All MahaRERA projects
23,645 registered projects with disclosed construction progress or complaint records. Page 35 of 48.
Pune
- ASEEM · GHORPADIRANADE REALTORS LLP · P52100023060 · possession Dec 2023 · 82.5% built
- ANP - LANDMARK · Near Bhumkar ChowkFive Star Construction Company · P52100023061 · possession Mar 2023 · 81.8% built
- GULMOHAR PARK B PHASE 2 · DEHUMercury Artharaj Landmarks AOP · P52100023073 · possession Dec 2024 · 90.9% built
- RUDRA DESIRE · AMBEKAR MALA BABURAO NAGARRADHAKRUSHANA MADHUKAR KALE · P52100023077 · possession Mar 2023 · 63.6% built
- SAMRAT SARTHAK · 411046BORA REALTY LLP · P52100023095 · possession Feb 2025 · 90.9% built · 1 complaint
- KONARK ALPHA · KHARADITreon Developers LLP · P52100023108 · possession Dec 2023 · 72.7% built
- FOREST GROVE AT GODREJ PARK GREENS · MAMURDI VILLAGEGodrej Skyline Developers Limited · P52100023129 · possession Sept 2027 · 70.9% built · 37 complaints
- AVON VISTA PROJECT 3 · PUNENAIKNAVARE PROFILE CONSTRUCTIONS PVT LTD · P52100023133 · possession Jun 2023 · 100% built · 3 complaints
- UTKARSH HEIGHTS · RAVIWAR PETHUTKARSH ASSOCIATES · P52100023142 · possession Mar 2029 · 21.8% built
- Akshara Platinum · MulshiGARVE DEVELOPERS · P52100023153 · possession Jun 2023 · 90.9% built · 3 complaints
- ELINA LIVING PHASE III · KONDHWARamkrishna Cine Exhibitors · P52100023154 · possession Jun 2024 · 100% built · 1 complaint
- Vardhaman Moonstone · TathwadeVardhaman Associates · P52100023184 · possession Mar 2025 · 100% built · 1 complaint
- Menlo Business Hub · HaveliMENLO REALTY LLP · P52100023185 · possession Dec 2027 · 59.1% built
- ROHAN ANAND PHASE I · SomataneROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED · P52100023186 · possession Dec 2024 · 90.6% built · 1 complaint
- ARV REGALIA · HaveliUNITREE INDIA REALTY LLP · P52100023200 · possession Dec 2026 · 89.1% built
- ROHAN YUVA - BLDG D · HaveliROHAN BUILDCON · P52100023214 · possession Mar 2027 · 87.9% built
- SHERKAR-BANKAR RESIDENCY · SURAYANAGARISACHIN SAYAJI BANKAR · P52100023248 · possession Dec 2020 · 90.9% built
- 72 RESIDENCE · Pune City72 RESIDENCE · P52100023265 · possession Dec 2026 · 45.5% built
- Kalpataru Exquisite - Wing 4 · WakadKalpataru Retail Ventures Private Limited · P52100023268 · possession Dec 2025 · 52.3% built
- Sai Sparsh · HaveliVAISHNAVI DEVELOPERS & BUILDERS · P52100023299 · possession May 2028 · 70% built
- JAY MALHAR RESIDENCY · SADASHIV PETHSHREE BUILDER AND DEVELOPER · P52100023318 · possession Jan 2024 · 90.9% built
- TINGRE ELITE PHASE 1 · LOHEGAONNITIN BABANRAO TINGRE · P52100023339 · possession Dec 2026 · 89.1% built
- Jaishankar Heights · HaveliSarthak Developers · P52100023349 · possession Dec 2023 · 100% built
- Shankeshwar Wisdom · MoshiNitin Chhaganlal Jain · P52100023359 · possession Sept 2023 · 81.8% built
- KRUSHNAKUNJ HOUSING SOCIETY · SAWANT NAGARDISHA CONSTRUCTIONS · P52100023366 · possession Dec 2023 · 81.8% built
- Kshitij Residency · Pune CityYash Buildcon · P52100023369 · possession Dec 2026 · 71.3% built · 7 complaints
- YashONE Pirangut Phase II · MulshiVilas Javdekar Eco Homes · P52100023378 · possession Dec 2022 · 12.7% built
- PARITOSH D · BALEWADISHARADA ALLIANCE SHELTERS · P52100023380 · possession Nov 2023 · 65.5% built
- VENKATESH GRAFFITI ELAN PHASE 1 · Keshav Nagar, MundhwaSHREE VENKATESH BUILDCON PVT LTD · P52100023431 · possession May 2024 · 90.9% built
- DREAMVILLE APARTMENT · SAWANT NAGARSAWANT AND MOTWANI ASSOCIATES · P52100023444 · possession Dec 2025 · 81.8% built
- ROHAN ANAND PHASE II · MawalROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED · P52100023451 · possession Dec 2026 · 53.6% built · 1 complaint
- MANTRA MONARCH PHASE 1 · HaveliMANTRA KINGDOM PRIVATE LIMITED · P52100023453 · possession Jun 2026 · 100% built · 1 complaint
- MangoNest Commercial · Vadgaon KhSanas Kulkarni Ventures · P52100023459 · possession Dec 2021 · 100% built
- Building Wing A Phase I Sudarshan Apartment Karve Nagar Pune · Village Hingne BudrukAnubhavshri Realty Pvt. Ltd. · P52100023468 · possession Dec 2024 · 61.8% built
- MAITRI PARK · MulshiSHREE CONSTRUCTIONS · P52100023471 · possession Jul 2027 · 44.4% built
- VTP Cygnus BuildingT12 and Commercial · ManjariARHUM ERECTORS PRIVATE LIMITED · P52100023473 · possession Jun 2025 · 84.6% built · 3 complaints
- RKL Anand ph1 · TathawadeLUNKAD GRUH NIRMAN COMPANY · P52100023493 · possession Jun 2023 · 90.9% built
- SHAMBHAVI · NEAR WOODS ROYALEM/S KHARDE PATIL · P52100023514 · possession Oct 2023 · 90.9% built
- N B OPAL PHASE -I · Near Podar international schoolNanasaheb Bhintade Spacess Pvt. Ltd. · P52100023516 · possession Dec 2023 · 98.2% built · 1 complaint
- ABHILASHA PARK A BUILDING · HaveliSAROVAR ASSOCIATES · P52100023526 · possession Jul 2023 · 100% built
- SHIVNIL · NEAR MOSHI TOLL PLAZASHIVKAILAS DEVELOPMENT CORPORATION · P52100023537 · possession Mar 2021 · 81.8% built
- CHANDRARANG SERENITY · MulshiCHANDRARANG DEVELOPER AND BUILDERS PVT. LTD. · P52100023540 · possession Dec 2028 · 89.1% built
- Maruti Enclave · HaveliMaruti Enclave · P52100023543 · possession Dec 2027 · 51.8% built
- CASALINO TOWERS PHASE II · HANDEWADISAI SIDDHI PROMOTERS AND BUILDERS · P52100023594 · possession Dec 2023 · 9.1% built · 1 complaint
- Opulent Properties Phase-II · HaveliOpulent Properties Phase -II · P52100023598 · possession Jan 2029 · 60.5% built
- Pankaj Aasmaan Phase IV · HaveliPankaj Developers · P52100023607 · possession Dec 2027 · 81.8% built
- Pankaj Aasmaan Phase V · HaveliPankaj Developers · P52100023613 · possession Dec 2026 · 4.5% built
- TIERRA PHASE 2 · HaveliTERRA PROPERTY · P52100023621 · possession Dec 2028 · 25.5% built
- Ajmera Exotica Phase-II · Wagholi GaonthanGOPINATH DEVELOPERS LLP · P52100023633 · possession Dec 2024 · 100% built
- SADGURU HERITAGE · HaveliSB REALTY · P52100023640 · possession Dec 2027 · 60.5% built
- SONAI DADA HEIGHTS · PUNEK M DEVELOPERS · P52100023642 · possession Nov 2022 · 52.9% built
- 39 PART PLUS 40 PART WADGAON KH TAL HAVELI DIST PUNE PHASE I · WADGAON KHPMAY CELL,PUNE MUNICIPAL CORPORATION · P52100023682 · possession Dec 2023 · 90.9% built
- MEMORIES 90 -PHASE III · MOHAMMADWADI PUNEM/s NAMO DEVELOPERS · P52100023691 · possession Dec 2025 · 75% built
- Pankaj Aasmaan Phase VI · HaveliPankaj Developers · P52100023709 · possession Dec 2027 · 81.8% built
- GANGA SERIO E F BUILDING · KHARADIGOEL GANGA LANDMARKS LLP · P52100023713 · possession Dec 2024 · 90.9% built · 2 complaints
- KANVAS B BUILDING · HaveliAnshul Bhosale Realty · P52100023770 · possession Dec 2027 · 38.6% built
- KUMAR SELENA A BUILDING · PASHANKumar Construction and Properties Pvt Ltd · P52100023773 · possession Dec 2024 · 63.6% built
