Delayed projects in Raigarh
1,018 MahaRERA-registered projects in Raigarh are past the possession date on file and still under 100% built. Where the promoter has formally revised the date, the original is shown alongside so you can see what changed.
Page 3 of 6
- SAI DEEP6.6 yr overdueSAMBHAV PROJECTS · PANVEL, RaigarhP52000004098· 81.8% built
- JIN YASH6.6 yr overdueContendre Infratech Pvt. Ltd. · SHILPHATA, RaigarhP52000017145· 90.9% built
- Eden Garden II6.6 yr overdueM C Babu · Uran, RaigarhP52000008714· 82.5% built
- SM Chandrabhaga6.6 yr overdueSM DEVELOPERS · Ulawe, RaigarhP52000002561· 90.9% built
- Chishti Apartment6.6 yr overdueDolphin Developers · Khopoli, RaigarhP52000013808· 90.9% built
- HARMONY APPARTMENT WING C6.6 yr overdueSHANTINIKETAN REALTORS · Mangaon, RaigarhP52000008185· 90.9% built
- KAJAL PRIDE6.6 yr overdueDEEPAK BHAICHAND SHAH · KARJAT, RaigarhP52000014535· 90.9% built
- POTE AALAYA6.6 yr overduePRAKASH GAJANAN POTE · Near Mari aai Temple, RaigarhP52000001069· 90.9% built
- DWARIKA VALLEY PHASE II6.6 yr overdueDWARIKA REAL INFRA LLP · Matoshri nagar, RaigarhP52000015872· 68.2% built· 1 complaint
- SHREE SADGURU COMPLEX PHASE I6.6 yr overdueEARTH HOME · Khalapur, RaigarhP52000011306· 90.9% built
- NEELKANTH AURA6.6 yr overdueNEELKANTH LIFESPACE LLP · NAVI MUMBAI, RaigarhP52000007335· 88% built
- PRATHAM RESIDENCY6.6 yr overdueADARSH ENTERPRISES · Uran, RaigarhP52000005240· 90.9% built
- SIMRAN HEIGHTS6.6 yr overdueNAVRANG HOME MAKERS · Panvel, RaigarhP52000002052· 73.2% built
- Alpine Heritage6.6 yr overdueALPINE SKYSCRAPERS LLP · NA, RaigarhP52000015494· 81.8% built
- AMBIKA HERITAGE6.6 yr overdueRADHA MEERA BUILDERS AND DEVELOPERS · Panvel, RaigarhP52000003237· filed Dec 2018 → now Dec 2019· 90.9% built· 1 complaint
- Omkara Hills6.6 yr overdueOmkara Builders & Developers · KARANJADE, RaigarhP52000000692· 82.7% built
- SHUBHASHREE APARTMENT6.6 yr overdueRAMESH GULAB TUPE · PANVEL, RaigarhP52000016100· 90.9% built
- AFFAN PLAZA6.6 yr overdueTAJ BUILDERS AND DEVELOPERS · GANDHARPALE, RaigarhP52000013713· 81.8% built
- Siddhivinayak Splendour6.6 yr overdueAshok Motiram Jaidhara · Ulwe, RaigarhP52000005567· 90.9% built
- RIDDHI SIDDHI REGENCY6.6 yr overdueK. RIDDHI SIDDHI DEVELOPERS · Panvel, RaigarhP52000012203· 90.9% built
- SAHIL APARTMENT6.6 yr overdueRAMESH GULAB TUPE · PANVEL, RaigarhP52000016275· 90.9% built
- DURVANKUR APARTMENT6.6 yr overdueMANOJ JAYANT BHAGWAT · Pen (M Cl), RaigarhP52000011694· 43.2% built
- SWASTIK HEIGHTS6.6 yr overdueMANGALAM DEVELOPER · Ramsheth Thakur International Sports Complex, RaigarhP52000021121· 88.2% built· 1 complaint
- Mahaavir Majesty - Phase I6.6 yr overdueMahaavir Impex · Panvel, RaigarhP52000002886· 90.9% built· 1 complaint
