Delayed projects in Thane
1,593 MahaRERA-registered projects in Thane are past the possession date on file and still under 100% built. Where the promoter has formally revised the date, the original is shown alongside so you can see what changed.
Page 8 of 8
- KANHA RESIDENCY1.3 yr overdueKULKARNII BUILDER · BELAVALI GAON, ThaneP51700030985· 90.9% built
- Kamdhenu23-west1.2 yr overdueAccura Developers LLP · Thane, ThaneP51700025164· 75.5% built
- Courtyard - Rozanne1.2 yr overdueCOURTYARD REAL ESTATE PRIVATE LIMITED · Thane, ThaneP51700006312· 88.6% built· 3 complaints
- SAI HANUMAN TOWER B WING1.2 yr overdueOM SAI BABA BUILDERS · RAI, ThaneP51700048598· 89.1% built
- Paramount D1.1 yr overdueKalpataru Homes Private Limited · Thane, ThaneP51700021474· 81.1% built· 4 complaints
- NISARG GREENS Phase - 2 D1.1 yr overdueNND Ambernath LLP · Amberntah East, ThaneP51700031807· 63.6% built
- Paramount A1.1 yr overdueKalpataru Homes Private Limited · Thane, ThaneP51700004031· 93.9% built· 5 complaints
- Royal Palm1.1 yr overdueBuildcon Enterprises · Washind, ThaneP51700028329· filed Jun 2024 → now Jun 2025· 78.5% built
- NISARG GREENS Phase - 2 F1.1 yr overdueNND Ambernath LLP · Ambernath East, ThaneP51700031797· 72.7% built
- RUNWAL EIRENE - PART I1.1 yr overdueRUNWAL DEVELOPERS LIMITED · Thane, ThaneP51700004574· 99.3% built· 56 complaints
- PINNACLE ADARSH1.1 yr overduePINNACLE ENTERPRISES · BELAVLI BADLAPUR WEST, ThaneP51700050363· 90.9% built
- RAUNAK CITY SECTOR IV - D41.1 yr overdueRAUNAK CORPORATION · KALYAN WEST, ThaneP51700019962· 90.9% built· 4 complaints
- HERITAGE GARDEN1.1 yr overdueHERITAGE GARDEN · Ulhasnagar, ThaneP51700054143· 53.6% built
- PATELS PRESTIGE1.1 yr overdueVRUDEE ASSOCIATES · AMBERNATH, ThaneP51700017035· filed Dec 2022 → now Jun 2025· 77% built
- Prapti Heritage1.1 yr overdueTridev Enterprises · Manjarli Badlapur West, ThaneP51700025683· 90.9% built
- KYRAA PARK1.1 yr overdueKYRAA INFRA PROJECTS PRIVATE LIMITED · Thane, ThaneP51700005769· filed Dec 2023 → now Jun 2025· 67.3% built· 4 complaints
- Paramount B1.1 yr overdueKalpataru Homes Private Limited · Thane, ThaneP51700004741· 93.4% built· 1 complaint
- Birla Vanya - Phase 11.1 yr overdueAditya Birla Real Estate Limited · Shahad, ThaneP51700019178· 99.2% built· 8 complaints
- ADITYA HEIGHTS1.1 yr overdueRATNAKAR DHARMA PATIL · MANDA, ThaneP51700048244· 90.9% built
- 27 East1.1 yr overdueRashi Developers · Sagaon, ThaneP51700028466· 65.3% built
- EAGLERIDGE WING B1.1 yr overdueROMA BUILDERS PRIVATE LIMITED · PATLIPADA, HIRANANDANI ESTATE, OFF GHODBUNDER ROAD, ThaneP51700017267· 90.9% built
- EAGLERIDGE WING A1.1 yr overdueROMA BUILDERS PRIVATE LIMITED · PATLIPADA, HIRANANDANI ESTATE, OFF GHODBUNDER ROAD, ThaneP51700019923· 90.9% built
