3,375 MahaRERA-registered projects in Pune are past the possession date on file and still under 100% built. Where the promoter has formally revised the date, the original is shown alongside so you can see what changed.
Page 15 of 17
- Periwinkle1.6 yr overdueAJIT GIRDHARILAL NAHAR · -, PuneP52100017310· 86.4% built
- SAI ANAND1.6 yr overdueSHREENATHJI LIFE SPACES · BIBWEWADI, PuneP52100035202· filed Dec 2023 → now Dec 2024· 90.9% built
- Kalpataru Exquisite - Wing D1.6 yr overdueKalpataru Retail Ventures Private Limited · Wakad, PuneP52100016932· 72.5% built· 3 complaints
- SPLENDID HOMES1.6 yr overdueSAGAR SHANTILALJI BHATEWARA · BANER PUNE, PuneP52100033350· filed Dec 2023 → now Dec 2024· 80% built
- VRINDAVAN1.6 yr overdueSOHAIL ISAQUE (ISAK) BAGWAN AND ISAQUE(ISAK) IBRAHIM BAGWAN · Jalochi, PuneP52100010752· 70.5% built
- PANAMA PARK1.6 yr overdueThe Kallyaanee Fortune Properties · Lohgaon, PuneP52100020820· 13.6% built
- ROHAN ABHILASHA 2 WING B1.6 yr overdueROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED · WAGHOLI, PuneP52100025681· 88.6% built
- Pyramid Axis1.6 yr overduePyramid Prasad Buildcon LLP · main Baner Road, PuneP52100021464· 99.1% built
- W-BIZ1.6 yr overdueAdi Siddhashila Associates · Wakad, PuneP52100024521· 53.9% built
- YashONE Wakad Central1.6 yr overdueVilas Javdekar Eco Shelters Private Limited · Wakad, PuneP52100020910· 95.2% built
- MHADA - Yashwin Encore1.6 yr overdueVilas Javdekar Lifestyle Developers Pvt. Ltd. · Opposite Sayaji Hotel, PuneP52100020924· 90.9% built
- Hirals Breeze1.6 yr overdueMangaldeep Associates & Developers · Rahatani, PuneP52100029974· filed Dec 2023 → now Dec 2024· 72.7% built
- SUKHWANI ASPIRE1.6 yr overdueBasant - Sukhwani · Kiwale, PuneP52100030795· 82.3% built
- Yashwin Encore1.6 yr overdueVilas Javdekar Lifestyle Developers Pvt. Ltd. · Opposite Sayaji Hotel, PuneP52100017756· 95.6% built· 3 complaints
- VaastuvivaE1.6 yr overdueB U BHANDARI VAASTU · Bhumkar Chowk, PuneP52100004510· 90.9% built
- Kalpataru Jade Residences B1.6 yr overdueAstrum Developments Private Limited · Haveli, PuneP52100000926· 79.2% built· 3 complaints
- AKSHAY GALAXY - BUILDING B1.6 yr overdueA. P. BHANDARI DEVELOPERS · Yewalewadi, PuneP52100028684· 61.8% built
- Aishwaryam Hamara Abhimaan1.6 yr overdueSAI ESSEN DEVELOPERS · Moshi, PuneP52100020889· 9.1% built
- PRISTINE GREENS PHASE III1.6 yr overduePRISTINE PROPERTIES · PUNE, PuneP52100024045· 98.2% built· 2 complaints
- MANTRA MAGIC PHASE 61.6 yr overdueMANTRA ISLAND HOMES CHIMBLI PRIVATE LIMITED · Chimbali, PuneP52100024209· 0% built
- KOHINOOR CORAL1.6 yr overdueYELLOWSTONE SKYSCRAPERS LLP · VILLAGE BHOIRWADI, TAL MULSHI, PuneP52100021279· 99.8% built
- PROJECT AT S.NO 168 H NO 7/A/B/C/28B/30/8/29/3F/3Y1.6 yr overdueSUNGRACE INFRA PROJECTS · Ambegaon, PuneP52100007062· 68.2% built
- PHOENIX RESIDENCY1.6 yr overduePHOENIX INFRASPACE · Porwal Park, PuneP52100034724· filed Dec 2023 → now Dec 2024· 68.2% built
