Delayed projects in Pune
3,375 MahaRERA-registered projects in Pune are past the possession date on file and still under 100% built. Where the promoter has formally revised the date, the original is shown alongside so you can see what changed.
Page 14 of 17
- JAYHIND HILLSIDE2.4 yr overdueSAGAR JAYSING ERANDE · DUDULGAON, PuneP52100022761· 81.4% built
- Legacy Liva2.4 yr overdueWhite Properties · Near Legacy Crest Project, PuneP52100024554· 90.9% built
- DWARKAMAI HEIGHTS2.4 yr overdueDWARKAMAI ASSOCIATES · CHARHOLI BUDRUK, PuneP52100046861· filed Mar 2023 → now Mar 2024· 63.5% built
- KANAKMANGALA - GAJANAN2.4 yr overdueKanakmangala Properties · Haveli, PuneP52100034371· 31.8% built
- PAVILION2.4 yr overdueCERATEC GARIMA · KIWALE, PuneP52100047319· 72.7% built
- JAMDAR ERA2.4 yr overdueYogesh Suresh Dudhal · Baramati, PuneP52100048521· 90.9% built· 1 complaint
- ELEGANCE PARK2.4 yr overdueM/S RAMOLI SRUSHTI DEVELOPERS · near Sarpanch Vasti, PuneP52100013441· filed Sept 2023 → now Mar 2024· 75.2% built· 3 complaints
- DRUMADAL2.4 yr overdueRanjekar Realty LLP · Shivajinagar, Bhamburda, PuneP52100026105· filed Sept 2023 → now Mar 2024· 55.5% built
- SAMARTH VILLA2.4 yr overdueD.A.BORADE & SONS · VISHAL NAGAR, PuneP52100050168· 81.8% built
- ROYAL RESIDENCY2.4 yr overdueS J BUILDER & DEVELOPERS · PIMPRI CHINCHWAD, PuneP52100045783· 81.8% built
- SUKHMANI NIWAS2.4 yr overdueM/S PREETAM ASSOCIATES · PIMPRI, PuneP52100048054· 9.1% built
- Arunya2.4 yr overdueGM Buildcon · Haveli, PuneP52100014346· filed Dec 2020 → now Mar 2024· 45.5% built· 1 complaint
- SHUBHASHREE2.4 yr overdueKotibhaskar Infrastructures &Developers Pvt.Ltd. · PUNE, PuneP52100045350· 99.1% built
- VEDANT PRIDE2.4 yr overdueVEDANT CONSTRUCTIONS · OPP OJASWI APARTMENT, PuneP52100033002· 81.8% built
- SAI DWARKA PHASE 22.4 yr overdueMAA SANKALP BUILDCON · YAWALEWADI, PuneP52100004883· filed Dec 2019 → now Mar 2024· 42.3% built· 8 complaints
- ACE AURUM COMMERCIAL2.4 yr overdueAALIA HOMES · OPP. SENTOSA RESORT, NEAR MUKAI CHOWK RAVET, PuneP52100030450· 90.9% built
- MILLENNIUM PACIFIC2.4 yr overdueMillennium Developers · TATHAWADE, PuneP52100027204· 89.1% built
- SIGNATURE PARK C AND D BUILDING2.4 yr overdueSHREE SONIGARA REALCON · THERGAON, PuneP52100020943· 42.3% built· 66 complaints
- KUMAR PEBBLE PARK KHUSHI 2- D22.4 yr overdueKumar Construction and Properties Pvt Ltd · HANDEWADI, PuneP52100020421· 49.1% built
- SIGNATURE PARK G AND H BUILDING2.4 yr overdueSHREE SONIGARA REALCON · THERGAON, PuneP52100019960· 45.5% built· 89 complaints
- Ganganagar2.4 yr overdueSanjay Chandrakant Bafana · Shirur, PuneP52100022015· 90.9% built
- SWANANDI RESIDENCY2.4 yr overdueAMIT SANJAY CHAKANKAR · DHAYARI, PuneP52100031935· filed Dec 2023 → now Apr 2024· 97.7% built
- BALEWADI 372.4 yr overduenitin shamrao patil · BALEWADI, PuneP52100028844· 72.7% built
- VEDANT DEVELOPERS2.4 yr overdueVEDANT DEVELOPERS · TAL- HAVELI, DISTRICT PUNE, PuneP52100048105· filed Dec 2023 → now Apr 2024· 36.8% built
