Delayed projects in Pune
3,402 MahaRERA-registered projects in Pune are past the possession date on file and still under 100% built. Where the promoter has formally revised the date, the original is shown alongside so you can see what changed.
Page 17 of 18
- GOVIND RIVERINE6 mo overdueBHARAT SITARAM KATE · Haveli, PuneP52100054850· 90.9% built
- Kalpataru Jade Residences H6 mo overdueAstrum Developments Private Limited · Baner, PuneP52100046423· 80.2% built
- RUDRADEEP6 mo overdueRAGHVENDRA MAHARUDRA TULSHIBAGWALE · SAHKAR NAGAR, PuneP52100046351· filed May 2024 → now Mar 2026· 80.9% built
- VISHNU GREENS6 mo overdueJAI GANESH PROPERTIES · Fursungi, PuneP52100051865· 90.9% built
- Skylark Apartments RVR 7A at Riverview City6 mo overdueRiverview City Constructions Ltd · Haveli, PuneP52100047628· 56.5% built
- LAKE TOWN D-6, WING - A and B6 mo overdueVENKATESH ASSOCIATES · KATRAJ, PuneP52100053248· filed Dec 2025 → now Mar 2026· 98.3% built· 1 complaint
- Sushila6 mo overdueParulekarkale Realty LLP · Ganesh Nagar, PuneP52100050888· filed Jun 2025 → now Mar 2026· 72.7% built
- Supreme Villagio II6 mo overdueTurquoise Housing LLP · Somatne, PuneP52100049506· 53.9% built
- 97 SONIGARA BIZZ6 mo overdueDHANASHRI CONSTRUCTION · RAVET, PuneP52100052052· filed Jun 2025 → now Mar 2026· 72.4% built
- BHAMA CENTER6 mo overdueAASTHA INFRA BUILDCON · WAKAD, PuneP52100022965· filed Dec 2022 → now Mar 2026· 81.1% built
- VISION ARISTO6 mo overdueVISION CREATIVE PROMOTERS · KIWALE, PuneP52100030708· 90.9% built
- GAIKWAD NIRVANAS6 mo overdueGAIKWAD DEVELOPERS · WAKAD, PuneP52100047315· 75.5% built
- AROHAN6 mo overdueRVR CONSTRUCTION · TALEGAON DABHADE, PuneP52100052715· 90.9% built
- SHREE GANESHA HEIGHTS6 mo overdueSIDDHIVINAYAK ENTERPRISES · MAMURDI, PuneP52100049450· 81.8% built
- Adiyogi6 mo overdueKIDPL ADIYOGI PRIVATE LIMITED · Pune, PuneP52100054560· filed Jul 2025 → now Mar 2026· 90.9% built
- SARA ABHIMAN6 mo overdueJAGRUTSARA STRUCTURES LLP · TALEGAON CHAKAN, PuneP52100046745· 88.5% built
- VTP AETHEREUS HIGH STREET6 mo overdueHOME RISING CONSTRUCTION LLP · Mahalunge, PuneP52100055356· filed Mar 2025 → now Mar 2026· 59.1% built· 1 complaint
- ATLANTA SQUARE6 mo overdueUTTAM ASSOCIATE · Mawal, PuneP52100054714· filed Dec 2025 → now Apr 2026· 78.2% built
- Shreenath Residency6 mo overdueChandrakant Gulab Jamdade · Jamdade Estate, PuneP52100052917· filed May 2025 → now Apr 2026· 81.8% built
- MY HOME KIWALE6 mo overdueRAVET LAND DEVELOPERS LLP · KIWALE, PuneP52100026833· 63.6% built· 3 complaints
- YashONE Eternitee Phase 16 mo overdueVilas Javdekar Infinitee Developers Pvt. Ltd. · Maan, PuneP52100046122· 89.5% built· 4 complaints
- GANGA DHAM TOWER B..6 mo overdueLegends County Landmark Pvt Ltd · Pune City, PuneP52100000212· 60% built
- LA VISTA6 mo overdueDARSHANRAJ REALITY · BHOSALE NAGAR, SHIVAJI NAGAR, PuneP52100052539· 78.2% built
- PALAASH OAK PRIME6 mo overdueBhakti Sagar Developers · -, PuneP52100047171· filed Dec 2025 → now Apr 2026· 90.9% built
