Delayed projects in Pune
3,375 MahaRERA-registered projects in Pune are past the possession date on file and still under 100% built. Where the promoter has formally revised the date, the original is shown alongside so you can see what changed.
Page 13 of 17
- PYRAMID COUNTY BHUKUM2.9 yr overduePRASAD LIFESPACES LLP · BHUGAON, PuneP52100000387· filed Mar 2022 → now Sept 2023· 88.6% built· 1 complaint
- PGD PINNACLE - A WING2.9 yr overduePGD Land LLP · KESHAVNAGAR, PuneP52100024896· 90.9% built
- Nyati Elan West III2.9 yr overduePSQUARE BUILDERS LLP · WAGHOLI, PuneP52100025599· 88.1% built
- Trinity Greens2.9 yr overdueRajmata Realty · Near Bhumkar chowk, PuneP52100021005· 75.8% built
- VASANT VIHAR B WING2.9 yr overdueA R DEVELOPERS · NARHE, PuneP52100022836· 55.5% built
- Shreyas Happy Homes2.9 yr overdueShreyas Shelters · Bhor, PuneP52100004564· 83.6% built· 4 complaints
- SHAMBHAVI2.8 yr overdueM/S KHARDE PATIL · NEAR WOODS ROYALE, PuneP52100023514· 90.9% built
- PARK TITANIUM PHASE II2.8 yr overduePride Purple Properties · WAKAD, PuneP52100001274· filed Oct 2022 → now Oct 2023· 90.9% built· 2 complaints
- ACE AASTHA BUILDING B2.8 yr overdueSAKSHI DEVELOPERS · OPP. TANISHQ ORCHID SOCIETY, PuneP52100016438· 83.6% built
- Bright Aristo2.8 yr overdueBrightera Builders · Dhore Wasti, PuneP52100011377· filed Dec 2020 → now Oct 2023· 81.8% built· 1 complaint
- SIDDHI ANAND RESIDENCY2.8 yr overdueANAND CONTRACTORS AND DEVELOPERS · BABRAS MALA, PuneP52100018538· 90.9% built
- MANIK SIGNIA2.8 yr overduePate Siddhashila Developers LLP · Shivajinagar (Bhamburda), PuneP52100022879· 95% built
- VISION ACE PHASE 12.8 yr overdueVISION ACE · TATHAWADE, PuneP52100017748· 95% built
- LEGACY MILLENNIA A2.8 yr overdueMILLENNIUM LEGACY DEVELOPERS · PUNAWALE, PuneP52100027317· 81.8% built
- JI TOWER2.8 yr overdueJADHAV CONSTRUCTION · BARAMATI, PuneP52100024294· 81.8% built· 2 complaints
- RANJEET HEIGHTS CO OP HSG SOCIETY2.8 yr overdueRAJESH DINESH VYAS · RAMBAUG COLONY, PuneP52100026612· 81.8% built
- Geras Adara2.8 yr overdueGera Realty Estates · Man, PuneP52100000889· 90.9% built
- SIDHIVINAYAK RESIDENCY2.8 yr overdueSWARAJ CONSTRUCTION · Pimpri Chinchawad (M Corp.), PuneP52100007687· filed Dec 2021 → now Oct 2023· 52.7% built
- VIVANTA LIFE VIPUL PHASE 12.8 yr overdueVIVANTA REALTY · Pimpri Chinchawad (M Corp.), PuneP52100001347· 81.8% built
- Ved - Ashritha Phase I2.8 yr overdueYogvinda Promoters & Developers Pvt. Ltd. · Katraj, PuneP52100002175· filed Aug 2019 → now Oct 2023· 40.9% built
- ELITE 12 PHASE 12.8 yr overdueS and S Associates · Pune City, PuneP52100031737· 90.9% built
- 41 Estera Phase 22.8 yr overdueSamarttha Trimurti Properties · PUNAWALE, PuneP52100014226· filed Mar 2022 → now Nov 2023· 90.9% built
- THE ADDRESS PHASE-32.7 yr overdueSOL Developers · OPP. BORATE VASTI, MOSHI, PuneP52100020839· 78.8% built