- Vtp Beaumonde- Nation R2 Tower52.4 yr overdueAshdan Developers Private Limited · Manjri, PuneP52100007384· filed Jul 2022 → now Apr 2024· 90.9% built· 33 complaints
- Boulevard part of Towers Phase 12.3 yr overdueBramhacorp Limited · Pune City, PuneP52100004150· 81.8% built· 1 complaint
- Kumar Prospera - A3, A4 and A52.3 yr overdueKumar Agro Products Pvt Ltd - Kumar Company (Now known as Kumar Construction and Properties Pvt Ltd) JV · Magarpatta, PuneP52100022619· 88.1% built· 1 complaint
- BLUE ROOF SERA2.3 yr overdueRainbow Construction · SUS, PuneP52100024232· 72.9% built
- Mont Vert Grande Bldg Type G plot 22.3 yr overdueNiraj Kumar Associates Pvt Ltd · Pashan, PuneP52100020880· 90.9% built
- Poorti2.3 yr overdueRahul Ramesh Shah · Gultekadi, PuneP52100032542· 90.9% built
- NYATI ELAN CENTRAL I2.3 yr overduePSQUARE BUILDERS LLP · WAGHOLI, PuneP52100029005· 86.4% built· 1 complaint
- NYATI ELAN SOUTH I2.3 yr overduePSQUARE BUILDERS LLP · WAGHOLI, PuneP52100029008· 86.4% built
- Mayuri Infinity2.3 yr overdueMAYURI LANDMARKSLLP · TATA inora park, PuneP52100015703· filed Apr 2021 → now Apr 2024· 66.7% built· 1 complaint
- Annapurna Smruti2.3 yr overdueGokhale Empires LLP · Shukrawar Peth, PuneP52100026504· 81.8% built· 1 complaint
- FORTUNE SHUBHAN PHASE 2 BUILDING D2.3 yr overdueFORTUNE COPORATION · Pune (M Corp.), PuneP52100006125· filed Jun 2019 → now Apr 2024· 90.9% built
- BALKRUSHNA AND NANDALAL2.3 yr overdueVAINATEYA BUILD PRIVATE LIMITED · PUNE, PuneP52100004293· filed Dec 2019 → now Apr 2024· 90.9% built
- SHREE DREAMS2.3 yr overdueRAFIK AKBAR MULLA · Shirur, PuneP52100001844· filed Feb 2020 → now Apr 2024· 90.9% built
- TRIDENT2.3 yr overdueDEU ASSOCIATES · PIMPLE NILKH, PuneP52100026732· 36.4% built
- Avani II2.3 yr overdueKamal Promoters & Builders. · Mohammadwadi chowk, PuneP52100015958· 51.8% built· 1 complaint
- Chinmay Pride2.3 yr overdueChinmay Pride · Mahavir Nagar, PuneP52100031331· 63.6% built
- VENKATESH GRAFFITI ELAN PHASE 12.2 yr overdueSHREE VENKATESH BUILDCON PVT LTD · Keshav Nagar, Mundhwa, PuneP52100023431· 90.9% built
- SAWALI APARTMENTS2.2 yr overduePARMAR REALTY · PARVATI, PuneP52100032232· 53.6% built
- RAGHUNANDAN KASTURI/ KAMTHE PATIL BUSINESS CENTER2.2 yr overdueRAGHUNANDAN ASSOCIATES · KONDHWA BK, PuneP52100020129· 81.8% built
- WESTBROOK2.2 yr overdueTara Constructions · AMBEGAON, PuneP52100003178· filed Sept 2020 → now May 2024· 68% built· 14 complaints
- MUKUND2.2 yr overdueKotibhaskar Infrastructures &Developers Pvt.Ltd. · MAHARSHI KARVENAGAR, PuneP52100045860· 90% built
- SOHAM GALAXY2.2 yr overdueNANDU NARHARI JAGTAP · PUNE, PuneP52100029013· filed Dec 2023 → now Jun 2024· 10% built
- Blue Ridge Project E Land T24 and T252.2 yr overdueParanjape Schemes (Construction) Ltd. · Hinjewadi, PuneP52100016328· 99.9% built· 1 complaint
- KUTUMB PRIME2.2 yr overdueNAIKNAVARE BUILDCON PVT LTD · Mawal, PuneP52100002348· filed Jun 2019 → now Jun 2024· 60.5% built
- Three Jewels2.1 yr overdueSnowflower Properties Private Limited · Kondhwa, PuneP52100006160· filed Dec 2023 → now Jun 2024· 71.8% built