- Nirman Vishnubaug · ERANDWANEPRIVEUS LIFESPACES LLP · P52100023778 · possession Jan 2024 · 90.9% built
- ABC-Convenience Shopping Phase-1 · Near Windmill villageAxis Paradigm Infra Properties · P52100023786 · possession Apr 2023 · 100% built
- CITY PLAZA · CHAKANBharat Builders and Developers · P52100023832 · possession Jun 2026 · 90.9% built
- Kasturi · kadolkar colonyNAKSHATRA BUILDCON · P52100023848 · possession Dec 2022 · 90.9% built
- GANGA DHAM TOWER C BIBVEWADI PUNE · Pune CityLegends County Landmark Pvt Ltd · P52100023864 · possession Jun 2027 · 11.4% built
- AAIJI PINK CITY · SATHE VASTIAAIJI REALTY · P52100023905 · possession Mar 2026 · 81.8% built
- SHIVKRUPA PRESTIGE · DHAYRISHIVKRUPA CONSTRUCTION · P52100023925 · possession Dec 2023 · 62.7% built
- NIVAAN MEADOWS · HaveliVISHAL CHUGERA PROPERTIES INDIA PRIVATE LIMITED · P52100023936 · possession Dec 2026 · 9 complaints
- Goodwill Unique Zest County Phase 2 · LohegaonZENITH BUILDCON · P52100023942 · possession Jun 2023 · 90.9% built
- 7 Plumeria Drive- Phase 2 · PunawaleB A Consulting · P52100023970 · possession Dec 2023 · 44.7% built
- Metro Life Maxima Residences Phase II · Next to Indira College of Commerce and ScienceRAMA SYNERGY SPACES · P52100023984 · possession Dec 2023 · 75.3% built · 11 complaints
- Matoshri Enclave · HaveliMatoshri Enclave · P52100024001 · possession Dec 2026 · 61.8% built
- OM SAI AVENUE · HaveliTANOJ DIGAMBAR BORATE · P52100024012 · possession Dec 2027 · 72.3% built
- RIOLAND A WING · WAKADWAMAN KALATE INFRASTRUCTURE · P52100024033 · possession Dec 2023 · 72.7% built
- WEST END VILLAGE PHASE-II BUILDING - H · HaveliTHE CONSTRUCTION AND DEVELOPMENT COMPANY · P52100024034 · possession Dec 2019 · 90.9% built
- PRISTINE GREENS PHASE III · PUNEPRISTINE PROPERTIES · P52100024045 · possession Dec 2024 · 98.2% built · 2 complaints
- HAGAWANE LANDMARK · HaveliHAGAWANE LANDMARK · P52100024051 · possession Dec 2026 · 81.8% built
- KAWAL ARCADE · NANA PETHSETHI GREENSCAPE VENTURE · P52100024053 · possession Sept 2026 · 72.7% built
- RR Business Centre · HaveliRIVER RESIDENCY DEVELOPERS · P52100024063 · possession Dec 2027 · 27.3% built · 2 complaints
- VERDURA · DUDULGAONSHUBHASHREE DEVELOPERS · P52100024065 · possession Mar 2023 · 81.8% built · 1 complaint
- RACHANA ETERNIA · BANERAthang Spaces LLP · P52100024077 · possession Dec 2023 · 81.8% built · 1 complaint
- YashONE Hinjawadi - Phase II · HinjawadiVilas Javdekar Eco Shelters Private Limited · P52100024108 · possession Mar 2025 · 100% built
- SHRIDHAR RESIDENCY · DAUNDMahendra Mahadeo Bhongle · P52100024114 · possession Sept 2023 · 100% built
- Mamurdi MHADA North · HaveliGodrej Skyline Developers Limited · P52100024142 · possession Mar 2027 · 72.9% built · 9 complaints
- 173 West Oaks · WakadSigma Housing · P52100024201 · possession Dec 2023 · 79.6% built
- Legacy Vista · RahataniLEGACY LIFESPACES LLP · P52100024212 · possession Dec 2023 · 86.4% built
- Lodha Pune NIBM Project · MohamadwadiLodha Developers Limited · P52100024215 · possession Jul 2026 · 69.7% built · 2 complaints
- Lolage Corner · Havelishrinivas tukaram badve · P52100024220 · possession Mar 2025 · 81.8% built
- SANCHES RESIDENCY · HaveliSANJAY SHIVAJIRAO KHOMANE · P52100024223 · possession Dec 2027 · 20.2% built · 1 complaint
- ANP - ATLANTIS -Phase I · BALEWADIM/S.Five Star Shelters · P52100024229 · possession Dec 2025 · 91.4% built
- BLUE ROOF SERA · SUSRainbow Construction · P52100024232 · possession Apr 2024 · 72.9% built
- AASAWARI CO. OP. HSG.SOCIETY · IDEAL COLONYVYAS BUILDCON PVT. LTD. · P52100024235 · possession Dec 2023 · 81.8% built
- EELA Phase-III · PunawaleM/s. Siddhashila Developers · P52100024257 · possession Jun 2022 · 90.9% built
- BA Swadesha- Phase 1 · Moshi BorhadewadiSpectrum Realty · P52100024275 · possession Dec 2023 · 71.4% built · 1 complaint
- JI TOWER · BARAMATIJADHAV CONSTRUCTION · P52100024294 · possession Oct 2023 · 81.8% built · 2 complaints
- GANGA GLITZ G UNDRI PUNE · UNDRILegends County Landmark Pvt Ltd · P52100024304 · possession Dec 2024 · 81.8% built
- VISION STARWEST PHASE - 1 · TATHAWADEVISION CREATIVE INFRA · P52100024346 · possession Jul 2023 · 90.9% built
- GREENVILLE · CHOURAINAGARSHREEJI DEVELOPERS · P52100024364 · possession Dec 2026 · 82.3% built
- 24K Sereno Building E · HaveliNOW Realty Promoters and Builders Private Limited · P52100024374 · possession Jun 2026 · 84.5% built · 1 complaint
- SILVER BROOK WING A · BAVDHAN KRBehede Properties LLP · P52100024383 · possession Mar 2023 · 48.6% built
- Majestique City building E · WagholiMANISH DWARKADAS MAHESHWARI · P52100024401 · possession Dec 2025 · 100% built
- MANORAMA HEIGHTS · SECTOR NO 9MAULI KRUPA DEVELOPERS · P52100024419 · possession Dec 2023 · 28.2% built
- Bluegrass Residences Tower II · Pune CitySagitarius Ecospaces LLP · P52100024441 · possession Apr 2026 · 81.8% built
- LAXMI AVENUE · NEAR PRISTINE PROLIFE PHASE IIILAXMAN SAIBANA MEHETRE · P52100024445 · possession Jun 2024 · 86.4% built
- Venkatesh Aveneu · MulshiRajHeramb Properties · P52100024485 · possession Jan 2028 · 36.6% built
- Laxmi Balaji Apartment · HaveliSuresh Balliaha Nagraj · P52100024488 · possession Dec 2027 · 58.6% built
- W-57 · WakadAdi Siddhashila Associates · P52100024520 · possession Dec 2025 · 89.1% built
- W-BIZ · WakadAdi Siddhashila Associates · P52100024521 · possession Dec 2024 · 53.9% built
- VTP Cygnus Building T10 · manjariARHUM ERECTORS PRIVATE LIMITED · P52100024551 · possession Jun 2025 · 87.9% built · 13 complaints
- Legacy Liva · Near Legacy Crest ProjectWhite Properties · P52100024554 · possession Mar 2024 · 90.9% built
- Samarth Srushti · ChikhaliSamarth Buildcon · P52100024587 · possession Mar 2025 · 90.9% built
- GYANGANGA E · RAHATANIGANGA GALAXY PROMOTERS · P52100024597 · possession Dec 2020 · 99.1% built
- 47 East - A · HaveliKumar Properties and Developers LLP · P52100024598 · possession Mar 2027 · 86.4% built · 59 complaints
- GODREJ BOULEVARD · Manjri KhurdManjari Housing Projects LLP · P52100024616 · possession Sept 2025 · 81.8% built · 3 complaints
- Venkatesh Skydale Phase 2 · Pune CityShree Venkatesh Buildcon · P52100024644 · possession Dec 2025 · 100% built
- PARK59 · MulshiSHIV DEVELOPERS · P52100024649 · possession Dec 2027 · 87.2% built
- AMBAR RESIDENCY A BUILDING · JALOCHIMEHTA BUILDERS · P52100024670 · possession Jan 2024 · 90.9% built
- CASA RIO PHASE II · CHIKHALIYASHODEEP ENGINEERS & BUILDERS · P52100024679 · possession Dec 2022 · 90.9% built
- EXCEL CELESTIA RESIDENCY E AND F AND MHADA · HaveliEXCEL HOUSING · P52100024681 · possession Oct 2026 · 95% built · 1 complaint
- Wellwisher Abode · HaveliWellwisher Corp · P52100024682 · possession Dec 2026 · 29.1% built
- Dominion Park · Near PCMC water tankAmalfi Realty Pvt Ltd · P52100024698 · possession Dec 2023 · 10.5% built
