali, Mumbai SuburbanP51800008405· filed Dec 2018 → now Dec 2019· 84.5% built· 1 complaint
- Nirmal Lifestyle-Zircon6.6 yr overdueNirmal Lifestyle Ltd · Kurla, Mumbai SuburbanP51800004719· filed Dec 2018 → now Dec 2019· 71.8% built· 65 complaints
- VEENA SANTOOR PHASE II6.6 yr overdueVeena Developers · Borivali, Mumbai SuburbanP51800001482· 86.8% built
- N.M.Joshi Building No.4 Annex6.6 yr overdueSHREE DEVELOPERS · Kurla, Mumbai SuburbanP51800006487· 80.6% built
- JYOTI PALACE6.6 yr overdueWESTBURY CONSTRUCTION PRIVATE LIMITED · Kurla, Mumbai SuburbanP51800006809· filed Dec 2018 → now Dec 2019· 65.6% built
- CONWOOD ASTORIA TOWER A6.6 yr overdueCONWOOD REALTY PRIVATE LIMITED · Borivali, Mumbai SuburbanP51800008188· filed Dec 2018 → now Dec 2019· 82.3% built· 25 complaints
- 117 RESIDENCY6.6 yr overdueV3 PARTNERS · chembur, Mumbai SuburbanP51800012457· 50% built
- 81 AUREATE6.6 yr overduePYRAMID DEVELOPERS · Andheri, Mumbai SuburbanP51800010171· filed Dec 2018 → now Dec 2019· 98% built· 25 complaints
- SILVERENE6.6 yr overdueSHREEJI COMBINE · Andheri, Mumbai SuburbanP51800005090· filed Dec 2018 → now Dec 2019· 88.2% built
- PANOM PARK PHASE 1 WING A B C AND C EXTENSION6.6 yr overduePANOM DEVELOPERS LLP · Andheri, Mumbai SuburbanP51800005027· 90.9% built
- RUNWAL GREENS Wings 5 - 86.6 yr overdueRunwal Apartments Private Limited · Kurla, Mumbai SuburbanP51800000271· 72.7% built· 44 complaints
- Modispaces Amazon6.6 yr overdueModispaces Real Estate Pvt Ltd · Borivali, Mumbai SuburbanP51800004328· 45.5% built
- SPARSH6.6 yr overdueVALUABLE DREAMSCAPE LLP · Andheri, Mumbai SuburbanP51800002394· filed Dec 2018 → now Dec 2019· 50.7% built
- Dhoot Adi Residency-Shree Adi House CHSL6.6 yr overdueDHOOT DEVELOPERS PVT. LTD. · CHEMBUR EAST, Mumbai SuburbanP51800008557· filed Dec 2018 → now Dec 2019· 41.8% built
- Resham6.6 yr overdueManoj Vasudev Wadhwa · Andheri, Mumbai SuburbanP51800009249· filed Dec 2018 → now Dec 2019· 56.4% built
- RUDRA6.6 yr overdueShree DPS Project and Services Pvt. Ltd. · Borivali, Mumbai SuburbanP51800010461· 90.9% built· 1 complaint
- ARKK AVENUE6.6 yr overdueARKK BUILDERS AND DEVELOPERS · Mumbai, Mumbai SuburbanP51800003639· 86.4% built
- Aayush Aura6.6 yr overdueAayush & Arrtha Realtors LLP · Kurla, Mumbai SuburbanP51800000622· filed Dec 2018 → now Dec 2019· 90.9% built
- UNIQUE ELITA6.6 yr overdueANKUR SHUBHAM DEVELOPERS · Andheri, Mumbai SuburbanP51800006885· filed Dec 2018 → now Dec 2019· 45.9% built· 1 complaint
- The Pinnacle6.6 yr overdueGERARIE ENTERPRISES AND DEVELOPERS PVT. LTD · Kurla, Mumbai SuburbanP51800005304· filed Dec 2018 → now Dec 2019· 90.9% built