- LAXMI AVENUE2.1 yr overdueLAXMAN SAIBANA MEHETRE · NEAR PRISTINE PROLIFE PHASE III, PuneP52100024445· 86.4% built
- AMEY2.1 yr overdueRanjekar Realty LLP · Kothrud, Pune, PuneP52100026733· 89.1% built
- ADI AVENTURA2.1 yr overdueADI HOMES · RAVET, PuneP52100016461· 87.9% built
- Savannah2.1 yr overdueSim Properties · wagholi, PuneP52100027297· 51.5% built
- DEVRAJ NISSARG2.1 yr overdueDEVRAJ BUILDERS AND DEVELOPERS · Baramati (M Cl), PuneP52100010031· filed Feb 2021 → now Jun 2024· 79.5% built· 1 complaint
- Borawake Shilp2.1 yr overdueUrban Creations · Satavvadi, PuneP52100028860· 77.3% built
- GREENVILLE BUILDING A12.1 yr overdueVision Realtors · Hadapsar, PuneP52100028126· 90% built· 1 complaint
- SPECTRUM2.1 yr overdueJOSHI BUILDCON LANDMARKS · Shivajinagar, PuneP52100032621· 68.2% built
- BHALCHANDRA PROSPERA2.1 yr overdueN B BHONDAVE PROMOTERS · RAVET, PuneP52100031692· 89.2% built· 1 complaint
- MILESTONE RKD DEVELOPERS2.1 yr overdueRKD DEVELOPERS · BANER, PuneP52100030844· 75.9% built
- Aldea Espanola Phase VI2.1 yr overduePuranik Buildcon Private Limited · Mahalunge, PuneP52100000537· 90.6% built· 1 complaint
- PRAYEJA CITY2.1 yr overduePRAYEJA CITY · Wadgaon Budruk, PuneP52100010668· filed Nov 2018 → now Jun 2024· 85.5% built· 11 complaints
- Mangalam homes2.1 yr overdueYashashree Group · Dudulgoan Moshi, PuneP52100021772· 61.4% built
- Gagan Utopia2.1 yr overdueGAGAN BUILDSCAPES LLP · Mundhwa, PuneP52100005074· filed Dec 2019 → now Jun 2024· 63.3% built· 2 complaints
- Megapolis Saffron - A3 to A92.1 yr overduePegasus Properties Pvt. Ltd. · Rajiv Gandhi Infotech Park, Phase 3, PuneP52100018779· 89.1% built
- SAPPHIRE TOWERS2.1 yr overdueCHAURANG VENTURES · CHOVISAWADI, PuneP52100027242· 89.5% built
- NANDANVAN2.1 yr overduePENTAGON PROPERTIES · Haveli, PuneP52100008374· filed Sept 2021 → now Jun 2024· 95.5% built
- PALAASH SADAPHULI PHASE 2 A1 WING2.1 yr overdueGS ASSOCIATES · Varale, PuneP52100005853· filed Apr 2018 → now Jun 2024· 81.8% built· 20 complaints
- GANDHI TOWERS2.1 yr overdueJAYSHREE SATISH GANDHI · DAUND, PuneP52100016096· 36.4% built
- VENKATESH GRAFFITI ELAN PHASE 22.1 yr overdueSHREE VENKATESH BUILDCON PVT LTD · KESHAVNAGAR MUNDHWA, PuneP52100026737· 90.9% built
- SUKHWANI NYSA2.1 yr overdueSUKHWANI LANDMARK · RAVET, PuneP52100026493· 81.6% built
- CASA ABRIGO2.1 yr overdueTECHSTONE CONSTRUCTIONS LLP · HADAPSAR, PuneP52100026227· 90.9% built
- Green park2.1 yr overdueAnishka Developers Pvt. Ltd. · Kondhwa Bk, PuneP52100000501· filed Dec 2022 → now Jun 2024· 98.2% built
- Sai Sanskruti2.1 yr overdueHORIZON REALTY · Kharadi, PuneP52100025975· 90.9% built
- Splendid Lake view2.1 yr overdueYASHADA HOMES · PASHAN, PuneP52100021727· 90.9% built
- Sai Sparsh-A1, A22.1 yr overdueJalan Associates · Bhor, PuneP52100003561· filed Dec 2018 → now Jun 2024· 99.1% built
- Guardian Cityscapes Phase 12.1 yr overdueGuardian Homes Private Limited · Dattawadi, PuneP52100003214· 75.2% built· 4 complaints
