Delayed projects in Mumbai Suburban
1,533 MahaRERA-registered projects in Mumbai Suburban are past the possession date on file and still under 100% built. Where the promoter has formally revised the date, the original is shown alongside so you can see what changed.
Page 6 of 8
- ARKADE EARTH - GARDENIA2.6 yr overdueArkade Developers Private Limited · Kanjurmarg East, Mumbai SuburbanP51800010074· 88.5% built
- Runwal Bliss Wing - A2.6 yr overdueEvie Real Estate Private Limited · Kurla, Mumbai SuburbanP51800001670· 98% built· 9 complaints
- Terraform Dwarka2.6 yr overdueMoney Magnum Nest Pvt Ltd · Kurla, Mumbai SuburbanP51800002826· 91.2% built· 1 complaint
- Ashford Royale Tower A2.6 yr overdueAshford Infotech Private Limited · Kurla, Mumbai SuburbanP51800003093· 92.5% built· 3 complaints
- TERRAFORM DWARKA2.6 yr overdueMoney Magnum Nest Pvt Ltd · Kurla, Mumbai SuburbanP51800002718· 91.2% built· 2 complaints
- Ganeshwadi CHS LTD - S.R.A2.6 yr overdueAshok Rajaram Gupta · Bhatwadi, Mumbai SuburbanP51800010062· 2.7% built· 80 complaints
- Kalpataru Radiance D2.6 yr overdueKeyana Estate LLP · Borivali, Mumbai SuburbanP51800000579· filed Jun 2022 → now Dec 2023· 97.2% built· 47 complaints
- ARKADE EARTH-DAFFODIL2.6 yr overdueArkade Developers Private Limited · Kanjurmarg East, Mumbai SuburbanP51800004440· 88.5% built
- NAV-VISHWADHAM CHSL2.6 yr overdueWOLFPACK HOUSING CORPORATION · Andheri, Mumbai SuburbanP51800001669· 90.9% built
- ACROPOLIS2.6 yr overdueVORA ASSOCIATES · BORIVALI WEST, Mumbai SuburbanP51800004939· 90.5% built
- Emerald Isle - T152.6 yr overdueLarsen & Toubro Ltd. (Realty Division) · Kurla, Mumbai SuburbanP51800013214· 90.2% built· 5 complaints
- AGARWAL PALAZZO2.6 yr overdueBALAJI DEVELOPERS · BORIVALI WEST, Mumbai SuburbanP51800017406· 98.6% built
- Emerald Isle - T102.6 yr overdueLarsen & Toubro Ltd. (Realty Division) · Kurla, Mumbai SuburbanP51800013052· 72.5% built· 4 complaints
- BHOOMI CELESTIA -A1 WING2.6 yr overdueSASHWAT CONSTRUWELL PRIVATE LIMITED · Librity Garden, Opp. S.N.D.T. Girls Collage, Mumbai SuburbanP51800010810· filed Dec 2022 → now Dec 2023· 63.6% built
- PEARL MAJESTIC2.6 yr overdueCHANDIWALA ENTERPRISES · Andheri, Mumbai SuburbanP51800015348· 90.9% built
- ASHOK ODYSSEY - B WING2.6 yr overdueSANYAM REALTORS PRIVATE LIMITED · Kurla, Mumbai SuburbanP51800004418· 90.9% built· 5 complaints
- KISHOR NIWAS2.6 yr overdueRATNA PREMJIBHAI GALA · Borivali, Mumbai SuburbanP51800014618· 0% built
- EKJYOT SANMAAN2.6 yr overdueDHEERAJ P VOHRA · Kurla, Mumbai SuburbanP51800011782· 90.9% built· 1 complaint
- AURIS SERENITY TOWER 22.6 yr overdueTRANSCON-SHETH CREATORS PRIVATE LIMITED · Borivali, Mumbai SuburbanP51800001413· 72.7% built· 18 complaints
- Suprabha-Shivam Lifestyle2.6 yr overdueShivam Lifestyle · Chembur, Mumbai SuburbanP51800029652· 90.9% built
- Rite Civis2.6 yr overdueYashodanand Developers · Bhandup West, Mumbai SuburbanP51800030301· 42.3% built· 2 complaints
- SWASTIK ELEGANCE2.6 yr overdueSwastik Realtors · Swastik park Chembur, Mumbai SuburbanP51800031928· 90.9% built
- PRIME GROUP PROJECT GRAND SLAM2.6 yr overduePRIME GROUP · Dahisar, Mumbai SuburbanP51800034404· 90.9% built
