Delayed projects in Pune
3,402 MahaRERA-registered projects in Pune are past the possession date on file and still under 100% built. Where the promoter has formally revised the date, the original is shown alongside so you can see what changed.
Page 15 of 18
- Kalpataru Jade Residences F1.8 yr overdueAstrum Developments Private Limited · Haveli, PuneP52100000869· 79.9% built· 4 complaints
- Magnolia Business Centre1.8 yr overduePARANJAPE SCHEMES (CONSTRUCTION) LTD · Pashan, PuneP52100021866· 90.9% built
- KOHINOOR CORAL1.8 yr overdueYELLOWSTONE SKYSCRAPERS LLP · VILLAGE BHOIRWADI, TAL MULSHI, PuneP52100021279· 99.8% built
- Kalpataru Exquisite - Wing 31.8 yr overdueKalpataru Retail Ventures Private Limited · Wakad, PuneP52100018100· 90.3% built
- ROHAN ABHILASHA 2 WING B1.8 yr overdueROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED · WAGHOLI, PuneP52100025681· 88.6% built
- Aishwaryam Hamara Abhimaan1.8 yr overdueSAI ESSEN DEVELOPERS · Moshi, PuneP52100020889· 9.1% built
- Kalpataru Exquisite - Wing 21.8 yr overdueKalpataru Retail Ventures Private Limited · Wakad, PuneP52100001266· 61.8% built
- Ashanand Residency G Building1.8 yr overdueAnand Deoram Tambe · Khed, PuneP52100019866· 30.9% built
- Pyramid Axis1.8 yr overduePyramid Prasad Buildcon LLP · main Baner Road, PuneP52100021464· 99.1% built
- Hirals Breeze1.8 yr overdueMangaldeep Associates & Developers · Rahatani, PuneP52100029974· filed Dec 2023 → now Dec 2024· 72.7% built
- Kalpataru Jade Residences G1.8 yr overdueAstrum Developments Private Limited · Haveli, PuneP52100018194· 78.5% built
- SAI ANAND1.8 yr overdueSHREENATHJI LIFE SPACES · BIBWEWADI, PuneP52100035202· filed Dec 2023 → now Dec 2024· 90.9% built
- Kalpataru Exquisite - Wing D1.8 yr overdueKalpataru Retail Ventures Private Limited · Wakad, PuneP52100016932· 72.5% built· 4 complaints
- DHANLAXMI ICON1.8 yr overdueHARI OM DEVELOPERS · Haveli, PuneP52100018523· 35.9% built
- Megapolis Saffron - Shops1.8 yr overduePegasus Properties Pvt. Ltd. · Rajiv Gandhi Infotech Park Phase 3, PuneP52100034988· filed Dec 2023 → now Dec 2024· 70.6% built
- ROHAN ANAND PHASE I1.8 yr overdueROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED · Somatane, PuneP52100023186· 90.6% built· 1 complaint
- Kalpataru Jade Residences B1.8 yr overdueAstrum Developments Private Limited · Haveli, PuneP52100000926· 79.2% built· 3 complaints
- Kalpataru Exquisite - Wing 11.8 yr overdueKalpataru Retail Ventures Private Limited · Wakad, PuneP52100000298· 55.9% built· 1 complaint
- GANGA LEGEND A3 AND B3..1.8 yr overdueLegends County Landmark Pvt Ltd · Bavdhan, PuneP52100000255· 73.8% built· 10 complaints
- PEBBLES II F BUILDING1.8 yr overdueAbhinav Rainbow Developers & Promoters LLP · Bavadhan BK, PuneP52100000730· 81.8% built
- Ashanand Residency F Buidling1.8 yr overdueAnand Deoram Tambe · Khed, PuneP52100019921· 72.7% built
- Tranquility Annexe A and B Wing Phase 11.8 yr overdueK AND B ASSOCIATES · Manjri Stud Farm, PuneP52100019051· 90.9% built
