27,983 registered projects with disclosed construction progress or complaint records. Page 23 of 56.
Mumbai City
- Godrej Avenue Eleven - Tower A · Ward EGODREJ RESIDENCY PRIVATE LIMITED · P51900005216 · possession Dec 2028 · 58.7% built · 10 complaints
- Earth Classic · Mumbai CityEarthClassic · P51900005225 · possession Dec 2017 · 90.9% built
- Desai Oceanic 11th and 12th Floor · Mumbai CityDESAI RESIDENCY PVT.LTD · P51900005231 · possession Feb 2019 · 90% built · 1 complaint
- GURUKRUPA BUILDING · Ward FNorthRAJMATA DEVELOPERS LLP · P51900005246 · possession Jul 2027 · 61% built
- Cygnus · MulundTrimity Developers Pvt Ltd · P51900005254 · possession Jun 2022 · 62.3% built
- ESTORIA HEIGHTS · Mumbai CitySANGHVI REALTECH PVT LTD · P51900005280 · possession Oct 2018 · 60% built
- RAJ CONSTRUCTIONS · Mumbai CitySHAKEEL AHMED MOHAMMED YUNUS · P51900005282 · possession Mar 2019 · 98.2% built · 1 complaint
- Vishnuchandra Sky · Ward FNorthPragatej Builders And Developers Pvt Ltds · P51900005324 · possession Dec 2020 · 99.5% built · 3 complaints
- LUMIERE · Ward GNorthNEW SIDDHARTH ENTERPRISES · P51900005337 · possession Sept 2022 · 56.4% built · 1 complaint
- SESEN · Ward ABCDSESEN REALTY PVT LTD · P51900005355 · possession Dec 2027 · 56.2% built · 2 complaints
- Kesar Equinox · Ward FNorthKESAR CORPORATION · P51900005362 · possession Dec 2021 · 23.6% built
- LODHA VENEZIA - 49TH TO 65TH FLOOR · Ward FSouthLodha Developers Limited · P51900005378 · possession Dec 2018 · 90.9% built · 8 complaints
- ELIZABETH HOUSE · Ward GNorthSURAJ ESTATE DEVELOPERS LTD · P51900005428 · possession Dec 2020 · 97.7% built · 1 complaint
- Chistiya Palace · Ward ERensar Infra Pvt.Ltd · P51900005473 · possession Oct 2026 · 98% built · 6 complaints
- Atlantis Residency · Mumbai CityJK BUILDERS · P51900005501 · possession Apr 2027 · 61.7% built · 2 complaints
- JOANITA VILLA · Mumbai CityWESTIN DEVELOPERS PVT. LTD · P51900005532 · possession Jun 2019 · 71.4% built · 3 complaints
- Indu Villa · Ward FNorthNarendra Vasanji Furia · P51900005575 · possession Mar 2019 · 100% built
- RUNWAL TIMELESS · Ward FNorthRUNWAL DEVELOPERS LIMITED · P51900005685 · possession Jan 2029 · 48.6% built · 12 complaints
- 9 RADHA · Ward FNorthISHAAN DEVELOPERS · P51900005726 · possession Sept 2020 · 60.5% built · 1 complaint
- RATNADEEP · Mumbai CityWESTIN DEVELOPERS PVT. LTD · P51900005835 · possession Dec 2020 · 85.9% built · 6 complaints
- ANURADHA TOWER · Ward FNorthDinesh Shivajirao Ghadage · P51900005892 · possession Dec 2022 · 90.9% built · 30 complaints
- AAROHI TOWER · Ward GNorthSUDHIR SHARAD REDKAR · P51900005921 · possession Dec 2017 · 90.7% built
- Ruparel Iris · Mumbai CityRuparel Estates India Pvt Ltd · P51900005988 · possession Jun 2026 · 83.6% built · 8 complaints
- 22 Dhuleva · Ward ABCDSafal realtor and Developers Pvt Ltd · P51900005991 · possession Dec 2022 · 62.7% built · 1 complaint
- LAKADAWALA HEIGHTS · Mumbai CityAARIAASH DEVELOPERS · P51900005993 · possession Apr 2027 · 7.9% built · 1 complaint
- ARIHANT TOWERS - BY MJ SHAH · Mumbai CityZEUS HOUSING COMPANY · P51900006005 · possession Dec 2027 · 66.8% built
- VALENCIA · Mumbai CityHEKS INFRASTRUCTURE & DEVELOPERS · P51900006034 · possession Nov 2026 · 97.4% built
- INSPIRE BKC PHASE 2 SIXTH AND SEVENTH FLOOR · Mumbai CityADANI DEVELOPERS PRIVATE LIMITED · P51900006101 · possession Dec 2017 · 100% built
- DILKAP GRANDEUR · Mumbai CityDILIP ESTATE & TOWN PLANNERS PVT LTD · P51900006119 · possession Nov 2026 · 66.5% built · 11 complaints
- Medius · Ward GNorthAVENTA PROPERTIES LLP · P51900006152 · possession Dec 2026 · 64% built · 7 complaints
- VIVARIA · Mumbai CityKALYANJI VELJI HUF · P51900006183 · possession Dec 2019 · 86.4% built
- DHUNJIBHOY ICE FACTORYPVT LTD · Mumbai CityRIZWAN ABDUL AZIZ DOSANI · P51900006273 · possession Apr 2028 · 58.5% built
- Godrej Avenue Eleven - Tower B · Ward EGODREJ RESIDENCY PRIVATE LIMITED · P51900006299 · possession Dec 2029 · 44.9% built · 8 complaints
- RUSTOMJEE CROWN -PHASE II · Ward GSouthRealgem Buildtech Private Limited · P51900006367 · possession Oct 2027 · 94.2% built · 32 complaints
- Sairaj Floor 1, 2 and 22 · Ward FSouthOmkar Realtors and Developers Private Limited · P51900006458 · possession Dec 2020 · 90.9% built
- PALACINO · Mumbai CityRISHABH DEVELOPERS · P51900006519 · possession Mar 2018 · 69.1% built · 1 complaint
- Mblu · chemburMETADESIGN INDIA PVT LTD · P51900006531 · possession Dec 2021 · 72.7% built · 1 complaint
- New Veerdhaval CHS. Ltd. · Babhai NakaShree Durga Vastu Makers Private Limited · P51900006532 · possession Mar 2019 · 85.5% built
- Silver heights · Mumbai CityKSHAMA BUILDERS & DEVELOPERS PRIVATE LIMITED · P51900006533 · possession Apr 2028 · 56.1% built · 10 complaints
- Tanishq Wisteria · Ward FSouthAakaar Tanishq Nirmaan J. V. · P51900006567 · possession Sept 2022 · 76.8% built · 2 complaints
- Crescent Bay - T4 · Ward FSouthL&T Parel Project LLP (JV with ORDPL) · P51900006593 · possession Aug 2018 · 88.9% built · 4 complaints
- A R B HEIGHTS · Mumbai CityARB DEVELOPERS · P51900006633 · possession Apr 2028 · 58.2% built
- Samta Parel · Ward FSouthNewlook Constructions Pvt. Ltd · P51900006654 · possession Jan 2023 · 56.2% built
- Matoshree Pride Building 1 · Mumbai CityMatoshree Properties · P51900006687 · possession Dec 2018 · 90% built · 4 complaints
- SHIVSOLITAIRE · Mumbai CitySO LUCKY BUILDERS · P51900006722 · possession Dec 2026 · 81.8% built · 1 complaint
- MANGIRISH · Ward GNorthACCORD ESTATES PVT LTD · P51900006752 · possession Jun 2022 · 100% built
- CRYSTAL VUE · Ward FNorthNageshwar V Neela · P51900006774 · possession Dec 2027 · 60.3% built
- Waterfront Tower · Ward ABCDSea Kunal Corporation Pvt. Ltd. · P51900006784 · possession Jul 2023 · 90.9% built
- LABDHI GARDENS PHASE 3 · NeralLabdhi Lifestyle Limited · P51900006804 · possession May 2019 · 100% built
- 25 South Tower A upto 10th Floor · Mumbai CityTwenty Five South Realty Limited · P51900006860 · possession Dec 2026 · 100% built
- PRAMAN SOLITAIRE · Ward ABCDPurohit Luxury Homes Private Limited · P51900006916 · possession Dec 2021 · 100% built
- RAJ RIDDHI RESIDENCY · Mumbai CityRAJ RIDDHI REALTIES · P51900006932 · possession Dec 2021 · 100% built
- AADITYA RESIDENCES · Ward ABCDM/S. A.K. DEVELOPERS · P51900007083 · possession Dec 2026 · 0% built · 1 complaint
- BAUG E UMAR · Ward EMAHANAGAR CONSTRUCTIONS PRIVATE LIMITED · P51900007117 · possession Apr 2027 · 40.5% built · 1 complaint
- CONTINENTAL HEIGHTS · Ward ESARAH HOUSING DEVELOPMENT PVT LTD · P51900007187 · possession Apr 2030 · 84.4% built
- RUSI MEHTA TOWERS · Mumbai CityANAHITA RUSI MEHTA · P51900007228 · possession Dec 2021 · 81.8% built
- MINT MAGNA HOUSING LLP · Ward GSouthMint Magna Housing LLP · P51900007234 · possession Mar 2018 · 81.8% built
