Delayed projects in Thane
1,593 MahaRERA-registered projects in Thane are past the possession date on file and still under 100% built. Where the promoter has formally revised the date, the original is shown alongside so you can see what changed.
Page 6 of 8
- Shrushti Aarambh, Wing - C of Phase - I3.6 yr overdueSHRUSHTI DEVELOPERS · Valivali, Badlapur (W), ThaneP51700015554· 80% built
- Lodha Kolshet Plot A - Tower J3.6 yr overdueLODHA DEVELOPERS LIMITED · Thane, ThaneP51700015243· 81.8% built
- DHAVAL3.6 yr overdueSHREEJI AND INNOVATIVE DEVELOPERS · VILLAGE BELVALI ,BACK SIDE OF RIDDHI SIDDHI BUILDING, ThaneP51700028136· 81.8% built
- Silver Park Residency Orchid3.6 yr overdueSuyash Enterprises · Bhiwandi, ThaneP51700007849· 90.9% built
- LOTUS PARK3.6 yr overdueREAL ENTERPRISE · SHAHPUR, ThaneP51700020522· 74.5% built
- SHRUSHTI PRARAMBH3.6 yr overdueSHRUSHTI DEVELOPERS · BADLAPUR, ThaneP51700016101· 90.9% built
- SHREEJI AVENUE3.6 yr overdueSHREEJI BUILDCON · WADEGHAR, ThaneP51700016300· 59.1% built
- BALAJI SHRUSHTI3.6 yr overdueVARSHA BUILDCON · Thane, ThaneP51700014837· 80.9% built
- FONTANA A ,B, I and J3.6 yr overduePalava Dwellers Private Limited · Kalyan, ThaneP51700000506· 81.8% built· 2 complaints
- SHREEJI NISARG PHASE I3.6 yr overdueSHREEJI DEVELOPERS · ERANJAD, 30 MTR BARVI DAM ROAD, ThaneP51700015127· 90.9% built
- Empire Industrial Centrum - Phase II3.6 yr overdueEMPIRE INDUSTRIES LIMITED · Ambarnath, ThaneP51700021315· 54.5% built
- M M VALEY A23.6 yr overdueALFA ENTERPRISES · Thane, ThaneP51700010237· 87.5% built· 2 complaints
- UMA GALAXY3.6 yr overdueUMIYA ENTERPRISES · TITWALA, ThaneP51700002937· filed Jun 2021 → now Dec 2022· 94.1% built
- Hemant Arcade3.6 yr overdueM/s VISHAL CONSTRUCTION · Nr Amrapali Hotel, ThaneP51700021187· 0% built
- TRIMURTI PARK3.6 yr overdueTRIMURTI CONSTRUCTION · Kalyan, ThaneP51700011458· 90.9% built
- SATYAM SHEELA3.6 yr overdueSHREE SATYAM GROUP · Ambarnath, ThaneP51700000943· 60.6% built· 1 complaint
- BALAJI EXOTICA-PHASE 13.6 yr overdueBALAJI WORLD · CHIKANGHAR, ThaneP51700015155· 90.9% built· 1 complaint
- Kalpataru Hills - Building 2A3.6 yr overdueKalpataru Properties (Thane) Pvt. Ltd. · Thane, ThaneP51700000584· 98.5% built· 2 complaints
- SHANKHESHWAR LAKE VIEW3.6 yr overdueSHREE SHANKHESHWAR ENTERPRISES · KHABALPADA, ThaneP51700015923· 90.9% built
- KRUSHAN DHAM3.6 yr overdueKRUSHAN DHAM BUILDERS & DEVELOPERS · Ambarnath, ThaneP51700015294· 90.9% built
- Fairway3.6 yr overdueROMA BUILDERS PRIVATE LIMITED · Thane, ThaneP51700000152· 90.9% built
- Preston3.6 yr overdueROMA BUILDERS PRIVATE LIMITED · Thane, ThaneP51700000139· 90.9% built
- SEA GREEN APARTMENT3.6 yr overdueAAKASH BUILDERS & DEVELOPERS · Mira-Bhayandar (M Corp.), ThaneP51700011846· filed Dec 2019 → now Dec 2022· 90.5% built· 5 complaints
- Barrington3.6 yr overdueROMA BUILDERS PRIVATE LIMITED · Thane, ThaneP51700000117· 90.9% built