- GOBIND REGENCY2.7 yr overdueSUKHMANI CONSTRUCTIONS · Khed, PuneP52100005810· 66.4% built
- PARITOSH D2.7 yr overdueSHARADA ALLIANCE SHELTERS · BALEWADI, PuneP52100023380· 65.5% built
- Prathamesh Excellencia2.7 yr overduePrathamesh Developers & Builders · Jeevan Nagar, Tathawade, PuneP52100020042· filed Mar 2023 → now Dec 2023· 95.5% built
- 61 IDEAL2.7 yr overdueSAMARTH BUILDERS · IDEAL COLONY, PuneP52100030155· 72.7% built
- Aaradhyam Phase I2.7 yr overdueJairaj Developers Unit 11 · -, PuneP52100016084· 74.1% built
- Sai Ellouera2.7 yr overdueSAI LANDMARKS LLP · Wakad, PuneP52100009634· filed Dec 2020 → now Dec 2023· 85.5% built
- SANSKAR RESIDENCY2.7 yr overdueSANSKARDEVELOPERS · CHOVISAWADI, PuneP52100005476· filed Jan 2021 → now Dec 2023· 81.8% built
- KRUSHNAKUNJ HOUSING SOCIETY2.7 yr overdueDISHA CONSTRUCTIONS · SAWANT NAGAR, PuneP52100023366· 81.8% built
- MANTRA 7 HILLS PHASE IV2.7 yr overdueMANTRA BUILDCRAFTS PRIVATE LIMITED · Haveli, PuneP52100001757· filed Dec 2022 → now Dec 2023· 90.9% built· 2 complaints
- Puneville Phase II Cluster A2.7 yr overdueBENCHMARRK REALTY PRIVATE LIMITED · Punawale, PuneP52100000440· filed Dec 2022 → now Dec 2023· 90.9% built
- DAFFODILS K BUILDING2.6 yr overdueVISHHRAM DEVELOPERS · SOMATANE, PuneP52100011485· 81.8% built· 1 complaint
- VARDHAMAN PALM ROSE2.6 yr overdueCHHAJED ASSOCIATES · PUNAWALE, PuneP52100014575· 94.4% built· 1 complaint
- POORVA SHRUSHTI A BUILDING2.6 yr overdueTejas Pooja Associates · WADGOAN KH, PuneP52100014650· 90.9% built
- AMAR LANDMARK2.6 yr overduePRITAM CONSTRUCTIONS PVT LTD · Haveli, PuneP52100015584· 81.8% built
- Lotus Pearls2.6 yr overdueSwayambhu Properties · Mamurdi, PuneP52100002516· 14.5% built
- REVELL ORCHID PHASE IV BUILDING F2.6 yr overdueABHAY INDRABHAN FULFAGAR · LOHEGAON, PuneP52100015949· 27.7% built
- BHALCHANDRA VIHAR PHASE - I / A and B2.6 yr overduePOLITE BUILDTECH · RAVET, PuneP52100015399· 82.7% built· 1 complaint
- SNEH PARK2.6 yr overdueAssociated Recons LLP · KOTHRUD, PuneP52100027499· 72.7% built
- Srinivasa Enclave2.6 yr overdueSrinivasa Constructions · AMBEGAON KH, PuneP52100001331· 49.1% built
- MEMORIES 90 -PHASE I2.6 yr overdueM/s NAMO DEVELOPERS · -, PuneP52100016824· 76.8% built
- EASTWOODS2.6 yr overdueAnand Constructions · Vimannagar, PuneP52100022931· 52.3% built
- Aura Grandeur2.6 yr overdueVSR Realty LLP · Pune City, PuneP52100010905· filed Jul 2019 → now Dec 2023· 90.9% built
- MAJESTIQUE OASIS2.6 yr overdueM/S. SHRADDHA DEVELOPERS · wagholi, PuneP52100013786· 71.1% built· 2 complaints
- SAI SHRADDHA PARK PH II WING M N O P PROJECT2.6 yr overdueGAURI SPACE CREATOR · Pimpri Chinchawad (M Corp.), PuneP52100009376· 70.2% built· 1 complaint
- SHREE PARSHVA ICON2.6 yr overdueAJIT BABULAL LODHA · LOHAGAON, PuneP52100016398· 90.9% built