- Kalpataru Solitaire6.6 yr overdueKalpataru Limited · Andheri, Mumbai SuburbanP51800000699· 89.2% built
- SHWETA CHS6.6 yr overdueATHARVA DEVELOPERS · Kurla, Mumbai SuburbanP51800001142· filed Dec 2018 → now Dec 2019· 90.9% built
- ASHOKHEIGHTS6.6 yr overdueNEW INDIA CONSTRUCTION COMPANY · Andheri, Mumbai SuburbanP51800001158· 90.8% built
- AUM HEIGHTS6.6 yr overdueAbhismit Enterprises · Borivali, Mumbai SuburbanP51800009081· filed Dec 2018 → now Dec 2019· 90.9% built
- AKHAND ANAND6.6 yr overdueSIV REALITY PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800009094· filed Dec 2018 → now Dec 2019· 45% built
- Solaris Titanium Towers6.6 yr overdueSolaris Developers Private Limited · Andheri, Mumbai SuburbanP51800008694· 98.6% built· 7 complaints
- VEENA SIGNATURE6.6 yr overdueVeena Developers · Borivali, Mumbai SuburbanP51800002804· 64.1% built· 1 complaint
- SHARNAM HEIGHTS6.6 yr overdueSHYAM BIHARILAL GEHANI · Borivali, Mumbai SuburbanP51800012351· 90.9% built
- SHRI HARI BUILDING6.6 yr overdueSHRI NEELKANTH DEVELOPERS · Borivali, Mumbai SuburbanP51800010627· filed Jan 2019 → now Jan 2020· 90.9% built
- SUN SHADE6.6 yr overdueSHUBHAM ENTERPRISE · Borivali, Mumbai SuburbanP51800002607· 47.2% built
- SAGAR DARSHAN CHS LTD6.4 yr overdueNIRMITEE DEVELOPERS · Borivali, Mumbai SuburbanP51800014616· 27.3% built
- Girivan Shivkunj6.4 yr overdueShri Sati Builders and Developers Private Limited · Chembur, Mumbai SuburbanP51800011754· 79.1% built
- Shanta Bhuvan CHS Ltd.6.4 yr overdueLabh Homes Creations And Holdings Pvt. Ltd. · Andheri, Mumbai SuburbanP51800005306· 90.9% built· 1 complaint
- Times Square- C WIng6.4 yr overdueNTPL DEVELOPERS,LLP · Andheri, Mumbai SuburbanP51800018273· 28.2% built
- Sheela Smruti CHSL6.3 yr overdueBlack Gold Developers Pvt Ltd · Andheri, Mumbai SuburbanP51800004201· 90.9% built
- SHRADDHA INFINITY6.0 yr overdueSHRADDHA LANDMARK PRIVATE LIMITED · Kurla, Mumbai SuburbanP51800010938· filed Dec 2018 → now Aug 2020· 43.5% built
- Ajmera Zeon5.9 yr overdueAjmera Realty & Infra India Ltd. · Kurla, Mumbai SuburbanP51800000779· 91.6% built· 1 complaint
- nehru nagar ekta co op hsg soc ltd5.9 yr overdueRachana Homes · Kurla, Mumbai SuburbanP51800011743· filed Sept 2018 → now Sept 2020· 60.3% built
- SHUBHANGI5.9 yr overdueOMKAR BUILDERS · Kurla, Mumbai SuburbanP51800004391· 90.9% built
- HARI KUNJ III5.9 yr overdueKUKREJA CONSTRUCTION CO · Kurla, Mumbai SuburbanP51800007495· 59.1% built
- ZEE USHA5.9 yr overdueZEE COM TRADE PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800005143· 85% built
- BLUE FORTUNA5.9 yr overdueATUL PROJECTS INDIA PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800010900· 90.9% built· 1 complaint