- ACE HOMES3.6 yr overdueAARTI ESTATES · KASARVADAVALI, ThaneP51700016575· 90.9% built
- SHREE GAURANG3.6 yr overdueGAURANG ASSOCIATES · NAUPADA, ThaneP51700015176· 0% built· 7 complaints
- RAHUL EXCELLENCE3.6 yr overdueSAROJ SHRAWANKUMAR BAGARIA · AMBARNATH, ThaneP51700012698· filed Dec 2018 → now Dec 2022· 60.9% built· 3 complaints
- PATELS ELYSIUM - 53.6 yr overdueAPACE REALTY · Ambarnath(M Cl), ThaneP51700010318· 33.2% built
- Mohan Areca3.6 yr overdueMOHAN LIFESPACES LLP · Ambarnath, ThaneP51700000829· filed Dec 2019 → now Dec 2022· 88.6% built· 14 complaints
- Eagleton3.6 yr overdueROMA BUILDERS PRIVATE LIMITED · Thane, ThaneP51700000089· 90.9% built
- Kismat Residency3.6 yr overdueKISMAT DEVLOPERS · Mira-Bhayandar (M Corp.), ThaneP51700009235· filed Dec 2021 → now Dec 2022· 62.7% built
- SHANTI GARDENS, SECTOR 5, BLDG. NO.83.6 yr overdueRAMNAGAR DEVELOPMENT CORPORATION · SHANTI GARDENS, ThaneP51700010577· 90.5% built
- AND LILY3.6 yr overdueANANTNATH DEVELOPERS · Thane, ThaneP51700008885· 90.9% built· 1 complaint
- Sai Satyam Homes3.6 yr overdueSai Satyam Developers · Kalyan, ThaneP51700001809· filed Jun 2021 → now Dec 2022· 90.9% built
- NIRAMAYA HEIGHTS3.6 yr overdueADIRAJ DEVELOPERS · Thane, ThaneP51700014303· 33.6% built
- HARMONY COMPLEX - C - WING3.6 yr overdueGOOD LUCKDEVELOPERS · Thane, ThaneP51700004497· 39.8% built
- Willowcrest3.6 yr overdueROMA BUILDERS PRIVATE LIMITED · Thane, ThaneP51700000146· 90.9% built
- EVERGREEN RESIDENCY C WING3.6 yr overdueBALAJI CONSTRUCTION · BADLAPUR GAON, ThaneP51700001677· 90.9% built
- K K RENUKA RESIDENCY A AND B WING3.6 yr overdueMADHU KACHHARAM ACHHRA HUF · AMBERNATH WEST, ThaneP51700021714· 81.1% built
- FLORENTIA3.6 yr overdueSIDDHIVINAYAK HOMES PVT. LTD. · MIRA BHAYANDAR, ThaneP51900009486· 90.9% built· 1 complaint
- Q Residences R23.6 yr overdueAurum RealEstate Developers Limited · Thane, ThaneP51700007844· 90.4% built
- SALANGPUR NIRMAN3.6 yr overdueSALANGPUR NIRMAN · MIRA ROAD EAST, ThaneP51700020659· 90.9% built
- MAHAVIR PARADISE , PHASE - 13.6 yr overdueMAHAVIR ENTERPRISES · CHIKLOLI, ThaneP51700016012· 90.9% built
- VARAD HEIGHTS3.6 yr overdueSHARAD RAGHUNATH MHATRE · KAMATGHAR, ThaneP51700014942· 90.9% built
- MANSAROVAR RESIDENCY E WING3.6 yr overdueKIRAN REALTY · Thane, ThaneP51700006405· 90.9% built
- SHREE DATTA3.6 yr overdueAADYASHAKTI ENTERPRISES · Thane, ThaneP51700016129· 75.5% built
- Euro Ville Phase I3.6 yr overdueVastu Rachana JV · Kharade, ThaneP51700001003· 78.2% built
- MANSAROVAR RESIDENCY C WING3.6 yr overdueKIRAN REALTY · Thane, ThaneP51700002268· 90.9% built
- N G TIVOLI Phase I3.6 yr overdueRNA Builders (NG) · Mira Road, ThaneP51700015568· 37.5% built
- MANGALAM3.6 yr overdueDEEPA SURESH GADA · Thane, ThaneP51700015621· 51.6% built· 1 complaint
- SAJAN HEIGHTS3.6 yr overdueDIKSHA DEVELOPERS · NEAR SADGURU DARSHAN, ThaneP51700009777· 36.4% built· 4 complaints
- SANKAT MOCHAN3.6 yr overdueMARUTI CORPORATION · BHIWANDI, ThaneP51700014096· 90.9% built