- EXCEL CELESTIA RESIDENCY2.6 yr overdueEXCEL HOUSING · PUNE, PuneP52100014266· filed Dec 2021 → now Dec 2023· 87.1% built
- Altus2.6 yr overdueArham Lifespace Realty · Balewadi, PuneP52100020726· 81.8% built
- Dominion Park2.6 yr overdueAmalfi Realty Pvt Ltd · Near PCMC water tank, PuneP52100024698· 10.5% built
- The Cliff Garden2.6 yr overdueVH Township Private Limited · Maan, Hinjawadi, PuneP52100015759· 90.9% built
- Siddhachal - A42.6 yr overdueViraj Properties (Now known as Viraj Properties & Real Estate Pvt Ltd) - Amogh Construction JV · Marketyard, PuneP52100018775· 90.9% built
- ARUN AION2.6 yr overduecelesta developers · Chinchwad, PuneP52100018655· 90.9% built· 1 complaint
- Mont Vert Spectra2.6 yr overdueGoyal Patel Construction · Haveli, PuneP52100011564· 90.9% built
- EXCEL CELESTIA RESIDENCY WING B AND C2.6 yr overdueEXCEL HOUSING · MOSHI DUDULGAON SHIV, PuneP52100015436· filed Dec 2022 → now Dec 2023· 95.5% built
- KalpaVruksha C2.6 yr overdueVaichal Constructions Pvt Ltd · -, PuneP52100019364· 90.9% built
- BA Swadesha- Phase 12.6 yr overdueSpectrum Realty · Moshi Borhadewadi, PuneP52100024275· 71.4% built· 1 complaint
- VANALIKA-PARADISE- III -3B2.6 yr overdueM/S. AVIOR MAJESTIQUE PROPERTIES · Mulshi, PuneP52100016963· 90.9% built· 2 complaints
- KONARK ALPHA2.6 yr overdueTreon Developers LLP · KHARADI, PuneP52100023108· 72.7% built
- Meghdoot Tower2.6 yr overdueV R Kulkarni & Associates · Haveli, PuneP52100020133· 90.9% built· 1 complaint
- 45 SHASHWAT AVENUE - B2.6 yr overdueSAMARTTHA PRISHA PROPERTIES · PUNAWALE, PuneP52100021932· 90.9% built· 5 complaints
- N B OPAL PHASE -I2.6 yr overdueNanasaheb Bhintade Spacess Pvt. Ltd. · Near Podar international school, PuneP52100023516· 98.2% built· 1 complaint
- RAJ RESIDENCY2.6 yr overdueSUMAN ASSOCIATES · RADHESHWARI NAGAR CO-OPERATIVE HOUSING SOCIETY, PuneP52100015150· 90.9% built
- Menlo Homes Hinjewadi Phase I2.6 yr overdueMenlo Homes LLP · Hinjewadi, PuneP52100014732· 81.8% built
- ROYAL CASSIA A WING2.6 yr overdueROYAL CASSIA A WING · Haveli, PuneP52100019483· 90.9% built· 1 complaint
- DEDGAONKAR ARCADE2.6 yr overdueTRINITY FACADES PRIVATE LIMITED · GURUWAR PETH PUNE, PuneP52100021263· 70.9% built
- GANGA LEGEND A4 AND B1..2.6 yr overdueLegends County Landmark Pvt Ltd · Bavdhan, PuneP52100000196· 76.9% built
- Building A3 Eon homes2.6 yr overdueHinjawadi Infradevelelopment Private Limited · Hinjwadi Ph-3, PuneP52100013714· 54.4% built· 2 complaints
- Aapla Ghar Paud 2 Phase I2.6 yr overduePhoenix Ventures · Paud, PuneP52100002798· 12.7% built· 1 complaint
- Green Park Business Center2.6 yr overduePrafulla Bhimdeo Taware · Near to Rui Hospital, PuneP52100014188· 90.9% built
- Vaiga2.6 yr overdueSOHANLAL SHANKARLAL VISHNOI · Chinchwad, PuneP52100022419· 99.8% built
- VTPSolitaire Building C AND D2.6 yr overdueWESTERNCITY TOWNSHIPS LLP · pashan, PuneP52100022428· 87.2% built· 3 complaints