- OCEAN STAR I · Ward GNorthSURAJ ESTATE DEVELOPERS LTD · P51900007257 · possession Mar 2027 · 73.9% built · 1 complaint
- Om Sat · Ward FNorthShree Siddhi Developers · P51900007293 · possession Dec 2019 · 90.9% built
- M 19 · Ward FNorthSUVIDHA LIFESPACES · P51900007305 · possession Dec 2022 · 62.7% built
- PRABHAV ARISHA · Mumbai CityPRABHAV ARISHA · P51900007376 · possession Mar 2027 · 77.3% built · 4 complaints
- MURGA GIRAN · Mumbai CityLAKADAWALA DEVELOPERS PVT. LTD. · P51900007404 · possession Nov 2021 · 90.1% built
- Annapurna Sadan · Mumbai CityD R Developers · P51900007411 · possession Oct 2028 · 89.8% built
- Samarth Raghukul · Ward GNorthM/S VIRTUE ENTERPRISES · P51900007414 · possession Dec 2017 · 71.8% built
- AL AMIR APARTMENT · DongriJANZEB AMIRKAMAL KHAN · P51900007426 · possession Dec 2028 · 64.8% built · 1 complaint
- Sanghvi Evana · Ward GSouthSanghvi Premises Private Limited · P51900007455 · possession Dec 2021 · 74.5% built · 1 complaint
- MODY KUNJ · Mumbai CityMEHTA ENTERPRISES · P51900007488 · possession Mar 2019 · 90.5% built
- A.R VINTAGE · Mumbai CityA.R ASSOCIATES · P51900007503 · possession Jun 2026 · 81.8% built
- SHANDILYA VILLA · Ward GSouthShandilya Properties LLP · P51900007512 · possession Jan 2023 · 90.9% built
- AVENUE 14 · Ward FNorthSHREE TIRUPATI BUILDERS AND DEVELOPERS · P51900007559 · possession Dec 2018 · 100% built · 2 complaints
- Golden Residency · Ward EGOLDEN REALTY · P51900007576 · possession Apr 2027 · 69.9% built
- THE PLATINUM · Mumbai CityRUBBERWALA HOUSING & INFRASTRUCTURE LTD. · P51900007633 · possession Apr 2027 · 100% built
- PANCHRATNA-NX · Ward FSouthSUDHIR KISHOR DESAI · P51900007684 · possession Apr 2027 · 82% built
- White Pearl · Mumbai CityImtiaz Saigara and Ahmedi Delawala · P51900007731 · possession Apr 2028 · 75.3% built · 2 complaints
- EIFFEL TOWER · Mumbai CityEMPRESS DEVELOPERS · P51900007758 · possession Apr 2028 · 78.5% built · 2 complaints
- Matoshree Ankur · Mumbai CityMatoshree Infrastructure Private Limited · P51900007859 · possession Sept 2018 · 90% built
- Jade Imperial · Mumbai CityNational Happy Homes · P51900007860 · possession Mar 2023 · 100% built
- KRISHNA BHUVAN C.H.S. · Ward FNorthSHAUNAK DILIP KIRKIRE · P51900007903 · possession Dec 2019 · 90.9% built · 5 complaints
- Bhavya Heights C Wing · Ward FNorthNewlook Constructions Pvt. Ltd · P51900007916 · possession Jan 2023 · 100% built
- Elite Crest · Mumbai CityElite Housing Developers LLP · P51900007928 · possession Jul 2018 · 100% built · 2 complaints
- MILLENNIUM COURT CO-OP. SOC. LTD · Mumbai CityMILLENNIUM COURT CO OPERATIVE HOUSING SOCIETY LTD. · P51900007933 · possession Dec 2018 · 93.2% built · 4 complaints
- Mittal Aristo · Ward FSouthAditdev Builders LLP · P51900007964 · possession Dec 2017 · 90.7% built
- Maheshwari Bhuvan · Mumbai CityEndemic Realtors Pvt. Ltd. · P51900007980 · possession Mar 2018 · 90.9% built
- BUILDING 2 - PHASE OF PROJECT NAMED VIVAREA CONSTRUCTED ON PORTION OF THE PROJECT LAND · Ward EGENEXT HARDWARE & PARKS PRIVATE LIMITED · P51900008014 · possession Jun 2019 · 100% built
- Crescent Bay - T1 - 40, 41 floors · Ward FSouthL&T Parel Project LLP (JV with ORDPL) · P51900008032 · possession Mar 2018 · 50% built
- BISMILLAH RESIDENCY · Ward ENIRBAN INFRASTRUCTURE PVT LTD · P51900008056 · possession Jul 2019 · 100% built · 1 complaint
- MAHESH APARTMENT · Mumbai CitySATYENDRAKUMAR SHANTISWAROOP MAHESH · P51900008085 · possession Dec 2018 · 82.5% built
- J K APARTMENT · Ward FSouthPLUS PROPERTIES PVT LTD · P51900008108 · possession Dec 2026 · 86.8% built
- AJINKYATARA · Mumbai CityBhalchandra Vinayak Wadnerkar · P51900008130 · possession Dec 2017 · 90.9% built
- DAFFODIL · Ward GNorthBUILDARCH LAND DEVLOPERS PVT. LTD. · P51900008175 · possession Dec 2021 · 90.9% built
- LEELA TARA · Ward ABCDSAKAAR DEVELOPERS · P51900008194 · possession Mar 2019 · 81.8% built
- MINERVA · Ward GSouthLokhandwala Kataria Construction Private Limited · P51900008204 · possession Apr 2027 · 82.5% built · 65 complaints
- PALETTE · Mumbai CitySURAJ ESTATE DEVELOPERS LTD · P51900008207 · possession Jan 2027 · 84% built · 8 complaints
- PRASHANT CO-OPERATIVE HOUSING SOCIETY LIMITED · Ward ABCDFIFTHWALL BUILDERS PRIVATE LIMITED · P51900008249 · possession Oct 2020 · 81.8% built
- NEO AMITY · Ward ABCDNARESH KESARIMAL MEHTA · P51900008285 · possession Apr 2027 · 47.3% built
- Greenstone Heritage - Wing - E and F · Ward ABCDBeauty Lifestyles and Homes Pvt. Ltd. · P51900008300 · possession Oct 2024 · 100% built
- KANJI TOWER · Mumbai CityVIJAYABEN KANJI ASHRA · P51900008342 · possession Dec 2017 · 90.5% built
- THE WORLD TOWERS - WORLD ONE - TIER II · Ward GSouthMACROTECH DEVELOPERS LIMITED · P51900008345 · possession Feb 2020 · 90.9% built · 15 complaints
- The Pavilion · Mumbai CitySkyline Developers · P51900008392 · possession Mar 2018 · 100% built · 1 complaint
- One India Tower · Ward EOne India Constructions Private Limited · P51900008466 · possession Apr 2029 · 88.3% built
- TARABAUG · Ward EDARSHAN DEVELOPERS · P51900008495 · possession Dec 2032 · 59.7% built
- TREVEDIA VUEPOINT · Ward GNorthS.B.BROTHERS DEVELOPERS · P51900008501 · possession Sept 2018 · 98.2% built · 2 complaints
- Shree Laxmi Residency · Ward EKSHITIJA INFRASTRUCTURE PVT LTD · P51900008576 · possession Dec 2021 · 99.1% built · 1 complaint
- NATHANI HEIGHTS REHAB · Mumbai CityNathani Parekh Constructions Private Limited · P51900008587 · possession Dec 2021 · 90.9% built
- Pawapuri · Ward FSouthBlue Lotus Jewellery Pvt.Ltd · P51900008592 · possession Jun 2022 · 100% built
- TANISHQ HOLLYHOCK · Mumbai CityTANISHQ CONSTRUCTION · P51900008628 · possession Dec 2018 · 90% built
- Elegant Residency · Mumbai CityBest Enterprises · P51900008636 · possession Apr 2028 · 81.3% built
- PRABHAT · Ward GNorthM/s PANCHARATNAA · P51900008699 · possession Jan 2020 · 99.5% built
- GRANDEUR · Mumbai CityM/s. Sambhav Projects (Registered) · P51900008771 · possession Dec 2019 · 81.8% built
- INSPIRE BKC PHASE 1 GROUND TO FOURTH FLOOR · Mumbai CityADANI DEVELOPERS PRIVATE LIMITED · P51900008813 · possession Dec 2017 · 100% built
- VARDHMAN FLORA PHASE I · Mumbai CityVARDHMAN DEVELOPERS LTD · P51900008829 · possession Dec 2026 · 67.5% built · 3 complaints
- NEELA CO HSG SOCIETY · Mumbai CitySHIVOM CONSTRUCTIONS · P51900008899 · possession Jul 2018 · 90.9% built · 2 complaints
- KSA PRIDE · Ward EKSA AND ASSOCIATES · P51900008919 · possession Jun 2023 · 100% built
- Hubtown - Celeste · Mumbai CityNayan Real Estate Private Limited · P51900008925 · possession Nov 2029 · 52.7% built · 2 complaints
- Harsh Bakul · Ward FNorthSRS HABITAT LLP · P51900008961 · possession May 2019 · 97.3% built
- THE WORLD TOWERS - WORLD ONE - TIER III AND TRINITY · Ward GSouthMACROTECH DEVELOPERS LIMITED · P51900008962 · possession Jun 2021 · 63.6% built · 10 complaints