- Madhuvan 5 76C1.8 yr overdueMagarpatta City Development Co. Pvt. Ltd. · Mohammadwadi, PuneP52100025506· 18.9% built
- MEMORIES 90 - PHASE II1.8 yr overdueM/s NAMO DEVELOPERS · MOHAMMADWADI, PuneP52100020409· 66.8% built
- Forest Trails Highland Tower 9, 10 and 111.8 yr overduePARANJAPE SCHEMES (CONSTRUCTION) LIMITED · Bhugaon, PuneP52100000067· filed Dec 2022 → now Dec 2024· 95.5% built· 14 complaints
- VaastuvivaE1.8 yr overdueB U BHANDARI VAASTU · Bhumkar Chowk, PuneP52100004510· 90.9% built
- Kalpataru Jade Residences C1.8 yr overdueAstrum Developments Private Limited · Haveli, PuneP52100000676· 80.5% built· 5 complaints
- MANTRA MAGIC PHASE 61.8 yr overdueMANTRA ISLAND HOMES CHIMBLI PRIVATE LIMITED · Chimbali, PuneP52100024209· 0% built
- Building Wing A Phase I Sudarshan Apartment Karve Nagar Pune1.8 yr overdueAnubhavshri Realty Pvt. Ltd. · Village Hingne Budruk, PuneP52100023468· 61.8% built
- GANGA GLITZ G UNDRI PUNE1.8 yr overdueLegends County Landmark Pvt Ltd · UNDRI, PuneP52100024304· 81.8% built
- iOS Tathawade1.8 yr overdueLinux Group · Tathawade, PuneP52100027952· filed Jul 2024 → now Dec 2024· 95.5% built· 58 complaints
- PHOENIX RESIDENCY1.8 yr overduePHOENIX INFRASPACE · Porwal Park, PuneP52100034724· filed Dec 2023 → now Dec 2024· 68.2% built
- Goodwill Crescent1.8 yr overdueChoice Lifestyle · Keshav Nagar, PuneP52100022861· 90.8% built
- PANAMA PARK1.8 yr overdueThe Kallyaanee Fortune Properties · Lohgaon, PuneP52100020820· 13.6% built
- YashONE Wakad Central1.8 yr overdueVilas Javdekar Eco Shelters Private Limited · Wakad, PuneP52100020910· 95.2% built
- MADHUKUNJ1.8 yr overdueNAKSHATRA CREATIONS · JEVHERI COLONY, PuneP52100048351· 49.1% built
- YASHODA COMPLEX1.8 yr overdueCHAITANYA MAHADEV GHULE · AMBEGAON BK, PuneP52100048559· 81.4% built
- KUMAR PRISM1.8 yr overdueKUMAR PROPERTIES AND PROMOTERS PRIVATE LIMITED · MUNDHAWA, PuneP52100034109· 36.4% built
- NANDANVAN1.8 yr overduePRIDE REALTY · KIRKATWADI, PuneP52100032704· 90.9% built
- URBANO1.8 yr overdueNG Rathi Associates · WAGHOLI, PuneP52100006449· filed Dec 2020 → now Dec 2024· 90.9% built· 3 complaints
- AMC AVENUE1.8 yr overdueKAMDHENU SPACES LLP · PUNE, PuneP52100033404· 81.8% built
- The Kings Way - A1, A2 and A31.8 yr overdueThe Kings Way AOP · ghorpadi, PuneP52100003300· filed Jun 2019 → now Dec 2024· 96.8% built· 1 complaint
- AARNA HILLS1.8 yr overdueRADHE GOVIND REALTORS · BANER, PuneP52100046166· 81.8% built
- Elina1.8 yr overdueTulip Venture · Pimple Nilakh, PuneP52100048472· 72.7% built
- Eraville Phase I1.8 yr overdueNeha Constructions · Sadesataranali Hadapsar, PuneP52100016089· filed Jun 2021 → now Dec 2024· 70.7% built
- a Familia1.8 yr overdueNidisha Buildcon LLP · Telco Colony Dattanagar, PuneP52100030581· 79.7% built
- Kalp Avenue1.8 yr overdueSuccess Aashirwad Infra · Moshi, PuneP52100029616· 50.9% built
- SHARAWATI APARTMENTS1.8 yr overdueRANADE REALTORS LLP · KOTHRUD, PuneP52100030474· 81.8% built
