Delayed projects in Mumbai Suburban
1,523 MahaRERA-registered projects in Mumbai Suburban are past the possession date on file and still under 100% built. Where the promoter has formally revised the date, the original is shown alongside so you can see what changed.
Page 5 of 8
- LITTLE MALABAR HILL4.0 yr overduePARDIS CONSTRUCTION LLP · Kurla, Mumbai SuburbanP51800003603· filed Sept 2020 → now Sept 2022· 90.9% built
- Deluxe Apartments4.0 yr overdueWest Avenue Realtors Private Limited · Andheri, Mumbai SuburbanP51800000819· filed Apr 2021 → now Sept 2022· 36.4% built
- ANANTYA4.0 yr overdueSHREE KRISHNA HOMES PVT. LTD. · Pant Nagar, Ghatkopar (East), Mumbai SuburbanP51800020909· 57.3% built
- ARIHANT4.0 yr overduePLAHA AND MEHTA ASSOCIATES · Kurla, Mumbai SuburbanP51800010147· filed Dec 2019 → now Sept 2022· 80.7% built
- UJVAL4.0 yr overduePARANJAPE SCHEMES (CONSTRUCTION) LTD · Borivali, Mumbai SuburbanP51800000657· filed Dec 2019 → now Sept 2022· 86.6% built· 1 complaint
- Stella Residency4.0 yr overdueVaibhavLaxmi Builders and Developers · Vikhroli East, Mumbai SuburbanP51800006691· filed Apr 2021 → now Oct 2022· 43.8% built· 1 complaint
- Alliance Ravi Kiran4.0 yr overdueALLIANCE CITY DEVELOPERS REALTORS PVT LTD · Kurla, Mumbai SuburbanP51800018068· 90.9% built
- Suma Sam CHSL4.0 yr overdueSuma Sam Co-op. Hsg. Soc. Ltd. · Borivali, Mumbai SuburbanP51800018744· 90.9% built
- Jayakunj Apartment CHSL4.0 yr overdueJayakunj Apartment CHSL · Borivali, Mumbai SuburbanP51800018749· 90.9% built
- HARI PRASAD BUILDING3.9 yr overdueNIRMITEE DEVELOPERS · SHRIKRISHNA NAGAR, BORIVALI (EAST), Mumbai SuburbanP51800027395· 9.1% built
- Dattatraya Annex3.9 yr overdueIndu Enterprise · Kurla, Mumbai SuburbanP51800006110· filed Dec 2018 → now Nov 2022· 81.4% built
- Redevelopment of Sanjog CHS Ltd3.9 yr overdueHeritage Lifestyles LLP · Borivali, Mumbai SuburbanP51800000984· filed Dec 2018 → now Nov 2022· 53.6% built
- RAVIRAJ TARANG3.8 yr overdueRAVINDRA SHANKAR SAWANT · Borivali, Mumbai SuburbanP51800010482· 60.6% built· 1 complaint
- Sanaya Elysium3.8 yr overdueM/s Sanaya Realties Pvt Ltd · Kurla, Mumbai SuburbanP51800001739· 85.7% built· 1 complaint
- VASANT OASIS DAFFODIL BLDG 73.8 yr overdueNEEPA REAL ESTATES PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800000798· 84.1% built· 6 complaints
- SIGNATURE BUSINESS PARK3.8 yr overdueSwastik Developers · Chembur, Mumbai SuburbanP51800007575· 79.1% built· 1 complaint
- Vaikunth Dham CHS Ltd3.8 yr overdueShivshankar Singh & Others · Kurla, Mumbai SuburbanP51800006275· 86.7% built
- Dev Darshan3.8 yr overdueCITY ESTATE DEVELOPERS LIMITED · Kurla, Mumbai SuburbanP51800007029· 45.5% built· 1 complaint
- VASANT OASIS BLUEBELL BLDG 93.8 yr overdueNEEPA REAL ESTATES PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800000762· 76.4% built· 3 complaints
- Sanskruti Splendour3.8 yr overdueSanskruti Nirman Pvt. Ltd. · BORIVALI, Mumbai SuburbanP51800009760· 58.2% built· 1 complaint
- AURIS SERENITY TOWER 13.8 yr overdueTRANSCON-SHETH CREATORS PRIVATE LIMITED · Borivali, Mumbai SuburbanP51800001080· 98.2% built· 4 complaints
- Madonna3.8 yr overdueMichael Rodrigues · Borivali, Mumbai SuburbanP51800010569· filed Dec 2019 → now Dec 2022· 90.9% built· 2 complaints
- Vishal Sagar3.8 yr overdueJ R Properties LLP · Kurla, Mumbai SuburbanP51800018676· 81.6% built