- MAGNUM TOWER · Ward FSouthHEMANT BHANUSHANKAR VYAS · P51900009005 · possession Mar 2019 · 100% built
- MAKSKAP CENTRE · Mumbai CityDILIP ESTATE & TOWN PLANNERS PVT LTD · P51900009030 · possession Aug 2024 · 89.2% built · 2 complaints
- Amarsons Entallia · konkanD T CORPORATION · P51900009079 · possession Sept 2022 · 71.7% built
- GSA GRANDEUR · -G S A CONSTRUCTIONS · P51900009097 · possession Oct 2026 · 90.9% built · 3 complaints
- Shiv Krupa · Mumbai CityR K ENGINEERS · P51900009182 · possession Jul 2018 · 84.1% built · 1 complaint
- LABDHI GARDENS PHASE 4 · NeralLabdhi Lifestyle Limited · P51900009217 · possession Dec 2019 · 86.1% built · 1 complaint
- AZHAAN RESIDENCY · Ward EBLUE PEARL DEVELOPERS · P51900009229 · possession Mar 2022 · 82.7% built
- PRASHANT UDYAN CHS LTD · Mumbai CitySHREE CHAMUNDA REALTORS · P51900009273 · possession Dec 2019 · 43.2% built
- Chandan Heights · Ward ABCDPavankumar Bachhraj Chandan · P51900009280 · possession Dec 2017 · 100% built
- ELITE RESIDENCE · Mumbai CityPCB TRADING PVT LTD · P51900009285 · possession Mar 2018 · 100% built
- NATHANI RESIDENCY · Ward ENathani Parekh Constructions Private Limited · P51900009339 · possession Apr 2027 · 90.9% built
- Raheja Imperia - I · Ward GSouthRaheja Universal (Pvt.) Ltd. · P51900009379 · possession Dec 2022 · 99.5% built · 7 complaints
- Lifescapes Altimo · Ward ABCDPeccadily Estate Pvt Ltd · P51900009427 · possession Mar 2024 · 100% built
- DESAI HARMONY · Mumbai CityDESAI RESIDENCY PRIVATE LIMITED · P51900009455 · possession Nov 2020 · 67% built · 4 complaints
- FORTUNE MIGNAS · Ward ENamla Developers Private Limited · P51900009466 · possession Dec 2018 · 81.8% built
- HORIZON TOWER · Ward FNorthHORIZON REALTY · P51900009490 · possession Oct 2020 · 80% built · 1 complaint
- LABDHI GARDENS PHASE 1 · Mumbai CityLabdhi Lifestyle Limited · P51900009584 · possession Dec 2017 · 100% built · 2 complaints
- KRYPTON TERRACES · Ward GSouthKRYPTON CONSTRUCTION & DEVELOPERS · P51900009619 · possession Jan 2023 · 100% built · 4 complaints
- BLISS · Mumbai CityNEETNAV CONSTRUCTION PRIVATE LIMITED · P51900009679 · possession Dec 2017 · 100% built
- Prestige Nautilus · Ward GSouthPrestige Falcon Mumbai Realty Private Limited · P51900009720 · possession Oct 2032 · 8.5% built · 17 complaints
- The Ruby - Ground and 1st Part, 21st to 39th Floor · Ward GNorthMindset Estates Private Limited · P51900009854 · possession Dec 2022 · 89.5% built · 1 complaint
- SHREE CHAMUNDA HEIGHTS · Mumbai CitySHREE CHAMUNDA REALTORS · P51900009861 · possession Dec 2019 · 58.6% built
- Proposed Redevelopment of Vaid Mahal · Ward ABCDLulu Enterprise · P51900009905 · possession Jul 2023 · 71.4% built
- FIFTY ONE EAST · Ward EDUDHWALA PROPERTY DEVELOPERS · P51900009934 · possession Mar 2019 · 89.1% built
- FUEGO · Mumbai CityHILTON INFRASTRUCTURE · P51900009939 · possession Oct 2027 · 97.5% built · 8 complaints
- SHAAD RESIDENCY · Ward ESHADAB ISLAM QURESHI · P51900009967 · possession Dec 2019 · 95.7% built · 2 complaints
- Parasmani - A · Mumbai CityParasmani Constructions Pvt .Ltd · P51900010014 · possession Dec 2018 · 90.9% built
- NEBULA · Mumbai CityRUBBERWALA REALTY · P51900010038 · possession Jun 2026 · 96.6% built · 5 complaints
- SANGHVI HEIGHTS · Mumbai CitySANGHVI PREMISES PRIVATE LIMITED · P51900010060 · possession Dec 2019 · 100% built
- RAJKAMAL PARK · Ward FSouthPRARTHANA GRIHA NIRMAN · P51900010115 · possession May 2025 · 89.9% built
- Crescent Bay - T2 · Ward FSouthL&T Parel Project LLP (JV with ORDPL) · P51900010178 · possession Mar 2019 · 89.6% built · 12 complaints
- 219 Boat Club · Mumbai CityMERINT DEVELOPERS PVT LTD · P51900010179 · possession May 2018 · 84.5% built
- SUKHADWALA MANSION · Mumbai CitySISODIA CANNING PVT LTD · P51900010180 · possession Mar 2021 · 30.9% built
- SHANTA NIVAS · Mumbai CitySUNRISE DEVELOPERS · P51900010283 · possession Dec 2017 · 72.3% built
- LODHA SEAVIEW · Ward ABCDMACROTECH DEVELOPERS LIMITED · P51900010326 · possession Dec 2022 · 90.9% built · 9 complaints
- Jayant Sapphire · Mumbai CityJayant Homes Private Limited · P51900010347 · possession Mar 2018 · 100% built
- IMPERIA HOMES · VakolaGPRS REALTY · P51900010379 · possession Dec 2019 · 58.6% built
- AMANN MARINA · Ward GSouthMS RELLIANCE CONSTRUCTION CO · P51900010428 · possession Dec 2019 · 81.8% built · 3 complaints
- NATHANI SQUARE · Mumbai CityA.PATNI REALTY PRIVATE LIMITED · P51900010462 · possession Apr 2027 · 90.9% built · 1 complaint
- Westside · Mumbai CityBhuvnesh Enterprises · P51900010464 · possession Mar 2028 · 99.5% built
- FORTUNE AURA · Ward ABCDK REALTORS · P51900010489 · possession Dec 2027 · 68.2% built
- BAUG-E-MOHAMMED · Ward ERIZWAN HABIB MALIK · P51900010538 · possession Dec 2023 · 90.5% built
- BISMILLAH HEIGHTS · Ward EMOHAMMED AKRAM HUSAIN NIRBAN · P51900010679 · possession Dec 2020 · 100% built · 1 complaint
- Riddhi Siddhi Apartments CHS · Ward FNorthSobhaniye JP Developers · P51900010722 · possession Dec 2021 · 99.1% built
- NEHA GALAXY · Ward GSouthSHISHIR MANGEH SHIVAPURKAR · P51900010851 · possession Jun 2026 · 51.4% built · 1 complaint
- ANAND SMRUTI · Ward FNorthJAGDISH JIVANDAS HUF · P51900010859 · possession Dec 2018 · 100% built
- AURUM Heights · Ward EKomal Developers · P51900010998 · possession Feb 2021 · 90.4% built
- THE RESIDENCE · Ward ABCDRUNWAL DEVELOPERS PVT LTD · P51900011063 · possession Dec 2020 · 90.9% built
- BRAHMA VIHAR · Mumbai CityUNITEX · P51900011161 · possession Dec 2017 · 100% built · 1 complaint
- ANANTAYA APARTMENTS · Mumbai CitySanskriti Developers · P51900011221 · possession Apr 2027 · 71.7% built · 4 complaints
- OCEANIC · Mumbai CitySHRI OMKAR CONSTRUCTION COMPANY · P51900011245 · possession Feb 2022 · 100% built
- NATHANI HEIGHTS SALE · Mumbai CityNathani Parekh Constructions Private Limited · P51900011250 · possession Apr 2027 · 96.1% built
- K RAS RESIDENCY · Ward FSouthK RAS GROUP · P51900011299 · possession Jan 2027 · 44.3% built · 8 complaints
- 25 South Tower A 11th to 47th Floor · Mumbai CityTwenty Five South Realty Limited · P51900011418 · possession Apr 2027 · 100% built · 4 complaints
- OM SWAMI ANAND · Mumbai CityAANANDVARDHAN REALTORS · P51900011546 · possession Dec 2017 · 90.9% built
- SHEEL MARIE CHS · Ward GSouthPUSHPAK REALTY DEVELOPERS · P51900011549 · possession Mar 2018 · 69.5% built
- AMRUT SMRUTI · Ward FNorthOM BUILDCON · P51900011560 · possession Mar 2018 · 90.9% built
- AZAD RESIDENCY · BycullaDUDHWALA CONSTRUCTION · P51900011568 · possession Jun 2026 · 99.7% built
- Gadkari Paradise · ChemburGadkari Builders & Associates · P51900011571 · possession Apr 2031 · 18.2% built
- MARINA BAY WORLI SEA FACE · Ward GSouthSaumya Buildcon Pvt Ltd · P51900011592 · possession Sept 2026 · 81.8% built
