Delayed projects in Pune
3,402 MahaRERA-registered projects in Pune are past the possession date on file and still under 100% built. Where the promoter has formally revised the date, the original is shown alongside so you can see what changed.
Page 16 of 18
- ADVIKA PHASE III - E1.3 yr overdueADVIKA CONSTRUCTIONS PVT.LTD · PISOLI, PuneP52100022868· filed Dec 2024 → now Jun 2025· 90.5% built
- ACE AURUM III TOWER 031.3 yr overdueJHAMTANI REALTY PRIVATE LIMITED · RAVET, PuneP52100025143· 49% built
- ACE AURUM III TOWER 011.3 yr overdueJHAMTANI REALTY PRIVATE LIMITED · RAVET, PuneP52100026571· 43.5% built
- ACE AURUM III TOWER 021.3 yr overdueJHAMTANI REALTY PRIVATE LIMITED · RAVET, PuneP52100026568· 48.1% built
- Pranam1.3 yr overduePrimary Housing Corporation LLP · Talegaon, PuneP52100000382· filed Dec 2019 → now Jun 2025· 56.9% built
- Palm Springs Phase 11.3 yr overdueDIVINE VENTURES AND LANKE BIRJE ASSOCIATES · Vinodewasti, PuneP52100026794· 81.8% built· 1 complaint
- Gagan Ela1.3 yr overdueGagan Landmarks LLP · Mohammadwadi, PuneP52100002439· filed Dec 2020 → now Jun 2025· 76.2% built· 6 complaints
- Ephelia- Phase 11.3 yr overdueMajestique Giga Homes LLP · kondhwa khurd, PuneP52100025991· 95.5% built
- ORIENT HILL VIEW1.3 yr overdueBOKHARA BUILDTECH · MOHAMMEDWADI, PuneP52100026764· 90.9% built· 1 complaint
- CHAITRANGAN1.3 yr overdueDEDGE HOUSING DEVELOPMENT LLP · KIRKATWADI, PuneP52100045554· filed Dec 2024 → now Jun 2025· 81.8% built
- Global Luxuria1.3 yr overdueDnyaneshwar Mahadu Jadhav proprietor of Global Construction · Alephata, PuneP52100026469· 36.1% built
- VISION PRISA1.3 yr overdueP4 GROUP · Haveli, PuneP52100051225· 90.9% built
- ESPACIO - COMMERCIAL1.3 yr overdueKNIGHT WEST REALTY LLP · BALEWADI, PuneP52100026492· 81.8% built
- ELYSIA TOWERS1.3 yr overdueBHAKTI BUILDERS · BHUMKAR NAGAR, PuneP52100027702· filed Dec 2024 → now Jun 2025· 80% built
- Yashodhan1.2 yr overdueAMIT JUGALKISHOR RATHI · Aundh, PuneP52100046635· 63.6% built
- KRISHNA VIJAY1.2 yr overdueM/S RUDRA DEVELOPERS · HADAPSAR, PuneP52100028074· filed Jun 2023 → now Jul 2025· 72.7% built
- Marvel Bounty J Building1.2 yr overdueMARVEL SIGMA HOMES PRIVATE LIMITED · Hadapsar, PuneP52100006797· filed Dec 2019 → now Aug 2025· 90.9% built· 5 complaints
- NYATI ERA I1.2 yr overdueNYATI CONSTRUCTION PRIVATE LIMITED · DHANORI, PuneP52100032682· filed Jun 2025 → now Aug 2025· 79.2% built· 3 complaints
- Kumar Prospera - A61.2 yr overdueKumar Agro Products Pvt Ltd - Kumar Company (Now known as Kumar Construction and Properties Pvt Ltd) JV · Magarpatta, PuneP52100029906· filed Jun 2025 → now Aug 2025· 90.9% built
- Kotwal Business Zone Building A1.1 yr overdueVISHHRAM DEVELOPERS · Village - Somatane, Tal - Mawal, PuneP52100054072· filed Mar 2025 → now Aug 2025· 72.7% built
- UJWAL VIAAN A WING1.1 yr overdueUJWAL CONSTRUCTION · DHAYARI, PuneP52100028620· 9.7% built