- LOTUS6.6 yr overdueM/S SERENE LIFESPACES · ULWE, RaigarhP52000002500· 90.9% built
- AKSHAT PRIME6.6 yr overdueYOGESH CONSTRUCTION · Uran, RaigarhP52000002802· 90.9% built
- SUNRISE RESIDENCY6.6 yr overdueRAJNIR ENTERPRISES PRIVATE LIMITED · Damat, RaigarhP51800005060· filed Dec 2018 → now Dec 2019· 89.1% built
- Aayushi Heights6.6 yr overduePRIYANSHI ENTERPRISES · Panvel, RaigarhP52000005007· 18.2% built
- Sunrise Parkville Annex6.6 yr overdueUnnati Enterprises · Ramkrishana Nagar, RaigarhP52000008663· 68.2% built
- USHAPRABHA CHS6.6 yr overdueSHASHIKANT GAJANAN POTE · Panvel, RaigarhP52000007082· 90.9% built
- MARATHON NEXZONE ZENITH -26.6 yr overdueSANVO RESORTS PVT. LTD. · PALASPE PHATA, RaigarhP52000000667· 72.7% built· 2 complaints
- MARATHON NEXZONE ZODIAC -26.6 yr overdueSANVO RESORTS PVT. LTD. · PALASPE PHATA, RaigarhP52000000661· 72.7% built· 2 complaints
- SWARA RESIDENCY6.6 yr overdueYOGESH ENTERPRISES · Panvel, RaigarhP52000006983· 79.4% built
- RIVERSIDE GREENS6.6 yr overdueGROW PLUS INFRA · Umroli, RaigarhP52000005275· filed Dec 2018 → now Dec 2019· 87.6% built· 2 complaints
- SIRVI Heights6.6 yr overduePYRAMID ENTERPRISES · KAMOTHE, RaigarhP52000012162· 59.1% built
- SILVER ARCH6.6 yr overdueHARE KRISHNA ENTERPRISES · Ulawe, RaigarhP52000006858· 90.9% built
- SIRVI AVENUE6.6 yr overduePYRAMID ENTERPRISES · Karanjade, RaigarhP52000004615· 68.2% built
- NAGESHWAR6.6 yr overdueMADHHU DAULATRAO PATIL · Panvel, RaigarhP52000006769· 74.5% built
- SAI SHRADDHA6.6 yr overdueBALAJI ENTERPRISES · BOPELE, RaigarhP52000015196· 40.9% built
- DHARTI VIEW6.6 yr overdueDHARTI ENTERPRISES · ULWE, RaigarhP52000014220· 9.1% built
- BALAJI DARPAN6.6 yr overdueBALAJI INFRA · Panvel, RaigarhP52000005816· 49.4% built
- SHIVAM APARTMENT6.6 yr overdueGOPIKRISHNA PRABHAKARAN NAIR · Neral, RaigarhP52000008618· 73.2% built
- BHIMASHANKAR6.6 yr overdueMADHHU DAULATRAO PATIL · Panvel, RaigarhP52000011874· 74.5% built
- Tejas Emerald6.6 yr overdueTejas Enterprises · Panvel, RaigarhP52000009591· 90.9% built
- MILLENIUM EMPIRE6.6 yr overdueBHARAT CONSTRUCTION · Panvel, RaigarhP52000001042· 75.2% built
- TARAMATI TOWER WING A B C D6.6 yr overdueVAST CONSTRUCTION · Pen (M Cl), RaigarhP52000002960· 59.1% built
- Eco Greens Phase II6.6 yr overdueEcopark Developers LLP · Karjat, RaigarhP52000000268· 87.9% built· 2 complaints
- UNWIND6.6 yr overdueLIFESPACE REALTY · ULWE, RaigarhP52000000773· 42.7% built
- ALIANA CITY PLAZA6.6 yr overdueZILL DEVELOPERS · Khalapur, RaigarhP52000002935· filed Dec 2018 → now Dec 2019· 42.4% built· 1 complaint
- SARTHAK HOMES6.6 yr overdueSARTHAK INFRA · NANA MASTER NAGAR, RaigarhP52000008473· 90.9% built· 1 complaint
- YASH LAXMI6.6 yr overdueAkshay Developers · Karjat, RaigarhP52000009103· 60% built
