Delayed projects in Thane
1,619 MahaRERA-registered projects in Thane are past the possession date on file and still under 100% built. Where the promoter has formally revised the date, the original is shown alongside so you can see what changed.
Page 6 of 9
- SHIVSHAKTI GREENS3.8 yr overdueSHIVSHAKTI REALITY · JOVELI GAON, ThaneP51700013872· 90.9% built
- Barrington3.8 yr overdueROMA BUILDERS PRIVATE LIMITED · Thane, ThaneP51700000117· 90.9% built
- LOTUS PARK3.8 yr overdueREAL ENTERPRISE · SHAHPUR, ThaneP51700020522· 74.5% built
- SHUBHAM HEIGHTS3.8 yr overdueSHYAMSUNDER RADHYSHYAM AGRAWAL · Mira-Bhayandar (M Corp.), ThaneP51700004023· 39.5% built
- Lodha Kolshet Plot A - Tower J3.8 yr overdueLODHA DEVELOPERS LIMITED · Thane, ThaneP51700015243· 81.8% built
- Clifton3.8 yr overdueROMA BUILDERS PRIVATE LIMITED · Thane, ThaneP51700000129· 90.9% built· 1 complaint
- MAHAVIR PARADISE , PHASE - 13.8 yr overdueMAHAVIR ENTERPRISES · CHIKLOLI, ThaneP51700016012· 90.9% built
- VARAD HEIGHTS3.8 yr overdueSHARAD RAGHUNATH MHATRE · KAMATGHAR, ThaneP51700014942· 90.9% built
- KSHIPRA3.8 yr overdueSARA REALTY · Thane, ThaneP51700015011· 90.9% built
- Hemant Arcade3.8 yr overdueM/s VISHAL CONSTRUCTION · Nr Amrapali Hotel, ThaneP51700021187· 0% built
- AAWAS DEEP3.8 yr overdueSHREE KRISHNA BUILDCON · YASHRAJ NAGAR, ThaneP51700014893· 27.7% built
- GNP GALAXY PHASE - I3.8 yr overdueROSHNI ENTERPRISES · Ambarnath, ThaneP51700002007· 81.8% built· 1 complaint
- M M VALEY A23.8 yr overdueALFA ENTERPRISES · Thane, ThaneP51700010237· 87.5% built· 2 complaints
- SHREEJI AVENUE3.8 yr overdueSHREEJI BUILDCON · WADEGHAR, ThaneP51700016300· 59.1% built
- SHREE SAI RAJ PARK BUILDING NO 3 C WING3.8 yr overdueSarvodayrajconstructioncompany · Kalyan, ThaneP51700007216· filed Dec 2019 → now Dec 2022· 81.8% built
- SAI CHARAN COMPLEX BUILDING NO 33.8 yr overdueOM SAI CHARAN BUILDERS · Thane, ThaneP51700001132· 90.9% built
- RADHA KRISHNA3.8 yr overdueRAMPRASAD SOHANLAL AGRAWAL · Thane, ThaneP51700016450· 90.9% built
- Cloverdale3.8 yr overdueROMA BUILDERS PRIVATE LIMITED · Thane, ThaneP51700000153· 90.9% built
- GLOBE PARADISE3.8 yr overdueGLOBE REALTORS · Kalyan, ThaneP51700004670· 63.6% built
- PARVATI HEIGHTS3.8 yr overdueHASTI BUILDCON · Thane, ThaneP51700015874· 86.4% built
- Hampton3.8 yr overdueROMA BUILDERS PRIVATE LIMITED · Thane, ThaneP51700000091· 90.9% built
- SEA GREEN APARTMENT3.8 yr overdueAAKASH BUILDERS & DEVELOPERS · Mira-Bhayandar (M Corp.), ThaneP51700011846· filed Dec 2019 → now Dec 2022· 90.5% built· 5 complaints
- SATYAM SHEELA3.8 yr overdueSHREE SATYAM GROUP · Ambarnath, ThaneP51700000943· 60.6% built· 1 complaint
- EVERGREEN RESIDENCY C WING3.8 yr overdueBALAJI CONSTRUCTION · BADLAPUR GAON, ThaneP51700001677· 90.9% built
- PALAVA URBANO G AND H3.8 yr overdueLodha Developers Limited · Kalyan, ThaneP51700000696· 81.8% built· 1 complaint