- KRISHNA HERITAGE3.8 yr overdueKRISHNA ENTERPRISES · KANDIVALI WEST, Mumbai SuburbanP51800017093· 90.9% built
- PRATHAM3.8 yr overdueVARDHMAN ENTERPRISES · Andheri, Mumbai SuburbanP51800009959· filed Dec 2017 → now Dec 2022· 90.9% built· 7 complaints
- EKTA TRINITY3.8 yr overdueEKTA HOUSING PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800005021· 94.3% built
- RBI employees Ashish chsl3.8 yr overdueTRIVENI DEVELOPERS · KASTUR PARK, Mumbai SuburbanP51800007607· filed Dec 2018 → now Dec 2022· 90.9% built· 9 complaints
- Kashish Park Ghatkopar3.8 yr overdueLadam Homes Pvt Ltd. · Kurla, Mumbai SuburbanP51800002692· filed Jun 2021 → now Dec 2022· 90.8% built· 11 complaints
- SHASHWAT PARK3.8 yr overdueATLANTA ASSOCIATES · Kurla, Mumbai SuburbanP51800003044· 71.5% built· 2 complaints
- Avant Heritage II-Basement plus stilt plus 3 Podium plus 20 Upper Habitable Floors3.8 yr overdueAishwarya Avant Builders LLP · Andheri, Mumbai SuburbanP51800015537· filed Jun 2021 → now Dec 2022· 80% built· 5 complaints
- SAMARTH RESIDENCY3.8 yr overdueAJAY SITARAM SURVE · Borivali, Mumbai SuburbanP51800013678· 90.9% built· 2 complaints
- THAKUR ASPIRE3.8 yr overdueTHAKUR REALTY PRIVATE LIMITED · Borivali, Mumbai SuburbanP51800003848· 21.8% built
- SWAMI DARSHAN3.8 yr overdueGIRISH Rupshi GADA · Junction of M. G. Road and Hunbow Lane, Mumbai SuburbanP51800014536· 64.1% built
- NEW VANDANA CO-OP HSG. SOC. LTD.3.8 yr overdueBhoomi Associates · Borivali, Mumbai SuburbanP51800016757· 64.5% built
- TRAFALGAR TOWER3.8 yr overdueM/S. Akshay Radha Kishan Construction · Kurla, Mumbai SuburbanP51800006369· filed Dec 2019 → now Dec 2022· 58.3% built
- VASANT OASIS DANICA BLDG NO 153.8 yr overdueNEEPA REAL ESTATES PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800015556· 76.4% built
- KAILASA3.8 yr overdueDEVNANI DEVELOPERS · CHEMBUR WEST, Mumbai SuburbanP51800017580· filed Jun 2021 → now Dec 2022· 90.9% built· 2 complaints
- Sumit Garden Grove3.8 yr overdueSumit Garden Grove Construction LLP · Chikoowadi, Mumbai SuburbanP51800009864· filed Dec 2021 → now Dec 2022· 45.5% built
- Anmol Fortune - III3.8 yr overdueWadhwa Realty Pvt Ltd. · Borivali, Mumbai SuburbanP51800001912· 90% built· 4 complaints
- Siddharth Residency Building no 2 wing d and e3.8 yr overdueRamesh Jadhavji Gajra · Kurla, Mumbai SuburbanP51800010378· 90.9% built
- BHIMASHANKAR HEIGHTS3.8 yr overdueMallhar Realtors Pvt Ltd · Borivali, Mumbai SuburbanP51800000274· 50.5% built· 2 complaints
- SHAPOORJI PALLONJI THE DESIGNATE3.8 yr overdueBEHOLD SPACE DEVELOPERS PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800001443· filed Jun 2021 → now Dec 2022· 80% built· 4 complaints
- Rustomjee Elements - Wing SC3.8 yr overdueRustomjee Realty Private Limited · Andheri, Mumbai SuburbanP51800005738· filed Jun 2021 → now Dec 2022· 69.5% built
- NAVNEET SADAN CHS LTD3.8 yr overdueSHREE SWAMI SAMARTH BUILDERS & DEVELOPERS · Kurla, Mumbai SuburbanP51800011489· 80% built
- Rustomjee Seasons - Wing A3.8 yr overdueKEYSTONE REALTORS LIMITED · Andheri, Mumbai SuburbanP51800001433· 89.1% built· 4 complaints
- SWASTIK EMERALD3.8 yr overdueSwastik Realtors · Kurla, Mumbai SuburbanP51800014935· 90.9% built
- GRAND EDIFICE3.8 yr overdueUJJWALA SATISH HAWARE · Borivali, Mumbai SuburbanP51700006407· filed Jun 2021 → now Dec 2022· 87.3% built
- Primus Residences3.8 yr overdueGurukrupa Developers · Andheri, Mumbai SuburbanP51800003522· 83.9% built· 3 complaints