- SHUBHAM APARTMENT6.6 yr overdueRAMESH GULAB TUPE · VILLAGE PUSHPAK NODE , TALUKA PANVEL, RaigarhP52000015885· 90.9% built
- SPACE PALACE6.6 yr overdueSPACE ASSOCIATE · Ulawe, RaigarhP52000003658· 90.9% built
- MANGALYA6.6 yr overdueINTEGRATE INFRASPACES · Karjat, RaigarhP52000001461· 69.5% built
- RAVIRAJ GARDEN PHASE I6.6 yr overdueRAJU WHABI · Rees, RaigarhP52000006834· 89.3% built
- V M HERITAGE 26.6 yr overdueDILAWAR SUJATKHAN PATHAN · Khopoli, RaigarhP52000011478· filed Jul 2019 → now Jan 2020· 33.6% built· 1 complaint
- SAI SANGAAM6.6 yr overdueHITESH RAJARAM SAWANT · Ulawe, RaigarhP52000003120· 90.9% built
- ASHISH AASHIYANA6.6 yr overdueMALLESH SUNDARAIH MATLA · Panvel, RaigarhP52000021038· 66.8% built· 2 complaints
- WHITE CASTLE6.6 yr overdueJAGO DEVELOPERS · Karjat, RaigarhP52000012822· filed Jun 2018 → now Jan 2020· 53.2% built
- Hermes6.5 yr overduePersipina Developers Private Limited · Panvel, RaigarhP52000000267· 54.5% built· 2 complaints
- Atlas6.5 yr overduePersipina Developers Private Limited · Panvel, RaigarhP52000000262· 54.5% built· 1 complaint
- Chintamani6.4 yr overdueShree Sadguru Builders · Pen, RaigarhP52000016118· 90.9% built
- VASANT NIRVANA PHASE 25.9 yr overdueM/S SHREE SAI DEVELOPERS · Karjat, RaigarhP52000005693· filed Sept 2019 → now Sept 2020· 68.2% built
- Parvati Emperia5.9 yr overdueR.D Builders · Panvel, RaigarhP52000003221· filed Mar 2019 → now Sept 2020· 65.9% built
- SIGNATURE RESIDENCY5.9 yr overdueDIVINE GANESHA DEVELOPERS · Uran, RaigarhP52000008593· filed Mar 2019 → now Sept 2020· 90.9% built
- Minerva5.9 yr overduePersipina Developers Private Limited · Panvel, RaigarhP52000000284· 54.5% built· 1 complaint
- ARIHANT ARSHIYA PHASE II5.9 yr overdueARIHANT SUPERSTRUCTURES LIMITED · Khalapur, RaigarhP52000002342· filed Mar 2019 → now Sept 2020· 87.4% built
- SOLITAIRE5.9 yr overdueRADIANT BUILDERS · Ulawe, RaigarhP52000001816· 90.9% built
- CHANDRADARSHAN5.9 yr overdueCHANDRADARSHAN DEVELOPERS · Pen (M Cl), RaigarhP52000002075· 87.7% built
- STAR RIGHT - 45.9 yr overdueSTAR RIGHT ESTATES INDIA PRIVATE LIMITED · SECTOR - 01, RaigarhP52000013338· 90.9% built
- KUM KUM BHAGYA5.9 yr overdueKUM KUM ENTERPRISES · Bopele, RaigarhP52000009221· filed Mar 2019 → now Sept 2020· 81.8% built
- DEEP DEVANSH-35.9 yr overdueSAMBHAV ARENA LLP · PANVEL, RaigarhP52000015670· 81.8% built
- PADMAVATI VILLA5.9 yr overduePADMAVATI DEVELOPERS · Ulawe, RaigarhP52000005830· 36.4% built
- RAMDOOT5.9 yr overdueHARESHKUMAR RASIKLAL SHAH · KARANAJADE PANVEL, RaigarhP52000016188· 8.2% built
- VAASTU Prathamesh5.9 yr overdueVAASTU Builders & Developers · Panvel, RaigarhP52000006919· 90.9% built
- SHREYAS APARTMENT5.9 yr overdueRUPAL VINOD TRAPASIA · SECTOR 06, RaigarhP52000016460· 90.9% built