- YUTHIKA ENCLAVE · HaveliAJIT DEVELOPERS AND COMPANY · P52100024706 · possession Dec 2021 · 81.8% built
- SAI MILLENIUM · PUNAWALESHIV CONSTRUCTIONS · P52100024710 · possession Apr 2025 · 90.9% built
- GANGA ALTUS KHARADI PUNE · Pune CityLegends County Landmark Pvt Ltd · P52100024713 · possession Dec 2028 · 77.3% built · 2 complaints
- POLITE HARMONY COMMERCIAL CENTRE · CHIKHALIPOLITE PROMOTERS AND BUILDERS · P52100024722 · possession Mar 2022 · 90.9% built
- MAULI · BANERAA ASSOCIATES · P52100024756 · possession Sept 2022 · 90.9% built
- UP-LIFE - PHASE - 6 - F - MAGENTA · MulshiAVIOR SHELTERS LLP · P52100024759 · possession Dec 2029 · 36.1% built
- Vithal Niwas · Pune CityM/S SHREERAM BUILDERS · P52100024779 · possession May 2023 · 81.8% built
- Supreme Estia Phase I · BanerSupreme Palatial Developers LLP · P52100024783 · possession Dec 2025 · 90.9% built
- Shankeshwar Gravity · NAMunisuvrat Properties · P52100024786 · possession Dec 2025 · 90.9% built
- AVANI NIVAS · CHARHOLIAVANI CORP. · P52100024811 · possession Dec 2025 · 72.7% built · 1 complaint
- VERTICA PHASE 1 · HaveliV Realty · P52100024817 · possession Dec 2028 · 72.2% built
- DOLPHIN ARCADE · HaveliSHREE MAHAVIR TILES & CEMENT PRODUCTS · P52100024820 · possession Dec 2022 · 100% built
- Karma Rejoice · HaveliRejoice homes LLP · P52100024825 · possession Jun 2028 · 51.3% built · 2 complaints
- Sun Enclave · HaveliNaresh Ramchandra Mittal · P52100024848 · possession Dec 2023 · 86.4% built
- UP-LIFE-PHASE-2-EMERALD · MulshiAVIOR SHELTERS LLP · P52100024865 · possession Dec 2029 · 30.6% built
- Horizons at Wakad, Phase-2 · WakadADI REALTIES · P52100024872 · possession Dec 2023 · 70.9% built
- Solitaire Business Hub-III-Phase-III,Baner · HaveliBaner Land Developers LLP · P52100024890 · possession Dec 2026 · 71.8% built · 16 complaints
- ABHILASHA · KothrudASHWAMEDH SPACES PRIVATE LIMITED · P52100024895 · possession Dec 2023 · 9.1% built
- PGD PINNACLE - A WING · KESHAVNAGARPGD Land LLP · P52100024896 · possession Sept 2023 · 90.9% built
- MANTRA MONARCH PHASE 3 · HaveliMANTRA KINGDOM PRIVATE LIMITED · P52100024918 · possession Jun 2026 · 100% built
- UP-LIFE-PHASE-5-IVORY · MulshiAVIOR SHELTERS LLP · P52100024921 · possession Dec 2029 · 21.8% built · 2 complaints
- Bhakti Park · AmbegaonPravin Haibatrao Shinde · P52100024924 · possession Aug 2024 · 28.2% built
- ACE AURUM III TOWER 04 · RAVETJHAMTANI REALTY PRIVATE LIMITED · P52100024925 · possession Jun 2025 · 50.5% built
- SENSORIUM, PHASE III · Village MaanJoyville Shapoorji Housing Private Limited · P52100024965 · possession May 2025 · 68.5% built
- COCONEST · HaveliLAKSHADEEP DEVELOERS · P52100024968 · possession Dec 2027 · 50.2% built
- ANTAAYA · BalewadiBALASAHEB BHATTU KARANJULE · P52100024983 · possession Jun 2025 · 52.7% built
- Sai-Sanjay Residency · PuneSaipuja Buildcon · P52100024996 · possession Jun 2022 · 90.9% built
- Legacy Riverside · ChikhaliSun Properties · P52100025012 · possession Mar 2024 · 90.9% built
- AMOGH HEIGHTS · PARVATIAMOGH PROMOTERS & BUILDERS · P52100025019 · possession Oct 2024 · 50.9% built
- SWAPNAPURTI · RAHATANI PCMCJ J REALTIES · P52100025050 · possession Dec 2023 · 90.9% built
- The Mint - Phase 1 · Pune CityThe Mint - Phase 1 · P52100025053 · possession Apr 2027 · 4.7% built
- ACE AURUM III TOWER 06 · RAVETJHAMTANI REALTY PRIVATE LIMITED · P52100025056 · possession Dec 2024 · 50.2% built
- PRIME ANGAN · Kesanand,PunePRIME DESTINY · P52100025067 · possession Dec 2026 · 88.3% built
- SHUBHALABHA SOCIETY · Pune CityIRIS CONSTRUCTION · P52100025073 · possession Mar 2027 · 85.5% built
- Bluegrass Business Park - Tower B · YeravadaFarrokh Framji Wadia · P52100025080 · possession Dec 2028 · 0.9% built
- ASHIRWAD HOMES · SR NO 275/1B, PLOT NO 05,DHORE WADA,NEAR RAILWY-STATION WADGAON MAWALBHARAT PREMCHAND KOTHARI · P52100025081 · possession Mar 2023 · 90.9% built
- AMBAR VIHAR · Near Gananjay SocietyHARIVIJAY INFRACON · P52100025090 · possession Aug 2023 · 100% built
- ESPACIO - A AND B · HaveliKNIGHT WEST REALTY LLP · P52100025098 · possession Dec 2026 · 81.4% built
- ESPACIO - WING C D AND E/MHADA · BALEWADIKNIGHT WEST REALTY LLP · P52100025099 · possession Dec 2025 · 78.8% built
- Solitaire Business Hub-III-Phase-II,Baner · HaveliBANER LAND DEVELOPERS LLP · P52100025108 · possession Dec 2026 · 71.8% built · 21 complaints
- Easterlia · LohegaonSpacemint Realty LLP · P52100025118 · possession Dec 2026 · 89.1% built
- MORELLA PHASE II · MulshiBuchade Patil Developers · P52100025135 · possession Dec 2026 · 4.5% built
- ACE AURUM III TOWER 03 · RAVETJHAMTANI REALTY PRIVATE LIMITED · P52100025143 · possession Jun 2025 · 49% built
- 43 Privet Drive- C Building · BalewadiS S Properties · P52100025169 · possession Dec 2023 · 70% built
- DOLPHIN VISTA · CHIKHALIMAHALAXMI ENTERPRISES · P52100025219 · possession Dec 2022 · 90.9% built
- L Axis Commercial Centre · HaveliPharande Promoters and Builders · P52100025221 · possession Dec 2026 · 98.5% built
- BramhaCorp Smart · HaveliBramhacorp Limited · P52100025256 · possession Dec 2026 · 72.7% built
- THE CENTRAL PARK PHASE -I · HaveliR RETAIL VENTURES PRIVATE LIMITED · P52100025260 · possession Dec 2026 · 100% built · 7 complaints
- SAEE ARJUN · CHOVISAWADIVISHAL HARIRAM TAPKIR · P52100025294 · possession Mar 2022 · 100% built
- 74DownTown · Baner Shroff Road Pune 411045Aura Realtors · P52100025327 · possession Jul 2023 · 90.9% built
- Shri Datta Puram · GAT NO 49, BHUKUM, PUNESAMRUDDHI PROPERTIES · P52100025332 · possession Mar 2027 · 79.5% built
- ANAND EXCLUSIVE · BABRAS MALA INDAPURANAND CONTRACTORES AND DEVELOPERS · P52100025418 · possession Dec 2024 · 90.9% built
- MELANGE RESIDENCES - PHASE IV · Hinjawadi Phase IIIRAMA SYNERGY SPACES · P52100025451 · possession Dec 2022 · 94.5% built
- Laxmi Homes · HaveliPokar Realty · P52100025463 · possession Jun 2024 · 72.7% built
- K SQUARE · OPP VP COLLAGEKHATRI AND KHATMODE ASSOCIATES · P52100025484 · possession Jan 2024 · 81.8% built
- Lunawat Apex · AundhNavya Prem Developers LLP · P52100025503 · possession Jun 2023 · 81.8% built
- Manhattan - H building · WagholiMAJESTIQUE HOUSING LLP · P52100025505 · possession Jun 2025 · 100% built
- MIDORI TOWER PHASE 2 · HaveliVIKRAM DEVELOPERS AND PROMOTERS · P52100025516 · possession Sept 2027 · 55.6% built · 1 complaint
- SILVER SPACE A WING · PIMPLE NILAKHDAMJI VASTA MAKWANA · P52100025541 · possession Dec 2020 · 81.8% built
- VANTAGE CAPITAL · HINJEWADIVINODE WAKADKAR INFRASTRUCTURE · P52100025551 · possession Mar 2027 · 80.9% built
- Sai Mystique Phase III Building L · HaveliSai Shree Developers · P52100025575 · possession Dec 2026 · 72.7% built
- VENKATESH SKYDALE PHASE 3 · Pune CityShree Venkatesh Buildcon · P52100025576 · possession Jun 2026 · 100% built
