Delayed projects in Thane
1,619 MahaRERA-registered projects in Thane are past the possession date on file and still under 100% built. Where the promoter has formally revised the date, the original is shown alongside so you can see what changed.
Page 7 of 9
- Sunrise C2.8 yr overdueAgile Real Estate Pvt. Ltd. · Thane, ThaneP51700000625· 92.9% built
- SHREERAM CO OP SOCIETY2.8 yr overdueRAHUL ENTERPRISES · KPARKHAIRANE, ThaneP51700024549· 90.9% built· 1 complaint
- New Suraj Tower2.8 yr overdueEkdanta Constructions and Developers · Thane, ThaneP51700015400· 90.9% built
- Vaikunth Cluster 42.8 yr overduePEPL Developers Pvt Ltd · Thane, ThaneP51700003283· 88.6% built· 11 complaints
- RAJ HOMES2.8 yr overdueRAJ HOMES · Thane, ThaneP51700019190· 85.9% built
- SHREE SAI GOPALKRISHNA BABA INDUSTRIAL PREMISES2.8 yr overdueNEWLOOK ELECTRONICS CENTRE PVT LTD · Atgaon, ThaneP51700005758· 45.5% built
- RAJ HERITAGE 12.8 yr overdueRAJ REALTY BUILDERS AND DEVELOPERS PRIVATE LIMITED · RAMDEV PARK, ThaneP51700020259· 90.9% built
- MAN BUSINESS SPACES2.8 yr overdueMERINO SHELTERS PRIVATE LIMITED · NERUL, ThaneP51700006944· 21.8% built
- HYDE PARK RESIDENCY F1 BUILDING PHASE2.8 yr overdueNEXUS BUILDERS AND DEVELOPERS PVT LTD · Thane, ThaneP51700008542· 90.9% built
- SHIV SAI RESIDENCY2.8 yr overdueSHIV SAI BUILDERS AND DEVELOPERS · AMBERNATH, ThaneP51700018693· 4.5% built
- OMKAR ENCLAVE2.8 yr overdueOMKAR ENTERPRISES · Kalyan, ThaneP51700007523· 90.9% built
- Green Heights2.8 yr overdueGreen Environment Constructions · Thane, ThaneP51700004561· 90.9% built
- Prakash Pratima2.8 yr overdueAnant Developers · GARIBACHA WADA, ThaneP51700022999· 43.6% built
- SAVALIYA AVENUE2.8 yr overdueSHREE SAVALIYA HOUSING LLP · Goddeo Village, ThaneP51700021757· 50.5% built
- JEWEL VISTA2.8 yr overdueJEWEL BUILDERS · Sonivali Village, ThaneP51700006876· 83.6% built
- Gingelia Residential2.8 yr overdueAcme Housing India Private Limited · Thane (M Corp.), ThaneP51700001033· filed Dec 2022 → now Dec 2023· 51.7% built· 8 complaints
- RADHA KRISHNA NIVAS PHASE 12.8 yr overdueNITIN GAJANAN KALE · Bhiwandi (M Corp.), ThaneP51700013772· 90.9% built
- ORCHID SQUARE PHASE 32.8 yr overdueM/S SQUAREFEET ECO HOUSING LLP · Ambarnath(M Cl), ThaneP51700014033· 81.8% built
- Sunrise E2.8 yr overdueAgile Real Estate Pvt. Ltd. · Thane, ThaneP51700000925· 99.4% built· 1 complaint
- Bhavani Heights2.8 yr overdueKalyani Enterprises · Badlapur (M Cl), ThaneP51800003594· 59.1% built· 9 complaints
- GANPATI RESIDENCY2.8 yr overdueGANPATI RESIDENCY · Badlapur (M Cl), ThaneP51700011720· 49.5% built
- FENNEL H2.8 yr overdueROYALE URBANSPACE LLP · SHAHAPUR, ThaneP51700003652· 78.7% built
- Bharat Ecovistas Phase II2.8 yr overdueBHARAT REALTY VENTURE PRIVATE LIMITED · Shilphata Junction, Thane, ThaneP51700000111· 95.5% built· 10 complaints
- K T PREMIA2.8 yr overdueK T & CO · Bhiwandi, ThaneP51700002939· 90.9% built