- SARVODAY NAGAR SECTOR 11.1 yr overdueTHALIA INVESTMENT PRIVATE LIMITED · Ambarnath, ThaneP51700007690· 89.1% built· 1 complaint
- FULORA CO-OP HOUSING SOCIETY LTD1.1 yr overduePINNACLE CREATORS · BADLAPUR EAST, ThaneP51700046975· 90.9% built
- MAYURESH PLANET12 mo overdueSHREEGOPAL JUGALKISHORE BARASIA · Thane, ThaneP51700011665· 86.4% built
- Harikunj Enclave12 mo overdueSamir Shrinivas Kale · Brahman Society, Naupada, ThaneP51700047799· 80.9% built
- SNEHAM11 mo overdueParidhi Developers · Thane, ThaneP51700020410· filed Feb 2025 → now Sept 2025· 81.8% built
- AYESHA GARDEN B WING11 mo overdueAZKA BUILDERS AND DEVELOPERS · KALYAN, ThaneP51700033810· filed Dec 2024 → now Sept 2025· 82.3% built
- Metropolis - Aquaris Phase 211 mo overdueANANT SQUARE · Kasarvadavli, ThaneP51700022959· 90.9% built
- Maatr Skye11 mo overdueMaatr Ventures · Khadakpada, ThaneP51700028786· 90.9% built
- RAM RIVERA11 mo overdueKULGAON BADLAPUR, ThaneP51700049706· 39% built
- VIVANTA MARVEL11 mo overdueTECHNO VISION REALTORS LLP · MIRA ROAD - EAST, ThaneP51700031458· 90% built· 1 complaint
- PRISM INDUSTRIAL ESTATE10 mo overdueSPLENDOR SHELTERS PVT LTD · NEAR PENDHARKAR COLLEGE, ThaneP51700032231· 90.9% built
- Lodha Amara - Wing 40 and 419 mo overdueLODHA DEVELOPERS LIMITED · Balkum, ThaneP51700020088· filed Nov 2024 → now Nov 2025· 81.6% built· 1 complaint
- PALAVA SERENITY A9 mo overdueLodha Developers Limited · Palava, ThaneP51700020155· 73.6% built
- Morivali Richmand Park9 mo overdueSHREE KHODIYAR BUILDCON · Mauje Morivali, ThaneP51700046687· filed Nov 2024 → now Nov 2025· 52.7% built
- GLENDALE8 mo overdueROMA BUILDERS PRIVATE LIMITED · PATLIPADA, HIRANANDNAI ESTATE, OFF. G B ROAD, ThaneP51700019542· 90.9% built
- GLENRIDGE8 mo overdueROMA BUILDERS PRIVATE LIMITED · PATLIPADA, HIRANANDANI ESTATE, OFF. G B ROAD, ThaneP51700019550· 90.9% built
- JP North Imperia - Tower 18 mo overdueJP Infra Realty Private Limited · Near Vinay Nagar, ThaneP51700019613· 88% built· 1 complaint
- vedant nakshatra M phase 28 mo overdueMOHAN HARDASMAL THARWANI · Rameshwadi, ThaneP51700008414· 69.5% built
- Immensa H8 mo overdueAgile Real Estate Pvt. Ltd. · Thane, ThaneP51700001310· 66.6% built· 19 complaints
- Godrej Alive E8 mo overdueModella Textile Industries Limited · Thane (M Corp.), ThaneP51700009992· 0% built· 1 complaint
- Immensa F8 mo overdueAgile Real Estate Pvt. Ltd. · Thane, ThaneP51700001278· 91.1% built· 25 complaints
- ORCHID SQUARE PHASE 48 mo overdueM/S SQUAREFEET ECO HOUSING LLP · Ambarnath, ThaneP51700022076· 81.8% built
- RAUNAK CITY SECTOR IV - D18 mo overdueRAUNAK CORPORATION · Kalyan, ThaneP51700003377· 90.9% built
- JP North Imperia - Tower 28 mo overdueJP Infra Realty Private Limited · Near Vinay Nagar, ThaneP51700019783· 90.9% built
- Immensa C8 mo overdueAgile Real Estate Pvt. Ltd. · Thane, ThaneP51700001040· 98.9% built· 24 complaints