- Shiv Shrushti Apartment5.9 yr overdueHarsh Constrution · NANDIMALNAKA, RaigarhP52000011617· filed Mar 2019 → now Sept 2020· 90.9% built
- ANAND5.9 yr overdueNAREN ENTERPRISES · Karanjade, RaigarhP52000006710· 70.9% built
- SKYLINE JEWEL5.9 yr overdueUNIQUE SUPER INFRA PRIVATE LIMITED · Taloje Panchnad, RaigarhP52000015945· 90.9% built
- SAGARIKA5.9 yr overdueESS GEE TRADEFIN PVT LTD · Uran, RaigarhP52000001052· 90.9% built
- EV CITY CENTRE5.9 yr overdueEV HOMES CONSTRUCTIONS PVT. LTD. · Panvel, RaigarhP52000009119· 97.7% built
- Gokul Niwas5.9 yr overdueShree Krishna Developers · New Panvel, RaigarhP52000013742· 90.9% built
- PLATINUM GHARONDA5.9 yr overdueJAY GURUDEV CONSTRUCTIONS · Bhuwaneshwar (CT), RaigarhP52000004277· 41.8% built
- ROHA GREEN5.9 yr overdueABS GROUP · Roha Ashtami (M Cl), RaigarhP52000002271· 90.9% built
- SOLITARE5.9 yr overdueSHIV PARVATI INFRA PVT LTD · plot no 77, RaigarhP52000014455· 90.9% built
- SHREE MAHALAKSHMI PARK BUILDING NO.25.9 yr overdueJAYVARDHAN INFRAPROJECTS PVT. LTD. · Dhamote, Neral, RaigarhP52000000460· 81.8% built
- GRANDEUR5.9 yr overdueM/S. ROYAL BUILDERS & DEVELOPERS · PEN, RaigarhP52000001212· 47.7% built
- GREEN PALMS5.9 yr overdueGREEN LEAF REALTY · NERAL, RaigarhP52000004448· filed Mar 2019 → now Sept 2020· 90.9% built
- The Mist -Phase I5.9 yr overdueGeeCee Ventures Limited · Karjat, RaigarhP52000007101· 87.2% built· 4 complaints
- ARIHANT ARSHIYA PHASE III5.9 yr overdueARIHANT SUPERSTRUCTURES LIMITED · Khalapur, RaigarhP52000003422· 81.1% built· 2 complaints
- SHREE CHINMAY GAURANG GRIHSANKUL5.9 yr overdueSHREE CHINMAY GAURANG INFRASTRUCTURE · PANVEL, RaigarhP52000004925· 90.9% built· 1 complaint
- DEEP DESTINY5.9 yr overdueSAMBHAV REALTY · KARANJADE, RaigarhP52000002407· 89.5% built
- DWARIKA VALLEY PHASE I5.9 yr overdueDWARIKA REAL INFRA LLP · Matoshree Nagar, RaigarhP52000003025· filed Mar 2019 → now Sept 2020· 78.8% built· 5 complaints
- SHREE SADGURU RESIDENCY5.9 yr overdueSAIDATTA BUILDCON SPECIALITIES PRIVATE LIMITED · SHELU, RaigarhP52000016133· 5.3% built
- RSM NIYATI5.9 yr overdueRSM HOMES LLP · Uran, RaigarhP52000002549· 90.9% built
- DEEP DEVANSH - 25.9 yr overdueSAMBHAV BUILDCON · PUSHPAK NODE, RaigarhP52000016024· 90.9% built
- Mellona5.8 yr overduePersipina Developers Private Limited · Panvel, RaigarhP52000000260· 54.5% built· 2 complaints
- Clio5.8 yr overduePersipina Developers Private Limited · Panvel, RaigarhP52000000184· 54.5% built· 3 complaints
- Shakti Residency5.8 yr overdueShiv Shakti Developers · Panvel, RaigarhP52000010973· filed Oct 2018 → now Oct 2020· 90.9% built
- ANKIT FIONA PHASE 15.8 yr overdueMAHESH SUHAS PADALKAR · BHUWANESHWAR, RaigarhP52000012190· filed Dec 2018 → now Oct 2020· 81.8% built