- Nexus Kinaara B C1.1 yr overdueNexus Enterprises · Chikhali, PuneP52100031120· filed Aug 2024 → now Aug 2025· 88.2% built
- Unique Legacy Royale1.1 yr overdueUnique Realty · Keshavnagar, PuneP52100030486· 90.9% built
- Fortune Pride1.1 yr overdueFOrtune Properties · Haveli, PuneP52100047707· 81.8% built
- Sur at Nanded City1.1 yr overdueNanded City Development & Construction Co. Ltd. · Nanded Phata, PuneP52100032686· 99.6% built
- Siddhesh Shreeram1.1 yr overdueSiddhesh Developers · karvenagar, PuneP52100047903· 89.5% built
- TruSpace Premiera1.1 yr overdueAtharva Enterprises · Near Park Central Hotel, PuneP52100048391· filed May 2024 → now Sept 2025· 81.8% built
- VANTAGIO. PH21.1 yr overdueHarmony Shubham Associates · Pune, PuneP52100034311· filed Apr 2024 → now Sept 2025· 94.5% built
- Amanora Ascent Avenue1.1 yr overdueCity Corporation Limited · Hadapsar, PuneP52100047453· filed Jun 2025 → now Sept 2025· 81.8% built
- Alpha C1.0 yr overdueRaichandani Constructions Private Limited · Pune, PuneP52100045387· filed Sept 2024 → now Sept 2025· 90.9% built
- SIDDHI SKYLARK1.0 yr overdueGANGADHAR RAMESH BHALEKAR · MOSHI, PuneP52100045994· filed Sept 2024 → now Sept 2025· 81.7% built
- Vatika1.0 yr overduekishor Laxmanrao Nimhan · warje, PuneP52100027403· 90.9% built
- Astonia Royale Phase II - K and L Building1.0 yr overdueAMIT ENTERPRISES HOUSING LIMITED · Ambegaon Bk, PuneP52100001124· filed Dec 2021 → now Sept 2025· 91.1% built
- T9 Chronos and T10 Supremus Phase 1 Of Raheja Reserve being Buildings T7 T8 T9 T10 in RV Premiere1.0 yr overdueCavalcade Properties Private Limited · NIBM, PuneP52100021356· 72.7% built· 5 complaints
- Windsor County Phase IV Wing I1.0 yr overdueWindsor Shelters · Ambegaon Bk., PuneP52100034251· 90.9% built
- VENKATESH GRAFFITI GLOVER PHASE 21.0 yr overdueSHREE VENKATESH BUILDCON PVT LTD · KESHAVNAGAR MUNDHWA PUNE, PuneP52100025956· 90.9% built
- Godrej Parkridge1.0 yr overdueManjari Housing Projects LLP · Manjari Kh, PuneP52100028310· 71.3% built· 37 complaints
- SUNDER MOTI1.0 yr overdueDILIP MOTILALJI CHORDIA · CHINCHWAD, PuneP52100051080· filed Mar 2025 → now Sept 2025· 81.4% built
- Metro Park County1.0 yr overdueM/s. Dream Works Realty · Balewadi, PuneP52100028748· 95.8% built· 1 complaint
- GODREJ BOULEVARD1.0 yr overdueManjari Housing Projects LLP · Manjri Khurd, PuneP52100024616· 81.8% built· 3 complaints
- JOYVILLE HADAPSAR ANNEXE PHASE 61.0 yr overdueJoyville Shapoorji Housing Private Limited · Shewalewadi, PuneP52100026779· 80.3% built
- VRUNDAVAN HEIGHTS1.0 yr overdueVRUNDAVAN DEVELOPERS · PATAT, PuneP52100030876· filed Sept 2024 → now Sept 2025· 89.1% built
- Hillview Residency P Commercial1.0 yr overdueKUMAR BEHARAY PROPERTIES LLP · Behind Mahatma Society Kothrud, PuneP52100052705· filed Sept 2024 → now Sept 2025· 81.8% built