- MANGAL PUSHP HEIGHTS2.8 yr overdueSUNIL MANGILAL JAIN · Thane, ThaneP51700009090· 33.2% built
- RITESH EMPIRE2.8 yr overdueSAPPHIRE DEVELOPERS · Kalyan, ThaneP51700013877· 95.5% built· 2 complaints
- MAYUR CHS LTD2.8 yr overdueMahesh Shriram Borkar · NAUPADA, ThaneP51700024371· 90.9% built
- COSMOS ENCLAVE - CHESTNUT2.8 yr overdueMONARCH DEVELOPERS · THANE, ThaneP51700015892· 90.9% built
- CHINTAMANI HABITAT DAFFODILS TYPE A1 - D2.8 yr overdueJASHNANI CONSTRUCTION PRIVATE LIMITED · Shahapur (CT), ThaneP51700001558· 46.1% built
- SHAH KINGDOM PHASE I A WING2.8 yr overdueSHAH GROUP BUILDERS LTD · Navi Mumbai (M Corp.), ThaneP51700006697· 30.7% built· 2 complaints
- AUDUMBER SHRUSHTI2.8 yr overdueKATHOD DAMA BHOIR · NEAR ST LAWRENCE INTERNATIONAL SCHOOL, BEFORE MUTHA COLLEGE, MHASOBA NAGAR, UMBARDE, ThaneP51700015962· 30% built
- Sunrise A2.8 yr overdueAgile Real Estate Pvt. Ltd. · Thane, ThaneP51700000635· 98.5% built· 1 complaint
- Sahakar Premier2.8 yr overdueSahakar Infracon Projects Private Limited · Thane, ThaneP51700004386· 36.4% built
- PATELS ELYSIUM - 62.8 yr overdueAPACE REALTY · Ambarnath(M Cl), ThaneP51700009032· 35.5% built
- SHRI VENKATESH KRUPA2.8 yr overdueMODI DEVELOPERS · BADLAPUR, ThaneP51700023261· filed Dec 2022 → now Dec 2023· 46% built
- Shivam Greens2.8 yr overdueM.K.DEVELOPERS · Badlapur, ThaneP51700014478· 46.4% built
- VIDHI PREM2.8 yr overdueLOTUS CONSTRUCTION · Kalyan, ThaneP51700030057· 86.8% built
- Dashmesh Crystal2.8 yr overdueDashmesh Infrastructure · kharvai naka, ThaneP51700020525· 90.9% built
- BALAJI RESIDENCY2.8 yr overdueOM SWAYAMBHU SIDDHIVINAYAK BUILDERS AND DEVELOPERS · Kalyan, ThaneP51700010313· 80.9% built
- MAN RESIDENCES2.8 yr overdueMERINO SHELTERS PRIVATE LIMITED · NERUL, ThaneP51700008980· 31.4% built
- PATELS ELYSIUM - 72.8 yr overdueAPACE REALTY · Ambarnath, ThaneP51700005803· 33.2% built
- BHAWANI CONSTRUCTION2.8 yr overdueBHAWANI CONSTRUCTIONS · Mira-Bhayandar (M Corp.), ThaneP51700012204· 27.3% built
- BADLAPUR ARCADE2.8 yr overdueMAHALAXMI BUILDERS & DEVELOPERS · BADLAPUR WEST, ThaneP51700015624· 90.9% built
- UNIVERSE I PHASE I2.8 yr overdueGayasuddin Riyazuddin Khan · Thane, ThaneP51700009797· 90.9% built
- SAI TIRTH PHASE I2.8 yr overduePINNACLE CORPORATION · JOVELI, ThaneP51700020430· 90.9% built
- Annapurna Aquarius2.8 yr overdueAnnapurna Properties · BHAYANDER WEST, ThaneP51800002185· 90.9% built
- Sunrise D2.8 yr overdueAgile Real Estate Pvt. Ltd. · Thane, ThaneP51700000640· 99.9% built· 3 complaints
- Amrut Siddhi2.8 yr overdueJayshree Builders · Near Railway Station, ThaneP51700001930· 90.9% built
- Sunrise B2.8 yr overdueAgile Real Estate Pvt. Ltd. · Thane, ThaneP51700000922· 93.9% built· 1 complaint
- SURVAL HEIGHTS2.8 yr overdueGAYATRI DEVELOPERS · BADLAPUR EAST, ThaneP51700030228· 74.1% built
- WING D- DURVANKUR2.8 yr overdueM K PATIL DEVELOPERS · Badlapur (M Cl), ThaneP51700004981· filed Aug 2019 → now Dec 2023· 90.9% built