- MEMORIES 90 - PHASE II1.6 yr overdueM/s NAMO DEVELOPERS · MOHAMMADWADI, PuneP52100020409· 66.8% built
- Mont Vert Grande Plot 4 Bldg D1.6 yr overdueNiraj Kumar Associates Pvt Ltd · Pashan, PuneP52100020690· 90.9% built
- BALAJI SERENITY1.6 yr overdueBalaji Buildcon · BANER, PuneP52100031813· 32.9% built· 1 complaint
- AARNA HILLS1.6 yr overdueRADHE GOVIND REALTORS · BANER, PuneP52100046166· 81.8% built
- NYATI DEFENCE ENCLAVE II1.6 yr overdueNYATI BUILDERS PRIVATE LIMITED · NEAR NYATI WINDCHIMES, PuneP52100048851· 76% built
- TruSpace Prima Angulus1.6 yr overdueAtharva Enterprises · Balewadi, PuneP52100029972· 98.2% built
- ARJUN HEIGHTS1.6 yr overdueSHRIRANG DNYANOBA DHODADE · Haveli, PuneP52100002334· filed Dec 2022 → now Dec 2024· 81.8% built· 1 complaint
- Mokate Heritage1.6 yr overdueMokate Constructions · Kothrud, PuneP52100035155· 90.9% built
- NANDANVAN1.6 yr overduePRIDE REALTY · KIRKATWADI, PuneP52100032704· 90.9% built
- Kohinoor Heights1.6 yr overdueVISHWA DEVELOPERS · Chikhali, PuneP52100033158· 90.9% built
- Kalp Avenue1.6 yr overdueSuccess Aashirwad Infra · Moshi, PuneP52100029616· 50.9% built
- Aditi Sadan CHSL1.6 yr overdueKelkar Pinnac Housing LLP · Sanewadi Aundh, PuneP52100045268· 81.8% built
- YASHODA COMPLEX1.6 yr overdueCHAITANYA MAHADEV GHULE · AMBEGAON BK, PuneP52100048559· 81.4% built
- The Kings Way - A1, A2 and A31.6 yr overdueThe Kings Way AOP · ghorpadi, PuneP52100003300· filed Jun 2019 → now Dec 2024· 96.8% built· 1 complaint
- Kalpataru Jade Residences D1.6 yr overdueAstrum Developments Private Limited · Baner, PuneP52100029693· 80.5% built· 1 complaint
- URBANO1.6 yr overdueNG Rathi Associates · WAGHOLI, PuneP52100006449· filed Dec 2020 → now Dec 2024· 90.9% built· 3 complaints
- BLUE SAPPHIRE1.6 yr overdueMODERN DEVELOPERS · Haveli, PuneP52100045946· 81.8% built
- CENTRO1.6 yr overdueLUSHLIFE REAL ESTATE LLP · Autade Handewadi, PuneP52100014734· filed Sept 2022 → now Dec 2024· 50% built
- VENKATESH VIOM1.6 yr overdueSHREE VENKATESH DEVELOPERS · BHUSARI COLONY, PuneP52100030481· 90.9% built
- SHARAWATI APARTMENTS1.6 yr overdueRANADE REALTORS LLP · KOTHRUD, PuneP52100030474· 81.8% built
- Prakash B Zone1.6 yr overduePrakash Ventures · Moshi , Sec-4 (Pradhikaran), PuneP52100047362· 81.8% built
- Ark One1.6 yr overdueIYI Milestone Realities LLP · Haveli, PuneP52100045548· 90.9% built
- ELEGANT-91.6 yr overduePRADEEP KASHINATH BHINGARE · Haveli, PuneP52100034293· 27.3% built
- EKAANT1.6 yr overdueSAKET DILIP SHAH · PARVATI (SAHAKARNAGAR), PuneP52100033340· filed Aug 2023 → now Dec 2024· 90.9% built
- NYATI ELAN CENTRAL II1.6 yr overduePSQUARE BUILDERS LLP · WAGHOLI, PuneP52100031800· 78.2% built
- NIRMAN KANCHANGANGA1.6 yr overdueNIRMAN BUILDERS · PARVATI, PuneP52100030471· 90.9% built
- GANDHARV GALAXIA1.6 yr overdueGANDHARV REALTY · HADAPSAR, PuneP52100009123· filed Dec 2019 → now Dec 2024· 90.9% built
- MITRAKUNJ1.6 yr overdueKishor B Sancheti · Parvati, PuneP52100049348· 72.7% built