- Olympiodoros Phase - II · LonavalaNeel Buildcon · P52100025577 · possession Jun 2027 · 72.6% built
- MAJESTIQUE SIGNATURE TOWERS C1 · BALEWADIM/s. Samarth Builders · P52100025590 · possession Dec 2024 · 100% built
- Eden Spaces Phase 2 · KiwaleElysian Realty · P52100025591 · possession Aug 2024 · 86.4% built
- VJ One Avenue · HinjawadiVilas Javdekar Eco Shelters Private Limited · P52100025592 · possession Dec 2023 · 76.1% built · 1 complaint
- Nyati Elan West III · WAGHOLIPSQUARE BUILDERS LLP · P52100025599 · possession Sept 2023 · 88.1% built
- VENKATESH SKYDALE PHASE 4 · Pune CityShree Venkatesh Buildcon · P52100025615 · possession Jun 2027 · 100% built · 2 complaints
- VENKATESH GRAFFITI GLOVER PHASE 1 · KESHAV NAGAR MUNDHWASHREE VENKATESH BUILDCON PVT LTD · P52100025621 · possession Sept 2024 · 90.9% built
- AAKAR INDIGO 2 · CHOVISAWADIAAKAR REALTIES · P52100025648 · possession Jun 2023 · 90.9% built
- ROHAN ABHILASHA 2 WING A · WagholiROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED · P52100025655 · possession Mar 2024 · 80% built
- ROHAN ABHILASHA 2 WING B · WAGHOLIROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED · P52100025681 · possession Dec 2024 · 88.6% built
- SAURABH HEIGHTS · KesnandSAURABH CONSTRUCTION · P52100025706 · possession Mar 2022 · 100% built
- Sai Proviso Emporis Phase 1 · MulshiEMPORIS INFORMATION TECHNOLOGIES LLP · P52100025711 · possession Dec 2026 · 46% built
- Harsh Apartment · RahatniMangaldeep Associates & Developers · P52100025753 · possession Dec 2022 · 81.8% built
- Prasun Morya · ThergaonPrasun Associates · P52100025761 · possession Dec 2020 · 90.9% built
- ADIAMVILLE · Ahead Balaji TempleM/S J.N.BUILDERS · P52100025763 · possession Jun 2026 · 72.5% built
- Golden Fortune · WakadGOLDEN VENTURES · P52100025780 · possession Sept 2022 · 100% built
- Skyways Esfera B Wing · LohegaonMoze Associates · P52100025786 · possession Oct 2022 · 81.8% built
- INDU GRACIA · ChikhaliVIJAY CONSTRUCTION NEXT · P52100025794 · possession Jan 2026 · 46.4% built
- Vaarivana Phase A - 2 · UrseSanjivani Integrated Township LLP · P52100025843 · possession Dec 2027 · 61.2% built · 5 complaints
- VARAD VIRAJ · DHAYARI PUNESHRIKANT HIRALALJI UNECHA · P52100025846 · possession Jun 2023 · 90% built
- GANGA MILLENNIA UNDRI BUILDING J,K,L,M AND N · HaveliMILLENNIA SCHEMES PRIVATE LIMITED · P52100025883 · possession Dec 2027 · 66.3% built · 1 complaint
- MIDORI TOWER PHASE 3 · HaveliVIKRAM DEVELOPERS AND PROMOTERS · P52100025886 · possession Sept 2027 · 73.4% built · 1 complaint
- Tanmay Pragati Villa · WakadPRITHVI ASSOCIATES · P52100025916 · possession Jan 2023 · 100% built
- SAI KUNJ · BAVDHANCHOULWAR CONSTRUCTION · P52100025939 · possession Jul 2023 · 56.4% built
- VENKATESH GRAFFITI GLOVER PHASE 2 · KESHAVNAGAR MUNDHWA PUNESHREE VENKATESH BUILDCON PVT LTD · P52100025956 · possession Sept 2025 · 90.9% built
- Sai Sanskruti · KharadiHORIZON REALTY · P52100025975 · possession Jun 2024 · 90.9% built
- GANGA ARCADIA A BUILDING · HaveliGOEL GANGA INDIA PVT LTD · P52100025978 · possession Mar 2027 · 33.1% built · 1 complaint
- Yashwin SukhNiwas · HinjawadiGROWISA ADVISORS · P52100025982 · possession Dec 2024 · 90.1% built
- The Legend Phase II · MulshiShree Sankalp Associates · P52100025986 · possession Dec 2027 · 81.8% built · 2 complaints
- Ephelia- Phase 1 · kondhwa khurdMajestique Giga Homes LLP · P52100025991 · possession Jun 2025 · 95.5% built
- Eastern River Residency Wing F · HaveliP52100026039 · possession Jun 2026 · 81.8% built
- GANGA AMBER PH II · MulshiSHRI SIDDHIVINAYAK DEVELOPERS · P52100026055 · possession Jun 2027 · 43% built · 23 complaints
- Estrella, Viva, Pirangut · MulshiK Raheja Corp Real Estate Private Limited · P52100026088 · possession Apr 2027 · 1 complaint
- 18 LATITUDE PHASE 2 · PUNAWALEGDSQUARE INFRA LLP · P52100026102 · possession Nov 2024 · 100% built
- DRUMADAL · Shivajinagar, BhamburdaRanjekar Realty LLP · P52100026105 · possession Mar 2024 · 55.5% built
- EWS- Akurdi · HaveliPIMPRI CHINCHWAD MUNICIPAL CORPORATION · P52100026117 · possession Dec 2023 · 23.3% built
- SPRING GARDENS PHASE - I · BORHADEWADIAchalare Realtors Private Limited · P52100026121 · possession Jun 2024 · 90.9% built
- NEST · NEAR ORCHID SCHOOLSKYLINE ENTERPRISES · P52100026122 · possession Dec 2021 · 72.7% built
- VISION ACE COMMERCIAL PHASE I · MulshiVISION ACE · P52100026126 · possession Sept 2026 · 72.7% built
- Vision Ace MHADA · OPP INDIRA SCHOOL NEAR AKSHRA SCHOOL TATHAWADEVISION ACE · P52100026135 · possession Oct 2022 · 59.1% built
- KUMAR PEBBLE PARK JOY 3 - C3 · HADAPSARKUMAR PROPERTIES AND PROMOTERS PVT. LTD · P52100026151 · possession Feb 2026 · 90.9% built
- Park Infinia - L2, L3, L4, K4, K5 and J4 · HadapsarKumar Properties and Real Estate Pvt. Ltd. · P52100026185 · possession Sept 2024 · 87.6% built
- Darekar Heights · TathawadeMangaldeep Radiant Developers · P52100026195 · possession Jun 2025 · 39.1% built
- HERAMB PLAZA · SOMWAR PETHBRICK NEST PROPERTIES LLP · P52100026196 · possession Dec 2026 · 81.8% built
- ANP MEMENTO · MulshiFive Star Construction Company · P52100026219 · possession Sept 2026 · 79.5% built · 17 complaints
- CASA ABRIGO · HADAPSARTECHSTONE CONSTRUCTIONS LLP · P52100026227 · possession Jun 2024 · 90.9% built
- UDYAM BIZ CASA · SaswadKADU PROPERTIES LLP · P52100026231 · possession Sept 2024 · 81.8% built
- AVNINDRA · HaveliATUL AMRUT DHANE · P52100026232 · possession Feb 2022 · 81.8% built
- GATHA HEIGHTS · CHOVISAWADIOMGATHA BUILDERS AND DEVELOPERS PVT LTD · P52100026233 · possession Oct 2021 · 72.7% built
- PRATHAM YASH VRINDAVAN II · CHOVISAWADIPRATHAM YASH BUILDERS · P52100026265 · possession Oct 2026 · 81.8% built
- PARKLANE URBANJOY- WING B · MulshiPARKLANE CONSTRUCTION LLP · P52100026272 · possession Dec 2027 · 41.4% built
- 41 EVOKE PHASE 1 · KOHALI GAS SERVICEKRIASLA ASSOCIATES · P52100026277 · possession Jul 2024 · 45.2% built · 2 complaints
- GEETANJALI NAMANA APARTMENT · AUNDHD & T PROPERTIES · P52100026286 · possession Jun 2023 · 100% built
- Ashanand residency Building D and E · KhedAnand Deoram Tambe · P52100026295 · possession Jun 2026 · 74.8% built · 1 complaint
- VJ Grand Central · WakadVilas Javdekar Eco Shelters Private Limited · P52100026304 · possession Dec 2024 · 89.5% built · 1 complaint
- KARMA ICONIC · HaveliKARMA BUILDERS · P52100026329 · possession Jun 2027 · 67% built · 2 complaints
- Mont Vert Kingstown Sector 1 Commercial Wing · BhugaonNiraj Kumar Associates Pvt Ltd · P52100026359 · possession Jun 2025 · 100% built
- Mont Vert Kingstown Sector 1 Residential Wings · MulshiNiraj Kumar Associates Pvt Ltd · P52100026366 · possession Jun 2026 · 60.5% built · 4 complaints