- ATMIYA HEIGHTS8 mo overdueAKSHAR GROUP · SONIVALI, ThaneP51700015091· 83.3% built
- RAUNAK CITY SECTOR IV - D28 mo overdueRAUNAK CORPORATION · Kalyan, ThaneP51700003210· 90.9% built
- Immensa G8 mo overdueAgile Real Estate Pvt. Ltd. · Thane, ThaneP51700001083· 70.4% built· 14 complaints
- MM VALLEY A-18 mo overdueALFA ENTERPRISES · KAUSA-MUMBRA-THANE, ThaneP51700024240· 79.8% built· 1 complaint
- North Barcelona8 mo overdueJP Infra Residency Private Limited · Near Vinay Nagar, ThaneP51700020082· 67.8% built· 3 complaints
- Godrej Alive A8 mo overdueModella Textile Industries Limited · Mulund Thane Circle, ThaneP51700010303· 0% built· 2 complaints
- GLENWOOD8 mo overdueROMA BUILDERS PRIVATE LIMITED · PATLIPADA, HIRANANDANI ESTATE, OFF. G B ROAD, ThaneP51700019547· 90.9% built
- NICE CITY8 mo overdueNICE REALTY AND DEVELOPERS · Thane, ThaneP51700010742· 89.1% built
- JP North Alexa8 mo overdueJP Infra Realty Private Limited · near Vinay Nagar, ThaneP51700016736· 81.8% built
- HUDA PARK8 mo overdueHUDA CONSTRUCTION · KAUSA MUMBRA, ThaneP51700016090· filed Dec 2024 → now Dec 2025· 81.8% built
- AMBER TARA8 mo overdueAMBERCORPORATION · TUKARAM NAGAR, ThaneP51700020065· 90.9% built
- MILLANO HEIGHTS8 mo overdueCHIMNANI CONSTRUCTIONS · Ulhasnagar, ThaneP51700047948· filed Dec 2024 → now Dec 2025· 86.8% built
- UNNATHI WOODS PHASE VII A8 mo overdueUNNATHI ESTATES · Thane, ThaneP51700000002· 90.9% built· 5 complaints
- Sunrise Parkview Phase I8 mo overdueSukham Corporation Proprietor Sunrise Lifespaces LLP · Padle Village, ThaneP51700021145· 86.4% built
- Godrej Alive C8 mo overdueModella Textile Industries Limited · Mulund Thane Circle, ThaneP51700009993· 0% built· 2 complaints
- JP North Euphoria8 mo overdueJP Infra Realty Private Limited · Vinaynagar, ThaneP51700016290· 86.1% built· 2 complaints
- Immensa B8 mo overdueAgile Real Estate Pvt. Ltd. · Thane, ThaneP51700000927· 99% built· 25 complaints
- RAUNAK HEIGHTS8 mo overdueUNNATHI ASSOCIATES · Thane, ThaneP51700000766· 90.9% built· 3 complaints
- Godrej Alive B8 mo overdueModella Textile Industries Limited · Mulund Thane Circle, ThaneP51700005281· 0% built· 9 complaints
- Immensa E8 mo overdueAgile Real Estate Pvt. Ltd. · Thane, ThaneP51700000924· 89.7% built· 19 complaints
- Immensa D8 mo overdueAgile Real Estate Pvt. Ltd. · Thane, ThaneP51700000732· 89.8% built· 27 complaints
- ARIHANT CITY PHASE-I BUIDING-A,B,C,D,D1,D2,H,H1,H2,F8 mo overdueARIHANT ENTERPRISES · Bhiwandi, ThaneP51700010884· 86.5% built
- SARVODAY SQUARE PHASE 2 BLDG NO 28 mo overdueSHREE SQUAREFEET ENTERPRISES LLP · Ambarnath, ThaneP51700018388· 90.9% built
- IMPERIAL HEIGHTS PHASE I - A AND B WING8 mo overdueAKSHAR SHANTI REALTORS PRIVATE LIMITED · Thane, ThaneP51700006296· filed Dec 2024 → now Dec 2025· 99.1% built· 5 complaints
