Delayed projects in Mumbai Suburban
1,533 MahaRERA-registered projects in Mumbai Suburban are past the possession date on file and still under 100% built. Where the promoter has formally revised the date, the original is shown alongside so you can see what changed.
Page 4 of 8
- DLH DREAM TOWER5.4 yr overdueDEV LAND & HOUSING PVT LTD · Andheri, Mumbai SuburbanP51800006778· filed Sept 2019 → now Mar 2021· 99.1% built
- PLATINUM TOWER-45.4 yr overdueSHIVKRUPA GRUHPRAVESH LLP · Andheri, Mumbai SuburbanP51800000494· filed Sept 2019 → now Mar 2021· 90.9% built
- EASTERN WINDS5.4 yr overdueSHREE KRISHNA HOMES PVT. LTD. · Kurla, Mumbai SuburbanP51800007604· filed Sept 2019 → now Mar 2021· 70.5% built
- M Space5.4 yr overdueMahindra Lifespace Developers limited · Borivali, Mumbai SuburbanP51800000179· filed Sept 2019 → now Mar 2021· 81.8% built
- GALAXY PINNACLE5.4 yr overdueMR REALTORS · Andheri, Mumbai SuburbanP51800012634· filed Sept 2019 → now Mar 2021· 45.5% built· 2 complaints
- KANAKIA RAINFOREST5.4 yr overdueKANAKIA SPACES REALTY PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800000224· 87.6% built· 14 complaints
- AARADHYA NINE5.4 yr overdueMICL REALTY LLP · Kurla, Mumbai SuburbanP51800000229· 90.9% built
- Shubham Sarayu5.4 yr overdueShubham Realty · Kurla, Mumbai SuburbanP51800004927· filed Jun 2019 → now Mar 2021· 90.9% built
- Godrej Central5.4 yr overdueGodrej Landmark Redevelopers Private Limited · Kurla, Mumbai SuburbanP51800001107· 89.1% built· 15 complaints
- Dineshkunj CHS Ltd5.4 yr overdueSwastik Realty Pvt Ltd · Borivali, Mumbai SuburbanP51800004364· filed Jun 2018 → now Mar 2021· 90.9% built· 1 complaint
- SHEETAL OM JAY ARADHANA5.4 yr overdueD.G.LAND DEVELOPERS PRIVATE LIMITED · Borivali, Mumbai SuburbanP51800000446· filed Dec 2018 → now Mar 2021· 44.1% built· 4 complaints
- SAI PRASAD5.1 yr overdueADITYARAJ BUILDERS · Kurla, Mumbai SuburbanP51800004104· 55% built
- Samadhan5.1 yr overdueShivam Parivar Developers Pvt Ltd · Andheri, Mumbai SuburbanP51800016620· 90.9% built· 8 complaints
- PARVATI SADAN5.1 yr overdueMEENA BUILDER UNIT OF V N RAIKAR HUF · PLOT NO 49A PARVATI SADAN FRONT OF DHANLAXMI BANK CHEMBUR MUMBAI, Mumbai SuburbanP51800016081· 87.3% built
- MARBLE HEIGHTS5.1 yr overdueSHREE SAI ENTERPRISES · Borivali, Mumbai SuburbanP51800007464· 39.1% built
- Rite Oscar5.1 yr overdueRITE PROPERTIES · Borivali, Mumbai SuburbanP51800020831· 90.9% built
- SIDDHIVINAYAK5.1 yr overdueTriumph Ventures · Borivali, Mumbai SuburbanP51800011066· 90.9% built· 4 complaints
- GEM PARADISE5.1 yr overdueVAYUPUTTRA BUILDERS & INFRASTRUCTURES PVT. LTD. · Vira Desai Road Andheri west, Mumbai SuburbanP51800014003· 90.9% built· 7 complaints
- Vaidya Cottage CHS Ltd4.8 yr overdueShamik Enterprises Pvt Ltd. · Vile Parle (east), Mumbai SuburbanP51800001902· filed Jun 2020 → now Oct 2021· 90.9% built· 2 complaints
- KANAKIA LEVELS4.8 yr overdueKANAKIA SPACES REALTY PRIVATE LIMITED · Borivali, Mumbai SuburbanP51800000223· filed Oct 2019 → now Oct 2021· 99% built· 8 complaints
- VIVANTE4.8 yr overdueMahindra Lifespace Developers limited · Andheri, Mumbai SuburbanP51800000242· filed Oct 2019 → now Oct 2021· 84.8% built· 1 complaint
- Meridia4.8 yr overdueAccord Builders · Kurla, Mumbai SuburbanP51800009440· 90.9% built· 27 complaints
- SAYLEE ENCLAVE4.8 yr overdueFUNSIGN HOUSING PVT. LTD · Borivali, Mumbai SuburbanP51800001965· 90.9% built
- VASANT KUNJ CHS LTD4.8 yr overdueCALVIN SHRESTH PROPERTIES LLP · Andheri, Mumbai SuburbanP51800002566· 80.5% built