- VIRAJ HEIGHTS · DHANORIVENKATESH DEVELOPERS · P52100026384 · possession Aug 2023 · 90.9% built · 1 complaint
- SHUBH EVAN C1 WING · HaveliKALASH ENTERPRISES · P52100026420 · possession Aug 2026 · 90.9% built
- NYATI EVOLVE III · MUNDHWANYATI GEETA ASSOCIATES · P52100026448 · possession Sept 2024 · 96.2% built
- JOYVILLE HADAPSAR ANNEXE PHASE 1 · ShewalewadiJoyville Shapoorji Housing Private Limited · P52100026451 · possession Jan 2025 · 90.9% built · 3 complaints
- Joyville Hadapsar Annexe Phase 5 · shewalewadiJoyville Shapoorji Housing Private Limited · P52100026452 · possession May 2025 · 90.9% built
- Global Luxuria · AlephataDnyaneshwar Mahadu Jadhav proprietor of Global Construction · P52100026469 · possession Jun 2025 · 36.1% built
- Joyville Hadapsar Annexe Phase 4 · shewalewadiJoyville Shapoorji Housing Private Limited · P52100026478 · possession May 2025 · 90.9% built
- Joyville Hadapsar Annexe Phase 2 · ShewalewadiJoyville Shapoorji Housing Private Limited · P52100026479 · possession Jan 2025 · 90.9% built · 1 complaint
- Joyville Hadapsar Annexe Phase 3 · ShewalewadiJoyville Shapoorji Housing Private Limited · P52100026480 · possession Jan 2025 · 90.9% built · 3 complaints
- ESPACIO - COMMERCIAL · BALEWADIKNIGHT WEST REALTY LLP · P52100026492 · possession Jun 2025 · 81.8% built
- SUKHWANI NYSA · RAVETSUKHWANI LANDMARK · P52100026493 · possession Jun 2024 · 81.6% built
- Annapurna Smruti · Shukrawar PethGokhale Empires LLP · P52100026504 · possession Apr 2024 · 81.8% built · 1 complaint
- Shri Swami residency · RuiShri construction and developers · P52100026512 · possession Jan 2024 · 49.1% built
- NB Coral · SaswadGanesh Associates · P52100026536 · possession Sept 2023 · 88.2% built
- ACE AURUM III TOWER 02 · RAVETJHAMTANI REALTY PRIVATE LIMITED · P52100026568 · possession Jun 2025 · 48.1% built
- ACE AURUM III TOWER 01 · RAVETJHAMTANI REALTY PRIVATE LIMITED · P52100026571 · possession Jun 2025 · 43.5% built
- Sukhwani Ambar · MulshiSUKHWANI DEVELOPERS · P52100026576 · possession Jun 2027 · 35.4% built
- MUKTAI AANGAN PHASE IX · HaveliGEET GOVIND DEVELOPERS · P52100026597 · possession Dec 2028 · 52.7% built
- GULAB BHAKTI NIWAS · HaveliBUTTEPATIL PROPERTIES · P52100026603 · possession May 2023 · 81.8% built
- SAI DARSHAN · TATHAWADESAI SHRADDHA DEVELOPERS · P52100026605 · possession Mar 2024 · 29.1% built
- RANJEET HEIGHTS CO OP HSG SOCIETY · RAMBAUG COLONYRAJESH DINESH VYAS · P52100026612 · possession Oct 2023 · 81.8% built
- Shri Sai Park · KhedSachin Bapurao Khupse · P52100026618 · possession Dec 2027 · 48.2% built
- Leisure Town Phase 2 · HaveliSai Proviso Homes · P52100026621 · possession Dec 2027 · 29.2% built · 1 complaint
- VISION STARWEST PHASE - 2 · TATHAWADEVISION CREATIVE DEVELOPERS · P52100026625 · possession Dec 2023 · 90.9% built
- SHAGUN · Near Nal Stop , Karve Road , ErandwaneSIDDHESH DEVELOPERS · P52100026627 · possession Mar 2021 · 90.9% built
- TEJ MAYURBAN · Pune CityTEJRAJ PROFILE INFRA LLP · P52100026669 · possession May 2027 · 63.6% built
- Gandharva Excellence Project III H Building Part 2 · Borhadewadi MoshiVinayak Pandharinath Bhongale · P52100026673 · possession Jun 2022 · 36.4% built · 1 complaint
- UDYAM BIZBAY · SaswadKADU REALTY · P52100026686 · possession Jun 2023 · 90.9% built
- GULAB COURT · HaveliBUTTEPATIL PROPERTIES · P52100026687 · possession May 2023 · 81.8% built · 1 complaint
- ARCHANA PARADISE WING A · MOHAMMADWADIKANIFNATH REALITY · P52100026701 · possession Jun 2024 · 51.4% built
- PANCHADRI · Pune CityTEJRAJ PROFILE INFRA LLP · P52100026710 · possession Jun 2026 · 100% built
- BARCODE · HaveliRAMA VENTURES · P52100026713 · possession Jun 2026 · 81.8% built
- Green County Phase II Wing-B · FursungiAnand Developers · P52100026716 · possession Jun 2025 · 86.1% built
- TEJ AMEET · Model Colony ShivajinagarTEJRAJ PROMOTERS AND BUILDERS · P52100026725 · possession Feb 2025 · 100% built
- TRIDENT · PIMPLE NILKHDEU ASSOCIATES · P52100026732 · possession May 2024 · 36.4% built
- AMEY · Kothrud, PuneRanjekar Realty LLP · P52100026733 · possession Jun 2024 · 89.1% built
- VENKATESH GRAFFITI ELAN PHASE 2 · KESHAVNAGAR MUNDHWASHREE VENKATESH BUILDCON PVT LTD · P52100026737 · possession Jun 2024 · 90.9% built
- Godrej Park Springs · HaveliManjari Housing Projects LLP · P52100026739 · possession Sept 2029 · 26.3% built · 2 complaints
- BARCODE · HaveliESSEN VENTURES · P52100026749 · possession Jun 2026 · 81.8% built
- Vaishnavi Arcade Phase 2 · HaveliTrimurti Developers · P52100026757 · possession Dec 2028 · 15.9% built
- DESTINATION EL PROGRESO · MOSHI PRADHIKARANEL PROGRESO VENTURES · P52100026761 · possession Jun 2024 · 57.6% built
- AISHWARYAPURI C.H.S.Ltd. · KOTHRUDHARIVIJAY INFRACON · P52100026762 · possession Mar 2023 · 100% built
- ORIENT HILL VIEW · MOHAMMEDWADIBOKHARA BUILDTECH · P52100026764 · possession Jun 2025 · 90.9% built · 1 complaint
- VTP Aethereus- Phase1 · MulshiHOME RISING CONSTRUCTION LLP · P52100026772 · possession Jun 2026 · 100% built · 30 complaints
- JOYVILLE HADAPSAR ANNEXE PHASE 6 · ShewalewadiJoyville Shapoorji Housing Private Limited · P52100026779 · possession Sept 2025 · 80.3% built
- LAGOM HOMES · MulshiH S ASSOCIATES · P52100026791 · possession Jun 2026 · 75.5% built · 15 complaints
- Ambrosia Alley · HaveliAMBROSIA LANDMARK PRIVATE LIMITED · P52100026792 · possession Jun 2027 · 90.9% built · 1 complaint
- Palm Springs Phase 1 · VinodewastiDIVINE VENTURES AND LANKE BIRJE ASSOCIATES · P52100026794 · possession Jun 2025 · 81.8% built · 1 complaint
- Joyville Hadapsar Annexe Phase 10 · ShewalewadiJoyville Shapoorji Housing Private Limited · P52100026795 · possession Jun 2025 · 83.4% built
- Joyville Hadapsar Annexe Phase 9 · ShewalewadiJoyville Shapoorji Housing Private Limited · P52100026797 · possession Jun 2025 · 86.5% built
- Mangalam Breeze · Dudulgoan MoshiMetro Buildcon · P52100026808 · possession Jun 2026 · 57.7% built
- MY HOME KIWALE · KIWALERAVET LAND DEVELOPERS LLP · P52100026833 · possession Apr 2026 · 63.6% built · 3 complaints
- Sukhwani Artize · HaveliSukhwani Buildtech · P52100026850 · possession Dec 2028 · 80.6% built
- Gandharva Excellence Project III A Commercial A Building C Building · Borhadewadi MoshiVinayak Pandharinath Bhongale · P52100026856 · possession Jan 2024 · 29.8% built · 1 complaint
- WESTFIELD 3 · HaveliGRD INFRAPROJECTS PRIVATE LIMITED · P52100026904 · possession Dec 2026 · 76.1% built
- K City Phase 1 · KeshavnagarUnique Triaa Ventures · P52100026909 · possession May 2025 · 100% built
- ROYAL CASSIA B WING · HaveliMercury Artharaj Landmarks AOP · P52100026939 · possession Jul 2027 · 37.3% built
- Neco Beaumont · Nyati County, Ahead of Delhi Public SchoolVasupujya Corporation · P52100026961 · possession Jun 2024 · 100% built · 1 complaint