- GHATKOPAR SHILPAKALA CHS LIMITED3.8 yr overdueM/S SUN-VUB · GARODIA NAGAR, Mumbai SuburbanP51800018507· 10.7% built
- SHREE MADHUVANDHAM3.8 yr overdueSUNDER CORPORATION · Borivali, Mumbai SuburbanP51800008266· 42.9% built
- RADHAKRISHNA CHS LTD3.8 yr overdueWESTIN SANKALP DEVELOPERS · Kandivli West, Mumbai SuburbanP51800018207· 90.9% built
- VASANT OASIS PETUNIA BLDG 83.8 yr overdueNEEPA REAL ESTATES PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800000691· 82.3% built· 2 complaints
- Sai Leela3.8 yr overdueLaxmi Associates · Borivali, Mumbai SuburbanP51800001249· filed Dec 2019 → now Dec 2022· 90.9% built
- VISHNUBHUVAN CHS LTD3.8 yr overdueShree S S Developers Private Limited · Kurla, Mumbai SuburbanP51800009053· 78.5% built
- SMGK ASSOCIATE RESIDENCY Wing B Phase 2 17th to 20th Floors3.8 yr overdueVastu Shilpa Complex Designers Pvt Ltd · Andheri, Mumbai SuburbanP51800004663· filed Dec 2019 → now Dec 2022· 51.5% built
- Transcon Triumph Tower 13.8 yr overdueTranscon Developers Pvt. Ltd. · Andheri, Mumbai SuburbanP51800005361· 70.8% built· 6 complaints
- MERAKI ARENA3.8 yr overdueMeraki Habitats LLP · CHEMBUR, Mumbai SuburbanP51800007144· filed Nov 2020 → now Dec 2022· 81.8% built
- Dhoot Sky Residency-New Sonali CHSL3.8 yr overdueDHOOT DEVELOPERS PVT. LTD. · Malad West, Mumbai SuburbanP51800008715· filed Jun 2021 → now Dec 2022· 54.1% built
- Vijayagar3.8 yr overdueSKYLINE LANDMARK PROJECTS PRIVATE LIMITED · Borivali, Mumbai SuburbanP51800029943· 90.9% built
- 111 HYDE PARK3.8 yr overdueMDM REALTY · Borivali, Mumbai SuburbanP51800007477· filed Jun 2022 → now Dec 2022· 90.9% built
- TAPSYA CHSL PHASE II ADDITIONAL FSI FROM 16TH TO 22ND FLOOR3.8 yr overdueNEMINATH HOMES PRIVATE LIMITED · VERSOVA 4 BUNGLOWS, Mumbai SuburbanP51800029453· 54.5% built
- AARAMBH WING C -D3.7 yr overdueSATELLITE DEVELOPERS PVT LTD · Borivali, Mumbai SuburbanP51800015002· 72.7% built· 2 complaints
- ORION3.7 yr overdueSHETH & SONAL DEVELOPERS · ANDHERI, Mumbai SuburbanP51800008348· filed Jul 2021 → now Jan 2023· 57.4% built· 1 complaint
- Sunrise Orlem 2A Phase 13.7 yr overdueDhaval Housing AOP · Borivali, Mumbai SuburbanP51800007706· filed Dec 2019 → now Jan 2023· 90.9% built
- Prime Classic3.7 yr overduePRIME GROUP LLP · Borivali, Mumbai SuburbanP51800026230· 90.9% built
- PANOM PARK WING E Sale Building No.33.6 yr overduePANOM DEVELOPERS LLP · Andheri, Mumbai SuburbanP51800029092· 90.9% built
- RAGHAV ONE453.6 yr overdueRAGHAV RAJ BUILDERS & DEVELOPERS LLP · Kurla, Mumbai SuburbanP51800026775· 90.9% built
- WHITE CITY PHASE 2 WING B3.6 yr overdueRAJESH REAL ESTATE DEVELOPERS PRIVATE LIMITED · Borivali, Mumbai SuburbanP51800008324· filed Jun 2019 → now Feb 2023· 90.9% built· 43 complaints
- WHITECITY PHASE 1 WING A3.6 yr overdueRajesh Real Estate Developers Private Limited · Borivali, Mumbai SuburbanP51800007798· filed Jun 2019 → now Feb 2023· 90.9% built· 33 complaints
- Lotus Royale3.6 yr overdueArvind Danabhai Desai · Juhu, Mumbai SuburbanP51800020315· filed Sept 2022 → now Mar 2023· 90.9% built
- Neelyog Aashiyana3.6 yr overdueNeelyog Construction Pvt Ltd · Borivali, Mumbai SuburbanP51800001136· 90.9% built
- SHRADDHA CHHAYA3.5 yr overdueSHRADDHA CHHAYA DEVELOPERS LLP · BORIVALI (WEST), Mumbai SuburbanP51800026301· 63.6% built
- VICTORY ARCH3.5 yr overdueTHAKKAR BUILDERS AND DEVELOPERS · HARIDAS NAGAR, Mumbai SuburbanP51800013975· filed Mar 2022 → now Mar 2023· 93.6% built