- SIddhanath apartment5.8 yr overdueSIDDHANATH DEVELOPERS · Karjat, RaigarhP52000009476· filed Apr 2018 → now Oct 2020· 57.3% built
- JIJAI COMPLEX5.8 yr overdueSHUBHAM BUILDERS & DEVELOPERS · NEAR BY TALOJA, RaigarhP52000012017· filed Dec 2018 → now Oct 2020· 85.5% built· 2 complaints
- YOGI KRISHNA5.8 yr overdueSONAL DEV-CON PVT LTD · -, RaigarhP52000001667· 81.8% built
- AATMAY ELIXIR5.8 yr overdueAATMAY REALTORS · Ulawe, RaigarhP52000011324· filed May 2018 → now Oct 2020· 64.8% built· 1 complaint
- RUCHA SOLITAIRE5.8 yr overdueCHINTAMANI PROJECTS · Neral, RaigarhP52000000208· 90.9% built
- AURA VILLAGE PHASE 15.8 yr overdueVECTOR LIFESPACE LLP · pen, RaigarhP52000010261· 83.2% built
- Cluster C5.8 yr overdueShibam Associates · Neral, RaigarhP52000006617· filed Nov 2019 → now Nov 2020· 90.9% built
- Aura5.7 yr overduePersipina Developers Private Limited · Panvel, RaigarhP52000000263· 54.5% built· 2 complaints
- Argus5.7 yr overduePersipina Developers Private Limited · Panvel, RaigarhP52000000265· 54.5% built· 4 complaints
- River View5.7 yr overdueMANGO HOMES · Panvel, RaigarhP52000005972· 46.5% built
- Aurora5.7 yr overduePersipina Developers Private Limited · Panvel, RaigarhP52000000256· 54.5% built
- Helios5.7 yr overduePersipina Developers Private Limited · Panvel, RaigarhP52000000261· 54.5% built
- NAKSHTRAM APARTMENT5.7 yr overdueVASANTI SHANKAR UTEKAR · PRABHAT COLONY, RaigarhP52000015651· 81.8% built
- NEELKANTH VIHAR PHASE I5.7 yr overdueNEELKANTH CONSTRUCTIONS · NEW PANVEL, RaigarhP52000005312· filed Sept 2019 → now Nov 2020· 56.8% built· 5 complaints
- Indiabulls Savroli - 25.7 yr overdueSylvanus Properties Limited · Khalapur, RaigarhP52000001567· 75.9% built· 7 complaints
- RAVI RACHANA5.7 yr overdueR.R.BUILDERS & DEVELOPERS · Panvel, RaigarhP52000001742· filed May 2019 → now Nov 2020· 84.5% built
- ABP VASTAV5.7 yr overdueABP BUILDERS & DEVELOPERS · Pen (M Cl), RaigarhP52000012512· filed May 2019 → now Nov 2020· 36.4% built
- SOLITAIRE5.6 yr overdueM/s. Panache Realty · New Panvel, RaigarhP52000004091· filed Jun 2019 → now Dec 2020· 90.9% built
- Indraprastha5.6 yr overdueA R Constructions · Karanjade, RaigarhP52000001877· filed Jun 2019 → now Dec 2020· 90.9% built
- APEX LOVE5.6 yr overdueAPEX GROUP · Karanjade, RaigarhP52000010576· filed Jun 2019 → now Dec 2020· 90.9% built
- URBAN VISTA II5.6 yr overdueARP INFRA · Khalapur, RaigarhP52000005780· 90.9% built
- ANAND PARK5.6 yr overdueAadinath Builders and Developers · Roha, RaigarhP52000000187· 90.9% built· 1 complaint
- KRISHNA VALLEY- PHASE 15.6 yr overduePRISHTI VENTURE PRIVATE LIMITED · Khalapur, RaigarhP52000000557· 90.9% built
- Eakadanta Sankul Phase-I5.6 yr overdueEAKADANTA REALTORS · Kondale, RaigarhP52000005394· 90.9% built