- CRYSTAL HARMONY4.8 yr overdueCRYSTAL BUILDERS & DEVELOPERS · Andheri, Mumbai SuburbanP51800008387· 36.4% built
- ASHTHA GOREGAON WEST4.7 yr overdueTOWN DEVELOPERS · Borivali, Mumbai SuburbanP51800001546· filed Dec 2019 → now Nov 2021· 87.9% built
- STAR ONE REALCON PVT LTD4.7 yr overdueSTAR ONE REALCON PVT LTD · Versova, Mumbai SuburbanP51800008499· filed Dec 2019 → now Nov 2021· 91.8% built
- SABARI SHOBHA4.7 yr overdueSabari Developers LLP · Kurla, Mumbai SuburbanP51800003844· filed Nov 2020 → now Nov 2021· 41.8% built
- SHETH MIDORI4.7 yr overdueSHETH INFRAWORLD PRIVATE LIMITED · Borivali, Mumbai SuburbanP51800000882· filed May 2019 → now Nov 2021· 90.9% built· 116 complaints
- Serenity Heights4.7 yr overdueAristocrat Marketing Ltd · Kurla, Mumbai SuburbanP51800002492· filed May 2019 → now Nov 2021· 90.9% built
- SAMARTH GARDEN WINGS F AND G4.7 yr overdueS.A.Developers · Kurla, Mumbai SuburbanP51800009013· filed Dec 2017 → now Nov 2021· 90.9% built· 2 complaints
- Redevelopment of Chembur Sandhya CHSL4.7 yr overdueHeritage Lifestyles & Developers Pvt. Ltd. · Kurla, Mumbai SuburbanP51800001760· filed Dec 2018 → now Nov 2021· 90.9% built· 1 complaint
- Veena Serenity4.7 yr overdueVEENA REALCON PRIVATE LIMITED · Kurla, Mumbai SuburbanP51800000016· 76.8% built· 17 complaints
- KANAKIA PARIS4.7 yr overdueKANAKIA SPACES REALTY PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800000122· filed Sept 2019 → now Dec 2021· 98.3% built· 11 complaints
- CHEMBUR HEIGHTS II4.6 yr overdueKUKREJA CONSTRUCTION CO · Kurla, Mumbai SuburbanP51800001916· filed Jun 2019 → now Dec 2021· 87.3% built
- HAPPY HOME C WING4.6 yr overdueENTEE DEVELOPERS · Kurla, Mumbai SuburbanP51800002874· filed Dec 2019 → now Dec 2021· 81.8% built· 3 complaints
- SANDHU PALACE A WING4.6 yr overdueSANDHU BUILDERS · Andheri, Mumbai SuburbanP51800001610· 90.9% built· 1 complaint
- Pushp Vinod - 154.6 yr overdueVas Infrastructure Ltd. · Borivali, Mumbai SuburbanP51800007682· 50% built
- AAFCON DEVELOPERS ASHOKANAND CHSL4.6 yr overdueAAFCON DEVELOPERS · Borivali, Mumbai SuburbanP51800007787· 71.8% built
- ALLURE WINGS A TO E4.6 yr overdueAADI PROPERTIES LLP · Kurla, Mumbai SuburbanP51800008521· 63.6% built· 9 complaints
- SAI DARSHAN4.6 yr overdueSAI DARSHAN · GHATKOPAR KIROL, Mumbai SuburbanP51800015047· 86.4% built
- Jhelum4.6 yr overdueSatre Infrastructure Private Limited · Kurla, Mumbai SuburbanP51800010836· 85.5% built
- SHREE GANESH PRASAD4.6 yr overdueANON DEVELOPERS · Kurla, Mumbai SuburbanP51800002888· 82.5% built
- Oasis - Tower 24.6 yr overdueAcme Housing India Private Limited · Borivali, Mumbai SuburbanP51800001238· filed Dec 2019 → now Dec 2021· 94.1% built· 22 complaints
- CHANDAN CHS LTD4.6 yr overdueAUM G M HEIGHTS · Andheri, Mumbai SuburbanP51800004733· 90.9% built
- RATNA MOHAN TRIVENI CHSL4.6 yr overdueATUL CORPORATES · Borivali, Mumbai SuburbanP51800006783· filed Dec 2018 → now Dec 2021· 76.6% built· 1 complaint
- REDEVELOPMENT OF STATE BANK OF INDIA EMPLOYEES SHREE CO-OP HOUSING SOC LTD4.6 yr overdueORRA REALTORS PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800010979· 53.6% built
- Rustomjee Seasons - Wing C4.6 yr overdueKEYSTONE REALTORS LIMITED · Andheri, Mumbai SuburbanP51800000309· 90.9% built
- SHEEL ENCLAVES4.6 yr overduePODDAR INFRACON PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800004722· 90.9% built