- KRUSHAN DHAM3.8 yr overdueKRUSHAN DHAM BUILDERS & DEVELOPERS · Ambarnath, ThaneP51700015294· 90.9% built
- MANSAROVAR RESIDENCY E WING3.8 yr overdueKIRAN REALTY · Thane, ThaneP51700006405· 90.9% built
- Euro Ville Phase I3.8 yr overdueVastu Rachana JV · Kharade, ThaneP51700001003· 78.2% built
- ACE HOMES3.8 yr overdueAARTI ESTATES · KASARVADAVALI, ThaneP51700016575· 90.9% built
- AND LILY3.8 yr overdueANANTNATH DEVELOPERS · Thane, ThaneP51700008885· 90.9% built· 1 complaint
- SALANGPUR NIRMAN3.8 yr overdueSALANGPUR NIRMAN · MIRA ROAD EAST, ThaneP51700020659· 90.9% built
- SAJAN HEIGHTS3.8 yr overdueDIKSHA DEVELOPERS · NEAR SADGURU DARSHAN, ThaneP51700009777· 36.4% built· 4 complaints
- VIHANGS VERMONT3.8 yr overdueVIHANG ENTERPRISES · Thane, ThaneP51700001458· 84% built· 3 complaints
- Leelaangan3.8 yr overduePravin Kashinath Haware · Ambarnath, ThaneP51700002749· 77.5% built· 2 complaints
- NIRAMAYA HEIGHTS3.8 yr overdueADIRAJ DEVELOPERS · Thane, ThaneP51700014303· 33.6% built
- SANKAT MOCHAN3.8 yr overdueMARUTI CORPORATION · BHIWANDI, ThaneP51700014096· 90.9% built
- SHRUSHTI PRARAMBH3.8 yr overdueSHRUSHTI DEVELOPERS · BADLAPUR, ThaneP51700016101· 90.9% built
- BALAJI EXOTICA-PHASE 13.8 yr overdueBALAJI WORLD · CHIKANGHAR, ThaneP51700015155· 90.9% built· 1 complaint
- RAHUL EXCELLENCE3.8 yr overdueSAROJ SHRAWANKUMAR BAGARIA · AMBARNATH, ThaneP51700012698· filed Dec 2018 → now Dec 2022· 60.9% built· 3 complaints
- Fairway3.8 yr overdueROMA BUILDERS PRIVATE LIMITED · Thane, ThaneP51700000152· 90.9% built
- SUSHAN3.8 yr overdueVENUS REALTORS · Thane, ThaneP51700015064· 18.2% built
- GLOBE BUSINESS PARK3.8 yr overduePIONEER INDUSTRIES · Ambarnath, ThaneP51700003290· 81.8% built
- SHREE DATTA3.8 yr overdueAADYASHAKTI ENTERPRISES · Thane, ThaneP51700016129· 75.5% built
- PATELS ELYSIUM - 53.8 yr overdueAPACE REALTY · Ambarnath(M Cl), ThaneP51700010318· 33.2% built
- UMA GALAXY3.8 yr overdueUMIYA ENTERPRISES · TITWALA, ThaneP51700002937· filed Jun 2021 → now Dec 2022· 94.1% built
- FONTANA A ,B, I and J3.8 yr overduePalava Dwellers Private Limited · Kalyan, ThaneP51700000506· 81.8% built· 2 complaints
- SHREE VIRAJ RESIDENCY WING C PHASE -II3.8 yr overdueSHREE VIRAJ ENTERPRISES · SHIRGAON, BADLAPUR (EAST), ThaneP51700018669· 90.9% built
- Eagleton3.8 yr overdueROMA BUILDERS PRIVATE LIMITED · Thane, ThaneP51700000089· 90.9% built
- K K RENUKA RESIDENCY A AND B WING3.8 yr overdueMADHU KACHHARAM ACHHRA HUF · AMBERNATH WEST, ThaneP51700021714· 81.1% built
- Vaikunth Cluster 13.8 yr overduePEPL Developers Pvt Ltd · Thane, ThaneP51700003535· 86.4% built· 10 complaints
- SONU AAI COMPLEX3.8 yr overdueARVIND GOPAL PATIL AOP · Thane, ThaneP51700012035· 84.7% built
- SHREEJI NISARG PHASE I3.8 yr overdueSHREEJI DEVELOPERS · ERANJAD, 30 MTR BARVI DAM ROAD, ThaneP51700015127· 90.9% built
- Asha Harmony3.8 yr overdueVir Enterprises · Thane, ThaneP51700022377· 90.9% built