- AURORA2.1 yr overdueMagnum Developers · GAT NO.927 PART, PuneP52100030790· 81.8% built
- Yes Residency2.1 yr overdueYemul& Sancheti Associates · Hadapsar, PuneP52100010630· filed Dec 2018 → now Jun 2024· 79.5% built· 2 complaints
- SPRING GARDENS PHASE - I2.1 yr overdueAchalare Realtors Private Limited · BORHADEWADI, PuneP52100026121· 90.9% built
- BHALCHANDRA VIHAR PHASE - IV/M32.1 yr overdueN B BHONDVE BUILDERS · RAVET, PuneP52100047005· 81.8% built
- PLATINUM TOWERS2.1 yr overdueLaxman Sopanrao Nimhan · wakad, PuneP52100016501· 90.9% built
- GAYATRREE LEGACY2.1 yr overdueGAYATRREE PROPERTIES · Chikhali, PuneP52100013335· filed Dec 2018 → now Jun 2024· 69.7% built· 5 complaints
- PALAASH SADAPHULI2.1 yr overdueGS ASSOCIATES · Varale, PuneP52100003228· filed Apr 2018 → now Jun 2024· 90.9% built· 21 complaints
- GREENVILLE BUILDING A42.1 yr overdueVision Realtors · HADAPSAR, PuneP52100052689· 90.9% built
- ARCHANA PARADISE WING A2.1 yr overdueKANIFNATH REALITY · MOHAMMADWADI, PuneP52100026701· 51.4% built
- ACORN PARK PHASE I2.1 yr overduePANTHEON ASSOCIATES LLP · wakad, PuneP52100028087· 86.4% built
- Laxmi Homes2.1 yr overduePokar Realty · Haveli, PuneP52100025463· filed Jul 2023 → now Jun 2024· 72.7% built
- Sukhniwas2.1 yr overdueAmol Ajit Ravetkar · Shivajinagar, PuneP52100009654· filed Feb 2021 → now Jun 2024· 90.9% built
- Swapnalok Nagari, Building No -32.1 yr overdueSWAPNALOK DEVELOPERS · Bhor, PuneP52100017102· 81.8% built
- DESTINATION EL PROGRESO2.1 yr overdueEL PROGRESO VENTURES · MOSHI PRADHIKARAN, PuneP52100026761· 57.6% built
- YAHAVI-TOWER-1-OAK2.1 yr overdueIMAGE REALTY PRIVATE LIMITED · OXFORD GOLF COURSE, PuneP52100028031· 81.8% built· 1 complaint
- GOKHALE SERENITY2.1 yr overdueSUDHIR MAHADEV GOKHALE · DHAYRI, PuneP52100028814· 73.3% built
- Swapnalok Nagari Commercial Building2.1 yr overdueSWAPNALOK DEVELOPERS · Bhor, PuneP52100017103· 81.8% built
- GOLDEN WINDS Building D Phase 52.1 yr overdueGOLDEN BRICKS DEVELOPERS · Opposite D Y Patil Knowledge City Off Porwal Road, PuneP52100027754· 81.8% built
- SAPPHIRE TOWERS 22.1 yr overdueCHAURANG VENTURES · CHARHOLI PHATA, CHOVISAWADI, PuneP52100031392· 89.5% built
- SHERLYN AVENUE2.1 yr overdueSHARAD SOPAN SHENDE · Pisoli, PuneP52100001087· filed Feb 2021 → now Jun 2024· 66.1% built
- NYATI ELITE2.1 yr overdueNITIN DWARKADAS NYATI · UNDRI VILLAGE, PuneP52100045651· 83.5% built
- KASTURI2.1 yr overdueMORYA LANDMARKS · BEHIND SEASONS HOTEL NEAR CROMA MALL AUNDH, PuneP52100048116· filed Jan 2024 → now Jun 2024· 63.6% built
- Dynamic Grandeur2.1 yr overdueDYNAMIC REALTY ENTERPRISES · Undri, PuneP52100005396· 85% built
- MANTRA CITY 360 PHASE042.1 yr overdueMANTRA ISLAND HOMES TALEGAON LLP · TALEGAON, PuneP52100001457· filed Oct 2019 → now Jul 2024· 90.9% built· 5 complaints
- 41 EVOKE PHASE 12.1 yr overdueKRIASLA ASSOCIATES · KOHALI GAS SERVICE, PuneP52100026277· 45.2% built· 2 complaints
- Vtp Cygnus- Nation R1-Tower 82.1 yr overdueAshdan Developers Private Limited · Manjri, PuneP52100007722· filed Jul 2023 → now Jul 2024· 90.9% built· 23 complaints