- ASHWA PLATINUM2.6 yr overdueASHWA PLATINUM · Kurla, Mumbai SuburbanP51800005636· filed Nov 2020 → now Dec 2023· 84.1% built· 10 complaints
- SWASTIK PHASE 12.6 yr overdueDISHA CONSTRUCTION · Andheri, Mumbai SuburbanP51800002197· filed Dec 2019 → now Dec 2023· 49.2% built· 1 complaint
- KANDIVALI BASANT BAHAR2.6 yr overdueWESTIN SANKALP DEVELOPERS · KANDIVALI WEST, MUMBAI, Mumbai SuburbanP51800031940· 40% built
- VARDHMAN CASTLE PHASE I2.6 yr overdueVENUS DEVELOPMENT CORPORATION · SANTACRUZ WEST, Mumbai SuburbanP51800033033· 0.2% built
- STERLING COURT WING D2.6 yr overdueAPRAULIC CONSTRUCTION INVESTMENT AND FINANCE PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800002160· filed Sept 2020 → now Dec 2023· 90.9% built
- Sahil Exotica2.6 yr overdueBOMBAY CONSTRUCTION & INFRAPROJECTS PVT LTD · Andheri, Mumbai SuburbanP51800003978· filed Jun 2019 → now Dec 2023· 87.3% built· 1 complaint
- ARIHANT ENCLAVE2.6 yr overdueM/s Arihant Enterprise · Andheri, Mumbai SuburbanP51800030594· 23.6% built
- MARY VILLA2.6 yr overdueH&D PROJECTS · Borivali, Mumbai SuburbanP51800031597· 81.8% built
- AURA APARTMENTS - PHASE 2 11TH FLOOR2.6 yr overdueBHOLENATH DEVELOPERS LTD. · GHATLA, Mumbai SuburbanP51800009179· filed Oct 2018 → now Dec 2023· 54.5% built
- SEYCHELLES2.6 yr overdueSHUBHAM ENTERPRISES · Andheri, Mumbai SuburbanP51800033314· 87.5% built
- SHUBH AANGAN WING B2.6 yr overdueG D REALTORS PVT LTD · BHANDUP EAST, Mumbai SuburbanP51800029568· 90.9% built
- Sunrise Orlem 2B Phase 32.6 yr overdueDhaval Housing AOP · Borivali, Mumbai SuburbanP51800006843· filed Jun 2021 → now Dec 2023· 83.6% built· 1 complaint
- MDM Zion2.6 yr overdueMDM REALTY LLP · Andheri West, Mumbai SuburbanP51800029740· 90.9% built
- CITI CHALET2.6 yr overdueBASONS CONSTRUCTIONS · Andheri, Mumbai SuburbanP51800046606· 90.9% built
- Athena2.6 yr overdueM/s. Sahajanand Developers · Goregaon West, Mumbai SuburbanP51800003330· filed Mar 2020 → now Jan 2024· 62.7% built· 10 complaints
- Puneet Sanjivani Phase 2 Floor 17 to Floor 202.6 yr overduePuneet Developers · Kurla, Mumbai SuburbanP51800017842· 90.9% built
- Puneet Sanjivani Phase 3 Floor 21 to Floor 232.6 yr overduePuneet Developers · Kurla, Mumbai SuburbanP51800017800· 90.9% built
- Laxmi Sanskruti2.5 yr overdueLAXMIDEVI DEVELOPERS · Jawahar Nagar, Goregaon West, Mumbai SuburbanP51800034219· 52.7% built
- Redevelopment of Om Divya Apartments Co-operative Housing Society Limited2.5 yr overdueM/s Shanti Developers · Borivali, Mumbai SuburbanP51800005768· filed Feb 2021 → now Feb 2024· 90.5% built
- KHAR HIRA PREMISES CO OP SOCIETY LTD2.5 yr overdueL NAGPAL DEVELOPERS · Andheri, Mumbai SuburbanP51800031276· 78.2% built
- RISHABRAJ VICINIA2.5 yr overdueH RISHABRAJ DEVELOPERS · GHATKOPAR EAST, Mumbai SuburbanP51800026330· 90.9% built
- Swashraya Andheri CHS Ltd2.5 yr overdueDEM CONSTRUCTIONS LLP · nr Juhu Lane, Mumbai SuburbanP51800030781· 67.4% built
- GOREGAON RASIK CO OP HSG SOCIETY LTD2.4 yr overdueAAKAR REAL ESTATE DEVELOPERS · GOREGAON WEST, Mumbai SuburbanP51800007636· filed Mar 2019 → now Mar 2024· 90.9% built
- CASA RAMIRO2.4 yr overduePRESCOTT HOUSING LLP · Andheri, Mumbai SuburbanP51800033552· 90.9% built