- SUNRISE GLORY PHASE II3.6 yr overdueSUNRISE LIFESPACES LLP · Thane, ThaneP51700003397· 90.9% built· 10 complaints
- GNP GALAXY PHASE - I3.6 yr overdueROSHNI ENTERPRISES · Ambarnath, ThaneP51700002007· 81.8% built· 1 complaint
- Asha Harmony3.6 yr overdueVir Enterprises · Thane, ThaneP51700022377· 90.9% built
- Clifton3.6 yr overdueROMA BUILDERS PRIVATE LIMITED · Thane, ThaneP51700000129· 90.9% built· 1 complaint
- SHREE VIRAJ RESIDENCY WING C PHASE -II3.6 yr overdueSHREE VIRAJ ENTERPRISES · SHIRGAON, BADLAPUR (EAST), ThaneP51700018669· 90.9% built
- VIHANGS VERMONT3.6 yr overdueVIHANG ENTERPRISES · Thane, ThaneP51700001458· 84% built· 3 complaints
- Lodha Amara - Tower 36 373.6 yr overdueLODHA DEVELOPERS LIMITED · ., ThaneP51700013961· 81.8% built· 3 complaints
- SHIVSHAKTI GREENS3.6 yr overdueSHIVSHAKTI REALITY · JOVELI GAON, ThaneP51700013872· 90.9% built
- SHREE SAI RAJ PARK BUILDING NO 3 C WING3.6 yr overduesarvodayrajconstructioncompany · Kalyan, ThaneP51700007216· filed Dec 2019 → now Dec 2022· 81.8% built
- Vaikunth Cluster 13.6 yr overduePEPL Developers Pvt Ltd · Thane, ThaneP51700003535· 86.4% built· 9 complaints
- AAWAS DEEP3.6 yr overdueSHREE KRISHNA BUILDCON · YASHRAJ NAGAR, ThaneP51700014893· 27.7% built
- OSHO DAYARAM3.6 yr overduePARVATI CONSTRUCTION CO. · Thane, ThaneP51700003187· 90.9% built
- Marvel Mountain3.6 yr overdueMarvel Buildcons · Ulhasnagar, ThaneP51700004847· filed Dec 2018 → now Dec 2022· 81.8% built
- AL ABBAS3.6 yr overdueAYMAN INFRA CONSTRUCTIONS · Bhiwandi, ThaneP51700005893· filed Dec 2023 → now Dec 2022· 75.8% built
- SAI SHRUSHTI ANNEX3.6 yr overdueSAI SHRUSHTI ENTERPRISES · NEAR KHIDKALESHWAR MANDIR, ThaneP51700015209· 50% built
- SAI AANGAN3.6 yr overduePINNACLE REALTORS · BADLAPUR GAON BADLAPUR WEST, ThaneP51700014960· 90.9% built
- Lifestyle City Kalyan- Platano C3.6 yr overdueNirmal Lifestyle (Kalyan) Private Limited · Vadavali Kh., ThaneP51700006766· filed Dec 2018 → now Jan 2023· 68.2% built· 69 complaints
- PALAVA CROWN3.6 yr overduePalava Dwellers Private Limited · Kalyan, ThaneP51700010935· 81.8% built· 1 complaint
- Lifestyle City Kalyan- Platano A3.6 yr overdueNirmal Lifestyle (Kalyan) Private Limited · Kalyan, ThaneP51700005583· filed Dec 2018 → now Jan 2023· 69.1% built· 51 complaints
- Lifestyle City Kalyan- Platano B3.6 yr overdueNirmal Lifestyle (Kalyan) Private Limited · Kalyan, ThaneP51700003540· filed Dec 2018 → now Jan 2023· 68.2% built· 40 complaints
- AMBRIN3.6 yr overdueIMPRESSIONS · NEAR SHIVAM HOSPITAL,GHARDA CIRCLE, ThaneP51700027906· 65.9% built
- GOLDEN VALLEY3.5 yr overdueA PLUS REALTY · Ambarnath, ThaneP51700002661· 67.3% built
- RUSTOMJEE AZZIANO WING E3.5 yr overdueKapstone Constructions Private Limited · Thane, ThaneP51700015260· 90% built· 1 complaint
- Om Sai Sankul3.5 yr overdueOm Sai Constructions · Kalyan, ThaneP51700013210· filed Feb 2022 → now Feb 2023· 90.9% built