- RUDRAKSH HERITAGE WING A AND WING B3.5 yr overdueS SQUARE DEVELOPERS · Mulund West, Mumbai SuburbanP51800009023· 79.1% built
- Mandor Heights Phase-II3.5 yr overdueA S K Construction Co · Borivali, Mumbai SuburbanP51800017804· 81.8% built· 3 complaints
- MAMTA3.5 yr overdueSHIVAM DEV INFRACON PVT LTD · ANDHERI WEST, Mumbai SuburbanP51800016215· 85.5% built
- Adarsh Nagar SRA CHS Ltd.3.5 yr overdueBombay Slum Redevelopment Corporation Pvt. Ltd. · Kandivali West, Mumbai SuburbanP51800028687· 81.8% built
- LIGHTHALL E WING3.5 yr overdueGamma Constructions Pvt Ltd · Kurla, Mumbai SuburbanP51800019614· 88.5% built
- Neelyog Veydaanta3.5 yr overdueRatan Builders · Kurla, Mumbai SuburbanP51800001645· 80.7% built· 1 complaint
- ANDHERI EKTA3.5 yr overdueMumbai Shelter Combines LLP · Andheri, Mumbai SuburbanP51800004843· filed Sept 2018 → now Mar 2023· 41.8% built
- KANAKIA ZENWORLD PHASE I3.5 yr overdueKANAKIA SPACES REALTY PRIVATE LIMITED · Kurla, Mumbai SuburbanP51800008343· 82.7% built· 15 complaints
- Dadamiyas Deluxe Apartment3.5 yr overdueDadamiya Infrastructure & Deluxe Infra · Kurla, Mumbai SuburbanP51800030492· 81.8% built
- Dridhena Developers and Realtors3.5 yr overdueDridhena Developers and Realtors · Borivali, Mumbai SuburbanP51800007733· filed Feb 2019 → now Mar 2023· 80.5% built
- Rite Fortis3.5 yr overdueRITE HOUSING DEVELOPERS · Borivali West, Mumbai SuburbanP51800031781· 86.4% built
- PARK REACH3.5 yr overduePLATINUM HOMES PROPERTY · Andheri, Mumbai SuburbanP51800003208· filed Dec 2019 → now Mar 2023· 90.9% built
- Sunteck City Avenue 23.5 yr overdueSunteck Realty Limited · Goregaon, Mumbai SuburbanP51800002637· filed Apr 2022 → now Apr 2023· 93.9% built· 34 complaints
- SAMAJ DARSHAN3.5 yr overdueH RISHABRAJ DEVELOPERS · Borivali, Mumbai SuburbanP51800010479· 90.9% built· 39 complaints
- HORIZON SHLOKA3.4 yr overdueHORIZON PROMOTERS INDIA LTD · MULUND WEST, Mumbai SuburbanP51800029955· 90.9% built
- ANTHURIUM3.4 yr overdueVIBHA PROPOERTIES LLP · Kurla, Mumbai SuburbanP51800010361· 90.9% built
- REDEVELOPMENT OF ABHIRAM CHSL3.4 yr overduePRANAV CONSTRUCTIONS LIMITED · KANDIVALI WEST, Mumbai SuburbanP51800018680· 90.9% built
- Priya Apartment3.4 yr overdueJasmina Constructions Pvt. Ltd. · Borivali, Mumbai SuburbanP51800005876· filed Jun 2019 → now Jun 2023· 90.9% built· 2 complaints
- Laxmi Developers3.3 yr overdueManoj Krishna Dhanawade · Borivali, Mumbai SuburbanP51800011637· filed Jun 2019 → now Jun 2023· 44.9% built· 2 complaints
- PANORAMA3.3 yr overdueEKTA SHUBHAM VENTURE · Kurla, Mumbai SuburbanP51800001112· filed Dec 2019 → now Jun 2023· 90.9% built· 2 complaints
- Amardeep CHS3.3 yr overdueAkshay Sthapatya H.S.A. · Kurla, Mumbai SuburbanP51800004991· filed Dec 2018 → now Jun 2023· 81.8% built· 9 complaints
- BORIVALI OM APARTMENT CO-OP HSG SOCIETY LTD3.3 yr overdueSAMARPAN HOMES & DEVELOPERS · BORIVALI EAST, Mumbai SuburbanP51800025172· 81.8% built
- The Trees, Origins3.3 yr overdueGodrej Properties Limited · Kurla, Mumbai SuburbanP51800000158· 35.7% built· 3 complaints
- CHAITANYA KOHINOOR3.3 yr overdueCHAITANYA DEVELOPERS · Borivali, Mumbai SuburbanP51800024570· 90.9% built
- MESACON JEWEL WING A AND B3.3 yr overdueMESACON PROJECTS · Andheri, Mumbai SuburbanP51800023745· 62.1% built