- VISHNU BHASKAR CHS LTD2.4 yr overdueSUDHANSHU INFRASTRUCTURES PRIVATE LIMITED · Kurla, Mumbai SuburbanP51800015748· filed Sept 2019 → now Mar 2024· 90.9% built· 1 complaint
- AIM Residency Phase I2.4 yr overdueA M ENTERPRISES · Andheri, Mumbai SuburbanP51800015762· 90% built
- MARUTI2.4 yr overdueINVENTION REALTORS PRIVATE LIMITED · Borivali, Mumbai SuburbanP51800012405· 86.8% built
- Maruti Bhuvan2.4 yr overdueSuresh Prabhushankar Sharma · Mogra, Mumbai SuburbanP51800005335· filed Mar 2019 → now Mar 2024· 72.7% built
- REDEVELOPMENT OF BORIVALI SHIVDARSHAN CHSL2.4 yr overduePRANAV CONSTRUCTIONS LIMITED · BORIVALI WEST MUMBAI, Mumbai SuburbanP51800026908· 86.7% built
- THE METROPOLE2.4 yr overdueRaveshia Realtors · GHATKOPAR, Mumbai SuburbanP51900026208· 81.4% built· 14 complaints
- Makarani Pada Phase 12.4 yr overdueK D Builders · Borivali, Mumbai SuburbanP51800008606· 24.2% built· 1 complaint
- AURUS2.4 yr overdueKINGSTAY REAL ESTATE PRIVATE LIMITED · MUMBAI, Mumbai SuburbanP51800015024· 90.9% built
- KRUPA2.4 yr overdueAASAMANTA REALTY · GOREGAON EAST, Mumbai SuburbanP51800032389· 90.9% built
- THE JAMBLI GALLI CHS LTD2.4 yr overdueMAHAVIR CORPORATIONS · BORIVALI WEST, Mumbai SuburbanP51800045335· 81.8% built
- LABH SAMARTH HEIGHT2.4 yr overdueM.V. LABH ASSOCIATES · Andheri, Mumbai SuburbanP51800011676· filed Dec 2018 → now Mar 2024· 90.9% built
- ACCORD CLASSIC2.4 yr overdueSUYOJANA IMPEX PVT. LTD · Borivali, Mumbai SuburbanP51800007765· filed Mar 2022 → now Mar 2024· 81.8% built
- MAYA HARMONY2.4 yr overdueMAYA DEVELOPERS · Kurla, Mumbai SuburbanP51800009358· filed Nov 2020 → now Mar 2024· 74.1% built
- Motivilla2.4 yr overdueAAKAR SHIV INFRA VENTURE · Goregaon West, Mumbai SuburbanP51800033793· 90.9% built
- MAYAANK HEIGHTS2.4 yr overdueN. K. LIFESTYLE · Borivali, Mumbai SuburbanP51800030223· 90.9% built
- PREETI SANGAM CHS2.4 yr overdueKANDIVALI PRITI SANGAM CO-OP HOS SOC LTD · Borivali, Mumbai SuburbanP51800011235· filed Jul 2022 → now Mar 2024· 30.2% built· 3 complaints
- SHREE SIDDHI BLDG NO 692.4 yr overdueHIRANIMANTHAN BUILDERS AND DEVELOPERS · Kurla, Mumbai SuburbanP51800003413· filed Mar 2020 → now Mar 2024· 90.9% built
- ROMELL CORNERSTONE2.4 yr overdueROMELL REAL ESTATE PRIVATE LIMITED · Borivali, Mumbai SuburbanP51800032709· 90.9% built
- Vidya Nidhi2.4 yr overdueLaxmi Aakar Realty · Goregaon West, Mumbai SuburbanP51800033588· 90.9% built
- Prem Zephyr2.4 yr overdueAshwin Enterprises · Mulund West, Mumbai SuburbanP51800029011· 90.9% built
- REDEVELOPMENT OF SILVERENE CHSL2.4 yr overduePRANAV CONSTRUCTIONS LIMITED · MUMBAI, Mumbai SuburbanP51800031840· 90.9% built
- Shikhar2.4 yr overduePTR Universal · Andheri, Mumbai SuburbanP51800020732· 97.3% built
- SHEETAL DHARMARAJ2.4 yr overdueD.G.LAND DEVELOPERS PRIVATE LIMITED · MARVE ROAD, Mumbai SuburbanP51800027915· 0% built· 1 complaint
- KAMGAR PANCH GANGA SRAPHASE 1 CHSPROPOSED2.3 yr overduePAYAL J SHAH · Borivali, Mumbai SuburbanP51800008400· filed Aug 2018 → now Apr 2024· 99.1% built· 1 complaint
- EKTA VERVE2.3 yr overdueEKTA WORLD PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800021089· 87% built· 2 complaints
- KUKREJA GARDENS WING A2.3 yr overdueTOLARAM AND CO · BHANDUP WEST, Mumbai SuburbanP51800020817· 73.3% built· 1 complaint