- Saarrthi Swadesh2.1 yr overdueSiddharth Properties · Mawal, PuneP52100003849· filed Sept 2018 → now Jul 2024· 90.9% built· 3 complaints
- Metro Life Bizz Bay2.1 yr overdueRAMA SYNERGY SPACES · Next to Indira College of Commerce and Science, PuneP52100022156· filed Jul 2023 → now Jul 2024· 90.9% built· 2 complaints
- TRIDENT2.1 yr overduePARANJAPE SCHEMES (CONSTRUCTION) LTD · Wakad, PuneP52100004511· filed Jul 2023 → now Jul 2024· 92.5% built· 2 complaints
- Sanghavi Paradise A Building2.1 yr overdueSanjay Walchand Sanghavi · Sanghavi Nagar, PuneP52100017993· filed Sept 2023 → now Jul 2024· 90.9% built
- LOTUS AVENUE2.1 yr overdueMAULI DEVELOPERS · CHOVISWADI, PuneP52100022298· 81.4% built
- LEGACY IVY2.1 yr overdueLEGACY LIFESPACES LLP · Punawale, PuneP52100029412· 77% built
- NYATI EMBRACE I2.1 yr overdueNITIN DWARKADAS NYATI · UNDRI, PuneP52100002290· 39.4% built
- Shravan Corner2.1 yr overdueSuraj Buildcon · Pimpri Chinchawad (M Corp.), PuneP52100013651· filed Oct 2018 → now Jul 2024· 60% built
- Sun-Srushti Greens2.1 yr overdueSRUSHTI DEVELOPERS · Pimpri Chinchawad (M Corp.), PuneP52100009844· filed Dec 2019 → now Aug 2024· 80% built
- Eden Spaces Phase 22.1 yr overdueElysian Realty · Kiwale, PuneP52100025591· filed Jun 2023 → now Aug 2024· 86.4% built
- DOLPHIN GARIMA2.0 yr overdueDOLPHIN VASTU · RAVET, PuneP52100030737· filed Dec 2023 → now Aug 2024· 81.8% built
- Bhakti Park2.0 yr overduePravin Haibatrao Shinde · Ambegaon, PuneP52100024924· filed Dec 2023 → now Aug 2024· 28.2% built
- VENTURE CITY A AND D WING2.0 yr overdueVENTURE GROUP · DUDULGAON, PuneP52100019311· filed Dec 2022 → now Aug 2024· 90.9% built· 1 complaint
- REAL DREAM HOMES WING A AND B2.0 yr overdueREAL BUILDCON BUILDERS AND DEVELOPERS · GANESH NAGAR, PuneP52100021993· 99.5% built
- Construction of 760 EWS tenaments on survey No 12 part at Talegaon Dabhade2.0 yr overduePUNE HOUSING AND AREA DEVELOPMENT BOARD · Joshiwada, PuneP52100019009· filed Jun 2022 → now Aug 2024· 86.8% built
- Dixit Sneh Sankul Phase 12.0 yr overdueSahasrabudhe & Kanitkar Associates · Nene Ghat, PuneP52100032280· filed Apr 2024 → now Aug 2024· 83.9% built
- United Athashri2.0 yr overdueTen Corner Developers LLP · Lohegaon, PuneP52100033894· filed Mar 2024 → now Aug 2024· 65.5% built
- Legacy Celestia2.0 yr overdueLegacy Lifespaces LLP · Wakad, PuneP52100030612· 90.9% built
- Nakshatra1.9 yr overdueANGAL & CO · Nimhan Mala, PuneP52100019074· 90.9% built· 5 complaints
- Mi Casa1.9 yr overdueMarimagnum Constructions · UNDRI, PuneP52100009650· filed Mar 2020 → now Sept 2024· 96.4% built
- TROVE1.9 yr overdueKALASH PROPERTIES · BANER, PuneP52100031289· filed Sept 2023 → now Sept 2024· 95.5% built
- NYATI EVOLVE I1.9 yr overdueNYATI GEETA ASSOCIATES · MUNDHWA, PuneP52100022030· 93.5% built
- NYATI EMPRESS1.9 yr overdueNYSHAA BUILDERS LLP · LOHEGAON, PuneP52100022492· 81.8% built
- VJ Town Centre1.9 yr overdueVilas Javdekar Eco Shelters Private Limited · Near Indira College, Wakad, PuneP52100028755· 84.1% built· 3 complaints