- Borivali Nirmala Sadan CHS LTD3.3 yr overdueShreenath Realty LLP · Borivali East, Mumbai SuburbanP51800029552· 60% built
- DARSHAN3.3 yr overdueArkade Developers Private Limited · VILE PARLE EAST, Mumbai SuburbanP51800027271· 67% built
- Grace Iconic Wing A-B3.3 yr overdueGrace Property Development Ventures · Andheri, Mumbai SuburbanP51800007207· filed Oct 2019 → now Jun 2023· 38.9% built
- MOHINI CASTLE3.3 yr overdueMOHINI SHELTORS PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800005492· filed Jun 2021 → now Jun 2023· 90.9% built
- PRABHAT DARSHAN3.3 yr overdueSHIVALIK VENTURES PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800002608· 89.5% built
- HILTON ENCLAVE WING A, B, B-13.3 yr overdueBHAVANI DEVELOPERS PVT LTD · Kurla, Mumbai SuburbanP51800012042· filed Jun 2021 → now Jun 2023· 90% built· 4 complaints
- Sunteck Icon, Kolekalyan, CST Road, Kalina, Santacruz East, Mumbai3.3 yr overdueSunteck Realty Limited · Andheri, Mumbai SuburbanP51800014845· 81.8% built
- Rosalia Apartments3.3 yr overdueKusum Associates · Andheri, Mumbai SuburbanP51800005568· filed Jul 2020 → now Jun 2023· 72.7% built· 5 complaints
- NEW LAXMI CHHAYA3.3 yr overduePARMAR AND SM CONSTRUCTION · Andheri, Mumbai SuburbanP51800009399· filed Jul 2019 → now Jun 2023· 90.9% built
- OM RESIDENCY3.3 yr overdueOscar Infrastructure Private Limited · Mulund west, Mumbai SuburbanP51800026044· 50.8% built
- SHIV GANGA3.3 yr overdueANJANI KUMAR COMPANY PRIVATE LIMITED · Borivali, Mumbai SuburbanP51800017043· 90.9% built
- HILL RIDGE3.3 yr overdueSIDHIVINAYAK REALTY CONSTRUCTION PRIVATE LIMITED · Mumbai, Mumbai SuburbanP51800009010· filed Dec 2018 → now Jun 2023· 90.9% built
- JEEVAN ANAND3.3 yr overdueSUYOG DEVELOPERS · Kurla, Mumbai SuburbanP51800007491· filed Jun 2021 → now Jun 2023· 90.9% built
- PRIDE3.3 yr overdueSalasar construction · Andheri, Mumbai SuburbanP51800027966· 90.9% built· 1 complaint
- Rajal - Veer Abhimanyu CHS Ltd3.3 yr overdueNisar Properties Private Limited · Borivali West, Mumbai SuburbanP51800006097· 90.9% built· 2 complaints
- JUHU ACROPOLIS3.3 yr overdueBHARAT REALTY VENTURE PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800017864· 90.9% built
- Laxmi Krupa CHS Ltd.3.3 yr overdueM/s. Shreepad Developers · Borivali, Mumbai SuburbanP51800011532· filed Dec 2019 → now Jun 2023· 68.2% built· 2 complaints
- WINSPACE AMELIO3.3 yr overdueBINI BUILDERS PRIVATE LIMITED · -, Mumbai SuburbanP51800010932· filed Jun 2021 → now Jun 2023· 90.9% built
- REDEVLOPMENT OF SUN AND MOON CHS LTD. BLDG NO. 12 AND 133.3 yr overdueKaustubh Construction Private Limited · Borivali, Mumbai SuburbanP51800007374· filed Dec 2019 → now Jun 2023· 81.8% built
- MESACON JEWEL WING C3.3 yr overdueMESACON PROJECTS · Andheri, Mumbai SuburbanP51800023909· 79.5% built
- Maxima3.3 yr overdueOberoi Constructions Limited · Andheri, Mumbai SuburbanP51800017154· 99.6% built· 1 complaint
- SHRADDHA VALENCIA3.3 yr overdueOM VAISHNAVI DEVELOPERS · Kurla, Mumbai SuburbanP51800006947· 90.9% built
- Parmarth Niketan - Redevelopment of Mani Bhuvan3.3 yr overdueJ V Constructions & Developers · Borivali, Mumbai SuburbanP51800001745· filed Dec 2019 → now Jun 2023· 90.9% built
- RGS ANANTYA3.3 yr overdueSINGH HOLDING PVT LTD · CHEMBUR, Mumbai SuburbanP51800032255· 90.9% built
- NANDANVAN3.3 yr overdueKOSMOS DEVELOPERS · BORIVALI, Mumbai SuburbanP51800012073· filed Jun 2021 → now Jun 2023· 23.6% built