- SATVIK WING B2.8 yr overdueM/s. JIGAR ENTERPRISE · Ambarnath, ThaneP51700029587· 45.5% built
- Our Town - Whispering Woods2.8 yr overdueKaiyomerz Cowas Palia · Dalkhan, ThaneP51700003884· filed Mar 2019 → now Dec 2023· 99.5% built· 3 complaints
- RAJ INAAYA2.8 yr overdueMAHALAXMI CONSTRUCTION · PALEGAON, ThaneP51700034259· 90.9% built
- VEDANT D52.8 yr overdueSAHEBRAO VITHAL SATRE · Thane, ThaneP51700048308· 60.9% built
- SHIVOM GALAXY2.8 yr overdueSHIVOM ENTERPRISES · Kalyan, ThaneP51700020888· filed Feb 2023 → now Dec 2023· 79.5% built
- Lucas Residency2.8 yr overdueSunita Developers · Ambernath West, ThaneP51700030052· 90.9% built
- Mohan Altezza II2.8 yr overdueMOHAN LIFESPACES LLP · Kalyan, ThaneP51700007011· filed Dec 2019 → now Dec 2023· 90% built· 2 complaints
- Tejas Society2.8 yr overdueRADHIKA SHELTERS · Shastri Nagar, ThaneP51700016283· filed Dec 2020 → now Dec 2023· 69.5% built
- Tisai Heights2.8 yr overdueTisai Construction · Katemanevali, Kalyan, ThaneP51700030323· 60% built
- SHIV SONAL PALACE CHS LTD2.7 yr overdueSAI PRASAD BUILDERS AND DEVELOPERS · AMBERNATH EAST, ThaneP51700034047· 27.3% built
- Lodha Amara - Tower 6, 222.7 yr overdueLODHA DEVELOPERS LIMITED · Kolshet, ThaneP51700014760· 81.8% built· 9 complaints
- PUSHKAR CO OP HSG SOCIETY PRAPOSED2.7 yr overdueAMEYA DEVELOPERS · OPP DNC HIGH SCHOOL, ThaneP51700025616· 28% built
- ASHAR ARIA2.6 yr overdueMs ASHAR VENTURES · Thane, ThaneP51700017518· 85.9% built
- V TEN RESIDENCY2.6 yr overdueV TEN REALTY PRIVATE LIMITED · Kalyan, ThaneP51700005357· filed Dec 2020 → now Feb 2024· 56.4% built· 1 complaint
- SUBODH2.6 yr overdueNEW HOMES CORPORATION · OWLA NAKA, ThaneP51700005802· filed Sept 2020 → now Mar 2024· 90.9% built
- GOPAL SMRUTI2.6 yr overdueDATTA BABURAO GHAVAT · AMBERNATH, ThaneP51700029145· 90.7% built
- JD Park2.5 yr overdueJD Housing LLP · Cherpoli, ThaneP51700016060· 90.9% built
- REGAL SQUARE PHASE III BLDG NO 72.5 yr overdueSQUAREFEET INFRASTRUCTURE LLP · TEMGHAR PADA, BHIWANDI, ThaneP51700021861· 90.9% built
- CHINTAMANI HABITAT LOTUS TYPE C - J2.5 yr overdueJASHNANI CONSTRUCTION PRIVATE LIMITED · Shahapur (CT), ThaneP51700005632· 71.8% built
- Mai Kripa Co. Op. Hsg. Soc.2.5 yr overdueOJASS CONSTRUCTIONS · Thane, ThaneP51700033561· 90.9% built
- Ace Courtyard2.5 yr overdueAce Signature Homes LLP · Mogharpada, ThaneP51700033813· 90.9% built
- SACHINAM CO OP HSG SOCIETY2.5 yr overdueSHREEKANTH DEVELOPERS · KULGAON, ThaneP51700033985· 63.6% built
- SHREE CHARAN APARTMENT2.5 yr overdueSHREE MANGALMURTI ENTERPRISES · MURBAD, ThaneP51700034064· 52.8% built
- Suraj Co.Op.HSG.SOC.Ltd2.4 yr overdueASD ENTERPRISES · Sarvodaya Nagar, ThaneP51700017984· 27.5% built
- HIGHLAND SPRINGS B4- A WING2.4 yr overdueSIDDHI REAL ESTATE DEVELOPERS · Thane, ThaneP51700005338· filed Jun 2023 → now May 2024· 90.9% built· 1 complaint
- HIGHLAND SPRINGS B4- B WING2.4 yr overdueSIDDHI REAL ESTATE DEVELOPERS · Thane, ThaneP51700007745· filed Jun 2023 → now May 2024· 90.9% built· 4 complaints