- Immensa A8 mo overdueAgile Real Estate Pvt. Ltd. · Thane, ThaneP51700001039· 99.8% built· 24 complaints
- SUKH SAGAR CO-OP HSG SOCIETY8 mo overdueNOBLE INFRASTRUCTURE BUILDER AND DEVELOPERS · KATRAP, ThaneP51700051135· 72.7% built
- KABINI8 mo overdueshree shakti developers · Chavindra, ThaneP51700010423· filed Dec 2021 → now Dec 2025· 90.9% built· 1 complaint
- SARVESH DREAM CITY WING D8 mo overdueSAI SHRADHA DEVELOPERS · JOVELI, ThaneP51700030642· 61.8% built
- SHARDA EMPORIO8 mo overdueSHARDA INFRA · NEAR AMAN TALKIES, ThaneP51700047731· 23.6% built
- Balaji Heritage8 mo overdueBalaji Developers · Belavali, ThaneP51700048085· filed Dec 2024 → now Dec 2025· 79.5% built
- GAYATRI NIWAS8 mo overdueGayatri Builders · CHIKANGHAR, ThaneP51700029816· 90.9% built
- KOEL8 mo overdueshree shakti developers · Chavindra, ThaneP51700007920· filed Dec 2021 → now Dec 2025· 90.9% built
- OMKAR RESIDENCY8 mo overdueM/s OMKAR ASSOCIATES · manda, ThaneP51700029285· 81.8% built
- AMBER BLISS8 mo overdueM/S. AMBER COMBINES · DOMBIVLI WEST, ThaneP51700032492· 79.1% built
- BALAJI EXOTICA BUILDING TYPE D PHASE III8 mo overdueBALAJI WORLD · CHIKANGHAR, ThaneP51700026674· filed Jun 2023 → now Dec 2025· 90.9% built· 1 complaint
- MANOHAR MAHAL8 mo overdueSHARDA VASTU NIRMITEE PVT. LTD. · PANCHPAKHADI, ThaneP51700048230· 81.8% built
- Anjani Pride8 mo overdueGeeta Developers · Mira Road (East), ThaneP51700024335· filed Jul 2025 → now Dec 2025· 88.6% built
- RAUNAK RESIDENCY8 mo overdueUNNATHI ESTATES · Thane, ThaneP51700009540· filed Jun 2024 → now Dec 2025· 69.5% built· 1 complaint
- Gaurang Apartment8 mo overdueGanesha Developers · Opp to State Bank of India, ThaneP51700048961· filed Dec 2024 → now Dec 2025· 90.9% built
- Ekatva Coral8 mo overdueSynergy Developers · Pancpakhadi, ThaneP51700049059· 66.8% built
- Sai Heritage8 mo overdueShashank Enterprises · Ambernath, ThaneP51700053065· 80.5% built
- AUROVILLE A AND B WING8 mo overdueARYA CONSTRUCTION · SANDAP, ThaneP51700047056· 81.8% built
- JVMs Magnum8 mo overdueJVM Spectrum LLP · Dhokali- Thane, ThaneP51700052431· 78.2% built
- Guru Ganesh CHS8 mo overdueVADNERE BUILDER & DEVELOPERS · Badlapur East, ThaneP51700049564· 81.8% built
- MEERA SQUARE8 mo overdueSARASWATI CORP · BEHIND SHIV MANDIR, ThaneP51700053500· filed Jun 2025 → now Dec 2025· 71.6% built
- MAXIMUS8 mo overdueGURUVIDHA ENTERPRISES · BHAYANDAR, ThaneP51700045811· 0.9% built
- AARADHYA HIGHPARK PROJECT III of PHASE 18 mo overdueMAN VASTUCON LLP · NEAR SINGAPORE INTERNATIONAL SCHOOL, ThaneP51700030611· 95% built· 2 complaints
- Sai Pearl8 mo overdueM/S MITRA REALITY · Katrap, ThaneP51700030340· 86.4% built· 1 complaint
- JVMs Spectrum8 mo overdueJVM Spectrum LLP · Dhokali- Thane, ThaneP51700050671· 72.7% built
- Shiv Paradise8 mo overdueShiv Corporation · Shirgaon, ThaneP51700046607· 90.9% built