- DAFFODIL GREENS F BUILDING2.6 yr overdueVISHHRAM NLP ASSOCIATES · DAUND, PuneP52100011911· 64.1% built· 2 complaints
- GOODWILL FABIAN PHASE 22.6 yr overdueChoice Developments · LOHGAON, PuneP52100027517· 99.1% built
- Majestique Rhythm County Phase I2.6 yr overdueMAJESTIQUE RISINGSUN LLP · Autade Handewadi, PuneP52100019616· 90.9% built
- Wakad Business Bay2.6 yr overdueMihir Projects · Behind Tip Top International Hotel, PuneP52100021744· 90.9% built· 1 complaint
- Millennium Manor2.6 yr overdueMillennium Developers · Chikhali, PuneP52100021632· 81.8% built
- Venkatesh Paradise B wing2.6 yr overdueSANJAY DNYANOBA JAGTAP · BUND GARDEN ROAD, PuneP52100001428· 37.5% built
- RIOLAND A WING2.6 yr overdueWAMAN KALATE INFRASTRUCTURE · WAKAD, PuneP52100024033· 72.7% built
- PLOT NO.7, VIVA, PIRANGUT2.6 yr overduePACT REAL ESTATE PRIVATE LIMITED · Pirangut, PuneP52100002681· 56.4% built
- MORELLA2.6 yr overdueGLOBAL PROPERTIES · MARUNJI, PuneP52100017772· 80% built
- ANTARA2.6 yr overdueSANRAJ REALTY · Yewalewadi, PuneP52100000698· 87.4% built
- HILLVEW RESIDENCY PHASE I PROJECT III BLDG N AND O2.6 yr overdueKUMAR BEHARAY PROPERTIES LLP · BEHIND MAHATMA SOCIETY KOTHRUD, PuneP52100014885· 90.9% built
- SAI KAMAL2.6 yr overdueACE DEVELOPER · NEXT TO KAUSHAL BUNGLOW, PuneP52100018894· 90.9% built
- Emerald Park2.6 yr overdueBalasaheb Vyankatrao Gaikwad · Punawale, PuneP52100001532· 69.1% built
- RAVITEJ2.6 yr overdueSRI KALPATRU REALTY PRIVATE LIMITED · DUDULGAON, PuneP52100019063· 88.8% built
- CASALINO TOWERS PHASE II2.6 yr overdueSAI SIDDHI PROMOTERS AND BUILDERS · HANDEWADI, PuneP52100023594· 9.1% built· 1 complaint
- WESTERN RIVER RESIDENCY2.6 yr overdueVGT Constructions · Bhosari, PuneP52100010759· filed Dec 2022 → now Dec 2023· 78.6% built
- SAI SHRADDHA PARK WING B C D E F G H I J K L PROJECT2.6 yr overdueSHIVAM DEVELOPERS · CHIKHALI, PuneP52100005202· 65.5% built
- INDRAYANI VATIKA2.6 yr overdueSANSKRUTI DEVELOPERS · PUNE, PuneP52100010977· 9.3% built
- Aapla Ghar Wagholi Annex 2 Phase I2.6 yr overdueMaple Homes LLP · Shiraswadi, PuneP52100006608· 18.2% built
- ABHILASHA2.6 yr overdueASHWAMEDH SPACES PRIVATE LIMITED · Kothrud, PuneP52100024895· 9.1% built
- SHIVRAJ RESIDENCY2.6 yr overdueSHREE SAI DEVELOPERS · PIRANGUTE, PuneP52100022479· 81.8% built
- VJ One Avenue2.6 yr overdueVilas Javdekar Eco Shelters Private Limited · Hinjawadi, PuneP52100025592· 76.1% built· 1 complaint
- Sun Enclave2.6 yr overdueNaresh Ramchandra Mittal · Haveli, PuneP52100024848· 86.4% built
- SWAPNAPURTI2.6 yr overdueJ J REALTIES · RAHATANI PCMC, PuneP52100025050· 90.9% built
- SHIVKRUPA PRESTIGE2.6 yr overdueSHIVKRUPA CONSTRUCTION · DHAYRI, PuneP52100023925· 62.7% built
- SHIVSHAKTI2.6 yr overdueATUL HARISHCHANDRA YELBHAR · CHAKAN NAGAR PALIKA, PuneP52100010645· filed Dec 2019 → now Dec 2023· 81.8% built