- MITHILA RESIDENCY6 mo overdueSHREEYASH ASSOCIATES · Plot No 3, Gat No 187/2/A, Jalochi, Baramati, PuneP52100051051· 79.1% built
- Satvik Villa6 mo overdueMak Developers Through Damji Vasta Makwana · Baner, PuneP52100052821· filed Apr 2025 → now Apr 2026· 63.6% built
- Gangawas6 mo overdueArchway Estates DB Gangawas LLP · Erandawane, PuneP52100034138· filed Dec 2024 → now Apr 2026· 80.8% built
- NIRMAN ADI6 mo overdueNIRMAN DEVELOPERS · Pune City, PuneP52100051655· 59.1% built· 1 complaint
- SWOJAS ADVAIT6 mo overdueSWOJAS REALTORS LLP · Pune City, PuneP52100045710· filed Oct 2025 → now Apr 2026· 81.8% built
- ALPINE ASTONIA6 mo overdueALPINE LANDMARKS LLP · Mawal, PuneP52100047595· 80.9% built
- 24 ELEMENTS5 mo overdueS.P. BUILDERS AND DEVELOPERS · Ambegaon, PuneP52100052370· 71.8% built
- JUBILATE COUNTY5 mo overdueJUBILATE COUNTY · Mulshi, PuneP52100027501· 28.2% built· 12 complaints
- ONELLA TOWER5 mo overdueSAHARA CONSTRUCTIONS · Haveli, PuneP52100029869· filed May 2024 → now May 2026· 90.9% built· 1 complaint
- Central Park Residences C15 mo overdueSRI KALPATRU REALTY PVT. LTD. · Borhadewadi, PuneP52100054901· 72.7% built
- Godrej Green Vistas5 mo overdueMahalunge Township Developers Private Limited · Mahalunge, PuneP52100028117· filed Jun 2025 → now May 2026· 79.7% built· 17 complaints
- MADHUSHREE4 mo overdueKPL BUILD CON LLP · Dhayari, PuneP52100051809· 81.8% built
- AARAMBH4 mo overdueR M S Developers · Haveli, PuneP52100050419· filed Dec 2024 → now May 2026· 54.5% built
- WESTWINDS Wing A4 mo overdueShreeram Sankalp Associates · Haveli, PuneP52100005189· filed Dec 2021 → now May 2026· 67.3% built
- INFINITY PLANET E WING4 mo overdueTULIP PROPERTIES · Haveli, PuneP52100034091· filed Dec 2025 → now May 2026· 90.9% built
- INFINITY CUBE4 mo overdueSNEHMANGAL TULIP DEVELOPERS · Mulshi, PuneP52100029887· filed Mar 2024 → now May 2026· 90.9% built
- Skyi Manas Lake Phase VIII4 mo overdueEnerrgia Skyi Ventures LLP · Mulshi, PuneP52100052033· 48.1% built
- Arunya A Wing4 mo overdueGM Buildcon · Haveli, PuneP52100027329· filed Jun 2024 → now May 2026· 79.1% built
- ABHISHEK CO OPERATIVE HOUSING SOCIETY LIMITED4 mo overdueFORTUNE DEVELOPERS · Pune City, PuneP52100053895· 68.2% built
- Nilay4 mo overdueANGAL & CO · Shivajinagar (Bhamburda), PuneP52100052245· 63.2% built
- SPLENDOUR COUNTY WAGHOLI4 mo overduePS DEVELOPERS · Haveli, PuneP52100021548· filed Jun 2024 → now Jun 2026· 86.4% built· 1 complaint
- PRIME PRESTIGE4 mo overduePRIME CONSTRUCTION · Junnar, PuneP52100052709· 81.8% built
- Navkar Suchit4 mo overdueFOUR PILLARS · Chinchwad Gaon, Pune, PuneP52100053413· filed Dec 2025 → now Jun 2026· 45.9% built
- Chandrasmit4 mo overdueMetricon Builders Private Limited · Pune City, PuneP52100047222· filed Jun 2025 → now Jun 2026· 64.1% built
- Phase VI - Buildings O1 and P14 mo overduePhase VI - Buildings O1 and P1 · Khed, PuneP52100012061· filed Dec 2019 → now Jun 2026· 27.7% built