- ISKCON RESIDENCY PHASE 18 mo overdueIskcon Realtors · AMBERNATH, ThaneP51700051160· 59.1% built
- Sai Heights Building No.1 B Wing8 mo overdueSai Siddhi Developers · Vithalwadi,, ThaneP51700032918· 90.9% built
- Shri Sai Mangal Co-Op Housing Society Ltd A Building8 mo overdueAMOGH ASSOCIATES · Village Chole , Thakurli, ThaneP51700050524· 84.1% built
- CHINTAMANI HABITAT JASMINE TYPE A-B-J8 mo overdueJASHNANI CONSTRUCTION PRIVATE LIMITED · SHAHAPUR, ThaneP51700034891· 81.8% built
- LAXMI NARAYAN CO OP HOUSING SOCIETY LTD8 mo overdueOJASS GOVIND INFRA LLP · NAUPADA, ThaneP51700049169· 74.3% built
- SHIVTEJ ASHIYANA8 mo overdueYOGESH RAMDAS SARJINE · Seawoods, ThaneP51700011753· filed Apr 2018 → now Dec 2025· 90.9% built
- Shivam Homes Wing A and B8 mo overdueShivam Homes · Badlapur East, ThaneP51700048026· 81.8% built
- Lakeview Co Operative Housing Limited7 mo overdueGP Infra · Neelkanthnagar, Kalyan, ThaneP51700049612· 81.8% built
- SAI MAJESTIC PARK7 mo overdueMARUTI DEVELOPERS · ROOM NO 362 SHEET NO 42, ThaneP51700050235· 43.6% built
- M M CITY5 mo overdueFINE CONSTRUCTION COMPANY · NEW SHILL, ThaneP51700022075· 84.1% built
- Amber Galaxy C Wing5 mo overduePANDHARINATH SITARAM PATIL · VITAWA, ThaneP51700024773· filed Jan 2024 → now Mar 2026· 26.8% built· 1 complaint
- SURYA EXCELLENCY5 mo overdueSURYAKANT MANGALDAS SAMANI AND CHAMPABEN VASANJI MASHRU · NARPOLI, ThaneP51700015832· 86.2% built
- SAI VIJAY HERITAGE5 mo overdueVIJAY LALSINGH THAKUR · Ulhasnagar, ThaneP51700034485· filed Mar 2025 → now Mar 2026· 51.8% built
- SUMITRA HEIGHTS5 mo overdueSWAMI NARAYAN ENTERPRISES · KALYAN DOMBIVLI M CORP, ThaneP51700052785· 90.9% built
- SAURABH HEIGHTS5 mo overdueS K DEVELOPERS · Badlapur, ThaneP51700051500· 90.9% built
- SATISH OAK HEIGHT5 mo overdueSHREE SAI PRATHAMESH DEVELOPERS · BADLAPUR WEST, ThaneP51700030403· 36.4% built
- Gayatri CHS LTD5 mo overdueShree Angarak Enterprises Builders and Developers · Thane, ThaneP51700032690· filed Dec 2023 → now Mar 2026· 81.8% built
- Shree Ram Radha Damodar5 mo overdueADITYA BUILDCON · Near Aditya Mangal Karyalaya, ThaneP51700050634· 72.7% built
- EMPIRE TOWERS5 mo overdueLAKHANI REALTY LLP · Naupada Thane, ThaneP51700005215· filed Jul 2024 → now Mar 2026· 38.2% built· 1 complaint
- NIRMAN SIGNATURE5 mo overdueSHREE SHA DEVELOPERS · Badlapur (W), ThaneP51700050640· 81.8% built
- KAPIL BLING5 mo overdueTRIDENT BUILDERS AND DEVELOPERS · BHIWANDI, ThaneP51700032751· filed Dec 2024 → now Mar 2026· 27.3% built
- SAI WORLD5 mo overduePINNACLE CORPORATION · BORADPADA ROAD, ThaneP51700034155· 90.9% built
- Sukoon Heights5 mo overdueVIRANI CONSTRUCTION COMPANY · Thane, ThaneP51700004837· 97% built
- 24 HIGH5 mo overdueDREAM APEX REALTIES LIMITED · OPP DY PATIL STADIUM, ThaneP51700025150· 60.9% built· 1 complaint