- BHIVAWANI CHAWL · Mumbai CityMS RADHAKRISHNA DEVELOPER · P51900011643 · possession Apr 2027 · 81.4% built
- SURESH SADAN · Mumbai CityJAVERBEN NENSHI CHHADVA · P51900011659 · possession Dec 2019 · 100% built · 1 complaint
- DILKAP CENTRE · Mumbai CityGORKAP PROPERTIES & INVESTMENTS PVT. LTD · P51900011709 · possession Oct 2027 · 71.2% built · 2 complaints
- Horizon · Ward GNorthZara Habitats LLP · P51900011721 · possession Jan 2021 · 76.4% built · 1 complaint
- Eon One · Ward GNorthFirstlight Properties Private Limited · P51900011726 · possession Oct 2026 · 100% built · 1 complaint
- KUL TULIP · Mumbai CityKUMAR BUILDERS MUMBAI REALTY PVT LTD · P51900011786 · possession Dec 2020 · 100% built · 8 complaints
- BUILDARCH OLIVE · Ward GNorthBUILDARCH LAND DEVLOPERS PVT. LTD. · P51900011900 · possession May 2018 · 72.7% built
- CHANDRA DARSHAN HEIGHTS · MUMBAICOMMERCIAL DEVELOPERS · P51900011926 · possession Dec 2023 · 100% built · 1 complaint
- ANZAR ELEGANCE · Mumbai CityMITHILA DEVELOPERS · P51900012009 · possession Apr 2029 · 87.9% built · 1 complaint
- Sanghvi Estella · Ward FSouthShree Naminath Lifespace LLP · P51900012022 · possession Apr 2027 · 86.8% built
- ROYAL RESIDENCY C PHASE I · Ward FSouthDEVANG HEMANTKUMAR VYAS · P51900012122 · possession Aug 2025 · 90.9% built · 13 complaints
- BAYVIEW HEIGHTS · Ward GNorthHIND CONSTRUCTION · P51900012124 · possession Dec 2018 · 90.9% built
- Ikebana · Mumbai CityM/s. Tejukaya Realty · P51900012152 · possession Dec 2017 · 97.7% built
- SAUDA HEIGHTS · Ward EM.K. INDIA ENTERPRISES · P51900012238 · possession Dec 2018 · 57.1% built
- VIVA RAM NIWAS C.H.S. · Ward FSouthVIVA ENTERPRISES LIMITED · P51900012295 · possession Jan 2021 · 90.9% built
- LE PALAZZO · Ward ABCDSri Harsh Developers · P51900012304 · possession Aug 2026 · 85% built · 26 complaints
- Kohinoor Square Phase 2 · Ward GNorthKohinoor CTNL Infrastructure Company Private Limited · P51900012308 · possession Dec 2023 · 81.8% built · 2 complaints
- Neumec Aura · Mumbai CityAura Monde LLP · P51900012309 · possession Apr 2028 · 40.9% built · 1 complaint
- ART GUILD HOUSE · Mumbai CityOFFBEAT DEVELOPERS PRIVATE LIMITED · P51900012314 · possession Mar 2018 · 54.5% built
- Om Gopal - Floor 3 to 9 · Ward GNorthOmkar Realtors and Developers Private Limited · P51900012360 · possession Jun 2026 · 90.9% built · 9 complaints
- KANAK HEIGHT · Ward ABCDSHANTILAL MISHRIMAL CHANDAN · P51900012370 · possession Dec 2017 · 80% built
- HEERA MANEK PRAGATEE ENCLAVE · Mumbai CityVIKRAM JAYANTILAL BRAHMABHATT · P51900012389 · possession Dec 2018 · 64.5% built
- Satguru Antop Hill · Ward FNorthNewlook Constructions Pvt. Ltd · P51900012390 · possession Jan 2023 · 56.9% built
- Shreeji Towers · Ward FNorthNEUMEC DEVELOPER AND BUILDERS · P51900012467 · possession Sept 2027 · 98.4% built · 3 complaints
- NEO PEARL · Ward ABCDUNIVERSAL BUILDERS & DEVELOPERS · P51900012476 · possession Dec 2018 · 81.8% built
- Sumit Lata · Ward FNorthSumit Snehashish Venture · P51900012481 · possession Jan 2021 · 76.8% built
- HILLWOOD · Mumbai CitySHREEJI LIFESPACES PRIVATE LIMITED · P51900012502 · possession Dec 2023 · 32.3% built
- Spenta Nest · Mumbai CitySpenta Nest · P51900012560 · possession Apr 2029 · 71.4% built
- LABDHI GARDENS PHASE 2 · NeralLabdhi Lifestyle Limited · P51900012567 · possession May 2019 · 100% built
- Hive suites · Mumbai CityHive suites · P51900012718 · possession Jun 2027 · 27.3% built · 1 complaint
- NAVNATH APARTMENT · Ward FSouthAARTI ESTATES · P51900012813 · possession Jul 2019 · 90.9% built
- MITTAL ELEGANT · Ward ABCDM M IDEAL INFRA · P51900012877 · possession Apr 2028 · 74.5% built · 2 complaints
- ASHATHLAXMI CO-OPERATIVE HOUSING SOCIETY LIMITED · MATUNGAAVS Realtors · P51900012933 · possession Feb 2022 · 80.9% built
- RAAJDEEP ARCADE · Mumbai CityRAAJDEEP ARCADE · P51900012983 · possession Dec 2026 · 78.2% built
- MAHALAXMI · Ward FNorthSugee Four Developers LLP · P51900013023 · possession Jun 2021 · 100% built
- NEMAT -E- FAROOQUE HERITAGE · Ward EFALAKDEVELOPER · P51900013072 · possession Apr 2027 · 58.6% built · 16 complaints
- SIDDHI VINAYAK GRANDEUR · Ward GSouthGOPAL RAMPRITSINGH THAKUR · P51900013137 · possession Oct 2023 · 100% built
- Daffodil Heights · Mumbai CityShree Krishna Constructions · P51900013369 · possession Apr 2030 · 62% built · 4 complaints
- GULMOHAR TERRACE · Mumbai CitySHINING SUN CONSTRUCTIONS · P51900013547 · possession Apr 2028 · 78.2% built · 2 complaints
- ISON HEIGHT · Ward GSouthHATDIA BUILDERS PVT LTD · P51900013590 · possession Apr 2027 · 83.2% built
- TRADE LINK BUILDING E WING A · Mumbai CityKAMALA MILLS LIMITED · P51900013638 · possession Jun 2022 · 100% built · 2 complaints
- TAJ ENCLAVE · Mumbai CityAloka Commercial Private Limited · P51900013712 · possession Jan 2021 · 90.9% built
- BKC EDGE · Mumbai CityLabdhi Bliss Private Limited · P51900013846 · possession Apr 2030 · 3 complaints
- DADAMAHARAJ HEIGHTS · Ward ABCDSHREE VASTUDEEP DEVELOPERS · P51900013974 · possession Apr 2027 · 80.8% built
- HAMILTON MANSION · Ward EM.I.REALTY PRIVATE LIMITED · P51900013981 · possession Apr 2027 · 100% built
- Sanghvi One · Ghatkopar WestRameshwar Enterprises · P51900014379 · possession Sept 2022 · 90.9% built
- Safiya Heights · ABCD-400001SMY ASSOCIATES · P51900014409 · possession Dec 2027 · 90.3% built
- PARSHWA LOTUS & RANGARI HEIGHTS · Ward EGOLD PLAZA DEVELOPERS PVT LTD · P51900014590 · possession Jan 2027 · 84.1% built · 3 complaints
- 1 OSR · Ward GNorthShagun Builders · P51900014754 · possession Mar 2023 · 90.9% built · 2 complaints
- Lodha Parel Project · Mumbai CityMACROTECH DEVELOPERS LIMITED · P51900014910 · possession Oct 2023 · 90.9% built
- Lodha Adrina · Ward GSouthLODHA DEVELOPERS LIMITED · P51900014937 · possession Jun 2026 · 88.6% built · 1 complaint
- Contemporary Builder Private Limited Tardeo Project · Ward ABCDContemporary builders private Limited · P51900014964 · possession Apr 2028 · 95.2% built
- GOLD FINCH · MATUNGANEHAL IMPORTS PVT. LTD. · P51900014976 · possession Mar 2023 · 100% built
- One Lodha Place · Mumbai CityMACROTECH DEVELOPERS LIMITED · P51900014984 · possession Mar 2023 · 100% built
- Lifescapes Harihar · Ward ABCDM/s Meridian Constructions Pvt Ltd · P51900014987 · possession Dec 2018 · 81.8% built
- 36 BABULNATH · Ward ABCDVINOD MOHANLAL JAIN · P51900015000 · possession Sept 2021 · 100% built
- Xenus Phase 1 · Ward FNorthRodium Properties division of Rodium Realty Ltd. · P51900015095 · possession Oct 2024 · 100% built · 1 complaint
- DIGNITY DIVINE · Ward FNorthDIGNITY REALTY · P51900015103 · possession Dec 2022 · 100% built · 2 complaints
- Aangan · Ward GNorthIndus Valley Constructions LLP · P51900015218 · possession Apr 2025 · 96.8% built · 3 complaints
- BEAUMONTE TOWER B PHASE 1 SALE BUILDING NO 10 · Ward FNorthSAHANA-SHETH · P51900015342 · possession Dec 2024 · 100% built