- SALEEL161.8 yr overdueGANGOTREE GREENBUILD · Sahakarnagar, PuneP52100029108· 81.8% built
- INDRAYANI PURAM1.8 yr overdueSHIVKRUPA DEVELOPERS · CHOVISAWADI, PuneP52100034310· 64.1% built
- MITRAKUNJ1.8 yr overdueKishor B Sancheti · Parvati, PuneP52100049348· 72.7% built
- SHUBHARAMBH1.8 yr overdueCRYSTAL HOMES BUILDPRO LLP · AMBEGAON PATHAR, PuneP52100015870· filed Dec 2019 → now Dec 2024· 81.8% built
- Mokate Heritage1.8 yr overdueMokate Constructions · Kothrud, PuneP52100035155· 90.9% built
- Ark One1.8 yr overdueIYI Milestone Realities LLP · Haveli, PuneP52100045548· 90.9% built
- IMPACT CASA1.8 yr overdueImpact Developers · LOHEGAON, PuneP52100033501· 36.4% built
- Success Windsor Tower1.8 yr overdueSUCCESS INFRA · Haveli, PuneP52100029582· 90.9% built
- GANDHARV GALAXIA1.8 yr overdueGANDHARV REALTY · HADAPSAR, PuneP52100009123· filed Dec 2019 → now Dec 2024· 90.9% built
- RAJGRUHI RESIDENCY TOWER D1.8 yr overdueAtria Constructions · KONDHWA BUDRUK, SHATRUNJAY MADIR ROAD, PuneP52100034436· 81.8% built· 5 complaints
- PRIMA -GLIDE PARK1.8 yr overdueJAGADGURU DEVELOPERS · LOHGAON, PuneP52100031920· 90.9% built
- NYATI DEFENCE ENCLAVE II1.8 yr overdueNYATI BUILDERS PRIVATE LIMITED · NEAR NYATI WINDCHIMES, PuneP52100048851· 76% built
- Kalpataru Jade Residences D1.8 yr overdueAstrum Developments Private Limited · Baner, PuneP52100029693· 80.5% built· 1 complaint
- ABHANG HEIGHTS B BUILDING1.8 yr overdueR K Lunkad Housing Company · Chovisawadi Pimpri Chinchwad (M.corp), PuneP52100031783· 90.9% built
- BALAJI SERENITY1.8 yr overdueBalaji Buildcon · BANER, PuneP52100031813· 32.9% built· 1 complaint
- VENKATESH VIOM1.8 yr overdueSHREE VENKATESH DEVELOPERS · BHUSARI COLONY, PuneP52100030481· 90.9% built
- VRUKSHVELI1.8 yr overdueFORTUNE DEVELOPERS · SHANTI SHEELA SOCIETY, ERANDWANE, PLOT NUMBER 76/29, PuneP52100030782· 81.8% built
- NAVKAR RESIDENCY1.8 yr overdueVINOD RAMANLAL DHADIWAL · SUSHILA PARK, PuneP52100048714· 64.5% built
- PARVATI NANDAN1.8 yr overdueGANESH BABAN AHER · Pimpri Chinchawad (M Corp.), PuneP52100013305· filed Dec 2020 → now Dec 2024· 90% built
- RAVEERA1.8 yr overdueINFINITY LANDMARKS · PIMPLE NILAKH, PuneP52100032611· 62.3% built
- ELEGANT-91.8 yr overduePRADEEP KASHINATH BHINGARE · Haveli, PuneP52100034293· 27.3% built
- EKAANT1.8 yr overdueSAKET DILIP SHAH · PARVATI (SAHAKARNAGAR), PuneP52100033340· filed Aug 2023 → now Dec 2024· 90.9% built
- Kishor Kunj1.8 yr overdueGPL REALTY · kothrude, PuneP52100046478· 85% built
- NEELKANTH RESIDENCY PHASE - II1.8 yr overdueSHIVSHAKTI ASSOCIATES · CHIKHALI, PuneP52100033196· 88.2% built
- NIRMAN KANCHANGANGA1.8 yr overdueNIRMAN BUILDERS · PARVATI, PuneP52100030471· 90.9% built
- ARJUN HEIGHTS1.8 yr overdueSHRIRANG DNYANOBA DHODADE · Haveli, PuneP52100002334· filed Dec 2022 → now Dec 2024· 81.8% built· 1 complaint
- CENTRO1.8 yr overdueLUSHLIFE REAL ESTATE LLP · Autade Handewadi, PuneP52100014734· filed Sept 2022 → now Dec 2024· 50% built
