Delayed projects in Mumbai Suburban
1,523 MahaRERA-registered projects in Mumbai Suburban are past the possession date on file and still under 100% built. Where the promoter has formally revised the date, the original is shown alongside so you can see what changed.
Page 8 of 8
- MIDAS-BHAKTI MEADOWS4 mo overdueIRENE EDWYN DMELLO · Kurla, Mumbai SuburbanP51800013457· filed Jun 2019 → now May 2026· 76.4% built· 19 complaints
- CONTENDRE ENCLAVE4 mo overdueCONTENDRE ENCLAVE · Kurla, Mumbai SuburbanP51800053218· 72.7% built
- CHARKOP JEEVAN MANGAL C.H.S. LTD4 mo overdueSANDHYA KSHITIJ BUILDERS PRIVATE LIMITED · Borivali, Mumbai SuburbanP51800034943· filed Oct 2024 → now Jun 2026· 90.9% built
- SHREE GOVIND KRUPA4 mo overdueMAMTORA FOUNDATION · Borivali, Mumbai SuburbanP51800046222· filed Dec 2024 → now Jun 2026· 81.8% built
- SUN SUMIT JEEVAN MANGAL4 mo overdueSUN SUMIT VENTURE · Borivali, Mumbai SuburbanP51800046062· filed Jun 2025 → now Jun 2026· 81.8% built
- RAKHI TOWER PHASE 3 12TH TO 15TH FLOOR PART3 mo overdueRAKHI TOWER PHASE 3 12TH TO 15TH FLOOR PART · Borivali, Mumbai SuburbanP51800027354· 36.4% built
- GARUDA SHATRUNJAY3 mo overdueMESSERS SHREE UMIYA BUILDERS & DEVELOPERS · Borivali, Mumbai SuburbanP51800011329· filed Dec 2024 → now Jun 2026· 53.2% built· 23 complaints
- GAURI EXCELLENCY3 mo overdueM/S GAURI LAND DEVELOPERS LLP · Borivali, Mumbai SuburbanP51800004832· filed Dec 2020 → now Jun 2026· 82.8% built· 10 complaints
- ALAG ANANTA3 mo overdueAlag Square LLP · Kurla, Mumbai SuburbanP51800045309· filed Sept 2024 → now Jun 2026· 90.9% built
- ASTRUM ANNEX3 mo overdueASTRUM REALITY PRIVATE LIMITED · Borivali, Mumbai SuburbanP51800048947· filed Dec 2024 → now Jun 2026· 70% built
- 63 ELEGANCE3 mo overdueSIDDHARTH DEVELOPERS · Mumbai, Mumbai SuburbanP51800009011· filed Dec 2022 → now Jun 2026· 60.9% built
- PANT NAGAR SARASWATI CHSL3 mo overdueKYRAA INFRA PROJECTS · GHATKOPAR, Mumbai SuburbanP51800027377· 90.9% built· 1 complaint
- New Saket Co-operative Housing Society Ltd.3 mo overdueSM Magnate Construction · Andheri, Mumbai SuburbanP51800049992· 90.9% built
- Pruthvi Pushpanjali3 mo overdueFlying Earth LLP · Andheri, Mumbai SuburbanP51800046070· 82.4% built
- D SOLITAIRE3 mo overdueKRISHNAN AND KAMAL ASSOCIATES · Borivali, Mumbai SuburbanP51800031850· filed Mar 2023 → now Jun 2026· 64.7% built
- BLA BUSINESS PARK3 mo overdueBLA Developers LLP · C.T.S. No. 492/A, 492/A/1, 492/A/2, 492/A/3, 492/A/4, 492/B, Mumbai SuburbanP51800049334· filed Mar 2026 → now Jun 2026· 90.9% built
- GOMANT KUTIR CHSL3 mo overdueJBR HOUSECON LLP · Borivali, Mumbai SuburbanP51800052397· filed Dec 2025 → now Jun 2026· 81.8% built
- BLOSSOM RESIDENCY3 mo overdueHF REALTY · Andheri, Mumbai SuburbanP51800028538· filed Jun 2024 → now Jun 2026· 90.8% built
- DPS NAKSHATRA HEIGHTS3 mo overdueDPS NAKSHATRA HEIGHTS · Borivali, Mumbai SuburbanP51800052649· 90.9% built
