Delayed projects in Pune
3,375 MahaRERA-registered projects in Pune are past the possession date on file and still under 100% built. Where the promoter has formally revised the date, the original is shown alongside so you can see what changed.
Page 17 of 17
- NIRMAN ADI4 mo overdueNIRMAN DEVELOPERS · Pune City, PuneP52100051655· 59.1% built· 1 complaint
- Satvik Villa4 mo overdueMak Developers Through Damji Vasta Makwana · Baner, PuneP52100052821· filed Apr 2025 → now Apr 2026· 63.6% built
- SWOJAS ADVAIT4 mo overdueSWOJAS REALTORS LLP · Pune City, PuneP52100045710· filed Oct 2025 → now Apr 2026· 81.8% built
- ATLANTA SQUARE4 mo overdueUTTAM ASSOCIATE · Mawal, PuneP52100054714· filed Dec 2025 → now Apr 2026· 78.2% built
- GANGA DHAM TOWER A..4 mo overdueLegends County Landmark Pvt Ltd · Pune City, PuneP52100000393· 69.7% built· 5 complaints
- PALAASH OAK PRIME4 mo overdueBhakti Sagar Developers · -, PuneP52100047171· filed Dec 2025 → now Apr 2026· 90.9% built
- Gangawas4 mo overdueArchway Estates DB Gangawas LLP · Erandawane, PuneP52100034138· filed Dec 2024 → now Apr 2026· 80.8% built
- 24 ELEMENTS4 mo overdueS.P. BUILDERS AND DEVELOPERS · Ambegaon, PuneP52100052370· 71.8% built
- ONELLA TOWER3 mo overdueSAHARA CONSTRUCTIONS · Haveli, PuneP52100029869· filed May 2024 → now May 2026· 90.9% built· 1 complaint
- Godrej Green Vistas3 mo overdueMahalunge Township Developers Private Limited · Mahalunge, PuneP52100028117· filed Jun 2025 → now May 2026· 79.7% built· 14 complaints
- JUBILATE COUNTY3 mo overdueJUBILATE COUNTY · Mulshi, PuneP52100027501· 28.2% built· 9 complaints
- Central Park Residences C13 mo overdueSRI KALPATRU REALTY PVT. LTD. · Borhadewadi, PuneP52100054901· 72.7% built
- INFINITY PLANET E WING3 mo overdueTULIP PROPERTIES · Haveli, PuneP52100034091· filed Dec 2025 → now May 2026· 90.9% built
- BLOSSOM GARDEN3 mo overdueM S ASSOCIATES · Haveli, PuneP52100008745· filed Jun 2019 → now May 2026· 12.7% built· 1 complaint
- VAISHNAVI CITY PHASE 2 SECTOR 23 mo overdueVAISHNAVI CITY PHASE 2 SECTOR 2 · Haveli, PuneP52100076657· 81.2% built
- AARAMBH3 mo overdueR M S Developers · Haveli, PuneP52100050419· filed Dec 2024 → now May 2026· 54.5% built
- MADHUSHREE3 mo overdueKPL BUILD CON LLP · Dhayari, PuneP52100051809· 81.8% built
- INFINITY CUBE3 mo overdueSNEHMANGAL TULIP DEVELOPERS · Mulshi, PuneP52100029887· filed Mar 2024 → now May 2026· 90.9% built
- WESTWINDS Wing A3 mo overdueShreeram Sankalp Associates · Haveli, PuneP52100005189· filed Dec 2021 → now May 2026· 67.3% built
- Sadanand Condominium3 mo overdueRajendra balakrushna Chaphalkar · Pune City, PuneP52100048959· filed Mar 2025 → now May 2026· 60.5% built
- Skyi Manas Lake Phase VIII3 mo overdueEnerrgia Skyi Ventures LLP · Mulshi, PuneP52100052033· 48.1% built
- Celestial City Phase II Building I, J, K3 mo overdueRAMA SYNERGY SPACES · Haveli, PuneP52100028977· filed Jun 2024 → now May 2026· 99.9% built