- SMITA APARTMENT1.8 yr overdueFORTUNE DEVELOPERS · CTS NO 40/2 ERANDWANE, FINAL PLOT NO 56 SUB PLOT NO 2, ERANDWANE, PUNE-411004, PuneP52100033240· 70% built
- MMC Dwaraka1.8 yr overdueV R Kulkarni & Associates · Parwati, PuneP52100048861· 90.9% built
- NEELAYA PROJECT 31.8 yr overdueNAIKNAVARE BUILDCON PVTLTD · TALEGAON, PuneP52100030648· 66.4% built
- Kohinoor Heights1.8 yr overdueVISHWA DEVELOPERS · Chikhali, PuneP52100033158· 90.9% built
- BLUE SAPPHIRE1.8 yr overdueMODERN DEVELOPERS · Haveli, PuneP52100045946· 81.8% built
- Prakash B Zone1.8 yr overduePrakash Ventures · Moshi , Sec-4 (Pradhikaran), PuneP52100047362· 81.8% built
- Teerth Avila1.8 yr overdueVIJAY TUKARAM RAUNDAL · Parkhe Vasti, PuneP52100034662· 62.7% built· 1 complaint
- A R IMPERIA1.8 yr overdueA R REALTY · WAKAD, PuneP52100032942· 78.6% built· 3 complaints
- Grande View 7 Capital1.8 yr overdueChirag Developers · Ambegaon Budruk, PuneP52100001308· filed Dec 2018 → now Dec 2024· 90.9% built
- SHRI RENUKA ASSOCIATES VANSHRI MAMURDI PROJECT1.8 yr overdueSHRI RENUKA ASSOCIATES · NEAR MAVAL GATE HOTEL, PuneP52100013840· filed Oct 2020 → now Dec 2024· 18.2% built
- VATSALYA PURAM BUILDING A1.8 yr overdueNANDAN DEVELOPERS · KUMBARE TOWNSHIP, PuneP52100033502· 99.8% built
- ANUSAYA NEST1.8 yr overdueRed Brick Habitants · CHOVISAWADI GAOTHAN, PuneP52100047088· 90.9% built
- Park Infinia - L1, K3 and I41.8 yr overdueKumar Properties and Real Estate Pvt. Ltd. · Hadapsar, PuneP52100045667· 86.2% built
- PITRUCHHAYA1.8 yr overdueMAITREE VENTURES · Pune City, PuneP52100030890· 9.1% built
- NYATI ELAN CENTRAL II1.8 yr overduePSQUARE BUILDERS LLP · WAGHOLI, PuneP52100031800· 78.2% built
- Aditi Sadan CHSL1.8 yr overdueKelkar Pinnac Housing LLP · Sanewadi Aundh, PuneP52100045268· 81.8% built
- TruSpace Prima Angulus1.8 yr overdueAtharva Enterprises · Balewadi, PuneP52100029972· 98.2% built
- VRINDAVAN PARK1.8 yr overdueJADHAV CIVIL PROJECT · Junnar, PuneP52100046916· 77.3% built
- Vitthal Shanti1.8 yr overdueVitthal Shant Enterprises · Somvar Peth, PuneP52100050241· filed Dec 2024 → now Jan 2025· 81.8% built
- VED VIHAR PHASE II - BUILDING NO. 41.7 yr overdueROHAN PATE GROUP OF CONSTRUCTIONS LLP · Kothrud, PuneP52100012713· filed Dec 2021 → now Jan 2025· 95.6% built· 2 complaints
- YASHADA SPLENDID PARK1.7 yr overdueYASHADA DEVELOPERS · Dudulgaon, PuneP52100021070· 95.2% built
- Joyville Hadapsar Annexe Phase 21.7 yr overdueJoyville Shapoorji Housing Private Limited · Shewalewadi, PuneP52100026479· 90.9% built· 1 complaint
- JOYVILLE HADAPSAR ANNEXE PHASE 11.7 yr overdueJoyville Shapoorji Housing Private Limited · Shewalewadi, PuneP52100026451· 90.9% built· 3 complaints
- Joyville Hadapsar Annexe Phase 31.7 yr overdueJoyville Shapoorji Housing Private Limited · Shewalewadi, PuneP52100026480· 90.9% built· 3 complaints
- Rose Castle1.7 yr overdueRose Crystal Developers · Borhadewadi, PuneP52100030687· filed Jul 2024 → now Jan 2025· 20% built
- LUMINARE HEIGHTS1.7 yr overdueDarsheel Group · Lipane Wasti, PuneP52100030987· filed Jul 2024 → now Jan 2025· 90.9% built