- SURYADARSHAN CHS LTD2.3 yr overdueH&D PROJECTS · Borivali, Mumbai SuburbanP51800046756· 70.5% built
- KRISHNA KOYNA2.3 yr overdueJKD ENGINEERS AND INFRASTRUCTURE PRIVATE LIMITED · SHIMPOLI, Mumbai SuburbanP51800027749· 20.6% built
- RISHABRAJ SURAJ2.2 yr overdueH RISHABRAJ REALTY · BORIVALI WEST, Mumbai SuburbanP51800029277· 90.9% built
- Bhagwati Ashish2.2 yr overduePritesh Damji Savla · Andheri, Mumbai SuburbanP51800010515· filed Nov 2020 → now May 2024· 88.6% built· 4 complaints
- Dreamsville2.2 yr overdueParadiso Builders Private Limited · Borivali, Mumbai SuburbanP51800046670· 81.8% built
- VIRESHWAR DARSHAN CHS LTD2.1 yr overdueVIRESHWAR DARSHAN CHS LTD · VILE PARLE EAST, Mumbai SuburbanP51800049312· 70% built
- REDEVELOPMENT OF KHATRI APARTMENTS COOPERATIVE HOUSING SOCIETY LIMITED2.1 yr overdueSRP REALTORS PRIVAYE LIMITED · Borivali, Mumbai SuburbanP51800009333· filed Dec 2019 → now Jun 2024· 90.9% built
- Skyline viha Wing B2.1 yr overdueAnkit Overseas · Kurla, Mumbai SuburbanP51800002495· filed Dec 2018 → now Jun 2024· 82.6% built· 1 complaint
- NIDHAAN CLOVER - A2.1 yr overdueNIDHAAN BUILDCON PRIVATE LIMITED · Kurla, Mumbai SuburbanP51800019932· 86.4% built
- EXPRESS ZONE MALL2.1 yr overdueCELLO SONAL CONSTRUCTION · Andheri, Mumbai SuburbanP51800002490· 81.8% built· 3 complaints
- GOREGAON SUKHNIWAS CO-OPERATIVE HOUSING SOCIETY LIMITED2.1 yr overdueDILIP DOSHI · Borivali, Mumbai SuburbanP51800028730· 91.8% built
- SOSAR SOLITAIRE2.1 yr overdueSOSAR ENTERPRISES · Andheri, Mumbai SuburbanP51800025925· 81.8% built
- DAHISAR SHIVANGAN WING A2.1 yr overdueYASH ENTERPRISES · DAHISAR EAST, Mumbai SuburbanP51800028519· 40% built· 3 complaints
- EXPRESS ZONE B WING2.1 yr overdueCELLO SONAL CONSTRUCTION · Andheri, Mumbai SuburbanP51800005634· 54.5% built
- 127 UPPER EAST2.1 yr overduePARANJAPE SCHEMES (CONSTRUCTION) LTD · Andheri, Mumbai SuburbanP51800000454· filed Dec 2019 → now Jun 2024· 56.4% built· 1 complaint
- BALI LAXMI2.1 yr overdueBALI SPACES LLP · Borivali, Mumbai SuburbanP51800027818· 90.9% built
- RAJAN DINAKAR PHATAK AND OTHERS2.1 yr overdueWESTIN SANKALP DEVELOPERS · Borivali, Mumbai SuburbanP51800028236· 89.1% built
- Supreme Evana2.1 yr overdueSupreme Mega Constructions LLP · Bandra West, Mumbai SuburbanP51800033931· 90% built
- Arkade Serene2.1 yr overdueArkade Developers Private Limited · Sunder Nagar Malad West, Mumbai SuburbanP51800029961· 74.5% built
- Bhoomi Samarth B Wing2.1 yr overdueSamarth Erectors & Developers · Borivali, Mumbai SuburbanP51800026289· 50.9% built
- NL TAKSASILA2.1 yr overdueNAHALCHAND LALOOCHAND PVT. LTD. · KANDIVALI (WEST), Mumbai SuburbanP51800025643· 90.9% built
- Kanchan Sheila CHS2.1 yr overdueYug Developers · Mulund West, Mumbai SuburbanP51800033242· filed Mar 2024 → now Jun 2024· 64.6% built
- SAI SOLITARE2.1 yr overdueSamrudhi Associates · Kurla, Mumbai SuburbanP51800006560· filed Jun 2021 → now Jun 2024· 89.5% built· 1 complaint
- Ajit Mulund CHS2.1 yr overdueYug Developers · Mulund, Mumbai SuburbanP51800032940· filed Mar 2024 → now Jun 2024· 64% built
- OMKAR CHS LTD2.1 yr overdueLAKSHMI BUILDERS AND DEVELOPERS · Andheri, Mumbai SuburbanP51800003558· filed Jul 2023 → now Jun 2024· 90.9% built