- ZEE SARGAM5.9 yr overdueZEE PRAGATEE DEVELOPERS LLP · Andheri, Mumbai SuburbanP51800003624· 48.5% built
- MEDHA CHSL5.9 yr overdueC H PATIL AND SONS LLP · Borivali, Mumbai SuburbanP51800006437· filed Mar 2019 → now Sept 2020· 90.9% built
- CD Plot No 69 Lumiere5.9 yr overdueSD SVP Nagar Redevelopment Private Limited · Andheri, Mumbai SuburbanP51800005440· filed Sept 2019 → now Sept 2020· 99.7% built· 43 complaints
- AVENUE 6415.9 yr overdueDIMPLE CREATIONS · BORIVALI, Mumbai SuburbanP51800014768· 90.9% built
- MATRUCHHAYA5.9 yr overdueSUJYOTI FININVEST PVT LTD · Kurla, Mumbai SuburbanP51800005037· filed Mar 2019 → now Sept 2020· 90.9% built
- ZEE CHAHYA5.9 yr overdueZEE COM TRADE PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800007998· 53.4% built
- Shivneri CHS Ltd5.9 yr overdueShree Chamunda Properties · Andheri, Mumbai SuburbanP51800012532· filed Mar 2019 → now Sept 2020· 56.7% built
- Lotus Niwas / Satya Niwas5.9 yr overdueK L Ventures and Enterprises · Borivali, Mumbai SuburbanP51800002047· filed Mar 2019 → now Sept 2020· 81.8% built
- KACHWALA PALACE5.9 yr overdueCREST VENTURES LIMITED · Andheri, Mumbai SuburbanP51800005902· 81.8% built
- UDAYA BHUVAN5.9 yr overdueSHREE KRISHNA HOMES PVT LTD · CHEMBUR, Mumbai SuburbanP51800011308· filed Mar 2019 → now Sept 2020· 40.5% built
- K L REGALIA5.9 yr overdueK L HOUSING LLP · Andheri, Mumbai SuburbanP51800011323· filed Mar 2018 → now Sept 2020· 67.5% built
- TILAK INDRAYANI CHS LTD5.9 yr overdueRELIANCE CORPORATION · Kurla, Mumbai SuburbanP51800002913· 90.9% built· 1 complaint
- Redevelopment of Juhu Shantivan CHSL5.9 yr overdueShree Mahavir Properties · Mumbai, Mumbai SuburbanP51800001772· filed Mar 2019 → now Sept 2020· 90.9% built
- EXPRESS ENCLAVE5.9 yr overdueMD GLOBUS REALTY PVT LTD · Andheri, Mumbai SuburbanP51800009088· 90.9% built
- AMRUT LEGACY5.9 yr overdueNITIN AMRUTLAL SHAH · Andheri, Mumbai SuburbanP51800009017· 54.1% built
- KANCHAN CHSL5.9 yr overdueC H PATIL AND SONS LLP · Borivali, Mumbai SuburbanP51800011409· filed Mar 2019 → now Sept 2020· 90.9% built
- 126 FLORENCIO5.9 yr overdueARHAM ENGINEERS · Kurla, Mumbai SuburbanP51800005828· filed Mar 2019 → now Sept 2020· 72.1% built· 7 complaints
- KRISHNA CHAITANYA RAJBHAVAN CHSL5.8 yr overdueEthics Infra Development Pvt. Ltd. · Andheri, Mumbai SuburbanP51800000078· filed Dec 2018 → now Oct 2020· 90.9% built· 2 complaints
- MADHUBAN A AND A1 WING5.8 yr overdueM.D. DEVELOPERS · Borivali, Mumbai SuburbanP51800010413· filed Dec 2018 → now Oct 2020· 90.9% built· 3 complaints
- SAFAVI CHS LTD5.8 yr overdueRAJ BUILDERS · Andheri, Mumbai SuburbanP51800009984· filed Oct 2018 → now Oct 2020· 84.5% built