- AKN ANNEXE3 mo overdueAKN ANNEXE · Andheri, Mumbai SuburbanP51800055901· filed Sept 2025 → now Jun 2026· 81.8% built
- DEVRAJ RESIDENCY3 mo overdueSHAMS ENTREPRISES · Malad - West, Mumbai SuburbanP51800051682· filed Jun 2024 → now Jun 2026· 89.1% built
- GHATKOPAR AVENUE AARADHYA ONE EARTH I PHASE V3 mo overdueMAN REALTORS AND HOLDINGS PRIVATE LIMITED · Kurla, Mumbai SuburbanP51800027922· 63.6% built
- VARDHAN HEIGHTS3 mo overdueVARDHAN HOUSING · Kurla, Mumbai SuburbanP51800014198· filed Dec 2022 → now Jun 2026· 58% built· 10 complaints
- FINE HEIGHTS3 mo overdueFINE HEIGHTS · Borivali, Mumbai SuburbanP51800055299· filed Dec 2025 → now Jun 2026· 70.9% built
- Ghodawat Skystar LLP3 mo overdueGhodawat Skystar LLP · Borivali, Mumbai SuburbanP51800032000· filed Dec 2025 → now Jun 2026· 64.1% built
- GAURI EXCELLENCY NX3 mo overdueM/S GAURI LAND DEVELOPERS LLP · Borivali, Mumbai SuburbanP51800029939· filed Dec 2023 → now Jun 2026· 80.2% built
- MAHINDRA ALCOVE WING D AND E3 mo overdueMahindra Lifespace Developers limited · Kurla, Mumbai SuburbanP51800028352· 29.1% built
- TULSI CHAMBERS3 mo overdueSURANA CONSTRUCTION (CHEMBUR ) · Kurla, Mumbai SuburbanP51800012437· filed Jun 2021 → now Jun 2026· 90% built· 15 complaints
- CODENAME RARE BY RUNWAL3 mo overdueRunwal Developers Ltd · Andheri, Mumbai SuburbanP51800034594· 90.9% built
- AMARYLLIS TOWERS AND PLAZA3 mo overdueNAHAR BUILDERS LTD. · Kurla, Mumbai SuburbanP51800028801· 80.5% built
- Florence Heights A and B Wing3 mo overdueM/s Vinayak Developers · Borivali, Mumbai SuburbanP51800049192· filed Dec 2024 → now Jun 2026· 76.3% built
- Neelyog Aashiyana II3 mo overdueNeelyog Construction Pvt Ltd · KANDIVALI WEST, Mumbai SuburbanP51800034106· 90.9% built
- Abundanttiafull - By Bholas3 mo overdueSandeep Dalchand Jain · Borivali, Mumbai SuburbanP51800052704· 67.7% built
- Sudarshan CHS Ltd3 mo overdueSUDARSHAN CO-OPERATIVE HOUSING SOCIETY LIMITED · Ghatkopar - East, Mumbai SuburbanP51800032217· 90.9% built
- Komal Kounteya CHSL3 mo overdueRander Bandhu Corporation LLP · Borivali, Mumbai SuburbanP51800049376· 94.5% built
- Nasar Enclave Sale Building A and B Wing3 mo overdueM/s. Nasar Associates · Andheri, Mumbai SuburbanP51800028733· 77.9% built
- Shankar Bhavan Premises Co-operative Society Limited3 mo overdueMishal Construction Private Limited · Kurla, Mumbai SuburbanP51900009596· filed Dec 2019 → now Jun 2026· 46.1% built
- Lodha Kandivali Project - Tower 33 mo overdueLodha Developers Limited · Akurli Village, Mumbai SuburbanP51800031346· filed Oct 2025 → now Jun 2026· 81.8% built
- AARADHYA EVOQ3 mo overdueMAN INFRA CONTRACTS LLP · Andheri, Mumbai SuburbanP51800034587· 90.9% built
- ALAG ENDEAVOUR3 mo overdueALAG ENDEAVOUR · Kurla, Mumbai SuburbanP51800028404· 0% built· 7 complaints