- HAVA MAHAL CHS LTD3.3 yr overdueH RISHABRAJ PROJECTS · MALAD EAST MUMBAI, Mumbai SuburbanP51800027606· 90.9% built
- BASERA CHS LTD3.3 yr overdueLAKSHMI BUILDERS AND DEVELOPERS · Andheri, Mumbai SuburbanP51800001959· 90.9% built
- GLOBAL RESIDENCY3.3 yr overdueGLOBAL HOUSING VENTURES · Borivali, Mumbai SuburbanP51800009478· 27.6% built· 2 complaints
- PEBBLES MARINA APARTMENTS3.2 yr overduePEBBLES INFRA PROJECTS LTD · Andheri, Mumbai SuburbanP51800012288· 56.4% built
- YASHASWATI CHS LTD3.2 yr overdueLAKSHMI BUILDERS AND DEVELOPERS · Kurla, Mumbai SuburbanP51800001279· 90.9% built
- KALINA MARKET3.2 yr overdueKRISHNA ASSOCIATES · Mumbai, Mumbai SuburbanP51800005221· filed Jun 2018 → now Jul 2023· 51.8% built
- Velentine Apartment 1 Wing D3.2 yr overdueVelentine Properties Private Limited · Andheri, Mumbai SuburbanP51800002036· 7.3% built
- Lodha Patel Estate - Tower C, D3.2 yr overdueMACROTECH DEVELOPERS LIMITED · Borivali, Mumbai SuburbanP51800014860· 81.8% built· 5 complaints
- Lodha Patel Estate - Tower A, B3.2 yr overdueMACROTECH DEVELOPERS LIMITED · Borivali, Mumbai SuburbanP51800014891· 81.8% built· 2 complaints
- SHREE ROYAL HEIGHT3.2 yr overdueROYAL'S RELATORS · Borivali, Mumbai SuburbanP51800022042· 81.8% built
- KRISHNA ENCLAVE3.2 yr overdueASHA DEVELOPERS · Andheri, Mumbai SuburbanP51800000004· 66.7% built
- Lodha Patel Estate - Tower G3.1 yr overdueMACROTECH DEVELOPERS LIMITED · Borivali, Mumbai SuburbanP51800016528· 90.9% built
- Rajhans Helix 33.1 yr overdueRajhans Infracon (India) Private Limited · Kurla, Mumbai SuburbanP51800007413· filed Dec 2019 → now Aug 2023· 90.9% built
- RISHABRAJ PRIDE3.1 yr overdueRRIL LIMITED · DAHISAR WEST, Mumbai SuburbanP51800031144· 90.9% built
- Shree Prafull CHSL3.1 yr overdueShree Shyam Developers · KANDIVALI WEST, Mumbai SuburbanP51800009183· filed Mar 2021 → now Sept 2023· 90.5% built
- NIRMAL ANAND CHS3.1 yr overdueNirmal Anand CHS LTD · Andheri, Mumbai SuburbanP51800007180· filed Sept 2022 → now Sept 2023· 90.9% built
- RUDRA HEIGHTS3.0 yr overdueSAGAR MANOJ GORADIA · Andheri, Mumbai SuburbanP51800026165· 90.9% built· 1 complaint
- LIGHT HALL F WING3.0 yr overdueGamma Constructions Pvt Ltd · Kurla, Mumbai SuburbanP51800026229· 90.9% built
- AARAMBH WING E - F3.0 yr overdueSATELLITE DEVELOPERS PVT LTD · Borivali, Mumbai SuburbanP51800015057· filed Mar 2023 → now Sept 2023· 72.7% built· 4 complaints
- Sunteck Pinnacle3.0 yr overdueSunteck Realty Limited · Borivali, Mumbai SuburbanP51800028821· 81.8% built
- Login3.0 yr overdueBombay Slum Redevelopment Corporation Pvt. Ltd. · Borivali, Mumbai SuburbanP51800006953· filed Sept 2022 → now Sept 2023· 90.9% built
- PRUTHVI SHAKUN3.0 yr overduePRUTHVI ENTERPRISE · VILE PARLE (EAST), Mumbai SuburbanP51800018162· 18.2% built
- Redevelopment of Om Yogeshwar CHS Ltd3.0 yr overdueVAMA LIFESTYLES · Adarsh, Mumbai SuburbanP51800032528· 82.6% built
- SUMUKH HILLS3.0 yr overdueM/S.YOGSIDDHI DEVELOPERS · Borivali, Mumbai SuburbanP51800005591· 90% built· 3 complaints
- SANKESHWAR DARSHAN3.0 yr overdueM/s. Rishabraj Balaji Infra · BORIVALI EAST, MUMBAI, Mumbai SuburbanP51800024086· 82.7% built· 2 complaints
- NEW FRIENDS SRA CHS LTD3.0 yr overdueM/S. VIRAJ ENTERPRIES · Andheri, Mumbai SuburbanP51800008637· 72.1% built
- REDEVELOPMENT OF MALAD AMBER CHSL3.0 yr overduePRANAV CONSTRUCTIONS LIMITED · MUMBAI, Mumbai SuburbanP51800025354· 90.9% built