- UNIQUE ESTATE3.5 yr overdueUNIQUE SHANTI REALTORS · MIRA ROAD EAST, ThaneP51700006459· filed Dec 2020 → now Mar 2023· 54.5% built
- ADIJON3.4 yr overdueJ. ALVARES & OTHERS · Thane, ThaneP51700008646· filed Mar 2022 → now Mar 2023· 90.9% built
- SHREE KAMAKHYA CHAMBERS3.4 yr overdueSHRIPRAKASH VIJAYNATH RAI · Thane, ThaneP51700011960· filed Mar 2022 → now Mar 2023· 90.9% built
- NEWA BHAKTI KNOWLEDGE CITY COMMERCIAL BUILDING PHASE 13.4 yr overdueNEWA TECHNOCITY (I) PRIVATE LIMITED · Thane, ThaneP51700010310· filed Sept 2021 → now Mar 2023· 90.9% built
- PALAVA - ESTELA D to G3.4 yr overduePalava Dwellers Private Limited · Kalyan, ThaneP51700011068· 81.8% built· 6 complaints
- Jasmine A, B, C, G, H and I3.4 yr overduePalava Dwellers Pvt Ltd · ., ThaneP51700020381· 78.2% built· 1 complaint
- PALVA MILANO D, G3.4 yr overduePalava Dwellers Private Limited · Kalyan, ThaneP51700010109· 72.7% built· 3 complaints
- Upper Thane - Sereno D and E3.4 yr overdueLODHA DEVELOPERS LIMITED · Surai, ThaneP51700014770· 81.8% built· 1 complaint
- KANAK RESIDENCY3.4 yr overdueKRISKAN INFRAVENTURE LLP · KAMATGHAR, ThaneP51700016074· 45.6% built
- CHESTERTON3.4 yr overdueROMA BUILDERS PRIVATE LIMITED · PATLIPADA, HIRANANDANI ESTATE, OFF GHODBUNDER ROAD, ThaneP51700019400· 90.9% built
- Jasmine T3.4 yr overduePalava Dwellers Pvt Ltd · PALAVA, ThaneP51700020373· 0% built· 1 complaint
- VASTU SIDDHI , PHASE II3.4 yr overdueSIDDHIVINAYAK GROUP · CHIKHLOLI, ThaneP51700016349· 81.8% built
- PALAVA MILANO E, F3.4 yr overduePalava Dwellers Private Limited · -, ThaneP51700011629· 72.7% built· 1 complaint
- SIDDHESHWAR HEIGHTS3.4 yr overdueSHREE JAI MALHAR ENTERPRISES · TITWALA, ThaneP51700008224· 34.8% built
- VAISHNAVI HIGHLIFE3.4 yr overdueMAA JIVDANI CONSTRUCTION COMPANY · Kalyan, ThaneP51700008333· 95.5% built
- AARADHYA PRIMUS3.4 yr overdueMAN VASTUCON LLP · NEAR SINGAPORE INTERNATIONAL SCHOOL, ThaneP51700023844· 81.8% built
- SHREERAM GALAXY3.4 yr overdueSHREE RAM BUILDERS · SHIVAJI UDYOG NAGAR, ThaneP51700009544· 25.5% built
- PALAVA AURORA B, C3.4 yr overduePalava Dwellers Private Limited · Kalyan, ThaneP51700010960· 72.7% built
- Palava - Trinity A to C3.4 yr overduePalava Dwellers Private Limited · Kalyan, ThaneP51700014396· 81.8% built· 2 complaints
- FLORENCE3.4 yr overdueSATGURU LIFESPACES · Kasarvadavli, ThaneP51700003627· filed Mar 2020 → now Mar 2023· 99% built· 1 complaint
- GAYATRI CLASSIC3.4 yr overdueTELE BUILD CONSTRUCTION PVT LTD · Bhiwandi, ThaneP51700005592· filed Mar 2020 → now Mar 2023· 65.5% built
- MADHUBAN PARK3.4 yr overdueRAJNB HOUSING LLP · B CABIN, ThaneP51700031395· 72.3% built
- Unique Heights3.4 yr overdueFAZAL MEHMOOD SHAIKH · Thane, ThaneP51700019173· 90.9% built
- Signature Residency3.3 yr overdueTheme Infraprojects Private Limited · Patalipada, ThaneP51700008025· filed Apr 2022 → now Apr 2023· 90.9% built· 2 complaints