- GOVIND SOLITAIRE3 mo overdueSHANKH DEVELOPERS LIMITED LIABILITY PARTNERSHIP · Kurla, Mumbai SuburbanP51800030555· filed Jul 2024 → now Jun 2026· 71.8% built
- GHARKUL HEIGHT3 mo overdueANGATH PROPERTIES LLP · Kurla, Mumbai SuburbanP51800017037· filed Dec 2022 → now Jun 2026· 26.4% built· 26 complaints
- CRYSTAL PRIDE3 mo overdueCRYSTAL CONSTRUCTION COMPANY · Borivali, Mumbai SuburbanP51800009735· filed Dec 2019 → now Jun 2026· 78.6% built
- ENSO SANZA3 mo overdueSai Aastha Developers · Borivali, Mumbai SuburbanP51800013955· filed Dec 2023 → now Jun 2026· 82.5% built· 38 complaints
- BHUVNESHWAR VINTAGE3 mo overdueS P INFRA · Kurla, Mumbai SuburbanP51800022717· filed Mar 2023 → now Jun 2026· 72.7% built
- Hubtown Seasons - Ardennes3 mo overdueJoynest Premises Private Ltd · Kurla, Mumbai SuburbanP51800032784· 77.3% built
- ROOPNIKETAN CO.OPERATIVE HOUSING SOCIETY LTD.3 mo overdueSHREE SHINGAR CONSTRUCTIONS PRIVATE LIMITED · Kurla, Mumbai SuburbanP51800051469· filed Dec 2025 → now Jun 2026· 76.8% built
- AMAIRA RESIDENCY3 mo overdueAMAIRA RESIDENCY · Andheri, Mumbai SuburbanP51800046422· 29.1% built
- MARATHON MILLENNIUM 23 mo overdueTERRAPOLIS ASSETS PVT LTD · Kurla, Mumbai SuburbanP51800021203· 29.4% built
- Gayatri Heights3 mo overdueGayatri Properties · Andheri, Mumbai SuburbanP51800049323· 90.2% built
- 19 DEGREE NORTH3 mo overdueARUNIS EDIFICE PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800050846· 66.8% built
- Vayuputra Trident3 mo overdueVayuputra Trident · Andheri, Mumbai SuburbanP51800053280· 44.7% built
- ODC 13 mo overdueNVN Buildcon LLP · Goregaon West, Mumbai SuburbanP51800046544· filed Dec 2024 → now Jul 2026· 81.8% built
- Rudra Paradise3 mo overdueR-Stone Design and Build Private Limited · Andheri, Mumbai SuburbanP51800008159· filed Jan 2021 → now Jul 2026· 76.2% built
- PRERANA CHSL3 mo overduePRERANA CHSL · Andheri, Mumbai SuburbanP51800053537· 90.9% built
- Vidyalankar CHSL2 mo overdueDESAI RESIDENCY PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800052458· filed Jul 2025 → now Jul 2026· 79.1% built
- Hubtown Seasons - B Wing2 mo overdueJoynest Premises PrivateLimited · Kurla, Mumbai SuburbanP51800008552· filed Jul 2025 → now Jul 2026· 69.5% built
- RISHABRAJ ARADHANA2 mo overdueRISHABRAJ ARADHANA · Borivali, Mumbai SuburbanP51800053420· 61.4% built
- Hubtown Premiere Residences - Commercial2 mo overdueHubtown Limited · Andheri, Mumbai SuburbanP51800003575· 72.7% built· 2 complaints
- PRIMROSE2 mo overdueKaustubh Construction Private Limited · Borivali, Mumbai SuburbanP51800046761· 90.7% built
- Lodha Kandivali Project - Tower 52 mo overdueLodha Developers Limited · Borivali, Mumbai SuburbanP51800032605· filed Sept 2025 → now Jul 2026· 81.8% built
- SAHAKAR VISTA2 mo overdueSAHAKAR VISTA · Borivali, Mumbai SuburbanP51800053793· 67.3% built
- SAYBA ARCADIA2 mo overdueSTAR EMPIRE · Kurla West, Mumbai SuburbanP51800055257· filed Mar 2026 → now Jul 2026· 81.8% built