- EMERALD HEIGHTS3 mo overdueM/S. RIDDHISIDDHI DEVELOPERS · Mawal, PuneP52100076755· 67.3% built
- Arunya A Wing3 mo overdueGM Buildcon · Haveli, PuneP52100027329· filed Jun 2024 → now May 2026· 79.1% built
- SHANTAI CLASSIC3 mo overdueSHANTAI GROUP · Haveli, PuneP52100023007· filed Dec 2024 → now Jun 2026· 70.8% built
- Nilay3 mo overdueANGAL & CO · Shivajinagar (Bhamburda), PuneP52100052245· 63.2% built
- ABHISHEK CO OPERATIVE HOUSING SOCIETY LIMITED3 mo overdueFORTUNE DEVELOPERS · Pune City, PuneP52100053895· 81.8% built
- Paradise - B2 and B32 mo overdueKEVIN PROPERTIES · Haveli, PuneP52100049914· 79.5% built· 1 complaint
- PRIME PRESTIGE2 mo overduePRIME CONSTRUCTION · Junnar, PuneP52100052709· 81.8% built
- SPLENDOUR COUNTY WAGHOLI2 mo overduePS DEVELOPERS · Haveli, PuneP52100021548· filed Jun 2024 → now Jun 2026· 86.4% built· 1 complaint
- Navkar Suchit2 mo overdueFOUR PILLARS · Chinchwad Gaon, Pune, PuneP52100053413· filed Dec 2025 → now Jun 2026· 45.9% built
- Chandrasmit2 mo overdueMetricon Builders Private Limited · Pune City, PuneP52100047222· filed Jun 2025 → now Jun 2026· 64.1% built
- RAM KANTA APARTMENTS2 mo overduePHADTARE BUILDCON · Haveli, PuneP52100048674· filed Jun 2025 → now Jun 2026· 62.3% built
- Prime Avenue2 mo overdueM/s Prasad Developers · Haveli, PuneP52100047879· filed Jun 2025 → now Jun 2026· 81.8% built
- Phase VI - Buildings O1 and P12 mo overduePhase VI - Buildings O1 and P1 · Khed, PuneP52100012061· filed Dec 2019 → now Jun 2026· 27.7% built
- VTP ALTAIR2 mo overdueIntegrated Business Ecosystem Private Limited · Haveli, PuneP52100030521· filed Jun 2025 → now Jun 2026· 94.2% built· 31 complaints
- PRISMA HOMES2 mo overdueprisma realty pvt ltd · Haveli, PuneP52100046647· filed Jun 2025 → now Jun 2026· 75.5% built
- SARA SWAPNODAY2 mo overdueJagrutsara Structures LLP · Khed, PuneP52100029638· filed Jun 2025 → now Jun 2026· 90.9% built
- SARIKA2 mo overdueM/s ANAND CONSTRUCTIONS · Chinchwad, PuneP52100053103· 97.9% built
- NAKSHATRA RESIDENCY2 mo overdueSHREE SAIRAJ DEVELOPERS · Haveli, PuneP52100046154· filed Jun 2025 → now Jun 2026· 71.8% built
- GAGAN ALLURE PHASE 22 mo overdueGAGAN ALLURE PHASE 2 · Haveli, PuneP52100027825· 47.5% built
- ADIAMVILLE2 mo overdueM/S J.N.BUILDERS · Ahead Balaji Temple, PuneP52100025763· 72.5% built
- Suyash Greens2 mo overdueSuyash Promotors & Developers · Mawal, PuneP52100003942· filed Dec 2018 → now Jun 2026· 85% built· 1 complaint
- Komal2 mo overdueSRKD LANDMARK LLP · Haveli, PuneP52100047236· filed Jan 2025 → now Jun 2026· 72.7% built
- SAMARTH HERITAGE2 mo overdueSHAMIK PRAVIN LADKAT · Haveli, PuneP52100048999· filed Dec 2025 → now Jun 2026· 57.7% built
- Eastern River Residency Wing F2 mo overdueHaveli, PuneP52100026039· filed Jun 2025 → now Jun 2026· 81.8% built
- ARV Newtown Phase III2 mo overdueVedant Infracon · Haveli, PuneP52100027214· 90.3% built· 1 complaint
- SKY GARDENS2 mo overdueAPK LANDMARKS LLP · Haveli, PuneP52100016753· filed Dec 2024 → now Jun 2026· 75.9% built· 3 complaints