- AASAWARI CO. OP. HSG.SOCIETY2.6 yr overdueVYAS BUILDCON PVT. LTD. · IDEAL COLONY, PuneP52100024235· 81.8% built
- Kunal Iconia -commercial phase 12.6 yr overdueKunal Sulakshan Associates · mamurdi, PuneP52100006222· 81.8% built
- Horizons at Wakad, Phase-22.6 yr overdueADI REALTIES · Wakad, PuneP52100024872· 70.9% built
- 173 West Oaks2.6 yr overdueSigma Housing · Wakad, PuneP52100024201· 79.6% built
- 7 Plumeria Drive- Phase 22.6 yr overdueB A Consulting · Punawale, PuneP52100023970· 44.7% built
- NAMRATA GLORIA2.6 yr overdueNAMRATA CONSTRUCTION · RAVET PUNE, PuneP52100003691· 72.7% built
- Menlo Homes Kharadi Next Phase I2.6 yr overdueMENLO REALTY LLP · Wagholi, PuneP52100005881· 81.8% built· 1 complaint
- ASEEM2.6 yr overdueRANADE REALTORS LLP · GHORPADI, PuneP52100023060· 82.5% built
- Metro Life Maxima Residences Phase II2.6 yr overdueRAMA SYNERGY SPACES · Next to Indira College of Commerce and Science, PuneP52100023984· 75.3% built· 11 complaints
- MANORAMA HEIGHTS2.6 yr overdueMAULI KRUPA DEVELOPERS · SECTOR NO 9, PuneP52100024419· 28.2% built
- DHARA ICON2.6 yr overdueD R BHONDVE PROPERTIES · HAVELI, PuneP52100015049· 90.9% built
- MAYANK2.6 yr overdueRANADE REALTORS LLP · GHORPADI, PuneP52100022751· 73.2% built
- addressOne - Phase 52.6 yr overduePeninsula Land Limited · Near MCA Stadium Gahunje Pune, PuneP52100018855· 78.2% built· 5 complaints
- AMAR BUSINESS ZONE2.6 yr overdueJAYASHRI KAILASH WANI · Baner, PuneP52100004353· 90.9% built
- Goodwill Fabian Phase 12.6 yr overdueChoice Developments · lohgaon, PuneP52100019512· 98.2% built
- Nirman Milestone2.6 yr overdueNIRMAN VENTURE · Mukai Chowk, PuneP52100022161· 80% built· 1 complaint
- RACHANA ETERNIA2.6 yr overdueAthang Spaces LLP · BANER, PuneP52100024077· 81.8% built· 1 complaint
- EWS- Akurdi2.6 yr overduePIMPRI CHINCHWAD MUNICIPAL CORPORATION · Haveli, PuneP52100026117· 23.3% built
- DK ELEGANCE2.6 yr overdueATMARAM MANOHAR GORE · RAVET PUNE, PuneP52100017792· 86.5% built
- ATHARVA2.6 yr overdueKedar Vikasrao Deshpande · Baner, PuneP52100022966· 90.9% built
- 39 PART PLUS 40 PART WADGAON KH TAL HAVELI DIST PUNE PHASE I2.6 yr overduePMAY CELL,PUNE MUNICIPAL CORPORATION · WADGAON KH, PuneP52100023682· 90.9% built
- 43 Privet Drive- C Building2.6 yr overdueS S Properties · Balewadi, PuneP52100025169· 70% built
- YashONE Hinjawadi - Phase 12.6 yr overdueVilas Javdekar Eco Shelters Private Limited · Hinjawadi, PuneP52100019468· 99.2% built
- The Cliff Garden2.6 yr overdueVH Township Private Limited · Maan, Hinjawadi, PuneP52100004906· 90.9% built
- KINGSBURY PHASE II2.6 yr overdueJaikul Associates · D Y PATIL COLLEGE AREA, PuneP52100019148· 90.9% built
- GREEN SQUARE2.6 yr overdueRASKAR REALTORS THROUGH ITS PROPRIETOR VIJAY NIVRUTTI RASKAR · BORHADEWADI MOSHI, PuneP52100018311· 81.1% built
- K.D. HILLS2.6 yr overdueKULSHREE ASSOCIATES · Katraj, PuneP52100013446· 33.2% built