- Oshi2.1 yr overdueSahyog Homes Limited · Oshiwara, Mumbai SuburbanP51800002965· filed Dec 2022 → now Jun 2024· 92.7% built· 7 complaints
- ACE AVENUE2.1 yr overdueAce properties · MULUND WEST, Mumbai SuburbanP51800033494· 90.9% built
- Acharat Baug2.1 yr overdueAnkur Premises Developers LLP · Andheri, Mumbai SuburbanP51800034682· 39.1% built
- Saraswati Sadan2.1 yr overdueLAKSHMI BUILDERS AND DEVELOPERS · Vile Parle East, Mumbai SuburbanP51800026655· 90.9% built
- Prem Belaire2.1 yr overdueM/s Aryan Infra · Kurla, Mumbai SuburbanP51800003675· filed Feb 2019 → now Jul 2024· 90.8% built· 1 complaint
- DEVCHHAYA2.1 yr overdueHARSHAL ENTERPRISES · RAWALPADA DAHISAR EAST, Mumbai SuburbanP51800015406· filed Mar 2024 → now Jul 2024· 90.9% built
- SHYAM KUNJ2.1 yr overdueBASONS CONSTRUCTIONS · Andheri, Mumbai SuburbanP51800046209· 90.9% built
- NIDHI TOWERS2.1 yr overdueRAJAN KUMAR MANCHANDA · Andheri, Mumbai SuburbanP51800008893· filed Jul 2022 → now Jul 2024· 90.9% built· 3 complaints
- AMARDEEP ALLIANCE2.1 yr overdueALLIANCE CITY DEVELOPERS REALTORS PVT LTD · St. Pius Church Mulund West, Mumbai SuburbanP51800024225· 90.9% built· 2 complaints
- Altavista - Phase 12.1 yr overdueSPENTA ENCLAVE PRIVATE LIMITED · Kurla, Mumbai SuburbanP51800001050· filed Dec 2019 → now Jul 2024· 90.9% built· 18 complaints
- PEARL RESIDENCY - WING-B, RESIDENTIAL PHASE - III2.1 yr overdueGIRIRAJ ENTERPRISES · Andheri, Mumbai SuburbanP51800006592· 52.7% built
- Shree Swami Samarth Krupa2.0 yr overdueShoreline Builders Pvt Ltd · Kurla, Mumbai SuburbanP51800018673· 19.8% built· 3 complaints
- SANTACRUZ ANURAG MANDIR CHSL2.0 yr overdueS M CONSTRUCTIONS · SANTACRUZ, Mumbai SuburbanP51800050095· 90.9% built· 1 complaint
- RISHABRAJ AGNEL2.0 yr overdueRISHABRAJ ESTATE DEVELOPERS PVT LTD · Borivali, Mumbai SuburbanP51800030530· 90.9% built
- OM TRIMURTI2.0 yr overdueJE AND VEE INFRASTRUCTURE · OPP OBEROI MALL, Mumbai SuburbanP51800020394· filed Dec 2023 → now Aug 2024· 85.5% built· 1 complaint
- Supreme Elenor2.0 yr overdueSupreme Mega Constructions LLP · Kurla, Mumbai SuburbanP51800030270· 70.9% built
- RISHABRAJ SUJAI2.0 yr overdueRISHABRAJ ESTATE DEVELOPERS PVT LTD · MALAD EAST, Mumbai SuburbanP51800031075· 90.9% built
- Chaitanya Anand - Lunkhod CHSL2.0 yr overdueChaitanya Developers · Andheri West, Mumbai SuburbanP51800029553· filed May 2024 → now Aug 2024· 90.9% built
- THE VILE PARLE MEGHALAYA CHSL2.0 yr overdueDHRUV INFRASTRUCTURE · VILE PARLE EAST, Mumbai SuburbanP51800033919· 90.9% built
- 52 PARK AVENUE2.0 yr overdueDAN KUTIR CHSL · Andheri, Mumbai SuburbanP51800032136· 90.9% built
- ACE FLORENCE2.0 yr overdueAce properties · MULUND WEST, Mumbai SuburbanP51800034518· 90.9% built
- RISHABRAJ RAMESHWAR2.0 yr overdueH RISHABRAJ REALTY · Borivali, Mumbai SuburbanP51800030723· 90.9% built
- AIM Avenue1.9 yr overdueAIM REALTORS PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800028763· 77.7% built
- IZARRA1.9 yr overdueORNO INFRAPROJECTS PVT LTD · Andheri, Mumbai SuburbanP51800018888· filed Dec 2022 → now Sept 2024· 90.9% built· 2 complaints
- CHANDAN HIRA1.9 yr overdueBALI SHELTERS LLP · GOREGAON WEST, Mumbai SuburbanP51800033253· 90.9% built