- PRIMUS · BANERRANADE BAGADE CONSTRUCTIONS · P52100026980 · possession Sept 2023 · 90.9% built
- SHUBHARAMBH CORNER · Havelisudarshan realities · P52100027006 · possession Dec 2030 · 49.1% built
- CHINMAY VAISHVA PHASE 2 · NEAR AMBEGAON PATHAR POLICE CHOWKICHINMAY VISHWA · P52100027024 · possession Jun 2022 · 72.7% built
- JAI BLISS · HaveliJAI CONSTRUCTIONS · P52100027040 · possession Dec 2026 · 63.8% built · 2 complaints
- Nikunj · HaveliDMBhosale · P52100027080 · possession Sept 2023 · 47.3% built
- PEACE PRIDE · HaveliPEACE CONSTRUCTIONS · P52100027097 · possession Dec 2027 · 27.7% built
- GANGA VASANT · Pune CityGANRAJ TOWNSHIP LLP · P52100027099 · possession Jun 2028 · 65% built
- 4 Taljai Hills Phase 1 · HaveliShri Taljai Mata Associates LLP · P52100027103 · possession Jun 2026 · 84.5% built · 1 complaint
- BELLACASA ROYALE TOWER / TYPE 'A' · SusRachana Lifespaces · P52100027124 · possession Jun 2027 · 90.9% built · 1 complaint
- SWARA BLOSSOM · HaveliBLUE SAPPHIRE VASTU NIRMITEE LLP · P52100027134 · possession Jun 2028 · 36.3% built
- ARNAV SOKANDE PATIL PLAZA · HaveliSOKANDE PATIL PROM & DEVELOPERS · P52100027150 · possession Nov 2026 · 70% built
- Sai Vivek · Santosh Bhondave Nagar, S. No- 77-4 RavetABHIJIT PRAKASH BORASE · P52100027160 · possession Apr 2024 · 100% built
- ECOPOLITAN PHASE II · MulshiIFTEKHAR PEERPASHAHUSSENI INAMDAR · P52100027161 · possession Jun 2026 · 100% built
- 9 VILLAS · Pune CityShri Balaji Housing Co. · P52100027173 · possession Dec 2027 · 85.5% built
- Kunal Aspiree Phase IV · BalewadiKunal Spaces Pvt Ltd · P52100027175 · possession Jun 2025 · 100% built
- COZY KARISHMA · HaveliMS COZY KARISHMA THROUGH PROPRIETOR MRS VIDYA SANTOSH HARGUDE · P52100027179 · possession Dec 2027 · 75.3% built
- AMAR ORNATE-II · HADAPSARMALOJI AND SONS · P52100027186 · possession Jun 2023 · 81.8% built
- MILLENNIUM PACIFIC · TATHAWADEMillennium Developers · P52100027204 · possession Mar 2024 · 89.1% built
- ABHANG RECIDENCY · HaveliSAI DEVELOPERS · P52100027212 · possession Jun 2027 · 56.4% built
- ARV Newtown Phase III · HaveliVedant Infracon · P52100027214 · possession Jun 2026 · 90.3% built · 1 complaint
- VENKATESH GRAFFITI GLOVER PHASE 3 - MHADA · KESHAV NAGAR MUNDHWASHREE VENKATESH BUILDCON PVT LTD · P52100027217 · possession Sept 2023 · 90.9% built
- Aditya Shagun · ChikhaliOgale Realty LLP · P52100027220 · possession Dec 2025 · 90.9% built
- AMARILLO PHASE 1 · HINJEWADI PHASE 1 , WAKAD ANNEXEkrrsna leela skyscraper llp · P52100027235 · possession Sept 2024 · 100% built · 1 complaint
- SAPPHIRE TOWERS · CHOVISAWADICHAURANG VENTURES · P52100027242 · possession Jun 2024 · 89.5% built
- Spring Field · HaveliSoham Developers · P52100027261 · possession Jun 2023 · 90% built
- KESAR VALLEY · HaveliBANSAL RIVERVIEW · P52100027291 · possession Jun 2026 · 87.9% built
- Savannah · wagholiSim Properties · P52100027297 · possession Jun 2024 · 51.5% built
- VAISHNAVI PRIDE · HaveliARUN SHRIPATI PAWAR · P52100027314 · possession May 2024 · 100% built
- LEGACY MILLENNIA A · PUNAWALEMILLENNIUM LEGACY DEVELOPERS · P52100027317 · possession Oct 2023 · 81.8% built
- Arunya A Wing · HaveliGM Buildcon · P52100027329 · possession May 2026 · 39.5% built
- AURALIA RESIDENCY · PUNAWALEANUSHREE AND JHAMTANI REALTY · P52100027347 · possession Feb 2025 · 81.8% built
- UNICON AKSHAR · HaveliMahalaxmi Creations · P52100027360 · possession Dec 2026 · 45.5% built
- SIGNATURE PARK E F I AND J BUILDINGS · MulshiSHREE SONIGARA REALCON · P52100027402 · possession Jun 2026 · 88.5% built · 46 complaints
- Majestique Signature Towers B5 · HaveliMAJESTIQUE HOMES LLP · P52100027411 · possession Jun 2026 · 100% built
- Blueridge-The Groves · HinjawadiNOVA DEVELOPERS PVT LTD · P52100027419 · possession Jun 2026 · 90% built
- 34 Western Pavillion · HaveliBLUE PEARL PROMOTERS AND DEVELOPERS · P52100027431 · possession Sept 2026 · 81.6% built
- ALANKAPURAM PH 3 A BUILDING · WADMUKHWADIR K Lunkad Housing corporation · P52100027434 · possession Mar 2024 · 81.8% built
- VRINDAVAN PARK · KADAMWAK WASTIMAP DEVELOPERS · P52100027482 · possession Apr 2027 · 43% built
- THE EVOQ · ASHOK THEATREFUTURISTIC HOMES · P52100027486 · possession Jun 2023 · 81.8% built
- SNEH PARK · KOTHRUDAssociated Recons LLP · P52100027499 · possession Dec 2023 · 72.7% built
- JUBILATE COUNTY · MulshiJUBILATE COUNTY · P52100027501 · possession May 2026 · 28.2% built · 7 complaints
- GOODWILL FABIAN PHASE 2 · LOHGAONChoice Developments · P52100027517 · possession Dec 2023 · 99.1% built
- Aaradhyam Phase II · TilekarnagarJairaj Developers Unit 11 · P52100027545 · possession Jun 2023 · 86.4% built
- Majestique Biznow · Kondhwa KhurdMajestique Springfields LLP · P52100027583 · possession Jun 2025 · 40.9% built
- La Vida - Phase 2 · BalewadiKakkad Properties · P52100027638 · possession Jun 2025 · 100% built · 1 complaint
- GANGA ASMI · MulshiSHANTI MOHAN DEVELOPERS LLP · P52100027644 · possession Jun 2027 · 59.3% built
- MAJESTIQUE MRUGAVARSHA PHASE II · DHAYARI PUNEMAJESTIQUE HERITAGE LIVING SPACES LLP · P52100027651 · possession Dec 2025 · 100% built
- SIDDHI-VIJAY · GULTEKADIBhairav Promoters · P52100027655 · possession Sept 2024 · 100% built
- THE CENTRUM · OPP SKYSCRAPERMANSION CREATORS · P52100027662 · possession Jun 2023 · 30.5% built
- Hillside Apartment 4th Floor · Talegaon DabhadePratik Chandrakant Bhide · P52100027682 · possession Jun 2023 · 94.5% built
- Vrundavan Heritage · SasvadKanha Properties · P52100027684 · possession Mar 2027 · 81.4% built
- PRATHAMESH RESIDENCY · MOHAN NAGARPRALHAD RAMBHAU SHIRSATH · P52100027691 · possession Sept 2022 · 90.9% built
- CORAL PARK PHASE 2 · CHOVISAWADIENKAY LIFE RELATORS PVT LTD · P52100027697 · possession Jun 2023 · 90.9% built
- CASA IMPERIA EWS · WAKADAum Sanskruti Housing · P52100027706 · possession Mar 2025 · 90% built
- World Two - Solitaire World · Pune CityClassic Promoters and Builders Private Limited · P52100027723 · possession Dec 2026 · 40.5% built
- GOLDEN WINDS Building D Phase 5 · Opposite D Y Patil Knowledge City Off Porwal RoadGOLDEN BRICKS DEVELOPERS · P52100027754 · possession Jun 2024 · 81.8% built
- Seeta-Govind · SADASHIV PETHRANADE REALTORS LLP · P52100027756 · possession Nov 2025 · 81.8% built
- ARYA · Pune CityZAHEER VAKIL ESTATES PRIVATE LIMITED · P52100027777 · possession Jun 2023 · 100% built
- GAGAN ALLURE PHASE 2 · HaveliGAGAN ALLURE PHASE 2 · P52100027825 · possession Jun 2026 · 47.5% built
- UNITAS FASHION CENTER · HaveliUNITATIS DEVELOPMENTS PVT. LTD · P52100027881 · possession Dec 2027 · 69.1% built
- IDEAL AVENUE · HaveliIDEAL BUILDERS · P52100027916 · possession Sept 2026 · 74.5% built
- Princetown Royal - B5 · UndriManikchand Kumar Properties · P52100027928 · possession Jun 2025 · 100% built