- Umang Pride - Building C1.7 yr overdueCorolla Gulmohar · Wagholi, PuneP52100054285· filed Dec 2024 → now Feb 2025· 90.9% built
- Kumar Pratham - A B C and Shops1.7 yr overdueKumar Agro Products Pvt Ltd · Moshi - Borhadewadi, PuneP52100022486· 97.7% built
- SYMPHONY APARTMENTS1.6 yr overdueAakar Constructions · VITTHAL NAGAR, HADAPSAR, PuneP52100034426· 64.5% built
- Megapolis Mystic - F1.6 yr overduePegasus Properties Pvt. Ltd. · Rajiv Gandhi Infotech Park Phase 3, PuneP52100029121· filed Jan 2025 → now Feb 2025· 90.9% built
- AURALIA RESIDENCY1.6 yr overdueANUSHREE AND JHAMTANI REALTY · PUNAWALE, PuneP52100027347· 81.8% built
- SAMRAT SARTHAK1.6 yr overdueBORA REALTY LLP · 411046, PuneP52100023095· 90.9% built· 1 complaint
- CASA IMPERIA EWS1.6 yr overdueAum Sanskruti Housing · WAKAD, PuneP52100027706· filed Sept 2022 → now Mar 2025· 90% built
- AMITs COLORI Phase-III G Building1.5 yr overdueAMIT ENTERPRISES HOUSING LIMITED · Undri, PuneP52100000785· filed Jun 2021 → now Mar 2025· 90.9% built· 3 complaints
- Paranjape Abhiruchi Parisar -T1,T2 ,T3, M1A, M1B and M21.5 yr overduePARANJAPE SCHEMES (CONSTRUCTION) LTD · Haveli, PuneP52100000452· filed Dec 2020 → now Mar 2025· 79.9% built· 28 complaints
- Happiness Hub - Varve1.5 yr overduePARANJAPE SCHEMES (CONSTRUCTION) LTD · Varve, PuneP52100000303· filed Mar 2020 → now Mar 2025· 88.2% built· 25 complaints
- Hi Life Phase31.5 yr overdueRising welworth Enterprises LLP · Dange Chowk, PuneP52100017456· filed Jun 2024 → now Mar 2025· 98.1% built· 2 complaints
- Samarth Srushti1.5 yr overdueSamarth Buildcon · Chikhali, PuneP52100024587· 90.9% built
- ARAMBH1.5 yr overdueSHRI JANANI DEVELOPERS · GHORPADI PETH, PuneP52100048101· filed Mar 2024 → now Mar 2025· 90.9% built
- Lolage Corner1.5 yr overdueShrinivas Tukaram Badve · Haveli, PuneP52100024220· 81.8% built
- AISHWARYAM DEERSTONE1.5 yr overdueESSEN REALTORS · PRADHIKARAN, PuneP52100045451· 80.9% built
- SPRINGNEST1.5 yr overdueSAIKRUPA ASSOCIATES · Pune City, PuneP52100029911· 90.9% built
- GIRIKUNJ1.5 yr overdueAvantika Sanjay Baviskar · NR MANRTA CITY, PuneP52100048636· 45.5% built
- Hi Life1.5 yr overdueRising welworth Enterprises LLP · Dange Chowk, PuneP52100016413· filed Jun 2023 → now Mar 2025· 97.7% built· 43 complaints
- NIRVANA LIFE COUNTY1.5 yr overdueKHANDVE NIRVANA REALTY · LOHAGAON, PuneP52100031558· 90.9% built
- PEARL EMINENT1.5 yr overduePEARL REALTY · BALEWADI, PuneP52100030820· 53.6% built
- T7 named Belvedere phase 3 of Raheja Reserve being buildings T7 T8 T9 T10 in RV Premiere1.5 yr overdueCavalcade Properties Private Limited · NIBM, PuneP52100030551· 72.7% built
- EVERNEST AARAMBH1.5 yr overdueEVERNEST HIGHRISELLP · PATILNAGAR, PuneP52100045785· 33.7% built
- BHALCHANDRA AKASHVAN1.5 yr overdueSAMARTH CHINTAMANI PROPERTIES · PUNAWALE, PuneP52100033049· 69.2% built· 25 complaints
- Maitri Imperial1.5 yr overdueS AND S ASSOCIATES · Ravet, PuneP52100033896· 64.5% built
- Sun City - Ambegaon Phase-II1.5 yr overdueMittal Projects · Near NH 4, PuneP52100030334· 81.4% built