- CITY PLAZA2 mo overdueBharat Builders and Developers · CHAKAN, PuneP52100023832· 90.9% built
- Ashapuri Vrundavan Phase I2 mo overdueAshapuri Developers · Mulshi, PuneP52100046393· filed Jun 2025 → now Jun 2026· 54.5% built
- OLIVE HOMES - 22 mo overdueAAKAR REALTIES · Chovisawadi, PuneP52100051060· 79.1% built
- NB TOWERS2 mo overdueSHEKHAR INFRATECH · NEAR TULSI LANDMARK, PuneP52100052677· 79.8% built
- Symphony2 mo overdueRAOSAHEB RANGRAO PATIL · Mulshi, PuneP52100033375· filed Jun 2023 → now Jun 2026· 81.8% built
- VAASTU IMPERIAL Wing A2 mo overdueM/S Twin Star Infrastructure · Haveli, PuneP52100009509· filed Dec 2024 → now Jun 2026· 66.7% built· 151 complaints
- IMPERIAL ATRIA TOWER 22 mo overdueMERIDIAN · Haveli, PuneP52100016407· filed Apr 2022 → now Jun 2026· 68% built· 1 complaint
- VIDULA APARTMENTS2 mo overdueHINDUSTAN BUILDERS · Kothrud, PuneP52100076729· 73.6% built
- PLATINUM SQUARE2 mo overduePLATINUM PROMOTERS · Mulshi, PuneP52100046699· 63.2% built
- LOVE SPRING2 mo overdueAPEX ASSOCIATES · Haveli, PuneP52100020368· filed Dec 2023 → now Jun 2026· 80.9% built
- Arihant Sakshi2 mo overdueDharmesh Vasantrai Shah · Pune City, PuneP52100032532· filed Jun 2024 → now Jun 2026· 54.5% built
- MADHUSAGAR2 mo overdueSIDDHASHILA VENTURES LLP · Pune City, PuneP52100047028· filed Dec 2025 → now Jun 2026· 90.9% built
- Golden Core2 mo overdueGhule Patil Developers · Pune City, PuneP52100052849· 72.7% built
- SARA SWAPNAVIHAR2 mo overdueJagrutsara Structures LLP · Khed, PuneP52100019508· 81.5% built
- Yashwin NuovoCentro2 mo overdueVilas Javdekar Lifestyle Developers Pvt. Ltd. · Wakad, PuneP52100034523· 95.8% built· 1 complaint
- Sapphire2 mo overdueLayra Phoenix Realty LLP · Haveli, PuneP52100054005· filed Dec 2025 → now Jun 2026· 81.8% built
- SKYLER PHASE II2 mo overdueSKYLER PHASE II · Haveli, PuneP52100027949· 44.5% built· 1 complaint
- SIGNATURE PARK E F I AND J BUILDINGS2 mo overdueSHREE SONIGARA REALCON · Mulshi, PuneP52100027402· 88.5% built· 46 complaints
- GATEWAY2 mo overdueRAICHANDANI CONSTRUCTIONS PRIVATE LIMITED · Pune City, PuneP52100048395· filed Dec 2025 → now Jun 2026· 83.3% built
- BASIL SERENITY2 mo overdueBASIL DEVELOPERS · CHARHOLI BK, PuneP52100051897· 89.1% built
- Sai Ramdas2 mo overdueRahul Ramdas Tupe · Haveli, PuneP52100028366· filed Jun 2024 → now Jun 2026· 45.5% built
- KOHINOOR VIVA PIXEL- PHASE I2 mo overdueRISING ASSOCIATES · Haveli, PuneP52100053030· 85.9% built· 1 complaint
- SHREE BALAJI HEIGHTS2 mo overdueSHREE BALAJI DEVELOPERS · Haveli, PuneP52100050055· filed Dec 2025 → now Jun 2026· 90.4% built
- VNSVL Shubh Nirvana - Phase II2 mo overdueViman Nagar Shubh Ventures LLP · Haveli, PuneP52100050937· 95.5% built
- Building A3 - VENICIA2 mo overdueLEENA CONSTRUCTIONS · Baner, PuneP52100046862· filed Dec 2025 → now Jun 2026· 97.3% built