- JANKI LEGACY4 mo overdueMihir Nandkumar papaiya · Mira Road East, ThaneP51700020239· 42.7% built
- YOGI NIWAS4 mo overdueELITE INFRASTRUCTURE · AMBERNATH, ThaneP51700015565· 1.8% built
- GLOBE BUSINESS SQUARE4 mo overdueGLOBE REALTY · Kalyan, ThaneP51700020338· 72.7% built
- SAI WORLD LEGEND4 mo overdueParadise Lifestyles Private Limited · Ulhasnagar, ThaneP51700025002· 45.8% built
- Terraform K - Residences4 mo overdueMoney Magnum Constructions · Thane, ThaneP51700002673· filed Sept 2023 → now May 2026· 90.9% built
- ISHWAR NEW AMIT3 mo overdueISHWAR DEVELOPERS · VADAVALI, ThaneP51700050877· filed May 2025 → now May 2026· 81.4% built
- ISHWAR SARASWATI PALACE3 mo overdueISHWAR REALITY · KANSAI, ThaneP51700051501· filed May 2025 → now May 2026· 72.3% built
- Mangeshi Royale3 mo overdueMangesh Dashrath Gaikar · Kalyan West, ThaneP51700034444· 0% built
- VRINDAVAN3 mo overdueSHIVRAJ DEVELOPERS · Kalyan, ThaneP51700020946· filed Jul 2024 → now May 2026· 86.4% built
- Rajas Leela3 mo overdueNakhye's Everest Estate Private Limited · Navagaon, ThaneP51700050538· 81.8% built
- Sai Ganesh Co-Operative Housing Society Ltd3 mo overdueShree Vyankatesh Enterprises · Dombivli West, ThaneP51700051405· 59.1% built
- Navkamal Pushpa CHS3 mo overdueDream Realtors · Naupada, Thane West, ThaneP51700056041· 27.3% built
- Mangeshi Marvel3 mo overdueMangesh Dashrath Gaikar · Kalyan West, ThaneP51700034332· 63.2% built
- SAI SHARADA CHS LTD3 mo overdueM SQUARE DEVELOPERS · GANESH NAGAR, ThaneP51700051917· 75% built
- UMA KUNJ COOPERATIVE HOUSING SOCIETY LIMITED3 mo overduePravin Arvind Apte · Badlapur, ThaneP51700033015· filed Dec 2025 → now May 2026· 90.9% built
- SARVODAY AANAND2 mo overdueOM SAI LAND DEVELOPERS · Kalyan, ThaneP51700000725· filed Dec 2020 → now Jun 2026· 76.4% built
- Kohinoor Eden B62 mo overdueKGI REALTY PRIVATE LIMITED · Kalyan East, ThaneP51700052179· 57.3% built
- 24 EAST2 mo overdueMALHAR DEVELOPERS · Thane, ThaneP51700049178· 96.4% built
- SAKET WORLD2 mo overdueAnand Associates · Near Chetana School, ThaneP51700024797· 11.3% built
- DAISY GARDENS SURVEY NO 112 mo overdueANKITA BUILDERS · Ambarnath, ThaneP51700005390· filed Dec 2020 → now Jun 2026· 90.9% built
- SANGHVIS SHRI PARRSSSVA CITY 15-162 mo overdueSANGHVI PREMISES PRIVATE LIMITED · Atgaon, ThaneP51700007140· filed Dec 2019 → now Jun 2026· 16.4% built
- SARVODAY SQUARE PHASE 3 BLDG NO 12 mo overdueSHREE SQUAREFEET ENTERPRISES LLP · Ambarnath, ThaneP51700027546· 81.8% built
- DEVI HEIGHTS2 mo overdueLUXUR AND LAVISH HOMES · Ulhasnagar, ThaneP51700034179· 91.4% built
- GAURAV SAFFRON2 mo overdueRavi Developments · Thane, ThaneP51700003472· filed Dec 2022 → now Jun 2026· 69.9% built· 41 complaints
- PLUTONIUM BUSINESS PARK2 mo overduePLUTONIUM BUSINESS SOLLUTION PRIVATE LIMITED · Thane, ThaneP51700025606· 74.1% built