- DEM PHOENIX2 mo overdueDEM BUILDWELL · Borivali, Mumbai SuburbanP51800048376· filed Oct 2025 → now Jul 2026· 82.1% built
- Hubtown Premiere Residences - Bel Air2 mo overdueHubtown Limited · Andheri, Mumbai SuburbanP51800005688· 58.4% built
- Jai Kamal2 mo overdueJai Kamal · Kurla, Mumbai SuburbanP51800052049· 64% built
- THE KOLLAGE2 mo overdueZIRE RUSHI CONSTRUCTION · Andheri (East), Mumbai SuburbanP51800012084· filed Dec 2022 → now Aug 2026· 99.9% built· 4 complaints
- VIHAR HEIGHTS2 mo overdueSaptrishi Homes LLP · Kurla, Mumbai SuburbanP51800026062· filed Aug 2025 → now Aug 2026· 60% built· 1 complaint
- The crown2 mo overdueElite Associates · Kurla, Mumbai SuburbanP51800048225· filed Apr 2026 → now Aug 2026· 86.8% built
- RAY1 mo overdueManish Builders & Developers · Borivali, Mumbai SuburbanP51800031492· filed Oct 2025 → now Aug 2026· 81.1% built· 1 complaint
- KUKREJA GARDENS WING B1 mo overdueTOLARAM AND CO · Kurla, Mumbai SuburbanP51800021344· filed Apr 2026 → now Aug 2026· 32.5% built· 1 complaint
- YASH SHRINE1 mo overdueYASHWANT SAMPATRAJ GANDHI · Borivali, Mumbai SuburbanP51800027389· filed Apr 2026 → now Aug 2026· 9.1% built
- SHRADDHA EVOQUE1 mo overdueSHRADDHA LANDMARK PRIVATE LIMITED · Ram Rahim Udyog Nagar, Sadan wadi, Bhandup West, Mumbai SuburbanP51800008864· filed Dec 2023 → now Aug 2026· 92.4% built
- NAV CHETNA1 mo overdueForishna Developers LLP · Andheri, Mumbai SuburbanP51800048061· filed Apr 2026 → now Aug 2026· 42.7% built
- VILLA 791 mo overdueMehta Jaising Builders LLP · Andheri, Mumbai SuburbanP51800052707· filed Apr 2026 → now Aug 2026· 63.6% built
- A.N. HEIGHTS1 mo overdueH SQUARE BUILDERS · Borivali, Mumbai SuburbanP51800005739· filed Jun 2021 → now Aug 2026· 90.5% built· 2 complaints
- ANANTA1 mo overdueANANTA · Kurla, Mumbai SuburbanP51800053780· filed Aug 2025 → now Aug 2026· 60% built· 1 complaint
- JAI SHREERAM PRASANNA CHSL1 mo overdueRIYAZ RAMZAN SHAH · Kurla, Mumbai SuburbanP51800011427· filed Jun 2022 → now Aug 2026· 72.6% built· 1 complaint
- The Waterfront1 mo overdueM/s Orbit Developers · Andheri, Mumbai SuburbanP51800050617· filed Aug 2025 → now Aug 2026· 60.5% built· 1 complaint
- ROYAL ALTEZZA1 mo overdueSHRI GANESH DEVELOPERS · Kurla, Mumbai SuburbanP51800030908· filed Aug 2025 → now Aug 2026· 94.1% built
- SATYAM1 mo overduePODDAR INFRACON PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800045715· filed Aug 2025 → now Aug 2026· 79.4% built· 1 complaint
- CHARKOP ASHRAY CO OP HOUSING SOCIETY LTD1 mo overdueCHARKOP ASHRAY CO OPERATIVE HOUSING SOCIETY LTD · CHARKOP, Mumbai SuburbanP51800027472· filed Dec 2024 → now Aug 2026· 81.8% built· 3 complaints
- Ventures ALTA MONTE1 mo overdueVENTURES KUBER REALITY LLP · Andheri, Mumbai SuburbanP51800007794· filed Dec 2018 → now Sept 2026· 47.5% built