- Panvelkar Swarajya Phase-I5.6 yr overduePanvelkar Infrastructures Private Limited · Karjat, RaigarhP52000001562· filed Dec 2019 → now Dec 2020· 30.1% built
- SAGAR PLAZA5.6 yr overdueSILVER LAND DEVELOPERS · Neral, RaigarhP52000014190· filed Dec 2019 → now Dec 2020· 90.9% built
- ROYAL PARK5.6 yr overdueSAIGURU ENTERPRISES · Karjat, RaigarhP52000005980· filed Dec 2019 → now Dec 2020· 22.7% built
- Eden Garden5.6 yr overdueM C Babu · Uran, RaigarhP52000005932· filed Dec 2019 → now Dec 2020· 90.9% built
- NAVRANGE APARTMENT5.6 yr overdueFurqan Shafi Navrange · Uran, RaigarhP52000000374· 90.9% built
- A K HERITAGE5.6 yr overdueUBEDULLA ABDUL KARIM PATEL · KHOPOLI, RaigarhP52000020168· 29.1% built
- BLUE RIDGE5.6 yr overdueSKY LINE DEVELOPERS · ULWE, RaigarhP52000015346· 90.9% built· 2 complaints
- MAGNEUM MARVEL5.6 yr overdueMAGNEUM DEVELOPERS · DEVNAGARI, RaigarhP52000016244· 27.3% built
- ORCHID BLISS5.6 yr overdueSUNNY BUILDTECH PRIVATE LIMITED · Ulawe, RaigarhP52000002967· filed Dec 2019 → now Dec 2020· 99.5% built· 1 complaint
- DREAM ENCLAVE5.6 yr overdueAAKAR DEVELOPERS · Panvel, RaigarhP52000008288· 90.9% built
- Madhav Ashirwad5.6 yr overdueDolphin Developers · Khopoli, RaigarhP52000013759· 90.9% built
- Prathamesh Rama Aishwarya5.6 yr overdueSachin Shringarpure Associates, Builders & Developers · Pen (M Cl), RaigarhP52000002046· 81.8% built
- AMOL SAMARTH5.6 yr overdueSACHIN TILAKCHAND KOTHARI · PANVEL, RaigarhP52000010947· 30.5% built
- LAXMI CASTELLO5.6 yr overdueLAXMI GLOBAL · Bopele, RaigarhP52000001905· 89.1% built
- LIFESPACE TEMPLEBELLS5.6 yr overdueLIFESPACE PROPERTIES · Ulawe, RaigarhP52000001134· 44.3% built
- SHAKUNTAL COMPLEX5.6 yr overdueAKHTAR LAMBADE · Mahad, RaigarhP52000013863· 70.9% built
- BALAJI DHAM5.5 yr overdueBALAJI INFRA · Panvel, RaigarhP52000015212· 27.3% built
- CHAITANYA NIWAS5.4 yr overdueRAJENDRA MADHUKAR JOSHI · Plot No.28, RaigarhP52000014297· 90.9% built
- OM CYGNUS5.4 yr overdueOM BUILDERS AND SUPERSTRUCTURES · ULWE, RaigarhP52000010728· 82.1% built
- SHIVTEJ PUSHPA5.4 yr overdueYOGESH RAMDAS SARJINE · Panvel, RaigarhP52000013064· 90.9% built
- Apartment 205.4 yr overdueAbhishek Agrawal · Khanda Colony, RaigarhP52000013194· 90.9% built
- HARI LEELA RESIDENCY5.4 yr overdueHARI LILA ENTERPRISES · Ulawe, RaigarhP52000012706· 90.9% built
- DATTA VIHAR5.4 yr overdueMAITREE BUILDERS · Palaspe, RaigarhP52000013719· 90.9% built
- STUDIO HIGH 5 Phase 25.4 yr overdueRAMSHIROMANI LURKHUR YADAV · DHAMOTE, RaigarhP52000003207· filed May 2019 → now Mar 2021· 81.8% built
- BELMAC RIVERSIDE-I5.4 yr overdueSUPREME HOLDINGS & HOSPITALITY (INDIA) LIMITED · Akurli Village, RaigarhP52000014630· filed Mar 2020 → now Mar 2021· 81.8% built