- GANRAJ APARTMENT1.0 yr overdueVAASTU VISHWA DEVELOPERSSS · JALOCHI, PuneP52100052009· 90.9% built
- Bhakti Shrinidhi1.0 yr overdueBHAKTI BUILDERS · Chinchwad, PuneP52100051298· 81.8% built
- ACE AASTHA BUILDING C1.0 yr overdueSAKSHI DEVELOPERS · OPP. TANISHQ ORCHID SOCIETY, PuneP52100024476· filed Oct 2024 → now Sept 2025· 87.7% built· 11 complaints
- Park Infinia - B1 and B21.0 yr overdueKumar Properties and Real Estate Pvt. Ltd. · Hadapsar, PuneP52100047895· filed Jul 2025 → now Oct 2025· 78.7% built
- GULMOHAR PARK1.0 yr overdueDEEPAK BHAUSAHEB KATE · BARAMATI, PuneP52100051482· 38.1% built
- S SQUARE12 mo overdueSANDIP MADHAV BHADALE · BAVDHAN KHURD, PuneP52100053501· filed Mar 2025 → now Oct 2025· 90.9% built
- Jubilation A Wing Phase II12 mo overdueAakankssha Properties · Yawalewadi, PuneP52100047953· 27.3% built
- SHRI VENKATESH PARK12 mo overdueAJAY BUILDERS DAUND · GOPALWADI, PuneP52100048143· 81.8% built
- Legacy Imperial Phase I11 mo overdueWhite Properties and Ventures · Near Symbiosis College, PuneP52100046570· 95.5% built
- KRYSTAL ONE PHASE I11 mo overdueRAMA SPACES · Chikhali, PuneP52100030567· filed Oct 2024 → now Oct 2025· 90.9% built· 2 complaints
- RAVIKIRAN ANNEXE PHASE I11 mo overdueDREAMHOUSE CONSTRUCTIONS PRIVATE LIMITED · WADMUKHWADI, PuneP52100045726· 90.9% built
- Peninsula - D11 mo overdueKumar Agro Products Pvt Ltd · Pashan, PuneP52100049664· 76.2% built
- RATNANKUR11 mo overdueRanjekar Realty LLP · Kothrud, PuneP52100035032· 81.8% built
- Seeta-Govind11 mo overdueRANADE REALTORS LLP · SADASHIV PETH, PuneP52100027756· 81.8% built
- INDUKIRAN CO-OP HOUSING SOCIETY LIMITED11 mo overdueKotibhaskar Infrastructures &Developers Pvt.Ltd. · KOTHRUD, PuneP52100046237· 70.9% built
- PROSPERIA PART 111 mo overduePristine Properties · CHIKHALI, PuneP52100020997· 81.8% built· 3 complaints
- SWAMI KUNJ10 mo overdueVaibhavlaxmi Infracon · Sadashiv Peth, PuneP52100054128· 9.1% built
- AVIKA10 mo overdueNJ PROPRTIES · CHIKHALI PCMC PUNE, PuneP52100047866· 81.8% built
- AVANI NIVAS10 mo overdueAVANI CORP. · CHARHOLI, PuneP52100024811· 72.7% built· 1 complaint
- KESAR10 mo overdueRAICHANDANI CONSTRUCTIONS PRIVATE LIMITED · HAVELI, PuneP52100034252· 9.1% built
- KRUSHNAKUNJ10 mo overdueBADHEKAR DEVELOPERS · KOTHRUD, PuneP52100050407· 81.8% built
- ARV Newtown Phase II10 mo overdueVedant Infracon · Pisoli, PuneP52100015904· 69.1% built
- Destination Ishanya A Wing10 mo overdueGavhane Realty · Bhosari, PuneP52100053406· 40.9% built
- Halima residency10 mo overdueIQBAL IBRAHIM SHAIKH · PUNE, PuneP52100033220· 81.8% built
- Supreme Estia Phase I10 mo overdueSupreme Palatial Developers LLP · Baner, PuneP52100024783· 90.9% built
- The Back Water Residency Phase II - B Building10 mo overdueLNK PROJECTS Through Proprietor Mr Narayan Baburao Khasnis · Sinhagad Fort area, PuneP52100031341· 4.5% built