- ASHIRWAD CHS LTD4.6 yr overdueASHIRWAD CO-OPERATIVE HOUSING SOCIETY LTD · Andheri, Mumbai SuburbanP51800008610· 81.8% built
- SUVIDHA SQUARE4.6 yr overdueSUVIDHA MILIND BUSINESS VENTURES · Andheri, Mumbai SuburbanP51800008291· filed Dec 2019 → now Dec 2021· 99.5% built
- Redevelopment of Sultanabad Darshan CHS Ltd4.6 yr overdueAFTAB CONSTRUCTIONS · Andheri, Mumbai SuburbanP51800011533· filed Dec 2017 → now Dec 2021· 90.9% built
- SAHAKAR NAGAR GRACE CO-OP. HSG. SOC. LTD4.6 yr overdueAPOORVA HOMES · Kurla, Mumbai SuburbanP51800005727· filed Dec 2019 → now Dec 2021· 62.1% built
- Constn of 219 Ts and 172 MIG Ts on CTS No 128 A 12 Pt at Mahaveer nagar Kandivali W Mumbai4.6 yr overdueMAHARASHTRA HOUSING AND AREA DEVELOPMENT AUTHORITY · Borivali, Mumbai SuburbanP51800000040· filed Dec 2019 → now Dec 2021· 27.5% built
- THE WINDSOR4.6 yr overdueGADIRAJU SUBRAMANYAM RAJU PROPRIETOR OF TIRUPATHI ENTERPRISES · Borivali, Mumbai SuburbanP51800000118· filed Dec 2019 → now Dec 2021· 58.4% built· 2 complaints
- YAMUNA HEIGHTS4.6 yr overdueSAINATH ENTERPRISES · Kurla, Mumbai SuburbanP51800002016· filed Dec 2019 → now Dec 2021· 46.2% built
- UK SANGFROID4.6 yr overdueKeemaya Build Private Limited · Andheri, Mumbai SuburbanP51800007085· filed Dec 2019 → now Dec 2021· 61.8% built· 8 complaints
- KABRA CENTROID A Redevelopment of GOP CHSL4.6 yr overdueKABRA AND ASSOCIATES · Andheri, Mumbai SuburbanP51800000307· 90.9% built· 1 complaint
- KISMET CHSL4.6 yr overdueMidcity Landmarks LLP · SANTACRUZ WEST, Mumbai SuburbanP51800003751· filed Dec 2019 → now Dec 2021· 69.1% built
- PARIJATAK CO OP HSG SOC LTD4.6 yr overdueSUNRISE HOUSING · Kurla, Mumbai SuburbanP51800001974· filed Dec 2019 → now Dec 2021· 80% built
- KESAR SCION4.6 yr overdueKESAR HOUSING & DEVELOPMENT CO · Kurla, Mumbai SuburbanP51800003391· 23.6% built
- LILIUM4.6 yr overdueJayshree Builders · Andheri, Mumbai SuburbanP51800000938· 90.9% built
- Oasis - Tower 14.6 yr overdueGlomore constructions · Borivali, Mumbai SuburbanP51800006404· filed Dec 2019 → now Dec 2021· 93.5% built· 44 complaints
- Shah Business Centre4.6 yr overdueSHAH HOUSECON PRIVATE LIMITED · Borivali, Mumbai SuburbanP51800002825· filed Dec 2019 → now Dec 2021· 60% built· 2 complaints
- SWAPNAPOORTI4.6 yr overdueM/S SHIV SAMRUDDHI DEVELOPERS · Andheri, Mumbai SuburbanP51800002012· filed Dec 2019 → now Dec 2021· 63.6% built
- BHOOMI CELESTIA B-WING4.6 yr overdueSASHWAT CONSTRUWELL PRIVATE LIMITED · Borivali, Mumbai SuburbanP51800004768· 61.3% built
- Aquaria Grande, Wing B Floor 33-384.6 yr overdueClub Aquaria Enterprises · Borivali, Mumbai SuburbanP51800007959· 54.5% built
- MOUNT BLISS4.6 yr overdueRANJANA BUILDERS AND DEVELOPERS · Nardas Nagar, Mumbai SuburbanP51800014154· 90.9% built
- KATEELESHWARI APARTMENT4.6 yr overdueKATEELESHWARI DEVELOPERS PRIVATE LIMITED & RAMANI BROTHERS · Mulund Check naka, Mumbai SuburbanP51800011873· 90.9% built
- MARATHON EMBLEM-24.6 yr overdueUNITED ENTERPRISES · Kurla, Mumbai SuburbanP51800000556· filed Dec 2019 → now Dec 2021· 45% built
- Imperial Heights Wing C and D4.6 yr overdueEPITOME RESIDENCY PRIVATE LIMITED · Borivali, Mumbai SuburbanP51800003270· filed Jun 2019 → now Dec 2021· 97.1% built· 34 complaints
- Emerald Isle - T94.6 yr overdueLarsen & Toubro Ltd. (Realty Division) · Kurla, Mumbai SuburbanP51800007280· 90% built· 2 complaints
- GOREGAON JANSEVA CHS LTD WING A AND B4.6 yr overdueKARWA AND KEWAL KIRAN REALTORS · Borivali, Mumbai SuburbanP51800008236· 90.9% built