- SARA SWAPNODAY4 mo overdueJagrutsara Structures LLP · Khed, PuneP52100029638· filed Jun 2025 → now Jun 2026· 90.9% built
- VTP ALTAIR4 mo overdueIntegrated Business Ecosystem Private Limited · Haveli, PuneP52100030521· filed Jun 2025 → now Jun 2026· 94.2% built· 33 complaints
- Panache4 mo overdueCedrus Assets · Ghorpadi, PuneP52100010652· filed Dec 2024 → now Jun 2026· 76.1% built
- Sapphire4 mo overdueLayra Phoenix Realty LLP · Haveli, PuneP52100054005· filed Dec 2025 → now Jun 2026· 81.8% built
- SKYLER PHASE II4 mo overdueSKYLER PHASE II · Haveli, PuneP52100027949· 44.5% built· 1 complaint
- TRISHALA4 mo overdueRAINBOW PROPERTIES · Gultekadi, PuneP52100077604· filed Dec 2025 → now Jun 2026· 90.9% built
- SURBHI SAMRUDHI4 mo overduePrakriti Space LLP · Haveli, PuneP52100052668· 88.7% built
- YASHODHAN4 mo overdueRANADE REALTORS LLP · Kothrud, PuneP52100051695· 72.7% built
- Panchratna Hills Phase 24 mo overduePanchratna Construction · Haveli, PuneP52100027976· filed Jun 2025 → now Jun 2026· 89.5% built
- DOLPHIN MATRIX4 mo overdueM/S. MAHALAXMI PROMOTERS · HINJAWADI, PuneP52100054157· filed Dec 2024 → now Jun 2026· 90.9% built
- Mangalam Breeze4 mo overdueMetro Buildcon · Dudulgoan Moshi, PuneP52100026808· 57.7% built
- SAMARTH HERITAGE4 mo overdueSHAMIK PRAVIN LADKAT · Haveli, PuneP52100048999· filed Dec 2025 → now Jun 2026· 57.7% built
- PG AVENUE 74 mo overduePARMAR REALTORS · VIJAY NAGAR COLONY, PuneP52100049232· 81.8% built
- addressOne - Phase 64 mo overduePeninsula Land Limited · Mawal, PuneP52100018788· filed Jun 2024 → now Jun 2026· 67.3% built· 34 complaints
- SIGNATURE PARK E F I AND J BUILDINGS4 mo overdueSHREE SONIGARA REALCON · Mulshi, PuneP52100027402· 88.5% built· 46 complaints
- NAKSHATRA RESIDENCY4 mo overdueSHREE SAIRAJ DEVELOPERS · Haveli, PuneP52100046154· filed Jun 2025 → now Jun 2026· 71.8% built
- GRAZIA4 mo overdueSBM SPACE REALTY LLP · KOTHRUD, PuneP52100052712· filed Dec 2025 → now Jun 2026· 80% built
- Revati4 mo overduePIONEER CONSTRUCTIONS · Haveli, PuneP52100053317· filed Dec 2025 → now Jun 2026· 80% built
- 4 Taljai Hills Phase 14 mo overdueShri Taljai Mata Associates LLP · Haveli, PuneP52100027103· 84.5% built· 1 complaint
- LOVE SPRING4 mo overdueAPEX ASSOCIATES · Haveli, PuneP52100020368· filed Dec 2023 → now Jun 2026· 80.9% built
- SELENIA4 mo overdueRIVER EDGE CONSTRUCTION · Haveli, PuneP52100030253· 60.9% built
- TATHASTU PHASE-I4 mo overdueM/s Shree Umiya Buildcon · SPINE ROAD PRADHIKARAN MOSHI, PuneP52100055321· filed Dec 2025 → now Jun 2026· 71.4% built
- GURMEHARS Silver and Devi Co-operative housing society4 mo overdueGURMEHARS Silver and Devi Co-operative housing society · Haveli, PuneP52100079573· 81.8% built
- Sai Ramdas4 mo overdueRahul Ramdas Tupe · Haveli, PuneP52100028366· filed Jun 2024 → now Jun 2026· 45.5% built
- Sarthak Aaradhana4 mo overdueSarthak Capital Housing · Haveli, PuneP52100050994· 90.9% built