- Blue Sapphire Business Park10 mo overdueMangaldeep Associates · Pimple saudagar, PuneP52100019991· filed Dec 2023 → now Dec 2025· 81.8% built
- MAULI SADAN10 mo overdueMR. RAMCHANDRA DHONDU ARGADE AND MR. SADASHIV UDDHAV JADHAV · Haveli, PuneP52100034977· filed Dec 2023 → now Dec 2025· 72.7% built
- AISHWARYAM HAMARA ABHIMAAN10 mo overdueSAI ESSEN DEVELOPERS · CHIKHALI, PuneP52100052847· 50.2% built· 2 complaints
- SKYLINE TOWERS-WING A10 mo overdueYUGANTH REALTY · KADAMWAKWASTI, PuneP52100047241· 81.8% built
- Majestique Nest Building C9 mo overdueM/S MAJESTIQUE ASSOCIATES · PUNE, PuneP52100020198· 90.9% built
- Perfect 10 Phase IV9 mo overdueShagun Manav Spaces LLP · Balewadi, PuneP52100022249· 80.5% built
- Shanti Towers9 mo overdueBora Developers · Golegaon Road, PuneP52100050909· filed Dec 2024 → now Dec 2025· 72.7% built
- W-579 mo overdueAdi Siddhashila Associates · Wakad, PuneP52100024520· 89.1% built
- MEMORIES 90 -PHASE III9 mo overdueM/s NAMO DEVELOPERS · MOHAMMADWADI PUNE, PuneP52100023691· 75% built
- Krishna Heights9 mo overdueNarayan Dharmaji Bodke · Haveli, PuneP52100018577· 90.9% built
- 11 West9 mo overdueBaner Hills LLP · Baner, PuneP52100020311· 90.9% built
- DREAMVILLE APARTMENT9 mo overdueSAWANT AND MOTWANI ASSOCIATES · SAWANT NAGAR, PuneP52100023444· 81.8% built
- FORTUNE PROSPERO9 mo overdueFORTUNE HOMES · KONDHAWA BK, PuneP52100046770· 76.4% built
- MAJESTIQUE MRUGAVARSHA PHASE I9 mo overdueMAJESTIQUE HERITAGE LIVING SPACES LLP · DHAYARI PUNE, PuneP52100022731· 66.7% built
- GANGA TRINITY PHASE I A1A2A39 mo overdueGANRAJ INFRASTRUCTURE LLP · PISOLI, PuneP52100019948· 0% built
- Aditya Shagun9 mo overdueOgale Realty LLP · Chikhali, PuneP52100027220· 90.9% built
- PLATINUM 99 mo overdueHNK BUILDTECH LLP · PUNE, PuneP52100020126· 72.7% built· 1 complaint
- Nexus Kinaara D9 mo overdueNexus Enterprises · Chikhali, PuneP52100033605· filed Dec 2024 → now Dec 2025· 88.6% built
- Rajveer Nucleus9 mo overdueWaghere Promoters · kaspate wasti, PuneP52100009974· 90.9% built
- Megapolis Serenity A8 to A12, B2 and Conv shop B9 mo overduePegasus Properties Pvt. Ltd. · Rajiv Gandhi Infotech Park Phase 3, PuneP52100022957· 85.2% built
- ESPACIO - WING C D AND E/MHADA9 mo overdueKNIGHT WEST REALTY LLP · BALEWADI, PuneP52100025099· 78.8% built
- EXCELLAA PLAZZO9 mo overdueTHE EXCELLAA · Ambegaon, PuneP52100021440· 90.9% built
- ANP - ATLANTIS -Phase I9 mo overdueM/S.Five Star Shelters · BALEWADI, PuneP52100024229· 91.4% built
- CHIRAG ELITE9 mo overdueP M DEVELOPERS · Near Baramati District Court, PuneP52100019319· 90.9% built
- EXCELLAA RESIDENCY9 mo overdueTHE EXCELLAA · AMBEGAON, PuneP52100021432· 90.9% built
- JARE ROYAL HOME9 mo overdueSACHIN VASANT JARE · MOSHI, PuneP52100048303· filed Dec 2024 → now Dec 2025· 72.7% built