- Ten X Vibes2.4 yr overdueTen X Vibes · Thane, ThaneP51700052442· 90.9% built
- Arya Sapphire2.3 yr overdueVAASTUDEAL DEVELOPERS PVT. LTD. · Asade Golavali, kalyan, ThaneP51700021439· filed Dec 2022 → now Jun 2024· 12.3% built
- MARATHON NEXTOWN SAPPHIRE2.3 yr overdueMARATHON ENER-GEN LLP · OFF KALYAN SHIL ROAD, ThaneP51700001265· filed Dec 2021 → now Jun 2024· 85.9% built
- MARATHON NEXWORLD AURA-22.3 yr overdueMATRIX ENCLAVES PROJECTS DEV. PVT. LTD · Thane, ThaneP51700000507· filed Jun 2023 → now Jun 2024· 26.3% built· 3 complaints
- DOSTI PLANET NORTH - PHASE 3 -DOSTI ONYX2.3 yr overdueCHALAMA INFRAPROPERTIES PRIVATE LIMITED · SHIL, ThaneP51700020162· 99.5% built· 1 complaint
- TRUSHNA CHS LTD2.3 yr overdueMahesh Shriram Borkar · PANCHPAKHADI, ThaneP51700023568· 77.5% built
- Satyabhama CHS LTD2.3 yr overdueMahesh Shriram Borkar · GHANTALI, ThaneP51700032055· 90.9% built
- HIBISCUS HEIGHTS2.3 yr overdueMOHAN DINESH SINGH · THANE, ThaneP51700017046· 63.6% built
- TULSA PARK2.3 yr overdueSHREE SHIVAM DEVELOPERS · Kalyan, ThaneP51700005797· filed Jun 2021 → now Jun 2024· 57.4% built
- OM SAI HOME2.3 yr overdueM/S. INFINI DEVELOPERS · TEMGHAR, ThaneP51700019911· 87.3% built
- SARVESHWAR CO-OP HSG SOC2.3 yr overdueDALAL BUILDSCAPE · TALUKA AMBERNATH, ThaneP51700031253· 71.8% built· 1 complaint
- AND ROSE2.3 yr overdueANANTNATH DEVELOPERS · Diva East, ThaneP51700019146· 90.9% built
- Kakad Paradise Phase 22.3 yr overdueKakad Housing Corporation · Thane, ThaneP51700006750· 90.9% built· 4 complaints
- SIDDHAKALA HEIGHTS2.3 yr overdueRushabh Developers · Thane, ThaneP51700027126· 90.9% built
- PRIYADARSHANI CHS LIMITED2.3 yr overdueANIRUDDHA GROUP SHILPALI PROJECT · Thane, ThaneP51700016267· filed Dec 2021 → now Jun 2024· 81.8% built
- SRUSHTI RESIDENCY BUILDING E2.3 yr overduePappu Developers & Group · KANCHANGAON THAKURLI, ThaneP51700028176· 90.9% built
- Annapurna Avenue2.3 yr overdueANNAPURNA BUILDCON INFRA PRIVATE LIMITED · THANE, ThaneP51800000876· filed Jun 2019 → now Jun 2024· 90.9% built
- AMBIKA HEIGHTS2.3 yr overdueRAJESH MAVJI CHHEDA · AMRAI CHOWK, ThaneP51700033336· 90.9% built· 1 complaint
- UNNATHI WOODS PHASE VII-B2.3 yr overdueUNNATHI ESTATES · KAVESAR, ThaneP51700015800· 89.8% built· 9 complaints
- ZIPRYA GOVIND TOWER2.3 yr overdueShivshkati Builders and Developers · Near Kopar Railway Station, ThaneP51700027822· filed Jun 2023 → now Jun 2024· 63.6% built
- JIGAR CONSTRUCTION VENUS2.3 yr overduePRAFUL HARIBHAI SENJALIA · Kalyan, ThaneP51700003962· filed Mar 2019 → now Jun 2024· 90.9% built
- AABIEL HEIGHTS2.3 yr overdueDAICHI INFRA LLP · Meera Hospital, ThaneP51700006603· filed Aug 2022 → now Jul 2024· 90.9% built
- Shree Vaishnavi Heights2.2 yr overdueShree Vaishnavi Gold Homes · Thane, ThaneP51700006741· filed Dec 2022 → now Jul 2024· 90% built
- Anmol Oasis2.2 yr overdueM/s Ekdant Housing · Bhaskar colony, ThaneP51700023557· 90.9% built