- FLORENTIA3.8 yr overdueSIDDHIVINAYAK HOMES PVT. LTD. · MIRA BHAYANDAR, ThaneP51900009486· 90.9% built· 1 complaint
- KONARK MEADOWS Phase-13.8 yr overdueAtlanta Landmark · Varap, ThaneP51700009313· 90.9% built· 1 complaint
- HARMONY COMPLEX - C - WING3.8 yr overdueGOOD LUCKDEVELOPERS · Thane, ThaneP51700004497· 39.8% built
- TRIMURTI PARK3.8 yr overdueTRIMURTI CONSTRUCTION · Kalyan, ThaneP51700011458· 90.9% built
- DYNAMIC CREST PHASE I - RIMO/EVEREST3.8 yr overdueSNEH MAKEWELL LLP · DOMBIVALI, ThaneP51800001460· filed Jun 2021 → now Dec 2022· 72.7% built
- SHREE MAHALAXMI HOMES3.8 yr overdueMAHALXMI FORTUNE · CHIKLOLI, ThaneP51700016810· 69.7% built
- Shrushti Aarambh, Wing - C of Phase - I3.8 yr overdueSHRUSHTI DEVELOPERS · Valivali, Badlapur (W), ThaneP51700015554· 80% built
- Preston3.8 yr overdueROMA BUILDERS PRIVATE LIMITED · Thane, ThaneP51700000139· 90.9% built
- BALAJI SHRUSHTI3.8 yr overdueVARSHA BUILDCON · Thane, ThaneP51700014837· 80.9% built
- Lodha Amara - Tower 36 373.8 yr overdueLODHA DEVELOPERS LIMITED · ., ThaneP51700013961· 81.8% built· 3 complaints
- Kismat Residency3.8 yr overdueKISMAT DEVLOPERS · Mira-Bhayandar (M Corp.), ThaneP51700009235· filed Dec 2021 → now Dec 2022· 62.7% built
- SHANKHESHWAR LAKE VIEW3.8 yr overdueSHREE SHANKHESHWAR ENTERPRISES · KHABALPADA, ThaneP51700015923· 90.9% built
- Willowcrest3.8 yr overdueROMA BUILDERS PRIVATE LIMITED · Thane, ThaneP51700000146· 90.9% built
- N G TIVOLI Phase I3.8 yr overdueRNA Builders (NG) · Mira Road, ThaneP51700015568· 37.5% built
- AL ABBAS3.8 yr overdueAYMAN INFRA CONSTRUCTIONS · Bhiwandi, ThaneP51700005893· filed Dec 2023 → now Dec 2022· 75.8% built
- Marvel Mountain3.8 yr overdueMarvel Buildcons · Ulhasnagar, ThaneP51700004847· filed Dec 2018 → now Dec 2022· 81.8% built
- SAI SHRUSHTI ANNEX3.8 yr overdueSAI SHRUSHTI ENTERPRISES · NEAR KHIDKALESHWAR MANDIR, ThaneP51700015209· 50% built
- NEW MODEL TOWN COMPLEX3.7 yr overdueQAVI CONSTRUCTION PVT. LTD. · NEAR ARCHANA ENG. MED. SCHOOL, ThaneP51700015557· 72.7% built
- SAI AANGAN3.7 yr overduePINNACLE REALTORS · BADLAPUR GAON BADLAPUR WEST, ThaneP51700014960· 90.9% built
- Lifestyle City Kalyan- Platano C3.7 yr overdueNirmal Lifestyle (Kalyan) Private Limited · Vadavali Kh., ThaneP51700006766· filed Dec 2018 → now Jan 2023· 68.2% built· 69 complaints
- PALAVA CROWN3.7 yr overduePalava Dwellers Private Limited · Kalyan, ThaneP51700010935· 81.8% built· 1 complaint
- Lifestyle City Kalyan- Platano A3.7 yr overdueNirmal Lifestyle (Kalyan) Private Limited · Kalyan, ThaneP51700005583· filed Dec 2018 → now Jan 2023· 69.1% built· 51 complaints
- Lifestyle City Kalyan- Platano B3.7 yr overdueNirmal Lifestyle (Kalyan) Private Limited · Kalyan, ThaneP51700003540· filed Dec 2018 → now Jan 2023· 68.2% built· 40 complaints
- AMBRIN3.7 yr overdueIMPRESSIONS · NEAR SHIVAM HOSPITAL,GHARDA CIRCLE, ThaneP51700027906· 65.9% built