- Megapolis Serenity A1 to A7, B1 and Conv shop A9 mo overduePegasus Properties Pvt. Ltd. · Rajiv Gandhi Infotech Park Phase 3, PuneP52100023051· 75.2% built· 2 complaints
- OM PARADISE NX9 mo overdueACON PROPERTIES · VIKAS NAGAR, KIWALE, PuneP52100019128· filed Dec 2022 → now Dec 2025· 72.7% built
- Kalpataru Exquisite - Wing 49 mo overdueKalpataru Retail Ventures Private Limited · Wakad, PuneP52100023268· 52.3% built· 1 complaint
- BHALCHANDRA BLESSINGS9 mo overdueN B BHONDAVE INFRA · SHINDEWASTI, PuneP52100046815· 95.5% built
- SURYA HEIGHTS9 mo overdueSURYAPUTRA DEVELOPERS · Junnar, PuneP52100030345· 64.5% built
- KOHINOOR SHANGRILA PHASE 29 mo overdueKOHINOOR PROPERTIES · PIMPRI, PuneP52100030688· 94.4% built· 2 complaints
- Pranjal9 mo overdueGajendra Dattatraya Pawar · PUNE, PuneP52100012334· filed Dec 2021 → now Dec 2025· 81.8% built
- GV7 CAPITAL 49 mo overdueChirag Developers · Ambegaon Budruk, PuneP52100022958· filed Mar 2022 → now Dec 2025· 7.7% built
- ANAND PRIDE PLUS9 mo overdueANAND CONTRACTORS & DEVELOPERS · BABRAS MALA, PuneP52100031161· filed Dec 2024 → now Dec 2025· 90.9% built
- SUKHWANI PALMS9 mo overdueSUKHWANI PROMOTERS & BUILDERS · WAGHOLI, PuneP52100030796· 58.6% built
- SWAPNALOK PHASE II WING G9 mo overdueMANAV KRUSHNAI DEVELOPERS THROUGH ITS PROPRIETOR MANAV REALTY · Fursungi Pune, PuneP52100034008· 90.9% built
- OMEGA COMMERCIAL COMPLEX - SOHAM ICON9 mo overdueSoham Developers · Haveli, PuneP52100006261· filed Dec 2019 → now Dec 2025· 67.3% built
- SAMARTH RESIDENCY9 mo overdueSHIVSAMARTH DEVELOPERS · ALANDI KHED, PuneP52100049691· 81.8% built
- Manasi9 mo overdueABHILASHA DEVELOPERS · Dahanukar Colony Kothrud, PuneP52100049332· 81.8% built· 2 complaints
- MANMOHAN RESIDENCY9 mo overdueHOME DEVELOPERS AND REALITY · PUNE, PuneP52100050793· 86.5% built
- YashONE Infinitee - Phase III9 mo overdueVilas Javdekar Infinitee Developers Pvt. Ltd. · Kate wasti, PuneP52100030825· 86.8% built
- Tulsidas City Center9 mo overdueRythm Properties · Near Shagun Chowk, PuneP52100078760· 40.9% built
- Raj Apartments9 mo overdueSainath Construction · Aundh, Pune, PuneP52100056085· 51.8% built
- VRUNDAWAN PARK AMENITY COMMERCIAL9 mo overdueVedant Developers · KASBA BARAMATI, PuneP52100048748· 81.8% built
- SUNVIEW CO-OPERATIVE HOUSING SOCIETY LIMITED9 mo overdueSAMRUDDHEE CONSTRUCTIONS · PIMPRI WAGHERE, PuneP52100050177· filed May 2025 → now Dec 2025· 90.9% built
- KRUPASINDHU RESIDENCY9 mo overdueKASBA,BARAMATI, PuneP52100049989· 90.9% built
- Avenue Daffodil9 mo overdueAVENUE REALTY · Baner, PuneP52100003389· filed Dec 2018 → now Dec 2025· 81.7% built
- Archana Prestige9 mo overdueKANIFNATH REALITY · mohamadwadi, PuneP52100050992· 81.8% built
- ALFA PREMIO PHASE 19 mo overdueARK PREM CONSTRUCTIONS · VIMAN NAGAR, PuneP52100000855· filed Sept 2018 → now Dec 2025· 95.9% built· 2 complaints
- Unique Legacy Regal9 mo overdueUnique Realty · Near Renuka Mata Mandir, PuneP52100045485· 86.8% built