- UDYAM BIZ CASA1.9 yr overdueKADU PROPERTIES LLP · Saswad, PuneP52100026231· filed Jun 2024 → now Sept 2024· 81.8% built
- NYATI EVOLVE II1.9 yr overdueNYATI GEETA ASSOCIATES · MUNDHWA, PuneP52100022029· 85.1% built
- VENKATESH GRAFFITI GLOVER PHASE 11.9 yr overdueSHREE VENKATESH BUILDCON PVT LTD · KESHAV NAGAR MUNDHWA, PuneP52100025621· 90.9% built
- Sukhwani Araya1.9 yr overdueSukhwani Associates · Rahatani, PuneP52100031415· 81.8% built
- Park Infinia - L2, L3, L4, K4, K5 and J41.9 yr overdueKumar Properties and Real Estate Pvt. Ltd. · Hadapsar, PuneP52100026185· 87.6% built
- Devanshi Nirmiti1.9 yr overdueNirmiti Realty · Galinde nagar, PuneP52100045661· 81.8% built
- Megapolis Saffron - A10 to A141.9 yr overduePegasus Properties Pvt. Ltd. · Rajiv Gandhi Infotech Park Phase 3, PuneP52100021609· 90.7% built
- DHANASHREE AANAND 11.9 yr overdueAtria Constructions · HANDEWADI CHOWK, PuneP52100031055· 90.9% built
- AAKANKSHA RESIDENCY1.9 yr overdueSHARVIN BUILDERS LLP · KATRAJ, PuneP52100033307· filed Dec 2023 → now Sept 2024· 58.2% built
- PRISM CITY-INDIGO1.9 yr overdueSWASTIK DIAMOND REALTY · CHARHOLI, PuneP52100030026· 88.2% built
- VJ IndiLife1.9 yr overdueVILAS JAVDEKAR GREENSCAPE DEVELOPERS LLP · Pashan, PuneP52100028030· 86.8% built· 2 complaints
- NYATI EVOLVE III1.9 yr overdueNYATI GEETA ASSOCIATES · MUNDHWA, PuneP52100026448· 96.2% built
- Madhukosh1.9 yr overdueKakkad Housing · Balewadi, PuneP52100019179· 74.1% built
- AMOGH HEIGHTS1.9 yr overdueAMOGH PROMOTERS & BUILDERS · PARVATI, PuneP52100025019· 50.9% built
- SUVIDHA SHARADA VIHAR1.9 yr overdueSUVIDHA SCHEMES · 1639A SADASHIV PETH, PuneP52100031448· 81.8% built
- VTP Beaumonde-Nation R2 T11.8 yr overdueAshdan Developers Private Limited · Manjri, PuneP52100009535· filed Jan 2022 → now Oct 2024· 88% built· 25 complaints
- AASARA Crystal Heights1.8 yr overdueSandeep Shivaji Tapkir · Dehu Phata, PuneP52100022365· filed Oct 2023 → now Oct 2024· 90.5% built
- Tara Towers1.8 yr overdueHublikar Constructions · Baner Residency Sakal Nagar, PuneP52100049226· 51.8% built
- Kalpataru Serenity - Bldg. 21.8 yr overdueKalpataru Gardens Pvt. Ltd. · PUNE, PuneP52100015855· 89.5% built· 1 complaint
- SHREERAM VRUNDAVAN1.8 yr overdueSHREERAM EMPIRE · JIJAMATA CHOWK, PuneP52100034163· 81.8% built
- Godrej Hillside 11.8 yr overdueMahalunge Township Developers LLP · Mahalunge, PuneP52100022099· 81.8% built· 5 complaints
- Divyash Residency1.8 yr overdueNihar Estates LLP · Baner, PuneP52100053119· 78.2% built
- PLOT NO. 10, VIVA,PIRANGUT,PUNE1.8 yr overduePACT REAL ESTATE PRIVATE LIMITED · Pirangut, PuneP52100002702· 72.1% built
- Godrej Hillside 21.8 yr overdueMahalunge Township Developers LLP · Mahalunge, PuneP52100022153· 81.8% built· 3 complaints
- VISION ACE PHASE II1.8 yr overdueVISION ACE · OPP INDIRA SCHOOL NEAR AKSHRA SCHOOL TATHAWADE, PuneP52100022545· 94.8% built
- Usha Enclave1.8 yr overduePATWARDHAN PROJECTS · Bhide Bag Behind Abhiruchi mall Vadgaon, PuneP52100031888· 73.6% built· 1 complaint