- DIPTI OCEAN TERRACES · SHIVAJI PARK DADAR WESTDIPTI ASSOCIATES · P51900015500 · possession Dec 2023 · 100% built
- Shantadurga · Ward FSouthLAKSHMI BUILDERS AND DEVELOPERS · P51900015604 · possession Jan 2023 · 90.9% built
- Ocean Towers - Phase I · Marine LinesMarine Drive Hospitality And Realty Private Limited · P51900015638 · possession Mar 2026 · 7.6% built
- Ocean Towers - Phase II · Marine LinesMarine Drive Hospitality And Realty Private Limited · P51900015653 · possession Mar 2026 · 7.6% built
- New Cuffe Parade - Lodha Gardenia · Mumbai CityLODHA DEVELOPERS LIMITED · P51900015715 · possession Mar 2023 · 71.4% built · 3 complaints
- ARKADE RISE · Mumbai CityArkade Paradigm · P51900015795 · possession Dec 2021 · 54.9% built
- South Tower · SaatraastaGlider Buildcon Realtors Private Ltd · P51900015854 · possession Dec 2025 · 90.9% built · 15 complaints
- DOSTI BELLEZA · Mumbai CityCRYSTAL BUILDERS AND DEVELOPERS · P51900015989 · possession Dec 2021 · 100% built
- HARINIWAS · GOREGAON WESTSHREE BALAJI CORPORATION · P51900016435 · possession Dec 2021 · 90.9% built
- Central Tower - Tower 2 · Mumbai CityGlider Buildcon Realtors · P51900016482 · possession Jun 2026 · 90.9% built · 10 complaints
- LODHA PARK - TOWN HOUSES · Ward GSouthLODHA DEVELOPERS LIMITED · P51900016526 · possession Dec 2021 · 67.3% built · 1 complaint
- DHARAM CASTLE · Mumbai CityBHURJI DEVELOPERS LLP · P51900016656 · possession Jul 2027 · 89.8% built · 3 complaints
- Vaastu · Ward FNorthVaswani 108 Lifespaces LLP · P51900016680 · possession Jul 2022 · 85.9% built
- ARIHANT HEIGHTS - JARIWALA AND KADUSKAR · Ward EDINESH JYOTICHAND JAIN · P51900016804 · possession Aug 2026 · 98.2% built
- Hubtown Harmony A Wing · Matunga EastHeet Builders Private Limited · P51900017558 · possession Dec 2024 · 81.8% built
- DOTOM DESIRE · DADAR WESTDOTOM VENTURES · P51900017691 · possession Dec 2023 · 100% built
- Hubtown Harmony Retail · Matunga EastHeet Builders Private Limited · P51900017699 · possession Dec 2023 · 80.9% built
- Hubtown Harmony B Wing · Matunga EastHeet Builders Private Limited · P51900017709 · possession Dec 2024 · 81.8% built
- Simna Heights / Shantichndra Heights · Ward ABCDASHRAF VALI MOHAMMAD QURESH · P51900017724 · possession Apr 2028 · 100% built · 2 complaints
- Essgee Options One Phase I · Ward GNorthGMJ BUILDERS & DEVELOPERS · P51900017841 · possession Dec 2023 · 81.1% built
- COMPOSITE BUILDING NO2 · Mumbai CityNEUMEC AND SANGAM JV · P51900018301 · possession Oct 2027 · 100% built
- SHREE SAMMET SHIKHAR HEIGHTS · Ward ABCDSHREE SAMMET SHIKHAR HEIGHTS · P51900018338 · possession Dec 2027 · 81.8% built
- Naman Xana · Ward GSouthShree Naman Residency Pvt. Ltd. · P51900018769 · possession Aug 2027 · 68.6% built
- 87 NINAD · Mumbai CityMAAULI CREATIONS PVT LTD · P51900018948 · possession Dec 2022 · 0.5% built
- Matru Ashish · Mumbai CityKalpataru Limited · P51900019426 · possession Dec 2023 · 70.2% built
- One Marina · Mumbai CityVALENCIA AND MISHAL VENTURES PVT LTD · P51900019619 · possession Apr 2029 · 45.7% built · 1 complaint
- Shreeji Heights · Ward ABCDAnupam Properties · P51900019688 · possession Dec 2022 · 100% built
- TOWER E OF BUILDING NO 3-PHASE OF PROJECT NAMED VIVAREA BEING CONSTRUCTED ON PORTION OF PROJECT LAND · Ward EGENEXT HARDWARE & PARKS PRIVATE LIMITED · P51900019931 · possession Jun 2024 · 99.7% built
- Piramal Aranya - Wing C · Mumbai CityGlider Buildcon Realtors Private Limited · P51900020330 · possession Dec 2027 · 87.7% built · 9 complaints
- Sukrut · Ward GNorthTECHNO PROPERTY DEVELOPERS PRIVATE LIMITED · P51900020341 · possession Mar 2023 · 89.5% built · 1 complaint
- SANGHVI PARSSSVA EXCELLENSEA · Ward ABCDSANGHVI PARSSSVA ENTERPRISE LLP · P51900020397 · possession Jul 2027 · 64.7% built
- North Tower - Tower 3 · Mumbai CityGlider Buildcon Realtors · P51900021057 · possession Apr 2027 · 84.1% built · 7 complaints
- OCEAN DRIVE · Mumbai CityATUL GK LIFESTYLE · P51900021226 · possession Jul 2027 · 29.6% built
- Nikhil Heights · Ward ABCDOstwal &Neumec Developers LLP · P51900021235 · possession Apr 2027 · 81.4% built
- NCP Commercial Tower - Supremus · Ward FNorthLODHA DEVELOPERS LIMITED · P51900021485 · possession Mar 2024 · 81.8% built
- BAIT US SALAM · Ward EY H ASSOICATES · P51900021783 · possession Dec 2028 · 52.2% built
- "The Mansion" By ABIL · Mumbai CityArindam Developers LLP · P51900022063 · possession Mar 2025 · 87.7% built
- Sumer Samaq Prime · Ward GSouthSamaq Builders Private Limited · P51900022219 · possession Dec 2027 · 79.8% built
- CHAITYA 777 · Ward EM/s. CHAITYA DEVELOPERS · P51900022725 · possession Apr 2032 · 96.4% built
- Shelaji Avenues · Mumbai CityAshirwad Shelaji Developers LLP · P51900023110 · possession Dec 2026 · 100% built
- Vanu Heights · Ward FNorthVanu Developers Private Limited · P51900023322 · possession Apr 2026 · 100% built
- SAI ARADHYA · DADAR WESTMANGALMURTI DEVELOPERS · P51900023477 · possession Jul 2027 · 81.8% built
- Sigma Garnet · Ward GNorthCOLO COLOR PRIVATE LIMITED · P51900023487 · possession Apr 2030 · 45.5% built
- Labdhi Seabreeze · Mumbai CityLabdhi Siddhivinayak Realtors LLP · P51900023708 · possession Apr 2028 · 90.9% built · 16 complaints
- AAYESHA PALACE · Ward FSouthZOEB ENTERPRISES · P51900023852 · possession Dec 2027 · 98.2% built · 2 complaints
- SADHANAA BUILDING · MatungaSIDAAN ENTERPRISE · P51900023932 · possession Oct 2023 · 73.1% built · 2 complaints
- ARYAVRAT PROJECT · DADAR WESTM/S Chintamani Land and Housing LLP · P51900024338 · possession Oct 2028 · 65.4% built
- Intelligentia Infinity by Haware Properties · Behind Shoppers Stop near Chembur GhatkoparHaware Housing · P51900025015 · possession Dec 2025 · 100% built
- SAMBHAV · Mumbai CityHelictite Residency Private Limited · P51900025024 · possession Apr 2029 · 69.1% built
- 25 South - Central Tower · PrabhadeviTwenty Five South Realty Limited · P51900025184 · possession Dec 2028 · 1.8% built
- SUMATI HEIGHTS · Mumbai CityTANGENT ENTERPRISES · P51900025185 · possession Dec 2023 · 100% built
- YASH TRINITY · Ward GNorthBhalchandra Vinayak Wadnerkar · P51900025356 · possession Jan 2027 · 90.9% built
- RANKA LIFESTYLE VENTURES · Gautam Nagar, Dadar (E)Bhavesh Jayantilal Jain · P51900025998 · possession Jun 2023 · 100% built
- Shanti Kunj- A Project by Tridhaatu · Mumbai CityTRIDHAATU RENOVATORS PRIVATE LIMITED · P51900026505 · possession Dec 2028 · 53.3% built · 1 complaint
- BURJ QADRI · Ward ELIMRA REALTY · P51900026528 · possession Jul 2027 · 90.9% built
- YASHVI REGENCY · Ward ABCDAASMA INFRA-CON LLP · P51900026765 · possession Oct 2028 · 86.8% built
- SHANTI HARBOUR CREST · Ward FSouthOJUS DEVELOPERS · P51900027180 · possession Jun 2028 · 45% built · 1 complaint
- Alhambra · Mumbai CityHydra Trading Private Limited · P51900027257 · possession Mar 2023 · 99.7% built