- GOLDEN VALLEY3.7 yr overdueA PLUS REALTY · Ambarnath, ThaneP51700002661· 67.3% built
- Om Sai Sankul3.6 yr overdueOm Sai Constructions · Kalyan, ThaneP51700013210· filed Feb 2022 → now Feb 2023· 90.9% built
- RUSTOMJEE AZZIANO WING E3.6 yr overdueKapstone Constructions Private Limited · Thane, ThaneP51700015260· 90% built· 1 complaint
- UNIQUE ESTATE3.6 yr overdueUNIQUE SHANTI REALTORS · MIRA ROAD EAST, ThaneP51700006459· filed Dec 2020 → now Mar 2023· 54.5% built
- PALAVA MILANO E, F3.5 yr overduePalava Dwellers Private Limited · -, ThaneP51700011629· 72.7% built· 1 complaint
- Jasmine A, B, C, G, H and I3.5 yr overduePalava Dwellers Pvt Ltd · ., ThaneP51700020381· 78.2% built· 1 complaint
- SHREERAM GALAXY3.5 yr overdueSHREE RAM BUILDERS · SHIVAJI UDYOG NAGAR, ThaneP51700009544· 25.5% built
- SIDDHESHWAR HEIGHTS3.5 yr overdueSHREE JAI MALHAR ENTERPRISES · TITWALA, ThaneP51700008224· 34.8% built
- PALAVA - ESTELA D to G3.5 yr overduePalava Dwellers Private Limited · Kalyan, ThaneP51700011068· 81.8% built· 6 complaints
- KANAK RESIDENCY3.5 yr overdueKRISKAN INFRAVENTURE LLP · KAMATGHAR, ThaneP51700016074· 45.6% built
- Palava - Trinity A to C3.5 yr overduePalava Dwellers Private Limited · Kalyan, ThaneP51700014396· 81.8% built· 2 complaints
- CHESTERTON3.5 yr overdueROMA BUILDERS PRIVATE LIMITED · PATLIPADA, HIRANANDANI ESTATE, OFF GHODBUNDER ROAD, ThaneP51700019400· 90.9% built
- VASTU SIDDHI , PHASE II3.5 yr overdueSIDDHIVINAYAK GROUP · CHIKHLOLI, ThaneP51700016349· 81.8% built
- PALVA MILANO D, G3.5 yr overduePalava Dwellers Private Limited · Kalyan, ThaneP51700010109· 72.7% built· 3 complaints
- PALAVA AURORA B, C3.5 yr overduePalava Dwellers Private Limited · Kalyan, ThaneP51700010960· 72.7% built
- NEWA BHAKTI KNOWLEDGE CITY COMMERCIAL BUILDING PHASE 13.5 yr overdueNEWA TECHNOCITY (I) PRIVATE LIMITED · Thane, ThaneP51700010310· filed Sept 2021 → now Mar 2023· 90.9% built
- Jasmine T3.5 yr overduePalava Dwellers Pvt Ltd · PALAVA, ThaneP51700020373· 0% built· 1 complaint
- Upper Thane - Sereno D and E3.5 yr overdueLODHA DEVELOPERS LIMITED · Surai, ThaneP51700014770· 81.8% built· 1 complaint
- SHREE KAMAKHYA CHAMBERS3.5 yr overdueSHRIPRAKASH VIJAYNATH RAI · Thane, ThaneP51700011960· filed Mar 2022 → now Mar 2023· 90.9% built
- AARADHYA PRIMUS3.5 yr overdueMAN VASTUCON LLP · NEAR SINGAPORE INTERNATIONAL SCHOOL, ThaneP51700023844· 81.8% built
- ADIJON3.5 yr overdueJ. ALVARES & OTHERS · Thane, ThaneP51700008646· filed Mar 2022 → now Mar 2023· 90.9% built
- VAISHNAVI HIGHLIFE3.5 yr overdueMAA JIVDANI CONSTRUCTION COMPANY · Kalyan, ThaneP51700008333· 95.5% built
- FLORENCE3.5 yr overdueSATGURU LIFESPACES · Kasarvadavli, ThaneP51700003627· filed Mar 2020 → now Mar 2023· 99% built· 1 complaint
- MADHUBAN PARK3.5 yr overdueRAJNB HOUSING LLP · B CABIN, ThaneP51700031395· 72.3% built
- GAYATRI CLASSIC3.5 yr overdueTELE BUILD CONSTRUCTION PVT LTD · Bhiwandi, ThaneP51700005592· filed Mar 2020 → now Mar 2023· 65.5% built