- Kishor Kunj1.6 yr overdueGPL REALTY · kothrude, PuneP52100046478· 85% built
- AMC AVENUE1.6 yr overdueKAMDHENU SPACES LLP · PUNE, PuneP52100033404· 81.8% built
- NEELKANTH RESIDENCY PHASE - II1.6 yr overdueSHIVSHAKTI ASSOCIATES · CHIKHALI, PuneP52100033196· 88.2% built
- VRUKSHVELI1.6 yr overdueFORTUNE DEVELOPERS · SHANTI SHEELA SOCIETY, ERANDWANE, PLOT NUMBER 76/29, PuneP52100030782· 81.8% built
- RAJGRUHI RESIDENCY TOWER D1.6 yr overdueAtria Constructions · KONDHWA BUDRUK, SHATRUNJAY MADIR ROAD, PuneP52100034436· 81.8% built· 5 complaints
- IMPACT CASA1.6 yr overdueImpact Developers · LOHEGAON, PuneP52100033501· 36.4% built
- MADHUKUNJ1.6 yr overdueNAKSHATRA CREATIONS · JEVHERI COLONY, PuneP52100048351· 49.1% built
- MMC Dwaraka1.6 yr overdueV R Kulkarni & Associates · Parwati, PuneP52100048861· 90.9% built
- Teerth Avila1.6 yr overdueVIJAY TUKARAM RAUNDAL · Parkhe Vasti, PuneP52100034662· 62.7% built· 1 complaint
- NEELAYA PROJECT 31.6 yr overdueNAIKNAVARE BUILDCON PVTLTD · TALEGAON, PuneP52100030648· 66.4% built
- Elina1.6 yr overdueTulip Venture · Pimple Nilakh, PuneP52100048472· 72.7% built
- KUMAR PRISM1.6 yr overdueKUMAR PROPERTIES AND PROMOTERS PRIVATE LIMITED · MUNDHAWA, PuneP52100034109· 36.4% built
- PRIMA -GLIDE PARK1.6 yr overdueJAGADGURU DEVELOPERS · LOHGAON, PuneP52100031920· 90.9% built
- SMITA APARTMENT1.6 yr overdueFORTUNE DEVELOPERS · CTS NO 40/2 ERANDWANE, FINAL PLOT NO 56 SUB PLOT NO 2, ERANDWANE, PUNE-411004, PuneP52100033240· 70% built
- PARVATI NANDAN1.6 yr overdueGANESH BABAN AHER · Pimpri Chinchawad (M Corp.), PuneP52100013305· filed Dec 2020 → now Dec 2024· 90% built
- INDRAYANI PURAM1.6 yr overdueSHIVKRUPA DEVELOPERS · CHOVISAWADI, PuneP52100034310· 64.1% built
- ABHANG HEIGHTS B BUILDING1.6 yr overdueR K Lunkad Housing Company · Chovisawadi Pimpri Chinchwad (M.corp), PuneP52100031783· 90.9% built
- VATSALYA PURAM BUILDING A1.6 yr overdueNANDAN DEVELOPERS · KUMBARE TOWNSHIP, PuneP52100033502· 99.8% built
- A R IMPERIA1.6 yr overdueA R REALTY · WAKAD, PuneP52100032942· 78.6% built· 3 complaints
- RAVEERA1.6 yr overdueINFINITY LANDMARKS · PIMPLE NILAKH, PuneP52100032611· 62.3% built
- SHRI RENUKA ASSOCIATES VANSHRI MAMURDI PROJECT1.6 yr overdueSHRI RENUKA ASSOCIATES · NEAR MAVAL GATE HOTEL, PuneP52100013840· filed Oct 2020 → now Dec 2024· 18.2% built
- ANUSAYA NEST1.6 yr overdueRed Brick Habitants · CHOVISAWADI GAOTHAN, PuneP52100047088· 90.9% built
- VRINDAVAN PARK1.6 yr overdueJADHAV CIVIL PROJECT · Junnar, PuneP52100046916· 77.3% built
- PITRUCHHAYA1.6 yr overdueMAITREE VENTURES · Pune City, PuneP52100030890· 9.1% built
- Success Windsor Tower1.6 yr overdueSUCCESS INFRA · Haveli, PuneP52100029582· 90.9% built
- NAVKAR RESIDENCY1.6 yr overdueVINOD RAMANLAL DHADIWAL · SUSHILA PARK, PuneP52100048714· 64.5% built
- Park Infinia - L1, K3 and I41.6 yr overdueKumar Properties and Real Estate Pvt. Ltd. · Hadapsar, PuneP52100045667· 86.2% built