- Ashanand Residency C building2.6 yr overdueAnand Deoram Tambe · Khed, PuneP52100006808· 81.8% built
- VISION STARWEST PHASE - 22.6 yr overdueVISION CREATIVE DEVELOPERS · TATHAWADE, PuneP52100026625· 90.9% built
- Legacy Vista2.6 yr overdueLEGACY LIFESPACES LLP · Rahatani, PuneP52100024212· 86.4% built
- Sayama Phase 32.6 yr overduePuranik Builders Limited · Lonavala (M Cl), PuneP52100002137· 81.8% built
- GALAXY2.6 yr overdueASWANI PARADISE · WAKAD, PuneP52100017540· 79.1% built· 3 complaints
- CASALINO TOWERS - PHASE 12.6 yr overdueSAI SIDDHI PROMOTERS AND BUILDERS · HANDEWADI, PuneP52100014588· 18.2% built
- Nakshatra2.6 yr overdueKrishnaraj Developers · Kothrud, PuneP52100007857· filed Dec 2020 → now Dec 2023· 55.9% built
- Skyi Songbirds Phase C2.6 yr overdueEnerrgia Skyi Developers · Bhugaon, PuneP52100000805· filed Nov 2020 → now Dec 2023· 91.6% built· 7 complaints
- GANGA LEGEND A2 AND B42.6 yr overdueLegends County Landmark Pvt Ltd · BAVDHAN, PuneP52100021020· 83.9% built· 4 complaints
- SAMRUDDHI ISHA2.6 yr overdueSAMRUDDHI ENTERPRISES · KIVALE, PuneP52100006794· filed Dec 2018 → now Dec 2023· 70.9% built· 7 complaints
- PARIJAT HEIGHTS2.6 yr overdueNew Horizon Realty · Priyanka Nagari, PuneP52100005180· filed May 2020 → now Dec 2023· 55.5% built· 1 complaint
- GULAB SRUSHTI2.6 yr overdueBUTTEPATIL PROPERTIES · KOTHRUD, PuneP52100031652· 59.1% built
- SAI DWARKA PHASE 32.6 yr overdueMAA SANKALP BUILDCON · YAWALEWADI, PuneP52100011408· filed Dec 2019 → now Dec 2023· 45.8% built· 1 complaint
- ATLANTAIII2.6 yr overdueG K WONDERS · WAKAD, PuneP52100030916· 84.5% built
- Revati Residency2.6 yr overdueGAURAV BHARAT SHAH · BIBWEWADI MUNJERI, PuneP52100029407· 63.6% built
- ANANTRUKMINI2.6 yr overdueDAJIKAKA GADGIL DEVLOPERS .PVT.LTD . · Pune City, PuneP52100001340· filed Dec 2019 → now Dec 2023· 95.5% built· 1 complaint
- Pushpakunj Homes2.6 yr overdueBHAKTI BUILDERS · Near Lokmanya Hospital, PuneP52100031893· 72.7% built
- SAI DWARKA PHASE 12.6 yr overdueMAA SANKALP BUILDCON · YAWALEWADI, PuneP52100009316· filed Dec 2018 → now Dec 2023· 81.8% built· 2 complaints
- BLUE BELLS PHASE 22.6 yr overdueKAVITA DEVRAM WALHEKAR · RAJIV GANDHI INFOTECH PARK, PHASE - II, MAAN, HINJAWADI, PuneP52100031327· filed Mar 2022 → now Dec 2023· 81.8% built
- Millennium Atlas2.6 yr overdueMillennium Developers · Tathawade,Pune, PuneP52100035007· 81.8% built
- 18 Latitude Commercial2.6 yr overdueG D Square Developer · Punawale, PuneP52100008782· filed May 2019 → now Dec 2023· 81.8% built
- RUTUGANDH2.6 yr overdueNAKSHATRA BUILDCON · MHASKARNES COLONY 2, PuneP52100029278· 63.6% built
- SHIVRANG2.6 yr overdueRANJEKAR REALTY AOP · Sadashiv Peth, PuneP52100030980· 90.9% built
- NIRMAN VIVA -F2.6 yr overdueNIRMAN HOMES · Ambegaon Budruk, PuneP52100033468· 81.8% built