- Shubhada · Shivaji Park, DadarSugee Twelve Developers LLP · P51900027415 · possession Sept 2024 · 40% built
- Bhavya Elite · Ward FNorthNewlook Constructions Pvt. Ltd · P51900027909 · possession Jun 2026 · 81.8% built · 1 complaint
- Haware Intelligentia Sigma South JVLR Wing A · Tagore Nagar, Vikhroli East, Hariyali Village, MumbaiSuresh Kashinath Haware · P51900028286 · possession Jun 2025 · 47% built
- CEEJAY RESIDENCY · Ward GSouthPRIME REALTY LLP · P51900028679 · possession Jun 2025 · 99.7% built
- Emmanuel · Ward GNorthSkyline Realty Private Limited · P51900028729 · possession Dec 2026 · 71.5% built
- ALI TOWER · Ward ABCDALAMDAR INFRASTRUCTURE PVT LTD · P51900028809 · possession Sept 2026 · 65% built
- Inspire · Mumbai CityR K Constructions · P51900029171 · possession Sept 2026 · 58.1% built · 8 complaints
- Redevelopment of Gomtibai Chawl · Ward ESILVERLINE ENTERPRISES · P51900029209 · possession Jun 2026 · 67.3% built
- New National Market Annexe · Ward FNorthSuleman Haroon & Company · P51900029270 · possession Dec 2027 · 86.8% built
- Park Abode · Ward GNorthShree Siddhivinayak Developer · P51900029734 · possession Jan 2027 · 72.7% built
- Bhairaav Blessings · Mumbai CityBHAIRAAV ERECTORS LIMITED · P51900029741 · possession Dec 2022 · 71.1% built
- Midtown Bay · Mumbai CityRising Sun Impex Private Limited · P51900030390 · possession Dec 2027 · 100% built · 6 complaints
- SAMARTHA HEIGHTS · Ward GNorthSIDDHESH SUBHASH TENDULKAR · P51900030413 · possession May 2026 · 263.6% built
- Joyville Hinjawadi - 1, Phase 7 · maanJoyville Shapoorji Housing Private Limited · P51900030420 · possession Sept 2022 · 72.7% built
- Twenty Five South - North Tower · Ward GNorthTwenty Five South Realty Limited · P51900030600 · possession Apr 2031 · 99.9% built
- Infinity Residences · Ward FSouthInfinity Associates · P51900030602 · possession Apr 2029 · 61.1% built · 1 complaint
- BUILDARCH DAISY · DADAR SHIVAJI PARKBUILDARCH LAND DEVLOPERS PVT. LTD. · P51900030673 · possession Dec 2024 · 81.8% built
- Pearl Heights · Mumbai CityM/s Sitesh Developers · P51900030972 · possession Oct 2027 · 64.1% built
- 118 WEST · Ward ETURQUOISE DEVELOPERS · P51900030992 · possession Dec 2031 · 100% built
- ARIHANT TOWER · Mumbai CityMEHTA DEVELOPERS · P51900031107 · possession Jan 2027 · 87.5% built
- BAFNA AVENUE · Ward ABCDBAFNA METSTRIPS PRIVATE LIMITED · P51900031232 · possession Apr 2028 · 81.8% built
- VITALIS · Ward GNorthSURAJ ESTATE DEVELOPERS LTD · P51900031447 · possession Apr 2027 · 48.1% built
- GURUKRUPA VYOM · MUMBAIGURUKRUPA REALCON INFRABUILD LLP · P51900031575 · possession Nov 2024 · 90.9% built
- VASANT PRABHA · DADAR WESTSUDHIR VASANT MAYEKAR · P51900031637 · possession Apr 2027 · 55.9% built
- BISMILLAH ELITE · NAGPADANIRBAN INFRASTRUCTURE PVT LTD · P51900031646 · possession Mar 2027 · 81.8% built
- ZARION · Ward GNorthAYG HOMES CONSTRUCTIONS PRIVATE LIMITED · P51900031858 · possession Oct 2026 · 99.5% built
- Birla Niyaara Phase-1 · Ward GSouthAditya Birla Real Estate Limited · P51900031916 · possession Mar 2028 · 49.1% built · 1 complaint
- AJMERA DOWNTOWN · Ward ABCDASHJIT REALTIES PVT. LTD. · P51900031924 · possession Apr 2028 · 59.2% built
- Avenue 15 · Ward FSouthRamesh Barrel Supplying Co · P51900032165 · possession Jan 2027 · 52.9% built
- SURAJ ETERNA · Ward GNorthSURAJ ESTATE DEVELOPERS LTD · P51900032173 · possession Apr 2027 · 78.2% built
- THE EDGE · Ward FSouthTEJUKAYA CORP PRIVATE LIMITED · P51900032613 · possession Apr 2031 · 26.4% built
- UNIQUE EXOTICA · Mumbai CityUCT OASIS LLP · P51900032868 · possession Dec 2024 · 100% built
- Ratan Address · Dadar WestShri Nakoda Enterprises · P51900032985 · possession Jan 2027 · 90.9% built
- PITTIE PARADISE · Mumbai CityVICTORIA ENTERPRISES LIMITED · P51900033030 · possession Aug 2026 · 68.7% built
- JADE AVENUE-Residential Wing · Mumbai CityJAIRAJHAPPYHOMES · P51900033215 · possession Jul 2027 · 96.6% built
- MUSTAFA PALACE · Mumbai CityELITE REALTY · P51900033383 · possession Dec 2026 · 80% built
- JADE CREST · Mumbai CityNational Happy Homes · P51900033760 · possession Sept 2026 · 93.6% built
- SHWESH CHAMPARAN · MATUNGA EASTSHWESH DEVELOPERS PRIVATE LIMITED · P51900033818 · possession Mar 2026 · 47.1% built
- THE AURO · Ward GSouthALAMDAR INFRASTRUCTURE PVT LTD · P51900033823 · possession Mar 2028 · 81.8% built
- Cynthiandra · Mumbai CityShubh Laxmi Developers · P51900033836 · possession Apr 2027 · 77.9% built
- Nexsa Sky Vista · Ward ED.K. REALTORS & DEVELOPERS LIMITED · P51900033907 · possession Oct 2027 · 58.2% built
- Shanti Tower · Ward GSouthShanti Prakash Realty & Infrastructure LLP · P51900033948 · possession Apr 2030 · 83.6% built
- CORNER OF FIVE · Mumbai CityRamniklal Dhanji Chhadva · P51900033973 · possession Mar 2026 · 100% built
- PAREKH HOUSE · Ward FNorthINNOVATIVE REALEST PRIVATE LIMITED · P51900034002 · possession Dec 2025 · 58.2% built
- SHREE UDYAN · SHIVAJI PARKSQUARE NINE HABITATS LLP · P51900034045 · possession Apr 2027 · 81.8% built
- NINE REFLEX · DADAR NAIGAONREFLEX PROJECTS LLP · P51900034207 · possession Apr 2027 · 58.2% built
- DIVINE HEIGHTS · Bandra WestDIVINE ASSOCIATES · P51900034314 · possession Mar 2024 · 90.9% built · 1 complaint
- Kalpataru Oceana · Ward GSouthKalpataru Properties (Thane) Pvt. Ltd. · P51900034316 · possession Dec 2026 · 56.4% built · 1 complaint
- KINGS TOWER · Ward EMOHAMMED ESHAQ ALI VADGAMA · P51900034425 · possession Jan 2027 · 80% built
- KALAYA TOWER · Prabhadevi DadarAkruti Developers and Builders · P51900034579 · possession Jun 2026 · 100% built · 2 complaints
- Godrej Horizon Phase I · Ward FNorthGodrej Projects Development Ltd · P51900034851 · possession Sept 2028 · 67.5% built · 6 complaints
- Dipti Royal Arc · Shivaji ParkDipti Associates · P51900034863 · possession Dec 2024 · 84.1% built
- The Baya Midtown · Ward GNorthRenaissance Construction (Rautwadi) · P51900035023 · possession Dec 2028 · 81.8% built
- 9th Avenue · K/W Ward Vile Parle (West) MumbaiAureum Homes LLP · P51900035024 · possession Mar 2025 · 90.9% built
- DHARTI HEIGHTS · Ward FSouthOm Shanti Housing · P51900035208 · possession Apr 2027 · 95.2% built
- SATNAM LEELA · SINDHI SOCIETYL NAGPAL DEVELOPERS · P51900045357 · possession Oct 2024 · 100% built
- VICEROY BY GROUP SATELLITE · Mumbai CitySATELLITE DEVELOPERS PRIVATE LIMITED · P51900045359 · possession Jul 2027 · 1.1% built
- SHREE MAHALAKSHMI RESIDENCY · Mumbai CitySHREE MAHALAKSHMI CONSTRUCTIONS · P51900045601 · possession Oct 2026 · 94.5% built
- THE LEGACY · Ward GSouthSACHIV SURINDER SAHNI · P51900045797 · possession Jul 2027 · 44.2% built
- WHITE FLOWER RESIDENCY · Ward EWHITE FLOWERS REALTY LLP · P51900045839 · possession Dec 2026 · 100% built
- 1891 Ekam Parkk · Ward GNorthNascent Developers · P51900046004 · possession Apr 2027 · 90.9% built