- Grande View 7 Capital1.6 yr overdueChirag Developers · Ambegaon Budruk, PuneP52100001308· filed Dec 2018 → now Dec 2024· 90.9% built
- SALEEL161.6 yr overdueGANGOTREE GREENBUILD · Sahakarnagar, PuneP52100029108· 81.8% built
- a Familia1.6 yr overdueNidisha Buildcon LLP · Telco Colony Dattanagar, PuneP52100030581· 79.7% built
- Eraville Phase I1.6 yr overdueNeha Constructions · Sadesataranali Hadapsar, PuneP52100016089· filed Jun 2021 → now Dec 2024· 70.7% built
- SHUBHARAMBH1.6 yr overdueCRYSTAL HOMES BUILDPRO LLP · AMBEGAON PATHAR, PuneP52100015870· filed Dec 2019 → now Dec 2024· 81.8% built
- Vitthal Shanti1.6 yr overdueVitthal Shant Enterprises · Somvar Peth, PuneP52100050241· filed Dec 2024 → now Jan 2025· 81.8% built
- VED VIHAR PHASE II - BUILDING NO. 41.6 yr overdueROHAN PATE GROUP OF CONSTRUCTIONS LLP · Kothrud, PuneP52100012713· filed Dec 2021 → now Jan 2025· 95.6% built· 2 complaints
- YASHADA SPLENDID PARK1.6 yr overdueYASHADA DEVELOPERS · Dudulgaon, PuneP52100021070· 95.2% built
- Joyville Hadapsar Annexe Phase 21.6 yr overdueJoyville Shapoorji Housing Private Limited · Shewalewadi, PuneP52100026479· 90.9% built· 1 complaint
- JOYVILLE HADAPSAR ANNEXE PHASE 11.6 yr overdueJoyville Shapoorji Housing Private Limited · Shewalewadi, PuneP52100026451· 90.9% built· 3 complaints
- Rose Castle1.6 yr overdueRose Crystal Developers · Borhadewadi, PuneP52100030687· filed Jul 2024 → now Jan 2025· 20% built
- LUMINARE HEIGHTS1.6 yr overdueDarsheel Group · Lipane Wasti, PuneP52100030987· filed Jul 2024 → now Jan 2025· 90.9% built
- Joyville Hadapsar Annexe Phase 31.6 yr overdueJoyville Shapoorji Housing Private Limited · Shewalewadi, PuneP52100026480· 90.9% built· 3 complaints
- Kumar Pratham - A B C and Shops1.5 yr overdueKumar Agro Products Pvt Ltd · Moshi - Borhadewadi, PuneP52100022486· 97.7% built
- SYMPHONY APARTMENTS1.5 yr overdueAakar Constructions · VITTHAL NAGAR, HADAPSAR, PuneP52100034426· 64.5% built
- Megapolis Mystic - F1.5 yr overduePegasus Properties Pvt. Ltd. · Rajiv Gandhi Infotech Park Phase 3, PuneP52100029121· filed Jan 2025 → now Feb 2025· 90.9% built
- SAMRAT SARTHAK1.5 yr overdueBORA REALTY LLP · 411046, PuneP52100023095· 90.9% built· 1 complaint
- AURALIA RESIDENCY1.5 yr overdueANUSHREE AND JHAMTANI REALTY · PUNAWALE, PuneP52100027347· 81.8% built
- CASA IMPERIA EWS1.4 yr overdueAum Sanskruti Housing · WAKAD, PuneP52100027706· filed Sept 2022 → now Mar 2025· 90% built
- Happiness Hub - Varve1.4 yr overduePARANJAPE SCHEMES (CONSTRUCTION) LTD · Varve, PuneP52100000303· filed Mar 2020 → now Mar 2025· 88.2% built· 25 complaints
- AMITs COLORI Phase-III G Building1.4 yr overdueAMIT ENTERPRISES HOUSING LIMITED · Undri, PuneP52100000785· filed Jun 2021 → now Mar 2025· 90.9% built· 3 complaints
- Paranjape Abhiruchi Parisar -T1,T2 ,T3, M1A, M1B and M21.4 yr overduePARANJAPE SCHEMES (CONSTRUCTION) LTD · Haveli, PuneP52100000452· filed Dec 2020 → now Mar 2025· 79.9% built· 28 complaints