- Malad Sati Darshan CHS Ltd.1 mo overdueGoyal Sati Darshan LLP · Borivali, Mumbai SuburbanP51800045878· filed May 2026 → now Sept 2026· 90.9% built
- NEELAM CHS LTD1 mo overdueSapriya Developers · KANDIVALI WEST, Mumbai SuburbanP51800076794· 90.9% built
- Primo0 mo overdueCeear Land Developers LLP · Kurla, Mumbai SuburbanP51800001724· filed Jun 2021 → now Sept 2026· 93.8% built· 43 complaints
- Dinaco Darshan CHS LTD0 mo overdueDinaco Darshan CHSL · Dahisar West, Mumbai SuburbanP51800032422· filed Dec 2024 → now Sept 2026· 64.9% built
- Shikhhar0 mo overdueMAHAVIR LAND DEVELOPER · Borivali, Mumbai SuburbanP51800051096· 90.9% built
- Laizer Elegance0 mo overdueLaizer Elegance · Kurla, Mumbai SuburbanP51800029739· 9.1% built
- ANUTAM0 mo overdueTRULY HIGHDREAMS REALTORS LLP · Andheri, Mumbai SuburbanP51800026032· filed Sept 2023 → now Sept 2026· 14.5% built· 1 complaint
- Shree Hari Krupa0 mo overdueShree Hari Krupa · Borivali, Mumbai SuburbanP51800055568· filed Dec 2025 → now Sept 2026· 67.3% built
- THE SANCTUARY - TOWER 40 mo overdueRunwal Construction Private Limited · Kurla, Mumbai SuburbanP51800025926· filed Jun 2026 → now Sept 2026· 99.8% built· 1 complaint
- THE SANCTUARY - TOWER 50 mo overdueRunwal Construction Private Limited · Mulund, Mumbai SuburbanP51800029440· filed Mar 2026 → now Sept 2026· 65.3% built· 1 complaint
- ANUPAM VILLA CHSL0 mo overdueM E INFRAPROJECTS PVT LTD · Kurla, Mumbai SuburbanP51800011219· filed Dec 2019 → now Sept 2026· 99.5% built
- TULSIDHAM CHS0 mo overdueSM & HAPPY HOME ASSOCIATES · VILE PARLE WEST, Mumbai SuburbanP51800021413· filed Dec 2022 → now Sept 2026· 81.8% built
- Vaastu Shreya0 mo overdueVaastu Shreya · Andheri, Mumbai SuburbanP51800077215· filed May 2026 → now Sept 2026· 51.8% built
- SHREE VALLABH0 mo overdueMAMTORA ENTERPRISE · Borivali, Mumbai SuburbanP51800047875· filed Sept 2025 → now Sept 2026· 69.6% built· 1 complaint
- ROYALE0 mo overdueKHOKER SYNERGY DEVELOPERS · Andheri, Mumbai SuburbanP51800006143· filed Jul 2023 → now Sept 2026· 81.8% built· 3 complaints
- Gopal Terrace Co-operative Housing Society LTD0 mo overduePolo Infra Developers Private Limited · Borivali, Mumbai SuburbanP51800050616· filed Mar 2025 → now Sept 2026· 68.2% built
- YAMUNA MAHARANI HEIGHTS0 mo overdueK B ASSOCIATES · Borivali, Mumbai SuburbanP51800028829· filed Sept 2024 → now Sept 2026· 52.3% built· 2 complaints
- BANDRA BOON CHS LTD0 mo overdueMASS JAKS ASSOCIATE VENTURES · BANDRA WEST, Mumbai SuburbanP51800030090· filed Dec 2024 → now Sept 2026· 74.6% built
- AAI SATIDEVI PARADISE0 mo overdueSHREENATH DEVELOPERS · MULUND WEST, Mumbai SuburbanP51800054925· filed Mar 2026 → now Sept 2026· 78.4% built· 2 complaints
- Wadhwa 723 Avenue0 mo overdueHarshvardhan Constructions · Andheri, Mumbai SuburbanP51800050698· filed May 2026 → now Sept 2026· 27.7% built