- Island Cove · Mumbai CityLH Residential Housing Private Limited · P51900046369 · possession Apr 2029 · 49.3% built · 2 complaints
- SANJANA HEIGHTS · Mumbai CitySAFEWAY PROJECTS PVT LTD · P51900046485 · possession Apr 2027 · 21.1% built · 1 complaint
- Lodha Bellevue · Mumbai CityLodha Developers Limited · P51900046567 · possession Sept 2028 · 76.8% built · 2 complaints
- 232 DHULEVA · Mumbai CityMAGNUM LANDCON LLP · P51900046593 · possession Apr 2028 · 50% built
- PURANDARE PARK CHSL · Ward FNorthDEVESH NARENDRA JANI · P51900046595 · possession Apr 2027 · 99.5% built
- Earth Enclave · Ward ABCDEarth Graphics · P51900046831 · possession Dec 2027 · 56.9% built
- Amaresha · Ward GNorthInconel Developers & Builders Private Limited · P51900046922 · possession May 2029 · 10.9% built
- RAMKUNJ · SHIVAJI PARKJAYANT JAGANNATH SIRSAT · P51900047036 · possession Dec 2025 · 77.1% built
- SERENE BAY · Ward GNorthSHUBHA GRUHA · P51900047047 · possession Jun 2026 · 64.6% built · 1 complaint
- Pearl Bay View · Ward GNorthPEARL CONCEPT CONSTRUCTIONS · P51900047085 · possession Apr 2027 · 61.1% built · 1 complaint
- Promesa Castor · Mumbai CityDARSHAN GROUP · P51900047226 · possession Apr 2027 · 77.7% built
- Adi Darsshan · Mumbai CityAdi Realtors · P51900047289 · possession Apr 2027 · 0.5% built
- CHIRAG HEIGHTS · Mumbai CityNETTHEIM BUILDERS LLP · P51900047318 · possession Apr 2027 · 83.5% built
- Kalpataru Prive · Ward ABCDKalpataru Hills Residency Private Limited · P51900047321 · possession Feb 2028 · 52.5% built
- PREM NAGAR - LEGACY · MULUND (WEST), MUMBAIRASIK KUNVERJI CHHEDA · P51900047347 · possession Dec 2026 · 52.3% built
- SUGAN HEIGHTS · Ward ABCDGULABDEVI JAIN & OTHERS · P51900047379 · possession Dec 2026 · 72.7% built
- SURAJ PARK VIEW 2 · Ward GNorthSURAJ ESTATE DEVELOPERS LTD · P51900047891 · possession Apr 2027 · 66.4% built · 1 complaint
- PARK WAY · Ward FNorthOm Sai Ganesh Builders & Developers Pvt Ltd · P51900047931 · possession Mar 2027 · 81.4% built
- SIDHESHWAR ROYALE · CHEMBURM/S YUG DEVELOPERS · P51900047936 · possession Jul 2027 · 64.1% built
- T - SQUARE · Mumbai CityTRINETRA BUILDERS AND DEVELOPERS · P51900047971 · possession Jul 2027 · 58.5% built
- Dignity Bayview · Mumbai CityDIGNITY REALTY AND HOUSING · P51900048008 · possession Jul 2027 · 62.3% built
- ALBURAQ · Ward EElite Constructions · P51900048082 · possession Dec 2027 · 63.6% built
- Saraswati Niwas · Ward GNorthSugee Twenty Three Developers LLP · P51900048130 · possession Aug 2026 · 81.8% built
- 42 EAST PARK · Mumbai CityMADHUPURI HOMES · P51900048224 · possession Apr 2026 · 97.3% built
- Godrej Five Gardens · Ward FNorthGodrej Projects Development Ltd. · P51900048424 · possession Apr 2029 · 50.4% built
- Seventh Avenue · Ward ERubberwala Housing & Infradevelopment LLP · P51900048564 · possession Apr 2027 · 58.5% built
- AIRYAMAN TERRACES · Ward GNorthAiryaman Developers LLP · P51900048609 · possession Apr 2027 · 93.2% built
- Bayview Phase-II · Ward EKapil Constructions · P51900048634 · possession Apr 2028 · 92.3% built
- DARUL MUSTAFA · Mumbai CityCitymaker Builders Private Limited · P51900048664 · possession Apr 2028 · 72.7% built
- AARADHYA AVAAN · Mumbai CitySHREEPATI SKIES (R R CHATURVEDI) · P51900048675 · possession Apr 2031 · 56.7% built
- SHREE SAI ARTI · Ward GNorthV.K DEVELOPERS · P51900048871 · possession Dec 2026 · 87.3% built
- MONTESOUTH TITLIS 4 · Ward ESWAYAM REALTORS & TRADERS LLP · P51900048944 · possession Oct 2027 · 96.7% built
- Indira · Shivaji Park, DadarSugee Developers Pvt. Ltd. · P51900048976 · possession Apr 2026 · 50.9% built · 2 complaints
- The IVY · Mumbai CityBaysquare Constructions · P51900049038 · possession Apr 2027 · 53.4% built
- MUFADDAL PARK · Ward EALAMDAR INFRASTRUCTURE PVT LTD · P51900049088 · possession Mar 2030 · 40.5% built
- NUTAN NISHIGANDHA C.H.S LTD · Vile Parle (East)CONARCH LIFESPACE LLP · P51900049182 · possession Dec 2025 · 72.7% built
- MAKHDOOM HEIGHTS · Ward GNorthNAQI DEVELOPERS PRIVATE LIMITED · P51900049200 · possession Mar 2027 · 51.6% built
- CHHAYA · Ward FNorthFORTUNE REALTY · P51900049414 · possession Apr 2027 · 88.6% built
- FORTUNE MAKHDOOM · Ward GNorthNamla Developers Private Limited · P51900049455 · possession Apr 2028 · 28.2% built
- OLYMPIA TOWER · Ward EOLYMPIA ENTERPRISES · P51900049469 · possession Apr 2029 · 90.1% built
- Amara · Ward GNorthSharcon Mutha · P51900049483 · possession Apr 2027 · 27.3% built
- AADI ARPAN · Ward FNorthAADI SHIKHAR LLP · P51900049501 · possession Nov 2026 · 68.8% built
- Servai Tower · Mumbai CityInclineestate Developers LLP · P51900049616 · possession Dec 2026 · 50.9% built
- Azara Residences · Ward EAzara Redstone LLP · P51900049639 · possession Apr 2028 · 49.1% built
- ROCKLINE PROPERTIES · Mumbai CityROCKLINE PROPERTIES AND DEVELOPERS PRIVATE LIMITED · P51900049686 · possession Apr 2028 · 41.4% built
- MONTESOUTH PILATUS 4 · Ward ESWAYAM REALTORS & TRADERS LLP · P51900049688 · possession Apr 2028 · 0% built
- Godrej Horizon Phase II · Ward FNorthGodrej Projects Development Ltd · P51900049757 · possession Jun 2029 · 51.5% built · 2 complaints
- MAHANAGAR HEIGHTS · Ward EMahanagar Construction Private Limited · P51900049886 · possession Oct 2027 · 40.5% built
- Monopoli · Ward FSouthMathuresh Infrapro Private Ltd · P51900049902 · possession Apr 2030 · 73.5% built
- KARPUR HEIGHTS · Ward GNorthPARVASHA GRIHNIRMAN SANSTHA · P51900050048 · possession Apr 2027 · 61.4% built · 1 complaint
- HASAN ALI · Mumbai CityCitymaker Builders Private Limited · P51900050081 · possession Apr 2029 · 58.8% built
- JADE AVENUE COMMERCIAL WING · MATUNGA CENTRALJAIRAJHAPPYHOMES · P51900050274 · possession Mar 2026 · 88.2% built
- The Altitude · Mumbai CityVDV Infrastructures LLP · P51900050381 · possession Jul 2029 · 13.6% built · 2 complaints
- La Belleza · Mumbai CityQaswa Enterprises · P51900050398 · possession Feb 2029 · 66.8% built
- ARAIA · Mumbai CityKAVITA DIMENSION LLP · P51900050460 · possession Apr 2028 · 57.3% built
- AAKASA · Ward GSouthTECHNO FRESHWORLD LLP · P51900050463 · possession Dec 2027 · 91.1% built
- Ratan Infinia · Ward FSouthShree Shankheshwar Enterprises · P51900050506 · possession Apr 2030 · 18.2% built
- BEAUMONTE TOWER C SALE BNDG NO 10 -WING C · Ward FNorthSAHANA-SHETH · P51900050715 · possession Dec 2027 · 7.7% built
- BHALCHANDRA NIWAS CHS · Ward FNorthISHAAN REALTORS · P51900050749 · possession Apr 2027 · 55.9% built
- CRD Aura · Ward GNorthCRD Blue Ocean LLP · P51900050806 · possession Dec 2027 · 23.3% built
- Novelty Grandeur · Mumbai CityGoodwill Theaters Private Limited · P51900050924 · possession Jul 2030 · 0% built
- YASH SUPRIYA · Ward FNorthYASH CONSTRUCTION COMPANY · P51900050949 · possession Apr 2027 · 49.5% built