- RISHABRAJ DIVINE3.0 yr overdueM/s. Rishabraj Balaji Infra · BORIVALI EAST, MUMBAI, Mumbai SuburbanP51800023315· 9.1% built
- SAVANNAH AVALON3.0 yr overdueSavannah Real Estate Pvt. Ltd · Andheri, Mumbai SuburbanP51800020465· 81.8% built
- Lodha Patel Estate - Tower E, F3.0 yr overdueMACROTECH DEVELOPERS LIMITED · Borivali, Mumbai SuburbanP51800014869· 81.8% built· 7 complaints
- NS HEIGHTS3.0 yr overdueNS BUILDERS & DEVELOPERS · Andheri, Mumbai SuburbanP51800002156· filed Mar 2021 → now Oct 2023· 90.9% built· 1 complaint
- Kandivali Sai Prassana CHS Ltd3.0 yr overdueAshwin Enterprise · Kandivali West, Mumbai SuburbanP51800032312· 90.9% built
- NEELKANTH TIRTH CO. OP. HOUSING SOC. LTD.3.0 yr overdueMAVERICK REALTORS · MUMBAI, Mumbai SuburbanP51800012145· filed Jun 2021 → now Oct 2023· 99.1% built
- SATRA HARMONY2.9 yr overdueRRB REALTORS PVT LTD. · Kurla, Mumbai SuburbanP51800000726· filed Dec 2019 → now Nov 2023· 90.9% built· 7 complaints
- HRESA - SAINAGAR APARTMENT PVT. LTD.2.9 yr overdueBHOLENATH DEVELOPERS LTD. · Kurla, Mumbai SuburbanP51800004835· filed Nov 2022 → now Nov 2023· 90.9% built
- REDEVELOPMENT OF PRAVESH CHSL2.9 yr overduePRANAV CONSTRUCTIONS LIMITED · BORIVALI EAST, Mumbai SuburbanP51800020989· 64.1% built
- BHAVESHA CO-OPERATIVE HOUSING SOCIETY LTD2.9 yr overdueBEAUTIFUL PROPERTIES PRIVATE LIMITED · ANDHERI (WEST), Mumbai SuburbanP51800033264· 90.9% built
- Sagar C.H.S2.9 yr overdueHIRANIMANTHAN BUILDERS AND DEVELOPERS · Kurla, Mumbai SuburbanP51800003741· filed Dec 2019 → now Dec 2023· 81.8% built· 1 complaint
- SAMRUDDHI CHS2.9 yr overdueHASMUKH R HIRANI · Kurla, Mumbai SuburbanP51800007054· filed Dec 2019 → now Dec 2023· 90.9% built
- DP STAR TRILOK2.8 yr overdueDP BUILDHOMES LLP · Kurla, Mumbai SuburbanP51800003937· filed Dec 2022 → now Dec 2023· 87.3% built· 6 complaints
- Jyoti building2.8 yr overdueLAXMI BUILDERS · Andheri, Mumbai SuburbanP51800028489· 90.9% built
- VISION HEIGHTS WING D2.8 yr overdueFIONA REALTY PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800010431· filed Jun 2021 → now Dec 2023· 81.8% built
- REDEVELOPMENT OF PUSHPAWADI CHSL2.8 yr overduePRANAV CONSTRUCTIONS LIMITED · Borivali, Mumbai SuburbanP51800028108· 43.6% built
- Shivoham Enclave2.8 yr overdueSiddheshwar Builders Pvt. Ltd. · EAST, Mumbai SuburbanP51800008766· filed Jun 2022 → now Dec 2023· 64.3% built
- ARKADE EARTH-DAFFODIL2.8 yr overdueArkade Developers Private Limited · Kanjurmarg East, Mumbai SuburbanP51800004440· 88.5% built
- ATHARV PALACE2.8 yr overdueJAGRUTI ENTERPRISES · Andheri, Mumbai SuburbanP51800008512· 90.9% built
- AGARWAL PALAZZO2.8 yr overdueBALAJI DEVELOPERS · BORIVALI WEST, Mumbai SuburbanP51800017406· 98.6% built
- BHOOMI CELESTIA -A1 WING2.8 yr overdueSASHWAT CONSTRUWELL PRIVATE LIMITED · Librity Garden, Opp. S.N.D.T. Girls Collage, Mumbai SuburbanP51800010810· filed Dec 2022 → now Dec 2023· 63.6% built
- Ruparel Elara2.8 yr overdueShree Siddhivinayak Infrastructure & Realty · Borivali, Mumbai SuburbanP51800014328· filed Dec 2019 → now Dec 2023· 56.4% built· 10 complaints
- Kalpataru Radiance D2.8 yr overdueKeyana Estate LLP · Borivali, Mumbai SuburbanP51800000579· filed Jun 2022 → now Dec 2023· 97.2% built· 47 complaints
- ARKADE EARTH - HAZEL2.8 yr overdueArkade Developers Private Limited · Kurla, Mumbai SuburbanP51800022666· 90.9% built