- SHASHWAT PARK Z-5 A and B WING APARTMENT2 mo overdueSHASHWAT HOMES · BADLAPUR WEST, ThaneP51700050263· filed Jun 2025 → now Jun 2026· 90.9% built
- NITIN ENCLAVES2 mo overdueNITIN ENCLAVES · Thane, ThaneP51700004830· filed Jun 2018 → now Jun 2026· 90.9% built· 8 complaints
- EKATVA ONYX2 mo overdueVERTICAL REALTORS PRIVATE LIMITED · Thane, ThaneP51700047272· filed Dec 2025 → now Jun 2026· 62.3% built
- ISHWAR BLOSSOM2 mo overdueISHWAR LIFESPACE · KANSAI SECTION, ThaneP51700049361· filed Dec 2024 → now Jun 2026· 72.3% built
- NICE GARDEN 12 mo overdueABHA CONSTRUCTIONS · SHILL, ThaneP51700026058· 81.8% built
- SEA GREEN PALACIA2 mo overdueSEA GREEN PALACIA · Ulhasnagar, ThaneP51700055526· 54.5% built
- SAROVAR DARSHAN2 mo overdueSHRI KHATU CONSTRUCTION · Bhiwandi, ThaneP51700010720· filed Mar 2019 → now Jun 2026· 88.5% built
- BSC IT PARK2 mo overduebansal steel corporation · Thane, ThaneP51700045736· filed Jun 2024 → now Jun 2026· 90.9% built
- Godrej Emerald Thane2 mo overdueGodrej Greenview Housing Private Limited · Thane, ThaneP51700000120· filed Dec 2024 → now Jun 2026· 99.6% built· 29 complaints
- DATTA SAMARTH2 mo overduePANDURANG ARJUN CHAWAN · Thane, ThaneP51700050343· filed Jun 2024 → now Jun 2026· 77% built
- REGENCY SAPPHIRE2 mo overdueREGENCY NIRMAN LTD · DOMBIVALI, ThaneP51700053596· 59.1% built
- Shree Prasad CHSL2 mo overdueLcon Infra LLP · Naupada, ThaneP51700055985· 63.8% built
- vraj vatika2 mo overduevraj vatika · Thane, ThaneP51700025676· 36.4% built
- The Icon Phase 22 mo overdueLeading Frontier Private Limited · Dhokali, ThaneP51700028535· 88.1% built· 1 complaint
- SUNRAJ SUPREME2 mo overdueVASHDEV BACHOMAL KHUSHALANI · DOMBIVILI EAST, ThaneP51700026868· 90.9% built
- THARWANI ARIANA PHASE IV2 mo overdueANIL HARDASMAL THARWANI · CHIKLOLI, ThaneP51700047534· 36.6% built
- SAGAR HEIGHTS2 mo overdueAADINATH DEVELOPERS · KHADAKPADA, ThaneP51700051990· filed Dec 2025 → now Jun 2026· 90.5% built
- BHOOMI ICON2 mo overdueFORNAX REALTY · Thane, ThaneP51700026412· filed Jun 2024 → now Jun 2026· 81.8% built
- VISHNU BLISS2 mo overdueLEGACY BUILDERS & INNOVATORS · ., ThaneP51700055630· filed Dec 2025 → now Jun 2026· 79.6% built· 1 complaint
- Aarambh - C2 mo overdueM/s. Annapurna Lifespaces LLP · Thane, ThaneP51700000940· 90.9% built
- YUGANDHAR SUDAMA2 mo overdueChaturthi Vastu Developers · Kalyan, ThaneP51700009697· 47.3% built
- Nida Amisha Heights2 mo overdueSAI KRUPA DEVELOPERS · MIRA BHAYANDAR, ThaneP51700009395· 64.5% built· 3 complaints
- New Kirtikar Proposed2 mo overdueNew Kirtikar Proposed · Thane, ThaneP51700004963· 49.5% built
- THARWANI SOLITAIRE PHASE IV1 mo overdueANIL HARDASMAL THARWANI · SHAHAD, ThaneP51700030172· filed Jul 2024 → now Jul 2026· 73.2% built
- Mangeshi Ambar1 mo overdueMangesh Dashrath Gaikar · Gandhare, ThaneP51700047989· 0% built