- EMPIRE TOWERS1.9 yr overdueSahakar Ventures · Borivali, Mumbai SuburbanP51800026306· 87.3% built
- REDEVELOPMENT OF POPULAR TERRACE CHSL1.9 yr overduePRANAV CONSTRUCTIONS LIMITED · BORIVALI WEST MUMBAI, Mumbai SuburbanP51800029351· 90.9% built
- Avenue Park - I1.9 yr overdueCB Enterprises · pathanwadi, Mumbai SuburbanP51800005425· filed Jun 2022 → now Sept 2024· 73.5% built· 1 complaint
- School View Shreyas CHS Ltd1.9 yr overdueMAJESTIC ROYALE DEVELOPERS · MUMBAI, Mumbai SuburbanP51800046219· 54.5% built
- PARLE NIMESH CO-OP. HSG. SOC. LTD.1.9 yr overdueCHINTAMANI COMMERCIAL VENTURES · VILE PARLE EAST, Mumbai SuburbanP51800030964· 90% built
- REDEVELOPMENT OF GALA APARTMENTS CHSL1.9 yr overduePRANAV CONSTRUCTIONS LIMITED · MALAD EAST, Mumbai SuburbanP51800029415· 90.9% built· 1 complaint
- REDEVELOPMENT OF TIARA CHSL1.9 yr overduePRANAV CONSTRUCTIONS LIMITED · MALAD WEST, Mumbai SuburbanP51800034818· 90.9% built
- PARLASHRAY CHSL1.9 yr overdueSai Ganesh Properties and Holdings LLP · VILE PARLE EAST, Mumbai SuburbanP51800033078· filed Mar 2024 → now Oct 2024· 90.9% built
- SAMARA1.8 yr overdueCharisma Builders Ltd · Chembur, Mumbai, Mumbai SuburbanP51800020854· filed Mar 2024 → now Oct 2024· 81.8% built
- CRYSTAL PARADISE RESIDENCES1.7 yr overduePrithvi Sthapti LLP · Andheri, Mumbai SuburbanP51800015472· filed Jun 2024 → now Nov 2024· 72.3% built
- Gagan 1391.7 yr overdueGagangiri Constructions · Kurla, Mumbai SuburbanP51800029662· 90.9% built
- SWANAND BLDG NO 331.7 yr overdueHIRANIMANTHAN BUILDERS AND DEVELOPERS · Kurla, Mumbai SuburbanP51800004914· filed Dec 2019 → now Nov 2024· 90.9% built
- HERITAGE HOUSE1.7 yr overdueGreen Tree Lifescapes LLP · Andheri, Mumbai SuburbanP51800033917· 0.9% built
- CELESTIAL HEIGHTS1.7 yr overdueAYYAPPA DEVELOPERS PVT. LTD. · Borivali, Mumbai SuburbanP51800005812· filed Jan 2021 → now Dec 2024· 46.4% built· 16 complaints
- SILVER SCAPE/SILVER ENCLAVE1.6 yr overdueMalde Properties LLP · MULUND WEST, Mumbai SuburbanP51800009210· filed Dec 2023 → now Dec 2024· 45.5% built
- KINGS PRIDE1.6 yr overdueNilesh Laxmikant Kudalkar · GOVANDI EAST, MUMBAI, Mumbai SuburbanP51800023958· filed Dec 2023 → now Dec 2024· 82.5% built
- Neelkanth Jyot CHS LTD.1.6 yr overdueSchemaatics · Ghatkopar, Mumbai SuburbanP51800022558· 41.4% built
- NISHCHAY WING F1.6 yr overdueSHREERAJ DEVELOPER LLP · Borivali, Mumbai SuburbanP51800009954· 87.7% built· 1 complaint
- Hubtown Seasons - Daintree1.6 yr overdueJoynest Premises Private Limited · Kurla, Mumbai SuburbanP51800002373· 81.8% built· 7 complaints
- VASUNDHARA HEIGHTS1.6 yr overdueVASUNDHARA MRK PROPERTIES PVT LTD · MULUND WEST, Mumbai SuburbanP51800019256· 90.9% built
- Supreme Headquarter Bandra1.6 yr overdueSupreme Heights LLP · Near Link Square Mall, Mumbai SuburbanP51800025298· 90% built
- AARADHYA EASTWIND1.6 yr overdueMICL DEVELOPERS LLP · Kurla, Mumbai SuburbanP51800020183· 90.9% built
- Jaliyan Heights Goregaon1.6 yr overdueJaliyan Developer · Goregaon East, Mumbai SuburbanP51800012880· filed Dec 2022 → now Dec 2024· 84.5% built· 2 complaints
- Puneet Sanjivani Phase 1 Floor 0 to Floor 161.6 yr overduePuneet Developers · Kurla, Mumbai SuburbanP51800015397· 90.9% built