- OMKAR HERITAGE2.6 yr overdueOMKAR LIFESPACES · RADHESHWARI NAGAR, PuneP52100046095· 78.2% built
- CRYSTAL HOMES2.6 yr overdueCRYSTAL CREATIONS · Pimpri Chinchawad (M Corp.), PuneP52100002053· filed Dec 2019 → now Dec 2023· 90.9% built
- SWOJAS ONE2.6 yr overdueUNITED DEVELOPERS · Haveli, PuneP52100030604· 81.8% built
- SUVIDHI APARTMENT2.6 yr overdueCOSMO LIFESCAPES LLP · YERWADA, PuneP52100015773· filed Jun 2022 → now Dec 2023· 81.8% built
- SANKALP VASTU2.6 yr overdueSANKALP REALTY · charholi, PuneP52100029957· 90.9% built
- SARTHAK2.6 yr overdueAmco Landmark LLP · Pune City, PuneP52100030813· 81.8% built
- RUDRAKSHAM PH 12.6 yr overdueONKAR CONSTRUCTIONS · Haveli, PuneP52100003403· filed Jun 2021 → now Dec 2023· 90.9% built
- VRINDANAND ELITE2.6 yr overdueMAKWANA AND TANMAY CONSTRUCTION · KONDHWA BUDRUK, PuneP52100030243· 53.3% built· 3 complaints
- Renuka Gulmohar Phase II2.6 yr overdueHaveli, PuneP52100001835· filed Dec 2024 → now Dec 2023· 82.1% built
- SAI EMRALD2.6 yr overdueSAIESHWAR PROJECTSS · Pune (M Corp.), PuneP52100006251· filed Dec 2018 → now Dec 2023· 99.2% built· 1 complaint
- ESSENCIA HEIGHTS2.6 yr overdueSanskruti & Aditya Associates · BALEWADI STADIUM, PuneP52100007045· filed Feb 2021 → now Dec 2023· 90.9% built
- SAI SINDHU2.6 yr overdueSHREE VIGHNAHAR PROMOTERS AND BUILDERS PVT LTD · Junnar, PuneP52100001923· filed Jul 2019 → now Dec 2023· 67.7% built
- JAY MALHAR RESIDENCY2.6 yr overdueSHREE BUILDER AND DEVELOPER · SADASHIV PETH, PuneP52100023318· 90.9% built
- Nirman Vishnubaug2.6 yr overduePRIVEUS LIFESPACES LLP · ERANDWANE, PuneP52100023778· 90.9% built
- AMBAR RESIDENCY A BUILDING2.6 yr overdueMEHTA BUILDERS · JALOCHI, PuneP52100024670· 90.9% built
- AVAANTI RESIDENCES AND PREMIUM COMMERCIAL SPACES2.6 yr overdueOLYMPIA · Haveli, PuneP52100009000· filed Jun 2020 → now Jan 2024· 89.3% built
- Shri Swami residency2.6 yr overdueShri construction and developers · Rui, PuneP52100026512· 49.1% built
- ICON TOWER2.6 yr overdueGAIKWAD PROMOTERS · DANGE CHOWK HINJEWADI ROAD, PuneP52100030416· 81.8% built
- Geetanjali B2.6 yr overdueJOSHI BUILDCON LANDMARKS · Sahakarnagar, PuneP52100034370· 90.9% built
- K SQUARE2.6 yr overdueKHATRI AND KHATMODE ASSOCIATES · OPP VP COLLAGE, PuneP52100025484· 81.8% built
- Priyadarshan - J2.6 yr overdueKumar Agro Products Pvt Ltd · Jai Bhavani Nagar, PuneP52100029119· 90.9% built
- Gandharva Excellence Project III A Commercial A Building C Building2.6 yr overdueVinayak Pandharinath Bhongale · Borhadewadi Moshi, PuneP52100026856· 29.8% built· 1 complaint
- LUXOR2.5 yr overdueGAJANAN UTTAMRAO MANTE · NR BITWISE CO, BANER, PuneP52100022342· 90.9% built
- ESHAN CULTURE2.5 yr overdueESHAN DEVELOPERS · Mamurdi, PuneP52100009970· filed Dec 2019 → now Feb 2024· 67.3% built
- ANAND PRIDE2.5 yr overdueANAND CONTRACTORES AND DEVELOPERS · BABRAS MALA, PuneP52100021410· 90.9% built