- AMBER VISTA2.2 yr overdueGURUKRUPA ENTERPRISES · Kalyan, ThaneP51700000456· 90.9% built
- Charms City A122.2 yr overdueCharms Developers · Titwala, ThaneP51700034654· 2.3% built
- UPPER THANE -SERENO A12.2 yr overdueLODHA DEVELOPERS LIMITED · ., ThaneP51700020191· 81.8% built
- Neelkanth Alpine2.2 yr overdueNeelkanth Infracon · Thane, ThaneP51700021881· 81.8% built
- SAI BALAJI COMPLEX2.2 yr overdueSAI BALAJI COMPLEX · TONDLIKAR NAGAR, ThaneP51700030544· 90.9% built
- Vaikunth Cluster 4A2.2 yr overduePEPL Developers Pvt Ltd · Balkum, ThaneP51700005256· 85.5% built
- VRUNDAVAN2.2 yr overdueSHREE VASTURACHANA DEVELOPERS · DEVRUNG, ThaneP51700003306· filed Jun 2019 → now Aug 2024· 89.1% built· 4 complaints
- Aaraadhy Imperial2.2 yr overdueNirmaan Realty · Tilak Nagar, ThaneP51700047256· 41.8% built
- SHRI SHIVANAND CHS2.2 yr overdueTrimity Constructions · BHASKAR COLONY, ThaneP51700024183· filed Jun 2023 → now Aug 2024· 81.4% built· 1 complaint
- Gayatri Complex2.2 yr overdueKanubhai Mohanbhai Lakkad · Kalyan, ThaneP51700009950· filed Dec 2019 → now Aug 2024· 81.6% built
- DAHISAR GULISTAN CHS2.1 yr overdueDAHISAR GULISTAN CO OPERATIVE HOUSING SOCIETY LIMITED · DAHISAR EAST, ThaneP51700006563· filed Jun 2021 → now Sept 2024· 90.7% built
- Lodha Splendora - River View2.0 yr overdueLODHA DEVELOPERS LIMITED · BHAYANDERPADA, ThaneP51700016375· 81.8% built· 4 complaints
- AMBER HEIGHTS2.0 yr overdueACE CONSTRUCTION · Bhiwandi, ThaneP51700004978· filed Jun 2021 → now Sept 2024· 90.9% built
- Metropolis - Aquaris Phase 12.0 yr overdueANANT SQUARE · Kasarvadavli, ThaneP51700022961· 90.9% built
- HILL CREST2.0 yr overdueUNIVERSAL INFRA · ULHASNAGAR, ThaneP51700030982· 59.5% built
- NIRMALA PARADISE2.0 yr overduePokhriyal And Associates · BADLAPUR WEST, ThaneP51700030774· 81.8% built
- AMAR VIJAY CHS LTD2.0 yr overdueJ.V. ENTERPRISES · STATION ROAD, ThaneP51700024853· 82.5% built
- Paramount F2.0 yr overdueKalpataru Homes Private Limited · Thane, ThaneP51700050624· 72.5% built
- Iris Shopping2.0 yr overdueHIRANANDANI PROPERTIES PRIVATE LIMITED · Hiranandani Meadows, ThaneP51700019505· filed Mar 2023 → now Oct 2024· 90.9% built
- NISARG GREENS - Phase - 2 B2.0 yr overdueNND Ambernath LLP · Morivali, ThaneP51700022786· 0% built
- NISARG GREENS - Phase - 2 C2.0 yr overdueNND Ambernath LLP · Morivali, ThaneP51700022586· 90.9% built
- Aims Sea View2.0 yr overdueAIMS PROMOTERS PVT LTD · Thane, ThaneP51700004956· filed Dec 2019 → now Oct 2024· 72.7% built· 22 complaints
- MANGALAM ARCADE2.0 yr overdueMANGALAM ENTERPRISES · BADLAPUR EAST, ThaneP51700050434· filed Apr 2024 → now Oct 2024· 72.7% built
- AUDUMBAR DARSHAN2.0 yr overdueAUDUMBAR ENTERPRISES · BADLAPUR EAST, ThaneP51700033432· filed Jan 2024 → now Oct 2024· 44.5% built
- Morivali Prarambh1.9 yr overdueSHREE KHODIYAR BUILDCON · Mauje, ThaneP51700047016· 86.4% built