- IHITA C AND D BUILDING9 mo overdueNayana Anand Kaswa · Bavadhan BK, PuneP52100009220· filed Dec 2019 → now Dec 2025· 90.9% built
- MY HOME PUNAWALE - Phase II9 mo overdueKeystone Properties · Punawale, PuneP52100033551· 90.9% built· 1 complaint
- CASA AMANTA9 mo overdueTECHSTONE REALTY LLP · Munjeri (Bibvewadi), PuneP52100049680· 90.9% built
- SHIVAAY LANDMARK9 mo overdueSHIVAAY REALITY · CHAROLI, PuneP52100052494· 81.8% built
- SWAPNA SADAN9 mo overdueJADHAV ASSOCIATES · DEFENCE COLONY, PuneP52100031106· 90.9% built
- RUPASHRI APARTMENTS9 mo overdueYATIN S KULKARNI · PARVATI, PuneP52100030617· 90.9% built
- SILVER SQUARE9 mo overdueG S SQUARE · FURSUNGI, PuneP52100034567· 80.5% built
- DEVAKINANDAN9 mo overdueKISHORKUMAR SWAROOPCHAND JAIN · NANA NANI PARK, PuneP52100045361· filed Dec 2024 → now Dec 2025· 81.8% built
- VASANT VIHAR9 mo overdueNAKSHATRA BUILDCON · TALEGAON DABHADE, PuneP52100048937· 38.2% built
- JANKI CRYSTAL9 mo overdueACE PROPERTIES · KIWALE, PuneP52100031236· 68.2% built
- QBIX9 mo overdueTopline Buildtech · Baner Taluka Haweli, PuneP52100033154· 90.9% built
- Grandeview7 Phase-VII Bldg-L9 mo overdueChirag Developers · Near Poddar International School, PuneP52100033228· filed Dec 2024 → now Dec 2025· 90.9% built
- NOBLE HEIGHTS9 mo overdueNOBLE DEVELOPERS · M PHULE PETH, PuneP52100052207· 33.6% built
- VISION SPACIO9 mo overdueVISION CREATIVE ASSOCIATES · DUDULGAON, PuneP52100053856· 92.9% built
- Easterlia Phase 29 mo overdueSpacemint Realty LLP · Khese Park, PuneP52100034658· 89.1% built
- CHORDIYA GALAXY9 mo overdueN K ASSOCIATES · KONDHWA BK, PuneP52100052801· 79.1% built
- SALISBURY TOWERS9 mo overdueATUR INDIA PRIVATE LIMITED · Gultekadi, PuneP52100003712· filed Jun 2022 → now Dec 2025· 99.8% built
- Janaranjani - D Phase II at Nanded City9 mo overdueNanded City Development & Construction Co. Ltd. · Nanded Phata, PuneP52100047078· 90% built
- Sai Vinay9 mo overdueVinayak Developers · Near Pimpri Station, PuneP52100055902· 69.1% built
- CONCLAVE9 mo overdueVEDA VENTURES · Pune City, PuneP52100048511· 81.8% built
- ISHAAN GHARKUL A9 mo overdueIshaan Buildcon · Bhor, PuneP52100018238· filed Dec 2022 → now Dec 2025· 54.5% built
- Sai Bliss9 mo overdueMr Vinod Kishanchand Matani · Punawale, PuneP52100049314· 81.8% built
- Shubham Tarangan Phase II9 mo overdueSHUBHAM VIPRA ASSOCIATES · 1.5 Kms from Alephata Chowk toward Nashik, A/P - Ale, Tal - Junnar, Dist - Pune, PuneP52100029066· 78.9% built· 3 complaints
- GANGA SERIO G BUILDING9 mo overdueGOEL GANGA LANDMARKS LLP · KHARADI, PuneP52100029757· 99.9% built· 2 complaints
- Basil Mondale9 mo overdueVelx Constructions Llp · Keshavnagar, PuneP52100033136· 84.2% built· 1 complaint
- SHANKESHWAR PEARL9 mo overdueS P DEVELOPERS · RAVET, PuneP52100035074· 60% built