- Sneha Avenue4 mo overdueNandu Antaram Rajput · Mulshi, PuneP52100049963· filed Dec 2025 → now Jun 2026· 84.5% built
- OSIAN ONE AND ONLY PHASE I4 mo overdueAHURA BUILDERS · MUNDHWA, PuneP52100030568· 92.7% built
- Asya4 mo overdueMOIRA SPACES OPC PRIVATE LIMITED · Pune City, PuneP52100066499· filed Dec 2025 → now Jun 2026· 64.2% built
- BASIL SERENITY4 mo overdueBASIL DEVELOPERS · CHARHOLI BK, PuneP52100051897· 89.1% built
- SHREE BALAJI HEIGHTS4 mo overdueSHREE BALAJI DEVELOPERS · Haveli, PuneP52100050055· filed Dec 2025 → now Jun 2026· 90.4% built
- 172W Inclusive Housing4 mo overdueVilas Javdekar Lifestyle Developers Pvt. Ltd. · Wakad, PuneP52100049412· 68.2% built
- Ashapuri Vrundavan Phase II4 mo overdueAshapuri Developers · Mulshi, PuneP52100050898· 34.5% built
- Unique Youtopia Phase II4 mo overdueUnique Associates · Haveli, PuneP52100046003· 90.9% built
- KESAR VALLEY4 mo overdueBANSAL RIVERVIEW · Haveli, PuneP52100027291· 87.9% built
- HARE KRISHNA KUNJ4 mo overdueB G PROMOTERS AND BUILDERS · Haveli, PuneP52100031579· filed Dec 2025 → now Jun 2026· 78.2% built
- VNSVL Shubh Nirvana - Phase II4 mo overdueViman Nagar Shubh Ventures LLP · Haveli, PuneP52100050937· 95.5% built
- Majestique Towers East Phase 44 mo overdueM/s. Sharad Shree Enterprises, Sachin Date, Jayshree Date · Haveli, PuneP52100028813· 59.5% built· 1 complaint
- ADIAMVILLE4 mo overdueM/S J.N.BUILDERS · Ahead Balaji Temple, PuneP52100025763· 72.5% built
- AVIRO4 mo overdueKrishna Vision · Haveli, PuneP52100045561· filed Jun 2025 → now Jun 2026· 90.9% built
- Blueridge-The Groves4 mo overdueNOVA DEVELOPERS PVT LTD · Hinjawadi, PuneP52100027419· 90% built
- NB TOWERS4 mo overdueSHEKHAR INFRATECH · NEAR TULSI LANDMARK, PuneP52100052677· 79.8% built
- SHIVSAHYADRI4 mo overdueNANDANVAN DEVELOPERS · Junnar, PuneP52100051720· 19.6% built
- Gandharv Nagari A64 mo overdueVinayak Pandharinath Bhongale · Haveli, PuneP52100047726· filed Oct 2024 → now Jun 2026· 69.5% built
- SKYWAY PARVATI4 mo overdueSKYWAY PARVATI · Haveli, PuneP52100056478· 72.7% built
- PANACHE AURA4 mo overdueSHREE BHAGWATI GROUP · DUDULGAON, PuneP52100052013· filed Dec 2025 → now Jun 2026· 81.8% built
- CITY PLAZA4 mo overdueBharat Builders and Developers · CHAKAN, PuneP52100023832· 90.9% built
- LAXMIKRUPA4 mo overdueGANGOTREE HOMES · Haveli, PuneP52100045252· filed Dec 2025 → now Jun 2026· 88.9% built· 1 complaint
- SARIKA4 mo overdueM/s ANAND CONSTRUCTIONS · Chinchwad, PuneP52100053103· 97.9% built
- Mont Vert Kingstown Sector 1 Residential Wings4 mo overdueNiraj Kumar Associates Pvt Ltd · Mulshi, PuneP52100026366· filed Jun 2025 → now Jun 2026· 61.5% built· 4 complaints
- BUNIYAD4 mo overdueRANADE REALTORS LLP · Karve Nagar, PuneP52100051468· 72.7% built
- The Terraces Phase 24 mo overdueRashmi Commercial Company Limited · Balewadi, PuneP52100004039· 87.7% built
- EMERALD TOWERS4 mo overdueSamruddhi Developers · Haveli, PuneP52100032827· filed Jun 2025 → now Jun 2026· 99.1% built