- SHIVDARSHAN PHASE I5.8 yr overdueSPACE DEVELOPER · BHANDUP WEST, Mumbai SuburbanP51800024522· 81.5% built
- SILICON ENCLAVE5.8 yr overdueSHILPRIYA BUILDERS AND DEVELOPERS · Kurla, Mumbai SuburbanP51800007484· filed Dec 2019 → now Oct 2020· 90.9% built
- SHETH EXOTICA5.8 yr overdueM/S SHETH PROPERTIES PVT LTD · Ghatkopar, Mumbai SuburbanP51800009092· filed Oct 2018 → now Oct 2020· 90.8% built
- Suparshwa Eternia5.8 yr overdueSuparshwa Estate · Andheri, Mumbai SuburbanP51800007773· filed Dec 2019 → now Oct 2020· 53.2% built
- Suparshwa Urbana5.8 yr overdueSuparshwa Estate · Andheri, Mumbai SuburbanP51800010166· filed Dec 2019 → now Oct 2020· 86.4% built
- GORAI SHREE RAM TOWER CHS LTD5.8 yr overdueJAGANNATH LAXMAN MORE · Borivali, Mumbai SuburbanP51800006753· filed Jun 2018 → now Oct 2020· 90.9% built
- Swastik Plaza C CHS Ltd-AVANA5.8 yr overduePRATIBHA VEEKAY REAL ESTATE LLP · Kurla, Mumbai SuburbanP51800004923· filed Dec 2018 → now Oct 2020· 90.9% built
- malad shanti5.8 yr overduesachit thakkar · Borivali, Mumbai SuburbanP51800010257· filed Dec 2018 → now Oct 2020· 22.4% built
- NATEKAR HEIGHTS5.8 yr overdueSabari Developers LLP · Kurla, Mumbai SuburbanP51800002547· filed May 2019 → now Oct 2020· 82.7% built
- SALONI ENCLAVE5.8 yr overdueNIKHIL BUILDERS · Kurla, Mumbai SuburbanP51800007822· filed Sept 2018 → now Oct 2020· 62.6% built
- Construction of 83 LIG Ts on Guest plot CTS no 43 Pt of Unnatagar, Village Pahadi goregaon5.8 yr overdueMUMBAI HOUSING AND AREA DEVELOPMENT BOARD · Andheri, Mumbai SuburbanP51800000023· filed Dec 2018 → now Oct 2020· 90.9% built
- PLOT NO 3 CHARKOP SECTOR 85.8 yr overdueMAHARASHTRA HOUSING AND AREA DEVELOPMENT AUTHORITY · Borivali, Mumbai SuburbanP51800000017· filed Dec 2018 → now Oct 2020· 88.2% built
- Rustomjee Paramount - Wing E5.7 yr overdueKEYSTONE REALTORS LIMITED · Andheri, Mumbai SuburbanP51800000862· 96.9% built
- Mahavir Aquila5.7 yr overdueMilestone Developers · Kurla, Mumbai SuburbanP51800000424· filed May 2019 → now Nov 2020· 81.8% built
- Redevelopment of GKW Sankey Employees chsl5.7 yr overdueHeritage Lifestyles & Developers Pvt. Ltd.e · Kurla, Mumbai SuburbanP51800001655· filed May 2019 → now Nov 2020· 85.2% built· 1 complaint
- Tiara5.7 yr overdueRaj Gul Bijlani · Kurla, Mumbai SuburbanP51800008126· filed May 2019 → now Nov 2020· 36.2% built
- Rustomjee Paramount - Wing D5.7 yr overdueKEYSTONE REALTORS LIMITED · Andheri, Mumbai SuburbanP51800000619· 97.5% built
- SAGAR APARTMENT5.7 yr overdueVIKAS NARAYAN RAIKAR · Kurla, Mumbai SuburbanP51800002093· filed Mar 2019 → now Dec 2020· 62.7% built
- INDU GANESH HEIGHTS5.7 yr overdueTIGON REALITY PRIVATE LIMITED · Kurla, Mumbai SuburbanP51800007655· filed Mar 2019 → now Dec 2020· 42.3% built