- Unique Heights3.5 yr overdueFAZAL MEHMOOD SHAIKH · Thane, ThaneP51700019173· 90.9% built
- ANANT PRABHA3.5 yr overdueRUSHIKESH ENTERPRISES · SURYODAY SOCIETY KANSAI, ThaneP51700031051· 90.9% built
- THARWANI ARIANA PHASE III3.5 yr overdueANIL HARDASMAL THARWANI · Ambarnath, ThaneP51700006728· 98% built
- Signature Residency3.5 yr overdueTheme Infraprojects Private Limited · Patalipada, ThaneP51700008025· filed Apr 2022 → now Apr 2023· 90.9% built· 2 complaints
- Courtyard - Ornella3.4 yr overdueCOURTYARD REAL ESTATE PRIVATE LIMITED · Thane, ThaneP51700000681· 52.7% built· 3 complaints
- SHREE ANANDI HERITAGE3.4 yr overdueJAI MALHAR BUILDERS & DEVELOPERS · Kalyan, ThaneP51700021914· 90.9% built
- Saayam Visava3.4 yr overdueShrikrishna Ramchandra Marathe · Middle class Soc., ThaneP51700024133· 73.6% built
- AASHRAY PEARL WING C3.4 yr overdueAASHRAYGROUP · Ambarnath, ThaneP51700005904· 90.9% built
- Courtyard - Onyx3.4 yr overdueCOURTYARD REAL ESTATE PRIVATE LIMITED · Thane, ThaneP51700000714· 53% built· 2 complaints
- AASHRAY AANAND3.4 yr overdueAASHRAY INFRA · Ambarnath, ThaneP51700008344· 37% built
- DEVTARA HEIGHTS3.4 yr overdueSavera Construction Co · Thane, ThaneP51700003412· filed Dec 2022 → now May 2023· 88.2% built
- VISHNU VATIKA WING A AND B PHASE I3.4 yr overdueVISHNU VATIKA · Badlapur (M Cl), ThaneP51700009860· filed Oct 2019 → now May 2023· 86.4% built
- YASHWANT HEIGHTS PHASE II3.4 yr overdueRAI RESIDENCY Private Limited · KALYAN E, ThaneP51700030946· 82.5% built
- AL-NASHRA HEIGHTS3.3 yr overdueUNIQUE BUILDERS AND DEVELOPERS · Kalyan, ThaneP51700005471· filed Jan 2021 → now Jun 2023· 90.9% built· 6 complaints
- SHIVANJALI HEIGHTS3.3 yr overdueSHIVANJALI CONSTRUCTION · BADLAPUR WEST, ThaneP51700032585· filed Jun 2022 → now Jun 2023· 50% built
- MARATHON NEXTOWN CORAL3.3 yr overdueMARATHON ENER-GEN LLP · Thane, ThaneP51700000952· filed Dec 2021 → now Jun 2023· 72.7% built· 3 complaints
- RAVIRAJ APARTMENT3.3 yr overdueRAJENDRA GHORPADE · GANESH NAGAR, ThaneP51700020559· filed Dec 2022 → now Jun 2023· 72.7% built
- PALAVA MARVELLA B,C,D,E,F,G3.3 yr overduePalava Dwellers Private Limited · ., ThaneP51700013462· 76.7% built· 4 complaints
- Mohan Skyville3.3 yr overdueMOHAN LIFESPACES LLP · Kalyan, ThaneP51700003607· filed Jun 2019 → now Jun 2023· 81.8% built
- Platinum Tower3.3 yr overdueHaware's Housing Development Finance Corporation Ltd. · Thane, ThaneP51700000549· filed Sept 2022 → now Jun 2023· 72.7% built
- PALAVA ESTELA H, I, J3.3 yr overduePalava Dwellers Private Limited · Palava, ThaneP51700013145· 81.8% built
- SHREE GALAXY HEIGHTS3.3 yr overdueV3 Reality · BADLAPUR AMBERNATH ROAD, ThaneP51700016371· filed Dec 2022 → now Jun 2023· 80% built
- USHA JOSHI PARK PHASE B3.3 yr overdueJ K T BUILDERS & DEVELOPERS · Khadavali, ThaneP51700012148· filed Dec 2021 → now Jun 2023· 18.6% built