- VASUNDHARA CHS LTD - Phase II - A and B Wing4.6 yr overdueRELIABLE CONSTRUCTIONS · Borivali, Mumbai SuburbanP51800005777· filed Dec 2019 → now Dec 2021· 39.6% built
- AMARDEEP MAHAL CHS LTD4.6 yr overdueNITIN HARSHADRAI MANIAR · Andheri, Mumbai SuburbanP51800000995· filed Dec 2019 → now Dec 2021· 72.7% built
- SAI SASTHA CRYSTAL4.6 yr overdueMS SAI SASTHA ENTERPRISES · Kurla, Mumbai SuburbanP51800002006· 90.9% built
- Shubham Solitude4.6 yr overdueShubham Enterprise · Kurla, Mumbai SuburbanP51800010051· 80% built
- Ramkrishna Heights4.6 yr overduePOOJA ENTERPRISES · Kurla, Mumbai SuburbanP51800005327· filed Dec 2018 → now Dec 2021· 99.1% built· 1 complaint
- Redevelopment of Lamplight CHSL4.6 yr overdueShree Mahavir Estates · Mumbai, Mumbai SuburbanP51800002461· filed Dec 2019 → now Dec 2021· 76.8% built
- REDEVELOPMENT OF DIVYA JYOTI CO-OPERATIVE HOUSING SOCIETY LIMITED4.6 yr overdueD V DEVELOPERS LLP · Borivali, Mumbai SuburbanP51800013943· 81.8% built
- Sea Jewel4.6 yr overdueSea Jewel Property Developers LLP · Borivali, Mumbai SuburbanP51800009552· 36.8% built
- Xpoint Redevelopment of Prem Bhavna CHSL4.6 yr overdueRodium Properties division of Rodium Realty Ltd. · Borivali, Mumbai SuburbanP51800001187· 50% built
- REGENT GALAXY4.6 yr overdueREGENT CONSTRUCTIONS · Borivali, Mumbai SuburbanP51800001438· filed Dec 2018 → now Dec 2021· 99.1% built
- AVIRON CLASSIC4.6 yr overdueSANJAY TALAKSHI SAVLA · Borivali, Mumbai SuburbanP51800008626· filed Dec 2019 → now Dec 2021· 65% built
- N G ECLAT A WING PHASE III4.6 yr overdueNARINDERPAL ROSHANLAL GUPTA · Andheri, Mumbai SuburbanP51800008047· 53.4% built· 1 complaint
- Parinee Adney4.6 yr overduePARINEE REALTY PRIVATE LIMITED · Borivali, Mumbai SuburbanP51800001852· filed Dec 2019 → now Dec 2021· 90.9% built· 31 complaints
- ZEE SWASTIK4.6 yr overdueZEE RPM BUILDERS AND DEVELOPERS LLP · Andheri, Mumbai SuburbanP51800010732· 19.7% built· 1 complaint
- DATTA RAMANAND CHS LTD4.6 yr overdueDISHA CONSTRUCTION · Andheri, Mumbai SuburbanP51800001236· filed Dec 2019 → now Dec 2021· 89.1% built
- KILBIL RATAN4.6 yr overdueR P COMBINES · MULUND, Mumbai SuburbanP51800012507· 90.9% built
- SUDHANSHU IMPERIA4.6 yr overdueSUDHANSHU INFRASTRUCTURES PRIVATE LIMITED · Kurla, Mumbai SuburbanP51800003303· filed Feb 2020 → now Dec 2021· 81.8% built
- SHREE SAI BABA CHS LTD4.6 yr overdueS M BUILDERS & DEVELOPERS · Andheri, Mumbai SuburbanP51800006163· filed Dec 2019 → now Dec 2021· 45% built
- PALKHI AURA4.6 yr overdueKCD AND SYNERGY VENTURES · Borivali, Mumbai SuburbanP51800009045· filed Dec 2019 → now Dec 2021· 87% built
- OMKARESHWAR CHS PROP4.6 yr overdueNEW LAXMI ENTERPRISES · Andheri, Mumbai SuburbanP51800012099· filed Dec 2019 → now Dec 2021· 53.2% built
- AARYA4.6 yr overdueRAJA BUILDERS · Andheri, Mumbai SuburbanP51800006434· 67.3% built· 1 complaint
- CHARKOP JINPREM CO OP HOUSING SOCIETY LTD4.6 yr overdueCHARKOP JINPREM CO. OP. HOUSING SOCIETY LTD · KANDIVALI WEST, Mumbai SuburbanP51800014718· 56.8% built
- Redevelopment of Apsara CHS Ltd.4.6 yr overdueHeritage Lifestyles & Developers Pvt.Ltd. · Kurla, Mumbai SuburbanP51800001743· filed Dec 2019 → now Dec 2021· 72.3% built
- Rustomjee Seasons - Wing B4.6 yr overdueKEYSTONE REALTORS LIMITED · Andheri, Mumbai SuburbanP51800000605· 90.9% built
- AMRAPALI4.6 yr overdueMANGAL BUILDHOME PRIVATE LIMITED · VILE PARLE EAST, Mumbai SuburbanP51800015180· 0% built