- SECTOR 22, TALOJA5.4 yr overdueCITY AND INDUSTRIAL DEVELOPMENT CORPORATION OF MAHARASHTRA LIMITED · SECTOR 22, RaigarhP52000017425· filed Dec 2020 → now Mar 2021· 78.2% built· 1 complaint
- PLOT NO 63 SECTOR 12 DRONAGIRI5.4 yr overdueCITY AND INDUSTRIAL DEVELOPEMENT CORPORATION OF MAHARASHTRA LTD · Uran, RaigarhP52000017365· filed Dec 2020 → now Mar 2021· 78.2% built
- INDRAPRASTHA PHASE 2 Includes Building no. 5,95.2 yr overdueM/s Indraprastha Associates · Gondhalpada, RaigarhP52000018038· 79.1% built
- SECTOR-27 TALOJA5.1 yr overdueCITY AND INDUSTRIAL DEVELOPMENT CORPORATION OF MAHARASTRA LIMITED · SECTOR 27, RaigarhP52000017438· filed Mar 2021 → now Jun 2021· 64.5% built
- QN GREENS PHASE 25.1 yr overdueQUALITAS NAMAN HOME MAKERS LLP · TALOJA PHASE 2, RaigarhP52000015726· 86.4% built
- RAPID RESIDENCY5.1 yr overduePARK VIEW DEVELOPERS · NERAL, RaigarhP52000010355· 99% built· 3 complaints
- DIVYA PLAZA5.1 yr overdueADITYA ENTERPRISES · Karjat, RaigarhP52000014481· 90.9% built
- PRABHU LOK5.1 yr overduePRABHU LOK ENTERPRISES · Khalapur, RaigarhP52000003248· 90.9% built
- SHREE RAM KRISHNA4.9 yr overdueVARDHAMAN DEVELOPERS · KARANJADE PANVEL, RaigarhP52000017661· 82.7% built
- KVK KESHAR BAUG I4.8 yr overdueM/S. KVK HOMES · Navi Mumbai Panvel Rigardh (CT), RaigarhP52000002105· 90.9% built
- Krishna Residency4.7 yr overdueS P Construction · Khalapur, RaigarhP52000000007· 90.9% built
- MAJESTIC VILLA4.7 yr overdueSKY CITY DEVELOPERS · Uran, RaigarhP52000002768· 81.8% built
- ARIHANT ALOKI PHASE I4.6 yr overdueARIHANT AASHIYANA PRIVATE LIMITED · Karjat, RaigarhP52000004014· filed Dec 2019 → now Dec 2021· 86.3% built
- RIVER VIEW APARTMENTS WING C4.6 yr overdueMs Babubhai Construction Co · Khalapur, RaigarhP52000007803· 90.9% built
- SANSKRITI INFRA4.6 yr overdueSANSKRITI INFRA · Uran, RaigarhP52000004608· 90.9% built
- Shree Balaji Hieghts4.6 yr overdueRAJENDRA SITARAM SAWANT · Roha Ashtami (M Cl), RaigarhP52000005765· 43.9% built
- Raj4.6 yr overdueRajhas Enterprise · PANVEL, RaigarhP52000013982· 21.8% built
- Ambika Nandan4.6 yr overdueLumbaram Modaram Patel · Pushpak New, RaigarhP52000018606· 90% built
- MORAJ MAA SMRITI4.6 yr overdueMORAJ BUILDING CONCEPTS PRIVATE LIMITED · Khalapur, RaigarhP52000005053· 72.1% built
- MILLENNIUM ICON4.6 yr overdueMILLENNIUM INFRA · Ulawe, RaigarhP52000008226· 69.7% built
- SILVER PALACE4.6 yr overdueHARE KRISHNA ENTERPRISES · ULWE, RaigarhP52000016353· 90.9% built
- KRISHNA LANDMARK4.6 yr overdueSHREE HARI CONSTRUCTION · Ulawe, RaigarhP52000013703· 81.8% built
- GALAXY GARDEN PLOT 14.6 yr overdueS K DEVELOPERS · Karjat, RaigarhP52000006725· filed Dec 2019 → now Dec 2021· 65.6% built
- Tulsi Centre Point4.6 yr overdueNavkar developers · NERAL, RaigarhP52000000571· filed Dec 2019 → now Dec 2021· 52.3% built