- MSR OLIVE1.5 yr overdueMind Space Realty Pvt. Ltd. · Ambegaon, PuneP52100008615· filed Jun 2021 → now Mar 2025· 59.5% built
- VIVESTA1.5 yr overdueNIYATI LIFESPACES PRIVATE LIMITED · SECTOR NO. CDC, PuneP52100051718· 90.9% built
- Ra Casa1.5 yr overdueLOHIA JAIN REALTY LLP · SR NO.53, HISSA NO 5, BAVDHAN KHURD, PuneP52100034344· 70.9% built
- Pragati Ambition1.5 yr overduePRAGATI BUILDTECH · Moshi, PuneP52100034480· 90.9% built
- GINI ARIA MHADA WING1.5 yr overdueGini Construction Pvt Ltd · YEWALEWADI, PuneP52100031664· 81.8% built
- Suhas Sudhanva1.5 yr overdueDigamber Parulekar · Rambaug Colony, PuneP52100030693· filed Dec 2024 → now Mar 2025· 88.6% built
- ADITYA GALAXY1.5 yr overdueAditya Properties · SHIVAJI NAGAR, PuneP52100034834· 93.2% built
- GANGA ACROPOLIS1.5 yr overdueGANRAJ HOMES LLP · Mulashi, PuneP52100001396· filed Jun 2023 → now Apr 2025· 83% built· 14 complaints
- GARDENIA CREST1.5 yr overdueRUJUTA SHELTERS · sus, PuneP52100001527· filed Jun 2019 → now Apr 2025· 90.9% built· 3 complaints
- Swanand Wing - A1.5 yr overdueDattaraya Bhaguji Vede · Bavdhan, PuneP52100045732· 56.4% built
- SAI MILLENIUM1.5 yr overdueSHIV CONSTRUCTIONS · PUNAWALE, PuneP52100024710· 90.9% built
- Bluegrass Residences - Tower I1.5 yr overdueSagitarius Ecospaces LLP · Pune City, PuneP52100018091· 81.3% built
- FORTUNE VEDANTA1.5 yr overdueFortune Associates · NEAR KHADI MACHINE CHOWK, PuneP52100027041· 90.9% built
- VISION RHYTHM1.5 yr overdueNAVYA ASSOCIATES · DUDULGAON, PuneP52100034825· 90.9% built
- Palmspring Towers - A6, A7 and B31.5 yr overdueKUMAR KERING DEVELOPERS LLP · Mohammedwadi, PuneP52100018532· 90.9% built
- SHREEYA APARTMENTS1.5 yr overdueRANADE BAGADE CONSTRUCTIONS · ERANDAVANE, PuneP52100045301· 81.8% built
- 41 ESTERA PHASE 31.4 yr overdueSAMARTTHA TRIMURTI PROPERTIES · NEAR SAWATA MALI MANDIR, PuneP52100019322· filed Sept 2023 → now May 2025· 90.9% built
- Vaidehi Villas1.4 yr overdueVaidehi Enterprises · Prathamesh Park, PuneP52100021172· 90.9% built
- Mangirish Co-operative Housing Society Ltd1.4 yr overdueCHITALE HOUSING AAKAR CONSTRUCTIONS · Shivajinagar, PuneP52100046515· filed Apr 2025 → now May 2025· 64.5% built
- Priyadarshan - I1.4 yr overdueKumar Agro Products Pvt Ltd · Jai Bhavani Nagar, PuneP52100047781· 86.5% built
- One Place1.4 yr overdueU D Developers LLP · Pune, PuneP52100016297· filed Dec 2024 → now May 2025· 81.8% built
- AVANEESH1.4 yr overdueKLS Constructions · NIGDI PRADHIKARAN PCMC PUNE, PuneP52100047283· 73.5% built
- Joyville Hadapsar Annexe Phase 41.4 yr overdueJoyville Shapoorji Housing Private Limited · shewalewadi, PuneP52100026478· 90.9% built
- Joyville Hadapsar Annexe Phase 51.4 yr overdueJoyville Shapoorji Housing Private Limited · shewalewadi, PuneP52100026452· 90.9% built
- SENSORIUM, PHASE II1.4 yr overdueJoyville Shapoorji Housing Private Limited · Village Maan, PuneP52100024964· 60.4% built· 1 complaint