- KANAKIA SEVENS4.6 yr overdueKANAKIA SPACES REALTY PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800000388· 84.9% built· 17 complaints
- Earth Terrace4.6 yr overdueM/s. Earth Graphics · Goregaon, Mumbai SuburbanP51900004900· filed Dec 2019 → now Dec 2021· 39% built
- SOLITAIRE BUSINESS PARK4.6 yr overdueCRESCENT REALTY DEVELOPERS PRIVATE LIMITED · Kurla, Mumbai SuburbanP51800010460· 40.9% built· 1 complaint
- ZEE SQUARE4.6 yr overdueZEE COM TRADE PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800003888· filed Dec 2019 → now Dec 2021· 86.8% built
- AVENUE WING A4.6 yr overdueDharmesh Constructions Private Limited · Borivali, Mumbai SuburbanP51800002030· filed Dec 2019 → now Dec 2021· 80.6% built· 21 complaints
- TRIMURTI CHSL PHASE I - UPTO 15TH FLOOR4.6 yr overdueROMELL REAL ESTATE PRIVATE LIMITED · Kurla, Mumbai SuburbanP51800007589· 90.9% built
- GHARKUL4.6 yr overdueAJITKUMAR CHS LTD · Borivali, Mumbai SuburbanP51800014246· filed Dec 2019 → now Dec 2021· 27.3% built
- DIVINE TOWERS4.6 yr overdueKABRA ESTATE AND INVESTMENT CONSULTANTS · MALAD WEST, Mumbai SuburbanP51800016392· 98.6% built
- Juhu Sheetal Co-operative Housing Society Ltd.4.6 yr overdueAmal Realtors Private Limited · Andheri, Mumbai SuburbanP51800000648· 90.9% built
- ATHARV SHAGUN4.6 yr overdueM/S ATHARV REALTY · Andheri, Mumbai SuburbanP51800005867· 90.9% built
- Shri Sadashiv CHSL4.6 yr overdueBhoomi Shashwat Estate Pvt. Ltd. · Andheri, Mumbai SuburbanP51800019208· 46.8% built
- NEW EKTA CHS4.6 yr overdueADITYA DEVELOPERS · Borivali, Mumbai SuburbanP51800007346· 76.8% built· 9 complaints
- ANANDA RESIDENCY4.6 yr overduePARADIGM AMBIT BUILDCON · Borivali, Mumbai SuburbanP51800000204· filed Dec 2019 → now Dec 2021· 95.7% built· 13 complaints
- Gomes Apartment CHS4.6 yr overdueMetro Associates · Borivali, Mumbai SuburbanP51800002316· 50% built
- STEVELAND4.6 yr overdueCALVIN PROPERTIES · Kurla, Mumbai SuburbanP51800001625· 90.9% built
- KUMBHAVATI NIWAS4.6 yr overdueKRISHNA BHOORARAM PUROHIT · Borivali, Mumbai SuburbanP51800014619· 69.1% built
- Gayatri CHSL 8th 9th floor4.6 yr overdueKhushi Associates · Borivali - West, Mumbai SuburbanP51800024958· 90.9% built
- DAHISAR SUMATI CHS LTD4.6 yr overdueBHATIA BUILDERS AND DEVELOPERS PVT LTDC · Borivali, Mumbai SuburbanP51800003975· filed Dec 2019 → now Dec 2021· 53.6% built
- NIDHAAN CLOVER - B4.6 yr overdueNIDHAAN BUILDCON PRIVATE LIMITED · Kurla, Mumbai SuburbanP51800010930· 89.1% built
- CITY PRIDE4.6 yr overdueCITYMAKER BUILDER PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800012418· filed Sept 2018 → now Jan 2022· 70% built
- SHREE SHIVSAMARTH RESIDENCY4.6 yr overdueSHREE SHIV SAMARTH DEVELOPERS · Kurla, Mumbai SuburbanP51800009568· filed Dec 2018 → now Jan 2022· 78.4% built
- Jeerawali Residency4.6 yr overdueGopuram Developers · Kurla, Mumbai SuburbanP51800008906· filed Jul 2018 → now Jan 2022· 89.4% built
- SKYE GRANDEUR4.5 yr overdueV K DEVELOPERS · GHATKOPAR EAST, Mumbai SuburbanP51800015316· 79.1% built
- PALI HILL NAVROZE PREMISES CHS LIMITED4.5 yr overdueKRYSHNAJAY DEVELOPERS PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800001695· filed Feb 2021 → now Feb 2022· 97.7% built
- KAPADIA AVENUE4.4 yr overdueL J ENTERPRISE · Borivali, Mumbai SuburbanP51800012139· filed Mar 2019 → now Mar 2022· 90.9% built
- SAT ANUPA CHS PHASE 14.4 yr overdueDISHA CONSTRUCTION · Andheri, Mumbai SuburbanP51800001640· filed Mar 2020 → now Mar 2022· 81.1% built· 1 complaint