- AIKYAM1.8 yr overdueSHREENATH ASSOCIATES · NEAR VENKATESH IMPERIYA, PuneP52100048456· 55.5% built
- CAPITAL ONE1.8 yr overdueSWOJAS ICON CONSTRUCTIONS LLP · BHAMBURDA SHIVAJINAGAR, PuneP52100033168· 81.8% built
- ADORN ALCAZAR-I1.8 yr overdueHASIB AHMED SHAIKH · KONDHWA BUDRUK, PuneP52100019924· 90.9% built
- Chinmay Heritage Phase 21.7 yr overdueChinmay Heritage · Niranjan Society, PuneP52100028113· 63.6% built
- PLOT NO 8, VIVA, PIRANGUT1.7 yr overduePACT REAL ESTATE PRIVATE LIMITED · Mulshi, PuneP52100002113· 78.2% built
- ARUNODAY CLASSIC1.7 yr overdueVAISHNAVI GROUP OF CONSTRUCTION · TALEGAON STATION, PuneP52100021781· filed Dec 2023 → now Nov 2024· 54.1% built
- Aditya Apartments Condominium1.7 yr overdueKelkar Housing LLP · Mahaganesh Colony, Kothrud, PuneP52100035170· filed Sept 2024 → now Nov 2024· 90.9% built
- PLANNING DESIGNING OBTAINING APPROVALS AND CONST OF 680 MIG TS ON S NO 126,127,1 TATHAWADE PUNE PH I1.7 yr overduePune Housing & Area Development Board · Bapu Buwaji Nagar, PuneP52100031648· 90.9% built· 1 complaint
- AMBAR RESIDENCY B BUILDING1.7 yr overdueMEHTA BUILDERS · JALOCHI, PuneP52100033604· 56.8% built
- AMRUT AURA1.7 yr overdueSIMMONI DEVELOPERS · MOSHI, PuneP52100032317· filed Dec 2023 → now Dec 2024· 80.9% built
- SAHARA EMERALD1.7 yr overdueSAHARA BUILDERS · BHEKRAINAGAR, PuneP52100033675· 9.4% built· 1 complaint
- ANAND EXCLUSIVE1.7 yr overdueANAND CONTRACTORES AND DEVELOPERS · BABRAS MALA INDAPUR, PuneP52100025418· 90.9% built
- Sai City1.7 yr overdueRaju Dnyandev Gaikwad · Daund, PuneP52100003598· filed Dec 2022 → now Dec 2024· 90.9% built
- Chaitanya Srusti1.7 yr overdueCHAITANYA DEVELOPERS · Daund, PuneP52100003910· filed Feb 2021 → now Dec 2024· 63.6% built
- GULMOHAR PARK B PHASE 21.6 yr overdueMercury Artharaj Landmarks AOP · DEHU, PuneP52100023073· filed Dec 2023 → now Dec 2024· 90.9% built
- SOLITAIRE BUSINESS HUB KALYANINAGAR1.6 yr overdueCLASSIC PROMOTERS & BUILDERS PVT LTD · YERWADA, PuneP52100014846· filed Jun 2023 → now Dec 2024· 68% built· 7 complaints
- Goodwill Crescent1.6 yr overdueChoice Lifestyle · Keshav Nagar, PuneP52100022861· 90.8% built
- KUMAR SELENA A BUILDING1.6 yr overdueKumar Construction and Properties Pvt Ltd · PASHAN, PuneP52100023773· 63.6% built
- DHANLAXMI ICON1.6 yr overdueHARI OM DEVELOPERS · Haveli, PuneP52100018523· 35.9% built
- PEBBLES II F BUILDING1.6 yr overdueAbhinav Rainbow Developers & Promoters LLP · Bavadhan BK, PuneP52100000730· 81.8% built
- Tranquility Annexe A and B Wing Phase 11.6 yr overdueK AND B ASSOCIATES · Manjri Stud Farm, PuneP52100019051· 90.9% built
- VJ Grand Central1.6 yr overdueVilas Javdekar Eco Shelters Private Limited · Wakad, PuneP52100026304· 89.5% built· 1 complaint
- RANGAI RESIDENCY1.6 yr overdueRAJRATNA PROMOTORS AND BUILDERS · BHOSARI, PuneP52100013661· filed Dec 2022 → now Dec 2024· 90.9% built
- Shree Ganesh Heights1.6 yr overdueShree Ganesh Developers · Haveli, PuneP52100051487· filed Dec 2023 → now Dec 2024· 90.9% built