- hi life phase31.4 yr overdueRising welworth Enterprises LLP · Dange Chowk, PuneP52100017456· filed Jun 2024 → now Mar 2025· 98.1% built· 2 complaints
- Samarth Srushti1.4 yr overdueSamarth Buildcon · Chikhali, PuneP52100024587· 90.9% built
- Lolage Corner1.4 yr overdueshrinivas tukaram badve · Haveli, PuneP52100024220· 81.8% built
- ARAMBH1.4 yr overdueSHRI JANANI DEVELOPERS · GHORPADI PETH, PuneP52100048101· filed Mar 2024 → now Mar 2025· 90.9% built
- MSR OLIVE1.4 yr overdueMind Space Realty Pvt. Ltd. · Ambegaon, PuneP52100008615· filed Jun 2021 → now Mar 2025· 59.5% built
- Ra Casa1.4 yr overdueLOHIA JAIN REALTY LLP · SR NO.53, HISSA NO 5, BAVDHAN KHURD, PuneP52100034344· 70.9% built
- GIRIKUNJ1.4 yr overdueAvantika Sanjay Baviskar · NR MANRTA CITY, PuneP52100048636· 45.5% built
- Suhas Sudhanva1.4 yr overdueDigamber Parulekar · Rambaug Colony, PuneP52100030693· filed Dec 2024 → now Mar 2025· 88.6% built
- T7 named Belvedere phase 3 of Raheja Reserve being buildings T7 T8 T9 T10 in RV Premiere1.4 yr overdueCavalcade Properties Private Limited · NIBM, PuneP52100030551· 72.7% built
- GINI ARIA MHADA WING1.4 yr overdueGini Construction Pvt Ltd · YEWALEWADI, PuneP52100031664· 81.8% built
- AISHWARYAM DEERSTONE1.4 yr overdueESSEN REALTORS · PRADHIKARAN, PuneP52100045451· 80.9% built
- Sun City - Ambegaon Phase-II1.4 yr overdueMittal Projects · Near NH 4, PuneP52100030334· 81.4% built
- BHALCHANDRA AKASHVAN1.4 yr overdueSAMARTH CHINTAMANI PROPERTIES · PUNAWALE, PuneP52100033049· 69.2% built· 25 complaints
- Hi Life1.4 yr overdueRising welworth Enterprises LLP · Dange Chowk, PuneP52100016413· filed Jun 2023 → now Mar 2025· 97.7% built· 43 complaints
- PEARL EMINENT1.4 yr overduePEARL REALTY · BALEWADI, PuneP52100030820· 53.6% built
- Pragati Ambition1.4 yr overduePRAGATI BUILDTECH · Moshi, PuneP52100034480· 90.9% built
- Maitri Imperial1.4 yr overdueS AND S ASSOCIATES · Ravet, PuneP52100033896· 64.5% built
- SPRINGNEST1.4 yr overdueSAIKRUPA ASSOCIATES · Pune City, PuneP52100029911· 90.9% built
- EVERNEST AARAMBH1.4 yr overdueEVERNEST HIGHRISELLP · PATILNAGAR, PuneP52100045785· 33.7% built
- VIVESTA1.4 yr overdueNIYATI LIFESPACES PRIVATE LIMITED · SECTOR NO. CDC, PuneP52100051718· 90.9% built
- ADITYA GALAXY1.4 yr overdueAditya Properties · SHIVAJI NAGAR, PuneP52100034834· 93.2% built
- GANGA ACROPOLIS1.4 yr overdueGANRAJ HOMES LLP · Mulashi, PuneP52100001396· filed Jun 2023 → now Apr 2025· 83% built· 14 complaints
- GARDENIA CREST1.4 yr overdueRUJUTA SHELTERS · sus, PuneP52100001527· filed Jun 2019 → now Apr 2025· 90.9% built· 3 complaints
- Swanand Wing - A1.3 yr overdueDattaraya Bhaguji Vede · Bavdhan, PuneP52100045732· 56.4% built
- Palmspring Towers - A6, A7 and B31.3 yr overdueKUMAR KERING DEVELOPERS LLP · Mohammedwadi, PuneP52100018532· 90.9% built
- Bluegrass Residences - Tower I1.3 yr overdueSagitarius Ecospaces LLP · Pune City, PuneP52100018091· 81.3% built
- SAI MILLENIUM1.3 yr overdueSHIV CONSTRUCTIONS · PUNAWALE, PuneP52100024710· 90.9% built