- ANANT PRABHA3.3 yr overdueRUSHIKESH ENTERPRISES · SURYODAY SOCIETY KANSAI, ThaneP51700031051· 90.9% built
- THARWANI ARIANA PHASE III3.3 yr overdueANIL HARDASMAL THARWANI · Ambarnath, ThaneP51700006728· 98% built
- AASHRAY PEARL WING C3.2 yr overdueAASHRAYGROUP · Ambarnath, ThaneP51700005904· 90.9% built
- AASHRAY AANAND3.2 yr overdueAASHRAY INFRA · Ambarnath, ThaneP51700008344· 37% built
- Courtyard - Ornella3.2 yr overdueCOURTYARD REAL ESTATE PRIVATE LIMITED · Thane, ThaneP51700000681· 52.7% built· 3 complaints
- SHREE ANANDI HERITAGE3.2 yr overdueJAI MALHAR BUILDERS & DEVELOPERS · Kalyan, ThaneP51700021914· 90.9% built
- Saayam Visava3.2 yr overdueShrikrishna Ramchandra Marathe · Middle class Soc., ThaneP51700024133· 73.6% built
- Courtyard - Onyx3.2 yr overdueCOURTYARD REAL ESTATE PRIVATE LIMITED · Thane, ThaneP51700000714· 53% built· 2 complaints
- VISHNU VATIKA WING A AND B PHASE I3.2 yr overdueVISHNU VATIKA · Badlapur (M Cl), ThaneP51700009860· filed Oct 2019 → now May 2023· 86.4% built
- YASHWANT HEIGHTS PHASE II3.2 yr overdueRAI RESIDENCY Private Limited · KALYAN E, ThaneP51700030946· 82.5% built
- DEVTARA HEIGHTS3.2 yr overduesavera construction co · Thane, ThaneP51700003412· filed Dec 2022 → now May 2023· 88.2% built
- AL-NASHRA HEIGHTS3.2 yr overdueUNIQUE BUILDERS AND DEVELOPERS · Kalyan, ThaneP51700005471· filed Jan 2021 → now Jun 2023· 90.9% built· 6 complaints
- SHREE GALAXY HEIGHTS3.1 yr overdueV3 Reality · BADLAPUR AMBERNATH ROAD, ThaneP51700016371· filed Dec 2022 → now Jun 2023· 80% built
- PALAVA AURELIA - C, H, I3.1 yr overduePalava Dwellers Private Limited · Palava, ThaneP51700013073· 54.5% built· 2 complaints
- USHA JOSHI PARK PHASE B3.1 yr overdueJ K T BUILDERS & DEVELOPERS · Khadavali, ThaneP51700012148· filed Dec 2021 → now Jun 2023· 18.6% built
- CRYSTAL SPIRES3.1 yr overdueLUXORA REALTORS PRIVATE LIMITED · Chitalsar Manpada, ThaneP51700009216· filed Jan 2021 → now Jun 2023· 84.8% built· 9 complaints
- SHIV SIDDHI3.1 yr overdueKEDAR CONSTRUCTION · mharal, ThaneP51700010414· 90% built
- UNIVERSE I PHASE II3.1 yr overdueSAHYADRI GRIH NIRMAN · Thane (M Corp.), ThaneP51700006220· 15.5% built
- PALAVA ESTELA A, B, C3.1 yr overduePalava Dwellers Private Limited · Palava, ThaneP51700013158· 81.8% built· 4 complaints
- SHIVANJALI HEIGHTS3.1 yr overdueSHIVANJALI CONSTRUCTION · BADLAPUR WEST, ThaneP51700032585· filed Jun 2022 → now Jun 2023· 50% built
- Mohan Skyville3.1 yr overdueMOHAN LIFESPACES LLP · Kalyan, ThaneP51700003607· filed Jun 2019 → now Jun 2023· 81.8% built
- SAI PAVITRA RESIDENCY3.1 yr overdueSAILAVKIK REALTY PRIVATE LIMITED · Thane, ThaneP51700021480· 81.8% built
- PALAVA MARVELLA A, H3.1 yr overduePalava Dwellers Private Limited · PALAVA, ThaneP51700015660· 81.5% built
- VISTA VALLEY3.1 yr overdueM/s IQRA REALTY · Kausa, ThaneP51700016240· 87.2% built
- SAI VIDHATA3.1 yr overdueSAI SHRADDHA ASSOCIATES · Ulhasnagar, ThaneP51700030832· 81.8% built