- EMERALD VISTA4 mo overduePADMAVATI LANDMARKS · Haveli, PuneP52100076742· 80% built
- NAVKSHITIJ CHS LTD4 mo overdueVishwam Realtors & Developers LLP · Haveli, PuneP52100028051· 81.8% built
- GINI ARIA - PHASE 24 mo overdueGini Construction Pvt Ltd · Yevlewadi, PuneP52100054760· 81.8% built
- Arihant Sakshi4 mo overdueDharmesh Vasantrai Shah · Pune City, PuneP52100032532· filed Jun 2024 → now Jun 2026· 54.5% built
- SONIGARA SUNVIEW4 mo overdueSONIGARA SUNVIEW · Haveli, PuneP52100079565· 72.7% built
- Golden Core4 mo overdueGhule Patil Developers · Pune City, PuneP52100052849· 72.7% built
- Eastern River Residency Wing F4 mo overdueHaveli, PuneP52100026039· filed Jun 2025 → now Jun 2026· 81.8% built
- Yashwin NuovoCentro4 mo overdueVilas Javdekar Lifestyle Developers Pvt. Ltd. · Wakad, PuneP52100034523· 95.8% built· 1 complaint
- VIDULA APARTMENTS4 mo overdueHINDUSTAN BUILDERS · Kothrud, PuneP52100076729· 73.6% built
- GAGAN ALLURE PHASE 24 mo overdueGAGAN ALLURE PHASE 2 · Haveli, PuneP52100027825· 47.5% built
- ARV Newtown Phase III4 mo overdueVedant Infracon · Haveli, PuneP52100027214· 90.3% built· 1 complaint
- Manek Regency4 mo overdueB. U. Bhandari Landmarks · Pune City, PuneP52100018550· filed Dec 2024 → now Jun 2026· 50% built
- Komal4 mo overdueSRKD LANDMARK LLP · Haveli, PuneP52100047236· filed Jan 2025 → now Jun 2026· 72.7% built
- 204 BLUE PARADISE4 mo overdueBLUE PEARL GROUP · Baner, PuneP52100047531· filed Mar 2025 → now Jun 2026· 76.4% built
- MADHUSAGAR4 mo overdueSIDDHASHILA VENTURES LLP · Pune City, PuneP52100047028· filed Dec 2025 → now Jun 2026· 90.9% built
- VARADSIDDHI PLAZA4 mo overdueVARADSIDDHI ASSOCIATES · Haveli, PuneP52100052597· 81.8% built
- DODKE PALAZZO4 mo overdueDODKE LANDMARKS · Haveli, PuneP52100031044· filed Dec 2024 → now Jun 2026· 90.2% built
- BARCODE4 mo overdueESSEN VENTURES · Haveli, PuneP52100026749· filed Jun 2023 → now Jun 2026· 81.8% built
- Ashapuri Vrundavan Phase I4 mo overdueAshapuri Developers · Mulshi, PuneP52100046393· filed Jun 2025 → now Jun 2026· 54.5% built
- Nakshatra i-Land Phase 44 mo overdueEllora Homemakers Pvt. Ltd. · Haveli, PuneP52100046743· 23.6% built
- TOP TOWERS - A4 mo overdueRAGA DEVELOPERS · Mulshi, PuneP52100034929· filed Dec 2025 → now Jun 2026· 81.8% built· 1 complaint
- Kingston Atlantis A1 and A2 Building4 mo overdueVedant Landmarks · MOHAMMADWADI, PuneP52100005525· filed Jun 2022 → now Jun 2026· 95.5% built· 25 complaints
- Mantra Mirari Phase 24 mo overdueMANTRA RESIDENCES MUNDHWA PRIVATE LIMITED · MUNDHWA, PuneP52100032842· 99.5% built
- KJ TOWER4 mo overdueKALYAN JAGANNATH JADHAV · Haveli, PuneP52100008908· filed Mar 2024 → now Jun 2026· 96.5% built· 3 complaints
- OLIVE HOMES - 24 mo overdueAAKAR REALTIES · Chovisawadi, PuneP52100051060· 79.1% built
- Building A3 - VENICIA4 mo overdueLEENA CONSTRUCTIONS · Baner, PuneP52100046862· filed Dec 2025 → now Jun 2026· 97.3% built