- Prime Vista0 mo overdueRUPVAKULA PROPERTIES PVT. LTD · Kurla, Mumbai SuburbanP51800020122· filed Mar 2023 → now Sept 2026· 78.9% built· 15 complaints
- OM PRIYADARSHANI0 mo overdueAAKRUTI ENTERPRISES · GHATKOPAR EAST, Mumbai SuburbanP51800052127· 88.2% built
- Shreeji Plaza Wing A0 mo overdueSIDDHARTH ENTERPRISES · MALAD WEST, Mumbai SuburbanP51800007051· filed Jun 2023 → now Sept 2026· 90.9% built· 5 complaints
- GOODWILL CO OPERATIVE HOUSING SOCIETY LTD0 mo overdueTRIMURTI BUILDCON BUILDERS AND DEVELOPERS · Mumbai, Mumbai SuburbanP51800049604· filed May 2025 → now Sept 2026· 81.8% built
- Bhaveshwar Heights0 mo overdueBhaveshwar Heights · Borivali, Mumbai SuburbanP51800052429· filed Jun 2026 → now Sept 2026· 81.8% built
- GULRAJ PARADISE0 mo overdueM/S RELIABLE CONSTRUCTION · Kurla, Mumbai SuburbanP51800004371· filed Jun 2021 → now Sept 2026· 52.1% built· 22 complaints
- HEMA APARTMENTS CO-OPERATIVE HOUSING SOCIETY LIMITED0 mo overdueHEMA APPARTMENTS CO-OPERATIVE HOUSING SOCIETY LIMITED · GHATKOPAR (EAST), Mumbai SuburbanP51800053101· filed Mar 2025 → now Sept 2026· 81.8% built
- ROMELL ORBIS0 mo overdueROMELL PROPERTIES PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800023625· filed Dec 2024 → now Sept 2026· 90.7% built
- Modirealty Vatvriksh0 mo overdueMODIREALTY DEVELOPERS PVT LTD · Borivali, Mumbai SuburbanP51800047278· 72.7% built
- GODREJ URBAN PARK0 mo overdueGODREJ PROPERTIES LIMITED · Kurla, Mumbai SuburbanP51800028364· 71.6% built· 2 complaints
- Jagdale Giriraj0 mo overdueJAGDALE INFRASTRUCTURE PVT. LTD. · Kurla, Mumbai SuburbanP51800045510· filed Sept 2025 → now Sept 2026· 90.9% built
- Trade Square 4th to 7th Floor0 mo overdueATUL PROPERTIES · Andheri East, Mumbai SuburbanP51800020821· filed Mar 2025 → now Sept 2026· 54.5% built· 1 complaint
- Sahakar Revanta0 mo overdueSAHAKAR BUILDERS & DEVELOPERS · Borivali, Mumbai SuburbanP51800051407· 72.7% built
- ABUNDANCE0 mo overdueGoodwill Developers · Kurla, Mumbai SuburbanP51800045501· filed Dec 2025 → now Sept 2026· 58.5% built· 1 complaint
- MANRAJ VIEW0 mo overdueEkta Developers · Kurla, Mumbai SuburbanP51800011821· filed Jun 2021 → now Sept 2026· 40.9% built
- THE NEW ANAND DEEP CHS LTD0 mo overdueSHREEJEE BUILDCON · Kurla, Mumbai SuburbanP51800048097· 60.4% built
- Rajal Godavari0 mo overdueNisar Properties Private Limited · Kurla West, Mumbai SuburbanP51800045303· filed Dec 2025 → now Sept 2026· 81.8% built
- ROMELL MYRA0 mo overdueROMELL PROPERTIES PRIVATE LIMITED · CTS 382, Mumbai SuburbanP51800023520· filed Dec 2024 → now Sept 2026· 0.8% built
- Shreeji Plaza Wing B0 mo overdueSIDDHARTH ENTERPRISES · BORIVALI, Mumbai SuburbanP51800011168· filed Jun 2025 → now Sept 2026· 90.5% built· 1 complaint
- VATIKA SUDARSAN0 mo overdueVATIKA SUDARSAN · Andheri, Mumbai SuburbanP51800056335· filed Jun 2026 → now Oct 2026· 81.8% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.