- SENSORIUM, PHASE I1.4 yr overdueJoyville Shapoorji Housing Private Limited · Village Maan, PuneP52100024963· 38.4% built· 2 complaints
- SENSORIUM, PHASE III1.4 yr overdueJoyville Shapoorji Housing Private Limited · Village Maan, PuneP52100024965· 68.5% built
- Sadguru Complex1.4 yr overdueJare Buildcon Pvt Ltd · DEHU, PuneP52100012957· filed Dec 2019 → now May 2025· 67.3% built
- Kalpataru Jade Residences A1.4 yr overdueAstrum Developments Private Limited · Baner, PuneP52100030004· 70.5% built
- VERISTA1.4 yr overdueVM REAL TECH LLP · Erandwane, PuneP52100047130· 90.9% built
- KUMAR PICCADILLY1.4 yr overdueKUMAR PROPERTIES AND PROMOTERS PVT. LTD · NEAR BHUMKAR CHOWK, PuneP52100029950· 90.9% built
- Falcon Towers at Riverview City1.4 yr overdueRiverview City Constructions Ltd · Haveli, PuneP52100032051· filed Apr 2025 → now Jun 2025· 97.3% built· 2 complaints
- Supreme Villagio I1.4 yr overdueTurquoise Housing LLP · Somatne, PuneP52100046867· filed Mar 2025 → now Jun 2025· 72.7% built
- Vision Harmony1.4 yr overdueM/S Vista Vision Developers LLP · Hingane (Bk) karvenagar, PuneP52100033418· 81.8% built
- 41COSMO1.3 yr overdueKRISALA ENTERPRISES LLP · TATHAWADE, PuneP52100029844· filed Dec 2024 → now Jun 2025· 86.4% built· 2 complaints
- U. S. Residency1.3 yr overdueNew Modern Buildwell Private Limited · Lonavala, PuneP52100029751· 41.8% built
- SIGMA CENTURIA1.3 yr overdueSigma Realtors · Haveli, PuneP52100003501· filed Sept 2018 → now Jun 2025· 45.5% built
- DS UNIQUE SARVODAYA1.3 yr overdueDS UNIQUE · Haveli, PuneP52100049916· 32.7% built· 2 complaints
- MADHVACHHAYA1.3 yr overdueFORTUNE DEVELOPERS · Pune City, PuneP52100053769· 72.7% built
- SACRED BASIL1.3 yr overdueM/S INFINITY DEVELOPERS · HAVELI WAKAD, PuneP52100028883· 81.8% built
- Kalpataru Estate Building 81.3 yr overdueKalpataru Construction (Pune) · Pimple Gurav, PuneP52100017535· filed Dec 2022 → now Jun 2025· 86.9% built· 48 complaints
- SHARADA MYRIA B AND C BUILDING1.3 yr overdueSHARADA ERECTORS PRIVATE LIMITED · Haveli, PuneP52100018973· filed Dec 2023 → now Jun 2025· 41.4% built
- Darekar Heights1.3 yr overdueMangaldeep Radiant Developers · Tathawade, PuneP52100026195· filed Jun 2024 → now Jun 2025· 39.1% built
- OMKAR SWARUP PHASE-21.3 yr overdueSANIKET INFRACON LLP · ICHHAPURTI GANESH MANDIR, PuneP52100033738· filed Jun 2024 → now Jun 2025· 81.8% built
- Mangalam Icon1.3 yr overdueRamdas Damodar Phuge proprietor of Bhagyalaxmi Construction · Haveli, PuneP52100029682· filed Jun 2024 → now Jun 2025· 63.8% built
- Joyville Hadapsar Annexe Phase 101.3 yr overdueJoyville Shapoorji Housing Private Limited · Shewalewadi, PuneP52100026795· 83.4% built
- GREENVILLE BUILDING A31.3 yr overdueVision Realtors · HADAPSAR, PuneP52100052806· 68.2% built
- MEDHA APARTMENTS1.3 yr overdueKEDAR SANJEEV KHADKE · PARVATI NORTH, PuneP52100046933· 81.8% built
- VASANTSHREE1.3 yr overduePIONEER CONSTRUCTIONS · Chittavihari Society, PuneP52100045708· filed Dec 2024 → now Jun 2025· 90% built