- GATEWAY4 mo overdueRAICHANDANI CONSTRUCTIONS PRIVATE LIMITED · Pune City, PuneP52100048395· filed Dec 2025 → now Jun 2026· 83.3% built
- Green Life3 mo overdueGreen Life · Mulshi, PuneP52100022404· 84.5% built
- KUMAR PRAJWAL3 mo overdueKEWAL REAL ESTATE DEVELOPERS PRIVATE LIMITED · Haveli, PuneP52100017868· filed Mar 2023 → now Jul 2026· 98.5% built
- Shivratna3 mo overdueMr Rajan Vishram Palekar · Ravet, PuneP52100055201· filed Jun 2025 → now Jul 2026· 72.7% built
- BVM FLORA3 mo overdueSunny Naresh Nagdev · Tathawade, PuneP52100053235· filed Jul 2025 → now Jul 2026· 72.7% built
- Celia Phase 23 mo overdueCelia Phase 2 · Pune City, PuneP52100001303· filed Jan 2021 → now Jul 2026· 31.4% built· 4 complaints
- Swastik Twin Tower3 mo overdueSwastik Builders · Haveli, PuneP52100030108· 90.9% built
- MANORAMA2 mo overduePANDIT JAVDEKAR ASSOCIATES · Haveli, PuneP52100049035· 81.8% built
- SHRIKISAN ENCLAVE2 mo overdueM/s. Tirupathi Properties Through Prop Mr. Vedprakash Shrikisan Agarwal · Haveli, PuneP52100076885· 30.9% built
- Gada Elina2 mo overdueKubix Realties LLP · Haveli, PuneP52100054293· 33.6% built
- Tranquility annexe c wing2 mo overdueK AND B ASSOCIATES · Manjri Stud Farm, PuneP52100030776· 90.9% built
- Lodha Pune NIBM Project2 mo overdueLodha Developers Limited · Mohamadwadi, PuneP52100024215· filed Dec 2025 → now Jul 2026· 69.7% built· 2 complaints
- Gharonda2 mo overdueParulekar Realty LLP · Haveli, PuneP52100053024· 61.4% built
- GLORIOUS TATHASTU2 mo overdueGlorious Buildcon · RAVET, PuneP52100054325· filed Dec 2025 → now Jul 2026· 90.9% built
- REAL DREAM HOMES WING C AND D2 mo overdueREAL BUILDCON BUILDERS AND DEVELOPERS · Mawal, PuneP52100046267· 58.5% built
- RKL Durvankur Jaswand2 mo overdueLUNKAD VISHWA DEVELOPER · Alandi Devachi, PuneP52100045975· filed Apr 2025 → now Jul 2026· 72.7% built
- TRIMURTI SANTKRUPA HEIGHTS2 mo overdueSAMBHAJI BABAN BORHADE · Haveli, PuneP52100050150· 50.9% built
- Swastik Paradise2 mo overdueNA ASSOCIATES · Ravet, PuneP52100077811· filed Mar 2026 → now Aug 2026· 72.7% built
- GANGA DHAM TOWER A..2 mo overdueLegends County Landmark Pvt Ltd · Pune City, PuneP52100000393· filed Apr 2026 → now Aug 2026· 69.7% built· 5 complaints
- INDIAN BANK STAFF CO-OPERATIVE HOUSING SOCIETY LTD2 mo overdueRAICHANDANI CONSTRUCTIONS PRIVATE LIMITED · Pune City, PuneP52100052515· filed Dec 2025 → now Aug 2026· 62.3% built
- Bluegrass Residences Tower II2 mo overdueSagitarius Ecospaces LLP · Pune City, PuneP52100024441· filed Apr 2026 → now Aug 2026· 81.8% built
- Aqua Life2 mo overdueLegacy Lifespaces LLP · Ravet, PuneP52100078125· 63.6% built
- CAPELLA2 mo overdueD K REALTIES · AMBEGAON, PuneP52100051877· 65.9% built
- ECO CITY2 mo overdueNAMRATA PROMOTERS AND BUILDERS · Mawal, PuneP52100050644· filed Jan 2026 → now Aug 2026· 90.9% built
- Luxuria1 mo overdueLuxuria · Mawal, PuneP52100078634· 44.1% built
- ANP RETREAT1 mo overdueFive Star Construction Company · Behind Golden Care Hospital, PuneP52100034557· filed Jun 2025 → now Aug 2026· 90.9% built