- SAI SAVLI · JunnarDEEPAK BALKRUSHNA REPALE · P52100027937 · possession Jun 2026 · 30.3% built
- SKYLER PHASE II · HaveliSKYLER PHASE II · P52100027949 · possession Jun 2026 · 44.5% built · 1 complaint
- Nakshatra Dreams 3 · SHIRUR GRAMINDream Keys Associates · P52100027972 · possession Jun 2024 · 100% built · 2 complaints
- Panchratna Hills Phase 2 · HaveliPanchratna Construction · P52100027976 · possession Jun 2026 · 81.8% built
- Peninsula C · PashanKumar Agro Products Pvt Ltd · P52100028012 · possession Oct 2024 · 100% built
- Eves Garden Phase VI · MundhwaSancheti Properties · P52100028017 · possession Jun 2024 · 100% built · 1 complaint
- VJ IndiLife · PashanVILAS JAVDEKAR GREENSCAPE DEVELOPERS LLP · P52100028030 · possession Sept 2024 · 86.8% built · 2 complaints
- YAHAVI-TOWER-1-OAK · OXFORD GOLF COURSEIMAGE REALTY PRIVATE LIMITED · P52100028031 · possession Jun 2024 · 81.8% built · 1 complaint
- Happinest Tathawade Phase-1 · MulshiMahindra Lifespace Developers limited · P52100028049 · possession Jan 2027 · 0% built · 1 complaint
- NAVKSHITIJ CHS LTD · HaveliVishwam Realtors & Developers LLP · P52100028051 · possession Jun 2026 · 81.8% built
- KRISHNA VIJAY · HADAPSARM/S RUDRA DEVELOPERS · P52100028074 · possession Jul 2025 · 72.7% built
- ACORN PARK PHASE I · wakadPANTHEON ASSOCIATES LLP · P52100028087 · possession Jun 2024 · 86.4% built
- Chinmay Heritage Phase 2 · Niranjan SocietyChinmay Heritage · P52100028113 · possession Nov 2024 · 63.6% built
- Shri Gurudev Samrajya E Wing · KhedVaishanavi Builders and Developers · P52100028115 · possession Dec 2022 · 42.7% built
- Godrej Green Vistas · MahalungeMahalunge Township Developers Private Limited · P52100028117 · possession May 2026 · 79.7% built · 11 complaints
- Sukhwani Euphoria · Near Kapil AkhilaSukhwani Buildtech · P52100028123 · possession Jun 2023 · 87.3% built
- GREENVILLE BUILDING A1 · HadapsarVision Realtors · P52100028126 · possession Jun 2024 · 90% built · 1 complaint
- SHREE CHINAR COOPERATIVE SOCIETY LIMITED · Ideal ColonySAACHEE INFRA · P52100028145 · possession Dec 2026 · 98.6% built
- Manhattan - I Building · WagholiMAJESTIQUE HOUSING LLP · P52100028152 · possession Jun 2025 · 100% built
- Anshul Ela E Building · Village MoshiM/s Anshul Rutuja Promoters and Builders LLP · P52100028177 · possession Oct 2026 · 90.9% built · 1 complaint
- CITY PLAZA · TALEGAON DABHADEShreenathji Construction LLP · P52100028180 · possession Dec 2026 · 100% built
- Altura · BanerSigma Housing · P52100028192 · possession Jun 2023 · 60.6% built
- UMAKANT ENCLAVE · HaveliMayuresh Constructions · P52100028216 · possession Dec 2029 · 62.3% built
- RAVINANDA AAMRAI PHASE II BUILDING B2 · HaveliOM SAI DEVELOPERS · P52100028220 · possession Dec 2028 · 77.7% built
- YashONE Infinitee - Phase I · Near Puneville ProjectVilas Javdekar Infinitee Developers Pvt. Ltd. · P52100028229 · possession Jun 2025 · 96.4% built
- Vrundavan Residency · HaveliSwamiraj Developers LLP · P52100028242 · possession Jun 2022 · 75.9% built
- ASMI PRIDE · MulshiM/S ICON DEVELOPERS · P52100028299 · possession Dec 2026 · 83.3% built
- MANSHA PHASE-II · HaveliM/S MANGAL SHANTI DEVELOPEMENT · P52100028315 · possession Jun 2027 · 80.3% built · 1 complaint
- Swami Residency · HaveliManik Sadashiv Mohite · P52100028342 · possession Jun 2026 · 86.4% built
- Sai Ramdas · HaveliRahul Ramdas Tupe · P52100028366 · possession Jun 2026 · 45.5% built
- RKH Pride · PimpriRKH Realty · P52100028377 · possession Jun 2024 · 100% built
- VTP Sierra Phase1 · MulshiPRASANNA DEVELOPERS · P52100028378 · possession Jun 2026 · 82.5% built · 15 complaints
- PRABHAKAR · CHINCHWADASHOK DINKAR RANAWADE · P52100028382 · possession Jun 2024 · 100% built
- SAI DWARKA · HaveliKRISHNA RAMA PROPERTIES · P52100028386 · possession Jun 2027 · 97% built
- Manhattan - B building · Wagholi PuneMAJESTIQUE HOUSING LLP · P52100028461 · possession Jun 2025 · 100% built · 4 complaints
- Westfield 23 · Cummins CampusGRD Westfield Realty LLP · P52100028463 · possession Dec 2026 · 90.9% built
- SKYRA EVERSHINE · MulshiANIL AMOLAKCHAND KANKARIYA · P52100028551 · possession Mar 2027 · 55.3% built · 1 complaint
- P S SANKALP · DHANORIP S DEVELOPERS · P52100028596 · possession Sept 2022 · 11.5% built
- UJWAL VIAAN A WING · DHAYARIUJWAL CONSTRUCTION · P52100028620 · possession Aug 2025 · 9.7% built
- Guardian Cityscapes Phase-3 · HaveliGuardian Homes Private Limited · P52100028630 · possession Jun 2027 · 90.2% built
- Yashwin SuperNova · Near Indira College, Wakad PuneVilas Javdekar Eco Shelters Private Limited · P52100028652 · possession Mar 2026 · 99.8% built · 1 complaint
- AKSHAY GALAXY - BUILDING B · YewalewadiA. P. BHANDARI DEVELOPERS · P52100028684 · possession Dec 2024 · 61.8% built
- Yash Grecia- E Wing · Pune CityAkshay Enterprises · P52100028705 · possession Sept 2026 · 100% built
- Metro Park County · BalewadiM/s. Dream Works Realty · P52100028748 · possession Sept 2025 · 95.8% built · 1 complaint
- VJ Town Centre · Near Indira College, WakadVilas Javdekar Eco Shelters Private Limited · P52100028755 · possession Sept 2024 · 84.1% built · 2 complaints
- Shubh Aarambh · DADACHI WASTISHUBH ASSOCIATES · P52100028760 · possession Mar 2024 · 90.9% built
- AURA DIVINE · Pune CityChandrashekhar Bhagwant Ghate · P52100028764 · possession Sept 2027 · 57.7% built · 1 complaint
- Sukhshanti Villas · TungarliYashant Ventures · P52100028766 · possession Dec 2030 · 50.1% built
- Majestique Towers East Phase 4 · HaveliM/s. Sharad Shree Enterprises, Sachin Date, Jayshree Date · P52100028813 · possession Jun 2026 · 59.5% built
- GOKHALE SERENITY · DHAYRISUDHIR MAHADEV GOKHALE · P52100028814 · possession Jun 2024 · 73.3% built
- Majestique Towers East Phase 3 · HaveliM/s. Sharad Shree Enterprises, Sachin Date, Jayshree Date · P52100028815 · possession Jun 2026 · 65% built
- SHREE GANRAJ COMPLEX · SuryanagariSHREE BUILTCON · P52100028826 · possession Sept 2024 · 100% built
- BALEWADI 37 · BALEWADInitin shamrao patil · P52100028844 · possession Apr 2024 · 72.7% built
- Kamalaraj Athens B and C · MulshiKAMALRAJ ESTATE · P52100028848 · possession Jun 2027 · 81.8% built
- Borawake Shilp · SatavvadiUrban Creations · P52100028860 · possession Jun 2024 · 77.3% built
- SACRED BASIL · HAVELI WAKADM/S INFINITY DEVELOPERS · P52100028883 · possession Jun 2025 · 81.8% built
- Imperial Plaza · HaveliImperial Landmarks Sachi My Home Developers · P52100028889 · possession Dec 2026 · 88.2% built · 9 complaints
- KAKADE- SANJEEVANI · NEAR BALADORBMK PROPERTIES PRIVATE LIMITED · P52100028898 · possession Jun 2023 · 70.5% built · 3 complaints
- LAXMI PURAM · HaveliUnknown · P52100028932 · possession Sept 2027 · 34.8% built