- REDEVELOPMENT OF NAVCHANDRAKUNJ CHSL4.4 yr overduePRANAV CONSTRUCTIONS LIMITED · Borivali, Mumbai SuburbanP51800016377· 39.5% built
- Sunrise Charkop Wing C4.4 yr overdueDhaval Housing AOP · Borivali, Mumbai SuburbanP51800004387· 88.6% built
- Swiss Boulevard4.4 yr overdueChaurang Associates · Kurla, Mumbai SuburbanP51700000636· 93.9% built
- Vastu Pinnacle4.4 yr overdueSanwar M Khandelwal · Borivali, Mumbai SuburbanP51800004711· filed Mar 2020 → now Mar 2022· 90.9% built· 1 complaint
- SHANTIVILLA4.4 yr overdueRIKHAV ASHIT SHAH · Vile Parle(West), Mumbai SuburbanP51800002468· 47.3% built
- MANALI CHS LTD4.4 yr overdueSAINATH BUILDERS AND DEVELOPERS · Kurla, Mumbai SuburbanP51800009091· filed Sept 2020 → now Mar 2022· 90.9% built· 3 complaints
- gagangiri Elanza4.4 yr overduePalan Realty Private Limited · Kurla, Mumbai SuburbanP51800010768· 99.5% built
- SETHIA SEA VIEW C AND D WING4.4 yr overduePrathamesh Land Developers · Borivali, Mumbai SuburbanP51800002308· filed Mar 2019 → now Mar 2022· 90.9% built· 6 complaints
- Bhaveshwar Nagar Building No. 34.4 yr overdueYog Reality · Kurla, Mumbai SuburbanP51800003355· filed Mar 2019 → now Mar 2022· 99.5% built· 1 complaint
- PLATINUM TOWER - 14.4 yr overdueAKSHAY GRUHPRAVESH LLP · Andheri, Mumbai SuburbanP51800000487· filed Mar 2020 → now Mar 2022· 90.9% built· 1 complaint
- SHARAD APARTMENTS CHS LTD4.4 yr overdueAAKAR CONSTRUCTIONS · Borivali, Mumbai SuburbanP51800003282· filed Dec 2017 → now Apr 2022· 90.9% built· 1 complaint
- Aria4.3 yr overdueParinee Realtors Pvt. Ltd. · Andheri, Mumbai SuburbanP51800003167· filed Dec 2020 → now Apr 2022· 87.7% built
- Kalpataru Avenue4.3 yr overdueNeo Pharma Private Limited · Borivali, Mumbai SuburbanP51800003417· filed Jun 2021 → now Apr 2022· 76.3% built· 1 complaint
- Kalpataru Yashodhan4.3 yr overdueKalpataru Property Ventures LLP · Andheri, Mumbai SuburbanP51800000442· 86.3% built· 2 complaints
- Muktanand Co-op Housing Society4.3 yr overdueKuldeep s Pednekar · Kurla, Mumbai SuburbanP51800006384· filed May 2018 → now May 2022· 53.6% built· 2 complaints
- The Ghatkopar Nilkantha Chs Ltd4.3 yr overdueSchemaatics · Kurla, Mumbai SuburbanP51800012450· filed Jan 2021 → now May 2022· 90.9% built
- YOGA YOG CHS - CREST4.3 yr overdueHariom Sayaji Properties LLP · Andheri, Mumbai SuburbanP51800001550· 72.7% built· 1 complaint
- Ratnadeep4.2 yr overdueAnkur Premises Developers LLP · Andheri, Mumbai SuburbanP51800007115· 81.8% built
- Prime Builders4.2 yr overduePrime Builders and Developers · Andheri, Mumbai SuburbanP51800008911· filed Nov 2020 → now May 2022· 90.9% built· 1 complaint
- SAPPHIRE BUSINESS ANNEXE4.2 yr overdueSAPPHIRE DEVELOPERS · Kurla, Mumbai SuburbanP51800007622· filed Nov 2020 → now May 2022· 81.8% built
- NEW PUSHPARAJ4.2 yr overdueYASH INFOMEDIA & ESTATE PRIVATE LIMITED · Kurla, Mumbai SuburbanP51800001883· filed Sept 2019 → now May 2022· 50.5% built
- Prime Builders and Developers - SadhuAdarsh4.2 yr overduePrime Builders and Developers · Andheri, Mumbai SuburbanP51800007720· filed Nov 2020 → now May 2022· 69.1% built
- HIMBINDU4.2 yr overdueM/s. Sahajanand Developers · Goregaon West, Mumbai SuburbanP51800003502· filed Dec 2018 → now May 2022· 52.7% built· 5 complaints
- KRIPA ALLURE4.2 yr overdueKRIPA ONENESS PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800018912· 79.5% built
- LODHA ETERNIS NATURA A4.2 yr overdueLODHA DEVELOPERS LIMITED · Andheri, Mumbai SuburbanP51800000345· 90.9% built· 1 complaint