- NISHIKA ELYSIUM · Ward GSouthFAIRLEAF DEVELOPERS PRIVATE LIMITED · P51900050965 · possession Dec 2028 · 74.4% built
- Shapoorji Pallonji The Odyssey 1 · Mumbai CityFloreat Investments Private Limited · P51900050998 · possession Aug 2031 · 9.1% built
- Arham Imperia · Ward EJ Gala Enterprises · P51900051009 · possession Aug 2029 · 36.8% built
- TAJUN HEIGHTS · Ward FNorthA-1 Enterprises · P51900051125 · possession Apr 2029 · 60.5% built
- SHAYONA · Mumbai CityDEVESH NARENDRA JANI · P51900051173 · possession Apr 2027 · 90.9% built
- Sugee Sukrut · Mumbai CitySugee Nine Developers LLP · P51900051181 · possession Feb 2027 · 90.9% built
- Pole Star · Mumbai CityOM SHANTI HOUSING DEVELOPMENT COMPANY · P51900051220 · possession Apr 2028 · 93.6% built
- MARQUEE · Ward GSouthHARBOUR FRONT PROPERTIES PRIVATE LIMITED · P51900051378 · possession Apr 2029 · 64.3% built
- DEJA VIEW · Mumbai CityZAHIDA ABU ASIM AZMI · P51900051418 · possession Jul 2027 · 0% built · 1 complaint
- Jade Solitaire · Ward FNorthNational Happy Homes · P51900051442 · possession Jul 2027 · 65.5% built
- DREAM RESIDENCY · Ward ABCDCINE PROPERTIES & FINANCE PVT LTD. · P51900051499 · possession Dec 2028 · 52% built
- BLUE OCEAN · Ward EQuba Developers LLP · P51900051566 · possession Sept 2027 · 56.8% built
- Sugee Renaissance · Ward ABCDSugee Two Developers LLP · P51900051597 · possession Jan 2027 · 37.8% built
- SAYED RESIDENCY · Mumbai CitySayed Sahab &Sons Realty · P51900051721 · possession Apr 2029 · 0.9% built
- Piramal Aranya - Ahan 2 · Mumbai CityPiramal Aranya - Ahan 2 · P51900051735 · possession Dec 2027 · 72.5% built · 2 complaints
- HARSH TULIP · Ward FNorthHARSH DEVELOPERS & INFRASTRUCTURE LLP · P51900051870 · possession Oct 2026 · 81.8% built
- Sea Krest · Ward GSouthSugee Developers Pvt. Ltd. · P51900051903 · possession Apr 2030 · 6.8% built
- BISMILLAH ARCADE 2 · BycullaMohammed Akram Mohammed Husain Nirban · P51900052000 · possession Dec 2027 · 81.8% built
- KRYPTON CROWN · Mumbai CityKRYPTON CREATION · P51900052238 · possession Jul 2027 · 38.2% built
- SHANKESH CROWN · Mumbai CitySHANKESH CROWN · P51900052336 · possession Apr 2027 · 72.7% built
- Vijayshree · Ward GNorthSugee Eighteen Developers LLP · P51900052518 · possession Jan 2027 · 46.5% built
- JADE ACHARYA · Ward FNorthRaghavendra Acharya & Others · P51900052681 · possession Apr 2027 · 94.4% built
- SEVEN DHULEVA · Mumbai CitySEVEN DHULEVA · P51900052793 · possession Dec 2027 · 100% built
- Aryam · Mumbai CityAryam · P51900052888 · possession Apr 2028 · 80.5% built
- GURUKRUPA DARSHANAM · Mumbai CityGURUKRUPA DARSHANAM · P51900053293 · possession Apr 2027 · 81.2% built
- STARDEOUS · Mumbai CitySTARDEOUS · P51900053358 · possession Apr 2028 · 49.3% built
- GURUKRUPA NIRMALAM · Mumbai CityGURUKRUPA NIRMALAM · P51900053380 · possession Apr 2027 · 100% built · 1 complaint
- Central Park · Mumbai CityCentral Park · P51900053390 · possession Nov 2028 · 80.1% built · 1 complaint
- OCEANA · Ward GNorthOCEANA · P51900053437 · possession Dec 2028 · 40% built
- Signature (The Business Hub) · Mumbai CityPrabhat Sadan Properties Private Limited · P51900053489 · possession Apr 2027 · 30.7% built
- Suraj Apartments · Mumbai CitySuraj Apartments · P51900053591 · possession Dec 2026 · 27.3% built
- A.M. GAZDAR RESIDENCY · Mumbai CityA.M. GAZDAR RESIDENCY · P51900053767 · possession Apr 2028 · 33.2% built
- GURUKRUPA ALAKNANDA · Mumbai CityGURUKRUPA ALAKNANDA · P51900053781 · possession Dec 2026 · 90.9% built
Other
- 47 RACE COURSEAKSHAY STHAPATYA PVT. LTD. · P51900005352 · possession Dec 2027 · 0% built · 1 complaint
- SAMRUDDHI CHS LTDUNISPACE DEVELOPERS PRIVATE LIMITED · P51900005827 · possession Dec 2021 · 100% built
- MAARIA ANNEXELAKADAWALA DEVELOPERS PVT. LTD. · P51900007782 · possession Dec 2029 · 59.5% built · 1 complaint
- F.W.TOWERCrystal Construction Corporation · P51900009073 · possession Aug 2026 · 21.8% built
- AMEX RESIDENCYAMEX DEVELOPERS PVT. LTD., · P51900009319 · possession Dec 2025 · 47.3% built · 1 complaint
- SHREEPATI BAYVIEWSHREEPATI BUILD INFRA INVESTMENT LIMITED · P51900010019 · possession Dec 2026 · 0% built · 1 complaint
- Fortune Vue A & B WingALF DEVELOPERS · P51900011198 · possession May 2027 · 42.5% built
- THE SOLUSUNITED SHELTERS PRIVATE LIMITED · P51900011937 · possession Dec 2028 · 0.9% built · 4 complaints
- AAKASH TOWERAAKASH ASSOCIATES INFRASTRUCTURE · P51900012769 · possession Jun 2024 · 40% built
- STELLASANT SAGAR BUILDERS AND DEVELOPERS PRIVATE LIMITED · P51900014065 · possession Mar 2019 · 81.8% built · 1 complaint
WADALA EAST
LALBAUG
Thane
- Sanghvi S3 Ecocity Woods · Near Dahisar CheckpostSanghvi Premises Pvt. Ltd. · P51900006575 · possession Dec 2024 · 79.5% built
- Sanghvi S3 Ecocity Orchid · Near Dahisar Check PostSanghvi Premises Pvt Ltd · P51900008323 · possession Dec 2024 · 71.8% built · 1 complaint
- OM SRUSHTI DARSHAN · THANE KHOPATVINAYAK DEVELOPERS · P51900009084 · possession Dec 2018 · 90.9% built
- FLORENTIA · MIRA BHAYANDARSIDDHIVINAYAK HOMES PVT. LTD. · P51900009486 · possession Dec 2022 · 90.9% built · 1 complaint
- KIPL Morya · VADAWALIkhade Infrastructre Pvt. Ltd. · P51900010004 · possession Jun 2022 · 78.4% built · 5 complaints
Mumbai Suburban
- Pant Nagar Ganadhiraj CHSL · KurlaMishal Construction Private Limited · P51900007103 · possession Dec 2027 · 52.2% built · 20 complaints
- Aveza Phase 2 · Mulund East, Opp Navghar Police Station, MHADA Colony, Mulund East,Tata Housing Development Company Limited · P51900007740 · possession Dec 2025 · 0% built
- Kam Ganesh Co-operative Housing Society Ltd and Nav Amardeep Co-operative Housing Society Limited · KurlaShubh Prabhav Infracom LLP · P51900008403 · possession Jun 2030 · 0% built · 2 complaints
- Shankar Bhavan Premises Co-operative Society Limited · KurlaMishal Construction Private Limited · P51900009596 · possession Jun 2026 · 46.1% built
- M/s Devidayal Metal Industies · LBS Marg BhandupPD Warehousing · P51900011120 · possession Jul 2022 · 100% built
- GARDEN VIEW · GhatkoparSAI EVEREST BUILDERS & DEVELOPERS PRIVATE LIMITED · P51900011692 · possession Nov 2023 · 100% built
- GHANSHAM HEIGHT · BorivaliGHANSHAM PROPERTIES · P51900014250 · possession Dec 2017 · 90.9% built
- THE METROPOLE · GHATKOPARRaveshia Realtors · P51900026208 · possession Mar 2024 · 81.4% built · 14 complaints
- THE VIEWS · KurlaAGNEL DEVELOPERS LLP · P51900031165 · possession Apr 2027 · 89.1% built · 3 complaints
- THE VIEWS II · KurlaAGNEL DEVELOPERS LLP · P51900033194 · possession Dec 2026 · 89.1% built · 2 complaints
Raigarh
- Mahalaxmi Nivara · MangaonMAHALAXMI BUILDTECH LLP · P51900007332 · possession Jun 2023 · 77.1% built
- SHREE SAMARTH KRUPA · MahadJITENDRA SURYAKANT MANE · P51900009929 · possession Dec 2021 · 72.7% built
- Roha Prime Square · AshtamiPrime Square Properties · P51900014230 · possession Mar 2022 · 90.9% built