- SHUBHAM AURA1.6 yr overdueAVVAD REALTTY LLP · Kurla, Mumbai SuburbanP51800021965· 90.9% built
- SWASTIK PEARL1.6 yr overdueSUVASYA BUILDERS AND DEVELOPERS LLP · Kurla, Mumbai SuburbanP51800024910· 75.5% built
- CELESTIAL1.6 yr overdueSU SHARDA EDIFICE LLP · Kurla, Mumbai SuburbanP51800001768· 99.7% built· 3 complaints
- SAIKRUPA CHSL1.6 yr overdueC H PATIL AND SONS LLP · Near Eksar Talao, Mumbai SuburbanP51800011410· 69.5% built
- Kalpataru Radiance B1.6 yr overdueKeyana Estate LLP · Borivali, Mumbai SuburbanP51800000810· filed Jun 2022 → now Dec 2024· 95.5% built· 32 complaints
- PEARL OASIS1.6 yr overdueBAHIST ENTERPRISES PVT LTD · PATHANWADI, Mumbai SuburbanP51800016403· 79.5% built
- NISHCHAY - WING E1.6 yr overdueSHREERAJ DEVELOPER LLP · REVENUE MAJUE DAHISAR, Mumbai SuburbanP51800015985· 89.5% built
- Godrej RKS1.6 yr overdueGodrej Projects Development Limited · Chembur, Mumbai SuburbanP51800023915· 78.4% built· 8 complaints
- Mayfair The View1.6 yr overdueMAYFAIR HOUSING · Kurla, Mumbai SuburbanP51800020140· 82.6% built
- DOSHI TARACHAND VALAMJI VANIK NIWAS1.6 yr overdueSHREE CUTCHI DASHA SHRIMALI VANIK GNYATI · Chembur, Mumbai SuburbanP51800045888· filed Dec 2023 → now Dec 2024· 90.9% built
- Mulund Om CHS Ltd1.6 yr overdueSUNRISE HOUSING · Nahur Village Mulund - West, Mumbai SuburbanP51800022406· 81.8% built
- LA PRENDA1.6 yr overdueD M LIFESPACES · Andheri, Mumbai SuburbanP51800022314· 88.6% built
- Sorrento1.6 yr overdueHGP Community Pvt. Ltd. · Kurla, Mumbai SuburbanP51800021706· 90.9% built
- Hubtown Seasons - Ecuador Cloud1.6 yr overdueJoynest Premises Private Limited · Chembur East, Mumbai SuburbanP51800004432· 81.8% built
- ALAG ARTIS1.6 yr overdueALAG LIFESPACE LLP · GHATKOPAR EAST, Mumbai SuburbanP51800032385· 84.5% built
- AUDUMBAR APARTMENTS CHS LTD1.6 yr overdueMASAKIN DEVELOPERS · MALAD WEST MUMBAI, Mumbai SuburbanP51800034993· 90.9% built
- ANNAVISTA1.6 yr overdueTRISONS BUILDERS · BANDRA WEST, Mumbai SuburbanP51800034372· 74.1% built
- Rajshree Eleven East1.6 yr overduePanchsheel 1 Upgrade LLP · Kurla, Mumbai SuburbanP51800030117· 85.4% built
- RISHABRAJ VILLA STELLA1.6 yr overdueH RISHABRAJ REALTY · Borivali, Mumbai SuburbanP51800034790· 72.7% built
- ADVENT NEEL1.6 yr overdueREGENT ASSOCIATES · Andheri, Mumbai SuburbanP51800032332· 78.9% built
- SHANTI HEIGHTS1.6 yr overdueSUNNY DEVELOPERS · MULUND WEST, Mumbai SuburbanP51800032643· 97.7% built
- Lotus Residency1.6 yr overdueLotus Logistics and Developers pvt ltd · Mumbai, Mumbai SuburbanP51800006322· filed Jun 2021 → now Dec 2024· 80.9% built· 2 complaints
- VARDHMAN PEARL1.6 yr overdueDIWALI DEVELOPERS · MALAD WEST, Mumbai SuburbanP51800032809· 36.4% built
- SATRA ONE1.6 yr overdueBLEU NOIR INFRASTRUCTURE DEVELOPMENT PVT. LTD. · GOREGAON WEST, Mumbai SuburbanP51800032891· 46.2% built· 1 complaint
- HS ALAG1.6 yr overdueHS ALAG REALTY LLP · Kurla, Mumbai SuburbanP51800031693· 90.9% built
- STAR CHS LTD1.6 yr overdueHEALTH COLONIES & CONSTRUCTION PVT.LTD. · POWAI, Mumbai SuburbanP51800035098· 23.6% built
- Apoorva Rise1.6 yr overdueApoorva Housing · Chembur, Mumbai SuburbanP51800031714· 97.7% built
- Anjani Tirth1.6 yr overdueGeeta Space Realtors · Borivali (West), Mumbai SuburbanP51800033828· 90.9% built