- MARATHON NEXTOWN CORAL3.1 yr overdueMARATHON ENER-GEN LLP · Thane, ThaneP51700000952· filed Dec 2021 → now Jun 2023· 72.7% built· 2 complaints
- AL HADI RESIDENTIAL COMPLEX3.1 yr overdueSAHYADRI GRIH NIRMAN · Thane, ThaneP51700012253· 44.8% built
- vedant imperial D phase 33.1 yr overdueMOHAN HARDASMAL THARWANI · Badlapur (M Cl), ThaneP51700007549· 63.2% built
- ROYAL NEST3.1 yr overdueDHANASHREE DEVELOPERS · Ambarnath(M Cl), ThaneP51700003909· filed Dec 2020 → now Jun 2023· 99.1% built
- PALAVA ESTELA H, I, J3.1 yr overduePalava Dwellers Private Limited · Palava, ThaneP51700013145· 81.8% built
- RAVIRAJ APARTMENT3.1 yr overdueRAJENDRA GHORPADE · GANESH NAGAR, ThaneP51700020559· filed Dec 2022 → now Jun 2023· 72.7% built
- Shree Datta Samartha CHSL3.1 yr overdueShree Sai Swami Enterprises · Near Railway Station, ThaneP51700034066· 90.9% built
- PALAVA MARVELLA B,C,D,E,F,G3.1 yr overduePalava Dwellers Private Limited · ., ThaneP51700013462· 76.7% built· 4 complaints
- AMBER ELLANCE A-13.1 yr overdueAAKASH CORPORATION · Thane, ThaneP51700013692· 90.9% built
- Platinum Tower3.1 yr overdueHaware's Housing Development Finance Corporation Ltd. · Thane, ThaneP51700000549· filed Sept 2022 → now Jun 2023· 72.7% built
- SAI SPRING3.1 yr overdueMOHAN KEDARNATH KRISHNAVANSHI · KALYAN, ThaneP51700009813· 90% built
- SAHAKAR PREMIER3.1 yr overduePREMIER REALTY · Thane, ThaneP51700002452· 27.3% built
- THARWANI MILLENNIUM CITY PHASE I3.1 yr overdueTHARWANI REALTORS · BADLAPUR, ThaneP51700023974· 95.9% built
- Dipti SkyCity Building 1 and 33.1 yr overdueDipti Home Makers Pvt Ltd · Ambarnath, ThaneP51700008856· 95.5% built
- Mohan Suburbia III3.0 yr overdueMOHAN LIFESPACES LLP · Khoj Kuntawli, ThaneP51700021395· filed Jun 2022 → now Aug 2023· 90.5% built
- SUNSET HEIGHTS 23.0 yr overdueALFA CONSTRUCTIONS · BADLAPUR GAON, ThaneP51700018798· filed Jun 2022 → now Aug 2023· 90% built
- HEMA KUNJ3.0 yr overdueBHADRANKAR ENTERPRISES LLP · Thane, ThaneP51700028739· 41.8% built· 1 complaint
- DEVESH3.0 yr overdueOM CONSTRUCTION CO · BHAYANDAR, ThaneP51700007526· 36.4% built
- SAI VILLA3.0 yr overdueBUILT TECH BUILDERS & DEVELOPERS PVT. LTD. · BADALAPUR GAON, ThaneP51700015189· filed Dec 2022 → now Aug 2023· 90% built· 1 complaint
- BHOOMI AVENUE3.0 yr overdueBHOOMI ENTERPRISES · AMBERNATH (E), ThaneP51700029068· 90.9% built
- CHANDRA BHAGA3.0 yr overdueVITTHAL MAULI CONSTRUCTION COMPANY · KATEMANEVALI, ThaneP51700010487· filed Jun 2021 → now Aug 2023· 34.5% built
- SAI REGENCY3.0 yr overdueSAI DEVELOPERS · NEAR AYYAPPATEMPLE, GAURIPADA, ThaneP51700013647· filed Dec 2018 → now Aug 2023· 89.8% built· 14 complaints
- SHIV JIVDANI SADAN3.0 yr overdueSHUBHAM BUILDERS & DEVELOPERS · GARIBACHA WADA, ThaneP51700021173· filed May 2022 → now Aug 2023· 19.1% built
- Pankaj Co-Op Housing Society Ltd.3.0 yr overdueAditya Associates · Sahakar Colony, Brahmin Society, Thane (W), ThaneP51700034605· 90.9% built