- iLife Upper NIBM9 mo overdueLegacy Fortune Associates · Undri, PuneP52100045658· 58.5% built
- USHAKIRAN9 mo overdueKapil Ulhas Trimal · SADASHIV PETH, PuneP52100046401· 45.5% built
- AARAV PALM SPRINGS9 mo overdueDIKSHIT RAJAN AGARWAL · Wagholi, PuneP52100051910· 81.8% built
- RESHMA HEIGHTS CO-OPERATIVE HOUSING SOCIETY LTD.9 mo overdueNestcon · Dahanukar Colony, PuneP52100051614· 68.2% built
- 51B Inclusive Housing9 mo overdueVilas Javdekar Eco Housing Private Limited · Balewadi, PuneP52100051227· 86.4% built
- Joyville Hadapsar Annexe Phase 149 mo overdueJoyville Shapoorji Housing Private Limited · Shewalewadi, PuneP52100031515· 57% built
- SUYOG SPACE - PHASE II9 mo overdueSUYOG BUILDERS · WAKAD, PuneP52100032138· 81.1% built
- ANUGANGA CLASSIC9 mo overdueBENKAR BUILDERS · DHAYARI, PuneP52100048218· 90.9% built
- VEDANT AVENUE9 mo overdueVedant Buildcon · Kasba, PuneP52100054028· 81.8% built
- Vertica Wing D9 mo overdueINFINITY CORP · Chikali, PuneP52100033670· 68.2% built
- YashONE Infinitee - Phase II9 mo overdueVilas Javdekar Infinitee Developers Pvt. Ltd. · Kate Wasti, PuneP52100029042· 93.3% built· 1 complaint
- BRENTWOOD9 mo overdueBANTHIA CONSTRUCTION · S.No. 278/4/2 Pallod Farm, PuneP52100047663· 75.5% built
- VATSALYA PROPERTIES9 mo overdueVatsalya Properties · NANA NANI PARK KONDHAWA BUDRUK, PuneP52100031866· filed Dec 2024 → now Dec 2025· 9.3% built
- AMARILLO TOWN9 mo overdueWAKADKAR BROTHERS · RAVET, PuneP52100035039· 90% built
- SWAPNA SADAN A9 mo overdueJADHAV ASSOCIATES · Defence colony Daund, PuneP52100033815· 90.9% built
- 33 Keshav Kunj9 mo overdueCRYSTAL PROPERTIES · Mundhawa, PuneP52100003364· filed Sept 2019 → now Dec 2025· 95.4% built
- YAHVI9 mo overdueVilas Shinde Developers · Parvati, PuneP52100076961· 81.8% built
- SHEETALKUNJ SAHAKARI GRUHARACHANA SANSATHA MARYADIT9 mo overdueICON PROPERTIES · SHIVAJI NAGAR, PuneP52100034994· 81.8% built
- OMKAR9 mo overdueRanjekar Realty LLP · Karve Nagar, PuneP52100052757· 81.8% built
- NIVASA ELEVIA - PHASE I9 mo overdueShree Samarth Spaces · KESHAVNAGAR, PuneP52100031816· filed Dec 2024 → now Dec 2025· 60% built· 1 complaint
- RA URBANIA9 mo overdueMs Croissance Buildcon · Ganesh Nagar, PuneP52100050429· filed Jun 2025 → now Dec 2025· 81.8% built
- 24 SUNSHINE TOWERS9 mo overdueSHIV ASSOCIATES · CHIKHALI, PuneP52100029620· 81.8% built
- IMPERIAL MIST9 mo overdueImperial Housing · BALEWADI, PuneP52100046615· 90.9% built
- PADMA MADHAV9 mo overdueVriddhi Realty Parvati LLP · KOTHRUD, PuneP52100052040· filed Jun 2025 → now Dec 2025· 66.8% built
- SWOJAS NAKSHATRA9 mo overdueSWOJAS ASSOCIATES LLP · ERANDWANA, PuneP52100032107· 90.9% built
- MANGAL KALASH9 mo overduePANKAJ CONSTRUCTIONS · Haveli, PuneP52100030962· 90.9% built
- Princetown Tower - C29 mo overdueManikchand Kumar Properties · Undri, PuneP52100045982· 90.9% built
- Kalpataru Serenity - Bldg. 39 mo overdueKalpataru Gardens Pvt. Ltd. · Pune, PuneP52100034075· 65.9% built