- Shree Rajrajeshwari Chhaya Chs Ltd.1.6 yr overdueSUNIL DINKAR SHINDE · Bhandup East, Mumbai SuburbanP51800032685· 90.9% built
- ALAG ARANYA1.6 yr overdueALAG AARCHIE LLP · Panth Nagar, Mumbai SuburbanP51800032034· 90.9% built
- DP STAR TRIVENI1.6 yr overdueDP BUILDHOMES LLP · BHANDUP WEST, Mumbai SuburbanP51800004550· filed Dec 2021 → now Dec 2024· 85.5% built
- CITI NEST1.6 yr overdueBasons Investments Private Limited · ANDHERI - EAST, Mumbai SuburbanP51800049340· 36.8% built
- ALAG OLIVE1.6 yr overdueALAG OLIVE LLP · GHATKOPAR EAST, Mumbai SuburbanP51800032510· 89.5% built
- Pragati Revanta1.6 yr overduePragati Enterprises · Ghatkopar, Mumbai SuburbanP51800032025· 90.9% built
- SEQUOIA1.6 yr overdueAUM PRIMA LLP · Andheri, Mumbai SuburbanP51800032970· 56.8% built
- PUSHP-VATIKA1.6 yr overdueANISH SHAH & MANISH SHAH · Andheri, Mumbai SuburbanP51800031796· 85% built
- RISHABRAJ GARDENIA1.6 yr overdueH RISHABRAJ REALTY · Andheri, Mumbai SuburbanP51800035106· 89.1% built
- Laxmi Kunj1.6 yr overdueGeeCee Ventures Limited · Andheri, Mumbai SuburbanP51800046721· 88.2% built
- PLATINUM PARK1.6 yr overdueshreeji Developers · Andheri, Mumbai SuburbanP51800008722· filed Jun 2021 → now Dec 2024· 85.9% built· 22 complaints
- BORIVALI SHALIMAR CO-OPERATIVE HOUSING SOCIETY LIMITED1.6 yr overdueTASMAI SHREE · Borivali, Mumbai SuburbanP51800045551· 90.9% built
- Bileshwar Darshan CHSL1.6 yr overdueM/s. Desai Residency Private Limited · Vile Parle East, Mumbai SuburbanP51800047797· 90.9% built
- RENDEZVOUS PREMISES CO-OP SOCIETY LTD1.6 yr overdueJGB BUILDERS LLP (CA to Owner) · Mumbai, Mumbai SuburbanP51800033783· 95.5% built
- JOSEPH VILLA1.6 yr overdueK.PATELAND CO · GOREGAON EAST, Mumbai SuburbanP51800045891· 72.7% built
- SHEEL APARTMENTS BY MAYFAIR1.6 yr overdueMAYFAIR HOUSING PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800031040· 82.7% built
- ALAG ASHTAPAD1.6 yr overdueCONTOUR DEVELOPERS LLP · Kurla, Mumbai SuburbanP51800031922· 90.9% built
- SHUBHAM AVALON CO-OPERATIVE HOUSING SOCIETY LIMITED1.6 yr overdueAVVAD HOUSING LLP · GHATKOPAR EAST, Mumbai SuburbanP51800045851· 90.9% built
- BHOOMI CELESTIA - A WING1.6 yr overdueSASHWAT CONSTRUWELL PRIVATE LIMITED · Librity Garden, Opp. S.N.D.T. Girls Collage, Mumbai SuburbanP51800011623· filed Dec 2022 → now Dec 2024· 30.5% built
- SUPREME MADHUKAR1.6 yr overdueSUPREME ENTERPRISE · BORIVALI, Mumbai SuburbanP51800032692· 86.8% built
- BORIVALI NEELKANTH NAGAR CHS LTD1.6 yr overdueMAHAVIR INFRASTRUCTURE · Borivali, Mumbai SuburbanP51800006154· filed Dec 2020 → now Jan 2025· 90.9% built
- GHATKOPAR PARK VIEW CHS LIMITED1.6 yr overdueEV AND SARAF REALTY · KURLA, Mumbai SuburbanP51800014255· filed Dec 2019 → now Jan 2025· 86.4% built
- The Greens - Radhakunj1.5 yr overdueEthics Infra Development Pvt Ltd · Kandivali East, Mumbai SuburbanP51800029355· filed May 2024 → now Feb 2025· 90% built
- REDEVELOPMENT OF PLOT NO. 2121.5 yr overduePRANAV CONSTRUCTIONS LIMITED · MUMBAI, Mumbai SuburbanP51800034087· 90.9% built
- SHUBH REGENCY1.5 yr overdueSHUBH ENTERPRISE · MULUND, Mumbai SuburbanP51800003145· filed Jun 2022 → now Feb 2025· 90.9% built· 2 complaints
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.