- Anant Greens Phase I4.6 yr overdueAnant Realty · Karjat, RaigarhP52000000955· 90.9% built
- WHITE JASMINE4.6 yr overdueSPS CONSTRUCTIONS · Panvel, RaigarhP52000000254· 90.9% built
- BHAKTI DARSHAN4.6 yr overdueVISHAL ENTERPRISES · ULWE, RaigarhP52000016425· 81.8% built
- STAR CITY4.6 yr overdueCITY ENTERPRISES · MAMDAPUR, RaigarhP52000015102· 81.8% built
- AADITYA GURUKRUPA4.6 yr overdueARVIND MAHADEV SAWLEKAR · NEAR PARAMOUNT HOSPITAL, RaigarhP52000014717· 90.9% built
- SAI SAFALYA4.6 yr overduePRASAD ESTATE · OLD POST OFFICE PANVEL, RaigarhP52000016178· 9.1% built
- RAM VILLA4.6 yr overdueSHREE RUDRA ENTERPRISES · Uran, RaigarhP52000014853· 90.9% built
- WHITE ASTER4.6 yr overdueSPS CONSTRUCTIONS · Panvel, RaigarhP52000000172· 90.9% built
- KANHA SHYAM RESIDENCY 24.6 yr overdueNEW ROYAL ENTERPRISES · KARANJADE, RaigarhP52000015021· 90.9% built
- GARDENIA4.6 yr overdueM/S KAMDHENU LIFESPACES · GHOTGAON, RaigarhP52000015108· 89.1% built
- SAI KIRAN4.6 yr overdueUJWALA BABAN GHADGE · NAVI MUMBAI, RaigarhP52000015403· 90.9% built
- Dreams Park - Bliss4.6 yr overdueMohd Khalid Mohd Iqbal Shaikh · Neral Mamdapur Sankul, RaigarhP52000016115· 90.9% built
- PANKAJ RESIDENCY4.6 yr overduePANKAJ HOMES · KARJAT, RaigarhP52000007097· 90.9% built
- KEHKASHAN APARTMENT4.6 yr overdueA M ENTERPRISES · MAMDAPUR, RaigarhP52000016006· 9.1% built
- KAPILA4.6 yr overdueSAI DEVELOPERS · TALOJA, RaigarhP52000017737· 60% built
- SHRIHAAN RESIDENCY4.6 yr overdueRasika Construction · NEAR DR TIWARI HOSPITAL, RaigarhP52000001459· 90.9% built
- DEEP DEVANSH - 44.6 yr overdueSAMBHAV ABODE · PUSHPAK NEW NAVI MUMBAI, RaigarhP52000016452· 79.5% built
- Mateshwari Regency Wing A104.6 yr overdueKrupa Mateshwari Home Makers · Karjat, RaigarhP52000006464· 68.6% built
- CROWN PHASE 14.6 yr overdueSHREE SAMARTH REALITY · Karjat, RaigarhP52000013990· 90.3% built
- BAY VIEW RESIDENCY PHASE 2 BLDG 34.6 yr overdueJM DEVELOPERS · Khalapur, RaigarhP52000006354· 70.5% built· 1 complaint
- Kalpataru Waterfront4.6 yr overdueKalpataru Plus Sharyans · Panvel, RaigarhP52000002819· 90.5% built· 1 complaint
- Mango Homes4.6 yr overdueAshirvad Projects · SHANKAR NAGAR, RaigarhP52000006969· 63.3% built
- KRUSHANPINGAKSH4.6 yr overdueSHRI SIDDIVINAYAK CONSTRUCTION · PANVEL, RaigarhP52000014527· 37.3% built
- SIDDHIVINAYAK MAHIMA4.6 yr overdueSIDDHIVINAYAK HOMES · Panvel, RaigarhP52000000840· 90.9% built
- ABRI NEST4.6 yr overdueABUFAIZ RABBANI KHAN · SECTOR 06, RaigarhP52000016347· 63.6% built
- Siddhivinayak Solitaire4.6 yr overdueAshok Motiram Jaidhara · Ulwe, RaigarhP52000008999· 90.9% built
- APEX VILLA4.6 yr overdueAPEX GROUP · KARANJADE, RaigarhP52000015666· 90.9% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.