- Magnolia Business Centre1.6 yr overduePARANJAPE SCHEMES (CONSTRUCTION) LTD · Pashan, PuneP52100021866· 90.9% built
- iOS Tathawade1.6 yr overdueLinux Group · Tathawade, PuneP52100027952· filed Jul 2024 → now Dec 2024· 95.5% built· 58 complaints
- Kalpataru Exquisite - Wing 31.6 yr overdueKalpataru Retail Ventures Private Limited · Wakad, PuneP52100018100· 90.3% built
- GANGA LEGEND A3 AND B3..1.6 yr overdueLegends County Landmark Pvt Ltd · Bavdhan, PuneP52100000255· 73.8% built· 10 complaints
- Forest Trails Highland Tower 9, 10 and 111.6 yr overduePARANJAPE SCHEMES (CONSTRUCTION) LIMITED · Bhugaon, PuneP52100000067· filed Dec 2022 → now Dec 2024· 95.5% built· 13 complaints
- Ashanand Residency G Building1.6 yr overdueAnand Deoram Tambe · Khed, PuneP52100019866· 30.9% built
- Kalpataru Jade Residences E1.6 yr overdueAstrum Developments Private Limited · Haveli, PuneP52100001392· 73.5% built· 1 complaint
- Building Wing A Phase I Sudarshan Apartment Karve Nagar Pune1.6 yr overdueAnubhavshri Realty Pvt. Ltd. · Village Hingne Budruk, PuneP52100023468· 61.8% built
- Yashwin SukhNiwas1.6 yr overdueGROWISA ADVISORS · Hinjawadi, PuneP52100025982· 90.1% built
- ROHAN ANAND PHASE I1.6 yr overdueROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED · Somatane, PuneP52100023186· 90.6% built· 1 complaint
- Legacy Aeon1.6 yr overdueLegacy Homes · Near Kalyan Bhel, PuneP52100020258· 77.3% built
- Kalpataru Jade Residences F1.6 yr overdueAstrum Developments Private Limited · Haveli, PuneP52100000869· 79.9% built· 4 complaints
- GANGA GLITZ G UNDRI PUNE1.6 yr overdueLegends County Landmark Pvt Ltd · UNDRI, PuneP52100024304· 81.8% built
- ACE AURUM III TOWER 061.6 yr overdueJHAMTANI REALTY PRIVATE LIMITED · RAVET, PuneP52100025056· 50.2% built
- Aero East PH II1.6 yr overdueM/S MIRACLE GURUKRUPA DEVELOPERS · Undri, PuneP52100018765· 81.8% built
- Kalpataru Jade Residences C1.6 yr overdueAstrum Developments Private Limited · Haveli, PuneP52100000676· 80.5% built· 5 complaints
- Ashanand Residency F Buidling1.6 yr overdueAnand Deoram Tambe · Khed, PuneP52100019921· 72.7% built
- Kalpataru Exquisite - Wing 21.6 yr overdueKalpataru Retail Ventures Private Limited · Wakad, PuneP52100001266· 61.8% built
- Madhuvan 5 76C1.6 yr overdueMagarpatta City Development Co. Pvt. Ltd. · Mohammadwadi, PuneP52100025506· 18.9% built
- Madhuvan 4 76B1.6 yr overdueMagarpatta City Development Co. Pvt. Ltd. · Mohammadwadi, PuneP52100025447· 9% built
- Kalpataru Jade Residences G1.6 yr overdueAstrum Developments Private Limited · Haveli, PuneP52100018194· 78.5% built
- Kalpataru Exquisite - Wing 11.6 yr overdueKalpataru Retail Ventures Private Limited · Wakad, PuneP52100000298· 55.9% built· 1 complaint
- GANGA SERIO E F BUILDING1.6 yr overdueGOEL GANGA LANDMARKS LLP · KHARADI, PuneP52100023713· 90.9% built· 2 complaints
- Megapolis Saffron - Shops1.6 yr overduePegasus Properties Pvt. Ltd. · Rajiv Gandhi Infotech Park Phase 3, PuneP52100034988· filed Dec 2023 → now Dec 2024· 70.6% built