- GRACE SQUARE TYPE D41.9 yr overdueSHREE SUMATINATH ENTERPRISES LLP · KAUSA, ThaneP51700016191· 90.9% built
- SAPPHIRE HEIGHTS1.8 yr overdueSPACE CORPORATION · Thane, ThaneP51700003426· 60.9% built
- Sanghvi S3 Ecocity Orchid1.8 yr overdueSanghvi Premises Pvt Ltd · Near Dahisar Check Post, ThaneP51900008323· filed Dec 2023 → now Dec 2024· 71.8% built· 1 complaint
- Sanghvi S3 Ecocity Woods1.8 yr overdueSanghvi Premises Pvt. Ltd. · Near Dahisar Checkpost, ThaneP51900006575· filed Dec 2023 → now Dec 2024· 79.5% built
- INDRAPRASTHA CO-OPERATIVE HOUSING SOCIETY LIMITED1.8 yr overdueAGILE ENTERPRISES · Naupada, Thane West, ThaneP51700020576· filed Dec 2023 → now Dec 2024· 56.4% built
- SHREE HARI DARSHAN BUILDING NO 71.8 yr overdueSHUBHAM ENTERPRISES · Thane, ThaneP51700010725· 27.3% built
- Thanekar Civic Phase II1.8 yr overdueThanekar Construction LLP · Chikhloli Badlapur, ThaneP51700048038· 51.1% built
- Intelligentia Spectrum Thane by Haware Properties1.8 yr overdueHaware Housing · Ghodbunder road, Thane, ThaneP51700019952· 63.6% built· 2 complaints
- Plan S Business Park1.8 yr overdueM/s. Vishwa Green Realtors Private Limited · SHIRWANE, ThaneP51700002027· 62.4% built· 3 complaints
- Sea Palace1.8 yr overdueSanjeev Vasant Divekar · Thane, ThaneP51700005875· filed Dec 2018 → now Dec 2024· 54.5% built· 10 complaints
- Mahindra Happinest Kalyan Project A1.8 yr overdueMAHINDRA HAPPINEST DEVELOPERS LIMITED(Formerly known as Mahindra Happinest Developers Pvt. LTD) · Bhiwandi Kalyan Junction, ThaneP51700022981· 81.8% built· 4 complaints
- L AND T SEAWOODS RESIDENCES PHASE I1.8 yr overdueL&T SEAWOODS LIMITED · Thane, ThaneP51700020275· 81.8% built· 7 complaints
- Vaikunth Cluster 21.8 yr overduePEPL Developers Pvt Ltd · Thane, ThaneP51700003793· 90.9% built· 9 complaints
- AMAKIN MOHAMMADIYA COMPLEX PHASE III1.8 yr overdueRAJ CORPORATION · Kalyan, ThaneP51700010706· 38% built
- ARIHANT AAROHI PHASE II1.8 yr overdueARIHANT SUPERSTRUCTURES LIMITED · VILLAGE PADLE, ThaneP51700015328· 90.5% built· 5 complaints
- Solitaire C1.8 yr overdueROMA BUILDERS PRIVATE LIMITED · Thane, ThaneP51700000413· 90.9% built
- Solitaire B1.8 yr overdueROMA BUILDERS PRIVATE LIMITED · Thane, ThaneP51700000197· 90.9% built
- RADHE KRISHNA RESIDENCY1.8 yr overdueMANGALAM INFRA · Dawale, ThaneP51700022023· 90.9% built
- R R RESIDENCY - D WING1.8 yr overdueSHRI RADHE REALITIES PROJECT DEVELOPER · OPP NAZARANA TALKIES, ThaneP51700016057· 90.9% built
- Solus1.8 yr overdueROMA BUILDERS PRIVATE LIMITED · Thane, ThaneP51700000193· 90.9% built
- Royal Empire1.8 yr overdueSAI POOJA CONSTRUCTIONS · BADLAPUR, ThaneP51700019929· 89.5% built
- L AND T SEAWOODS RESIDENCES - NORTH TOWERS1.8 yr overdueL&T SEAWOODS LIMITED · L&T Seawoods, ThaneP51700026653· 71.8% built· 2 complaints
- Vedant Imperial Bunglow 1 To 8 Phase 21.8 yr overdueMOHAN HARDASMAL THARWANI · Badlapur (M Cl), ThaneP51700007492· 48.5% built
- GODREJ NIRVAAN1.8 yr overduePRAKHHYAT DWELLINGS LLP · Bhadvad & Tembhgar, ThaneP51700022148· 74.4% built· 3 complaints