- FORTUNE VEDANTA1.3 yr overdueFortune Associates · NEAR KHADI MACHINE CHOWK, PuneP52100027041· 90.9% built
- SHREEYA APARTMENTS1.3 yr overdueRANADE BAGADE CONSTRUCTIONS · ERANDAVANE, PuneP52100045301· 81.8% built
- Vaidehi Villas1.3 yr overdueVaidehi Enterprises · Prathamesh Park, PuneP52100021172· 90.9% built
- 41 ESTERA PHASE 31.3 yr overdueSAMARTTHA TRIMURTI PROPERTIES · NEAR SAWATA MALI MANDIR, PuneP52100019322· filed Sept 2023 → now May 2025· 90.9% built
- Mangirish Co-operative Housing Society Ltd1.3 yr overdueCHITALE HOUSING AAKAR CONSTRUCTIONS · Shivajinagar, PuneP52100046515· filed Apr 2025 → now May 2025· 64.5% built
- Priyadarshan - I1.3 yr overdueKumar Agro Products Pvt Ltd · Jai Bhavani Nagar, PuneP52100047781· 86.5% built
- AVANEESH1.2 yr overdueKLS Constructions · NIGDI PRADHIKARAN PCMC PUNE, PuneP52100047283· 73.5% built
- SENSORIUM, PHASE III1.2 yr overdueJoyville Shapoorji Housing Private Limited · Village Maan, PuneP52100024965· 68.5% built
- Joyville Hadapsar Annexe Phase 41.2 yr overdueJoyville Shapoorji Housing Private Limited · shewalewadi, PuneP52100026478· 90.9% built
- Sadguru Complex1.2 yr overdueJare Buildcon Pvt Ltd · DEHU, PuneP52100012957· filed Dec 2019 → now May 2025· 67.3% built
- SENSORIUM, PHASE II1.2 yr overdueJoyville Shapoorji Housing Private Limited · Village Maan, PuneP52100024964· 60.4% built· 1 complaint
- SENSORIUM, PHASE I1.2 yr overdueJoyville Shapoorji Housing Private Limited · Village Maan, PuneP52100024963· 38.4% built· 2 complaints
- Joyville Hadapsar Annexe Phase 51.2 yr overdueJoyville Shapoorji Housing Private Limited · shewalewadi, PuneP52100026452· 90.9% built
- KUMAR PICCADILLY1.2 yr overdueKUMAR PROPERTIES AND PROMOTERS PVT. LTD · NEAR BHUMKAR CHOWK, PuneP52100029950· 90.9% built
- VERISTA1.2 yr overdueVM REAL TECH LLP · Erandwane, PuneP52100047130· 90.9% built
- Kalpataru Jade Residences A1.2 yr overdueAstrum Developments Private Limited · Baner, PuneP52100030004· 70.5% built
- Falcon Towers at Riverview City1.2 yr overdueRiverview City Constructions Ltd · Haveli, PuneP52100032051· filed Apr 2025 → now Jun 2025· 97.3% built· 2 complaints
- Vision Harmony1.2 yr overdueM/S Vista Vision Developers LLP · Hingane (Bk) karvenagar, PuneP52100033418· 81.8% built
- Supreme Villagio I1.2 yr overdueTurquoise Housing LLP · Somatne, PuneP52100046867· filed Mar 2025 → now Jun 2025· 72.7% built
- 41COSMO1.2 yr overdueKRISALA ENTERPRISES LLP · TATHAWADE, PuneP52100029844· filed Dec 2024 → now Jun 2025· 86.4% built· 2 complaints
- U. S. Residency1.2 yr overdueNew Modern Buildwell Private Limited · Lonavala, PuneP52100029751· 41.8% built
- SIGMA CENTURIA1.2 yr overdueSigma Realtors · Haveli, PuneP52100003501· filed Sept 2018 → now Jun 2025· 45.5% built
- DS UNIQUE SARVODAYA1.2 yr overdueDS UNIQUE · Haveli, PuneP52100049916· 32.7% built· 2 complaints
- MADHVACHHAYA1.2 yr overdueFORTUNE DEVELOPERS · Pune City, PuneP52100053769· 72.7% built