- Hundiwale2.9 yr overdueAditya Associates · Thane, ThaneP51700046290· 90.9% built
- SAIRAJ EMERALD2.9 yr overdueSAIRAJ ENTERPRISES · BADLAPUR WEST, ThaneP51700049097· 71.8% built
- S. A. Patil Nagar Garden View CHS2.9 yr overdueShree Khodiyar Builders and Developers · Ambarnath, ThaneP51700032102· 70.4% built
- Lodha Amara - Tower 20, 212.9 yr overdueLODHA DEVELOPERS LIMITED · Kolshet, ThaneP51700016961· 81.8% built· 8 complaints
- TRICITY PALACIO2.9 yr overdueTRICITY REALTY LLP · Thane, ThaneP51700002400· 95.5% built
- Lifestyle City Kalyan - Applause B2.9 yr overdueNirmal Lifestyle (Kalyan) Private Limited · Kalyan, ThaneP51700003543· filed Dec 2018 → now Sept 2023· 58.6% built· 26 complaints
- Upper Thane - Sereno A, B, B12.9 yr overdueLODHA DEVELOPERS LIMITED · Surai, ThaneP51700016243· 81.8% built· 2 complaints
- Upper Thane - Tiara C2.9 yr overdueLODHA DEVELOPERS LIMITED · Bhiwandi, ThaneP51700016437· 81.8% built
- DELTA WOODS2.9 yr overdueDelta venture · MIRA ROAD, ThaneP51700018070· 73.2% built· 2 complaints
- Maatr Waters2.9 yr overdueMaatr Enterprises · Village Barave, ThaneP51700026313· 90.5% built
- Riverwood Park Building No. 22.9 yr overdueShree Khidkaleshwar Property Developers Pvt. Ltd. · Thane, ThaneP51700004997· filed Apr 2021 → now Sept 2023· 99.1% built
- TRICITY PROMENADE2.9 yr overdueTRICITY REALTY LLP · Thane, ThaneP51700013737· 89.9% built
- HYDE PARK RESIDENCY F5 BUILDING PHASE2.9 yr overdueNEXUS BUILDERS AND DEVELOPERS PVT LTD · Thane, ThaneP51700027694· 86.8% built
- Upper Thane - Woodlands G,H,I2.9 yr overdueLODHA DEVELOPERS LIMITED · Anjur, ThaneP51700016245· 81.8% built· 5 complaints
- Bharat Ecovistas Phase III2.9 yr overdueBHARAT REALTY VENTURE PRIVATE LIMITED · Shilphata Junction, Thane, ThaneP51700015290· filed Dec 2021 → now Oct 2023· 81.8% built· 3 complaints
- ASHAR EDGE WING B PHASE III2.8 yr overdueMs ASHAR VENTURES · Thane, ThaneP51700016016· 94.5% built
- Anthurium2.8 yr overdueAARTI ESTATES · Thane, ThaneP51700002317· 70% built
- VISHNU VATIKA NX WING C1 E1 E2 PHASE 12.8 yr overdueVISHNU GROUP · BADLAPUR, ThaneP51700004777· 88.5% built
- PALAVA AURORA A,D2.8 yr overduePalava Dwellers Private Limited · Palava, ThaneP51700015090· 77.3% built
- Tokyo Bay Phase - 12.8 yr overduePuranik Tokyo Bay Private Limited · Thane, ThaneP51700000618· 90.9% built· 6 complaints
- PATELS ELYSIUM - 22.8 yr overdueAPACE REALTY · Ambarnath, ThaneP51700008491· 87.3% built
- PALAVA MILANO A,B,C,H,I,J2.8 yr overduePalava Dwellers Private Limited · Palava, ThaneP51700015016· 78.2% built· 3 complaints
- Riverwood Park Building No. 42.8 yr overdueShree Khidkaleshwar Property Developers Pvt. Ltd. · Thane, ThaneP51700004003· filed Oct 2022 → now Oct 2023· 94.1% built
- SAI WORLD RETREAT2.8 yr overdueParadise Leisure Homes · Ulhasnagar (M Corp.), ThaneP51700001566· 24.8% built
- PATELS ELYSIUM - 42.8 yr overdueAPACE REALTY · Ambarnath, ThaneP51700006142· 87.3% built