- SAJAG CHS5.7 yr overdueNavkar Infra Projects · Borivali, Mumbai SuburbanP51800001223· filed Jun 2019 → now Dec 2020· 90.9% built
- PRITHVI APARTMENT5.7 yr overdueHITENDRA NIMBALKAR · Borivali, Mumbai SuburbanP51800016469· 90.9% built
- SALE BUILDING NO 1 VAASTU SHANTI WING A B C5.6 yr overdueM/S ANSHUMAN DEVELOPERS · Andheri, Mumbai SuburbanP51800006806· filed Jun 2019 → now Dec 2020· 90.6% built
- PLATINUM TOWER - 75.6 yr overdueTIRUPATI GRUHPRAVESH LLP · Andheri, Mumbai SuburbanP51800000654· filed Jun 2019 → now Dec 2020· 90.9% built· 2 complaints
- AMRUT ELLEGANCE5.6 yr overdueAMRUT ENTERPRISES · Andheri, Mumbai SuburbanP51800002223· filed Jun 2019 → now Dec 2020· 39.3% built
- Akash Kiran CHS Ltd5.6 yr overdueShamik Enterprises Pvt Ltd. · Andheri, Mumbai SuburbanP51800005909· filed Jun 2019 → now Dec 2020· 90.9% built
- PARAG - RESERVE CO-OP HSG SOC5.6 yr overdueSADGURU BUILDSPACESPVT. LTD. · Borivali, Mumbai SuburbanP51800004572· 62.5% built
- WINDSOR5.6 yr overdueTHE WINDSOR · Andheri, Mumbai SuburbanP51800011781· 72.7% built
- Nav Vani5.6 yr overdueGiriraj builders and developers · Ghatkopar, Mumbai SuburbanP51800015835· 86.4% built
- Kuber Varshatai Tower5.6 yr overdueANAND DATTATRAYA PATIL · Kurla, Mumbai SuburbanP51800001601· filed Dec 2019 → now Dec 2020· 72.3% built
- LIVA ROCA5.6 yr overdueParinee Shelters Pvt. Ltd. · Andheri, Mumbai SuburbanP51800001785· 43.6% built
- AMBAJI NIKETAN CO-OP. HOUSING SOCIETY LTD.5.6 yr overdueBHOLENATH DEVELOPERS LTD. · Kurla, Mumbai SuburbanP51800000759· filed Jun 2018 → now Dec 2020· 90.9% built
- Udyanjali Chs5.6 yr overdueASHRAY DEVELOPERS · Andheri, Mumbai SuburbanP51800004917· 39.1% built
- RBI Employees Siddhivinayak CHS Ltd5.6 yr overdueVASUNDHARA BUILDERS · Borivali, Mumbai SuburbanP51800012461· 72.9% built
- SATELLITE GLORY5.6 yr overdueSATELLITE DEVELOPERS PVT LTD · Andheri, Mumbai SuburbanP51800005350· 80.3% built
- Rajshree Status5.6 yr overdueJetalaal Laxmiechand Dedhia · Kurla, Mumbai SuburbanP51800002062· 90.9% built
- SUN-VISON SOLITAIRE5.6 yr overdueDHAN INTERNATIONAL PVT LTD · Andheri, Mumbai SuburbanP51800001637· filed Mar 2018 → now Dec 2020· 60% built· 2 complaints
- SHIVPURI BUILDING NO.10 CHS LTD - SHIVAM HEIGHTS5.6 yr overdueSIDHIVINAYAK CONSTRUCTIONS · CHEMBUR, Mumbai SuburbanP51800008516· filed Dec 2018 → now Dec 2020· 81.8% built
- Milan Residency5.6 yr overdueM/s Milan Builders · Borivali, Mumbai SuburbanP51800005484· filed Dec 2018 → now Dec 2020· 71.8% built
- Aspen Park5.6 yr overdueMessrs. Unique Real Estate Developers · Borivali, Mumbai SuburbanP51800001218· 97.5% built