- Ornate Kallisto Phase II1.8 yr overdueOrnate Buildcon Developers · Temghar, ThaneP51700018908· 90.9% built· 1 complaint
- Mangeshi Jupiter1.8 yr overdueMangesh Dashrath Gaikar · Ambivali, ThaneP51700024517· 23.2% built
- MANSAROVAR RESIDENCY D WING1.8 yr overdueKIRAN REALTY · Thane, ThaneP51700006054· 59.5% built
- Hotel1.8 yr overdueROMA BUILDERS PRIVATE LIMITED · Thane, ThaneP51700000928· filed Dec 2020 → now Dec 2024· 90.9% built
- PRACHI RESIDENCY1.8 yr overduePRACHI DEVELOPERS · NR SHINDE ALI RICKSHAW STAND SHIRGAON, ThaneP51700018459· 90.9% built
- SPAN SIGNATURE1.8 yr overdueANNAPURNA BUILDCON INFRA PVT LTD · Mira-Bhayandar (M Corp.), ThaneP51700011940· 81.8% built
- Rituworld Phase III M and N1.8 yr overdueMOHAN HARDASMAL THARWANI · badlapur, ThaneP51700006857· 90.9% built
- Rohini1.8 yr overdueThilayaparambil Kumaran Joshi · Thane, ThaneP51700013602· filed Jun 2021 → now Dec 2024· 90.9% built
- HIGHLAND HAVEN BUILDING 7G MIST-A PHASE 61.8 yr overdueSIDDHI KRISH DEVELOPERS · Thane, ThaneP51700004403· 52.3% built
- MASTER BUSINESS CENTRE1.8 yr overdueMASTER BUSINESS CENTRE · Ambarnath, ThaneP51700055525· 68.2% built
- Shree Kacharnath CHS Ltd1.8 yr overdueAMOGH ASSOCIATES · Chole Village, ThaneP51700047049· 85.5% built
- Shiv ganga Apartment1.8 yr overdueSHREE SWAMI SAMARTH CONSTRUCTION · Ulhasnagar, ThaneP51700047981· 45.5% built
- GAMI SOLITAIRE1.8 yr overdueANIL LAXMAN GAMI · KOPARKHAIRANE, ThaneP51700045909· 9.1% built
- ROHIT CO-OP HOUSING SOCIETY LTD1.8 yr overdueVEDANT CONSTRUCTION · Panchpakhadi, ThaneP51700045536· 89.1% built
- Panvelkar Estate - Stanford - Phase II - R1 - B1.8 yr overduePanvelkar Infrastructures Private Limited · Mankivali, ThaneP51700031879· 90.9% built
- URBAN NEST BLDG - 11.8 yr overdueCLLARO ENTERPRISES LLP · BEVERLY PARK MIRA ROAD EAST, ThaneP51700046736· 90.9% built
- PUSHPAK HEIGHTS1.8 yr overdueJ K ASSOCIATES · VISHNUNAGAR, NAUPADA, ThaneP51700050747· 46.8% built
- SHRESHTHA SWAPNA CO-OP HOUSING SOCIETY LTD1.8 yr overdueOM SHREE SAI BUILDERS AND DEVELOPERS · Taluka Ambarnath, ThaneP51700031812· 46.8% built
- Shreeram Vaishali1.8 yr overdueADITYA REALTORS · Dombivali East, ThaneP51700032988· 60% built
- SAI POOJA1.8 yr overdueSAIRAJ ENTERPRISES · BADLAPUR, ThaneP51700045755· 72.7% built
- PRIYANKA PARADISE1.8 yr overduePRIYANKA REGENCY LLP · Thane, ThaneP51700051357· 90.9% built
- OM DATTATRAY CHS LTD1.8 yr overdueSHIV SHAKTI DEVELOPERS · SHIV GANGA NAGAR, ThaneP51700048053· 72.7% built
- OM SAI HOME-D1.8 yr overdueM/S. INFINI DEVELOPERS · KAMATGHAR, ThaneP51700032786· 90.9% built
- SIDDHIVINAYAK RESIDENCY1.8 yr overdueSAIRAJ DEVELOPERS · BADLAPUR, ThaneP51700033059· 72.7% built
- RBI Employees Awantika Co Op Hsg Soc Ltd1.8 yr overdueGOVIND OJASS EDIFICE PVT. LTD. · Naupada, ThaneP51700048962· 72.7% built
- Geeta Heights1.8 yr overdueMAYUR GROUP (RD) · Rambaugh, ThaneP51700029333· 90.9% built