- Aaryavarta4.2 yr overdueDipti Spaces Pvt. Ltd. · Andheri, Mumbai SuburbanP51900002676· 90.9% built· 6 complaints
- SHRIRANG4.1 yr overdueVIRENDRA NATWARLAL SHETH · Kurla, Mumbai SuburbanP51800004570· filed Jun 2020 → now Jun 2022· 90.9% built· 6 complaints
- Redevelopment of New Monalisa CHSL4.1 yr overdueShree Mahavir Estates · Mumbai, Mumbai SuburbanP51800001955· filed Dec 2020 → now Jun 2022· 34.4% built
- Redevelopment of Silverlight CHSL4.1 yr overdueShree Mahavir Estates · Mumbai, Mumbai SuburbanP51800002541· filed Dec 2020 → now Jun 2022· 36.2% built
- Kalpataru Radiance E4.1 yr overdueKeyana Estate LLP · Borivali, Mumbai SuburbanP51800013245· 46.9% built
- ALAG STELLA4.1 yr overdueALAG PROPERTY CONSTRUCTIONS PVT. LTD. · MULUND EAST, Mumbai SuburbanP51800018925· filed Jun 2021 → now Jun 2022· 82.3% built
- PLUTO-B -SUNCITY HOUSING PHASE- I4.1 yr overdueSUNCITY COMPLEX · Kurla, Mumbai SuburbanP51800004553· filed Dec 2018 → now Jun 2022· 90.9% built
- SHUBH CHINTAN4.1 yr overdueAUM ENTERPRISES · Kurla, Mumbai SuburbanP51800007195· 90.9% built
- SHEETAL DWAR4.1 yr overdueSHEETAL ENTERPRISES · Borivali, Mumbai SuburbanP51800003724· filed Dec 2019 → now Jun 2022· 35.7% built
- BT SUJATA CHSL4.1 yr overdueC H PATIL AND SONS LLP · Borivali, Mumbai SuburbanP51800003936· filed Jan 2021 → now Jun 2022· 63.6% built
- EVERSHINE CROWN4.1 yr overdueEVERSHINE BUILDERS PRIVATE LIMITED · Borivali, Mumbai SuburbanP51800003631· 80% built· 5 complaints
- SAI SYMPHONY4.1 yr overdueSainath Realtors · Kurla, Mumbai SuburbanP51800000842· filed Dec 2018 → now Jun 2022· 92.3% built
- PLATINUM TOWER - 314.1 yr overdueMANAS GRUHPRAVESH LLP · Andheri, Mumbai SuburbanP51800001759· 85.4% built
- SBI Staff Trinity CHS Ltd4.1 yr overdueRajshree Enterprise · Borivali, Mumbai SuburbanP51800008470· filed Dec 2019 → now Jun 2022· 37% built
- SHUBH AANGAN4.1 yr overdueG D REALTORS PVT LTD · Kurla, Mumbai SuburbanP51800005320· filed Jun 2021 → now Jun 2022· 90.9% built
- Kashmiri Heights4.1 yr overdueM.K.Enterprises · Andheri, Mumbai SuburbanP51800008802· 74.5% built· 2 complaints
- Regent Heights-New Ganga Niwas CHSL4.1 yr overdueRDB Mumbai Infrastructures Private Limited · Andheri, Mumbai SuburbanP51800011798· filed Jun 2019 → now Jun 2022· 84.5% built
- MANHAR RESIDENCY4.1 yr overdueSHLOK ENTERPRISES (MANHAR) · Dahisar west, Mumbai SuburbanP51800002057· filed Dec 2019 → now Jun 2022· 90.8% built
- 10 Square4.1 yr overdueVIJAY KAMDAR · Andheri, Mumbai SuburbanP51800004094· filed Jun 2018 → now Jun 2022· 82.7% built· 2 complaints
- royale residences b and c wing4.1 yr overduem/s rani creators , consultant and service providers · Kurla, Mumbai SuburbanP51800005315· filed Dec 2019 → now Jun 2022· 49.7% built
- SUMATI SADAN4.1 yr overdueMARK LIFE SPACE · MALAD (W), Mumbai SuburbanP51800021758· 81.8% built
- Moreshwar tower4.1 yr overdueyashraj corporation · Kurla, Mumbai SuburbanP51800003786· filed Mar 2020 → now Jun 2022· 51.8% built
- INSIGNIA4.1 yr overdueULTRA SPACE DEVELOPERS PRIVATE LIMITED · Kalina, Mumbai SuburbanP51800002313· filed Apr 2020 → now Jun 2022· 96.1% built· 64 complaints
- The Trees, Residential Phase 14.1 yr overdueGodrej Properties Limited · Kurla, Mumbai SuburbanP51800000165· 89.1% built· 5 complaints
- SHREE DEEPLAXAMI4.1 yr overduePURO CONSTRUCTIONS · Kurla, Mumbai SuburbanP51800009423· filed Dec 2019 → now Jun 2022· 24% built
- SUYOG CHS4.1 yr overdueADITYARAJ BUILDERS · Kurla, Mumbai SuburbanP51800004742· filed Feb 2021 → now Jun 2022· 72.7% built