- NIDHAAN HOUSE2.8 yr overdueNIDHAAN INFRACON PRIVATE LIMITED (FORMERLY KNOWN AS AJAB REAL ESTATE COMPANY PRIVATE LIMITED) · Andheri, Mumbai SuburbanP51800005536· 76.4% built
- HIRA KUTIR CHS LTD2.8 yr overdueH RISHABRAJ PROJECTS · Borivali, Mumbai SuburbanP51800005267· 9.1% built
- EKTA TRIPOLIS PHASE I2.8 yr overdueEKTA EVERGLADE HOMES PRIVATE LIMITED · Borivali, Mumbai SuburbanP51800000947· filed Jun 2021 → now Dec 2023· 88.5% built· 75 complaints
- PEARL HARMONY2.8 yr overdueCHANDIWALA ENTERPRISES · Andheri, Mumbai SuburbanP51800004224· filed Dec 2021 → now Dec 2023· 46.7% built
- ARKADE EARTH - EBONY2.8 yr overdueArkade Developers Private Limited · Kanjurmarg East, Mumbai SuburbanP51800008953· 88.5% built· 1 complaint
- Parshvanath2.8 yr overdueACORP REALTY · Andheri, Mumbai SuburbanP51800017960· 90.9% built
- ARKADE EARTH - FERN2.8 yr overdueArkade Developers Private Limited · Kurla, Mumbai SuburbanP51800004750· 88.5% built· 1 complaint
- KABRA PRIMERA2.8 yr overdueKABRA ESTATE AND INVESTMENT CONSULTANTS · JVPD SCHEME, Mumbai SuburbanP51800015963· 94.5% built· 1 complaint
- MARATHON EMINENCE2.8 yr overdueNEXZONE BUILDCON LLP · MULUND WEST, Mumbai SuburbanP51800016063· 81.8% built
- ASHOK ODYSSEY - C WING2.8 yr overdueSANYAM REALTORS PRIVATE LIMITED · Kurla, Mumbai SuburbanP51800004602· 90.9% built· 10 complaints
- VASANT OASIS LILLIUM BLDG 162.8 yr overdueNEEPA REAL ESTATES PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800000918· 36.7% built· 2 complaints
- Terraform Dwarka2.8 yr overdueMoney Magnum Nest Pvt Ltd · Kurla, Mumbai SuburbanP51800002826· 91.2% built· 1 complaint
- ECO HEIGHTS2.8 yr overdueETCO BUILDERS PRIVATE LIMITED · NITYANAND NAGAR, Mumbai SuburbanP51800002429· 90.9% built· 9 complaints
- EKJYOT SANMAAN2.8 yr overdueDHEERAJ P VOHRA · Kurla, Mumbai SuburbanP51800011782· 90.9% built· 1 complaint
- Runwal Bliss Wing - A2.8 yr overdueEvie Real Estate Private Limited · Kurla, Mumbai SuburbanP51800001670· 98% built· 9 complaints
- Castle Rock C and D Wing2.8 yr overdueHGP Community Pvt. Ltd. · Kurla, Mumbai SuburbanP51800000405· 90.9% built· 2 complaints
- Ashford Royale Tower A2.8 yr overdueAshford Infotech Private Limited · Kurla, Mumbai SuburbanP51800003093· 92.5% built· 3 complaints
- ZEE SAHYADRI2.8 yr overdueZEE COM TRADE PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800006241· 0% built
- Ganeshwadi CHS LTD - S.R.A2.8 yr overdueAshok Rajaram Gupta · Bhatwadi, Mumbai SuburbanP51800010062· 2.7% built· 80 complaints
- Kush Solitaire2.8 yr overdueKush Buildcon LLP · Village Malad East Mumbai, Mumbai SuburbanP51800028906· 90.9% built
- VIJAY CHS LTD2.8 yr overdueSAI LIFE DEVTAA REALTORS · Kurla, Mumbai SuburbanP51800008457· filed Dec 2022 → now Dec 2023· 90.9% built· 3 complaints
- ORION WEST2.8 yr overdueGIRISH & ASSOCIATES · Andheri, Mumbai SuburbanP51800023726· 90.9% built
- VASANT OASIS CAMELIA BLDG 132.8 yr overdueNEEPA REAL ESTATES PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800000921· 46.4% built· 8 complaints
- RUDRAKSHA BUILDING NO 112.8 yr overdueRAJ UNIVERSAL · DAHISAR EAST, Mumbai SuburbanP51800021545· filed Dec 2022 → now Dec 2023· 90.9% built· 1 complaint
- KISHOR NIWAS2.8 yr overdueRATNA PREMJIBHAI GALA · Borivali, Mumbai SuburbanP51800014618· 0% built
- SRISHTI PRIDE PHASE 1- WING A2.8 yr overdueKRISHNA ENTERPRISE · Kurla, Mumbai SuburbanP51800010994· 99.6% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.