- YASHWIN HINJAWADI1.3 yr overdueVilas Javdekar Eco Shelters Private Limited · HINJAWADI, PuneP52100000037· 94.5% built· 2 complaints
- ACE AURUM III TOWER 041.3 yr overdueJHAMTANI REALTY PRIVATE LIMITED · RAVET, PuneP52100024925· 50.5% built
- PALMNEST PHASE III1.3 yr overdueNG RATHI PROPERTIES LLP · KESNAND ROAD, PuneP52100015668· filed Dec 2022 → now Jun 2025· 56.4% built· 1 complaint
- RAVI UDAY1.3 yr overdueLAJWANTI CONSULTANTS AND BUILDERS PRIVATE LIMITED · -, PuneP52100032853· 77.2% built
- YashONE Infinitee - Phase I1.3 yr overdueVilas Javdekar Infinitee Developers Pvt. Ltd. · Near Puneville Project, PuneP52100028229· 96.4% built
- Green County Phase II Wing-B1.3 yr overdueAnand Developers · Fursungi, PuneP52100026716· 86.1% built
- MILLENNIA1.3 yr overdueM/S SAGA CONSTRUCTIONS ANU GROUP · NEAR SHRIRANG VIHAR, PuneP52100032494· 81.8% built
- NYATI EXUBERANCE III1.3 yr overdueNYATI BUILDERS PRIVATE LIMITED · MOHAMMADWADI, PuneP52100034932· filed Jun 2024 → now Jun 2025· 38.1% built
- Chinmay Paradise1.3 yr overdueChinmay Paradise · Kondhwa BK, PuneP52100047572· 74.5% built
- Mangalmurti Residency1.3 yr overdueKRISHNAPRAKASH ASSOCIATES · Kharadi, PuneP52100050222· 81.8% built
- VTP Cygnus Building T101.3 yr overdueARHUM ERECTORS PRIVATE LIMITED · manjari, PuneP52100024551· 87.9% built· 14 complaints
- Joyville Hadapsar Annexe Phase 91.3 yr overdueJoyville Shapoorji Housing Private Limited · Shewalewadi, PuneP52100026797· 86.5% built
- Majestique Rhythm County Phase II1.3 yr overdueMAJESTIQUE RISINGSUN LLP · Pune, PuneP52100027794· 90.9% built· 1 complaint
- Majestique Biznow1.3 yr overdueMajestique Springfields LLP · Kondhwa Khurd, PuneP52100027583· 40.9% built
- Green Woods1.3 yr overdueGoldfinger Ventures · Pune City, PuneP52100013183· filed Dec 2017 → now Jun 2025· 81.8% built
- ICON RESIDENCY1.3 yr overdueICON BUILDERS · PUNE, PuneP52100033227· 27.3% built
- VTP Cygnus BuildingT12 and Commercial1.3 yr overdueARHUM ERECTORS PRIVATE LIMITED · Manjari, PuneP52100023473· 84.6% built· 3 complaints
- VTP Beaumonde Building T31.3 yr overdueARHUM ERECTORS PRIVATE LIMITED · Manjari, PuneP52100022781· 80.9% built· 6 complaints
- SILVER STONE1.3 yr overduePanama Sunarch Developers · HANDEWADI, PuneP52100010659· filed Dec 2024 → now Jun 2025· 79.2% built· 2 complaints
- Guardian Cityscapes Phase 21.3 yr overdueGuardian Homes Private Limited · Dattawadi, PuneP52100003427· filed Jun 2023 → now Jun 2025· 81.8% built
- Laxmi Pride1.3 yr overdueM/S B J HULAWALE PROPERTIES · Survey No. 5/1, 5/2, PuneP52100027806· filed Jun 2022 → now Jun 2025· 90.9% built
- ANTAAYA1.3 yr overdueBALASAHEB BHATTU KARANJULE · Balewadi, PuneP52100024983· 52.7% built
- PRAGATI HEIGHTS1.3 yr overduePragati Builders and Developers · Jalochi, PuneP52100047529· 72.7% built
- SWOJAS AVANI1.3 yr overdueSWOJAS REALTORS LLP · ERANDWANA, PuneP52100046896· 90.9% built
- Kumar Pratham - D E G1.3 yr overdueKumar Agro Products Pvt Ltd · Moshi, PuneP52100031354· 93% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.