- Celestial City Phase II Building I, J, K · HaveliRAMA SYNERGY SPACES · P52100028977 · possession May 2026 · 99.9% built
- SILVER PARK · JunnarJAIHIND PROPERTIES · P52100028984 · possession Dec 2027 · 13.9% built · 1 complaint
- NYATI ELAN CENTRAL I · WAGHOLIPSQUARE BUILDERS LLP · P52100029005 · possession Apr 2024 · 86.4% built · 1 complaint
- NYATI ELAN SOUTH I · WAGHOLIPSQUARE BUILDERS LLP · P52100029008 · possession Apr 2024 · 86.4% built
- VIVEK APARTMENTS · SAHAKAR NAGAR NO. 2URBAN REALTY · P52100029010 · possession Mar 2024 · 100% built
- SOHAM GALAXY · PUNENANDU NARHARI JAGTAP · P52100029013 · possession Jun 2024 · 10% built
- Avika Periwinkle · BanerM/S Avika Buildcon Pvt Ltd · P52100029015 · possession Jun 2023 · 90.9% built
- SULOCHAN PARK · Vanaj ParamhansnagarASHWAMEDH SPACES PRIVATE LIMITED · P52100029020 · possession Aug 2023 · 90% built
- Riverdale Grove · HaveliDuville Estates Private Limited · P52100029023 · possession Jun 2026 · 50.5% built · 7 complaints
- GANGA AASHRAY · HaveliGOEL GANGA SPACE LLP · P52100029031 · possession Dec 2024 · 100% built
- YashONE Infinitee - Phase II · Kate WastiVilas Javdekar Infinitee Developers Pvt. Ltd. · P52100029042 · possession Dec 2025 · 93.3% built · 1 complaint
- JISHA ORCHID · RAHATANIYASH BUILDERS · P52100029044 · possession Mar 2022 · 81.8% built
- BRAMHA SKYCITY PHASE 3 · HaveliBRAMHA MULTICON PVT LTD · P52100029056 · possession Apr 2027 · 61.6% built · 1 complaint
- Shubham Tarangan Phase II · 1.5 Kms from Alephata Chowk toward Nashik, A/P - Ale, Tal - Junnar, Dist - PuneSHUBHAM VIPRA ASSOCIATES · P52100029066 · possession Dec 2025 · 78.9% built · 2 complaints
- SALEEL16 · SahakarnagarGANGOTREE GREENBUILD · P52100029108 · possession Dec 2024 · 81.8% built
- Priyadarshan - J · Jai Bhavani NagarKumar Agro Products Pvt Ltd · P52100029119 · possession Jan 2024 · 90.9% built
- Megapolis Mystic - F · Rajiv Gandhi Infotech Park Phase 3Pegasus Properties Pvt. Ltd. · P52100029121 · possession Feb 2025 · 90.9% built
- Keshar · HaveliBadhekar Properties · P52100029132 · possession Aug 2026 · 45.5% built · 1 complaint
- Casa Elanza · Pune CityParmaz Green Realty LLP · P52100029148 · possession Sept 2026 · 86.8% built
- SQUARE 9 · BHOSARISKYLINE BUILDERS & DEVELOPERS · P52100029157 · possession Jun 2027 · 80.5% built
- NAKSHATRA · Pune CityTIRUPATI DEVELOPER · P52100029163 · possession Dec 2026 · 100% built
- Chintamani Corner · RavetSudam Sitaram Kunjir · P52100029173 · possession Jan 2023 · 100% built
- GOLDEN NEST · WakadSAH DEVELOPERS · P52100029184 · possession May 2023 · 80.7% built
- BHALCHANDRA VIHAR PHASE - II / C · RAVETPOLITE BUILDTECH · P52100029204 · possession Jun 2023 · 74.5% built
- VARDHAMAN SQUARE · MawalINTELLA HOMES · P52100029216 · possession Dec 2028 · 86.4% built
- LOTUS AMAN · HaveliM/s. Lotus Aman Developers LLP · P52100029240 · possession Dec 2024 · 100% built
- Bhansali campus phase II · near sinhgad collegeG K Associates · P52100029257 · possession Jan 2028 · 90.9% built
- THE BUSINESS GATE · MOSHI, PUNEKesar Vasudev Properties · P52100029275 · possession Oct 2026 · 81.8% built · 1 complaint
- RUTUGANDH · MHASKARNES COLONY 2NAKSHATRA BUILDCON · P52100029278 · possession Dec 2023 · 63.6% built
- GULMOHAR PARK · CHAKANG G BUILDERS AND DEVELOPERS · P52100029279 · possession Dec 2028 · 84.8% built
- Indira Shankar Nagari Pushkar 1 & Pushkar 2 · HaveliELITE SHELTERS · P52100029290 · possession Feb 2027 · 29.3% built · 1 complaint
- AUSTIN ONE · HaveliAUSTIN REAL INFRA LLP · P52100029297 · possession Jun 2026 · 64.4% built
- PRISMA SQUARE · BORHADEWADI MOSHIprisma realty pvt ltd · P52100029300 · possession May 2023 · 100% built
- GARLI HERITAGE · PIMPRIGAONVSQUARE INCORP · P52100029334 · possession May 2023 · 52.3% built
- ALLURE · RAVETVINOD PREMCHAND CHANDWANI · P52100029341 · possession Jun 2023 · 100% built
- TRIDENT E F · MulshiPARANJAPE SCHEMES (CONSTRUCTION) LTD · P52100029377 · possession Dec 2027 · 34.1% built
- Revati Residency · BIBWEWADI MUNJERIGAURAV BHARAT SHAH · P52100029407 · possession Dec 2023 · 63.6% built
- LEGACY IVY · PunawaleLEGACY LIFESPACES LLP · P52100029412 · possession Jul 2024 · 77% built
- ARYAA DREAM TOWN · KhedVINI BUILDERS AND DEVELOPERS · P52100029439 · possession Dec 2026 · 36.8% built
- ARSH COMPLAX · HaveliMILAN DEVELOPERS · P52100029490 · possession Dec 2027 · 19.1% built
- L Axis Phase II Cluster C · HaveliPharande Promoters and Builders · P52100029497 · possession Jun 2027 · 78.5% built · 1 complaint
- SAI ARCADE · HaveliMaanvi Developers · P52100029509 · possession Dec 2026 · 100% built
- Puneville Phase III Cluster A · MulshiBenchmarrk Realty LLP · P52100029522 · possession Jun 2028 · 48.5% built · 27 complaints
- Godrej Hill Retreat · MulshiMahalunge Township Developers Private Limited · P52100029559 · possession Dec 2026 · 90% built · 58 complaints
- Sai Residency · MulshiSAI DEVELOPERS · P52100029569 · possession Dec 2026 · 74.7% built
- Sukhwani Niketan Phase II · HaveliSUKHWANI DEVELOPERS · P52100029575 · possession Mar 2027 · 80.5% built · 1 complaint
- Success Windsor Tower · HaveliSUCCESS INFRA · P52100029582 · possession Dec 2024 · 90.9% built
- Kalp Avenue · MoshiSuccess Aashirwad Infra · P52100029616 · possession Dec 2024 · 50.9% built
- 24 SUNSHINE TOWERS · CHIKHALISHIV ASSOCIATES · P52100029620 · possession Dec 2025 · 81.8% built
- Lonavala's Finest Phase2 · WaksaiRAHUL HANUMANT SATAV · P52100029628 · possession Dec 2026 · 63.6% built
- SARA SWAPNODAY · KhedJagrutsara Structures LLP · P52100029638 · possession Jun 2026 · 90.9% built
- Yash Grecia- D Wing · PuneAkshay Enterprises · P52100029639 · possession Mar 2026 · 100% built
- SPORTSVILLE · MulshiYELLOWSTONE SKYSCRAPERS LLP · P52100029650 · possession Dec 2026 · 74.7% built · 16 complaints
- SAHIL YASHIKA · KONDWA(BK)YOGESH OMPRAKASH AGARWAL · P52100029680 · possession Jun 2023 · 63.6% built
- Mangalam Icon · HaveliRamdas Damodar Phuge proprietor of Bhagyalaxmi Construction · P52100029682 · possession Jun 2025 · 63.8% built
- TANISHQ MANTHAN · HaveliTANISHQ PROPERTIES · P52100029684 · possession Dec 2026 · 72.7% built
- Kalpataru Jade Residences D · BanerAstrum Developments Private Limited · P52100029693 · possession Dec 2024 · 80.5% built · 1 complaint
- SAMARTH COUNTY · HaveliD A BORADE AND SONS · P52100029698 · possession Oct 2026 · 84.1% built
- TIME CITY · AlephataSUDHIR MARUTI NARAWADE · P52100029707 · possession Dec 2027 · 24.2% built
- Mont Vert Belcreek · BhugaonMont Vert Elegance · P52100029714 · possession Dec 2028 · 56.1% built · 27 complaints
- KAMAL CLASSIC · OLD SANGVIVENKATESHWARA BUILDCON · P52100029717 · possession Mar 2022 · 70% built
- U. S. Residency · LonavalaNew Modern Buildwell Private Limited · P52100029751 · possession Jun 2025 · 41.8% built