- Panchratna Hills Phase 22 mo overduePanchratna Construction · Haveli, PuneP52100027976· filed Jun 2025 → now Jun 2026· 81.8% built
- AUSTIN ONE2 mo overdueAUSTIN REAL INFRA LLP · Haveli, PuneP52100029297· filed Dec 2025 → now Jun 2026· 64.4% built
- BARCODE2 mo overdueESSEN VENTURES · Haveli, PuneP52100026749· filed Jun 2023 → now Jun 2026· 81.8% built
- Gandharv Nagari A62 mo overdueVinayak Pandharinath Bhongale · Haveli, PuneP52100047726· filed Oct 2024 → now Jun 2026· 69.5% built
- SHAVIRA RESIDENCY2 mo overdueSHAVIRA DEVELOPERS LLP · Pune City, PuneP52100046402· filed Dec 2025 → now Jun 2026· 64.7% built
- Panache2 mo overdueCedrus Assets · Ghorpadi, PuneP52100010652· filed Dec 2024 → now Jun 2026· 76.1% built
- LAMBODAR RESIDENCE2 mo overdueVIGHNAHARTA LANDMARKS · Haveli, PuneP52100054922· 56.4% built
- SELENIA2 mo overdueRIVER EDGE CONSTRUCTION · Haveli, PuneP52100030253· 60.9% built
- Blueridge-The Groves2 mo overdueNOVA DEVELOPERS PVT LTD · Hinjawadi, PuneP52100027419· 90% built
- SHIVSAHYADRI2 mo overdueNANDANVAN DEVELOPERS · Junnar, PuneP52100051720· 19.6% built
- BUNIYAD2 mo overdueRANADE REALTORS LLP · Karve Nagar, PuneP52100051468· 72.7% built
- LAXMIKRUPA2 mo overdueGANGOTREE HOMES · Haveli, PuneP52100045252· filed Dec 2025 → now Jun 2026· 88.9% built· 1 complaint
- EMERALD TOWERS2 mo overdueSamruddhi Developers · Haveli, PuneP52100032827· filed Jun 2025 → now Jun 2026· 99.1% built
- GINI ARIA - PHASE 22 mo overdueGini Construction Pvt Ltd · Yevlewadi, PuneP52100054760· 81.8% built
- HARE KRISHNA KUNJ2 mo overdueB G PROMOTERS AND BUILDERS · Haveli, PuneP52100031579· filed Dec 2025 → now Jun 2026· 78.2% built
- TATHASTU PHASE-I2 mo overdueM/s Shree Umiya Buildcon · SPINE ROAD PRADHIKARAN MOSHI, PuneP52100055321· filed Dec 2025 → now Jun 2026· 71.4% built
- AVIRO2 mo overdueKrishna Vision · Haveli, PuneP52100045561· filed Jun 2025 → now Jun 2026· 90.9% built
- PG AVENUE 72 mo overduePARMAR REALTORS · VIJAY NAGAR COLONY, PuneP52100049232· 81.8% built
- Majestique Towers East Phase 32 mo overdueM/s. Sharad Shree Enterprises, Sachin Date, Jayshree Date · Haveli, PuneP52100028815· 65% built
- 172W Inclusive Housing2 mo overdueVilas Javdekar Lifestyle Developers Pvt. Ltd. · Wakad, PuneP52100049412· 68.2% built
- Kingston Atlantis A1 and A2 Building2 mo overdueVedant Landmarks · MOHAMMADWADI, PuneP52100005525· filed Jun 2022 → now Jun 2026· 95.5% built· 25 complaints
- Mont Vert Kingstown Sector 1 Residential Wings2 mo overdueNiraj Kumar Associates Pvt Ltd · Mulshi, PuneP52100026366· filed Jun 2025 → now Jun 2026· 61.5% built· 4 complaints
- DURGA VIHAR2 mo overdueSatkar Reality · Haveli, PuneP52100048316· filed Oct 2025 → now Jun 2026· 72.3% built
- SKYWAY PARVATI2 mo overdueSKYWAY PARVATI · Haveli, PuneP52100056478· 72.7% built
- Swami Residency2 mo overdueManik Sadashiv Mohite · Haveli, PuneP52100028342· filed Dec 2024 → now Jun 2026· 86.4% built
- BARCODE2 mo overdueRAMA VENTURES · Haveli, PuneP52100026713· filed Jun 2023 → now Jun 2026· 81.8% built