- NISHIRAJ5.6 yr overdueUNIQUE BUILDERS & DEVELOPERS · Borivali, Mumbai SuburbanP51800008181· filed Mar 2019 → now Dec 2020· 45.5% built
- Jeevan Heights5.6 yr overdueJ. P. Realtors · Kandivali West, Mumbai SuburbanP51800012228· 56.1% built
- Embassy5.6 yr overdueDrushti Realtors Private Limited · Kurla, Mumbai SuburbanP51800008398· 68.6% built
- BURHANI BUILDING5.6 yr overdueMS DEVELOPERS · Borivali, Mumbai SuburbanP51800003165· 90.9% built
- VARDHMAN EMPIRE5.6 yr overdueVARDHMAN DEVELOPERS LTD · Borivali, Mumbai SuburbanP51800006315· filed Dec 2018 → now Dec 2020· 90.9% built· 2 complaints
- MAYADEVI/ VIKUTHDHAM5.6 yr overdueHOME TODAY RENOVATION INDIA PVT.LTD · Borivali, Mumbai SuburbanP51800006678· filed Dec 2018 → now Dec 2020· 47.5% built
- AL-BURHAN CHS-Phase-I5.6 yr overdueRAJ ROMELL REALTORS · Andheri, Mumbai SuburbanP51800009971· 80.5% built
- MULUND KAVITA KIRAN CHS5.6 yr overdueIndu Enterprise · Kurla, Mumbai SuburbanP51800011080· 90.9% built· 2 complaints
- K M ENTERPRISES5.6 yr overdueK M ENTERPRISES · Andheri, Mumbai SuburbanP51800007922· filed Dec 2018 → now Dec 2020· 85.5% built
- LAXMI CHS5.6 yr overdueADITYA DEVELOPERS · Borivali, Mumbai SuburbanP51800007179· 76.4% built· 2 complaints
- THE JOTE MAHAL5.6 yr overdueSHIRISH MADHAV KULKARNI · Kurla, Mumbai SuburbanP51800012097· filed Jul 2019 → now Jan 2021· 75% built
- K K SOLITAIRE5.6 yr overdueNavin M Mehta · Kurla, Mumbai SuburbanP51800012460· filed Jul 2019 → now Jan 2021· 90.9% built
- SHREEJI RESIDENCY5.6 yr overdueshree siddhivinayak construction co · MULUND WEST, Mumbai SuburbanP51800015912· 33.6% built
- DATTA KRUPA5.6 yr overdueSHREE HERAAMBH VASTU NIRMAN LLP · Kurla, Mumbai SuburbanP51800004548· 90.9% built
- RUDRAKSHA5.6 yr overdueRAJ UNIVERSAL · Borivali, Mumbai SuburbanP51800003842· 81.8% built· 1 complaint
- RASHMI SHEELA5.5 yr overdueMODIS NAVNIRMAN LLP · Borivali, Mumbai SuburbanP51800014151· 90.9% built
- Ankur Palace5.5 yr overdueOSHO Developers · Borivali, Mumbai SuburbanP51800010439· filed Aug 2019 → now Feb 2021· 70.5% built· 2 complaints
- Sudesh5.5 yr overdueAnkur Premises Developers LLP · Andheri, Mumbai SuburbanP51800014138· 88.2% built
- Un Named5.5 yr overdueSanjay Fakirchand Garg · Borivali, Mumbai SuburbanP51800012444· 44.5% built
- ASPIRE RESIDENCY5.5 yr overdueASPIRE RESIDENCY LLP · MULUND WEST, Mumbai SuburbanP51800011875· filed Aug 2019 → now Feb 2021· 90.9% built
- Redevelopment of Tirandaz Subha Niketan CHS Ltd.5.5 yr overdueheritage Lifestyles & Developers Pvt. Ltd. · Mumbai, Mumbai SuburbanP51800001807· filed Mar 2019 → now Feb 2021· 90.9% built
- URVASHI CHS5.4 yr overdueADITYA DEVELOPERS · Borivali, Mumbai SuburbanP51800008896· 17.6% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.