- SACRED BASIL1.2 yr overdueM/S INFINITY DEVELOPERS · HAVELI WAKAD, PuneP52100028883· 81.8% built
- Kalpataru Estate Building 81.2 yr overdueKalpataru Construction (Pune) · Pimple Gurav, PuneP52100017535· filed Dec 2022 → now Jun 2025· 86.9% built· 48 complaints
- OMKAR SWARUP PHASE-21.1 yr overdueSANIKET INFRACON LLP · ICHHAPURTI GANESH MANDIR, PuneP52100033738· filed Jun 2024 → now Jun 2025· 81.8% built
- SHARADA MYRIA B AND C BUILDING1.1 yr overdueSHARADA ERECTORS PRIVATE LIMITED · Haveli, PuneP52100018973· filed Dec 2023 → now Jun 2025· 41.4% built
- Darekar Heights1.1 yr overdueMangaldeep Radiant Developers · Tathawade, PuneP52100026195· filed Jun 2024 → now Jun 2025· 39.1% built
- Mangalam Icon1.1 yr overdueRamdas Damodar Phuge proprietor of Bhagyalaxmi Construction · Haveli, PuneP52100029682· filed Jun 2024 → now Jun 2025· 63.8% built
- SWOJAS AVANI1.1 yr overdueSWOJAS REALTORS LLP · ERANDWANA, PuneP52100046896· 90.9% built
- ICON RESIDENCY1.1 yr overdueICON BUILDERS · PUNE, PuneP52100033227· 27.3% built
- Pranam1.1 yr overduePrimary Housing Corporation LLP · Talegaon, PuneP52100000382· filed Dec 2019 → now Jun 2025· 56.9% built
- PALMNEST PHASE III1.1 yr overdueNG RATHI PROPERTIES LLP · KESNAND ROAD, PuneP52100015668· filed Dec 2022 → now Jun 2025· 56.4% built· 1 complaint
- Majestique Biznow1.1 yr overdueMajestique Springfields LLP · Kondhwa Khurd, PuneP52100027583· 40.9% built
- Chinmay Paradise1.1 yr overdueChinmay Paradise · Kondhwa BK, PuneP52100047572· 74.5% built
- Mangalmurti Residency1.1 yr overdueKRISHNAPRAKASH ASSOCIATES · Kharadi, PuneP52100050222· 81.8% built
- YASHWIN HINJAWADI1.1 yr overdueVilas Javdekar Eco Shelters Private Limited · HINJAWADI, PuneP52100000037· 94.5% built· 2 complaints
- Kumar Pratham - D E G1.1 yr overdueKumar Agro Products Pvt Ltd · Moshi, PuneP52100031354· 93% built
- ADVIKA PHASE III - E1.1 yr overdueADVIKA CONSTRUCTIONS PVT.LTD · PISOLI, PuneP52100022868· filed Dec 2024 → now Jun 2025· 90.5% built
- Gagan Ela1.1 yr overdueGagan Landmarks LLP · Mohammadwadi, PuneP52100002439· filed Dec 2020 → now Jun 2025· 76.2% built· 6 complaints
- VTP Beaumonde Building T31.1 yr overdueARHUM ERECTORS PRIVATE LIMITED · Manjari, PuneP52100022781· 80.9% built· 6 complaints
- VISION PRISA1.1 yr overdueP4 GROUP · Haveli, PuneP52100051225· 90.9% built
- MILLENNIA1.1 yr overdueM/S SAGA CONSTRUCTIONS ANU GROUP · NEAR SHRIRANG VIHAR, PuneP52100032494· 81.8% built
- MEDHA APARTMENTS1.1 yr overdueKEDAR SANJEEV KHADKE · PARVATI NORTH, PuneP52100046933· 81.8% built
- Joyville Hadapsar Annexe Phase 101.1 yr overdueJoyville Shapoorji Housing Private Limited · Shewalewadi, PuneP52100026795· 83.4% built
- Majestique Rhythm County Phase II1.1 yr overdueMAJESTIQUE RISINGSUN LLP · Pune, PuneP52100027794· 90.9% built· 1 complaint
- PRAGATI HEIGHTS1.1 yr overduePragati Builders and Developers · Jalochi, PuneP52100047529· 72.7% built
- Ephelia- Phase 11.1 yr overdueMajestique Giga Homes LLP · kondhwa khurd, PuneP52100025991· 95.5% built