- Sneha Avenue2 mo overdueNandu Antaram Rajput · Mulshi, PuneP52100049963· filed Dec 2025 → now Jun 2026· 84.5% built
- EMERALD VISTA2 mo overduePADMAVATI LANDMARKS · Haveli, PuneP52100076742· 80% built
- Nakshatra i-Land Phase 42 mo overdueEllora Homemakers Pvt. Ltd. · Haveli, PuneP52100046743· 23.6% built
- Unique Youtopia Phase II2 mo overdueUnique Associates · Haveli, PuneP52100046003· 90.9% built
- THE ADDRESS PHASE-42 mo overdueSOL Developers · Haveli, PuneP52100032678· 56.4% built
- Majestique Towers East Phase 42 mo overdueM/s. Sharad Shree Enterprises, Sachin Date, Jayshree Date · Haveli, PuneP52100028813· 59.5% built· 1 complaint
- 198 City hub2 mo overdueUrban Syndicate · Pune City, PuneP52100019925· filed Jun 2023 → now Jun 2026· 80% built
- PANACHE AURA2 mo overdueSHREE BHAGWATI GROUP · DUDULGAON, PuneP52100052013· filed Dec 2025 → now Jun 2026· 81.8% built
- SPARKLE Phase II2 mo overdueSKYRISE VENTURES LLP · Haveli, PuneP52100055140· 45.5% built
- The Terraces Phase 22 mo overdueRashmi Commercial Company Limited · Balewadi, PuneP52100004039· 87.7% built
- KESAR VALLEY2 mo overdueBANSAL RIVERVIEW · Haveli, PuneP52100027291· 87.9% built
- Al Marjaan2 mo overdueBriskband Associates · Haveli, PuneP52100019898· filed Dec 2024 → now Jun 2026· 50.9% built· 9 complaints
- 204 BLUE PARADISE2 mo overdueBLUE PEARL GROUP · Baner, PuneP52100047531· filed Mar 2025 → now Jun 2026· 76.4% built
- 24K Sereno Building E2 mo overdueNOW Realty Promoters and Builders Private Limited · Haveli, PuneP52100024374· filed Jun 2025 → now Jun 2026· 84.5% built· 1 complaint
- GURMEHARS Silver and Devi Co-operative housing society2 mo overdueGURMEHARS Silver and Devi Co-operative housing society · Haveli, PuneP52100079573· 81.8% built
- SONIGARA SUNVIEW2 mo overdueSONIGARA SUNVIEW · Haveli, PuneP52100079565· 72.7% built
- DODKE PALAZZO2 mo overdueDODKE LANDMARKS · Haveli, PuneP52100031044· filed Dec 2024 → now Jun 2026· 90.2% built
- NAVKSHITIJ CHS LTD2 mo overdueVishwam Realtors & Developers LLP · Haveli, PuneP52100028051· 81.8% built
- Mantra Mirari Phase 22 mo overdueMANTRA RESIDENCES MUNDHWA PRIVATE LIMITED · MUNDHWA, PuneP52100032842· 99.5% built
- SWAMIPUSHPA2 mo overdueNUTAN DEVELOPPERS · Pune City, PuneP52100034641· filed Sept 2025 → now Jun 2026· 95.9% built
- Ashapuri Vrundavan Phase II2 mo overdueAshapuri Developers · Mulshi, PuneP52100050898· 33.6% built
- OMKAR HEIGHTS2 mo overdueOMKAR HEIGHTS · Mulshi, PuneP52100030932· filed Jun 2024 → now Jun 2026· 50.9% built
- VAASTU IMPERIAL Wing B2 mo overdueM/S Twin Star Infrastructure · Haveli, PuneP52100007631· filed Dec 2024 → now Jun 2026· 98% built· 46 complaints
- Aarambh2 mo overdueSeven Star Properties · Mulshi, PuneP52100013050· filed May 2019 → now Jun 2026· 83.6% built
- OSIAN ONE AND ONLY PHASE I2 mo overdueAHURA BUILDERS · MUNDHWA, PuneP52100030568· 92.7% built