- PARAMOUNT2.4 yr overdueBUILDCON DEVELOPERS · NEAR BARAMATI BANK, PuneP52100045480· 48.7% built
- GAIKWAD MIRO2.4 yr overdueGAIKWAD DEVELOPERS · GAIKWAD NAGAR, PuneP52100016064· 81.8% built
- Rajdheera Business Square2.4 yr overdueRajdheera Properties · Talegaon Station, PuneP52100033395· filed Mar 2023 → now Mar 2024· 54.5% built
- AANCHAL D BUILDING2.4 yr overdueSWAN PROPERTIES · Haveli, PuneP52100005073· filed Mar 2023 → now Mar 2024· 90.9% built
- A P Pinnacle Phase 12.4 yr overdueA P Construction · Haveli, PuneP52100019457· 86.4% built
- Godrej Rejuve2.4 yr overdueOXFORD REALTY LLP · Keshavnagar, PuneP52100018720· 90.9% built· 9 complaints
- SARA CITY C82.4 yr overdueJagrutsara Structures LLP · KHARABWADI, PuneP52100015654· 90.9% built
- Gagan Commerce Centre2.4 yr overdueGagan I-Land Township Private limited · Sangamwadi, Pune, PuneP52100016445· 4.5% built
- NANDAN PROBIZ2.4 yr overdueNANDAN ASSOCIATES · BALEWADI, PuneP52100001376· filed Mar 2022 → now Mar 2024· 81% built· 7 complaints
- Silver Crest Commercial Wing A and B2.4 yr overdueM/S Mahavir Realty · Wagholi, PuneP52100030182· filed Mar 2023 → now Mar 2024· 70.5% built
- AAPLE GHAR TOWNSHIP A AND E WING2.4 yr overdueWabale Patil Urbanizers · Tandulwadi, PuneP52100016436· 90.9% built
- SAI DARSHAN2.4 yr overdueSAI SHRADDHA DEVELOPERS · TATHAWADE, PuneP52100026605· 29.1% built
- ROHAN ABHILASHA 2 WING A2.4 yr overdueROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED · Wagholi, PuneP52100025655· 80% built
- ALANKAPURAM PH 3 A BUILDING2.4 yr overdueR K Lunkad Housing corporation · WADMUKHWADI, PuneP52100027434· 81.8% built
- Majestique City D Building2.4 yr overdueMANISH DWARKADAS MAHESHWARI · Pune-Nagar Road, PuneP52100019947· 90.9% built
- SARA CITY C112.4 yr overdueJagrutsara Structures LLP · KHARABWADI, PuneP52100015547· 90.9% built· 1 complaint
- TARANGAN APARTMENTS2.4 yr overdueHINDUSTAN BUILDERS · SHUKRAWAR PETH, PuneP52100051558· 86.8% built
- FLORIA BUILDING A2.4 yr overdueAKSHAY CHINTAN BUILDERS · Pune (M Corp.), PuneP52100003367· 46.4% built
- SARA CITY C92.4 yr overdueJagrutsara Structures LLP · KHARABWADI, PuneP52100015625· 90.9% built
- SARA CITY C102.4 yr overdueJagrutsara Structures LLP · KHARABWADI, PuneP52100015649· 90.9% built
- KALPAK HOMES KIRKATWADI PHASE II2.4 yr overdueSHUBHANKAR DEVELOPERS · KIRKATWADI, PuneP52100000741· filed Dec 2019 → now Mar 2024· 87.3% built· 7 complaints
- PRANAM TOWERS2.4 yr overdueAMIS CONSTRUCTIONS LLP · CHOVISAWADI, PuneP52100016611· 18.2% built
- Krushnai Vihar Phase-I2.4 yr overdueKrushnai Associates · Shirur, PuneP52100001766· filed Sept 2020 → now Mar 2024· 90.5% built
- Legacy Riverside2.4 yr overdueSun Properties · Chikhali, PuneP52100025012· 90.9% built
- Shubh Aarambh2.4 yr overdueSHUBH ASSOCIATES · DADACHI WASTI, PuneP52100028760· 90.9% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.