- LAXMI ARCADE1.8 yr overdueSATISH KASHINATH GUJARATHI · NEAR POST OFFICE SHAHAPUR, ThaneP51700047732· 40% built
- SUNDAR RESIDENCY F WING1.8 yr overdueNAVADITYA DEVELOPERS · GAURIPADA, ThaneP51700030083· 12.5% built
- RUNWAL PEARL1.8 yr overdueRunwal Construction Private Limited · Thane, ThaneP51700001383· filed May 2019 → now Dec 2024· 95.5% built· 6 complaints
- Shree Ganesh Apartment1.8 yr overdueSHRI GANESH BUILDER AND DEVELOPERS · Ulhasnagar, ThaneP51700048692· 72.7% built
- SUYASH CO.OP. HOUSING SOCIETY LTD1.8 yr overdueSNA Build-Tech · Thane, ThaneP51700030476· 87.3% built
- DIYA WOODS1.7 yr overdueKRISHA ENTERPRISES · TITWALA, ThaneP51700021634· filed Dec 2022 → now Jan 2025· 89.1% built
- SIDDHESHWAR HEIGHTS A WING FROM 2nd TO 14th FLOOR1.7 yr overdueSHREE JAI MALHAR ENTERPRISES · Kalyan, ThaneP51700031142· filed Dec 2024 → now Jan 2025· 37.5% built
- Bank of Maharashtra Employees Manisha Co-Operative Housing Society Limited1.7 yr overdueJ B Constructions · Tilak nagar, ThaneP51700050442· 90.9% built
- RAHUL CO.OP. HOUSING SOCIETY LTD1.7 yr overdueSNA Build-Tech · PANCHPAKHADI, ThaneP51700030595· 80% built
- SANGHVI PARSSSVA CITY1.6 yr overdueSANGHVI PREMISES PRIVATE LIMITED · Atgaon, ThaneP51700009886· filed Dec 2020 → now Mar 2025· 81.8% built
- Madhu Milind Co-Op Housing Society Ltd1.6 yr overdueAditya Associates · Naupada, ThaneP51700034830· 87.7% built
- AARADHYA HIGHPARK - PROJECT 1 OF PHASE I1.5 yr overdueMAN VASTUCON LLP · NEAR SINGAPORE INTERNATIONAL SCHOOL, ThaneP51700017865· 90.9% built· 13 complaints
- Metropolis - RIVERA1.5 yr overdueANANT SQUARE · Kasarvadavali, ThaneP51700022700· 90.9% built
- SUYOG APARTMENT1.5 yr overdueTELANGE BUILDERS & DEVELOPERS PRIVATE LIMITED · SAI SECTION, ThaneP51700045255· 49.1% built
- PARADISE PARK - Phase 11.5 yr overdueM/S VAKRATUND ENTERPRISES · Belavli, ThaneP51700016121· filed Mar 2024 → now Mar 2025· 45.5% built
- TEN X HABITAT Raymond Realty | Tower A & B1.5 yr overdueRaymond Limited · Thane, ThaneP51700019265· 84.7% built· 3 complaints
- Senwin Residency1.5 yr overdueSenwin Divine Ventures · Waldhuni, ThaneP51700046632· 79.5% built
- SAI TIRTH PHASE II1.5 yr overduePINNACLE CORPORATION · JOVELI, ThaneP51700034566· 90.9% built
- SONAL RESIDENCY1.5 yr overdueRAJNB HOUSING LLP · VILLAGE KANSAI, ThaneP51700047994· 67.7% built
- Shanti Legacy1.5 yr overdueAnmol Infra · Thane, ThaneP51700047026· 29.1% built
- NIRJA HEIGHTS1.5 yr overdueNIRJA BUILDERS AND DEVELOPERS · CHAKKI NAKA TISGAON KALYAN EAST, ThaneP51700051866· 90% built
- SHARMILA RESIDENCY1.5 yr overdueANNAPURNA ENTERPRISES · AMBERNATH, ThaneP51700032556· 61.8% built
- NILYOG APARTMENT1.5 yr overdueRAJNB HOUSING LLP · SURYODAYA CHS, ThaneP51700048983· filed Mar 2024 → now Mar 2025· 34.1% built
- PUSHKARAJ CHS PROPOSED1.5 yr overdueSPLENDOR SHELTERS PVT LTD · BEHIND DNC HIGHSCHOOL, ThaneP51700051480· 90.9% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.