- Global Luxuria1.1 yr overdueDnyaneshwar Mahadu Jadhav proprietor of Global Construction · Alephata, PuneP52100026469· 36.1% built
- YashONE Infinitee - Phase I1.1 yr overdueVilas Javdekar Infinitee Developers Pvt. Ltd. · Near Puneville Project, PuneP52100028229· 96.4% built
- Green Woods1.1 yr overdueGoldfinger Ventures · Pune City, PuneP52100013183· filed Dec 2017 → now Jun 2025· 81.8% built
- Guardian Cityscapes Phase 21.1 yr overdueGuardian Homes Private Limited · Dattawadi, PuneP52100003427· filed Jun 2023 → now Jun 2025· 81.8% built
- ANTAAYA1.1 yr overdueBALASAHEB BHATTU KARANJULE · Balewadi, PuneP52100024983· 52.7% built
- ORIENT HILL VIEW1.1 yr overdueBOKHARA BUILDTECH · MOHAMMEDWADI, PuneP52100026764· 90.9% built· 1 complaint
- VTP Cygnus Building T101.1 yr overdueARHUM ERECTORS PRIVATE LIMITED · manjari, PuneP52100024551· 87.9% built· 14 complaints
- CHAITRANGAN1.1 yr overdueDEDGE HOUSING DEVELOPMENT LLP · KIRKATWADI, PuneP52100045554· filed Dec 2024 → now Jun 2025· 81.8% built
- Joyville Hadapsar Annexe Phase 91.1 yr overdueJoyville Shapoorji Housing Private Limited · Shewalewadi, PuneP52100026797· 86.5% built
- ESPACIO - COMMERCIAL1.1 yr overdueKNIGHT WEST REALTY LLP · BALEWADI, PuneP52100026492· 81.8% built
- Laxmi Pride1.1 yr overdueM/S B J HULAWALE PROPERTIES · Survey No. 5/1, 5/2, PuneP52100027806· filed Jun 2022 → now Jun 2025· 90.9% built
- RAVI UDAY1.1 yr overdueLAJWANTI CONSULTANTS AND BUILDERS PRIVATE LIMITED · -, PuneP52100032853· 77.2% built
- VASANTSHREE1.1 yr overduePIONEER CONSTRUCTIONS · Chittavihari Society, PuneP52100045708· filed Dec 2024 → now Jun 2025· 90% built
- GREENVILLE BUILDING A31.1 yr overdueVision Realtors · HADAPSAR, PuneP52100052806· 68.2% built
- ACE AURUM III TOWER 011.1 yr overdueJHAMTANI REALTY PRIVATE LIMITED · RAVET, PuneP52100026571· 43.5% built
- ACE AURUM III TOWER 021.1 yr overdueJHAMTANI REALTY PRIVATE LIMITED · RAVET, PuneP52100026568· 48.1% built
- Green County Phase II Wing-B1.1 yr overdueAnand Developers · Fursungi, PuneP52100026716· 86.1% built
- NYATI EXUBERANCE III1.1 yr overdueNYATI BUILDERS PRIVATE LIMITED · MOHAMMADWADI, PuneP52100034932· filed Jun 2024 → now Jun 2025· 38.1% built
- Palm Springs Phase 11.1 yr overdueDIVINE VENTURES AND LANKE BIRJE ASSOCIATES · Vinodewasti, PuneP52100026794· 81.8% built· 1 complaint
- ACE AURUM III TOWER 041.1 yr overdueJHAMTANI REALTY PRIVATE LIMITED · RAVET, PuneP52100024925· 50.5% built
- SILVER STONE1.1 yr overduePanama Sunarch Developers · HANDEWADI, PuneP52100010659· filed Dec 2024 → now Jun 2025· 79.2% built· 2 complaints
- ACE AURUM III TOWER 031.1 yr overdueJHAMTANI REALTY PRIVATE LIMITED · RAVET, PuneP52100025143· 49% built
- VTP Cygnus BuildingT12 and Commercial1.1 yr overdueARHUM ERECTORS PRIVATE LIMITED · Manjari, PuneP52100023473· 84.6% built· 3 complaints
- Yashodhan1.1 yr overdueAMIT JUGALKISHOR RATHI · Aundh, PuneP52100046635· 63.6% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.