- VARADSIDDHI PLAZA2 mo overdueVARADSIDDHI ASSOCIATES · Haveli, PuneP52100052597· 81.8% built
- Asya2 mo overdueMOIRA SPACES OPC PRIVATE LIMITED · Pune City, PuneP52100066499· filed Dec 2025 → now Jun 2026· 64.2% built
- MERAKI2 mo overdueTHE GEN GROUP OF CONSTRUCTIONS · Haveli, PuneP52100030495· filed Dec 2025 → now Jun 2026· 90.9% built
- Olina2 mo overdueS S PROJECTS · Haveli, PuneP52100049956· filed Dec 2025 → now Jun 2026· 88.2% built
- Square One2 mo overdueKokane - Waghere Associates · Haveli, PuneP52100020339· filed Aug 2022 → now Jun 2026· 72.7% built
- SAI SAVLI2 mo overdueDEEPAK BALKRUSHNA REPALE · Junnar, PuneP52100027937· filed Jun 2024 → now Jun 2026· 30.3% built
- Riverdale Grove2 mo overdueDuville Estates Private Limited · Haveli, PuneP52100029023· 50.5% built· 8 complaints
- 4 Taljai Hills Phase 12 mo overdueShri Taljai Mata Associates LLP · Haveli, PuneP52100027103· 84.5% built· 1 complaint
- Revati2 mo overduePIONEER CONSTRUCTIONS · Haveli, PuneP52100053317· filed Dec 2025 → now Jun 2026· 80% built
- Mangalam Breeze2 mo overdueMetro Buildcon · Dudulgoan Moshi, PuneP52100026808· 57.7% built
- ARCADIA2 mo overdueACME SAWANT VENTURES · Haveli, PuneP52100013508· filed Dec 2022 → now Jun 2026· 49.8% built· 2 complaints
- SURBHI SAMRUDHI2 mo overduePrakriti Space LLP · Haveli, PuneP52100052668· 88.7% built
- YASHODHAN2 mo overdueRANADE REALTORS LLP · Kothrud, PuneP52100051695· 72.7% built
- addressOne - Phase 62 mo overduePeninsula Land Limited · Mawal, PuneP52100018788· filed Jun 2024 → now Jun 2026· 67.3% built· 31 complaints
- MARVEL ISOLA J BUILDING2 mo overdueMARVEL LANDMARKS PVT LTD · Haveli, PuneP52100001843· filed Jun 2021 → now Jun 2026· 78.6% built· 40 complaints
- Sarthak Aaradhana2 mo overdueSarthak Capital Housing · Haveli, PuneP52100050994· 90.9% built
- TRISHALA2 mo overdueRAINBOW PROPERTIES · Gultekadi, PuneP52100077604· filed Dec 2025 → now Jun 2026· 90.9% built
- PANNA2 mo overdueNABAR ASSOCIATES · Haveli, PuneP52100045604· filed Jun 2024 → now Jun 2026· 81.8% built
- TOP TOWERS - A2 mo overdueRAGA DEVELOPERS · Mulshi, PuneP52100034929· filed Dec 2025 → now Jun 2026· 81.8% built· 1 complaint
- Manek Regency2 mo overdueB. U. Bhandari Landmarks · Pune City, PuneP52100018550· filed Dec 2024 → now Jun 2026· 50% built
- JITO NAGAR2 mo overdueJAIN ASHAPURI DEVELOPER UNIT II · Haveli, PuneP52100047920· filed Sept 2025 → now Jun 2026· 65.2% built
- SHREERAM SHIVALAY EAST2 mo overdueRohit Skylines · Haveli, PuneP52100048271· filed Jun 2025 → now Jun 2026· 90.9% built
- KJ TOWER2 mo overdueKALYAN JAGANNATH JADHAV · Haveli, PuneP52100008908· filed Mar 2024 → now Jun 2026· 96.5% built· 1 complaint
- SHREEYANSH PARK2 mo overdueSHREEYANSH PARK · Haveli, PuneP52100019134· filed Sept 2020 → now Jun 2026· 81.8% built
- Green Life2 mo overdueGreen Life · Mulshi, PuneP52100022404· 84.5% built
- KUMAR PRAJWAL2 mo overdueKEWAL REAL ESTATE DEVELOPERS PRIVATE LIMITED · Haveli, PuneP52100017868· filed Mar 2023 → now Jul 2026· 98.5% built