- ASHAR EDGE WING A PHASE II2.8 yr overdueMs ASHAR VENTURES · Thane, ThaneP51700016015· 96.4% built
- ASHAR EDGE GALLERIA- PHASE I2.8 yr overdueMs ASHAR VENTURES · Thane, ThaneP51700016033· 86.4% built
- SAHAYOG NILAYAM2.8 yr overdueSAHAYOG CONSTRUCTION · Manda, ThaneP51700008289· 90.6% built· 1 complaint
- SHANKAR PALACE2.8 yr overdueshree ramesh homes builders and developers · Thane, ThaneP51700012469· 90.9% built· 2 complaints
- JEEVAN CHS LTD2.8 yr overdueSHARDA VASTU NIRMITEE PVT. LTD. · PANCHPAKHADI, ThaneP51700023605· 90.9% built
- PATELS ELYSIUM - 32.8 yr overdueAPACE REALTY · Ambarnath(M Cl), ThaneP51700010280· 87.3% built
- SHRUTI APARTMENT2.7 yr overdueVIKRANT V RAIKAR HUF - - · Thane, ThaneP51700025732· 39.2% built
- Silver Park Residency Aster2.7 yr overdueSuyash Enterprises · KAMATGHAR, ThaneP51700015485· 90.9% built
- CONCEPT ARENA2.6 yr overdueCONCEPT REALTY · Ambarnath, ThaneP51700003805· filed Jun 2021 → now Dec 2023· 14.4% built
- MARATHON NEXWORLD AURA-12.6 yr overdueMATRIX ENCLAVES PROJECTS DEV. PVT. LTD · Betawade Gaon, ThaneP51700000652· filed Dec 2022 → now Dec 2023· 46.5% built· 32 complaints
- K. D. HERMITAGE, B. NO. 22.6 yr overdueD. K. Enterprises · OPP. OVERHEAD WATER TANK, ThaneP51700017723· filed Dec 2022 → now Dec 2023· 72.7% built· 1 complaint
- MAHAVIR DREAMLAND2.6 yr overdueMAHAVIR DREAMLAND · Bhiwandi, ThaneP51700012940· filed Dec 2022 → now Dec 2023· 81.8% built
- Vaikunth Cluster 42.6 yr overduePEPL Developers Pvt Ltd · Thane, ThaneP51700003283· 88.6% built· 11 complaints
- RITESH EMPIRE2.6 yr overdueSAPPHIRE DEVELOPERS · Kalyan, ThaneP51700013877· 95.5% built· 2 complaints
- Sunrise D2.6 yr overdueAgile Real Estate Pvt. Ltd. · Thane, ThaneP51700000640· 99.9% built· 3 complaints
- RAJ HERITAGE 12.6 yr overdueRAJ REALTY BUILDERS AND DEVELOPERS PRIVATE LIMITED · RAMDEV PARK, ThaneP51700020259· 90.9% built
- MANGAL PUSHP HEIGHTS2.6 yr overdueSUNIL MANGILAL JAIN · Thane, ThaneP51700009090· 33.2% built
- GAMI REAGAN2.6 yr overdueSHRI GAMI INFOTECH PVT LTD · Thane, ThaneP51700013200· 93% built
- SHREE SHASWAT BUILDING NO 152.6 yr overdueWHITE HEAVEN REALTY · PLEASANT PARK, ThaneP51700021222· 63.6% built
- Amrut Siddhi2.6 yr overdueJayshree Builders · Near Railway Station, ThaneP51700001930· 90.9% built
- Shivam Greens2.6 yr overdueM.K.DEVELOPERS · Badlapur, ThaneP51700014478· 46.4% built
- Sunrise E2.6 yr overdueAgile Real Estate Pvt. Ltd. · Thane, ThaneP51700000925· 99.4% built· 1 complaint
- MAN BUSINESS SPACES2.6 yr overdueMERINO SHELTERS PRIVATE LIMITED · NERUL, ThaneP51700006944· 21.8% built
- MAN RESIDENCES2.6 yr overdueMERINO SHELTERS PRIVATE LIMITED · NERUL, ThaneP51700008980· 31.4% built
- RADHA KRISHNA NIVAS PHASE 12.6 yr overdueNITIN GAJANAN KALE · Bhiwandi (M Corp.), ThaneP51700013772· 90.9% built
- ORCHID SQUARE PHASE 32.6 yr overdueM/S SQUAREFEET ECO HOUSING LLP · Ambarnath(M Cl), ThaneP51700014033· 81.8% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.