- PALAVA ESTELA A, B, C3.3 yr overduePalava Dwellers Private Limited · Palava, ThaneP51700013158· 81.8% built· 4 complaints
- SAI PAVITRA RESIDENCY3.3 yr overdueSAILAVKIK REALTY PRIVATE LIMITED · Thane, ThaneP51700021480· 81.8% built
- SAI VIDHATA3.3 yr overdueSAI SHRADDHA ASSOCIATES · Ulhasnagar, ThaneP51700030832· 81.8% built
- PALAVA MARVELLA A, H3.3 yr overduePalava Dwellers Private Limited · PALAVA, ThaneP51700015660· 81.5% built
- VISTA VALLEY3.3 yr overdueM/s IQRA REALTY · Kausa, ThaneP51700016240· 87.2% built
- UNIVERSE I PHASE II3.3 yr overdueSAHYADRI GRIH NIRMAN · Thane (M Corp.), ThaneP51700006220· 15.5% built
- PALAVA AURELIA - C, H, I3.3 yr overduePalava Dwellers Private Limited · Palava, ThaneP51700013073· 54.5% built· 2 complaints
- Shree Datta Samartha CHSL3.3 yr overdueShree Sai Swami Enterprises · Near Railway Station, ThaneP51700034066· 90.9% built
- vedant imperial D phase 33.3 yr overdueMOHAN HARDASMAL THARWANI · Badlapur (M Cl), ThaneP51700007549· 63.2% built
- CRYSTAL SPIRES3.3 yr overdueLUXORA REALTORS PRIVATE LIMITED · Chitalsar Manpada, ThaneP51700009216· filed Jan 2021 → now Jun 2023· 84.8% built· 9 complaints
- SAI SPRING3.3 yr overdueMOHAN KEDARNATH KRISHNAVANSHI · KALYAN, ThaneP51700009813· 90% built
- AMBER ELLANCE A-13.3 yr overdueAAKASH CORPORATION · Thane, ThaneP51700013692· 90.9% built
- SHIV SIDDHI3.3 yr overdueKEDAR CONSTRUCTION · mharal, ThaneP51700010414· 90% built
- AL HADI RESIDENTIAL COMPLEX3.3 yr overdueSAHYADRI GRIH NIRMAN · Thane, ThaneP51700012253· 44.8% built
- ROYAL NEST3.3 yr overdueDHANASHREE DEVELOPERS · Ambarnath(M Cl), ThaneP51700003909· filed Dec 2020 → now Jun 2023· 99.1% built
- SAHAKAR PREMIER3.2 yr overduePREMIER REALTY · Thane, ThaneP51700002452· 27.3% built
- Dipti SkyCity Building 1 and 33.2 yr overdueDipti Home Makers Pvt Ltd · Ambarnath, ThaneP51700008856· 95.5% built
- THARWANI MILLENNIUM CITY PHASE I3.2 yr overdueTHARWANI REALTORS · BADLAPUR, ThaneP51700023974· 95.9% built
- Mohan Suburbia III3.2 yr overdueMOHAN LIFESPACES LLP · Khoj Kuntawli, ThaneP51700021395· filed Jun 2022 → now Aug 2023· 90.5% built
- SUNSET HEIGHTS 23.2 yr overdueALFA CONSTRUCTIONS · BADLAPUR GAON, ThaneP51700018798· filed Jun 2022 → now Aug 2023· 90% built
- DEVESH3.1 yr overdueOM CONSTRUCTION CO · BHAYANDAR, ThaneP51700007526· 36.4% built
- HEMA KUNJ3.1 yr overdueBHADRANKAR ENTERPRISES LLP · Thane, ThaneP51700028739· 41.8% built· 1 complaint
- SAI VILLA3.1 yr overdueBUILT TECH BUILDERS & DEVELOPERS PVT. LTD. · BADALAPUR GAON, ThaneP51700015189· filed Dec 2022 → now Aug 2023· 90% built· 1 complaint
- SAI REGENCY3.1 yr overdueSAI DEVELOPERS · NEAR AYYAPPATEMPLE, GAURIPADA, ThaneP51700013647· filed Dec 2018 → now Aug 2023· 89.8% built· 14 complaints
- BHOOMI AVENUE3.1 yr overdueBHOOMI ENTERPRISES · AMBERNATH (E), ThaneP51700029068· 90.9% built