- G G CAPITAL1 mo overdueGG BUILDERS AND DEVELOPERS · Jalochi, PuneP52100055383· 65.5% built
- DIVYA ELITE1 mo overdueRRS INFRACON LLP · KONDHWA, PuneP52100047933· filed Jun 2025 → now Aug 2026· 53.2% built
- TUNGABHADRA CO OP HSG SOC1 mo overdueUnknown · Haveli, PuneP52100046370· filed Apr 2025 → now Aug 2026· 81.8% built
- PROFITBAY - BT KAWADE ROAD1 mo overdueVENTURESPRO PROJECTS LLP · Haveli, PuneP52100033914· filed Aug 2023 → now Aug 2026· 71.7% built
- KRYSTAL ONE PHASE II1 mo overdueRAMA SPACES · Haveli, PuneP52100047325· filed Aug 2025 → now Aug 2026· 90.9% built
- Prime Space1 mo overdueNath Estate · Dudulgaon, PuneP52100054765· filed Dec 2025 → now Aug 2026· 72.7% built
- Yogamrut1 mo overdueJay Ganesh Buildcon · Ambegaon Bk, PuneP52100033612· filed May 2024 → now Aug 2026· 81.8% built
- RISING HILLS1 mo overdueUnknown · Haveli, PuneP52100033495· filed Mar 2025 → now Aug 2026· 90.9% built
- CHANDRA APARTMENT1 mo overdueDESHPANDE LANDMARK PRIVATE LIMITED · Kothrud, PuneP52100045316· filed May 2024 → now Aug 2026· 63.6% built
- SHUBH EVAN C1 WING1 mo overdueKALASH ENTERPRISES · Haveli, PuneP52100026420· filed Dec 2024 → now Aug 2026· 90.9% built
- TruSpace Platina1 mo overdueAtharva Developments · Balewadi, PuneP52100078268· 68.2% built
- MRUDULA RESIDENCY1 mo overdueSAMARTH ASSOCIATES · Haveli, PuneP52100022729· 72.7% built
- Gandharv Nagari Building A3 Wing A, B1 mo overdueVinayak Pandharinath Bhongale · Gandharv Nagari, PuneP52100048889· filed Sept 2025 → now Sept 2026· 91.4% built
- 34 Western Pavillion1 mo overdueBLUE PEARL PROMOTERS AND DEVELOPERS · Haveli, PuneP52100027431· filed Apr 2024 → now Sept 2026· 81.8% built
- Varad Residency1 mo overdueVilas Bhagaji Arekar · Near bhumkar Vasti, PuneP52100050115· filed Dec 2025 → now Sept 2026· 81.8% built
- VISION ACE COMMERCIAL PHASE I1 mo overdueVISION ACE · Mulshi, PuneP52100026126· filed Jun 2023 → now Sept 2026· 72.7% built
- IDEAL AVENUE1 mo overdueIDEAL BUILDERS · Haveli, PuneP52100027916· filed Sept 2024 → now Sept 2026· 80% built
- 1 NEW CASTLE1 mo overdueCHAVDA REALTY LLP · BANER, PuneP52100052768· filed Dec 2025 → now Sept 2026· 41.4% built
- 7 Plumeria Drive- Phase 30 mo overdueB A Consulting · Punawale, PuneP52100050087· filed Mar 2026 → now Sept 2026· 85.3% built
- CITY ONE SKYVE0 mo overdueSHREE SAI CAPITAL · Haveli, PuneP52100033011· filed Dec 2025 → now Sept 2026· 93.5% built· 2 complaints
- Spring Residency0 mo overduePritam Ashok Kachi · Haveli, PuneP52100008915· filed Dec 2018 → now Sept 2026· 90.9% built· 2 complaints
- Majestique Swapnangan Wing A and Wing B0 mo overdueMajestique Horizon LLP · Haveli, PuneP52100031125· filed Dec 2025 → now Sept 2026· 87.7% built· 19 complaints
- VAISHNAVI CITY PHASE 2 SECTOR 20 mo overdueVAISHNAVI CITY PHASE 2 SECTOR 2 · Haveli, PuneP52100076657· filed May 2026 → now Sept 2026· 81.8% built
- GRACE AVENUE0 mo overdueTRIMURTHY NARAYAN · Baner, PuneP52100066459· filed Mar 2025 → now Sept 2026· 30.9% built