- EURUS9 mo overdueEDENIC ENTERPRISES PVT LTD · PUNE, PuneP52100034246· 70% built
- VNSVL Shubh Nirvana Phase 19 mo overdueViman Nagar Shubh Ventures LLP · Viman Nagar, PuneP52100031263· 93.6% built
- VALLABHNIWAS CO-OP HOUSING SOCIETY LTD9 mo overdueSWOJAS REALTORS LLP · RAMBAUG COLONY, PuneP52100046809· 73.2% built
- RVK JANAKI9 mo overdueRVK REALTY · SATHE COLONY, PuneP52100031533· 81.8% built
- Shankeshwar Gravity9 mo overdueMunisuvrat Properties · NA, PuneP52100024786· 90.9% built
- YOGANAND PARK 29 mo overdueBELVALKAR HOUSING LLP · KOTHRUD, PuneP52100051502· 72.7% built
- KUMAR PALMCREST A59 mo overdueKUMAR PROPERTIES AND PROMOTERS PRIVATE LIMITED · PISOLI, PuneP52100033817· 72.1% built
- Shree Apartment9 mo overdueS R Developers · Near Veer Baba Mandir, PuneP52100051723· 90.9% built
- Anand Residency9 mo overdueTapkir Associates · Haveli, PuneP52100053521· 90.9% built
- MANGALAM SIGNATURE9 mo overdueMetro Realty Group · Moshi, PuneP52100031523· 18.2% built
- Hill Avenue9 mo overdueILMS SHELTERS PVT LTD · Near Pashan Hills, PuneP52100051340· 81.8% built
- Nexus Atrium ABC8 mo overdueNexus Buildwell · Borhadewadi, PuneP52100032575· filed Jun 2024 → now Jan 2026· 90.9% built
- INDU GRACIA8 mo overdueVIJAY CONSTRUCTION NEXT · Chikhali, PuneP52100025794· 46.4% built
- RATNAPRABHA8 mo overdueASHWAMEDH SPACES PRIVATE LIMITED · Kothrud, PuneP52100045880· filed Jun 2025 → now Feb 2026· 90.5% built· 1 complaint
- KUMAR PEBBLE PARK JOY 3 - C38 mo overdueKUMAR PROPERTIES AND PROMOTERS PVT. LTD · HADAPSAR, PuneP52100026151· 90.9% built
- KLS SUPREMUS8 mo overdueRAMRAI INFRA · Pashan, PuneP52100032488· filed Jun 2025 → now Feb 2026· 99.5% built· 6 complaints
- Kohinoor Sapphire III8 mo overdueRISING ASSOCIATES · Tathawade, PuneP52100033835· 79.3% built· 1 complaint
- DEVALE DIVINE8 mo overdueOMKAR KISHOR DEVALE · BARAMATI, PuneP52100051853· 65.9% built
- Solitaire Ten7 mo overdueASHOK DHANRAJ CHORDIA · Bhosale Nagar, PuneP52100045976· filed Mar 2025 → now Mar 2026· 81.8% built
- LOTUS PARK7 mo overdueSRI SRI BUILDCON · MOSHI, PuneP52100054280· 81.8% built
- AAIJI PINK CITY7 mo overdueAAIJI REALTY · SATHE VASTI, PuneP52100023905· 81.8% built
- NIRVANA LIFECITY7 mo overdueNIRVANA LIFECITY LLP · NEAR NYATI EVITA, PuneP52100020070· 89.1% built
- SOBHA NESARA BLOCK-17 mo overdueSOBHA LIMITED · KOTHRUD, PuneP52100020057· filed Mar 2025 → now Mar 2026· 98.2% built· 4 complaints
- AUMSANIKA PARAS RESIDENCY7 mo overdueAUMSANIKA DEVELOPERS LLP · PUNE, PuneP52100056040· 80.9% built
- Yashwin SuperNova7 mo overdueVilas Javdekar Eco Shelters Private Limited · Near Indira College, Wakad Pune, PuneP52100028652· 99.8% built· 1 complaint
- MATRIX6 mo overdueBHARAT HASTIMAL JAIN · MUNJERI BIBVEWADI, PuneP52100048463· 27.3% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.