- SHIV JIVDANI SADAN3.1 yr overdueSHUBHAM BUILDERS & DEVELOPERS · GARIBACHA WADA, ThaneP51700021173· filed May 2022 → now Aug 2023· 19.1% built
- CHANDRA BHAGA3.1 yr overdueVITTHAL MAULI CONSTRUCTION COMPANY · KATEMANEVALI, ThaneP51700010487· filed Jun 2021 → now Aug 2023· 34.5% built
- Pankaj Co-Op Housing Society Ltd.3.1 yr overdueAditya Associates · Sahakar Colony, Brahmin Society, Thane (W), ThaneP51700034605· 90.9% built
- Hundiwale3.1 yr overdueAditya Associates · Thane, ThaneP51700046290· 90.9% built
- SAIRAJ EMERALD3.1 yr overdueSAIRAJ ENTERPRISES · BADLAPUR WEST, ThaneP51700049097· 71.8% built
- DELTA WOODS3.0 yr overdueDelta venture · MIRA ROAD, ThaneP51700018070· 73.2% built· 2 complaints
- S. A. Patil Nagar Garden View CHS3.0 yr overdueShree Khodiyar Builders and Developers · Ambarnath, ThaneP51700032102· 70.4% built
- Upper Thane - Sereno A, B, B13.0 yr overdueLODHA DEVELOPERS LIMITED · Surai, ThaneP51700016243· 81.8% built· 2 complaints
- Riverwood Park Building No. 23.0 yr overdueShree Khidkaleshwar Property Developers Pvt. Ltd. · Thane, ThaneP51700004997· filed Apr 2021 → now Sept 2023· 99.1% built
- Upper Thane - Woodlands G,H,I3.0 yr overdueLODHA DEVELOPERS LIMITED · Anjur, ThaneP51700016245· 81.8% built· 5 complaints
- TRICITY PALACIO3.0 yr overdueTRICITY REALTY LLP · Thane, ThaneP51700002400· 95.5% built
- Upper Thane - Tiara C3.0 yr overdueLODHA DEVELOPERS LIMITED · Bhiwandi, ThaneP51700016437· 81.8% built
- Lodha Amara - Tower 20, 213.0 yr overdueLODHA DEVELOPERS LIMITED · Kolshet, ThaneP51700016961· 81.8% built· 8 complaints
- HYDE PARK RESIDENCY F5 BUILDING PHASE3.0 yr overdueNEXUS BUILDERS AND DEVELOPERS PVT LTD · Thane, ThaneP51700027694· 86.8% built
- Maatr Waters3.0 yr overdueMaatr Enterprises · Village Barave, ThaneP51700026313· 90.5% built
- TRICITY PROMENADE3.0 yr overdueTRICITY REALTY LLP · Thane, ThaneP51700013737· 89.9% built
- Lifestyle City Kalyan - Applause B3.0 yr overdueNirmal Lifestyle (Kalyan) Private Limited · Kalyan, ThaneP51700003543· filed Dec 2018 → now Sept 2023· 58.6% built· 26 complaints
- Bharat Ecovistas Phase III3.0 yr overdueBHARAT REALTY VENTURE PRIVATE LIMITED · Shilphata Junction, Thane, ThaneP51700015290· filed Dec 2021 → now Oct 2023· 81.8% built· 3 complaints
- SAHAYOG NILAYAM3.0 yr overdueSAHAYOG CONSTRUCTION · Manda, ThaneP51700008289· 90.6% built· 1 complaint
- PALAVA MILANO A,B,C,H,I,J3.0 yr overduePalava Dwellers Private Limited · Palava, ThaneP51700015016· 78.2% built· 3 complaints
- PATELS ELYSIUM - 23.0 yr overdueAPACE REALTY · Ambarnath, ThaneP51700008491· 87.3% built
- SAI WORLD RETREAT3.0 yr overdueParadise Leisure Homes · Ulhasnagar (M Corp.), ThaneP51700001566· 24.8% built
- ASHAR EDGE WING B PHASE III3.0 yr overdueMs ASHAR VENTURES · Thane, ThaneP51700016016· 94.5% built
- JEEVAN CHS LTD3.0 yr overdueSHARDA VASTU NIRMITEE PVT. LTD. · PANCHPAKHADI, ThaneP51700023605· 90.9% built