- NEHRU NAGAR NISHIGANDHA CHS LTD4.1 yr overdueAISHWARYA BUILDERS & DEVELOPERS · Kurla, Mumbai SuburbanP51800002020· filed Dec 2019 → now Jun 2022· 90.9% built
- Grishma Heights4.1 yr overdueRIGHT CHANNEL CONSTRUCTION PVT LTD · kandivali west, Mumbai SuburbanP51800012108· filed Dec 2018 → now Jun 2022· 97.7% built
- Rustomjee Paramount - Wing C4.1 yr overdueKEYSTONE REALTORS LIMITED · Andheri, Mumbai SuburbanP51800000481· 99.2% built
- Avant Heritage I4.1 yr overdueAishwarya Avant Builders LLP · Andheri, Mumbai SuburbanP51800009299· filed Dec 2018 → now Jun 2022· 90.9% built· 27 complaints
- The Trees Residential Phase 24.1 yr overdueGodrej Properties Limited · Kurla, Mumbai SuburbanP51800000161· 90.9% built· 1 complaint
- KANJUR MATRUCHHAYA CHS LTD4.1 yr overdueSUNIL DINKAR SHINDE · Kurla, Mumbai SuburbanP51800015513· 90.9% built
- SUNFLOWER4.1 yr overdueShree Krishna Developers · Kurla, Mumbai SuburbanP51800006422· filed Dec 2018 → now Jun 2022· 90.9% built· 6 complaints
- Royal Fantasy Phase I4.1 yr overdueRoyal Fantasy Constructions Private Limited · Andheri, Mumbai SuburbanP51800009606· filed Dec 2018 → now Jun 2022· 84.2% built· 5 complaints
- Om Shyam4.1 yr overdueKurla, Mumbai SuburbanP51800002462· filed Apr 2021 → now Jun 2022· 90.9% built
- Ananta Apartments4.1 yr overdueSMARTSOLUTIONS · Vileparle east, Mumbai SuburbanP51800023422· 55.6% built
- Jaliyan Heights Borivali4.1 yr overdueJaliyan Developer · Borivali, Mumbai SuburbanP51800012925· filed Jul 2021 → now Jun 2022· 67.5% built· 1 complaint
- JANHAVI ENCLAVE4.1 yr overdueJANHAVI HOUSING DEVELOPERS PRIVATE LIMITED · Kurla, Mumbai SuburbanP51800009236· filed Jun 2021 → now Jun 2022· 52.5% built
- Sai Radha Complex4.1 yr overdueG. K. Realtors · Kurla, Mumbai SuburbanP51800010063· filed Jun 2019 → now Jul 2022· 86.1% built
- VINIYOG CHS LTD.4.1 yr overdueVINAYAK DEVELOPERS · Borivali, Mumbai SuburbanP51800008768· filed Jul 2020 → now Jul 2022· 90.9% built
- TEENMURTY SUMMIT4.1 yr overdueM/s Teenmurty Summit Realty LLP · Borivali, Mumbai SuburbanP51800006085· 90.9% built
- f RESIDENCES-MALAD4.1 yr overdueM/S RIDDHI SIDDHI CONSTRUCTION · Borivali, Mumbai SuburbanP51800007547· 81.4% built· 11 complaints
- Heritage Park4.1 yr overdueVelentine Developers · Andheri, Mumbai SuburbanP51800004034· 90.9% built
- RANJANA HEIGHTS4.1 yr overdueNAYAK REALTY · Kurla, Mumbai SuburbanP51800005503· filed Dec 2018 → now Aug 2022· 90.9% built· 1 complaint
- FINE RESIDENCY4.0 yr overdueFINE DEVELOPMENTS · Andheri, Mumbai SuburbanP51800004690· 90.9% built
- Lodha Supremus - Andheri4.0 yr overdueLODHA DEVELOPERS LIMITED · Andheri, Mumbai SuburbanP51800013696· 90.9% built· 1 complaint
- Amity Apartments4.0 yr overdueRaajyam Realty LLP · Andheri, Mumbai SuburbanP51800004960· filed Aug 2018 → now Aug 2022· 68.6% built· 1 complaint
- SIGMA EMERALD4.0 yr overdueSIGMA REALTORS (INDIA) PRIVATE LIMITED · ANDHERI, Mumbai SuburbanP51800009738· 90% built
- Redevelopment of Jai Vijay CHSL - Phase I3.9 yr overdueKOLTE-PATIL DEVELOPERS LIMITED · Mumbai, Mumbai SuburbanP51800004446· filed Sept 2019 → now Sept 2022· 63.6% built· 2 complaints
- UJVAL3.9 yr overduePARANJAPE SCHEMES (CONSTRUCTION) LTD · Borivali, Mumbai SuburbanP51800000657· filed Dec 2019 → now Sept 2022· 86.6% built· 1 complaint
- ARIHANT3.9 yr overduePLAHA AND MEHTA ASSOCIATES · Kurla, Mumbai SuburbanP51800010147· filed Dec 2019 → now Sept 2022· 80.7% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.