- STAR VISTA0 mo overdueRAVIE KHILUMAL OCHANNI · Haveli, PuneP52100031091· filed Jul 2024 → now Sept 2026· 90.9% built· 1 complaint
- Prathamesh Co-Op Housing Soc0 mo overdueJoshi Associates · Right Bhusari Colony, Kothrud, PuneP52100052452· filed Sept 2025 → now Sept 2026· 75% built
- Krishna Kamal0 mo overdueVakratund Reality · Sadashiv Peth, PuneP52100032848· filed Dec 2024 → now Sept 2026· 85.9% built
- Sadanand Condominium0 mo overdueRajendra balakrushna Chaphalkar · Pune City, PuneP52100048959· filed Mar 2025 → now Sept 2026· 71.4% built
- STAR VISTA - MHADA0 mo overdueRAVIE KHILUMAL OCHANNI · Ravet, PuneP52100080257· filed Aug 2025 → now Sept 2026· 72.7% built
- OM MANGALAM CHAITANYA0 mo overdueSHRI ASSOCIATES · Haveli, PuneP52100031241· 81.8% built
- Sai Aura0 mo overdueWJV LANDMARKS LLP · Pimple Saudagar, PuneP52100051930· filed Mar 2026 → now Sept 2026· 78.2% built
- PENTAGON BUSINESS HUB0 mo overdueCOSMIC INFRASTRUCTURE · Haveli, PuneP52100034525· filed Apr 2024 → now Sept 2026· 89.5% built
- BLOSSOM GARDEN0 mo overdueM S ASSOCIATES · Haveli, PuneP52100008745· filed Jun 2019 → now Sept 2026· 36.4% built· 1 complaint
- ARUNALI0 mo overdueBadhekar Properties · Haveli, PuneP52100030309· filed Jun 2025 → now Sept 2026· 81.8% built
- CLEVELAND PARK0 mo overdueVARDAAN LIFESTYLE LIMITED · MOHAMMADWADI, PuneP52100003050· filed Dec 2022 → now Sept 2026· 90.9% built· 2 complaints
- OM MANGALAM DISHA0 mo overdueSHRI ASSOCIATES · Village Kiwale, PuneP52100048442· filed Apr 2026 → now Sept 2026· 81.8% built
- GHULE PRIDE0 mo overdueSHRAVYA DEVELOPERS · Haveli, PuneP52100050890· filed Dec 2025 → now Sept 2026· 90.9% built
- KING TOWER0 mo overdueSHREE MORYA DEVELOPERS · Punawale, PuneP52100053670· filed May 2026 → now Sept 2026· 35.9% built
- SWOJAS MAITREE0 mo overdueSWOJAS ENTERPRISES · ERANDWANA, PuneP52100052855· 81.4% built
- OSIAN NAVKAR0 mo overdueOSIAN REALTY · Pune City, PuneP52100052913· 83.6% built
- Celestial City Phase II Building I, J, K0 mo overdueRAMA SYNERGY SPACES · Haveli, PuneP52100028977· filed Jun 2024 → now Sept 2026· 99.9% built
- EMERALD HEIGHTS0 mo overdueM/S. RIDDHISIDDHI DEVELOPERS · Mawal, PuneP52100076755· filed May 2026 → now Sept 2026· 67.3% built
- ENLIVEN HOME B WING PHASE 20 mo overdueSIDDHIVINAYAK PROPERTIES · WAGHOLI, PuneP52100050030· filed Dec 2024 → now Sept 2026· 81.8% built
- TOWN SQUARE0 mo overdueKRUPASINDHU DEVELOPERS · NEAR SHREEJI SHARAN BUILDING, PuneP52100052087· 90.5% built
- KPCT0 mo overduePARMAR PROPERTIES PVT.LTD. · Pune City, PuneP52100008820· filed Dec 2020 → now Sept 2026· 90.9% built
- GURUVAIBHAV CO-OP.HOUSING SOCIETY LIMITED0 mo overdueSHREEPAD ASSOCIATES · RAMBAUG COLONY, PuneP52100049050· filed Mar 2025 → now Sept 2026· 90.9% built
- SHANTAI CLASSIC0 mo overdueSHANTAI GROUP · Haveli, PuneP52100023007· filed Dec 2024 → now Oct 2026· 70.8% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.