- Swastik Twin Tower1 mo overdueSwastik Builders · Haveli, PuneP52100030108· 90.9% built
- BVM FLORA1 mo overdueSunny Naresh Nagdev · Tathawade, PuneP52100053235· filed Jul 2025 → now Jul 2026· 72.7% built
- FUSION TOWERS PHASE III1 mo overdueRAMA SYNERGY SPACES · Hinjewadi Phase III, PuneP52100049215· filed Jul 2025 → now Jul 2026· 69.1% built· 1 complaint
- Shivratna1 mo overdueMr Rajan Vishram Palekar · Ravet, PuneP52100055201· filed Jun 2025 → now Jul 2026· 72.7% built
- S3 LIFESTYLE1 mo overdueSIDDHIVINAYAK KOHINOOR VENTURES · Haveli, PuneP52100012294· filed Jan 2021 → now Jul 2026· 67.7% built
- celia phase 21 mo overduecelia phase 2 · Pune City, PuneP52100001303· filed Jan 2021 → now Jul 2026· 31.4% built· 4 complaints
- Gada Elina1 mo overdueKubix Realties LLP · Haveli, PuneP52100054293· 33.6% built
- Siddhachal - A11 mo overdueViraj Properties (Now known as Viraj Properties & Real Estate Pvt Ltd) - Amogh Construction JV · Haveli, PuneP52100050272· 89.7% built
- GLORIOUS TATHASTU1 mo overdueGlorious Buildcon · RAVET, PuneP52100054325· filed Dec 2025 → now Jul 2026· 90.9% built
- ANP BIZSQUARE1 mo overdueFIVE STAR VIGHNESH ASSOCIATES (AOP) · Wakad, PuneP52100055995· filed Sept 2025 → now Jul 2026· 90.9% built
- RKL Durvankur Jaswand1 mo overdueLUNKAD VISHWA DEVELOPER · Alandi Devachi, PuneP52100045975· filed Apr 2025 → now Jul 2026· 72.7% built
- Lodha Pune NIBM Project1 mo overdueLodha Developers Limited · Mohamadwadi, PuneP52100024215· filed Dec 2025 → now Jul 2026· 69.7% built· 2 complaints
- REAL DREAM HOMES WING C AND D1 mo overdueREAL BUILDCON BUILDERS AND DEVELOPERS · Mawal, PuneP52100046267· 58.5% built
- SHRIKISAN ENCLAVE1 mo overdueM/s. Tirupathi Properties Through Prop Mr. Vedprakash Shrikisan Agarwal · Haveli, PuneP52100076885· 79.1% built
- Ravindu1 mo overdueShubh Ventures · Haveli, PuneP52100050148· 9.1% built
- MANORAMA1 mo overduePANDIT JAVDEKAR ASSOCIATES · Haveli, PuneP52100049035· 81.8% built
- Gharonda1 mo overdueParulekar Realty LLP · Haveli, PuneP52100053024· 61.4% built
- DHRUPI TOWERS1 mo overdueHRITIK NITIN JAIN · CHAROLI (BK), PuneP52100077117· filed Dec 2024 → now Jul 2026· 66.4% built
- Tranquility annexe c wing1 mo overdueK AND B ASSOCIATES · Manjri Stud Farm, PuneP52100030776· 90.9% built
- Swastik Platinum1 mo overdueSwastik Infinity · Haveli, PuneP52100050394· 27.7% built
- IVY BY VISTAARA HOMES1 mo overdueVistaarahomes Realty LLP · Haveli, PuneP52100045294· filed Dec 2025 → now Jul 2026· 66.6% built
- Sai Aarav1 mo overdueABHIJIT PRAKASH BORASE · Mulshi, PuneP52100048212· 21.1% built
- AISHWARYAM GAURAV0 mo overdueSAI ESSEN DEVELOPERS · Haveli, PuneP52100055833· 88.5% built
- RADHIKA RESIDENCY0 mo overdueMYBHOOMI VASTUSPACE · Haveli, PuneP52100051486· 62.7% built
- VASTUSHREE PHASE-10 mo overdueVASTU CONSTRUCTION · Haveli, PuneP52100077481· filed Aug 2025 → now Aug 2026· 85.5% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.