- URBAN Villa1 mo overdueYASH INFRA · Thane, ThaneP51700015488· filed Dec 2022 → now Jul 2026· 90.9% built
- GANESH DARSHAN1 mo overdueJ.V. REALTY · PENKARPADA MAHAJANWADI, ThaneP51700047281· 27.3% built
- Veer Galaxy1 mo overdueYash Infra · near vandana depo, ThaneP51700051438· filed Jul 2025 → now Jul 2026· 66.8% built
- NEELKANTH SADAN1 mo overdueSHREEJI ENTERPRISES · THANE, ThaneP51700047708· 72.7% built
- AMAR PUSHPAKUNJ1 mo overdueAMAR PUSHPAKUNJ · Thane, ThaneP51700054590· 50.6% built
- BALAJI ESTATE1 mo overdueM/s. Sai Balaji Buildcon · Umbroli, ThaneP51700027980· filed Jun 2025 → now Jul 2026· 83.6% built· 8 complaints
- PREMSADAN CHS1 mo overdueNAMRATA REALTORS · G B PATHARLI, ThaneP51700047653· filed Jul 2025 → now Jul 2026· 67.3% built
- NANDIGRAM1 mo overdueYOGESH KISHOR MAHAJAN · Mahagiri Kharkar Ali, Thane, ThaneP51700049363· filed Mar 2025 → now Jul 2026· 81.4% built
- JAYRAM HEIGHTS1 mo overdueASHAPURA ENTERPRISES · JAYRAM HEIGHTS STAR COLONY NEAR SAI BABA MANDIR P AND T COLONY SERVICE ROAD DOMBIVLI EAST 421201, ThaneP51700034741· filed Jan 2026 → now Jul 2026· 65.9% built
- RAJ SILVERSTONE PHASE-21 mo overdueSKYSPACE BUILTEK · BELAVALI BADLAPUR WEST, ThaneP51700047261· filed Jul 2025 → now Jul 2026· 71.4% built
- SHREEJI GREENS1 mo overdueDEEP LAXMI ASSOCIATES · BADLAPUR, ThaneP51700046293· 81.8% built
- SHREE SAI KABADI WAINGANKAR COMPLEX1 mo overdueDevidas Anant Waingankar · Khativali, ThaneP51700010661· filed Jul 2019 → now Jul 2026· 80.8% built
- SARASWATI DEVI KRUPA1 mo overdueYOGIRAJ HERITAGE · RAM MANDIR ROAD NO 5, ThaneP51700053444· 90.9% built
- SAVALIYA RESIDENCY1 mo overdueShree Savaliya Housing LLP · Mira Road East, ThaneP51700027312· filed Jun 2025 → now Jul 2026· 75.9% built
- SATYAM SHEELA WING F1 mo overdueSHREEJI DEVELOPERS · Ambarnath, ThaneP51700046976· 90.5% built
- VAISHNAVI DHAM COMPLEX1 mo overdueVAISHNAVI BUILDERS AND DEVELOPERS · NEW STANDARD SCHOOL, ThaneP51700031112· 54.7% built
- SHREEJI MEADOWS1 mo overdueDEEPLAXMI DEVELOPERS · BELAVLI, ThaneP51700031453· 81.8% built
- SAIRAJ AVENUE WING B1 mo overdueVIRENDRA ATMARAM SALUNKHE · BEHIND SHREE COMPLEX BADLAPUR WEST, ThaneP51700049787· filed May 2024 → now Jul 2026· 90.9% built
- USHA KIRAN RESIDENCY F1 F21 mo overdueSTALWART IMPEX PVT LTD · Ambarnath, ThaneP51700004142· filed Dec 2018 → now Jul 2026· 90.9% built
- Swastik Paradise1 mo overdueGHUDE ENTERPRISES · Chikhaloli, ThaneP51700056372· filed Dec 2025 → now Jul 2026· 81.5% built
- Anantsavitri Ratna Heights0 mo overdueKrisha Realty · Near Maxus Mall, ThaneP51700032014· filed Dec 2024 → now Aug 2026· 90.9% built
- 127 RAJ HOMES A WING0 mo overdueRAJ HOMES · Penkar Pada ( Mahajanwadi), ThaneP51700034776· filed Sept 2025 → now Aug 2026· 90.9% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.