- SHANKAR PALACE3.0 yr overdueShree Ramesh Homes Builders And Developers · Thane, ThaneP51700012469· 90.9% built· 2 complaints
- PATELS ELYSIUM - 43.0 yr overdueAPACE REALTY · Ambarnath, ThaneP51700006142· 87.3% built
- Tokyo Bay Phase - 13.0 yr overduePuranik Tokyo Bay Private Limited · Thane, ThaneP51700000618· 90.9% built· 6 complaints
- VISHNU VATIKA NX WING C1 E1 E2 PHASE 13.0 yr overdueVISHNU GROUP · BADLAPUR, ThaneP51700004777· 88.5% built
- ASHAR EDGE GALLERIA- PHASE I3.0 yr overdueMs ASHAR VENTURES · Thane, ThaneP51700016033· 86.4% built
- Riverwood Park Building No. 43.0 yr overdueShree Khidkaleshwar Property Developers Pvt. Ltd. · Thane, ThaneP51700004003· filed Oct 2022 → now Oct 2023· 94.1% built
- PATELS ELYSIUM - 33.0 yr overdueAPACE REALTY · Ambarnath(M Cl), ThaneP51700010280· 87.3% built
- ASHAR EDGE WING A PHASE II3.0 yr overdueMs ASHAR VENTURES · Thane, ThaneP51700016015· 96.4% built
- PALAVA AURORA A,D3.0 yr overduePalava Dwellers Private Limited · Palava, ThaneP51700015090· 77.3% built
- Anthurium3.0 yr overdueAARTI ESTATES · Thane, ThaneP51700002317· 70% built
- SHRUTI APARTMENT2.9 yr overdueVIKRANT V RAIKAR HUF - - · Thane, ThaneP51700025732· 39.2% built
- Silver Park Residency Aster2.9 yr overdueSuyash Enterprises · KAMATGHAR, ThaneP51700015485· 90.9% built
- MAHAVIR DREAMLAND2.8 yr overdueMAHAVIR DREAMLAND · Bhiwandi, ThaneP51700012940· filed Dec 2022 → now Dec 2023· 81.8% built
- MARATHON NEXWORLD AURA-12.8 yr overdueMATRIX ENCLAVES PROJECTS DEV. PVT. LTD · Betawade Gaon, ThaneP51700000652· filed Dec 2022 → now Dec 2023· 46.5% built· 35 complaints
- CONCEPT ARENA2.8 yr overdueCONCEPT REALTY · Ambarnath, ThaneP51700003805· filed Jun 2021 → now Dec 2023· 14.4% built
- K. D. HERMITAGE, B. NO. 22.8 yr overdueD. K. Enterprises · OPP. OVERHEAD WATER TANK, ThaneP51700017723· filed Dec 2022 → now Dec 2023· 72.7% built· 1 complaint
- KRISHNAKALP2.8 yr overdueSHIVAM ENTERPRISES · KATRAP BADLAPUR, ThaneP51700022665· 90.9% built
- Mateshwari Altura B and C Wing2.8 yr overdueMateshwari Realtors · Kalyan, ThaneP51700010188· 64.1% built· 27 complaints
- GAMI REAGAN2.8 yr overdueSHRI GAMI INFOTECH PVT LTD · Thane, ThaneP51700013200· 93% built
- The Universe II2.8 yr overdueG.E.CONSTRUCTIONS · Thane (M Corp.), ThaneP51700006721· 90.9% built
- SAI SATYAM RESIDENCY2.8 yr overdueSAI SATYAM GROUP · WADEGHAR, ThaneP51700015767· 60.6% built
- Shree Krishna Residency2.8 yr overduePanchala Builders & Developers · Ambernath, ThaneP51700014692· 90.9% built
- PYRAMID ELEMENTS2.8 yr overduePYRAMID INFRATECH CO · Thane, ThaneP51700013897· 81.8% built
- SHREE SHASWAT BUILDING NO 152.8 yr overdueWHITE HEAVEN REALTY · PLEASANT PARK, ThaneP51700021222· 63.6% built
- RAJ FLORENZA2.8 yr overdueRAJ REALTORS · Vijay Park, ThaneP51700001219· 90.9% built
- PATELS RESIDENCY - E WING2.8 yr overduePARAM BUILDERS AND DEVELOPERS · AMBARNATH, ThaneP51700023093· 9.1% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.